Loading...
6.1g ERMUSR 09-13-2022______________________________________________________________________________ Page 1 of 1 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Thomas Geiser – Operations Director MEETING DATE: September 13, 2022 AGENDA ITEM NUMBER: 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Staff has been attending meetings with Sherburne County to plan for the County Road 44 project. • Working on 2023 budget items along with the 2023 Fee Schedule. • We are still having issues with the fuse pads we received which were incorrectly assembled. The problem is that there are some loose parts, and the nuts and bolts are deteriorating. Irby Utilities is helping to facilitate a resolution to this issue. The vendor who sold the pads has 8 of the 12 left to fix at this time. • We made the switch from oil filled to open air switch gears. We can get two open air models for the price of one oil filled model. • Attending weekly Highway 169 Redefine project meetings. There are very small adjustments on the electric side of things. We are currently lowering 700 feet of 500 mcm feeder line along Dodge Avenue in front of McDonalds. • Attended Miske 8th addition pre-construction meeting. • Working on a plan for the new feeder line from the 14-4 substation down Parrish Avenue to Otsego to help back up the City of Otsego when needed. We will also replace equipment on the west side of Parrish Avenue with underground infrastructure and get rid of the overhead services that cross that road from the main three phase line. 113