6.1e ERMUSR 11-12-2019 �j Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow—Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: November 12, 2019 6.1e SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Delivered 13 new water meters. • Sealed the water meter, installed an encoder receiver transmitter, and took curb stop ties from 20 water services. • Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH • Completed 23 routine fluoride samples o All samples met MDH standards. o Submitted MDH Fluoride Report • The water department completed the annual inspection of the Lake Orono Dam on October 2. The dam seems to be in satisfactory condition. • The contractor preforming the restoration work on Auburn Street Water Tower halted work for the winter on October 29.The temperatures are too low for the final paint coating to cure properly.They have done most of the structural repairs: sand blasted the old paint off, and applied a paint primer coating on the surface.They will continue work on the tower in April of 2020. This tower will remain empty for the season instead of Johnson Street Tower. Since Johnson Tower has double the water capacity of Auburn Tower, it will be more prone to freezing due to less water turnover. We are planning to install a mixer in Johnson tower. The cost of the mixer will be passed on to the contractor preforming the work at Auburn Street Tower due to them missing the contract deadline for completing the project. • Water Operator Eric Jean gave notice that his final day of employment with ERMU will be November 14. He has accepted a job opportunity in Alaska.The position opening was posted on November 5 with a closing date of November 22 • The water department has continued to locate and validate existing areas of the distribution system, along with locating new developments for addition to the map. ATTACHMENTS: • October 2018 Pumping by Well Page 1 of 1 233 i an C Q z E a 4- 0 o v CU NCtS N o v e m L.) m M v �]A O e-i m -a • rsi a }▪ r M 0 01 co 0 0 Cs! � 0 0 G : O p\ e-i v U O ui 4 O O 0)