5.3 ERMUSR 12-13-2022��i
Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO:
FROM:
ERMU Commission
Melissa Karpinski — Finance Manager
MEETING DATE:
AGENDA ITEM NUMBER:
December 13, 2022
5.3
SUBJECT:
2023 Annual Business Plan (Budget, Schedule of Rates & Fees)
ACTION REQUESTED:
Adopt the 2023 Annual Business Plan
BACKGROUND:
In November, the preliminary 2023 Annual Business Plan was presented to the Commission.
There have been some changes due to finalizing of projects and expenses. The final highlights
are discussed below.
DISCUSSION:
Electric Budget and Rates
As discussed in November, we are proposing a 5% rate increase for 2023.
Notable items in the electric budget for 2023 are:
• Up to a 3.25% wage adjustment for all pay plan groups.
• Conservative estimate for usage and growth.
• 21% purchase power expense increase.
• No landfill gas plant related expenses due to decommissioning in 2022.
• Contracting of tree trimming for $140k.
• Increased depreciation expense due to the new field services building.
• Increased Customer Accounts expense due to increased number of customer
satisfaction surveys.
• Administrative expenses for having an administrations director for the full year, UPMIC
distribution's change in percentage, expenses for potential bonding for AMI project*,
and Travel and Training includes some additional expenses for the new general
manager.
• Replacement of Bucket Truck #4.
• Replacement of Vactron #50.
• Replacement of Truck #20.
• Shared cost in the replacement for Vehicle #1 for administration and Pickup Trucks #2
and #32 for technical services.
• Highway 169 Redefine project from reserves.
• Otsego transformer replacement from reserves.
Page 1 of 2
100
• County Road 12 interconnection agreement with Connexus from reserves.
• Electric Service Territory acquisition loss of revenue for Areas 1&2, 3&4, 5&6, and 7&8
from reserves.
*AMI project from either an inter -fund borrowing or bonding.
Water Budget and Rates
As discussed in November, we are proposing a 2% rate increase for 2023.
Notable items in the water budget for 2023 are:
• Up to a 3.25% wage adjustment for all pay plan groups.
• Conservative estimate for usage and growth.
• Increased Customer Accounts expense due to increased number of customer
satisfaction surveys.
• Administrative expense for administrations director for a full year, UPMIC distribution's
change in percentage, Travel and Training includes some additional expenses for the
new general manager.
• Replacement of Pickup Truck #3.
• Shared cost in the replacement for Vehicle #1 for administration and Pickup Truck #2
and #32 for technical services.
• Water main construction from reserves.
• AMI project from reserves.
Summary
Submitted for approval is the 2023 Annual Business Plan which includes the 2023 Budget and
the 2023 Schedule of Rates & Fees. The 2023 fees were already approved by the Commission in
November and are being presented here unchanged. The adoption of the 2023 Schedule of
Rates & Fees through the adoption of the Annual Business Plan shall supersede and replace all
previously adopted tariffs, rates, and fees.
FINANCIAL IMPACT:
Notable items discussed above. As previously discussed, we are proposing a rate increase of 5%
for electric and 2% for water.
ATTACHMENTS:
• Proposed 2023 Annual Business Plan
o 2023 Budget
o 2023 Schedule of Rates & Fees
Page 2 of 2
101
-Ith, m-
�■
Municipal Utilities
2023 Annual Business Plan
102
TABLE OF CONTENTS
2023 BUDGET
• Summary of Budgets
• Electric Revenue and Expense Budget
• Water Revenue and Expense Budget
• Electric Capital Budget
• Administration and Technical Services Capital Budgets
• Water Capital Budget
• Training and Travel Budget
• Dues and Subscriptions Budget
• Conservation Improvement Program Budget
2023 SCHEDULE OF RATES & FEES
• Residential All Electric Service Rate
• Residential Electric Service Rate
• Residential Clean Energy Choice Program Rate
• Non -Demand All Electric Service Rate
• Non -Demand Electric Service Rate
• Demand All Electric Service Rate
• Demand Electric Service Rate
• Large Industrial Demand Electric Service Rate
• Transmission Transformed Service Rate
• Commercial Clean Energy Choice Program Rate
• Off -Peak Demand Electric Service Rate
• Commercial All Electric with Ground Source Heat Pump Service Rate
• Ground Source Heat Pump Program Rate
• Electric Vehicle Charging Rates
• Energy Management Program Rates
• Street/Security Light Service Rate
• Water Service Rates
• Fee Schedule
103
Municipal Utilities
2023 Budget
104
ELK RIVER MUNICIPAL UTILITIES
SUMMARY OF YEAR 2023
BUDGETS
ELECTRIC BUDGET SUMMARY
2023
ELECTRIC REVENUE $
47,672,142
ELECTRIC EXPENDITURES
(46,207,114)
ELECTRIC NET FOR CAPITAL
1,465,028
3.07% Margin
DEBT RETIREMENT
(915,000)
NET LESS DEBT PRINCIPAL PMTS
550,028
CAPITAL EQUIPMENT/CONSTRUCTION
(8,213,440)
FUND FROM RESERVES
250,000 *
Highway 169 redefine
FUND FROM RESERVES
500,000 *
Otsego Transformer Replacement
FUND FROM RESERVES
1,224,190 *
Territory Acquisition Areas 18,2, 3&4, 58,6, 7&8 Loss of Revenue
BONDING or INTER -FUND BORROWING
2,500,000
AMI
NET
(3,189,222)
DEPRECIATION
3,220,836
NET TO RESERVES
31,614 *
Note that this is separate from above funding of draw on reserves
WATER BUDGET SUMMARY
2023
WATER REVENUE $
3,461,947
WATER EXPENDITURES
(3,409,180)
WATER NET FOR CAPITAL
52,767
1.52% Margin
DEBT RETIREMENT
(60,000)
NET LESS DEBT PRINCIPAL PMTS
(7,233)
CAPITAL EQUIPMENT/CONSTRUCTION
(3,139,750)
FUND FROM RESERVES
1,198,000 *
AMI
FUND FROM RESERVES
1,250,000 *
Water Main Construction (Schoolview)
BONDING
-
NET
(698,983)
DEPRECIATION
1,202,937
NET TO RESERVES
503,954 *
Note that this is separate from above funding of draw on reserves
* Currently, target reserves are met.
105
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
2023 ELECTRIC BUDGET
2023 Annual
2022 Annual
2021 Annual
Electric
Budget
Budget
Actual
Revenue
Operating Revenue
Elk River
440.4411 ELECT SALES- ELK RIVER RESIDENTIAL
14,039,146
13,522,235
13,020,814
440.4412 ELECT SALES - ELK RIVER NON -DEMAND
3,461,850
3,228,253
3,030,512
440.4413 ELECT SALES - ELK RIVER DEMAND
20,243,229
19,635,955
18,940,232
440.4461-4463 PCA SALES REVENUE- ELK RIVER
4,297,101
9/t amountadded 2023
Total for Elk River:
42,041,325
36,386,443
34,991,559
Otsego
440.4416 ELECT SALES- OTSEGO RESIDENTIAL
1,420,072
1,367,786
1,297,397
440.4417 ELECT SALES - OTSEGO NON -DEMAND
454,649
423,970
439,205
440.4418 ELECT SALES - OTSEGO DEMAND
1,180,452
1,123,576
1,241,021
440.4464-4466 PCA SALES REVENUE - OTSEGO
330,484
9/t account added 2023
Total for Otsego:
3,385,656
2,915,332
2,977,625
Rural Big Lake
440.4421 ELECT SALES- BIG LAKE RESIDENTIAL
214,102
206,219
188,172
440.4422 ELECT SALES - BIG LAKE NON -DEMAND
4,513
4,208
4,468
440.4467-4468 PCA SALES REVENUE - BIG LAKE
20,043
-
- 9/t account added 2023
Total for Rural Big Lake:
238,658
210,428
192,642
Dayton
440.4431 ELECT SALES- DAYTON RESIDENTIAL
221,646
213,485
196,462
440.4432 ELECT SALES - DAYTON NON -DEMAND
39,638
36,964
38,223
440.4469-447 PCA SALES REVENUE- DAYTON
24,187
9/t a-untadded 2023
Total for Dayton:
285,471
250,449
234,686
Public St & Hwy Lighting
440.4414 ELECT SALES - SEC LTS
260,000
250,000
252,069
Total for Public St & Hwy Lighting:
260,000
250,000
252,069
Other Electric Sales
440.455 SUB -STATION CREDIT
4,800
4,800
4,800
440.4554 RATE INCREASE
773,546
Total for Other Electric Sales:
4,800
4,800
778,346
Total for Operating Revenue:
46,215,911
40,017,451
39,426,927
Other Operating Revenue
Interest/Dividend Income
460.4691 INTEREST & DIVIDEND INCOME
50,000
80,000
52,514
Total for Interest/Dividend Income:
50,000
80,000
52,514
Customer Penalties
470.4701 CUSTOMER DELINQUENT PENALTIES
250,000
235,000
Total for Customer Penalties:
250,000
235,000
-
LFG Project
470.4721 LFG PROJECT
836,000
1,019,096
Total for LFG Project:
-
836,000
1,019,097
Connection Fees
470.4702 DISCONNECT& RECONNECTCHARGE
220,000
220,000
263,330
Total for Connection Fees:
220,000
220,000
263,330
Misc Revenue
470.4703 MISC ELEC REVENUE - TEMP CHG
2,000
2,000
2,612
470.4704 STREET LIGHT
20,000
20,000
51,590
470.4715 TRANSMISSION INVESTMENTS
649,231
600,000
525,384
470.4722 MISC NON -UTILITY
90,000
90,000
102,899
470.4723 GAIN ON DISPOSITION OF PROPERTY
-
-
-
470.4739 PERA PENSION REVENUE
-
-
4,869
470.477 CONTRIBUTIONS FROM CUSTOMERS
175,000
175,000
385,316
470.478 CONTRIBUTIONS FROM GRANTS
Total for Misc Revenue:
936,231
887,000
1,072,671
Total Other Revenue
Total for Total Other Revenue:
1,456,231
2,258,000
2,407,612
Total Revenue
47,672,142
42,275,451
41,834,539 12.8%
Expenses
Purchased Power
540.5551 PURCHASED POWER
24,207,981
27,017,920
28,169,145
540.5553 ENERGY ADJUSTMENT CLAUSE
8,558,044
9/t account added 2023
Total for Purchased Power:
32,766,025
27,017,920
28,169,145 21.3%
Operating & Mtce Expense
540.5461 OPERATING SUPERVISION
137,000
143,000
108,275
540.5471 DIESEL OIL FUEL
10,000
10,000
7,222
540.5472 NATURALGAS
25,000
17,500
23,963
540.5483 ELECTRIC & WATER CONSUMPTION - PLANT
34,000
30,000
28,591
540.5484 PLANT SUPPLIES & OTHER EXPENSE
13,000
13,000
11,401
540.5491 MISC POWER GENERATION EXPENSE
8,000
8,000
6,281
540.5521 MAINTENANCE OF STRUCTURE - PLANT
20,000
15,000
11,633
540.5531 MTCE OF PLANT ENGINES/GENERATORS
39,000
25,000
37,825
540.5541 MTCE OF PLANT/LAND IMPROVEMENT
35,000
30,000
24,715
Total for Operating & Mice Expense:
321,000
291,500
259,909
Landfill Gas
550.505 LANDFILL GAS PLANT PURCHASED GAS
-
151,794
172,348 Per contract ending 10/2022
550.5051 LANDFILL GAS PLANT OPERATIONS & MTCE
-
415,187
543,031
550.5052 LANDFILL GAS PLANT ADMINISTATION
-
25,550
5,188
550.5053 LANDFILL GAS PLANT INSURANCE
-
19,950
19,389
106
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
2023 ELECTRIC BUDGET
2023 Annual
2022 Annual
2021 Annual
Electric
Budget
Budget
Actual
550.5054 LANDFILL GAS PLANT MTCE
650
2,763
Total for Landfill Gas:
-
613,131
742,722
Transmission Expense
560.562 TRANSMISSION MTCE AND EXPENSE
70,000
66,700
67,470
Total for Transmission Expense:
70,000
66,700
67,471
Distribution Expense
580.5801 REMOVE EXISTING SERVICE & METERS
1,050
2,500
397
580.5821 SCADA EXPENSE
44,000
44,000
42,351
580.5831 TRANSFORMER EXPENSE OH & URD
15,000
13,000
16,107
580.5851 MTCE OF SIGNAL SYSTEMS
2,000
2,000
1,350
580.5861 METER EXPENSE - REMOVE & RESET
1,500
1,000
1,495
580.5871 TEMP SERVICE - INSTALL & REMOVE
3,500
2,000
2,586
580.5881 MISC DISTRIBUTION EXPENSE
300,000
280,000
243,531
580.589 INTERCONNECTION CARRYING CHARGE
2,416
2,416
2,416
Total for Distribution Expense:
369,466
346,916
310,235
Maintenance Expense
590.5911 MTCE OF STRUCTURES
46,000
30,000
25,034
590.5921 MTCE OF SUBSTATIONS
35,000
26,000
12,180
590.5922 MTCE OF SUBSTATION EQUIPMENT
77,000
69,000
72,011
590.5931 MTCE OF OH LINES/TREE TRIM
225,000
225,000
59,360
$1401, contractors
590.5932 MTCE OF OH LINES/STANDBY
40,000
36,000
36,674
590.5933 MTCE OF OH PRIMARY
170,000
170,000
152,255
590.5941 MTCE OF URD PRIMARY
170,000
165,000
176,888
590.5943 LOCATE ELECTRIC LINES
106,000
105,100
102,561
590.5944 LOCATE FIBER LINES
1,000
1,000
308
590.5951 MTCE OF LINE TRANSFORMERS
60,000
60,000
51,790
590.5961 MTCE OF STREET LIGHTING
45,000
45,000
24,711
590.5962 MTCE OF SECURITY LIGHTING
15,000
10,000
13,815
590.5971 MTCE OF METERS
85,000
80,000
64,016
590.5972 VOLTAGE COMPLAINTS
10,000
10,000
7,420
590.5981 SALARIES TRANSMISSION & DISTRIBUTION
30,500
30,000
25,935
590.5985 ELECTRIC MAPPING
95,000
90,000
79,158
590.5991 MTCE OF OH SECONDARY
25,000
25,000
19,784
590.5992 MTCE OF URD SECONDARY
60,000
50,000
47,085
590.5995 TRANSPORTATION EXPENSE
245,000
240,000
221,526
Total for Maintenance Expense:
1,540,500
1,467,100
1,192,521
Depreciation & Amortization
595.8031 DEPRECIATION
2,552,700
2,436,698
2,289,550
595.8032 AMORTIZATION
668,136
668,135
668,135
Total for Depreciation & Amortization:
3,220,836
3,104,833
2,957,685
Interest Expense
596.8071 INTEREST EXPENSE- BONDS
870,695
906,275
818,495
596.8075 INTEREST EXPENSE - DEFEASED BONDS
-
-
(276)
597.8281 AMORTIZATION OF DEBT DISCOUNT
(59,863)
(60,766)
(61,039)
Total for Interest Expense:
810,832
845,509
756,910
Other Operating Expense
597.8165 EV CHARGING EXPENSE
7,731
4,240
4,010
597.8213 LOSS ON DISPOSITION OF PROP (CAPITAL)
15,500
12,500
45,213
597.8263 OTHER DONATIONS
3,000
3,000
1,177
597.8265 MUTUALAID
-
-
6,860
597.8302 PENSION EXPENSE
45,000
45,000
(283,382)
597.8303 OPEB EXPENSE
-
-
(208,273)
597.8311 OTHER INTEREST EXPENSE
378
-
(980)
597.8341 INTEREST EXPENSE - METER DEPOSITS
2,500
2,000
890
Total for Other Operating Expense:
74,109
66,740
(434,484)
Customer Accounts Expense
900.9021 METER READING EXPENSE
47,000
42,100
44,749
900.903 DISCONNECT/RECONNECT EXPENSE
22,000
16,100
17,106
900.9051 MISC CUSTOMER ACCOUNTS EXPENSE UTILITY
312,500
272,000
269,231
Customer satisfaction survey
900.9061 BAD DEBT EXPENSE & RECOVERY
20,000
20,000
6,672
Total for Customer Accounts Expense:
401,500
350,200
337,760
Administrative Expense
920.9201 SALARIES OFFICE & COMMISSION
950,000
860,000
773,608
Admin Director
920.9202 SALARIES COVID-19
-
-
21,040
920.9205 TEMPORARY STAFFING
4,000
4,000
-
920.9211 OFFICE SUPPLIES
107,000
107,000
74,004
920.9212 ELECTRIC & WATER CONSUMPTION - OFFICE
29,000
29,000
24,641
920.9213 BANK FEES
2,500
2,500
2,380
920.9221 LEGAL FEES
40,000
32,000
22,855
920.9231 AUDITING FEES
18,520
18,040
16,960
920.9241 INSURANCE
186,000
182,884
152,429
920.926 UTILITY SHARE -DEFERRED COMP
124,000
123,500
102,611
920.9261 UTILITY SHARE - MEDICAL/DENTAL/DISABIL
858,481
847,000
759,627
920.9262 UTILITY SHARE -PERA
288,000
280,000
263,991
920.9263 UTILITY SHARE - FICA
280,000
265,000
253,522
920.9264 EMPLOYEE SICK PAY
150,000
133,025
140,780
920.9265 EMPLOYEE HOLIDAY PAY
157,500
146,991
152,302
920.9266 EMPLOYEE VACATION & PTO PAY
250,000
231,961
226,253
920.9267 UPMIC DISTRIBUTION
91,015
60,000
58,665
920.929 LONGEVITY PAY
16,369
-
-
920.9291 CONSULTING FEES
80,000
55,000
79,398
Bonding
920.9301 TELEPHONE
41,000
31,300
31,253
107
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
2023 ELECTRIC BUDGET
2023 Annual
Electric Budget
920.9302 ADVERTISING 15,000
920.9303 DUES & SUBSCRIPTIONS - FEES 172,675
920.9305 SCHOOLS & MEETINGS 259,925
920.9321 MTCE OF GENERAL PLANT &OFFICE HEATING 7,600
Total for Administrative Expense: 4,128,585
General Expense
920.9269 CIP REBATES - RESIDENTIAL
920.927 CIP REBATES -COMMERCIAL
920.9271 CIP -ADMINISTRATION
920.9272 CIP - MARKETING
920.9273 CIP - LABOR
920.9274 CIP REBATES - LOW INCOME
920.9275 CIP - LOW INCOME LABOR
920.9281 ENVIRONMENTAL COMPLIANCE
920.9306 MISC GENERAL EXPENSE
Total for General Expense:
Total Expenses (before Operating Transfers)
Operating Transfer
Operating Transfer/Other Funds
597.8262 TRANSFER TO CITY ELK RIVER REVENUE
Total for Operating Transfer/Other Funds:
Utilities & Labor Donated
597.8261 UTILITIES & LABOR DONATED TO CITY
Total for Utilities & Labor Donated:
Total Operating Transfer
Total for Total Operating Transfer:
Net Income Profit(Loss)
100,170
189,583
19,700
30,039
178,511
18,000
9,887
34,219
2,500
582,609
44,285,461
2022 Annual
2021 Annual
Budget
Actual
13,000
13,860
130,365
230,896 Bonding
224,212
118,020
7,500
7,313
3,784,279 3,526,417
57,907 49,218
232,200 104,250
85,301 5,418
47,000 27,462
100,512 143,124
18,500 18,635
9,750 10,474
34,000 32,269
2,500 5,574
587,670 396,426
38,542,498 38,282,718 15%
1,681,653
1,455,458
1,407,734
1,681,653
1,455,458
1,407,734
240,000
230,000
224,814
240,000
230,000
224,814
1,921,653 1,685,458 1,632,548
1,465,028 2,047,495 1,919,272
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
2023 WATER BUDGET
2023 Annual 2022 Annual 2021 Annual
Water Budget Budget Actual
Revenue
Operating Revenue
Water Sales
610.6101 Water Sales Residential 1,397,043 1,359,866 1,764,627
610.6102 Water Sales Commercial 850,022 842,025 925,451
610.6103 Water Sales Irrigation 256,349 243,025 359,060
Total for Water Sales: 2,503,413 2,444,916 3,049,140
Total Operating Revenue
2,503,413 2,444,916 3,049,139
Total for Total Operating Revenue: 2,503,413 2,444,916 3,049,140
Other Operating Revenue
Interest/Dividend Income
460.4691 Interest & Dividend Income 35,000 35,000 24,676
460.4692 Other Interest/Misc Revenue 1,500 1,000 1,310
Total for Interest/DividendIncome: 36,500 36,000 25,988
Customer Penalties
620.6301 Customer Penalties 28,000 18,000 -
Total for Customer Penalties: 28,000 18,000 -
Connection Fees
620.6401 Water/Access/Connections Fees 450,000 430,000 548,947
620.6402 Customer Connection Fees 40,000 35,000 42,709
620.6407 Bulk Water Sales/Hydrant Rental 28,000 15,000 28,810
Total for Connection Fees: 518,000 480,000 620,467
Misc Revenue
470.4722 Misc Non -Utility 50 - 31
470.4739 Para Pension Revenue - - 910
620.626 Transfer In From City - - 195,245
620.6403 Miscellaneous Revenue 500 - 1,141
620.6323 Gain On Disposition Of Property - - -
620.6404 Hydrant Maintenance Program 13,500 13,000 13,209
620.6405 Contributions from Developers 65,000 65,000 552,919
620.6406 Water Tower Lease 296,984 286,153 275,727
Total for Misc Revenue: 376,034 364,153 1,042,472
Total Other Revenue
958,534 898,153 1,688,927
Total for Total Other Revenue: 958,534 898,153 1,688,927
Total Revenue 3,461,947 3,343,069 4,738,067
Expenses
Production Expense
700.7021 MTCE OF STRUCTURES 90,000 75,000 173,376
Total for Production Expense: 90,000 75,000 173,376
Pumping Expense
710.7101 SUPERVISION 69,000 66,000 57,004
710.7181 ELECTRIC & GAS UTILITIES 288,000 270,000 263,078
710.7182 SAMPLING 15,000 15,000 14,339
710.7183 CHEMICAL FEED 50,000 36,000 36,273
710.722 MTCE OF WELLS 165,000 160,000 125,418
710.723 SCADA- PUMPING 16,000 16,000 5,140
Total for Pumping Expense: 603,000 563,000 501,438
Distribution Expense
730.7301 MTCE OF WATER MAINS 120,000 120,000 226,593
730.7309 LOCATE WATER LINES 17,250 17,000 16,132
730.7312 WATER METER SERVICE 66,000 55,000 60,844
730.7316 BACKFLOW DEVICE INSPECTION 16,000 15,000 9,055 Labor and software expense
730.7321 MTCE OF CUSTOMERS SERVICE 30,500 30,500 28,116
730.7325 WATER MAPPING 12,500 12,500 8,732
730.7331 MTCE OF WATER HYDRANTS - PUBLIC 19,000 18,000 13,517
730.7332 MTCE OF WATER HYDRANTS - PRIVATE 5,000 5,000 5,093
730.7341 WATER CLOTHING/PPE 9,000 7,000 13,542
730.7391 WAGES WATER 7,300 9,500 6,138
730.7395 TRANSPORTATION EXPENSE 16,500 15,000 10,198
730.7399 WATER PERMIT 18,600 18,600 14,875
Total for Distribution Expense: 337,650 323,100 412,901
Depreciation & Amortization
595.8031 DEPRECIATION 1,202,937 1,199,124 1,139,801
Total for Depreciation & Amortization: 1,202,937 1,199,124 1,139,802
109
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
2023 WATER BUDGET
Water
Interest Expense
596.8071 INTEREST EXPENSE - BONDS
596.8075 INTEREST EXPENSE - DEFEASED BONDS
597.8281 AMORTIZATION OF DEBT DISCOUNT/PREMIUM
Total for Interest Expense:
Other Operating Expense
597.8213 LOSS ON DISPOSITION OF PROP (CAPITAL)
597.8264 DAM MAINTENANCE EXPENSE
597.8302 PENSION EXPENSE
597.8303 OPEB EXPENSE
597.8311 OTHER INTEREST EXPENSE
597.8341 INTEREST EXPENSE - METER DEPOSITS
Total for Other Operatin Expense:
Customer Accounts Expense
900.9021 METER READING EXPENSE
900.9051 MISC CUSTOMER ACCOUNTS EXPENSE UTILITY
900.9061 BAD DEBT EXPENSE & RECOVERY
Total for Customer Accounts Expense:
Administrative Expense
920.9201 SALARIES OFFICE & COMMISSION
920.9202 SALARIES COVID-19
920.9205 TEMPORARY STAFFING
920.9211 OFFICE SUPPLIES
920.9212 ELECTRIC & WATER CONSUMPTION - OFFICE
920.9213 BANK FEES
920.9221 LEGAL FEES
920.9231 AUDITING FEES
920.9241INSURANCE
920.926 UTILITY SHARE - DEFERRED COMP
920.9261 UTILITYSHARE- MEDICAL/DENTAL/DISABIL
920.9262 UTILITY SHARE - PERA
920.9263 UTILITY SHARE - FICA
920.9264 EMPLOYEE SICK PAY
920.9265 EMPLOYEE HOLIDAY PAY
920.9266 EMPLOYEE VACATION & PTO PAY
920.9267 UPMIC DISTRIBUTION
920.929 LONGEVITY PAY
920.9268 WELLHEAD PROTECTION
920.9291 CONSULTING FEES
920.9301 TELEPHONE
920.9302 ADVERTISING
920.9303 DUES & SUBSCRIPTIONS- FEES
920.9305 SCHOOLS & MEETINGS
920.9321 MTCE OF GENERAL PLANT & OFFICE HEATING
Total for Administrative Expense:
2023 Annual 2022 Annual 2021 Annual
Budget Budget Actual
43,000
46,371
36,296
-
-
(69)
(6,651)
(6,651)
(3,325)
36,349
39,720
32,902
500
-
662
1,750
1,750
(393)
-
-
18,645
-
-
(44,525)
95
-
(244)
125
100
26
2,470
1,850
(25,830)
2,500
2,500
2,326
81,620
71,200
69,886 Customer satisfaction survey
250
500
-
84,370
74,200
72,213
268,500
235,000
224,435 Admin Director
-
-
1,791
1,000
1,000
-
25,500
23,700
23,716
8,000
8,000
6,160
625
700
607
9,000
8,000
5,080
4,630
4,510
4,240
36,000
27,000
22,128
30,500
28,000
17,722
215,000
217,000
189,669
54,000
51,000
49,360
52,000
49,000
47,321
27,000
30,000
26,235
30,800
28,000
28,139
44,000
41,000
41,535
18,069
11,000
11,275
3,106
-
-
10,000
20,000
3,790 Wellhead protection plan amendment
35,000
20,000
43,887
9,500
6,800
7,365
6,500
5,000
3,791
78,320
73,616
106,965
63,705
55,026
24,356
1,900
1,900
1,828
1,032,654
945,252
891,406
General Expense
920.9269CIPREBATES -RESIDENTIAL
10,500
4,500
5,279
920.927CIPREBATES -COMMERCIAL
500
500
-
920.9272 CIP- MARKETING
500
500
121
920.9273 CIP - LABOR
4,700
4,700
4,430
920.9281 ENVIRONMENTAL COMPLIANCE
2,200
2,200
952
920.9306 MISC GENERAL EXPENSE
250
250
805
Total for General Expense:
18,650
12,650
11,590
Total Expenses (before Operating Transfers)
3,408,080
3,233,895
3,209,798
Operating Transfer
Utilities & Labor Donated
597.8261 WATER & LABOR DONATED TO CITY
1,500
1,500
1,258
Total Operating Transfer
-
Total for Total Operating Transfer:
1,500
1,500
1,259
Net Income Profit(Loss)
52,367
107,674
1,527,010
110
Elk River Municipal Utilities Business Plan/Budget
2023 Electric Department Capital Budget
Capital Construction Projects
Cost Description
$ 250,000 Highway 169 redefine Reserves
$ 100,000 Rebuild: Parish Ave
$ 75,000 199th rebuild
$ 100,000 Rebuild Sandpiper Estates
$ 100,000 Waco Business Center Dr Recon
$ 100,000 Cty Rd 44 Rebuild
$ 100,000 Cty Rd 33
Subtotal $ 825,000 *Projects listed in order of priority
Capital Construction Substations
Cost Description
$ 150,000 East Design
$ 500,000 Otsego Transformer Replacement Reserves
$ 30,000 Station 14-3 Relay Panel Replacement
$ 6,000 Station 14-4 Recloser Controller Replacement
$ 51,000 West Bank #1 Relay Panel Replacement, Recloser Controller and Tank Replacement
$ 45,000 West Bank #2 Relay Panel Replacement and Recloser Tank Replacement
Subtotal $ 782,000
Capital Construction Feeders
Cost Description
$ 300,000 New Feeder to tie Sub 14-4 to Otsego Sub
$ 100,000 County Rd 35 Feeder to Waco
$ 250,000 Rebuild Feeder 46 Substation to Hwy 10
Subtotal $ 650,000
Capital Construction System
Cost Description
$ 510,000 Transformers and Meters
$ 2,500,000 AMI Bond
$ 350,000 New Development Distribution Installation
$ 50,000 Street Lighting
$ 75,000 Ongoing OH Equip Replacement (Poles, Switches, Cut -Outs)
$ 150,000 Ongoing LIRD Equip Replacement (Switches, J-Boxes, Fuse Pads)
$ 50,000 Fault Indicators Replacements
Subtotal $ 3,685,000
Capital Equipment Needs
Cost Description
$
250,000 Replace Bucket Truck Vehicle #4
$
130,000 Replace Vactron Vehicle #50
$
20,000 Trailer
$
6,125 Shared Equipment Scrubber
$
65,000 Replace Truck Vehicle #20
$
10,000 Ez Spot
$
161,800 Electric share of Administration
$
356,825 Electric Share of Technical Services
$
17,500 Tools at Field Services Building
Subtotal $ 1,017,250
Capital Facilities & Misc Needs
Cost Description
$ 30,000 Vactron clean out west sub
$ 300,000 County Rd 12 Interconnection Agreement - Connexus Reserves
$ 924,190 Territory Acquisition - Loss of Revenue Pmt (2015 Contract - Area 1&2, 3&4, 5&6, 7&8) Reserves
Subtotal $ 1,254,190
Total Capital $ 8,213,440
Electric Noteworthy Non -Recurring Expenses
Cost Description
$
21,200 Computers, iPads, Software, Accessories
$
6,000 Paint Trailer
$
10,000 Paint Transformers/Switchgear
$
10,000 Tools
$
15,000 Station 14-3 Contractor Testing and Inspections
$
14,000 Electric share of Administration
$
18,170 Electric share of Technical Services
Total $ 94,370
111
Elk River Municipal Utilities Business Plan/Budget
2023 Administration and Technical Services Departments Capital Budgets
Administration Capital Needs
Cost Description
$ 10,000 Office Furniture
$ 7,000 Hallway Display and Branding
$ 7,500 Computer Monitor Arms
$ 10,600 Server upgrades
$ 10,000 Network Switch (City main core)
$ 5,000 Network Switches/Misc (ERMU)
$ 40,000 Security Camera System Replacement
$ 25,000 Building Security
$ 5,000 Voice Server Replacement
$ 15,900 MDMS
$ 10,000 Phone System
$ 50,000 Vehicle #1
Subtotal $ 196,000
Administration Noteworthy Non -Recurring Expenses
Cost Description
$
17,500 Computers, Wads, Software, Accessories, Scanners, Printers - Upgrades
Subtotal
$
17,500
Total Administration
$
213,500
Technical Services Capital Needs
Cost Description
Currently designated as emergency
Diesel Engines Emission Retrofit $ 350,000 standby, retrofit on hold until further notice
Diesel Plant to run on Natural gas. $ 20,000 Deferred until future date
$
25,000 Upgrade tanks per inspection issues
$
25,000 Repair Exhaust - Engine #3
$
10,000 Rebuild - Engine #3
$
63,500 Fiber Extension - 169 to Sub
$
15,000 Fiber Extension - Station 14
$
61,000 Fiber Extension - Johnson Tower Due to AMI
$
- Fiber Extension - Auburn Tower Due to AMI
$
9,500 Locator
$
130,000 Trucks Vehicle #2 & #32
$
37,000 EV DC Fast Charger
Subtotal
$
376,000
Technical Services Noteworthy
Non
-Recurring Expenses
Cost Description
$
8,600 Computers, Wads, Software, Accessories - Upgrades
$
10,000 General Engine Inspections/Maint.
Subtotal
$
18,600
Total Technical Services
$
394,600
Total Capital Items
$
572,000
Total Non-Recuring Expenses
$
36,100
112
Elk River Municipal Utilities Business Plan/Budget
2023 Water Department Capital Budget
Water Capital Construction Needs
Cost
Description
$
15,000
Well #4 Rehab
$
20,000
Well #7 VFD
$
20,000
Flood Alarms - Well 2, 3, 5 and 7
$
15,000
Chlorine Analyzers
$
100,000
Facility Repair
$
150,000
Meadowvale Booster Station
$
90,000
Freeport Tower Paint/Sandblast
$
15,000
Placeholder for undetermined projects
$
90,000
SCADA upgrades
$
55,000
Well #9 Fiber
$
1,198,000
AMI Reserves
$
1,250,000
Water Main Construction (Schoolview) Reserves
Subtotal $ 3,018,000
Capital Equipment Needs
Cost Description
$ 875 Shared Equipment Scrubber
$ 65,000 Trucks #3
$ 34,200 Water share of Administration
$ 19,175 Water Share of Technical Services
$ 2,500 Tools at Field Services Building
Subtotal $ 120,875
Total Capital $ 3,139,750
Water Noteworthy Non -Recurring Expenses
Cost Description
$ 7,000 Computers, iPads
$ 10,000 Meters/ERT
$ 10,000 Tools
$ 3,500 Water share of Administration
$ 430 Water share of Technical Services
Total $ 30,930
113
EI«tri<
MMUA verhead Hot Line School
MMUA Undeego,—d School
MMUA ansformer School
MMUA Substation Workshop
2staff
2staff
2staff
2 staff
ff
eadership
Adva cad St mgnWorkshop
Aoorent—hlo
staff
Istaff
3 staff
' off
0.odeoteam staff teem -Kansas Ciry, KS
g School/Diesel Workshop 2staff
ff Cgmbe'rinformxdon Con£(NLSC� staff n --mg
IM UA TKO Conference staff van ry p on and Assistantattending portal
ming/Chaicaw Workshop 4staff
eryday Leadership Training 73 Identifled need in Survey
oo Driving xhool istaff Ed
- -
Addid nal Tmmmg raven ry natant
ertification Continuing Education 4 staff
ertdication continuing Edocetion stiff TECO
Unliceced El -colon Continuing Eduadon stiff W 60 -
PublicA El--1 Skills Staff - - - 2024
W-A Certificate Pmgam stiff 2,350 - -
E.,kflowTe1- Certdicetion Class staff -
ProfessionalOpeatorend Devempment staff 750 JSO
off -
1,710
dership i staff - jS onth program
eALea
ryday—d—hpTaining 64 Identifled need in Survey
Additional Training
Te<hni<al5ervi«a
Workshop - - -
eselWodrsAop 1staff - 850 EST
2 2,ODD- -
workshop istaff 200 200 2o0
Workshops/EPS - - -
Conference staff - -
Sobsmdon School 2staff
war Oueliry twining staff
Inffared Cameo twining staff
UMMA er ff
ff
Leadershiv I staffff 3,580 - -
ff -
1,710
erydayLeadersFpTraining a Identifed need in Survey
Additional Taining
Administration
ertdication continuing Edocetion
nel Conference
staff ertification Continuing Education
ITatercertification Continuing Education
staff
staff
r W.,k hop
ff
staff
ff
ntoalSommerM—Ing
staff/5 comm
UA egislet��e Roundwp
staff/l wmm
egKI.C. R—dwp
2staff/l wmm
UA T&O Cnference
Advanced Twining
roar
staff
Istaff
1staff 2,000
Clerk's Conference
MN ip.1 C1. k, I-Ift to
ertifiation Twining
Aeadeg
Istaff -
I staff TODD S,OEO SOO —pleb, 2023
staff - -
MMUA rship Aademy
Rodeop'n ea g o Ldership
I 4,31D 4,310 4,3 10
- - nth prog
staff ram
staff2:421) Kansas
a
PA E&O Cnfrence
onel Conference
staff asadena, CAKS
staff/0 wmm 3,050 3,050
em'b,rinformadon Conf(NLSC)
APPAng (Mg etc)
ff
staff
staff 2,500 25DD
ng(Mg ,etc)
nng/Conferene
staff 3,500 - -
staff - - Moved to Office
end Fall Meeeing
n1-ky Egoipment Show
eryday eadeship raining
ory egal& RegulatConference
Ch ppewa Valley Tech-Elecaic Taining —Tin I,
AdditionalTraining
42o- -
- odd y.,(fly out mon fly beck thur(
staff - SCO
all1,
- nclodes Strategic Planning
,
staff - - New Atto y
2staff - -
Office
ember Information Conf(NLSC) istaff Added additional staff for prepaation of AMI
Cl
0 00 Identifed need in Survey
g ff
Clerk's Conference Istaff 800 -
ns onference staff - - ommumcations
Chamberttaaders0 Pmgam istaff
Fin—nong (APA, NISC & MI,,)ng Ed, Mist PR, Excel, Accounting Mist
eryday Leadership Taining TT 1aff 4,783 4,783 4,545 Identifled need in Survey
Lers eadhip - - -
MRA AmploymentiawUpdate 1
staff -
conference staff -
PA cybersecodty Sommh staff
IT SCCPOnline Edocetion staffTTrlbibg
NLSC/Misc IT Taining istaff Tai g
Additional Training
52
fety Treiniire
Safe DdverTaining ]staff
Additional Training
ngT
Laborrt
Education
Total
Tutal<hanCe — 131
114
ELK RIVER MUNCIPAL UTILITIES
DUES & SUBSCRIPTIONS - FEES BUDGET FOR 2023
Budget
Budget
Actual
Description
2023
2022
2021
MMUA Membership Dues
33,839
33,839
32,413
MMTG Dues
6,550
6,550
6,549
APPA Dues
17,338
17,630
17,629
APPA DEED Program Dues
3,600
3,600
3,526
Customer Service Survey
6,000
-
-
MMUA Monthly Safety Meetings
30,500
30,500
30,237
Rotary
300
300
-
Drug and Alcohol Random Testing
1,500
1,500
894
Bond Administrative & Management Fees
6,400
5,400
8,222 US Bank, City (Bond Disclosure Fees), Moody's
Quarterly MN Dept of Health Water Connection Fee
55,500
54,500
52,902
MRWA Annual Fee
300
300
300
AWWA Annual Fee Dues
2,120
2,120
2,065
MPCA Permit Fee - WTP
350
350
-
MPCA Permit Fee - Engines
360
360
354
Homeland Security (Hazardous Chemical Fee)
700
700
700
SUSA Membership
125
125
125
Elk River Chamber Membership
620
620
590
Economic Development Association
350
350
- MN Deed, EDA of MN
GASB Subscription
287
287
-
ESRI Small Govt Enterprise agreement
27,300
27,000
26,969
Citizen Serve
3,800
-
- New 2023
mPower Maintenance
-
6,000
6,000
AMI
-
-
Adobe Creative Cloud software
1,720
800
791 Includes stock image subscription
Adobe Pro software
1,200
800
978 Additional for CS Dept
SIEM Solution
2,380
2,380
- New 2022 - Billed from city
Customer Service Chat Feature
4,000
-
- New 2023
Munici-pals Membership
25
25
-
Survey Monkey
390
390
384
AWWA Partnership Safe Water Treatment/Distribution
100
100
-
accessiBe
490
490
Subscription added for new website
HR professional memberships)
1,400
1,400
1,344 SHRM and MRA
Miscellaneous
6,451
5,565
3,189 Detail below
Bond Underwriter's Discount
20,000
-
104,988 AMI Bonding
Bond Service Professional Fee
15,000
-
36,713 AMI Bonding
Total
250,995
203,981
337,862
Budget Change
23%
-32%
Budget Change without Bonding Expenses
6%
7%
Miscellaneous
6,451
5,565
3,189 Total
APA- Northstar Chapter Membership Fee
50
50
50
Supervisors Legal Update Renewal
530
530
504
Class A Electrical License
130
130
128
Journey worker A Electrician License Fee
43
43
-
Master A Electrician License Fee
73
-
73
Unlicensed Electrican Fee
24
19
24
CPA License Renewal
102
102
102
MN Society of CPA Membership
680
630
630 2 memberships
Zoom
170
170
162
MCFOA Membership
92
90
92 2 memberships
AWWA Membership Renewal
324
316
160 4 memberships
MPCA Wastewater Certification Renewal
92
92
- 4 renewals
Engineer License Renewal
-
125
- Even year renewal
IEEE Membership Renewal
241
241
-
Notary Renewal Fee
-
-
- Renews 1/2024 and 12/2027 - 5 years
APA Membership Renewal
298
260
262
Misc Bonds/Permits
1,000
1,000
445
Water Operator License
92
92
101 4 renewals
ISC2 Certification (IT)
125
125
125
RP3 Application Fee
-
1,200
- Every 3 years
BPMS Software
-
-
-
Sprinkler Inspection
350
350
-
CPP Certification Renew
-
-
150 Every 5 years (renewed in 2021)
Backflow Tester Certification Recert
-
-
- 1st in 2024
Go Daddy
150
-
141
IT ProTV
240
-
40
Amazon Business Prime Membership
200
-
-
Marco Meraki Licenses
1,045
-
-
State Registration Backflow Prevention
400
-
-
115
2023 CIP Operating Budget
Required Spending and Savings Goals
otal CIP Budget 2023
Total Spending Level 1.5% of GOR $ 580,109
Low Income Requirement .2% of Residential GOR $ 27,887
Energy Savings Goal (kWh) 4,957,493
Possible Distributed Renewable Generation Funds $ 28,969
Possible Research and Development Funds $ 57,939
Direct Labor
$
155,883
General & Administration
$
70,214
Advertising
$
30,039
Equipment
$
-
Contract (Includes $34,219 MN PUC Assessment)
$
34,219
Total
$
290,356
ERMU Rebates $ 289,7531
Total all Expenses and Rebates $ 580,109 I
Total Estimated kWh Savings 5,285,602
otal Operating CIP Budget No Rebates Only Direct Costs
otal Rebate Budget
Direct Labor $ 155,883
Advertising $ 30,039
Equipment $ -
Contract (Includes $34,219 MN PUC Assessment) $ 34,219
Total ERMU Operating Expenses $ 220,142
ERMU Self Funded 289,7531
otal Requested Budget
Direct Labor
$
155,883
Advertising
$
30,039
Equipment
$
-
Contract (Includes $31,000 MN PUC Assessment)
$
34,219
ERMU Self Funded Rebates
$
289,753
Total Requested 2022 Budget*
$
509,894
*No General and Administrative Included
116
-Ith, m-
�■
Municipal Utilities
2023 Schedule of Rates &Fees
117
Elk River
Municipal Utilities
RESIDENTIAL ALL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To single-family residences and individually metered apartments for all domestic purposes
with electric energy as a sole source of heating, and when all service is supplied through a single meter,
provided ratings of individual single-phase motors do not exceed five (5) horsepower.
Character of Service: AC, 60 cycles, 120/240 volt, three wire, single-phase.
Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter
is allowed for existing services only. Service under this rate schedule shall not be sub -metered and
resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must
be furnished without specific charge or price which varies with the quantity of energy used.
Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as
one single family private residence.
Meter equipment must be accessible to our service department at any time.
Residential All Electric Service Rate:
J Basic Monthly Electric Charge: J::�. �!'�°.., 5 .Q0. per month
Summer Winter
$0. 13734 / kWh / month $0.444& 12545/ kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: The Basic Monthly Electric Charge.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Page 1 of 2
118
Residential All Electric Service Rate
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 1 °, 24?4.... ,,R...2 0,22.1
A..R: , � ,4...,ki � , 2 . .
Effective January 1, 22424 ..,2..2..
Page 2 of 2
119
Elk River
Municipal Utilities
RESIDENTIAL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To single-family residences and individually metered apartments for all domestic purposes
when all service is supplied through a single meter, provided ratings of individual single-phase motors
do not exceed five (5) horsepower.
Character of Service: AC, 60 cycles, 120/240 volt, three wire, single-phase.
Special Conditions: Residential service to a multiple dwelling or apartment house through a single meter
is allowed for existing services only. Service under this rate schedule shall not be sub -metered and
resold to the individual tenants on the basis of usage and the cost of electric service to the tenant must
be furnished without specific charge or price which varies with the quantity of energy used.
Any apartment or dwelling unit which has separate permanent kitchen facilities shall be considered as
one single family private residence.
Meter equipment must be accessible to our service department at any time.
Residential Electric Service Rate:
Basic Monthly Electric Charge: $J:..:,v 51.. 5 O.Q. per month
Summer Winter
$0.41 1.3...✓...3 4. / kWh / month $0.4 1941254 / kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Basic Monthly Electric Charge.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Page 1 of 2
120
Residential Electric Service Rate
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 1 °, 24'"4.,,R...2.2..
A..R: , � ,4...,ki � , 2 . .
Effective January 1, 22424 ..,2..2..
Page 2 of 2
121
Elk River
Municipal Utilities
RESIDENTIAL CLEAN ENERGY CHOICE PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To ERMU customers receiving service under another residential electric rate.
This Program is available to residential customers choosing to purchase renewable energy. Customers'
will have the option to purchase 50, 75 or 100 percent of the monthly energy consumption from
renewable energy sources.
ERMU customers receiving service under the electric vehicle charging rate will be automatically enrolled
in the Residential Clean Energy Choice Program Rate at the 100 percent participation level at no
additional monthly charge.
The customer shall agree to:
1. Complete an application - through the online registration process, or by returning a printed copy
to ERMU.
2. Clearly indicate the participation level and the additional monthly charge applicable to the 50,
75 or 100 percent subscription level desired.
3. Provide notice to ERMU to cancel participation.
ERMU shall provide:
1. Monthly billing statement with the Clean Energy Choice participation level clearly identified.
2. The applicable incremental cost per participation level will be identified and added to the billing
statement.
Participation Level %
Monthly Charge
50
$1
75
$2
100
$3
Federal, state and local taxes may apply.
Adopted December.14 2....2...................202:.2-
2023.. Effective January 1,.2..0..2...2...................................
Page 1 of 1
122
Elk River
Municipal Utilities
NON -DEMAND ALL ELECTRIC SERVICE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
electric energy as a sole source of heating, and with actual or projected demands of less than 50 kW for
the previous 12 consecutive months if applicable. When the Customer achieves an actual maximum
demand of 50 kW or greater, the Customer will be placed on the Demand Electric Service rate in the
next billing cycle. The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. Rating of individual single-phase motors and other
single-phase power and heating units served under this schedule shall not exceed ten (10) horsepower
(or 7.355 kW) except by special permission. (Not applicable to resale, standby or auxiliary service.)
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now
being served by this voltage. A Customer requiring voltages other than that already established by
ERMU shall be required to provide suitable space and location for ERMU's' transformers, metering and
associated equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Installation of Demand Meter: At the option of ERMU, a demand meter may be installed on any
customer whose monthly usage exceeds 15,000 kWh.
Non -Demand All Electric Service Rate:
Basic Monthly Electric Charge: $ 0.2.5.3- .,.Q..C1 per month
Summer Winter
$0.42.6.:2.1::...0/kWh /month $O..p:.6..2....�::.�::.�::.: �::.../ kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
123
Non -Demand All Electric Service Rate
Federal, state, and local taxes may apply.
Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer
capacity requested by customer.
In case of equipment having abnormally low annual utilization factors or unusual operating
characteristics, special minimum charges may be prescribed by ERMU.
Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the
Customer of a power factor of not less than 98% at all times. If the power factor, as measured by the
electric department, is lower than 98%, the monthly demand charge may be multiplied by the ratio 98%
divided by the measured power factor, or at ERMU's option, the power factor may be corrected at the
Customer's expense.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will
be allowed to be across -the -line started without notification and written authorization from ERMU. In
addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate
or changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rate set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2......1 ::..R.....�":��.�".2
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2...................................
Page 2 of 2
124
Elk River
Municipal Utilities
NON -DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demands of less than 50 kW for the previous 12 consecutive months if applicable.
When the Customer achieves an actual maximum demand of 50 kW or greater, the Customer will be
placed on the Demand Electric Service rate in the next billing cycle. The Customer accounts shall be in
compliance with all policies, procedures, and safety requirements, and shall be taken through one
meter. Rating of individual single-phase motors and other single-phase power and heating units served
under this schedule shall not exceed ten (10) horsepower (or 7.355 kW) except by special permission.
(Not applicable to resale, standby or auxiliary service.)
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three phase will only be applicable to existing customers now
being served by this voltage. A Customer requiring voltages other than that already established by
ERMU shall be required to provide suitable space and location for ERMU's transformers, metering and
associated equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Installation of Demand Meter: At the option of ERMU, a demand meter may be installed on any
customer whose monthly usage exceeds 15,000 kWh.
Non -Demand Service Rate:
Basic Monthly Electric Charge: $ 0.2.5.3- .,.Q..C1 per month
Summer Winter
. ��,1 ../ kWh / month 0.1' 6 �-.�::.�::.�.:.... / kWh / month
O.. p .2..6.:2.....................
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
125
Non -Demand Electric Service Rate
Federal, state, and local taxes may apply.
Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer
capacity requested by customer.
In the case of equipment having abnormally low annual utilization factors or unusual operating
characteristics, special minimum charges may be prescribed by ERMU.
Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the
Customer of a power factor of not less than 98% at all times. If the power factor, as measured by the
electric department, is lower than 98%, the monthly demand charge may be multiplied by the ratio 98%
divided by the measured power factor, or at ERMU's option, the power factor may be corrected at the
Customer's expense.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will
be allowed to be across -the -line started without notification and written authorization from ERMU. In
addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rate set forth herein maybe modified by the amount of any governmental changes imposed
and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2-4-1:.:�..P.....2.��.�":.2
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2...................................
Page 2 of 2
126
Elk River
Municipal Utilities
DEMAND ALL ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
electric energy as a sole source of heating, and with actual or projected demand greater than or equal to
50 kW. A Customer account with a billing demand of less than 50 kW for 12 consecutive months will be
given the option of switching to the Non -Demand rate. The Customer accounts shall be in compliance
with all policies, procedures, and safety requirements, and shall be taken through one meter. (Not
applicable to resale, standby or auxiliary service.) A Customer on this rate may qualify for integrity
testing.
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space and location for ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Demand Service Rate:
Basic Monthly Electric Charge: $ '! ":: e e� 00. per month.
Summer Winter
"J Demand Charge: ! : :: ": $11.75 in kW /month
Energy Charge: ...Q..'.7 35.. $0." .. 0.0..'Z' 35. in kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state and local taxes may apply.
Page 1 of 2
127
Demand All Electric Service Rate
Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. In addition, Customers who fail to provide adequate corrective equipment shall
be required to own and maintain their own transformers. No motor larger than ten (10) HP (or 7.355
kW) will be allowed to be across -the -line started without notification and written authorization from
ERMU.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments may be made in the billing demand, when the power factor, as
determined by test, at the time of the Customer's maximum use is less than 98%. If the power factor, as
measured by ERMU's electric department, is lower than 98%, the monthly demand charge may be
multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option, the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein maybe modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2......1 ::..R.....�":��.�".2
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2................................
Page 2 of 2
128
4=:"
Elk Riv
Municipal Utilities
DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand
of less than 50 kW for 12 consecutive months will be given the option of switching to the Non -Demand
rate. The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary
service.) A Customer on this rate may qualify for integrity testing.
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space and location for ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer and billed individually.
Meter equipment must be accessible to our service department at any time.
Demand Service Rate:
Basic Monthly Electric Charge: $ '! ":: e 7.L.00. per month.
Summer Winter
Demand Charge: $ J 6 �5 $11.75 in kW / month
......................................
Energy Charge: ...���7(').�."�. $0." ..::�0.... 07035....in kWh / month
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state and local taxes may apply.
Page 1 of 2
129
Demand Electric Service Rate
Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of Elk River Municipal Utilities' system so that the load will not
unduly interfere with service on Elk River Municipal Utilities' lines. In addition, Customers who fail to
provide adequate corrective equipment shall be required to own and maintain their own transformers.
No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across -the -line started without
notification and written authorization from ERMU.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments may be made in the billing demand, when the power factor, as
determined by test, at the time of the Customer's maximum use is less than 98%. If the power factor, as
measured by ERMU's electric department, is lower than 98%, the monthly demand charge may be
multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option, the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein maybe modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2-4-1:.:�..P.....2.��.�":.2
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2................................
Page 2 of 2
130
4=:"
Elk Riv
Municipal Utilities
LARGE INDUSTRIAL DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 1 MW. A Customer account with a billing demand
of less than 1 MW for 12 consecutive months may be switched to the Demand Electric Service Rate. The
Customer accounts shall be in compliance with all policies, procedures, safety requirements, and shall
be taken through one or more meters. Not applicable to resale, standby or auxiliary service.
Character Of Service: 3-Phase Primary, 7,200/12,470 volt, AC, 60 cycles.
Special Conditions: Customer must provide a location suitable for the installation of a utility metering
cabinet(s). Customer will be responsible for providing suitable wire and connection in the utility owned
metering cabinet(s). The primary meter(s) and cabinet(s) shall be installed to service one class of
business. If additional buildings are required for a given business, they shall be interconnected by the
customer to the existing meter(s), unless an exception is approved by management. If additional
meters and services are requested by the customer, each shall be treated as a separate customer and
billed individually. A customer on the rate may qualify for integrity testing.
ERMU equipment and metering must be accessible to ERMU 24 hours per day.
Demand Service Rate:
y g J J ": �'1C1 per month.
Basic Month) Electric Charge: .p. ...............
Summer Winter
Demand Charge: $ J C5 $11.25 in kW / month
............................
�'155 $0." 63...�,.5;,5: in kWh /month
Energy Charge: 0:�66� ............................
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Page 1 of 2
131
Large Industrial Demand Electric Service Rate
Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across -
the -line started without notification and written authorization from ERMU.
Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the
power factor, as determined by test, at the time of the Customer's maximum use is less than 98%. If the
power factor, as measured by ERMU's electric department, is lower than 98%, the monthly demand
charge may be multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option,
the power factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2-4-1:.:�..P.....2.��.�":.2
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2................................
Page 2 of 2
132
4=:"
Elk Riv
Municipal Utilities
TRANSMISSION TRANSFORMED SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for new non-residential Customer accounts with projected demand greater than or
equal to 10 MW. The Customer must maintain an annual load factor greater than or equal to 75%. A
Customer account with a monthly billing demand of less than 10 MW for 12 consecutive months or an
annual load factor less than 75% may be switched to another electric rate schedule (additional charges
may apply to recover stranded costs). The Customer owned equipment must be in compliance with all
policies, procedures, safety requirements, and applicable electrical codes.
Character of Service: 3-Phase Transmission Transformed 7,200/12,470-volt, AC, 60 cycles.
Special Conditions: The Customer must execute a contract with the utility that commits to a minimum
term of service, identifies the annual peak demand and load factor, agrees to the requirements for
registering generation with Midcontinent Independent System Operator (MISO) if applicable, and
accepts the certain risks that include fluctuating market -based rates and prices established by MISO.
The Customer must connect directly to the Utility's distribution substation(s) and provide the location
suitable for the installation of the utility owned transformer(s) and metering equipment on the
Customer's property. Customer will be responsible for providing suitable wire and connection in the
utility owned metering equipment. The metering equipment shall be installed to service one class of
business. If additional buildings are required for a given business, they shall be interconnected by the
customer to maintain one metered account, unless an exception is approved by management. If
additional meters and services are requested by the customer, each shall be treated as a separate
customer and billed individually.
ERMU equipment and metering must be accessible to ERMU 24 hours per day.
Transmission Demand Charge:
Transmission Demand charges are determined by monthly maximum metered 15-minute Customer
demand, adjusted for applicable MISO zone transmission losses. All applicable MISO transmission
charges, including but not limited to the below, shall apply to all transmission demand quantities:
A. Schedule 1
B. Schedule 2
C. Schedule 9
D. Schedule 26
Page 1 of 3
133
Transmission Transformed Service Rate
Capacity Charge:
Capacity charges are determined by Customer selection of one of the options below:
A. If customer has its own generation, then the capacity billing determinant shall be the maximum
metered 15-minute demand in excess of Customer's registered generation in a given month. To
qualify for this billing determinant, Customer's generation must be registered with MISO and
comply with all MISO requirements for capacity resources.
B. If Customer does not have its own generation, or if Customer fails to register its generation with
MISO or fails to comply with all MISO requirements for capacity resources, then the capacity
billing determinant shall be monthly maximum metered 15-minute Customer demand.
The following charges shall apply to all capacity quantities. The above -defined billing determinant
multiplied by:
A. $10.90 per kW -month for all capacity quantities during the months of June through September.
B. $3.60 per kW -month for all capacity quantities during the months of October through May.
Energy Charge:
Energy billing is determined by actual hourly usage. The following charges shall apply to all energy (kWh)
quantities:
A. MISO Real -Time Locationa) Marginal Price at the applicable MISO Node.
B. All applicable MISO Ancillary Services Charges.
C. MISO Multi -Value Project Charges.
D. A charge of $0.002 per kWh for the cost of compliance with the State of Minnesota's Renewable
Energy Standard.
E. A charge of $0.01 per kWh to cover all dispatch, billing, and administrative costs. This charge
shall be inclusive of all regulatory charges collected by Utility on all customers.
City fees, such as franchise and storm water, will apply.
Federal, state, and local taxes may apply.
Failure to Generate: If Customer has registered generation that does not perform as registered when
requested by utility, utility's wholesale supplier, or MISO, Customer shall be responsible for:
A. Any financial or other penalties imposed by MISO related to the generation's failure to perform.
B. All costs of utility or utility's wholesale supplier to acquire replacement capacity to replace
registered generation that did not perform.
Transformation Charge: Customer shall pay a monthly transformation charge based on the cost of
providing transmission transformed service to Customer, including recovery of costs for any new
substation or related facilities.
Page 2 of 3
134
Transmission Transformed Service Rate
Minimum Bill: Charges for failure to meet minimum peak demand and load factor requirements shall be
outlined in the contract between Customer and Utility.
Power Factor Adjustment: Power factor adjustments may be made in the billing demand, when the
power factor, as determined by test, at the time of the Customer's maximum use is less than 98%. If the
power factor, as measured by ERMU's electric department, is lower than 98%, the monthly demand
charge may be multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option,
the power factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Service shall comply with all applicable ERMU Policies and rules.
2. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
3. Customer is responsible for any new charges or fees imposed by MISO or any new regulatory or
legislative action that results in increased costs to provide power supply to Customer.
4. All rates in this electric rate schedule are subject to change with commission approval.
5. Exceptions by management approval only.
Adopted December 1..4P....2 ......1......P.....
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023.. Effective January 1,.2....2...2...................................
Page 3 of 3
135
Elk River
Municipal Utilities
COMMERCIAL CLEAN ENERGY CHOICE PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To ERMU customers receiving service under another commercial electric rate.
This Program is available to commercial customers choosing to purchase renewable energy. Customers'
will be required to participate for one calendar year and the applicable Clean Energy Choice incremental
charge will apply to all energy sold in the calendar year.
The customer shall agree to:
1. Contact ERMU staff to discuss program participation.
2. Sign a contractual agreement for one calendar year prior to December 1 for participation in the
upcoming year.
3. Continue to participate in the program annually until customer provides written notice of
cancelation to ERMU.
4. Provide written notice of cancelation in the program to ERMU prior to December 1 of a given
year for the upcoming year.
ERMU shall provide:
1. Estimate of annual incremental charge for participating in program.
2. Clean Energy Choice incremental charge per kWh is $0.002.
3. The incremental charge applies to all kWh purchases in excess of the Wholesale Renewable
Energy Standard.
4. The incremental charge will be calculated based on actual kWh consumed in the billing period.
5. The incremental charge will be calculated as follows:
[kWh consumed X (100% - Wholesale Renewable Energy Standard) X $0.002]
6. Monthly billing statement with the Clean Energy Choice incremental charge identified.
7. Program price changes by November 1 for the coming year.
Federal, state and local taxes may apply.
Adopted December 14 )- 2-4-1..3..........�".0.22...
2023 Effective January 1,.2..0..2...2...................................
Page 1 of 1
136
Elk River
Municipal Utilities
OFF-PEAK DEMAND ELECTRIC SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: Available for non-residential customer accounts. Existing or new Customer accounts with
actual or projected demand greater than or equal to 50 kW. A Customer account with a billing demand
of less than 50 kW for 12 consecutive months will be given the option of switching to the Non -Demand
rate. The Customer accounts shall be in compliance with all policies, procedures, and safety
requirements, and shall be taken through one meter. (Not applicable to resale, standby or auxiliary
service.)
Character Of Service: AC, 60 cycles, 120 volts or 120/240 volts, single-phase; 120/208 volts, or 277/480
volts, three-phase. Four wire, 240 volts three-phase will only be applicable to existing customers now
being served by this voltage. A customer requiring voltages other than that already established shall be
required to provide suitable space location of ERMU's transformers, metering and associated
equipment.
Special Conditions: One meter shall be installed to service one class of business. If additional buildings
are required for a given business, they shall be interconnected by the customer to obtain one meter,
unless an exception is approved by management. If additional meters and services are requested by the
customer, each shall be treated as a separate customer.
Meter equipment must be accessible to our service department at any time.
Off Peak Demand Service Rate:
Basic Monthly Electric Charge: $75.50 per month.
Demand Charge:
On -Peak $ J 6 75 $11.75 in kW / month
Off -Peak $6.30 $6.30 in kW / month
Energy Charge: 0��$00���in kWh / month
.......:._�......:
On-Peak Demand: Actual demand during On -Peak Periods
On -Peak Period: 3:00 PM -10:00 PM weekdays
Off -Peak Demand: Actual demand during Off -Peak Periods less On -Peak Demand
Off -Peak Period: All non On -Peak Periods
Summer Rate: Applicable during the five monthly billing periods of June — October.
Winter Rate: Applicable during the seven monthly billing periods of November — May.
Rates are subject to application of Power Cost Adjustment (PCA).
Page 1 of 2
137
Off -Peak Demand Electric Service Rate
Federal, state, and local taxes may apply.
Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand
charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW
per month of excess transformer capacity requested by customer.
Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected
for power factor if required) during any fifteen (15) minute period occurring in the current billing period.
But in no month shall the billing demand be greater than the value in kW determined by dividing the
kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the
customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m.
Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous
demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of
isolating the load from the balance of ERMU's system so that the load will not unduly interfere with
service on ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across -
the -line started without notification and written authorization from ERMU.
In addition, Customers who fail to provide adequate corrective equipment shall be required to own and
maintain their own transformers.
Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than
50 kW, power factor adjustments will be made in the billing demand, when the power factor, as
determined by test, at the time of the Customer's maximum use is less than 98%. If the power factor, as
measured by ERMU's electric department, is lower than 98%, the monthly demand charge may be
multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option, the power
factor may be corrected at the Customer's expense.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December .1-4P.....2..0..2..1...1:'..1.....�":��.�".2
..:.. r....i. r.0....i.a..�:.� e..0 . y...... 4,P2,
Effective January 1, .2.0.22 2023
Page 2 of 2
138
Elk River
Municipal Utilities
COMMERCIAL ALL ELECTRIC WITH GROUND SOURCE HEAT PUMP SERVICE RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To commercial customers having a single meter that includes a ground source heat pump
(GSHP) in excess of 50 kW but no more than 150 kW in aggregated name plate capacity of the GSHP
equipment (condensers and pumps).
Character of Service: AC, 60 cycles, 120/240 volts, three wire, and three-phase.
Special Conditions: This Program is available to commercial customers. A GSHP will be the only central
heating and/or cooling system for the commercial workspaces. Commercial structures that are
classified as Utility and Miscellaneous Group U by the International Code Council are not eligible for this
rate. GSHPs that qualify for this program will not be interrupted. A GSHP paired with another heating
source such as natural gas, fuel oil, or propane may qualify for the Dual Fuel Program.
To qualify for the special rate, the customer shall provide:
1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning
September 1, 2016.
2. ERMU and the customer will agree on a meter location prior to the meter socket installation.
3. Commercial customers may have a separate meter to determine the energy and demand of the
GSHP. Electric usage for the non-heating/cooling energy use of the building may be metered and
priced using the appropriate rate (demand, or non -demand) schedule.
4. Accommodations for a meter and associated wiring installed according to the applicable
electrical codes and will be installed by a qualified electrician.
5. Inspection by a State certified inspector and representative of ERMU.
6. Customers on this rate will not be eligible for the Dual Fuel Program.
Meter equipment must be accessible to our service department at any time.
Ground Source Heat Pump Service Rate:
Basic Monthly Electric Charge: $ 0.25 30.50 per month
Energy Charge: $0.026„ f.1 / kWh
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Minimum Bill: Basic Monthly Electric Charge.
Page 1 of 2
139
Commercial All Electric with Ground Source Heat Pump Service Rate
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Terms and Conditions:
1. Usage may be fractionalized on the actual days of service for application of a change in rate, or
changing from summer to winter or from winter to summer rates.
2. Service will be furnished pursuant to ERMU's rules.
3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules
governing Extension of Service and Facilities.
4. The rates set forth herein may be modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
5. Exceptions by management approval only.
Adopted December 14 )- 2-4-1:.:�..P.....2.��.�":.2'
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2....2...2................................
Page 2 of 2
140
Elk River
Municipal Utilities
GROUND SOURCE HEAT PUMP PROGRAM RATE
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To single family residences, non -demand and demand customers receiving service under
another rate, who add a second meter for any of the following controlled loads:
Ground Source Heat Pump Rate: This Program is available to residential and commercial customers. A
ground source heat pump (GSHP) is a central heating and/or cooling system for residential living spaces
or commercial work spaces. Residential living spaces will meet all the applicable Minnesota state
building codes. Commercial structures that are classified as Utility and Miscellaneous Group U by the
International Code Council are not eligible for this rate. This program is available to residential or
commercial customers with a GSHP as their sole heat source. GSHPs that qualify for this program will
not be interrupted. A GSHP paired with another heating source such as natural gas, fuel oil, or propane
may qualify for the Dual Fuel program.
To qualify for the special rate, the customer shall provide:
1. The GSHP is the only heat source. Only closed loop GSHPs are eligible for this rate beginning
January 1, 2016.
2. ERMU and the customer will agree on a meter location prior to the meter socket installation.
3. Commercial customers may have a separate meter to determine the load of the heat pumps.
Electric usage for the remainder of the building will be metered and priced using the
appropriate rate (Demand or Non -Demand).
4. Accommodations for a meter and associated wiring installed according to the applicable
electrical codes and will be installed by a qualified electrician.
5. Inspection by a State certified electrical inspector and a representative of ERMU.
ERMU shall provide:
1. All electric energy consumed by the primary electric heating system at 0.
36...�:.:...per kWh.
2. A meter socket to accommodate the meter in a mutually agreed to location.
3. A meter to measure electricity consumed by the electric heating system.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Adopted December 14 )- 2.4-1...�........�".0.22...
�..�:. �.�,r.�.�..i.�,r.d....i. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023 Effective January 1,.2..0..2...2...................................
Page 1 of 1
141
Elk River
Municipal Utilities
ELECTRIC VEHICLE CHARGING RATES
Residential and Commercial Electric Vehicle Charging Rate
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To single family residences, non -demand and demand customers receiving service under
another rate.
Electric Vehicle Charging Rate: This Program is available to all customers of ERMU that own an
electrically powered vehicle used for on road transportation. Charging of the vehicle can occur any time
but will be subject to on -peak and off-peak energy charges per hour daily. On -peak hours are Monday
through Friday between 10 AM and 10 PM. Off-peak hours are Monday through Friday between 10 PM
and 10 AM, Saturdays, Sundays, and the following holidays ( New Year's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, and Christmas Day).
To qualify for the special rate, the customer shall provide:
1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles.
This charging station must be 240 volt.
2. Customer is responsible for installation of the additional meter socket in a mutually agreed upon
location.
3. Inspection by a State Certified electrical inspector of all metering equipment and provide an
affidavit to ERMU when completed.
ERMU shall provide:
1. All on -peak electric energy consumed by the electric vehicle charging equipment will be at the
L�0F, 334 /kWh for the five monthly billing periods of June — October, summer rate o...............................................
....J.3 7.. ,
and the winter rate of 0.
-1.�".5 43/kWh for the seven monthly billing periods of November —
May.
2. All off-peak electric energy consumed by electric vehicle charging equipment will be at the rate
of 0.
.............................
3. This equipment will be available for charging at applicable rates 24 hours per day and is not
subject to any load control strategies.
4. All electric energy provided to an account that participates in this rate will be automatically
enrolled in the Clean Energy Choice Program at the 100 percent participation level at no
additional monthly charge.
5. All electric energy provided for the electric vehicle charging equipment will be 100 percent
renewable.
6. Electric meter.
Page 1 of 2
142
Electric Vehicle Charging Rates
7. Final inspection prior to meter activation to ensure only qualified loads are being supplied
through the electric vehicle charging equipment.
Rates are subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Public Electric Vehicle Charging Rate: This rate is available to anyone charging an electric vehicle or
plugin electric vehicle at a public electric vehicle charging station owned and operated by ERMU within
the ERMU service territory. All persons must have an active ChargePoint account or have the capability
to create a ChargePoint account prior to utilizing the charging equipment for an electric vehicle or plug-
in hybrid electric vehicle.
To charge at the public charging stations customers shall:
1. Utilize their existing ChargePoint account or create a new account using a credit or debit card
prior to charging the electric vehicle or plug-in hybrid.
ERMU shall provide:
1. Access to public electric vehicle charging stations located in the ERMU service territory.
2. The chargers will be either level two (240 volt) or DC Fast Charging (480 volt) charging
equipment.
3. Electric energy consumed at the level two charging stations will be at a rate of $0.4:!51 20. per
kWh at all times.
4. Electric energy consumed at the DC Fast Charging station will be at a rate of $0.22.009 2 5., per kWh
at all times.
5. Electric energy provided at the public electric vehicle charging stations will be 100 percent
renewable.
Federal, state, and local taxes may apply.
Page 2 of 2
143
Electric Vehicle Charging Rates
Adopted December.-4 1- .....3.P.....2.0.22...
Effective January 1, 2.02.) 2 0 2 3..
Page 2 of 2
144
Elk River
Municipal Utilities
MORATORIUM EFFECTIVE FERRUARY 14,2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS
ENERGY MANAGEMENT PROGRAM RATES
Available: Within Elk River Municipal Utilities (ERMU) established service territory.
Applicable: To single family residences, non -demand and demand customers receiving service under
another rate, who add a second meter for any of the following controlled loads:
Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space
heating system consists of an electric heating system and a secondary non -electric space heating system
both capable of heating the living space at design conditions. Interruptions of the electric heating
system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per
heating season.
To qualify for the special rate, the customer shall provide:
1. An electric space heating system which can be interrupted by a single 5 amp rated relay.
2. A secondary non -electric space heating system capable of automatic start-up and continuous
operation upon interruption of the electric heating system.
3. Obtain a load control device furnished by ERMU.
4. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
5. Inspection by a State certified electrical inspector and a representative of ERMU.
6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage.
7. Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the
residential building code.
8. Exceptions by management approval only.
ERMU shall provide:
1. All electric energy consumed by the primary electric heating system at $0:(.620„ 0651.. per kWh.
2. During peak load conditions, ERMU will turn customer controlled electrical heat off for extended
periods of time as stated above.
3. A meter to measure electricity consumed by the electric heating system.
4. A load control device and meter socket to accommodate the meter.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state and local taxes may apply.
Page 1 of 3
145
Energy Management Program Rates
Electric Thermal Storage (ETS) Space Heating Rate: This Program is available to all ERMU customers.
An ETS space heating system is designed to store heat produced by electricity generated during eight
off-peak hours for use in heating during the remaining on -peak hours daily. Off-peak hours typically
occur between 11 PM and 7 AM. Qualifying ETS configurations may be central storage furnaces, room
storage heaters or slab (deep heat) systems including combinations of same.
To qualify for the special rate, the customer shall provide:
1. An ETS space heating system listed by UL or some other nationally recognized testing agency
which can be interrupted by a single 5 amp rated relay.
2. Obtain a load control device from ERMU.
3. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
4. Inspection by a State certified electrical inspector and a representative of ERMU.
ERMU shall provide:
1. All electric energy consumed by this ETS system at „05„01:. per kWh.
2. This equipment will be energized only for 8 off peak hours daily. Additional on -time is provided
on weekend days and holidays.
3. A meter to measure electricity consumed by the ETS space heating system.
4. A load control device which will automatically control ETS space heating system during on -peak
hours.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Electric Thermal Storage (ETS) Water Heating Rate: This Program is available to all ERMU customers.
An ETS water heater is designed with extra storage capacity to provide total domestic hot water needs
from electricity consumed only during eight off-peak hours daily. Off-peak hours typically occur between
11 PM and 7 AM. Qualifying ETS configurations may be a large single tank, dual tanks plumbed in series,
or an electric and non -electric tank plumbed in series with the electric placed on the cold water side.
Electric water heater must have an energy factor of .91 or more and a minimum of 80 gallons of storage
capacity.
To qualify for the special rate, the customer shall provide:
1. An ETS water heating system which can be interrupted directly by a single 30 amp rated relay.
2. Obtain a load control device from ERMU.
3. Accommodations for a meter and load control device and associated wiring installed according
to the applicable electrical codes, and installed by a qualified electrician.
4. Inspection by a State certified electrical inspector and a representative of ERMU.
5. This rate is not available for hot water use in any production process for Commercial and
Industrial users.
Page 2 of 3
146
Energy Management Program Rates
ERMU shall provide:
1. All electric energy consumed by the ETS water heater at $0.( 4,oL ..............................
_�;1!; 01:. per kWh.
2. This equipment will be energized only for 8 off-peak hours daily.
3. A meter to measure electricity consumed by the ETS water heater.
4. A load control device and meter socket to accommodate the off-peak meter.
Rate is subject to application of Power Cost Adjustment (PCA).
Federal, state, and local taxes may apply.
Adopted December. -4 1..1 ...................
".�:�. ":. ":
�..�:. �.�,r.�.�.�.�,r.d....�. a..�:.�.e.,.�y...... � �P....2..�:�..2...2..
2023.. Effective January 1,.2..0..2...2...................................
Page 3 of 3
147
Ells River
Municipal Utilities
STREET/SECURITY LIGHT SERVICE RATE
Available: To any customer meeting Elk River Municipal Utilities (ERMU) criteria for service under this
schedule, and whose lighting needs are not being furnished under any other schedule. Installation costs
will be determined by ERMU per the Utilities Fee Schedule or on a time and materials basis.
Applicable: As determined by ERMU, but generally to non -metered roadway and area lighting.
Character Of Service: 120/240 volts, AC, as available.
Street/Security Light Service
Federal, state, and local taxes may apply.
Type
Monthly Rate Per
Fixture
Standard Low Output (<249 Watt HPS, <74 Watt LED)
$10.00
Standard Medium Output (250-399 Watt HPS, 75-124 Watt LED)
$16.00
Standard High Output (400 Watt or larger HPS, 125 Watt or larger LED)
$21.00
Standard Low Output with Decorative Pole (<74 Watt LED)
$18.00
Decorative Medium Output with Decorative Pole (75-124 Watt LED)
$26.00
Ownership of Equipment: ERMU will install, own, and operate the lights, including fixtures and control
equipment, unless otherwise agreed upon by ERMU and the Customer.
Lamp Replacements: Lamp replacements will be made by ERMU.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
General Terms and Conditions Applicable To Non -Metered Lighting Service:
1. Area lighting installed on ERMU poles shall not be of the type that interferes with climbing
room, work space, or wire clearance as defined by the National Electrical Safety Code and is to
be installed below the secondary line and service drops, all per ERMU's specification.
2. All area lights installed under this schedule shall be equipped with a photo -electric control which
will limit the hours of illumination from dusk to dawn (approximately 4,400 hours per year).
3. The rates set forth herein maybe modified by the amount of any governmental changes
imposed and levied on transmission, distribution, production, or the sale of electrical power.
Page 1 of 2
Street/Security Light Service Rate
4. Exceptions by management approval only.
Adopted December 14, 2021
Effective January 1, 2022
Page 2 of 2
149
Elk River
Municipal Utilities
WATER SERVICE RATES
Available: To all customers who have municipal water service available at their property, lying within
the corporate limits of the City of Elk River.
Special Conditions: Each customer served by one meter. Multiple living entities, such as apartments,
may be served by a combined meter upon approval of the Elk River Municipal Utilities (ERMU) and
acceptance of applicable charges.
Special Charges: A basic monthly water charge shall be applied to each meter based on the meter size
according to the schedule below, and is separate from any water use. Included in the basic monthly
water charge is $0.81 that is collected on a monthly basis from each service connection (excluding
irrigation only accounts) to recover the total annual cost of $9.72 for the State of Minnesota Safe Water
Testing Program (Minnesota Statutes 144.3831).
Water Rates:
BASIC MONTHLY
1st TIER
2nd TIER
3rd TIER
METER TYPE
CHARGE
Cost per 1000
Cost per 1000
Cost per
gallons
gallons
1000 gallons
Residential
$ 9 83..
$3.50
$4.00
Commercial 3
/1
$.'........................................ .e
$1.94
$3.50
$4.00
Commercial 1
�..�.�..�"
..........:...'...........:.:
1.9„
3.50
4.00
Commercial 1 %
$1�� .�„ ::.4:4:
$1.94 „
$3.50
$4.00
Commercial 1 %2
$ !': 4 : e"
$1.94 „
$3.50
$4.00
Commercial
$.:..!: �'1 �.��3
�...
$3.50
$4.00
Commercial 3
r !':.3��
$�,q,..p.w,p..w,�......................................
$1.94
$3.50
$4.00
Commercial
$ 52.��.4
3
$3.50
$4.00
Commercial
$84,42P91..78
$3.50
$4.00
Commercial
$.1.......p.13
$1.9.
$3.50
$4.00
..........................................
Commercial Irrigation
Seasonally or
...
20:!:;,,
$3.50
$4.00
Permanently Installed
Federal, state, and local taxes may apply.
Page 1 of 2
150
Water Service Rates
Residential Rate Tier Definition:
First Tier Rate = 0 — 9,000 gallons per month.
Second Tier Rate = Between 9,000 and 15,000 gallons per month.
Third Tier Rate = Above 15,000 gallons per month.
Commercial Rate Tier Definition:
First Tier Rate = 0 — 1.1 X previous year's winter measurement period average monthly consumption.
Second Tier Rate = Between 1.1 X previous year's winter measurement period average monthly
consumption to 1.1 X previous year's winter measurement period average monthly consumption +
40,000 gallons.
Third Tier Rate = Above 1.1 X previous year's winter measurement period average monthly
consumption + 40,000 gallons.
Winter Measurement Period Definition: December — April billing cycles.
For new customers, if a minimum of 3 winter months previous year's history is not available to establish
the Tier amount, the First Tier rate shall be utilized until a minimum of 3 months history is established.
Commercial irrigation is not eligible for First Tier Rate as there is no winter use.
Minimum Bill: Basic monthly water charge plus any charges applicable to multiple living entities.
Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and
Delinquent Notices.)
Adopted December .1-4P.....2..0..2......1:'..1.....�":��.�".2
2023 Effective January 1,...2�;:..2...................................
Page 2 of 2
151
/�
Elk River
Municipal Utilities
2023 Utilities Fee Schedule
ELECTRIC
New Residential Electric Connection - Developer - Lot With municipal Water service $975.00
New Residential Electric Connection - Developer - Lot without municipal water service
$1,075.00
New Electric Connection - Builder
$875.00
New Wire Footages over 200' (per foot)
$4.00
New Service Frost Trenching (per foot)
$5.00
New Commercial & Industrial Electric Connection
50%
Service Upgrades or Additions for Existing Customers
100%
Minimum Temporary Electric Service Fee - Existing Transformer
$220.00
Minimum Temporary Electric Service Fee - Without Existing Transformer
$850.00
Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture
$2,700.00
Street Light - 23' Decorative Pole with Cobra Fixture
$1,800.00
Street Light - 14' Decorative Pole with Cobra Fixture
$4,100.00
Street Light - 14' Decorative Pole with Acorn Fixture
$5,300.00
Security Light - Wood Pole with Fixture
$975.00
Security Light - Existing Pole
$350.00
Pole Attachment Fee (per pole)
$15.00
Manual Meter Reading Fee (per month)
$10.00
Meter Installation Fee (per individually metered apartment unit)
WATER
Water Access Charge = Water Connection Charge + Water Availability Charge
$22.00
$3,990.00
Water Connection Charge (Per Plumbing Unit) - Builder
$3,600.00
Water Availability Charge (Per Plumbing Unit) - Developer
$390.00
Abandoned Water Service
$6,000.00
Backflow Preventer Device Non -Compliance (per month)
$100.00
Deposit for 5/8" Hydrant Meter
$150.00
Deposit for 2 1/2" Hydrant Meter
$1,000.00
Hydrant Water Sales - Rental (per week)
$50.00
Hydrant Water Sales - Units (per l000 gallons)
$4.00
Hydrant Wrench
$40.00
Manual Meter Reading Fee (per month)
$10.00
Private Hydrant Maintenance Program Monthly Fee
ADMINISTRATIVE
Administrative Fee for Continued Submission of Checks After No -Check Notice Given
$5.00
$20.00
Billable Cost of Materials Markup
15%
Billable Labor Markup
55%
Billable Vehicle / Equipment (per hour)
$45.00
Commerical Application Fee
$20.00
Electric Service Disconnect/Trip Fee - Meter Technician
$50.00
Electric Service Disconnect/Trip Fee - Line Crew
$150.00
Water Service Disconnect/Trip Fee - Water Operator
$100.00
Meter Tampering Fee
$250.00
Meter Testing Fee
$50.00
NSF Fee
$30.00
Penalty Amount
10%
Photocopies (per page)
$0.25
Red Tag Handling Fee
$20.00
Adopted by the Utilities Commission on October 11, 2022 under authority per Minnesota Statute 412.361
152