5.5 ERMUSR 11-8-2022��i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Chris Kerzman — Engineering Manager MEETING DATE: AGENDA ITEM NUMBER: November 8, 2022 5.5 SUBJECT: Field Services Facility Expansion Project Update ACTION REQUESTED: None DISCUSSION: RJM Construction completed paving the wear course on October 29, and completed striping of the employee and vendor parking lot. Punch lists have been issued to RJM for the interior of the building, and external punch list inspection for the north portion of site was completed on November 4. The contractors are finishing up installation and controls for the heating system for the garage bays, and ERMU will relocate our vehicles once heat is operational. RJM has contracted a structural engineer to help with evaluation of the floor slab. They currently have core drilling scheduled to verify the scan report at select areas throughout the building. ERMU staff expects the core drilling will be completed before the commission meeting and continues to work with RJM to understand the condition of the floor and future maintenance concerns due to the thickness and rebar placement concerns. The railings at the front of the building are temporary solutions and will be replaced, there have been supply issues from the subcontractor supplying them that RJM continues to work through. We are expecting that permanent railings will arrive in 4-6 weeks and will schedule replacement with RJM. RJM was granted a Temporary Certificate of Occupancy for the building on October 28, we are working with RJM to schedule completion of some of the more impactful punch list items prior to moving staff into the upper level. Page 1 of 1