Loading...
Tranquil_22_412378109653213TYLER STREET NW6213456 1248711539.9'20.2'412,350 SF11,175 SF21,093 SF27,244 SF14,497 SF16,541 SF16,909 SF11,151 SF24,495 SF16,340 SF24,427 SF12,456 SF11,606 SF12,350 SF14,674 SF12,350 SF16,750 SF16,684 SF39,815 SF18,465 SFTW I N L A K E S R O A D NW 60'45'55'50'55'60'50'60'60'ULYSSES ST NW60.0'191ST AVE NW190 1/2 AVE NW190TH AVE NW47,210 SF48'60'60'60'60'60'60'60'60'60'50'60'60'60'60'60'60'60'60'60'60'60'60'60'60'60'60'60'50'60'60'60'60'PROPOSED ENTRANCE PER CITY DETAILPROPOSED ENTRANCE PER CITY DETAIL14,300 SF14,300 SF14,300 SF13,837 SF60'60'NWL OF BASINNWL OF BASIN20'R=50'L=88.5'R=67'L=118.6'R=100'L=142.5'R=500'L=172.3'R=25'L=35.6'R=25'L=40.3'BASIN SETBACKBASIN SETBACKPROPOSED ROAD PER CITY DETAILPROPOSED TURF ESTABLISHMENTPROPOSED TURF ESTABLISHMENTPROPOSED DRIVEWAY(EXACT LOCATION DETERMINEDBY HOME BUILDER)R45'PROPOSED TEMPORARYASPHALT CUL-DE-SAC60'60'60'60'47'60'5'23'65'45'INFILTRATION BASIN45'R=25'L=39.3'R=25'L=39.3'TAPER MOUNTABLE CURB TO B618TAPER MOUNTABLE CURB TO B618130 LF OF 10' WIDEASPHALT TRAIL278 LF OF 10' WIDEASPHALT TRAILPED RAMP WITH TRUNCATED DOMESPED RAMP WITH TRUNCATED DOMES130 LF OF 10' WIDEASPHALT TRAIL184.2'6' WIDE CONCRETE SIDEWALKPROPOSED ROUND-A-BOUT TO BECONSTRUCTED BY SHERBURNE COUNTYIN 2021 CONSTRUCTION SEASONTIE INTO OR EXTEND TO PROPOSEDASPHALT TRAIL CONSTRUCTED BYSHERBURNE COUNTY IN 2021CONSTRUCTION SEASONREPLACE 80 LF OF 10' WIDE ASPHALTDRIVEWAY AND TIE INTO OR EXTENDTO PROPOSED DRIVEWAY ENTRANCEPED RAMP WITH TRUNCATED DOMES6' WIDE CONCRETE SIDEWALKPROPOSED TURF ESTABLISHMENTRETAINING WALL(PER CIVIL DESIGN PROFESSIONALSENGINEERING PLANS DATED 06/30/2021)SCALE: 1" = 50'050' GOPHER STATE ONE CALL MINNESOTA TOLL FREE 1-800-252-1166TWIN CITY AREA 651-454-0002CALL 48 HOURS BEFORE DIGGING:SITE BASE SITE PLANC23:36 PM N:\Projects Current\21-0046.00 Rohlf Plat\Survey\dwg\ASB\Site Plan.dwg5/9/2022 PROPOSED DRIVEWAY(EXACT LOCATION TO BEDETERMINED BY HOUSE BUILDER)PROPOSED TURF ESTABLISHMENTPROPOSED ASPHALT PAVEMENTCONCRETE CURB AND GUTTER - MOUNTABLELEGEND:SITE PLAN NOTES:1.CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATIONOF EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION.2.CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PRIOR TOTHE START OF CONSTRUCTION.3.CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE CITY,COUNTY AND STATE REGULATIONS.4.SITE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PLANSAPPROVED BY THE CITY.5.CONSTRUCTION OF PROJECT SHALL MEET CITY OF ELK RIVER DESIGNSTANDARDS (LAST REVISION AUGUST 2017) UNLESS PLANS INDICATESOTHERWISE.6.PEDESTRIAN CURB RAMPS SHALL CONFORM TO MNDOT STANDARD PLANS.60'60'PROPOSED HOUSE PAD(EXACT LOCATION TO BEDETERMINED BY HOUSE BUILDER)DESCRIPTIONDATENO. REV FILE NO.: DWG FILE: CHECKED BY: DRAWN BY: DESIGN BY: DATE: SHEET NO.LAND SURVEYING CIVIL ENGINEERING ENVIRONMENTAL SERVICES 13076 FIRST STREET, BECKER, MN 55308-9322 TEL: 763-262-8822 FAX: 763-262-8844 BOGART, PEDERSON & ASSOCIATES, INC. TRANQUIL MEADOWS RESIDENTIAL DEVELPOPMENT PROVIDENCE S&S, LLC City of Elk River, Sherburne County, MN 02/22/2021 21-0046.00 CJD MJM MJM I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Signed: Date: Lic. No. Christopher J. Dahn 5862804/18/2022 -02/22/2021 DRAWINGS ISSUED TO CITY 1 03/12/2021 DRAWINGS REVISED PER CITY REVIEW 2 03/30/2021 MPCA REVIEW 3 04/21/2021 FINAL CONSTRUCTION PLANS 4 05/14/2021 DRAWINGS REVISED PER 2ND CITY REVIEW 5 06/30/2021 ADDENDUM 1 6 04/18/2022 RECORD AS-BUILT DRAWINGSRECORD DRAWINGMEASURED BY: MW/CK @ BPA (04-18-22)DRAWN BY MW @ BPARECORD DRAWING