6.1i ERMUSR 08-11-2020UTILITIES COMMISSION MEETING TO:FROM: ERMU Commission Mike Tietz –Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: August 11, 2020 6.1i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In June, the locating department had a total of 597 locate tickets consisting of 6 emergency tickets, 467 normal tickets, 2 boundary survey tickets,4 non-excavation tickets, 99 updated tickets, 7 cancellations, and 12 locate meets. This is a 16.2% decrease in volume of tickets from the previous month. • Electrical Technicians continue to do weekly meter reads, service orders, updating the power bill, weekly substation checks, dealing with customer meter issues and off-peak concerns. The electrical techs continue disconnecting the remaining off-peak radios on thesystemas time allows. Approximately 50% of the 496 radios have been disconnected at this time. • On July 23, staff ran generators #1, #2, & #4 without any issues. • Mapping department continues to update points and attributes for our systems assets within the ESRI ArcView GIS system. The AppSuite/ESRI integration is expected to be completed with the next iVue upgrade to version 2.48 on August 13. Staff continues to assist the water department with on-call rotation support. • Connexus Energy utilized a line recloser tie along Highway 10 on July 28 and 29 to provide power to their members while they did some work on their lines. MMPA has adjusted this usage off our July power bill. • EIR Testing & Maintenance Co. is repairing the three spare voltage regulators we had at the power plant. We plan to use these to replace the three on County Road 13 that need repairs. We anticipate having them in service by the end of August. • We took delivery of the replacement locator F150 pickup #14 from Elk River Ford on July 10. We will be sending the previouspickup #14 to auctionin September. ______________________________________________________________________________ Page 1 of 1 104