Loading...
7.5 SR 10-17-2022Request for Action To Item Number Mayor and City Council 7.5 Agenda Section Meeting Date Prepared by Public Hearings October 17, 2022 Zack Carlton, Community Development Director Item Description Reviewed by Conditional Use Permit: Establish a Residential Chris Leeseber , Senior Planner Reviewed by Planned Unit Development, Jackson Hills Phase II, Briggs Companies Cal Portner, City Administrator Action Requested Approve, by motion, a Conditional Use Permit establishing a residential Planned Unit Development (PUD), with the following conditions: f 1. A PUD Agreement shall be developed and signed by both parties prior to issuance of a building permit. 2. Staff approval of landscape and lighting plans. 1 3. All utility meters shall be on an elevation of a building that does not face a public right-of-way. -- 4. The developer shall provide evidence that any long-term dewatering will not be detrimental to the stormwater system or as the long-term structural integrity of the proposed structures. 5. On -site soil mitigation must be monitored by a certified professional and building permits will not be released until a - RR . final report has been provided to the city. 6. Water service pipe over 2-1/2" in size shall be ductile iron. 7. Hydrants shall be spaced so that all portions of a building or `" residence to be protected are within a 250-foot radius of a - - hydrant. Final review by the fire chief and eity engineer. 8. There are at least eight existing water service stubs to this property; all unused water services shall be shut off and disconnected at the main, and the stop box shall be removed by IpII `A a licensed plumber or licensed sewer installer at the expense of t. the property owner. Figure I - Background/Discussion CU 22-17 - The applicant submitted a Conditional Use Permit to support multi -phase development of three 44-unit apartment buildings with different building designs and layouts similar to the first phase of Jackson Hills, constructed in 2018. Planning Commission Discussion The Commission reviewed the application on August 23, 2022, where they had numerous questions regarding the proposed project and development. Two residents expressed concerns on a handful of topics at the public hearing. The Commission continued their discussion to September 27, 2022. The Elk River Vision A nelcoming community nvith revolutionary and spirited resourcefulness, exceptional p Q w E H E U e T service, and community engagement that encourages and inspires prosperity ,� g /� Soil Suitability The subject site has poor soils not immediately suitable for construction. To ensure the site is buildable, the applicant is working with Independent Testing Technologies (ITT) to prepare a geotechnical analysis and recommendation. ITT completed an analysis for Jackson Hills V and monitored the soil remediation. Staff s recommended conditions would require the applicant to work directly with ITT during construction to ensure their recommendations are satisfied. Issuance of additional building permits should also require submittal of a final report from ITT indicating the site has been properly prepared for development. Public Utilities The Commission asked if existing public utilities have capacity to adequately serve the three proposed buildings. The property has been guided for high density residential uses since the first round of discussions with The Mississippi Connections Plan in 2006/2007 and long-term infrastructure plans have taken the development goals into account. The engineering department has reviewed the proposal and does not have concerns with the capacities of the existing trunk utilities as they relate to this project. Land Use Guidance Guided for high density residential, initial discussions state a goal for high density residential uses abutting Lion's Park. Although the current Comprehensive Plan moves away from explicit guidance provided by The Mississippi Connections Plan, the site continues to be guided for multifamily use. The plan notes these areas include higher density apartment and/or condominium complexes in a master planned setting with open space and recreational amenities. The sites' location near Lion's Park, downtown and schools is an appropriate fit for higher density residential uses. Traffic and Circulation Concerns were discussed regarding traffic and the impact on the local road network for which the applicant engaged a traffic engineer. The public works director reviewed the document and agreed with the findings of a negligible change to traffic counts, capacities, and wait times on the surrounding streets and intersections. He also reviewed the proposed driveway locations along Jackson Ave and their alignment with city streets on the east side of the road. The review did not identify any concerns with traffic or access. At the September 27, 2022, Commission meeting, after reviewing the traffic information and hearing comments from the public works director, they unanimously recommended approval with an add to condition number four related to the long-term structural integrity of the proposed buildings. Additional Public Comments The Council held and continued a public hearing on September 19, 2022, where two individuals spoke in favor of the proposal. After the Planning Commission, staff was also contacted by a resident that expressed concerns regarding the soil remediation and long-term structural stability of the site. Financial Impact None Attachments ■ Planning Commission Packet dated August 23, 2022 ■ Traffic Analysis and Study dated September 25, 2022 Request for Action ver To Item Number Planning Commission 4.4 Agenda Section I Meeting Date Prepared by Public Hearings August 23, 2022 Zack Carlton, Community Development Director Item Description Reviewed by Briggs Companies — Parcel ID# 75-134-2305 Chris Leeseber , Senior Planner Reviewed by ■ Conditional Use Permit for a Planned Unit Development Uackson Hills Phase II), Case No. CU 22-17 Action Requested Recommend, by motion, approval of the Conditional Use Permit establishing a residential Planned Unit Development (PUD), with the following conditions: 1. A PUD Agreement shall be developed and signed by both parties prior to issuance of a building permit. 2. Staff approval of landscape and lighting plans. 3. All utility meters shall be on an elevation of a building that does not face a public right-of-way. 4. The developer shall provide evidence that any long-term dewatering will not be detrimental to the stormwater system. 5. On -site soil mitigation must be monitored by a certified Hwy 10 professional and building permits will not be released until a final report has been provided to the city. 6. Water service pipe over 2-1/2" in size shall be ductile CR 33 3 RR I 1 • CR 12 iron. 7. Hydrants shall be spaced so that all portions of a building P� or residence to be protected are within a 250-foot radius of a hydrant. Final review will be made by the Fire Chief °'s9 and City Engineer. 8. There are at least 8 existing water service stubs to this property; all unused water services shall be shut off and Figure disconnected at the main, and the stop box shall be removed by a licensed plumber or licensed sewer installer at the expense of the property owner. The Elk River Vision A welcoming community nrith revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity P0WIREU�g0Y 1 14 f Background/Discussion The applicant has submitted a Conditional Use Permit to support development of three 44-unit apartment buildings. The project will be developed in multiple phases and building designs and layouts would appear like the first phase of Jackson Hills constructed in 2018. The subject site is currently undeveloped and sits at a low elevation. A wetland delineation did not reveal any existing wetlands, but the soils will be challenging for development. Comprehensive Plan The Comprehensive Plan guides this area for High -Density Residential uses, supporting the proposed apartment development. Engineering and Utilities The new apartment buildings will connect to city services, and all stormwater/utility plans will require approval from city staff. Applicable Regulations Conditional Use Permit/PUD The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: 9. mill not endanger, injure or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience orgeneral welfare of the neighborhood or the city. Surrounding parcels are largely developed; uses include Lions Park, single-family homes, a religious institution, and phase one of the Jackson Hills project. The proposed use will not detrimentally impact the use and enjoyment of nearby properties. 2. mill be consistent n4th the Comprehensive Plan. The property is guided for high -density residential uses, including apartment buildings. The use will be consistent with the Comprehensive Plan. 3. mill not impede the normal and orderly development and improvement of surrounding vacant propery. The surrounding area is largely developed, and the additional use is taking advantage of a unique parcel in the area. Although the development will require significant on -site soil mitigation, the use will not impede the normal and orderly development of surrounding properties. 4. mill be served adequateybj and mill not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, neater and sen.,er systems, parks and schools; and mill not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. Staff has included a condition of the developer to verify long-term dewatering impacts, ensuring no negative impacts to city facilities. With the included condition, the use will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal, water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. S. mill not involve uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to any persons or properly because of excessive traffic, noise, smoke, fumes, glare, odors, dust or vibrations. The proposed residential use will not involve uses, activities, processes, materials, equipment, or conditions that will be detrimental to other properties. 6. mill not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance. The site is a large, undeveloped, low-lying area with unstable soils not meant for development. To create a buildable site, the project will require significant on -site mitigation of soils. To address these concerns, staff has included a condition requiring independent review and testing by a certified professional. There are no natural or historic features of importance in the surrounding area. 7. mill fully comply with all other requirements of this Code, including any applicable requirements and standards for the issuance of a license or permit to establish and operate the proposed use in the city. The conditions included in the recommendation for approval along with the deviations approved with the PUD agreement will ensure the subdivision will fully comply with all requirements of this code and the agreement. Additionally, Sec 30-1564 describes the standards for establishment of a PUD district. 1. Land will be -oned into the PUD -oning district only upon approval of a conceptplan for the PUD, pursuant to the procedure set forth in this section. A PUD will be authoriTed on land in a PUD Toning district only upon issuance of a conditional use permit, pursuant to the procedure set forth in this section. A Conditional Use Permit will be issued in accordance with the above standards. 2. The uses allowed in a PUD shall be limited to land uses consistent with the tit y's comprehensive plan and land use map, and to those uses identified in the conceptplan for the PUD Zoning district and the conditional use permit for the PUD. The Comprehensive Plan and land use map guide this area for high density uses, which includes apartment buildings. 3. The area of land to be included in a PUD shall be in uniform control of the applicant. The applicant will be in control of all parcels prior to recording the CUP. 4. A PUD shall be designed to form a desirable unified environment within its proposed boundaries, including uniform design elements, landscaping,, lighting and signage. The PUD is designed as one project with uniform design elements throughout the project area. 5. A PUD shall not cause undesirable impacts on adjacent lands and land uses. In particular, uses on the PUD perimeter shall be compatible with adjacent uses outside the PUD. Nearby land uses include city parks, single-family homes, religious institution, and an apartment building. Staff does not identify undesirable impacts on adjacent land uses. All parcels are consistent with the Comprehensive Plan. The PUD will not cause undesirable impacts on adjacent lands and land uses. 6. A PUD shall be served by adequate transportation, water, sanitary sewer and drainage systems. The project area will be served by public services and will not adversely impact transportation networks within the area. 7. A PUD shall not adversely affect existing or proposed parks, schools, streets or other public facilities. Existing public facilities are not impacted by the proposed project. 8. The council may establish varied and reasonable lot area, frontage, side yard, and setback requirements for a PUD and may author'.Ze a density which it determines to be appropriate under the circumstances. Any permitted density shall be consistent with the tit .y's comprehensive plan and not adversely affect the public health, safety and welfare. The proposal is consistent with densities described in the Comprehensive Plan, setbacks from public rights -of -way, and design standards for similar developments within city code. All deviations will be outlined in the required PUD agreement. 9. More than one principal building may be constructed on a lot within a PUD if author"-ed by the council. Unless othena ' permitted by the council, a PUD shall comply with the schedules of dimensional regulations set forth in this article, except that individual lots shall have no less than 80 percent of the minimum area for similar uses. The project does not conflict with standards described in city code. In reviewing the standards for approval of a Conditional Use Permit and Planned Unit Development the proposed project meets the standards and is recommended for approval with the outlined conditions. Financial Impact None Council Meeting If acted on, this item will go to the September 19, 2022, City Council meeting. Attachments ■ Location Map ■ Applicant's Narrative ■ Site Plans ■ Building Elevations I )- i- 1-1.;C ; I ' I 75 - 12-03 40 4, 75-412-0330 75-412-0320 z 75-412-0310 75-134-2305 7m,street 1p %75-4i2_0225, 9 1 *= Pith treat Northwest A 75-13 42309 110606 3 sit M • 75-13 17 !r it {� • jae jL Pat Briggs Zone Change &Conditional Use Permit 423'6 r lli 57N . Jwest 12-0230 s 12 -023 SJL r ttt s a e 12.0240 - - I r2-g�c-vwv ` �� � 5ttt Str et Nolthw_esi,, f Case No: ZC 22-08 CU 22-17City of Elk River Jackson Street Apartment Narrative To construct a New 44 unit, 3 story Apartment Building in 2024, 2026,2028 each phase will include 4---Studios, 13-- 1 Bedroom Suites, 9-- 2 Bedroom Suites, 8 2 Bedroom Suites/w/Den, and 103 Bedroom Suites. 44 Total Units. -1st floor exterior fagade would include 6" EDCO Steel siding & Cultured Stone on the North, East and West elevation. Maintenance free decking. 44 Covered parking stalls and 47 Uncovered parking stalls which is a total of 91 stalls/44= 2.1 stalls per unit. landscape design to be completed once civil plans are approved. as as a condition of Final PUD. The comprehensive plan is zoned PUD. Proposed objectives are to Design, construct a family orientated multifamily apartment building close to Employers, schools and downtown businesses to accommodate the changing housing environment. Thank you for giving us this opportunity to work with and be a part of The City of Elk River Housing Efforts. Patrick Briggs 612-919-1561-pat@thebriggscompanies.com Jackson Street Apartments Amenities 1. Washer/Dryer hook-ups in every unit 2. Fitness Room 3. Community Room with kitchen, tables, furniture & Wi-Fi 4. Theater Room 5. Resource Center 6. Arts & Crafts Room 7. Elevator 8. 10 foot ceilings with vaulted ceilings on 1st floor 9. Stainless Steel Appliances 10. Designer Lighting 11. 2 panel doors with Brush Nickle hardware levers with Key Fob access entrance doors 12. Controlled Entry 13. Surveillance throughout entire community 14.Onsite Management 15. Package Receiving 16.Outside Patio 17.Outdoor Seating 18. Heated Parking 19. High Speed Internet 20. Balconies 21. Car Wash 22. Pet Wash Station S 4I ❑ am-az�zs I IE � e ss _ /// III I �Im �_ + - fiasw I 0 1 gym- / — —\ u — — I " -jlll-lill lii ,33 I II - II »,-ems II � �IN !� ti aw I �—AII "IJII xex III ass �, A Ili GRAPHIC SCALE Ell s.00 ,o (IN FEET) .o ADOI xx no r �I Apo YYN v v rt Imo— �JI I I I I a �nan ao tt III"i B- �,'V� ao> PHASE 3 m m* N W PROPOSED 44-UNIT III I$^ �I " IomoAf fl IIII = APARTMENT BUILDING AREA=26,184 SF I czi � I li I I 4� 45' 5 Nrc I FFE=903 D0 -.- .ry z �s�33 ev it n mxwoc""` I z —� Ilil Ire IIII l I I i I � I I V �ssnLLs exxmm �I I I IIi ��09„ li u I � N II Nx 2 sa�ia ,e ° UffRw� o aa, `�azR R oa , nb — ---- ------ — ----- h— FgH_Aso s: — M ,4CKS0 is �3 eZ E) ��.5SOJ Y &20 (� Z - - ___ ------ a o N Nn vo ee i-c. asw ,we c eoas7 Q } ,.E aeaoo (EJ/ oa !) l is evz.s Fc-so y J of (c11 a14 1 /lE) H ti NOTES: 1. RASE PLAN USED IS A BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED BY BOGART, PEDERSON & ASSOCIATES, INC. Ul I cn 2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE Q APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS = AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL cn CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -CALL cn 1L ~ Q W ONLINE OR Z BY CALLING 811 OR 1-800-252-1166. O 0 0 < TH 3, ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE Z � OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS U1 Z 0 OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF ENROL 0 STANDARD SPECIFICATIONS FOR CONSTRUCTION. — In = 0 0 4, TOTAL LOT AREA = 285,9 SURFACE SF (6.56 ACRES) 0 > GS EXISTING IMPERVIOUS SURFACE AREA = 5,802 SF (1-0%) — PROPOSED IMPERVIOUS SURFACE AREA = 159,408 SF (55.8%) Y D' m REVIEW PLAN Qw °� NOT FOR CONSTRUCTION c_1 n 1 I X ------------- -----++—---—o------ ---� — 111 I I� IT III II I X —LII I la 9 — 1� ro I Imo— �II .I a a IIII.�>o .III }�ili lo(z nDzo> xl I I �IIiI °T Ii2 IIII o .. >I� Y IIII 7� III F� lrloo a ao II II III � � ool� � o �yeg/ II IIN IIIV/„••,;;;� �� `���1\L_-_JIII III III PHASE 3 PROPOSED 44-UNIT APARTMENT BUILDING AREA=26,184 SF FFE=9D3.DO II � i ee 9 ��� � ov o NA�o ee, I � �n � �� .o �o 00 — =v Y o _ ass r—TI e9 a — — a9s U�_� � ,4CKSOV AVENUE —_ — --- --- NOTES: 1. BASE PLAN USED IS A BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED BY BOGART. PEDERSON & ASSOCIATES, INC. 2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE -CALL ONLINE OR BY CALLING 811 OR 1-800-252-1166, 3, ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 4, THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED FOR EROSION AND SEDIMENT CONTROL DURING THE SITE DEVELOPMENT PROCESS: A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK ENTRANCE) AS SHOWN ON THE PLANS PRIOR TO START OF WORK. B. NO CONCRETE WASHOUTS ARE ALLOWED ON THE PROJECT SITE. SOIL STOCKPILES SHALL HAVE PERIMETER CONTROL AND HAVE TEMPORARY SEED AND MULCH. C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED- INSPECT TEMPORARY EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH 1/2' OR MORE RAIN EVENT. CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE EFFECTIVE. REPLACE DETERIORATED, DAMAGED OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. D. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF DEPOSITION- REMOVAL OF TRACKING MATERIALS SHALL BE COMPLETED AT THE END OF EACH WORK DAY WHEN IT OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF CONDITIONS WARRANT. E, PERFORM SITE REMOVALS, GRADING, EXCAVATION AND EMBANKMENT, SEED AND MULCH ALL DISTURBED AREAS OUTSIDE OF PROPOSED GRAVEL, PAVEMENT AND BUILDING AREAS WITHIN 72 HOURS OF THIS WORK, F. INSTALL UTILITIES AND CONCRETE PAVEMENT OR GRAVEL SECTION, FINE GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT VEGETATION OF SOD/SEED PER PLANS. THE STORMWATER INFILTRATION AREAS SHALL BE STABILIZED WITH MNDOT #35-241 NATIVE SEED MIX APPLIED AT A FATE OF 36.5 LBE PER ACRE- G. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER SITE HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED WITH AT LEAST 70% COVERAGE- ® V GRAPHIC SCAIN FEET LE I-F a.1 8�3 n tl z a (� J ZO d' �O J Z Q O it In OW N (n Vn < 0 _ (n O Z Z Q d � cn Z J _ 0 U In w 0 > In � Y CD 0 w CO REVIEW PLAN Qw °UT NOT FOR CONSTRUCTION C_2 LE IL ILI uj/ I I I LL, Lai L F, MI 1-11 LE LIJLU F I JUM LAI LUUJI.o AL M Tj ED Eli L UL OL—Li J�, M [D IL a. ILI ab-, ��l LL::::::: ;71 ��l STUDIO AAND B L OM 2 11"-1'-D" wTnS, Ill Ill (AE.1FT) il4"— GOOgSS5-1B OWeGIFD APPLIANCE NOTES: sHaLL CGm..I WITH SECTION eoa55. [Al 17,1 SECT eoa 5 A AR ' LOOP BE PRO' THE 0' AN DO OR UT HE 0' AN jai iET eMEE e LNOTo BETRGCT THE CLEAR FLGGR SPACE F OR TIE GAIN 8 BE GED DOOR EDCM. LAoTN'04PPODTAEToTHETHSIDE OF THE OVENR�S SHALL 1 YING 80 3 Pogo NED ADJACENT To ONE SIDE ROOR I OTTOM IT DIED DOOR ENS 8 HALL HAVE A WORK SURIACE [Al171 11 THE 5 CONTRO IB SHALL NOT REG GIBE REACHING ACROSS LOCAL ON �. FSECT Sol55 4 1 NOT T SUNK TALI BRILOOGO4 R SPACE FOR THE DISHWASHER O RAN ADTACENCLEAR EAPPLANceiACEE i HAL BE 011i ET zn MA. PRO M THE CPNTERLNE GF ROOM FINISH SCHEDULE - UNITS NOTE. ROOM NAME FLOOR BASE WALLS CEILING NOTES 1. <i DENOTES WALLTYPE -SEE SHEET MAT'L MANUF MAT'L FINISH HGT MAT'L FINISH GYP BY PAINT A4.0 FOR WALL TYPES 2.(1) DENOTES DOOR TYPE -SEE SHEET A8.0 FOR DOOR SCHEDULE C.EETE TOPPING CONETCO OR CPTWOOD GYP BY PAINT SEE PIN FOR CARPET LOCE TOPPING CONETCO I RUBBER GYP BY G­ a O U 0 w U 0 w Of m x ui 0 z L ONE BEDROOM - 1C ADA 1/4" - 10. � IIIII141111I141111I141111I1411111 1141111114111111141 Illlrllll �� IIIIl141II1l141II1l141II1l141IIII IIII IIII IIII III _ i � i_ IIII 111111111141111114111111411111141 �,I_I:II:11�1111114h'4'4�1'4'4�1'll��ll!' r !I �, :i I,hIIII � Iq II IIIIIIIIIIII� �Iq li.lil611,ulI Ir I IIIs I�il Il�IIII�II,IIII Ill�il� !I Illl:i�,h��l� Ir 11I IIII 1�1i II�! !I ��II �'� II �I� I'IIIq IIIl�,I . ,IIII �r�il I `n ONE BEDROOM - 1 D `.n ONEOM-1E BEDRO NOTE: 1.0 DENOTES WALLTYPE -SEE SHEET A4.0 FOR WALL TYPES 2. () DENOTES DOOR TYPE -SEE SHEET A8.0 FOR DOOR SCHEDULE ROOM FINISH SCHEDULE - UNITS a O U 0 DO U 0 DO Of DO x ui 0 z L C n TWO BEDROOM — 2A U ,'4.-„0. I-,oa,-,- ­ ', TWO BEDROOM — 2C ­Tzos,3os �ssaoFn TWO BEDROOM — 2B NOTE: 1. U DENOTES WALLTYPE —SEE SHEET A4.0 FOR WALL TYPES 2. (-) DENOTES DOOR TYPE —SEE SHEET A8.0 FOR DOOR SCHEDULE ROOM FINISH SCHEDULE — UNITS ROOM NAME FLOOR BASE WALLS CEILING NOTES MAIL MANUF MAT'L FINISH HGT MAIL FINISH 11—Y — E a O U 0 w U cl Of w w DO uJ F- F- O z n THREE BEDROOM - 3A 0 ° LADN. �r O0 BATHROOM BATHROOM KITCHEN O I C 1 CLOSET t BEDROOM BEDROOM ❑ LIVING ROOM e � II I III n n TWO BEDROOM - 2D @ @ @ 0; 1— PATI 112 THREE BEDROOM - 3B NOTE: 1. U DENOTES WALLTYPE -SEE SHEET A4.0 FOR WALL TYPES 2. () DENOTES DOOR TYPE -SEE SHEET A8.0 FOR DOOR SCHEDULE ROOM FINISH SCHEDULE - UNITS ROOM NAME FLOOR BASE WALLS CEILING NOTES MAT'L MANUF MAT'L FINISH HGT MAT'L FINISH .—T FREE I AR.AllL. L�C `o U Gl O U G1 t U Q N O W U '3 � N N 0 = f6 O U c c O w Y w 3 � O a � � m v� a UNIT PLANS O AS NOTED A6.3 THREE BEDROOM - 3C AND TWO BEDROOM 2E + DEN L THREE BEDROOM - 3D AND TWO BEDROOM 2F + DEN NOTE: 1. U DENOTES WALLTYPE -SEE SHEET A4.0 FOR WALL TYPES 2. (-) DENOTES DOOR TYPE -SEE SHEET A8.0 FOR DOOR SCHEDULE ROOM FINISH SCHEDULE - UNITS `o U Gl O U G1 t U Q N O W U '3 � N N 0 = f6 O U c c O w � Y � 3 � w O � � m v� h� UNIT PLANS O AS NOTED A6.4 THREE BEDROOM - 3E AND TWO BEDROOM 2G + DEN THREE BEDROOM - 3F AND TWO r,--F BEDROOM 2H +DEN NOTE: I I 1.0 DENOTES WALLTYPE -SEE SHEET A4.0 FOR WALL TYPES 2.(-) DENOTES DOOR TYPE -SEE SHEET UNIT PLANS A8.0 FOR DOOR SCHEDULE ROOM FINISH SCHEDULE - UNITS ROOM NAME FLOOR BASE WALLS CEILING NOTES MAIL MANUF _­ JMATL FINISH HGT MAIL FINISH LE ECA T111111 -REFT 11 Y AS N.FFEO NI NETC1 1111 FEE, ,NT T111 RINE - IR-N. NI.FER T1111N. REFT - y, F, 'A A! T1111NE RINETC1 IF C-111 AINT FREE A6.5 11NIRY T1111N. KFNETC1 RIFFER WIFE L -1 S' TRAFFIC SOLUTIONS September 25, 2022 To: Pat Briggs, The Briggs Companies From: Vernon Swing, PE Re: Traffic Study — Jackson Hills Apartments — Phase 2-4, Elk River, MN Per your request, SZ Traffic Solutions, LLC has reviewed the traffic impacts associated with the completion of phase 2-4 of the Jackson Hills Apartments (hereafter referred to as Proposed Project) in Elk River, MN. The Proposed Project will complete 132 low-rise multi -family apartment units, and will be accessed via 4 driveways, two from Jackson Ave NW and two from 6t' Street NW, however, for the purposes of this analysis the site access is assumed to occur at one location directly from Jackson Ave NW. The site is located adjacent to the west side of Jackson Ave NW and is south of School St NW, and for the purposes of this analysis the Proposed Project is expected to be fully occupied by 2025. (See Attached Vicinity Map and Site Plan.) To determine the impacts to the traffic capacity of Jackson Ave from the Proposed Project, traffic data collected by MnDOT was acquired, the trip generation of the proposed use was forecast, and traffic queuing analysis was conducted. This memorandum summarizes the findings. Traffic Counts The traffic data used in this study was acquired by SZ Traffic Solutions from MnDOT including AM and PM peak hour turning movement counts at the intersections of Jackson Ave NW and TH 10, Jackson Ave NW and TH 169, and School St NW and Freeport Ave NW. These counts were used to estimate the existing traffic conditions at Jackson Ave NW and School St NW. The existing traffic volumes are shown on the Figures Below. Also, the daily traffic volumes from MnDOT (5200 trips per day) on Jackson Avenue near the site are used to identify the roadway capacity with and without the project. 1 I P a g e Scooters Coffee, Mankato, MN Existing AM Peak Traffic Future Conditions Existing PM Peak Traffic To quantify the impacts of a development on the surrounding roadway system, it is necessary to first forecast and analyze traffic conditions that would be present on the roadway system without the inclusion 2 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN of the proposed project. For this study, it is anticipated that the Proposed Project will be completed and fully occupied by 2025. Review of historical traffic counts in the vicinity of the site suggest traffic has declined over the last 20 years, however, to provide a conservative analysis this study assumes traffic will grow at an annual rate of 0.5 percent through the 2025 design year. The figures below illustrates the No - Build traffic volumes for year 2025 with the growth factor applied to existing traffic volumes. 2025 No Build AM Peak Traffic 2025 No- Build PM Peak Traffic . VIZ maw 3 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN Trip Generation and Distribution The trip generation for the Proposed Project discussed in the introduction has been estimated based on the methodology described by the Institute of Transportation Engineers (ITE) in Trip Generation, 1 I" Edition. The ITE land use code coinciding with the development is Code 220 for Low -Rise Multi -Family Housing. Table 1 summarizes the findings. Table 1 Trip Generation Forecast Land Use AM Peak Hour PM Peak Hour Daily Trips Enter Exit Enter Exit Low Rise Multi -Family (132 Units) 13 Trips 40 Trips 42 Trips 25 Trips 890 Trips TOTAL 53 Trips 67 Trips 890 Trips The ITE data indicates the Propose Project will generate 53 trips during the AM Traffic Peak, 13 entering and 40 exiting, 67 trips during the PM Traffic Peak, 42 entering and 25 exiting, and 890 trips per day. These trips were assigned to the local street network through a single access point onto Jackson Ave NW to test the impact of a 100 percent concentration at one location (very conservative and not likely since there are four driveways with the development). The distribution of site traffic to area roadways is based on existing traffic patterns in the area and travel times from Google Maps and Apple Maps. In general, 20 percent of site traffic is destined to/from the north, 25 percent to/from the west and 55 percent to/from the south and east. The figures below illustrate the trip assignment. 4 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN AM Peak Trip Assignment PM Peak Trip Assignment —ice+ - • _ - - — _i �• School St WWFM V •i� '14 M l 5 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN The trip assignment shown above has been combined with the 2025 No Build Traffic volumes to generate the 2025 Build traffic volumes shown on the Figures below. 2025 Build AM Peak Traffic 2025 Build PM Peak Traffic 6 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN Traffic Operations The operating conditions of transportation facilities, such as roadways, traffic signals, roundabouts and stop -controlled intersections, are evaluated based on the relationship of the theoretical capacity of a facility to the actual traffic volume on that facility. Various factors affect capacity including travel speed, roadway geometry, grade, number of travel lanes, and intersection control. The current standards for evaluating capacity and operating conditions are contained in Highway Capacity Manual'. The procedures describe operating conditions in terms of driver delay represented as a Level of Service (LOS). Operations are given letter designations with "A" representing the best operating conditions and "F" representing the worst. Generally, level of service "D" represents the threshold for acceptable overall intersection operating conditions during a peak hour. The Chart below summarizes the level of service and delay criteria for signalized and unsignalized intersections. Level of Service Description Delay (sec) Signalized Unsignalized/ Roundabout A Primarily free -flow operation. 0-10 0-10 - - - - - - - - - - - - - - - -- B Reasonably unimpeded operation. >10-20 >10-15 --- - - - - -- — - - - -- Kill C operation. The ability to maneuver is more restricted than LOS B. >20-35 >15 25 _ _ _ _ _ _ _ _ _ _Stable ' L,v D Less stable operation. Small increases in flow may cause large increases in delay and reduced speeds. >35-55 >25-35 -6--* ;001 ;001 ----------------- o_%' co ; Unstable operation. Low speeds and considerable delay. >55-80 >35-50 -rV 151 _ 001 - ( 7 . ,. (! Lam_-- Congested operation. High delay and extensive queuing. >80 >50 For side street stop -controlled intersections special emphasis is given to providing an estimate for the level of service of the minor approaches. Traffic operations at an unsignalized intersection with side street stop -control can be described two ways. First, consideration is given to the overall intersection level of service. This takes into account the total number of vehicles entering the intersection and the capability of the intersection to support these volumes. Second, it is important to consider the delay on the minor approaches, since the mainline does not have to stop. It is common for intersections with higher mainline traffic volumes to experience increased levels of delay and poor level of service on the side streets. 1 Highway Capacity Manual (HCM), Transportation Research Board, 61h Edition 7 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN A final fundamental component of operational analyses is a study of vehicular queuing, or the line of vehicles waiting to pass through an intersection. An intersection can operate with an acceptable Level of Service, but if queues from the intersection extend back to block entrances to turn lanes or accesses to adjacent land uses, unsafe operating conditions could result. In this report, the Industry Design Standard 95t'' percentile queue length is used. The 951'' Percentile Queue Length refers to that length of vehicle queue that has only a five -percent probability of occurring during an analysis hour. This study has utilized the industry current Synchro/SimTraffic software package (1 I' Edition) to analyze the 2025 No -Build and Build conditions for the AM and PM peak hours at the site access intersection, and at the Jackson Ave NW intersections with School St NW and with TH 10. It is noted the site access intersection is stop controlled and the other intersections are traffic signal controlled. The results of the capacity analysis are summarized in Tables 2. Table 2 Peak Hour Operations LOS (Delay in sec) plus Vehicle Queuing in Feet Intersection No. 2025 NB AM 2025 NB PM 2025 B AM 2025 B PM Jackson Ave/TH10 C (24.1) E (64.8) C (22.7) E (61.1) C (25.9) E (61.1) EBL C (21.9) E (64.5) WBL Worst Movement 95th Percentile Q EBT-445' WBL-480' EBT-519' WBT-461' Jackson Ave/School St B (11.7) C (25.8) EBL B (14.7) C (24.4) WBL B (12.6) C (21.1) WB B (15.1) C (24.1) EBL Worst Movement 95th Percentile Q WBT-170' EBL-246' WBT-164' EBL-270' Jackson Ave/Site Access Worst Movement N/A I N/A I A (2.3) A (7.7) EBL EB-44' A (3.1) A (6.4) NBL 95th Percentile Q E13-43' The results shown in Table 2 indicate the overall operations of the study area intersections are providing acceptable overall LOS with manageable vehicle queues for both the No -Build and Build conditions. The roadway capacity conditions on Jackson Ave NW were also reviewed. In the vicinity of the site Jackson Ave NW is generally a two-lane road with turn lanes at critical intersections which has a capacity for approximately 15,000 trips per day. Currently Jackson Ave NW carries 5,200 trips per day or utilizes approximately 35 percent of its capacity. The addition of the site traffic will add approximately 712 trips per day in the southerly direction (greatest increase) increasing the daily traffic to approximately 5,912 trips per day. The addition of the new trips will change the roadway capacity usage to 39 percent. There is sufficient capacity for future growth on Jackson Ave NW. Conclusion The proposed Jackson Hills Apartments Phase 2-4 to the Jackson Ave NW corridor will not result in poor operations or excessive queuing at the study area intersections. Please contact Vernon Swing at vswingtraffickgmail.com or 612-968-4142 with any questions. Attachments: Vicinity Map; Site Plan 8 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN ►. _ Z * r"' .. •..' ate• �. � �. . Elk'River High School C) *" 0. ' School St NW McDonald's . • ^ r A ►• �' A cxv OIL Elk River l h Walmart Supercenter � The Home DepotCr + 'a • Nc y; r `L 'rj`• � Gj — OtseQol-mit. Google m O T �,�.�P J _r�. �- r` NOTES: 1. � F N uw IS A BO ART NIP Tcpam� �tIM1EX PREPARED Ev W aAKT, PEPERRA 8 iSSCCi*TES,TiG Y mu Emc5 ulM WCatl 5 M3 2T.EYAPUMS 91PRI NS APPACIOWA1E URIY. CCNTR+LTV> 91.+LL CMFMM ALL LEC.ATINS NIP EIEVAlNP16i P1PlT iP 0mlPA/Lrm. LONTR41I SHMIL CNWE PNI®Y GWRYQ Al11 9R 7-lW-iG]-�1d5.eAr r ii 1 AFL WNSTF.CT04 Sn AT COVOW TO T11E kS' M#$1M� M E OF T41 Polo CC1 SMECFua.TIC"L w Slatlq,lMP PEEK -lion if THE UT- ai fL Mnp AI(0 W i U%T Wh* CF wboDOT 51"MV VECfO 110N* IW CPIST4'VCFOA 4. 1QTAL WT ARF . 28t 9W7 W lb.M FLIE&) CMIST*C Y"Ytk�S UMACL AAA . ;LIW IF 4T aF[1 PIE QMD IWPEF110Yd UWACE AMU — Id0.MTS'A {4S4IEJ CUPEN OCAS d WN [fl Q ~ tl Q Lj CL 2 JJ X CA J CG o g Y� m it � laa REVIEW PLAN NOT FUR CONSTRUCTbN �_p Jackson Hills Phase 2 CUP 5-134 2201 A T5-1342309 t` 18;0120 16-0106 hw st 6j7"5,8*64-qLO5 A75-41 a 7 -412 30-412-0380 i th ,Stre. 75-412- 320 75-412-0390 75-412-0310 75-1342305 J = 7ath Str,eettNozltlswest , f • 1 7 C 75-412-0212-0230 ' 75-d12-0220 75 12-0235 S tr a 75-412-0240 a * 7512-0245 0 75-412-0250 °} ' ` kith tfe_+�l Norfliv, t a S -m_,41091 I oil Pat Briggs Zone Change &Conditional Use Permit 75-412- 1025 75-412-0130 } 303 75-412-0120 75-412 ..,. 75-412-0116 75-412-0140 t1i Street­b,ihwe :t Case No: ZC 22-08 City C U 2 2 -17 EfL*-'k,�=,�::aRiver Background ■ Proposal for three 44-unit apartment buildings ■ Constructed in phases ■ Zoned PUD ■ Guided for High -Density Residential Uses ■ Previous two comp plans and Msp. Connections ■ 6.64 acres ■ Low-lying property with challenging soils ■ Wetland delineation did not identify wetlands oil 1 -2 :-') (It ii 7 75 -41616 5 75-i34200 75416 75-0416 75.416 410 7 Ff, L Bill lit LIZ m� 4 PROPMD �MIT wmT.Em, 75 12 oil It 75 12 wry ---------- �44+ --- -- - - ------ 75 12 PROPOSED -UNIT A-MNY AREA-nji,$ IF 77 IT rthW St sit Wo'C's I it fog 3442303 75 1 75 1 0 Northwest 75 64 05 75-864-0110 e. 75!412!iD370 0 75- 12 380 5 7 5 12' 23 5 75- 12-02 0 75-d12-024Z 5 2-0250iy IS 75 0— -ij 16 5 th b 11 t- t Noi Rxn.a9998 � � - 'if"g7 -x.-•--p £ : / / 14 RS I-r.�._asza9 � II sew cwc Imp I INS Ln �p I 1�� - � I Is•,�F - --------- -------- -----------I +-- - «�-4- -� - �.--or-- �_ — . — . — • — - — — — — — ------ -} 1 e "`� I 1 9,E'r p - rtt.33' F nr.3s � I I NxL=tsas.00 :IY I ; II III mweea.m �_•---------� I I C � I N I Ll all ix mom= "' caner II� n II mmm I .-1� � � r p Ilorn�mouni E $mrn��ni w_ PHASE 3 1 m o .� +onm�m PROPOSED 44-UNIT ca�c rot I II = o V APARTMENT BUILDING II ,Y v z pl AREA=26.184 SF I I z z 4 P cai FFE=903.00 r c7 Zi m L- I v N . t _ o' I I PHASE a Puaa I I ey. - I 4 hl c U,�.cr 46 GARAM MA gu"�- II 4a� I r. �_ - u1�-as�.eo s-a�ws 54 Sl1RiACE STI115 r1ixweee.ay _ f S actor I I �x - I z27 nu5NNR No. z ea0 _ �s-.Ho.r zm u •<`•--8su'�i}1I _ RA„=9r.av--- -----� -- - -- - - - - - - - - - -'=-------- -- - L --- - - ---- --- _ r AE=899.33 !..=992.84 r.a Ab a.�.'+4 Pmking Ne pvrkMg vim° < s< w l g n —n r s = n E �g56a c �r u T- 49 R�39�z ea o-,�II� �. IF®886. N .SO PENU Rrm-90.E&f .R-9tl&5.f' �F�@97E9' rr=I—» �s-90n33 ir— 8. rF--ess_:� -a�3 « - - - - - =- � ��,>=-ter•. �� rm 6 1.E=89279 (N) y 57lHrf "Rw Ele 9GT ]/ fY-sb2 S7 9 44 fie 91237 CB FC=9M42 RRrr=9R769 IAW 88 LE=989..Sd NAW 89 R.90A23 4F=9D637 i.E=B9220 [SJ M AE-B99.64 f.E=9Q7.09 !.E_69 1.E=896SA 09 gTAG{ V7 LE=896 C0 LE=8 (E) 1.E=O fMEJ m f.F. B65.3 l.E=889GO7O7 94 d3 l.F.. 9n5.5d fE) J l.E=99ARi (iJf.F.= 905.21 (5) y Ills AE-89aN (NO "I ES: PLAN USED IS A BOUNDARY AND TOPOGRAPHIC SURVEY ARED BY BOGART, PEDERSON & ASSOCIATES, INC. XISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE OXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS LEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL ACT UTILITY COMPANIES VIA GOPHER STATE ONE -CALL E OR BY CALLING 811 OR 1-800-252-1166. 'ONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE I PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS IE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT DAR❑ SPECIFICATIONS FOR CONSTRUCTION. It WMA City " EIY,�V: River I `-a 6A U. rj al WK NOTES: 1. BASE PLAN USED IS A BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED BY BOGART, PEDERSON & ASSOCIATES, INC. 2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE —CALL ONLINE OR BY CALLING 811 OR 1-800-252-1166. 3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. �1 axaPagn---��_�------�\�\\\ 1SI N�.00 11��� c== rr�J\\\1\V4 I - - --_ 8°599 PHASE 3 PROPOSED 44—UNI7 O1 a m p TFuI I APARTMENT BUILDING / AREA=26,164 SF FFE=903.00 4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED FOR EROSION AND SEDIMENT CONTROL DURING THE SITE DEVELOPMENT PROCESS: A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK ENTRANCE) AS SHOWN ON THE PLANS PRIOR TO START OF WORK. B. NO CONCRETE WASHOUTS ARE ALLOWED ON THE PROJECT SITE. SOIL S70CKPILFS SHALL HAVE PERIMETER CONTROL AND HAVE TEMPORARY SEED AND MULCH. C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH 1/2" OR MORE RAIN EVENT, CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE EFFECTIVE. REPLACE DETERIORATED, DAMAGED OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. D. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF DEPOSITION. REMOVAL OF TRACKING MATERIALS SHALL BE COMPLETED AT THE END OF EACH WORK DAY WHEN IT OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF CONDITIONS WARRANT. E. PERFORM SITE REMOVALS, GRADING, EXCAVATION AND EMBANKMENT, SEED AND MULCH ALL DISTURBED AREAS OUTSIDE OF PROPOSED GRAVEL, PAVEMENT AND BUILDING AREAS WITHIN 72 HOURS OF THIS WORK. F. INSTALL UTILITIES AND CONCRETE PAVEMENT OR GRAVEL SECTION. FINE GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT VEGETATION OF SOD/SEED PER PLANS. THE STORMWATER INFILTRATION AREAS SHALL BE STABILIZED WITH MNDOT #35-241 NATIVE SEED MIX APPLIED AT A RATE OF 36.5 LBS PER ACRE. G. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER R u� 5=JaCUMAWRW 0 : Elk K—, M—m I GGD* ID. Svm%r--N-2021 777_w., Milk tag: m City of EIL Rive'r-' Planning Commission 8=23=2022 ■ PC held a public hearing on August 23, 2022 ■ Two residents spoke during the public hearing ■ PC and residents shared concerns about project ■ Soil/site suitability ■ Public Utilities ■ Land Use Guidance ■ Traffic/Circulation ■ PC postponed action and requested a traffic study ■ Staff was also contacted after the meeting by a resident that shared similar concerns Soil/Site Suitability ■ Applicant submitted a geotechnical report prepared by Independent Testing Technologies (IT'I) ■ Same company completed report and inspection for phase 1 ■ Staff share similar concerns ■ Recommended conditions require applicant to work directly with ITT during construction and submittal of a final report summarizing and verifying the work completed Public Utilities ■ The property will be adequately served by available public utilities. ■ Long-term planning has guided this property for high -density residential uses since the mid 2000's ■ Infrastructure is in place to handle the increased flow/use. ■ ERMU and Engineering have included conditions for approval Land Use Guidance ■ Two iterations of the Comprehensive Plan and the Mississippi Connections small area plan have guided this property for HD residential. ■ Abuts Lion's Park, near schools and churches, efficient access to major highways, and utilities in place. ■ Other properties in area guided for mixed residential Traffic and Circulation ■ Applicant provided traffic analysis 9-26-2022 ■ Staff are comfortable with findings of no negative impact to surrounding roadways ■ Driveway locations are acceptable Table 1 Trip Generation Forecast Land Use __N.1 Peak Hour P__N1 Peak Hour Daily Trips Enter Exit Enter Exit Low Rise Multi-Faiiiily (132 Units) 13 Trips 40 Trips 42 Trips 25 Trips 890 Trips TOTAL 53 Trips 67 Trips 890 Trips Table 2 Peak Hour Operations LOS (Delay in sec) plus Vehicle Queuing in Feet Intersection No. 2025 NB AM 2025 NB PM 2025 B AM 2025 B PM Jackson Ave/TH10 C (24.1) E (64.8) C (22.7) E (61.1) C (25.9) E (61.1) EBL C (21.9) E (64.5) WBL Worst Movement 95th Percentile Q EBT-445' WBL-480' EBT-519' WBT-461' Jackson Ave/School St Worst Movement B (11.7) C (25.8) EBL B (14.7) C (24.4) WBL B (12.6) C (21.1) WBT B (15.1) C (24.1) EBL 95th Percentile Q WBT-170' EBL-246' WBT-164' EBL-270' Jackson Ave/Site Access N/A N/A A (2.3) A (7.7) EBL A (3.1) A (6.4) N BL Worst Movement 95th Percentile Q F1 EB-44' I EB-43' The results shorn in Table 2 indicate the overall operations of the study area intersections are providing acceptable overall LOS with manageable vehicle queues for both the No -Build and Build conditions. City Council 9- 19-2022 ■ Council opened the public hearing ■ Two individuals spoke in support of the proposed project. ■ CC continued the PH to 10-17-2022 Planning Commission 9=27=2022 ■ PC reviewed the traffic analysis along with the comments from the city engineer. ■ The analysis did not show a significant decrease in the operation of the surround streets/intersections. ■ Based on the traffic analysis and the additional information regarding their previous concerns, the Commission unanimously recommended approval with a small change to condition #4. Conditions ■ DNR has expressed long-term concerns regarding dewatering. ■ Required to demonstrate no -impact to city utilities. ■ Soil mitigation monitored and approved by a certified professional. ■ Landscape and lighting plans ■ Parking standards incorporated into PUD Action Requested ■ Approve, by motion, the Conditional Use Permit establishing a residential PUD, with the conditions outlined in the memo. oil 1 -2 :-') (It ii 7 75 -41616 5 75-i34200 75416 75-0416 75.416 410 7 Ff, L Bill lit LIZ m� 4 PROPMD �MIT wmT.Em, 75 12 oil It 75 12 wry ---------- �44+ --- -- - - ------ 75 12 PROPOSED -UNIT A-MNY AREA-nji,$ IF 77 IT rthW St sit Wo'C's I it fog 3442303 75 1 75 1 0 Northwest 75 64 05 75-864-0110 e. 75!412!iD370 0 75- 12 380 5 7 5 12' 23 5 75- 12-02 0 75-d12-024Z 5 2-0250iy IS 75 0— -ij 16 5 th b 11 t- t Noi NOTES: 1. BASE PLAN USED IS A BOUNDARY AND TOPOGRAPHIC SURVEY PREPARED BY BOGART, PEDERSON & ASSOCIATES, INC. 2. ALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN ARE APPROXIMATE ONLY. CONTRACTOR SHALL CONFIRM ALL LOCATIONS AND ELEVATIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT UTILITY COMPANIES VIA GOPHER STATE ONE —CALL ONLINE OR BY CALLING 811 OR 1-800-252-1166. 3. ALL CONSTRUCTION SHALL CONFORM TO THE MOST RESTRICTIVE OF THE PROJECT SPECIFICATIONS, THE STANDARD SPECIFICATIONS OF THE CITY OF ELK RIVER AND THE LATEST EDITION OF MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. �1 axaPagn---��_�------�\�\\\ 1SI N�.00 11��� c== rr�J\\\1\V4 I - - --_ 8°599 PHASE 3 PROPOSED 44—UNI7 O1 a m p TFuI I APARTMENT BUILDING / AREA=26,164 SF FFE=903.00 4. THE FOLLOWING SEQUENCE AND PROTOCOLS SHALL BE FOLLOWED FOR EROSION AND SEDIMENT CONTROL DURING THE SITE DEVELOPMENT PROCESS: A. INSTALL PERIMETER CONTROLS (SILT FENCE & ROCK ENTRANCE) AS SHOWN ON THE PLANS PRIOR TO START OF WORK. B. NO CONCRETE WASHOUTS ARE ALLOWED ON THE PROJECT SITE. SOIL S70CKPILFS SHALL HAVE PERIMETER CONTROL AND HAVE TEMPORARY SEED AND MULCH. C. MAINTAIN ALL TEMPORARY EROSION CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH 1/2" OR MORE RAIN EVENT, CLEAN OR MAINTAIN THESE DEVICES AS NEEDED TO BE EFFECTIVE. REPLACE DETERIORATED, DAMAGED OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY. D. REMOVE ALL SOILS AND SEDIMENTS DEPOSITED ONTO PUBLIC AND/OR PRIVATE PAVEMENT AREAS WITHIN 24 HOURS OF DEPOSITION. REMOVAL OF TRACKING MATERIALS SHALL BE COMPLETED AT THE END OF EACH WORK DAY WHEN IT OCCURS. SWEEPING MAY BE ORDERED AT ANY TIME IF CONDITIONS WARRANT. E. PERFORM SITE REMOVALS, GRADING, EXCAVATION AND EMBANKMENT, SEED AND MULCH ALL DISTURBED AREAS OUTSIDE OF PROPOSED GRAVEL, PAVEMENT AND BUILDING AREAS WITHIN 72 HOURS OF THIS WORK. F. INSTALL UTILITIES AND CONCRETE PAVEMENT OR GRAVEL SECTION. FINE GRADE SITE AND RESTORE GREEN AREAS WITH PERMANENT VEGETATION OF SOD/SEED PER PLANS. THE STORMWATER INFILTRATION AREAS SHALL BE STABILIZED WITH MNDOT #35-241 NATIVE SEED MIX APPLIED AT A RATE OF 36.5 LBS PER ACRE. G. REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER R u�