Loading...
Tranquil_22_143463461260C1260C1260B1260B1260B1260B1260B1260B32B32B1260C12378109653213TYLER STREET NW6213456 124871154ULYSSES ST NW191ST AVE NW190 1/2 AVE NW190TH AVE NWINSTALL 616 LFOF TEMPORARY SILT FENCEINSTALL 1668 LFOF TEMPORARY SILT FENCEINSTALL 84 LFOF TEMPORARY SEDIMENT LOGINSTALL 84 LFOF TEMPORARY SEDIMENT LOGPLACE ROCK CONSTRUCTION ENTRANCE(CONTRACTOR TO DECIDE FINAL LOCATION)PLACE 9,730 S.Y. OFEROSION CONTROLBLANKET (3N-STRAW)PLACE 1,230 S.Y. OFEROSION CONTROLBLANKET (3N-STRAW)PLACE 1,370 S.Y. OFEROSION CONTROLBLANKET (3N-STRAW)PLACE 840 S.Y. OFEROSION CONTROLBLANKET (3N-STRAW)INSTALL 457 LFOF TEMPORARY SILT FENCEINSTALL 231 LFOF TEMPORARY SILT FENCETEMPORARY SEDIMENT FILTER (TYP)TEMPORARY SEDIMENT FILTER (TYP)INSTALL 114 LFOF TEMPORARY SILT FENCEINSTALL 84 LFOF TEMPORARY SEDIMENT LOGINSTALL ±680 LF OF SEDIMENT LOGSTEMPORARY GRADING LIMITS FORWETLAND DELINEATIONSCALE: 1" = 50'050'EROSION EROSION CONTROL PLANC123:38 PM N:\Projects Current\21-0046.00 Rohlf Plat\Survey\dwg\ASB\Erosion Control.dwg5/9/2022 GRADING LIMITS AND PROPOSEDTEMPORARY SILT FENCETEMPORARY ROCK CONSTRUCTION ENTRANCEPROPOSED FLEXAMAT984PROPOSED CONTOUREROSION CONTROL BLANKET (3N-STRAW)EMERGENCY OVERFLOWE.O.F.TEMPORARY SEDIMENT FILTERLEGEND:FIBER-LOG ROLLSEROSION CONTROL NOTES:1.CONTRACTOR SHALL CONFINE CONSTRUCTION OPERATIONS TO THECONSTRUCTION/GRADING LIMITS SHOWN.2.ALL WORK SHALL CONFORM TO THE MINNESOTA POLLUTION CONTROL AGENCY'SSTORM WATER PERMIT REQUIREMENTS. CONTRACTOR SHALL OBTAIN ALL PERMITS ANDCOMPLY WITH ALL PERMIT REQUIREMENTS.3.THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSTALLEDPRIOR TO ANY DEMOLITION OR GRADING OPERATIONS AND MAINTAINED TO CONFORMWITH THE STANDARDS SPECIFIED BY THE PERMIT.4.CONTRACTOR SHALL INSPECT TEMPORARY EROSION CONTROL MEASURES ON THEENTIRE SITE AT LEAST EVERY 7 DAYS AND WITHIN 24 HOURS OF ANY MEASURABLERAINSTORM. DAMAGED SILT FENCE OR OTHER EROSION CONTROL DEVICES ORPRACTICES SHALL BE REPAIRED IMMEDIATELY. INSPECTION AND MAINTENANCE OFDEVICES SHALL CONTINUE UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATION ANDA NOTICE OF TERMINATION IS SUBMITTED TO THE MPCA.5.ALL GRADING OPERATIONS SHALL BE CONDUCTED IN A MANNER TO MINIMIZE THEPOTENTIAL FOR SITE EROSION.6.THE SITE SOIL EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSTALLED ANDMAINTAINED TO CONFORM WITH THE STANDARDS SPECIFIED BY THE CITY OF ELK RIVERAND THE MPCA.7.EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO THE DISTURBANCE OFANY AREAS AND MAINTAINED UNTIL ALL TRIBUTARY DISTURBED AREAS ARE RESTORED.8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL EROSIONCONTROL MEASURES, INCLUDING SILT FENCE AND BALES, UPON ESTABLISHMENT OFPERMANENT VEGETATION IN SAID AREAS.9.ALL SOILS TRACKED ONTO PAVEMENT OR ANY OTHER OFF-SITE AREA SHALL BEREMOVED DAILY.10.THE SITE SEDIMENT CONTROL FACILITIES FOR THE PROJECT MUST BE INSTALLED PRIORTO ANY GRADING OPERATION.11.ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED AND VEGETATEDAS SOON AS POSSIBLE. ANY FINISHED AREAS SHALL BE SEEDED AND MULCHED WITHIN7 DAYS AFTER FINISHED GRADING IS COMPLETED IN ACCORDANCE TO MN/DOT 2575.12.ALL DISTURBED AREAS NOT IN WETLAND BUFFERS SHALL BE REVEGETATED WITHMN/DOT SEED MIX, MULCHED, FERTILIZED & DISK ANCHORED, PER THE FOLLOWINGSCHEDULE:STANDARD SEED MIX 25-131: 220 LB/AC.FERTILIZER 22-5-10:350 LB/AC.MULCH TYPE 3: 2 TONS/AC.INFILTRATION BASIN SEED MIX 33-261:35 LB/AC.13.ALL DISTURBED AREAS IN WETLAND BUFFERS SHALL BE REVEGETATED WITH MN/DOTSEED MIX, MULCHED, FERTILIZED & DISK ANCHORED, PER THE FOLLOWING SCHEDULE:WETLAND BUFFER SEED MIX 34-261:31.5 LB/AC.14.CONTRACTOR SHALL INSTALL TEMPORARY SEDIMENT BMP'S SHOWN AND NOT SHOWNON PLANS DURING PHASING ON PROJECT TO COMPLY WITH MPCA, CITY INSPECTORAND DEVELOPER REQUEST15.CONSTRUCTION OF PROJECT SHALL MEET CITY OF ELK RIVER DESIGN STANDARDS(LAST REVISION AUGUST 2017) UNLESS PLANS INDICATES OTHERWISE.DESCRIPTIONDATENO. REV FILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: SHEET NO.LAND SURVEYING CIVIL ENGINEERING ENVIRONMENTAL SERVICES 13076 FIRST STREET, BECKER, MN 55308-9322 TEL: 763-262-8822 FAX: 763-262-8844 BOGART, PEDERSON & ASSOCIATES, INC. TRANQUIL MEADOWS RESIDENTIAL DEVELPOPMENT PROVIDENCE S&S, LLC City of Elk River, Sherburne County, MN 02/22/2021 21-0046.00 CJD MJM MJM I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Signed: Date: Lic. No. Christopher J. Dahn 5862804/18/2022 -02/22/2021 DRAWINGS ISSUED TO CITY 1 03/12/2021 DRAWINGS REVISED PER CITY REVIEW 2 03/30/2021 MPCA REVIEW 3 04/21/2021 FINAL CONSTRUCTION PLANS 4 05/14/2021 DRAWINGS REVISED PER 2ND CITY REVIEW 5 06/30/2021 ADDENDUM 1 6 04/18/2022 RECORD AS-BUILT DRAWINGSRECORD DRAWING