5.2a ERMUSR 01-10-2023Elk Rive
U11 midu 1171 Utiliti P q
A 4 rki :11 W1,01111",
W 1110 Oj I:J:h W p rem IrsTaFA1101 oral
Tuesday, January 10, 2023
3:30 p.m.
ERMU Field Services Training Room
1435 Main Street
Elk River, Minnesota
The purpose of the meeting is as follows:
® To consider and take action on agenda items listed on the attached agenda.
In accordance with State Statute, I hereby request the city clerk to post this notice at
least three days prior to the meeting date. I further request the city clerk to notify each
member of the Elk River Municipal Utilities Commission of this special meeting, in
writing, at least one day before the meeting.
31
Joh'NY Dietz, Chair Datj
I HEREBY CERTIFY, that this notice has been posted and that I have served this notice
upon the members of the Elk River Municipal Utilities Commission by mail at least one
day prior to the above -called Elk River Municipal Utilities Commission special meeting.
In accordance with State Statute, this notice will be posted at least three days prior to
the meeting date.
Mark Hanson, General Manager Date
3
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
P'AIA cument G"701 2017
Change Order
PROJECT: (Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
109820 Elk River Municipal Utilities - Contract For: Construction Manager at Change Order Number: 006
Field Services Building Risk
Elk River Date: January 12, 2021 Date: December 2.2., 2022
OWNER: (Nance and address) ARCHITECT: (Name and address) CONTRACTOR: (Name and address)
Elk River Municipal Utilities Kodet Architectural Group Ltd RJM Construction
1705 Main St. 15 Groveland Terrace 830 Boone Avenue North
Elk River, MN 55330 Minneapolis, MN 55403 Golden Valley, MN 55427
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert. a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon adjustments
attributable to executed Construction Change Directives.)
PCO Owner-42 (Fencing and retaining wall changes) = credit ($19,343.73)
Total = credit ($19,343,73)
The original Guaranteed Maximum Price was S 12,180,926.00
The net change by previously authorized Change Orders $ 77,744.78
The Guaranteed Maximum Price prior to this Change Order was 12,258,6 0.78
The Guaranteed Maximum Price will be decreased by this Change Order in the amount of _ 19,343.73
The new Guaranteed Maximum Price including this Change Order will be S 12,2.39,32T05
The Contract Time will be unchanged by Zero (0) days. �........._...........ww_
The new date of Substantial Completion will be 8/12/22
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Kodet Architectural Group Ltd RJM Construction Elk River Municipal Utilities
( tit )ye) CONTRACTOR (Firm name)FZ"
ftnrrd bVy OWNER (Firm name)
'rdarrc� ARCHITECT Frlrtr � � M #.A,.,
SIGNATURE SIGNATURE t''4aIGNATURE
Kris Hahn
Edward Daniel Kodet Ii1, AiA Mark Hanson
PRINTED NAME AND TITLE PRINTED NAME AND TITLE PRINTED NAME AND TITLE
12/22/2022 1/4/202 3
DATE DATE DATE
AIA Document G701" — 2017. Copyright Cc7 1979, 1987, 2000 , 2001 and 2017 by The American Institute of Architects. All rights reserved. The. ' Arerican
Institute of Architects," "AIA," the AIA Logo, and 'AIA Contract Documents" are registered U adernarks and may not be used without permission. This document
was produced by AIA software at 09:30:35 ET on 12/22/2022 under Order No.2114348185 which expires on 08/13/2023, is not for resale, is licensed for one-time
use only, and may only be used in accordance with the AiA Contract Documents" Terms of Service. To report copyright violations, e-mail copyright@aia.org,
User Notes: (3139ADA42)
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
830 Boone Avenue
Golden Valley, MN 55427
P:952-837-8600
llYlj www.rjmconstruction.com
0 N S T R UC1"1101,,i CHANGE ORDER REQUEST
To: Elk River Municipal Utilities PCO: Owner-42
13069 Orono Parkway From: Justin Rice
Elk River, MN 55330 PH:
Email: justin.rice@rjmconstruction.com
Description: PR-21 - Fencing and retaining wall changes Date: 05/30/2022
Project: Elk River Municipal Utilities - Field Services Facility
Details:
Removal of the retaining wall on the east propertly line as well as adjustments to the fence location
Item Subcontractor: Phase:
1 Sunram Construction, Inc 32-32-05- Unit Masonry Retaining Walls-12,420.43
Reduction in the amount of modular retaining walls
2 Action Fence Inc. 32-31-05- Site Fencing-810.00
Credit of $15/If for 54 LF of fence (RJM estimate)
3 Great Northern Landscapes, Inc 32-90-05- Landscaping-5,450.00
Reduction in the amount of landscape rock and associated
fabric
Subtotal:-18,680.43
General Liability-208.30
Builders Risk -55.11
Bond-166.37
SDI -1.25%-233.52
-663.30
Total For Change Order:-19,343.73
Architect: Approved Elk River Municipal Utilities Submitted RJM Construction, LLC
By: By:
Signed:.,,,__ Signed:... Signed:
Date: _ Date: Date:
Page 1 of 1
20520-0154
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
SUNRAM CONSTRUCTION, INC.
20010 75TH AVENUE NORTH
CORCORAN, MN 55340
(763) 420-2140 PHONE
(763) 494-3951 FAX
general_mail@sunramconstructioninc.com
FAX COVER SHEET
DATE: 06/01/2022
COMPANY: RJM CONSTRUCTION
DELIVER TO: JUSTIN RICE
FROM: LEE W. SUNRAM
NUMBER OF PAGES: 1 OF 1
RE: ERMU PR-21 (ELIMINATE WALL #2)
MODULAR BLOCK RETAINING WALL
587 S.F.; @ $36.31 S.F. = $21,313.97
TO INCLUDE THE FOLLOWING:
(IF ITEM BELOW IS MARKED WITH AN "X" IT IS INCLUDED IN THE BID PRICE)
X MODULAR BLOCK
X CLASS #5 BASE
X %" DRAINAGE ROCK
X DRAIN TILE
X C?EOGRID
FABRIC
SEALANT
PERMIT
X ICE: -ENGINEERING
X UNION LABOR
X EQUIPMENT
X TAX
BOND
SPECIAL INSPECTION WITH CERTIFICATION LETTER
X CENTRAL, CERTIFICATION CERT PROGRAM (SBE)
_ WE BACKFILL WITH MATERIAL ON SITE (GEOGRID AREA ONLY)
X WE BACKFILL W/GRANULAR MATERIAL SUPPLIED BY OTHERS (APPROX 100 C.Y.)
'"EXCAVATION BY OTIHER ***
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
Great Northern Landscapes, Inc.
To: Justin Rice
Of. RJM
Job: Elk River Municipal Utilities
Date: July 29, 2022
Re: Change Order Request — PR 21 Revised
Deduct Fabric & 1.5" Trap Rock
o ($5450.00)
Total CO Request Deduct: ($5450.00)
A Formal Nofice to Proceed is Reqidredfor work to Commence
Todd Kleven
Great Northern Landscapes
�C411 I)JhL,
763-441-1567
19720 fguamt Street NW
Elk. River, ',XNT 55330
763.441.1567 (0) 76.3.274.2679 (P�
91
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
AIA Document G7091 - 2011
Proposal Request
PROJECT: (name and address)
108820 Elk River Municipal Utilities -
Field Services Building
Elk River
OWNER: (name and address)
Elk River Municipal Utilities
1705 Main St.
Elk River, MN 55330
CONTRACT INFORMATION:
Contract For: Construction Manager at
Risk
Date: January 12, 2021
ARCHITECT: (natne and address)
Kodet Architectural Group Ltd
15 Groveland Terrace
Minneapolis, MN 55403
Architect's Project Number: Kodet
Proposal Request Number: 021
Proposal Request Date: May 27, 2022
CONTRACTOR: (name and address)
RJM Construction
830 Boone Avenue North
Golden Valley, MN 55427
The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to
the Contract Documents described herein. The Contractor shall submit this proposal within seven (7) days or notify the
Architect in writing of the anticipated date of submission.
(Insert a detailed description qfthe proposed modifications to the Contract Documents and, if applicable, attach or reference
specific exhibits.)
Contractor to provide pricing, including labor and materials, to make the folflowing site changes as noted in the attached
narrative from Landform dated May 27, 2022 - see attached CO. 1, C2. 1, C3.1 B, C7.1 & L2. 1.
THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE, OR A DIRECTION TO PROCEED WITH THE WORK
DESCRIBED IN THE PROPOSED MODIFICATIONS.
REQUESTED BY THE ARCHITECT:
_In /
Edward Daniel Kodet 111, ATA -
President
PRINTED NAME AND TITLE
AJA Document 13709' - 2018 Copyright 1993, 2001 and 2018 by The American Institute of Architects, All rights reserved. The"American Institute of
Architects," WA,' the AIA Logo, and WA Contract Documents" are registered trademarks and may riot be used without permission This document woes
produced by AIA software at 14:18:41 ET on 05/27/2022 under Order No.6631446434 which expires on 0811312022, is not for resale, is licensed for one-time use
only, and may only be used in accordance with the AIA Contract Documents" Terms of Service To report copyright violations, e-inail copyright@aia,org,
User Notes: (3F.39ADA55)
W,
DocuSign Envelope ID: C3B353B7-14E7-4E4D-B4FF-EC60926FACB5
DATE
PROJECT NAME
PROJECT NUMBER
CIVIL SHEETS ISSUED
LANDSCAPE SHEETS ISSUED
SPECIFICATIONS SECTION ISSUED
GP
•
.. A
r,,r
D F
O
R M
.m , I
I
f1L-
v I)1;)
May 27, 2022
Elk River Municipal Utilities
ERM18001
C0.1, C2.1, C3.1B (issued), C3.1, C7.1 (for clarification)
L2.1(issued)
None
SHEET C2.1 SITE PLAN
a) ADDED Trex privacy fence
b) REVISED location of security fence on east side of site
c) REVISED location of tracking pad on southeast corner of site
d) REMOVED concrete pad adjacent to tracking pad
SHEET C3.113 GRADING, DRAINAGE, PAVING & EROSION CONTROL - SOUTH
a) REVISED grades at southeast corner
b) REVISED curb at tracking pad to Surmountable Curb.
SHEET L2.1 LANDSCAPE PLAN
a) ADDED seed mix 'CUT LESS Low Grow Fescue'
b) REVISED area of rock mulch at southeast corner
c) REVISED area of erosion blanket
d) REVISED area east of building to be 'CUT LESS Low Grow Fescue' and erosion control blanket.
e) REMOVED strip of rock mulch along east curb line
END OF PR 21
Provide individual pricing for each sub -item of this addendum.
If any of these items are unclear or in need of further clarification contact the Engineer I Landscape Architect at
(612) 252-9070.
93
ELK RIVER MUNICIPAL UTILITIES
ELK RIVER, MINNESOTA
wag
� 77 K RAVER
MINDPAL UTURES
ELKRIVER M',
9
LO
rn
\AM ENLARGED PLANC .
g
..
..»-
yy.J «
��� �
ENLARGED PLAN
0- WATERMAIN CROSSING
PACER DETAIL 0_1HALLOW CATCH BASIN STANDARD SILT �FENCE
OF ELK RIVER �"Y OF ELK RNTR 0 CITY OF ELK RIVER
17-1-
GRATE CASTING E ---ILIG T9P MANHOLE ROCK CONSTRUCTION ENTRANCE
C in'
L,P
10- OF ELK MVER 1� E UTY ., -EEOF ELK RIVER
_I;LM` C PIPE SE301%G --- CASTING 0 RIP -RAP INSTAL-APON
a -i &'LkF6�k li,- CITY OF ELK RfVEJf 0 CTTY OF ELK RWER I '- -I c" OF ELK qKF:R
W"
�Rwl v *F�
ELK RIVER
MUNICIPAL UTILITIES
ELK RIVER, MN
L A N D F 0 R M
ti
GRATE CASTING E ---ILIG T9P MANHOLE ROCK CONSTRUCTION ENTRANCE
C in'
L,P
10- OF ELK MVER 1� E UTY ., -EEOF ELK RIVER
_I;LM` C PIPE SE301%G --- CASTING 0 RIP -RAP INSTAL-APON
a -i &'LkF6�k li,- CITY OF ELK RfVEJf 0 CTTY OF ELK RWER I '- -I c" OF ELK qKF:R
W"
�Rwl v *F�
ELK RIVER
MUNICIPAL UTILITIES
ELK RIVER, MN
L A N D F 0 R M
ti
0
\
3