6.1j ERMUSR 07-12-2022��i Elk River � Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow — Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: July 12, 2022 6.1j S U BJ ECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Delivered 21 new water meters, sealed the meter, installed an encoder receiver transmitter, and took curb stop ties. • Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH • Completed 22 routine fluoride samples o All samples met MDH standards. o Submitted MDH Fluoride Report • Submitted Discharge Monitoring Report to the Minnesota Pollution Control Agency for the Diesel Generation Plant. • Collected 28 of the necessary 30 water samples from households throughout the water system for lead and copper testing. Staff contacted residents to ask if they would participate, delivered sample bottles with instructions to those who agreed, picked up the water samples, and sent them into a lab to be tested. The results will be sent to the MDH and each resident that participated. • Our annual Water System Leak Detection Survey has been completed. There were seven fire hydrants identified as having leaks, the water operators have been working on repairing the leaking hydrants. • The submersible pump that failed in the reclaim tank at the water treatment plant for wells 7 and 9 has been replaced. • Installation of the new water main in Natures Edge Business Center 3rd Addition has been completed. Water department staff have been working with Cargill and City staff to get water service to Cargill buildings from the new water main. ATTACHMENTS: • June 2022 Pumping by Well Page 1 of 1 100 June 2022 Monthly Pumping By Well �Well #2, 10.511, 8% Well #9, 13J1, 11% Well #8, 15.081, 12% Well #7, 15. Well #3, 15.356, 12% � �\ � � - Values Are Displayed in Millions of Gallons (Well #, Gallons Pumped, Percentage of Pumping) 101