Tranquil_22_33463461260C1260C1260B1260B1260B1260B1260B1260B32B32B1260CREMOVE FENCESAW CUT EXISTING ASPHALTREMOVE FENCEREMOVE SHEDS (INCLUDES FOUNDATION)REMOVE CONCRETE,GRAVEL, AND ASPHALTPAVEMENTREMOVE TREES AND VEGETATIONREMOVE TREES AND VEGETATIONREMOVE TREESAND VEGETATIONREMOVE PIPE ANDTANK TO CLEANOUTSAW CUT EXISTING ASPHALTREMOVE ASPHALTPAVEMENTREMOVE AND CAP WELL(CONTRACTOR TO PULLPERMITS NECESSARY)REMOVE CONCRETE PADREMOVE SILOREMOVE CONCRETE PADREMOVE OVERHEADELECTRICAL LINE & POLEENTRANCE AND PAVEMENT TO BEREMOVED BY COUNTYREMOVE POOL ANDEQUIPMENTREMOVE SEPTIC SYSTEM DRAINFIELDSAW CUT CURB FOR ENTRANCESAW CUT CURB FOR ENTRANCEAREA OF REMOVAL LIMITS (TYP)REMOVE FENCEPROTECT AND MAINTAIN EXISTINGHOUSE AND SURROUNDING DRIVEWAYREMOVE FLARED END SECTION(SEE UTILITY PLAN)REMOVE ASPHALT DRIVEWAYPORTION (SEE SITE PLAN)SCALE: 1" = 50'050'DEMOLITION GOPHER STATE ONE CALL MINNESOTA TOLL FREE 1-800-252-1166TWIN CITY AREA 651-454-0002CALL 48 HOURS BEFORE DIGGING:DEMOLITION PLANC13:36 PM N:\Projects Current\21-0046.00 Rohlf Plat\Survey\dwg\ASB\Demo.dwg5/9/2022
DEMOLITION GENERAL NOTES:1.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM OR COORDINATE ALLUTILITY CONNECTIONS AND RELOCATIONS FROM EXISTING UTILITY LOCATIONS TO THEPROPOSED BUILDING, AS WELL AS TO ALL ON-SITE AMENITIES. THESE CONNECTIONSINCLUDE BUT ARE NOT LIMITED TO WATER, SANITARY SEWER, UNDERGROUND GAS, ETC.2.THE CONNECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH STATE AND LOCALSTANDARD SPECIFICATIONS FOR CONSTRUCTION. UTILITY CONNECTIONS(UNDERGROUND GAS, WATERMAIN, AND STORM SEWER) MAY REQUIRE A PERMIT FROMTHE CITY.3.THE CONTRACTOR SHALL VERIFY THE ELEVATIONS AT PROPOSED CONNECTIONS TOEXISTING UTILITIES PRIOR TO ANY DEMOLITION.4.CONTRACTOR SHALL COORDINATE WITH THE CITY OF ELK RIVER FOR ALL UTILITYDISCONNECTIONS, SERVICE TERMINATIONS AND REMOVALS. CONTRACTOR SHALLCOORDINATE UTILITY DISCONNECTIONS AND RELOCATIONS WITH THE UTILITYPROVIDERS PRIOR TO THE START OF CONSTRUCTION. ALL SERVICECONNECTIONS/DISCONNECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH STATEAND LOCAL STANDARD SPECIFICATIONS FOR CONSTRUCTION. CONTRACTOR SHALLOBTAIN ALL NECESSARY STATE AND LOCAL PERMITS NECESSARY FOR UTILITYCONSTRUCTION AND WORK WITHIN ADJACENT RIGHT-OF-WAYS.5.IF DEWATERING IS REQUIRED FOR THIS PROJECT, THE PUMP DISCHARGE SHALL BETREATED PRIOR TO BEING DISCHARGED OFF-SITE OR INTO A SURFACE WATER. THEDISCHARGE SHALL BE VISUALLY CHECKED TO ENSURE THAT IT IS VISIBLY CLEAN WATER.6.CONTRACTOR SHALL PROTECT UTILITIES, STRUCTURES AND TREES (NOTED AND NOTNOTED) TO REMAIN AND SHALL BE RESPONSIBLE TO REPAIR DAMAGES TO ANYFEATURES TO REMAIN.7.TREES 6" AND LARGER AND OTHER NOTABLE VEGETATION WERE IDENTIFIED ANDLOCATED DURING THE COURSE OF THE SURVEY. CONTRACTOR SHALL FIELD VERIFYTHE EXISTING CONDITIONS OF THE PROJECT AREA AND REMOVE ALL TREES NOTDESIGNATED TO BE SAVED AND PROTECTED. ALL TREES, DEBRIS, ROOTS, BOULDERSAND TOPSOIL SHALL BE REMOVED FROM THE SITE.8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL ITEMS INDICATED ANDUNINDICATED IN THE AREA OF THE REMOVAL LIMITS.9.CONSTRUCTION OF THE PROJECT SHALL MEET CITY OF ELK RIVER DESIGN STANDARDS(LAST REVISION AUGUST 2017) UNLESS PLANS INDICATES OTHERWISE.REMOVE PAVEMENT SECTION (AS INDICATED).REMOVE EXISTING TREES (AS INDICATED)LEGEND:REMOVE FEATURE (AS INDICATED)SALVAGE (AS INDICATED)SAW-CUTREMOVE EXISTING BUILDINGS (AS INDICATED)AREA OF REMOVAL LIMITS (TYP)DESCRIPTIONDATENO.
REV
FILE NO.:
DWG FILE:
CHECKED BY:
DRAWN BY:
DESIGN BY:
DATE: SHEET NO.LAND SURVEYING
CIVIL ENGINEERING
ENVIRONMENTAL SERVICES
13076 FIRST STREET, BECKER, MN 55308-9322
TEL: 763-262-8822 FAX: 763-262-8844
BOGART, PEDERSON
& ASSOCIATES, INC.
TRANQUIL MEADOWS
RESIDENTIAL DEVELPOPMENT
PROVIDENCE S&S, LLC
City of Elk River, Sherburne County, MN
02/22/2021
21-0046.00
CJD
MJM
MJM
I hereby certify that this plan, specification, or
report was prepared by me or under my direct
supervision and that I am a duly Licensed
Professional Engineer under the laws of the
State of Minnesota.
Signed:
Date: Lic. No.
Christopher J. Dahn
5862804/18/2022
-02/22/2021 DRAWINGS ISSUED TO CITY
1 03/12/2021 DRAWINGS REVISED PER CITY REVIEW
2 03/30/2021 MPCA REVIEW
3 04/21/2021 FINAL CONSTRUCTION PLANS
4 05/14/2021 DRAWINGS REVISED PER 2ND CITY REVIEW
5 06/30/2021 ADDENDUM 1
6 04/18/2022 RECORD AS-BUILT DRAWINGSRECORD DRAWING