Loading...
7.1. PCSR 11-22-2022Request for Action To Item Number Planning Commission 7.1 Agenda Section Meeting Date Prepared by Work Session Chris Leeseberg, Senior Planner November 22, 2022 Item Description Reviewed by Garnet Novotny – 17355 Fillmore St. NW; 75-Zack Carlton, Community Development Director 001-4200, 4400, 7405 Reviewed by Concept Review for 55+ Apartment Building, Case No. CR 22-06 Action Requested Provide the applicant with informal, non-binding, feedback regarding the proposed development project. Background/Discussion The applicant has submitted a concept sketch for a senior 55+ apartment building on the two 35-acre parcels. The subject site is zoned for 2.5-acre single family residential lots and is outside the Urban Service District. A majority of the eastern parcel is encumbered by wetlands and the southeast corner of the western lot has some wetland. The proposal shows an L-shaped apartment structure with parking and a circular drive lane, various trails and boardwalks through upland and wetland areas, and sport courts. During the city staff site plan review meeting, the following comments were shared by various departments:  A traffic study would need to be completed.  Sewer and water would need to be extended.  Three-phase electric power would need to be run to the property.  The closest water main available for connection to city water service is over one thousand feet away. Water main facilities will need to be extended from the trunk system or water distribution system.  Approximately 1,300 feet of urban city street would need to be th constructed from the intersection of 175 Avenue and Fillmore Street.  Park dedication at a per unit cost, not to exceed $500,000 for high-density residential. This assumes park dedication is not in the form of land. All these requirements will be at the developer’s cost. The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: August 2020 If the property owner decides to proceed following the concept review process, formal applications would include a Land Use Amendment, Zone Change, and Final Plat. The land use amendment would be to guide the property Multifamily Residential from Rural Residential as well as bring the property into the Urban Service District. The zone change would be from R1-a, Large Lot Single Family Well and Septic lots, to R4 Multiple Family Residential. Attachments  Location Map  Applicant’s Narrative  Concept Plans CONCEPT DATAGross Site Area:55.7 Ac ±Proposed Apartment Units:60 Units ±Proposed Apartment Area:50,000 SF ±PEDERSONBOGART763-262-8822Senior Living Facility Concept BElk River, MNParcel ID: 75-001-4405, 75-001-4200, 75-001-4400N100'0SCALE: 1" = 100'N:\Proposals\Projects Proposed\75-001-4405 Elk River\Elk River Concept B.dwg