8.1 SR 11-21-2022Request for Action
To
Item Number
Mayor and City Council
8.1
Agenda Section
Meeting Date
Prepared by
General Business
November 21, 2022
Justin Femrite, P.E., Public Works Director
Item Description
Reviewed by
Consider Corridor of Commerce Grant Submittal
Cal Portner, City Administrator
Reviewed by
Action Requested
Approve, by motion, TH 10/169 improvements for a Corridors of Commerce Grant submittal.
Background/Discussion
A new round of Corridors of Commerce transportation project grants ($250M) is open until November 30.
At the October 17 Council meeting, Council expressed consensus for staff to work toward a potential project
submittal for improvements to TH 10/169. The layout was derived from concepts currently being developed but
not yet approved by MnDOT whose ultimate vision is converting TH 10/169 to a freeway style corridor. The city
prefers two interchanges and retaining some access at 171" Avenue and 173Td Avenue.
The Elk River Chamber of Commerce staff hosted a meeting with community stakeholders and our state
representatives on November 14. There seems to be community consensus regarding a need to plan for long term
improvements to TH 10/169, but there remains a gap in what those improvements should be. The proposal likely
won't yield 100% support of any option and also get MnDOT approval.
The application submittal does not come with a guarantee of an award. If successful, the project would go through
several years of development and refinement to include environmental review, preliminary design, right-of-way
acquisition, final design, and construction.
Financial Impact
There is no cost to submit the application. Project cost sharing would be discussed in depth if project was selected.
Mission/Policy/Goal
Meet changing needs - Agile
Attachments
Program Scoring Guidance
Proposed Project Layout
Example of 3/4 Access Intersection.
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires pi ospei ly.
M
TUREJ
Updated.• August 2020
Corridors of Commerce
Program Guidance & Selection Process
Updated for 2022-2023 Project Selection Process
I. Overview
A healthy transportation network supports a growing economy by helping facilitate commerce
throughout the State. Transportation investments directly and indirectly foster economic growth
through the provision of construction jobs and a commerce -friendly network of corridors to ship goods
and provide mobility to citizens. In 2013, the Minnesota Legislature created the Corridors of Commerce
Program with the purpose of achieving two major goals.
• Provide additional highway capacity on segments where there are currently bottlenecks in the
system.
• Improve the movement of freight and reduce barriers to commerce.
The Corridors of Commerce program is not intended to serve as an alternative funding mechanism for
MnDOT's regular preservation and expansion program. The Minnesota Legislature enacted this program
to be separate from MnDOT's regular program and established separate eligibility and scoring criteria
for the program that are different than MnDOT's regular program priorities.
II. Project Eligibility
The Corridors of Commerce law specifically laid out program eligibility guidelines. In order for a
project to be eligible for the program, it must meet the following eligibility requirements.
1. Projects must either be classified as a Capacity Improvement Projects or Freight Improvement
Projects. The requirements for each of those classifications are as follows;
a. Capacity Improvement Projects must meet one of the following bullets;
■ Currently is not a divided highway, and that highway is an expressway or
freeway beyond the project limits.
■ Contains a highway terminus that lacks an intersection or interchange with
another trunk highway.
■ Contains fewer lanes of travel compared to that highway beyond the project
limits.
■ Contain a location that is proposed as a new interchange or to be reconstructed
from an intersection to an interchange.
b. Freight Improvement Projects must meet one of the following bullets.
• Remove or reduce an existing barrier to commerce.
• Preserve existing freight movement.
• Support an emerging industry.
• Provide connections between the trunk highway system and other
transportation modes for the movement of freight.
2. Projects must be consistent with MnDOT's Statewide Multimodal Transportation Plan.
3. Projects must be able to begin construction within four years of award of the funding, but the
actual construction start may be delayed beyond 4-years to avoid significant impacts to the
travelling public by having parallel routes in the same region under construction at the same
time.
4. Projects must be on the Interregional Corridor Network of state highways, including the
supplemental freight routes, in Greater Minnesota or any state highway in the eight -county
MnDOT Metropolitan District.
5. The amount of corridors of commerce funding needed to construct the project (including
construction cost, right-of-way, & engineering) cannot exceed the amount of funding available.
6. A project that is listed in MnDOT's State Transportation Improvement Program (STIP) is not
eligible for funding, unless the project was listed in the STIP because it previously received
Corridors of Commerce funding.
III. Project Recommendations
Thin Prnracc
MnDOT will utilize an on-line project recommendation process. (New for 2022) Only an individual
serving as an official representative of one of the following organizations may submit a project
recommendation for consideration of the program below:
• An area transportation partnership
• Any city, county, or township in Minnesota
• Any tribal government in Minnesota
• Any corridor coalition which is formally organized as a not -for -profit organization.
• Any metropolitan planning organization
• Any regional development organization
Each project submitted needs to be able to provide to MnDOT, upon request, a copy of a resolution or
letter authorizing them to submit that project on behalf of the organization. (New for 2022) Each
organization is limited to submitting one project recommendation during each project recommendation
cycle.
The following information needs to be provided through the on-line system for the project to be
considered recommended to MnDOT;
A. Name of applicant
B. Email address of applicant
C. Phone number for applicant
D. Name of the organization applicant represents
E. Project location
F. (New for 2022) A detailed project description that corresponds with the cost estimate identified
in item "G" below.
G. (New for 2022) A cost estimate (construction only) for the project in FY 2022 dollars that has
been reviewed and agreed to by any registered engineer in the State of Minnesota.
H. (New for 2022) Name and contact information for licensed engineer who reviewed cost
estimate
I. Identify source and dollar amount for other funding sources committed to the recommended
project.
J. Name and contact information for those funding source commitments.
MnDOT Recommendations
MnDOT will not make any agency project recommendations as a part of this process. MnDOT will rely
solely upon the on-line recommendation process to provide the list of projects to be considered for the
program.
IV. Scoring and Ranking
Legislative Criteria
The Corridors of Commerce law includes nine criteria which MnDOT must use to score and rank projects
for the program. The law requires that all nine criteria must be used and that MnDOT cannot add any
additional criteria. The nine criteria in the law are as follows:
• Return on Investment
• Economic Competitiveness
• Freight Efficiency
• Safety
• Regional Connections
• Policy Objectives
• Community Consensus
• Project Deliverability
• Regional Balance
Scoring Overview
All projects that have been determined to be eligible for the program will be scored. Up to a 100 Points
each will be awarded to projects in eight of the nine criteria. The top point score for a project would be
800 points. The ninth criteria, Regional Balance, has been set-up as a funding division criterion that will
be applied after the projects have been scored and ranked using the other seven criteria.
Return on Investment, Economic Competitiveness, Freight Efficiency, and Safety criteria, MnDOT will be
scoring using a decile system approach. Under this approach, project outputs that relate to each of the
criteria will be compared against each other by sorting them from the best output down to the lowest
output. The project outputs will then be divided into ten equal groups or deciles based upon where
they compare to all the other projects. Those projects with an output in the top decile (the top 10%)
will receive the maximum number of points for that output. Those projects with an output in the
bottom decile (bottom 10%) will receive the lowest number of points for that output. Below is an
example of how the decile scoring system works;
Top Decile
= 50 points
2nd Decile
= 45 points
3rd Decile
= 40 points
4t" Decile
= 35 points
5t" Decile
= 30 points
6t" Decile
= 25 points
7t" Decile
= 20 points
8t" Decile
= 15 points
9t" Decile
= 10 points
Bottom Decile
= 5 points
There are two project outputs for each criteria, except economic competitiveness (it has just one).
Therefore, a project may score 50 points in one output and only 30 points in the other output to get a
combined 80 points for that criteria.
The remaining four scoring criteria of Regional Connections, Policy Objectives, Community Consensus,
and Project Deliverability have had specific scoring matrixes developed for them. Each of those matrices
will determine the amount of points a project receives from that criteria. Each of the scoring criteria
and the methodology being incorporated with them is discussed briefly in the next section.
Individual Criteria Scorine Methodol
Return on Investment. The law states the first criteria is a return on investment (ROI) measure that
provides for comparison across eligible projects. MnDOT will incorporate the Project Effectiveness
analysis from the FHWA Highway Capacity manual as the basis for determining ROI outputs. There are
essentially two outputs as a part of this analysis: Travel Time Savings and 5-year Crash Reduction
Savings.
Travel Time Savings are calculated by first determining what the current travel times are along the
roadway (MnDOT will be using one of two available travel time data sets which incorporates cell phone
and GPS data). Next, future travel times are calculated based upon the recommended project being
constructed. There are two factors which can impact future travel times on the corridor, increases in
the capacity of the roadway and increases in the posted speed limit resulting from the improvement.
Combined, these savings represent the total travel time savings. The total savings is then divided by the
cost of the project to the Corridors of Commerce Program to determine a Return on Investment output
for travel time.
Please note the cost used to determine the ROI is the cost to the corridors of commerce program and not
the total cost of the project. As an example, if a project's total cost was $100 M but the submitter was
only asking for $50 M from the program because the other $50 M is covered from other sources, the
travel time savings would be divided by $50 M and not $100 M. This is also true for the 5-year Crash
Reduction Savings below.
5-Year Crash Reduction Savings are calculated by first determining the type and severity of crashes at
the proposed project locations for the last five years using MnDOT's crash data. Using FHWA's Crash
Modification Factors, it is possible to project the amount of reduction in crashes a particular type of
improvement can be expected to generate. For example, if there are 100 specific type of crashes in the
project area and the modification factor projects the project will result in a 50% savings in those crashes,
the project will result in savings of 50 of those particular crashes. The number of crash savings by each
type is then multiplied by the individual crash cost to produce a Total Crash Savings from the
improvement. The total savings is then divided by the cost of the project to the Corridors of Commerce
Program to determine a Return on Investment output for 5-Year Crash Savings.
Economic Competitiveness. The law states that the project must produce a measurable impact on
commerce and economic competitiveness. MnDOT purchased the Regional Input -Output Modeling
System (RIMS -II) data set for each MnDOT district. That data set summarizes a multiplier of the Number
of Jobs per Million dollars of investment factor for each of the eight MnDOT Districts. To determine the
output for the criteria, the total cost of the project (not the cost to the corridors of commerce program)
is multiplied by the respective multiplier factor in Table 1.
Table 1
District
Multiplier
District 1—
Northeast Minnesota
9.9502
District 2 - North Central Minnesota
8.6916
District 3
—Central Minnesota
10.2447
District 4 —
Northwest Minnesota
8.4549
District 6—Southeast
Minnesota
9.6264
District 7 —Southern
Minnesota
9.6277
District 8 —
Southwest Minnesota
9.5527
Metro
11.4459
RIMS -II estimates the total amount of direct and indirect economic benefit from the total investment. It
does not estimate increased economic development potential. MnDOT plans to conduct additional
research into better methods for calculating the economic competitiveness benefits of a project for
future Corridors of Commerce program selections.
Freight Efficiency. For this criteria in the law it states, "measures of annual average daily traffic and
commercial vehicle miles traveled, which may include data near the project location on the trunk
highway or on connecting trunk or local highways; and measures of congestion or travel time reliability,
which may be within or near the projects limits, or both." To cover this criteria effectively, two project
outputs will be used to calculate points; Travel Reliability and Heavy Commercial Average Annual Daily
Traffic.
Travel Reliability will be calculated using the same travel time data from the Return on Investment
Travel Time Savings output, however the data will be looked at differently. Instead of calculating the
travel time savings, the reliability of the roadway's travel time will be evaluated. Both the percentage
and degree of travel time un-reliability will be utilized to develop an index that can be compared to all
the other projects. For more specific information about the Travel Reliability calculation, please consult
the technical scoring system document also located on the Corridors of Commerce website.
Heavy Commercial Average Annual Daily Traffic (HCAADT) will be taken from MnDOT's traffic count
volumes maps and used directly as this output. MnDOT will determine the closest HCAADT to the
project or use a weighted HCAADT figure if more than one volume is available along the project area.
Safety. This criteria in the law is a measure in traffic safety improvement. Safety is one of the few areas
that can impact multiple scoring criteria. As noted in the Return of Investment criteria, 5-year Crash
Savings from safety improvement from the project has already been given points. For the Safety
Criteria, MnDOT did not want to use the exact same data from the ROI criteria. As a result, MnDOT
decided to use two different outputs from its 5-year crash statistics for this criteria which measure the
existing crash conditions of the project roadway in comparison to the other project roadways being
scored. The two outputs being used are;
• 5-Year Average Number of Fatal and Type A Injury Crashes
• 5-Year Average Number of All Crashes
A decile output score for both the Fatal/Type A Injury Crashes and All Crashes will be calculated for all
the projects.
Regional Connections. The law defines this criteria as "connections to regional trade centers, local
highway systems, and other transportation modes." To score points for this criteria, MnDOT developed
the following point matrix (Table 2) for scoring projects according to this criteria. As a point of
clarification, if a recommended project has more than one applicable Project Type, MnDOT will apply
the highest scoring Project Type from the table to calculate the points.
Table 2
eroject ripe
Interstate System/
Supplemental IRC
Principal
All other
Connection to Level 1
IRCSystem
System
Arterials
THs
Trade Center
Closing a Gap in a Larger Corridor (ex.
Lane Gaps)
100
90
50
100
50
Add Lanes to Existing Facility (expands
capacity) Does not include filling a gap
90
80
50
90
50
Eliminate Existing Isolated Intersection
with an Interchange or Grade Separation;
Reconstruct Intersection/Interchange
so
70
zo
so
zo
with More Capacity
Completing a Corridor Conversion
(Multiple Interchanges and Access
N/A
N/A
N/A
70
20
Patterns)
Creating/Improving Connection to a
Multimodal Facility
60
so
30
60
30
Add Passing Lanes to a Facility
N/A
40
10
10
10
Missing interchange ramps/movements
20
10
10
20
10
Project minimally impacts connectivity
between trade centers for users
0
0
0
0
0
Policy Objectives. The Corridors of Commerce law defines this criteria as "the extent to which the
project addresses multiple transportation system policy objectives and principles." MnDOT chose to use
its Statewide Multimodal Policy Plan (SMPP) as the basis for developing a point matrix for this criteria,
see Table 3. Unlike the Corridor Connections matrix, the Policy Objectives matrix has two separate
scoring areas.
The first is the Open Decision Making section. Projects which have had a corridor study, safety plan,
safety audit, or environmental document that covers the proposed project area will receive 50-points. If
the project does not have any of those things, it will receive no points from this section. For a corridor
or safety plan to receive points, it must have been completed within the last ten years for the eight
county metro area or within the last twenty years for the rest of the counties in Minnesota. Although
MnDOT does not need to have contributed financially to the study for it to count, MnDOT needs to have
been involved and concur with the findings of the study, otherwise it will not receive any points.
The second section on Policy Objectives matrix covers System Stewardship and Healthy Communities
policy areas from MnDOT's policy plan. For each of the bullets a project meets, it receives 10-points for
up to a maximum of 50-points for this section. The bullets have been developed based upon stated
goals and priorities from MnDOT's SMPP. Combing Section one and two then represent a project's
score for the Policy Objectives criteria.
Table 3
�g
1
Open
There has been a corridor study, safety plan, safety audit, or
Decision
environmental document that covers the proposed project
50 - Points
making
• Pavement and/or bridges within the project area are due for a
major rehabilitation or replacement within the next eight years
• Project incorporates ITS technology or traveler information system
component
. The project addresses a significant flooding risk, snow trap/drifting
10—
System
issue, or other environmental impact that affects the reliability of
Points for
Stewardship
the roadway
each
and Healthy
. Project reduces VMT or hours of congestion
category.
Communities
. Project removes an at grade rail crossing
• Project includes improvements for bicyclists and pedestrians
Maximum
. Project replaces existing overhead lighting with new L.E.D lighting
of 50
. Adds or supports transit service (like park and ride facilities, transit
only shoulders, and park and pool locations).
. Project will improve access to health care or to recreational areas of
the State
Total Points available
100
Community Consensus. The Corridors of Commerce definition for this criteria is support and consensus
for the project among members of the surrounding community. To best achieve that, MnDOT has
developed a matrix which asks for resolutions and letters support from three different groups. Looking
at Table 4, notice that the first area requires a resolution of support for the project from each of the
municipalities and counties touched by the proposed project. To help ensure that projects meet the
spirit of this criteria, MnDOT has made this section an all or nothing points area. In order to receive the
45-points, all the municipalities and counties impacted (touched) by the project need to provide a
resolution of support for the project, otherwise the project does not receive any of the 45-points.
The next section of the matrix covers support from the local planning agency for the area. For this
section, only letters of support are needed not resolutions. The letters can be from either the Chair of
the Planning Agency or its lead staff member. However if a project impacts more than just one regional
planning agency, it will need a letter from each planning agency to get the points. Otherwise it will not
receive any points.
The last section of the Community Consensus matrix requests a single letter of support from any
chamber of commerce. This section was added to help reflect the economic impact nature of the
Corridors of Commerce program. There is no requirement that the chamber of commerce letter come
from a chamber in the project's geography, just that a single letter of support be received for the
project.
The resolutions and letters of support are not needed for the projects until 60-days after the closing of
the on-line recommendation process. MnDOT will contact all the municipalities and counties impacted
by a recommended project by letter to request they consider providing a resolution of support for the
project. Within that letter, MnDOT will note that if the local government does not provide a support
resolution it will impact the projects scoring within the Corridors of Commerce program. MnDOT will
likewise notify the regional planning agencies of projects that will need letters of support from them.
The project submitter is responsible for contacting a local chamber of commerce and have them send a
letter of support. All resolutions and letters should be sent by mail or electronically to Patrick
Weidemann at MnDOT (See Section VI for contact information).
Resolutions of Support from
Impacted Jurisdictions
Letter of Support
Letter of Support
Table 4
Resolutions supporting the
project from each municipality
and county that is touched by
the project limits.
A letter of support for the
project from the metropolitan
planning organization, regional
development commission, or
regional planning agency
A single letter of support for the
project from any chamber of
commerce
45 —points (If all jurisdictions
provide a resolution, otherwise
no points.)
45 — points (If more than one
planning agency touched by the
project, must have all provide
letters of support or no points
awarded)
10-points
Project Deliverability. (NEW for 2022) This criteria was added during the 2021 Legislative Session.
The criteria is designed to award points for those projects which are further along in the project
development process and thus have a higher likelihood to be delivered within the funding timeframe for
the program. One of the best lead measures for being able to deliver a project within a reasonable time
frame and budget is to determine where a recommended project is at in the environmental review
process. MnDOT has developed the table below to award the Project Deliverability criteria points based
upon where the project is at in the environmental review process.
Table 5
Regional Balance. The criteria Regional Balance does not have any accompanying language with it in
the law. MnDOT intends to use the division/awarding of the funding across the state as the way this
criteria gets incorporated.
Protect Selection Process
All recommended projects that meet both the eligibility requirements and project recommendations
requirements of the program will be scored. MnDOT will develop project descriptions and cost
estimates from the information provided by the submitters to a sufficient enough level, so that they can
be scored in each of the eight point scoring criteria. The projects will then be scored and ranked
together on a single list from the highest scoring project to the lowest.
MnDOT will award funding to the projects starting with the top scoring project and continuing down the
list until all the funding is expended. The Regional Balance Criteria may result in some projects being
skipped over in lieu of lower scoring projects from another region or area of the State, in order to
ensure the funding is "regionally balanced". MnDOT intends to work with the Legislature during the
2023 session to help get more direction and/or definition to what they mean by Regional Balance.
Should MnDOT not get any additional direction from the Legislature, MnDOT will look at its past usage
of a soft 50-50 split and discuss other approaches publicly in the Spring of 2023 before making any final
decisions on splits.
V. Additional Program Guidance
The following is some additional program guidance and clarifications:
1. MnDOT's cost participation policy applies to all the selected corridors of commerce projects.
For purposes of that policy, all projects selected for award in the program will be treated as
WnDOT Initiated" projects.
2. MnDOT will not award funding to a project that does not meet all the applicable state and
federal laws, even if it scores the highest in the program.
3. Use of FHWA federal funding on a Corridors of Commerce project is limited to only those
projects which have previously been identified through MnDOT's performance based planning
process and have been developed to be eligible for federal funding (i.e. followed the NEPA
process).
VI. FY 2022-2023 Program Schedule:
August 1, 2022
November 30 2022
December 1, 2022
March 1, 2023
VII. Program Contacts
If you have additional questions about the Corridors of Commerce Program, please feel to contact one
of the individuals below.
Patrick Weidemann
Director of Capital Planning and Programming
MnDOT Office of Transportation System Management
(320) 295-9667
weidemann(@state.mn.us
3
z
d
a
Ati Ave NW' —
—173rdAve NW O
10
1
171st La NW
.�-171 st Ave _ ®• €1 I
Elk River
/ 40 Nowthen
181st
AveNWru
I 64
Ramsey
� o
i
d�
G/i I
Focus
Area
Alpine Dr
• �C
Hassan Dayton
yPhhP�ih
a ��n
i�165thAAve NW
Possible Inclusion for
Additional C.O.C. Funding
fl,