Loading...
4.6 SR 08-15-2022Request for Action To Item Number Ma Tor and CinT Council 4.6 Agenda Section Meeting Date Prepared by Consent August 15, 2022 Matt Stevens Chief OpeYatoY Item Description Reviewed by High`va�T 169 Force Main Valve Installation ustin Femrite, Chief En ineer Reviewed by Cal Pormer, Cit�T Administrator Action Requested Approve, byT motion, attached quotation for installing a valve on the High`vayT 169 force main. Background/Discussion As a follow-up to the June 16`i' wastewater callout for water coming out of the valve pit at the Highway 169 lift station, we have identified the need to install valves on the three force mains that feed the wastewater treatment facilityT. The quote is foY the first of the three valves that are needed. The Highwayr169 foYce main is a priorityr since we will need to isolate this line in 2023 for planned modifications as paYt of the 969 Bedefine pYoject. Due to the laYge pipe diameter, there is on1yT one manufacturer of the valve required and veryT limited companies who can complete the installation. Brenteson Companies will act as our general contractor for the excavation with the support of Municipal Pipe Services who will cut in the new valve. The valves on the other t�vo foYce mains feeding the plant will be added to the CIP to complete next year. Financial Impact The cost of the valve installation is $50,930.00 and will come from our Trunk UtilityT Fund. Mission/Policy/Goal Meet changing needs - Agile Attachments ■ Brenteson Quotation The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. rowEREo ar �I'1 ���� Up�iited.• August 2020 P.O. Box 335 Big Lake, Minnesota 55309 Phone: 763-263-3100 ar Fax: 763-241-1798 Website: �v�vw.brentesoncompanies.com - Email: info(a�brentesoncompanies.com PROPOSAL To: Elk River WWTP Work Site: Elk River WWTP Attn: Matt Stevens Attn: Matt Stevens Address: 248 Railroad Drive Address: 248 Railroad Drive Ci /St/Zi : Elk River, MN 55330 Ci /St/Zi : Elk River, MN 55330 Phone: 763-274-8349 Date of Plan: NO PLANS Plan Sheets: Fax: Addenda: Quotation #: 1 Prepared by: Mike Loehrer Date: 07/27/2022 We hereby propose to furnish the material and perform the labor necessary for compleiion of ihe project as follows: Inclusions: • Mobilization • Excavate and expose existing 14" force main for valve insertion • Insert valve. • Pour concrete up to half the pipe diameter. • Backfill with onsite material. Exclusions: Hauling of trees or brush; hidden and buried debris; disposal of material with debris; soil correction; Sheeting, Shoring, Bracing, Etc.; insulation; traffic control; handling or testing of contaminated soil; soil conditioning; importing soil; exporting soil; soil correction in paved areas; soil testing; Class 5; Paving; dewatering; treating discharge waters; tree protection fence; maintain or repair erosion control; sweeping; soil beds for landscaping; lawn restoration; SWPPP Inspections; temporary erosion control; additional erosion control, required by any governing authority, that is not shown on the plans; concrete wash out; damage to public or private utilities, eXcept those correctly marked by Gopher State One Call; locating private utilities; cleaning up garbage/debris from other contractors; snow removal; winter conditions; Spring Road Restrictions; pipe bedding; SAGWAC; Permits; Bond and all other items not specifically included in the Inclusions above. All material will be provided, and work performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workman-like manner for the sum of: Brenteson Companies: $ 14,630.00 Municipal Pipe Services: $ 36,300.00 Total Bid: $ 50,930.00 **Temporary Hydro-mulch will be charge at $3.90 per square yard with a minimum of 300 square yard per eveni ** This Proposal is valid for no longer than 30 days from the date prepared and noted above. � Fuel Surcharge will be applied to all tPucking invoiced at the rate of I% for every $010 increase above $3. 50 per gallon. We will be using the weekly fuel rate as listed each Monday in the EIA. Website: www.eia.Qov/vetroleum/Qasdiesel �* Due to current supply chain issues, material pricing is based on availability at the time of bid and pricing is subject to change based on current price at time of shipping. Page 1 of 2 This Proposal shall become part of any Contract, as an Exhibit. Any alteration or deviation from above specifications involving eXtra cost will be executed only upon written orders and will be an extra charge over and above the estimate. All Agreements are contingent upon strikes, accidents, or delays beyond our control. Owner is to carry fire, tornado and all other necessary insurance naming Brenteson Companies, Inc. as an additional insured. Warkman's Compensations and Public Liability Insurance on above wark is to be taken out by Brenteson Companies, Inc. Owner: Quotation accepted by: Matthew Brenteson, BRENTESON COMPANIES, INC. Please sign and date above to accept this Quotation. Date Page 2 of 2