6.1j EMRUSR 10-11-2022UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow – Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: October 11, 20226.1j SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: Delivered eightnew water meters, sealed the meter,installed an encoder receiver transmitter, and took curb stop ties. Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH Completed 21 routine fluoride samples o All samples met MDH standards. o Submitted MDH Fluoride Report Submitted Discharge Monitoring Report for the Diesel Generation Plant to the Minnesota Pollution Control Agency. With combined efforts of staff in many departments at ERMU along with Robyn Hoerr from Minnesota Rural Water Association and Terry Bovee Water Resource Planner, there is continued progress on a draft of part two of the Well Head Protection Plan revision. We are on track to meet the deadline for submitting the plan revision by February 2023. The existing roofing for the Well 3 water treatment building has been removed and replaced. This was part of the 2022 Capital Projects budget as the roof has reached the end of its lifespan and had developed leaks. th Water Department staff have been working with the contactor for Miske Meadows 8 Additionon performing water main shutdowns for connection of new water main pipe in that development. ATTACHMENTS: September 2022 Pumping by Well ______________________________________________________________________________ Page 1 of 1 106