Loading...
Information #3 10-17-2005 Minnesota Pollution Control Agency September 29, 2005 O('r t J <'OOS The Honorable Stephanie A. Klinzing Mayor, City of Elk River 13065 Orono Parkway P.O. Box490 Elk River, MN 55330-0490 RE: National Pollutant Discharge Elimination System (NPDES) Permit MN0020788 Compliance Monitoring Survey Dear Mayor Klinzing: On September 26, 2005, the MPCA staff recently completed a compliance monitoring survey of the city of Elk River's wastewater treatment facility. Mr. Gary Leirmoe accompanied us during the inspection and led a tour of the facility. As you will note in the attached inspection report, I did not find any deficiencies at the time of the inspection. The facility is well operated and maintained and the city does an excellent job of supporting its infrastructure. Thank you and your staff for providing such excellent service and answering our questions. Herschel Blasing North Central Regional Unit Brainerd Office Municipal Division HB :vms cc: Gary Leirmoe, Wastewater Operator, Elk River Jennifer Satnik, MPCA, St. Paul Eudale Mathiason, MPCA, St. Paul 7678 College Road, Suite 105; Baxter, Minnesota 56425; Voice (218) 828-2492; Fax (218) 828-2594; TTY (651 )-282-5332 S1. Paul · Duluth · Brainerd · Detroit Lakes · Marshall · Rochester · Mankato · Willmar; Web Site www.pca.state.mn.us Equal Opportunity Employer . Printed on recycled paper containing at least 20% fibers from paper recycled by consumers. Facility: Elk River Wastewater Treatment Facility Address: City Hall 13065 Orono Parkway Elk River, Minnesota 55330 Responsible Official: The Honorable Stephanie Klinzing Permit Expiration: 6/30/07 Phone: (763) 441-4918 Class: B Title: Mayor Operator: Gary Leirmoe Certifications/Expiration: Inspection Type: C Inspector Code: S Inspection Date: 9/26/05 Facility Type: M Transaction Code: N NPDES/SDS #: MN0020788 Facility Representatives Gary Leirmoe Titles Wastewater Chief Operator Inspectors Herschel Blasing, Brian Fitzpatrick, Chris Klucas - MPCA AREAS EVALUATED DURING INSPECTION Collection System N Process Control y Records y Lift Stations N Laboratory y Reporting y Flow Measurement! Maintenance Discharge Monitoring Instrumentation y Program y Reports y Treatment System y Sampling y Effluent Data Y Disinfection y Pretreatment y Compliance Schedule N DecWorination N Solids Handling y Other N 2 INSPECTION SUMMARY Herschel Blasing, Brian Fitzpatrick, and Chris Klucas of the Minnesota Pollution Control Agency (MPCA), conducted a Compliance Monitoring Survey (CMS) on September 26, 2005, to determine the Elk River Wastewater Treatment Facility's (WWTF) compliance status with the terms and conditions of its National Pollutant Discharge Elimination System (NPDES) permit. The CMS was conducted in the presence of Gary Leirmoe, Wastewater Chief Operator. Comments: The City has currently started going through their first phase of the Wastewater Treatment Facility upgrades and modifications which will result in replacing the anaerobic digester cover and cover for the methane gas storage facility. During our inspection, the digester was currently being worked on and plans for the starting work on the methane storage facility is scheduled for the spring of2006. The City is planning on replacing/installation of two new influent flow bar screens and will need to switch from influent flow measurement to effluent flow measurements for reporting daily flows. The City has hired Mr. Bill Chang from BDM as the City Engineer and I am requesting that Mr. Chang contact Mr. EuDale Mathiason, MPCA Project Engineer, regarding this change for approval. The City has sold off most of their land application of biosolids equipment and will be utilizing Fergus Power and Pump as a contract land application applicator. By December 31 of each year an Annual Land Application Report is due and even though the City has been hiring this work done, the City will still need to submit an Annual Land Application Report. Because of more stringent effluent discharge limits being required as permits are re-issued to Permittees, the City may soon have a phosphorus discharge effluent limit imposed. I talked with Mr. Leirmoe about this during the inspection and it appears that the City is already preparing for these future requirements and an additional phase project will be to upgrade to chemically treat for phosphorus removal. It was quite evident during the time of the inspection that Mr. Leirmoe and his staff are doing an excellent job of operations al1d maintena..llee at the wastewater treatment facility and I would like to commend them and the City for their hard work and efforts in helping to protect our resources. Corrective Actions: NONE Signature of Inspector ~.... Date r;_;;2~/CJ Comments and questions should be addressed to: Herschel Blasing Minnesota Pollution Control Agency 7678 College Road, Suite 105 Baxter, Minnesota 56425 3