Loading...
4.4 SR 02-21-2023Request for Action To Item Number Ma Tor and CinT Council 4.4 Agenda Section Meeting Date Prepared by Consent Februar�T 21, 2023 Ryan Sandhoefner, Engineer 1 Item Description Reviewed by Engineering Design Standards Updates ustin Femrite P.E., Public Works Director Reviewed by Cal Portner, Ci r Administrator Action Requested Approve, byT motion, the updated Engineering Design Standards. Background/Discussion The Engineering Design Standards weYe most Yecently updated in 2021 and weYe reviewed to ensure they continue to reflect industryT standards for materials and construction practices for our public infrastructure. The only material change is requirements related to grade adjustment riser rings for storm sewer and sanitaryT sewer structures along with all related standard plates. The updates do not propose anyT modifications to our standard street oY trail sections that would otherwise incYease development oY project costs. We have also incorporated recommended changes and modifications provided by Elk River Municipal Utilities for the watermain section of the standards. This section is included `vith our standards as the water sy stem is designed and installed with the same engineer and contractor as the other public improvements in a t�rpical project. Financial Impact None. Mission/Policy/Goal OpportunityT to live, work, and play. Attachments ■ Engineering Design Standards The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. rowEREo ar �I'1 ���� Up�iited.• August 2020 Y' � � �' Engineering Design Standards �. � Last Revision: February 2023 City of Elk River Design Standards �O City of Elk River, Elk River, Minnesota All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from the address below. City Engineer City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 763.635.1000 E1kRiverMN.gov City of Elk River Design Standards Index Section 2000 — Street Design Standards ..............................................................................................................2 Section 2500 — Storm Drainage Design Standards ..........................................................................................6 Section 3400 - Watermain Design Standards ....................................................................................................8 Section 4000 — Sanitary Sewer Design .............................................................................................................. 20 Section 5000 — GIS Information Requirements ............................................................................................. 26 Elk River As-built Review Ghecklist .................................................................................................................... 27 Development Plan Requirements .............................................................. Items Needed to Start Utility Construction .......................................... Appendix: ................................................................................................................... 2000 — Surmountable and B618 Concrete Curb and Gutter 2001 — Concrete "V" Gutter 2002 — Depressed Curb with Driveway Apron 2005 - Catch Basin Frame Placement Surmountable Curb and Gutter 2007 — Rural Driveway Entrance 2009 — Standard Silt Fence 2010 — T��pical Urban Residential Street Section 2011 — Typical Non-Urban Residential Street Section 2012 — Bituminous Trail Typical Section 2015 — Rock Construction Entrance 2500 — Shallo�v Catch Basin 2501 — Standard Manhole 2502 — Slab Top Manhole 2503 — Concrete Pipe Joint Ties 2504 — Trash Guard 2505 — Rip-Rap Installation 2506 — Standard Manhole Casting 2507 — Standard Inlet Casting 2509 — Grate Casting 2511 — Catch Basin Inlet Protection 2513 — Concrete Erosion Mat Outlet Installation Detail 3400 — TS�pical Water La�rout 3401 — Pacer Hydrant Detail 3402 — Hvdrant Restraint Detail 3403 — T��pical Service Detail 3404 — Watermain Crossing 3405 — Class C Pipe Bedding 3406 — Class B Pipe Bedding 3408 — Tracer Wire Detail 3409 — Tracer Wire Layout Detail 4000 — Standard Manhole 4001 — Slab Top Manhole 4002 — Inside Drop Manhole (Two Feet or Less) 4004 — Outside Drop Manhole 4005 — Standard Air Relief Manhole 4006 — Class B Pipe Bedding 4007 — Typical House Service 4008 — Ser�=ice Riser Section .................................................. 2 8 .................................................. 2 9 ........................Standard Plates City of Elk River Design Standards Section I 000 - General These design standards are intended to provide general requirements of the Citv of Elk River for the purpose of public impro�rements. This document does not contain all Ciry requirements, but rather provides guidelines as to rypes of materials and design practices. The City- of Elk Ri�rer will review each proposed improvement project individually- for compliance with these design standards, current Cin� ordinances, CitS- of Ell� River general specifications, and general engineering practice. The City of Elk River reserves the right to modify these design standards and to require more stringent requirements on an� public improvement. The City of Elk Ri�rer general specifications are available upon request. In addition to the standards detailed in this manual, all placement, testing and material requirements prescribed in the current versions of the 1�1nDOT Standard Specifications for Construction and the City Engineers Association of Minnesota (CEA1V� Standard Specifications shall be followed. END OF SECTION 1000 OO City of Elk River, Minnesota — All rights reserved City of Elk River Design Standards Section 2000 — Street Design Standards Design Criteria 1. 1��inimum street grade of 0.50%, ma�imum street grade of 8.00% in accordance with City ordinance. Rural street sections require a minimum grade of 0.75% within 100 feet of low points. 2. Ma�imum slope of approach grade tangent at street intersections of 1.00% for 100 feet from the edge of the cross street. 3. Minimum intersection radii of 25 feet to back-of-curb. 4. Cul-de-sac entrance radii of 35 feet to back-of-curb. 5. 1��inimum grade for circumference of cul-de-sac is 0.50%. 6. Horizontal and vertical curves should meet design standards detailed in the most current version of the MnDOT Roadway Design Manual for the corresponding design speed and roadway type. 7. Minimum design speed shall be 30 MPH unless otherwise approved by the City Engineer. 8. Cul-de-sacs shall ha�re a diameter of 90 feet, face-of-curb to face-of-curb. 9. Urban (defined as those with public sewer and water s�stems) residential streets shall ha�-e 28" surmountable curb in accordance with Standard Plate No. 2000 and Standard Plate No. 2010. All other urban streets shall have B618 curb and gutter. B618 curb and gutter shall be constructed at all radii and catch basins with a ten-foot transition from surmountable curb to B618 curb and gutter. 10. Rural (defined as those without public sewer and water systems) residen�ial streets, are allowed to follow design standards shown in Standard Plate No. 2011. This section allows the abiliry to create a less intensive section making use of roadside ditch for drainage management. 11. Street pavement sections shall be designed in accordance with the minimal thicknesses shown below: Local Residential Street Section 8" Aggregate Base, Class 5 2'/z" Non-wear Course Mixture SPNWB230C 1'/Z" Wear Course Mixture SPWEA240C Local residential streets are defined as those expecting to serve less than 1,OOOvpd. All other streets shall be designed for 9-ton loading based on geotechnical evaluation of soil borings and the expected traffic demands. The minimum 9-ton section is as follows: 9-Ton Street Section 10" Aggregate Base, Class 5 2'/z" Non-wear Course Mixture SPNWB330C 2" Wear Course Mixture SPWEB340C 12. Minimum street width shall be 32-feet face of curb to face of curb. All residential stYeets will be reviewed for possible widening based on their anticipated uses. 13. All urban commercial or industrial zoned streets and all urban collector and arterial streets shall OO City of Elk River, Minnesota — All rights reserved 2 City of Elk River Design Standards ha�re a si�-foot wide concrete sidewalk on at least one side. Other streets shall ha�re concrete sidewalk as directed by- the Cin� Council. Concrete sidewalk shall be located one foot from the property line. 14. All concrete sidewalks in new developments shall be 6" thick to allow for future driveway locations. 15. All concrete utilized in public right-of-way shall be MnDOT 3A32 or 3A32HE (High Early) mi� with a specified air content of 6.5%. Testing procedures shall be consistent MnDOT's Schedule of Materials Control for Concrete Field Testing. If the public concrete curb or sidewalk is damaged or there is need to replace during private construction, the private contractor is responsible for completion of repairs. The following conditions must be met before the replacement or repair will be accepted: A. All work in the public right-of-way requires the use of traffic control in accordance with MnDOT's Temporary Traffic Control Layouts Field Manual. B. Damaged concrete sha11 be cut and removed. Straight line cut shall be made in the e�sting control joints, not mid-panel. C. Class 5 aggregate base shall be placed and compacted to a minimum uniform depth of 4 inches. D. Forms shall be set to full depth of the concrete section. E. Must set an inspection time with the City of Elk River 24 hours in advanced of the pour. F. Your testing company shall test the mi� for proper air entraining prior to placement. City inspectors review the concrete ticket and observe the test. Failure of the test will result in mix rejection unless amended and retested. G. Concrete placement and finishing shall be in accordance with industry standards for external concrete. No steel troweling is allowed. The finished product shall be broom finished to match e�sting surfaces. H. White curing membrane shall be applied to all e�posed surfaces, including the back of curb, within 1 hour of final finishing. Cold weather curing and protection procedures are required if freezing temperatures are forecasted within 1 week of placement. I. The concrete shall be protected from traffic use for a minimum of 7 days, or 3 days if high early concrete is used. 16. Temporary� turnarounds with concrete curb and gutter shall be constructed at all dead-end streets which provide access to adjacent lots. Temporar� turnarounds behind concrete curb and gutter will not be allowed. 17. Driveways on new residential properties shall have a maximum grade of 8.0%. 18. Bituminous trails shall be constructed as directed by the Ciry Council. The bituminous surface shall be 10-feet in width. The trail section shall include, 6" of class 5 aggregate base, 2'/Z" of wearing course bituminous (SPWEA240C). The aggregate base shall be placed and compacted to 1-foot beyond the edge of pavement to a total width of 12-feet. The constructed trail should have a tight finish with minimal voids. Depending on the site, conditions may warrant different construction techniques and rypical section. All trails are subject to approval by the Ciry Engineer. 19. Concrete pedestrian ramps shall be constructed at all locations where sidewalks and �sails connect to a street having concrete curb and gutter. Pedestrian curb ramps shall be constructed with a red colored detectable warning (truncated dome t��pe) panel. MnDOT Standard Plates shall be followed. Pedestrian ramps must meet all current ADA standards. OO City of Elk River, Minnesota — All rights reserved City of Elk River Design Standards 20. Cul-de-sac streets shall not exceed 700 feet from the center of the intersection to the center of the cul-de-sac. 21. "Ey�ebrow" cul-de-sacs will not be allowed. 22. Retaining walls are generally not allowed within the City right-of-way. Retaining walls must be re�riewed and approved by- the City� Engineer and the following: A. Must conform to an engineered design if less than 4 feet in height (e�posed face). B. Must be specifically designed for the site b�� a Licensed Professional Engineer if greater than 4 feet in height. C. Must have fence or railing if greater than 4-feet in height. 23. The Cityr will impose a�1,000 maintenance fee for every patch location needed in the base course pavement. No patches are allowed in any wear course pavement. 24. All castings (manholes and valve boxes) must be raised to '/z" below the finished asphalt base course elevation before paving of the asphalt base. Any cuts in the new base course pavement to adjust a casting to grade will be subject to the above described �1,000 maintenance fee. Adjustments to meet the final wear course elevation shall be accomplished using glue in steel adjusting rings. 25. Street signs, including regulatory and street names, shall be installed in new developments by the de�reloper per CitS- sign standards and the Minnesota 1�lanual of Uniform Traffic Control Devices (1VIMUTCD). Street signs shall match City appro�red street names. "No Outlet" plates shall be installed along with street name signs where appropriate. Sign and post shop drawings shall be supplied to and appro�red by the Street division prior to order or installation. 26. Street name sign specifications: A. Street signs shall be E-450 SC/AL flat 0.080 aluminum plate single faced with 3MTM High Intensitv Grade Prismatic Sheeting with screened white on green 6" Highway Gothic Font letters and a'/2" white border. Plates shall be 9" wide by 36" or longer in length. Lettering shall not be all capital. Signs indicating numerical avenues should end in NW and signs indicating named streets should not include the NW. B. Plates shall be center saddle rype. Stacking of street name plates should not exceed 3 plates. C. StYeet sign brackets shall be mounted on a 12-foot long galvanized tubular post, 23/8" outside diameter and a wall thickness of 0.080". Install with an anti-rotation device to a minimum depth of 30". 27. No Outlet signs shall be E-450 SC/AL flat 0.080 aluminum plate single faced with 3MTM High Intensit�� Grade Prismatic Sheeting with screened black on y-ellow 6" Highway Gothic Font. The sign shall include a black border with the lettering NO OUTLET and a directional arrow. The No Outlet signs will be placed on the bottom of the street name stack and the stack should not be taller than a 3-plate maxirrium. 28. Stop signs (R1-1) shall be 0.080 aluminum plate with 3MTM High Intensity� Grade Prismatic Sheeting, 30" x 30", mounted on an 8-foot long, 3 pound per foot channel post bolted to a 8' long, 3 pound per foot galvanized channel post stub that is driven into the ground a minimum of 3 feet. At intersections with street signs and a stop sign, the stop sign shall be mounted on the street signpost. 29. Speed limit (30 MPH) signs shall be posted at each entrance residential de�relopments, unless OO City of Elk River, Minnesota — All rights reserved 4 City of Elk River Design Standards otherwise noted. 30. Placement and installation of all signs are to be in accordance with the MMUTCD and at subject to final approval from the Street Superintendent. 31. Street name signs other than the above specification require approval by the City Street Superintendent (763.635.1120). END OF SECTION 2000 OO City of Elk River, Minnesota — All rights reserved City of Elk River Design Standards Section 2500 — Storm Drainage Design Standards Storm design criteria and standards shall follow the requirements detailed in the Elk River Stormwater Program guide. Minor drainage facilities shall carry the 10-year recurrence runoff flows. Minor facilities include street gutter capaciry, cross-culverts, storm sewers, and swales to the limits of easement and/or right-of-wa� . Materials 1. Pipe for all storm sewer installations shall be reinforced concrete pipe. Reinforced circular pipe shall conform to ASTM C 76 for Wall B pipe. Reinforced Arch pipe shall conform to ASTM C 506. Plastic or HDPE pipe for storm sewer installations in green spaces (side or rear yard) may be considered on an individual basis. 2. Standard curb inlet castings shall be Neenah R-3067-V or appro�red equal. In developments with surmountable curb, the curb at catch basin inlets shall n�pically- transition to a B-type curb as shown on Standard Plate 2005. When inlet castings do not align with a property line and surmountable concrete curb and gutter is being placed, inlet castings may be Neenah R-3501-TB provided written approval is obtained from the City prior to construction. 3. For new developments, stormwater outfall erosion prevention material shall be concrete articulated block (eg. Flexamat) or appro�red equal. 4. Driveway culverts located in city right-of-way shall be concrete or corrugated metal pipe. The culverts must be designed and sized to handle the expected drainage. Minimum allowable size for a driveway culvert shall be 12-inches. 5. Rip-rap shall be Class IV random rip-rap in accordance with Mn/DOT 2511 except that all rip- rap shall be made up of granite. Placement of rip-rap shall be as shown on Standard Plate 2505. 6. Rear yard inlets shall utilize a Neenah R-1733 casting with a type C grate. Ditch inlet cas�ings shall be R-4341-A or R-4342. All manhole and catch basin adjustments shall be Cretex Pro-Ring or approved equal. Manhole and catch basin adjustments shall consist of a�rariery of heights (thicknesses), diameters and shapes all conforming to the following requirements: A. Grade adjustments — The grade adjustments shall be manufactured from ARPRO Expanded Polypropylene (EPP) black, 5000 series meeting ASTM D3575 and ASTM D4819-13; B6D7G4L3M24S2T17W7. The grade adjustments shall be manufactured using a high compression molding process to produce a finished densit�� of 120 g/1 (7.5 pc�. The grade adjustments shall meet or exceed the load rating requirements of AASHTO M306, HS-20 and HS-25. B. "Grade" adjustments may contain either an upper and lower key-wa� (tongue and groove) for vertical alignment and/or an adhesive tYench on the underside with a flat top. C. "Finish" or "Flat" adjustments may either have a keyway (groove) on the underside for vertical alignment and/or an adhesi�re trench with a flat upper surface. These adjustments shall be available in heights (thicknesses) which will allow final adjustments of the frame and cover or grate to within '/4" (one quarter inch) of the specified final elevation. "Finish" adjustments may also have a ke�vay on the upper surface of the inner diameter to facilitate installation of an "Angle" adjustment. D. "Angle" adjustments may either have an upper or lower key�vay (tongue and groove) for vertical alignment and/or an adhesive trench on the underside. When required, the "Angle" OO City of Elk River, Minnesota — All rights reserved 6 City of Elk River Design Standards adjustments shall allow final adjustment of the frame and cover or grate to within'/4" (one quarter inch) of the specified final ele�ration. E. Adhesive/Sealant installation of Cretex Pro-Ring shall conform to the following requirements: a) Any adhesive or sealant used for watertight installation of the grade adjustment rings shall be M-1 Structural Adhesi�re/Sealant, Rapid Set Fle�ible Construction Adhesive & Sealant or equal meeting these applicable performance standards: a. ASTM G920, Type S, Grade NS, Class 35. Uses NT, T1, M, G, A and O. b. ASTM E84, Class A c. Federal Specification TT-S-00230-C Type II, Class B d. Corps of Engineers CRD-G541, Ty-pe II, Class B e. Canadian Standards Board CAN 19, 13-M82 b) Other adhesives or sealants may only be used with owner's written authorization. ROUND RIMGS 40" �.D. X 27 " I.D. PART NUMBER RING TYPE RING HEIGHT 40 27F-075 4Q 27F 100 40-27F125 40-27F 15Q 40-27F-175 40-27F-200 40-27F-225 40-27F250 40-27F-400 aa-z7F soa 40-27A-100 aa-z7�-zao 40-27G-400 �o-z�c-�ao FINI5H FINISH FINISH FINISH FINISH FINISH FINISH FINISH FINISH FINISH ANGLE GRADE GRADE GRADE 3l4" y„ 1-1 /4., 1-112„ 1-314" 2�� 2-1 /4„ 2-1 !2„ 4" s° 3/4" TO 1-3/4" 2�� 4" 6" Installation RECTANGULAR 3fi" I.D. X 24" I.D. PAF�T NUMBER RING TYPE RING HEIGHT RT 36-24-075 RT 36-24-100 RT 36-24-125 RT 36-24-150 RT 36-24-200 RT 36-24-300 RT 36-24-400 RT 36-24A1-2L RT 36-24A1-2S FLAT FLAT FLAT FLAT FLAT FLAT FLAT ANGLE (l+o-ng) ANGLE (short} 31�„ �„ 7-7/4" 1-112„ 2,� 3" 4" 1 " TO 2" 1 " TO 2" 1. Cretex Pro-Ring manhole and catch basin grade adjustment rings: A. Installation and surface preparation sh�ill be in accordance with the manufacturer's instructions. B. The joint between the first grade ring and the top of the manhole, catch basin or utility structure shall be sealed using the specified sealant/adhesi�re. C. If the top of the manhole, catch basin, or utility structure is not level or is irregular, then a bed of specified mortar or grout shall be placed on the top surface of the utiliry structure and the first grade ring shall be embedded and le�reled into the bed of material. D. The remaining joints between all grade adjustments and the frame and cover or grate shall be sealed using the specified adhesive/sealant. E. No other materials shall be used in the cons�suc�ion of the grade adjustment area beyond those specified above. Prohibited materials include, but are not limited to wood or wood shims of an�� kind, concrete, brick, block, stones, etc. END OF SECTION 2500 OO City of Elk River, Minnesota — All rights reserved City of Elk River Design Standards Section 3400 - Watermain Design Standards Design Criteria 1. All Watermain design shall comply with the latest edition of the Ten States Standards for Water Works, APWA and blinnesota Department of Health standards. 2. Water S�-stem installation and testing shall be in accordance with CEAM standard specifications e�cept as modified herein. �. The minimum size of watermain shall be 8 inches. (Hydrant leads can be 6") 4. Watermain pipe shall be ductile iron in accordance with AWWA C151. 5. The minimum bury depth of watermain shall be 7' - 6" to top of pipe. 6. The minimum size of water service lines and corporations shall be 1 inch. When water service lines exceed 200-feet, the ser�rice line and corporation shall be 1'/Z". 7. No dead-end mains shall be constructed. All watermains shall be looped. 8. Water looping outside of the Right of Way� shall be HDPE, valved at each end with no connec�ion�senices in between. 9. Temporary- dead-end mains shall be equipped with a fire hy�drant for flushing purposes. 10. Hy�drants shall be spaced so that all portions of a building or residence to be protected are within a 250-foot radius of a hydrant (Final review will be made by the Fire Chief and City Engineer) 11. Each hydrant lead shall be equipped with a resilient seated valve for shut-off purposes and installed in accordance with the standard detail. 12. Val�res shall be placed throughout the distribution system so that each portion may be isolated with the least interruption of ser�rice. Val�res shall be placed at each roadway intersection or the intersection of watermains. (Final review will be made by the Water Superintendent and City Engineer� 13. A"Hydrafinder" locating device shall be installed on each hydrant installed and shall be mounted on the upper flange of the hydrant with a straight mounting bracket as indicated in Elk River Standard Plate 3401. For ever� five hydrant locating devices installed, one extra h�drant locating device shall be delivered to the Elk River Municipal Utilities. 14. All hy�drants and leads shall be restrained from the main to the hydrant using threaded rods or Megalug restraint glands in accordance with the standard detail plates. 15. To allow the hydrant to drain after use, the hydrant bottom shall be surrounded by Coarse Filter Aggregate (Mn/DOT 3149.2H) or 3/4" — 1'/z" clear drain rock covered with plastic material as indicated on Standard Plate 3402. 16. All watermain valves shall be operated only by Elk River Municipal Utiliry forces (763.635.1361). OO City of Elk River, Minnesota — All rights reserved 8 City of Elk River Design Standards Materials 1. The materials used in this work shall be new, conforming to the requirements of the referenced specifications for class, kind, type, size, and grade of material as specified below and other details indicated in the contract. 2. Watermain pipe shall be ductile iron pipe Special Class 52 and shall conform to the requirements of A�WA C151 (ANSI A21.51). 3. "Hydrafinder" hydrant locating de�rices, as manufactured by RoDon Corporation, shall be five feet in length and furnished with a°flat" steel mounting bracket and the MIL SPEC spring mount. 4. Pipe bends and fittings to be furnished with fusion bonded epo�y external coating and interior lining and shall conform to the requirements of AWWA C550 and C116/A21.16, with 6-8 mil nominal thickness. All pipe bends and fittings shall be restrained with Series 1100 Megalug mechanical joint restraint fittings as manufactured bv EBBA Iron, Inc. or equal. ALPHA single bolt (grip ring) restrained joints, or equal may be used in lieu of lug mechanical joint restraint fit�ings. All nuts, bolts, and �ie rod type restraints shall be stainless steel. 5. All pipe and fittings shall be furnished with cement mortar lining meeting the requirements of A�X�`Y�A C104 (ANSI A21.4) for standard thicl�ness lining. All interior and exterior surfaces of the pipe and fitting shall have a tar or bituminous seal coating at least one mil thick. Spott�� or �in seal coating, or poor coating adhesion, shall be cause for rejection. 6. Ta�prn� Slee�res: Tapping sleeves shall be Smith-Blair 622 or 662, as shown in the table below, or approved equal. Bxanch E�istin Pi e Size Pipe Size 6" 8" 10" 12" 16" 20" 24" 6" 662 662 662/622 662/622 622 622 622 8" 662 662 662/622 662/622 622 622 622 10�� ��a/�aa ��a/�aa ��a ��a �aa �aa �aa 1a�� ��a/�aa ��a/�aa ��a ��a �aa �aa �aa Model 622 shall have the following characteristics. Bod�- shall be 3/8" carbon steel ASTM 285, Grade A. Flange shall be AWWA C207 Class D, ANSI 1501b drilling. Gasket shall be grade 60 concave wedge gaskets. Bolts and nuts shall be high strength low alloy steel, AWWA C111, ANSI A21.11. Model 662 shall have the following characteristics. Bod�- shall be full circumference band, 18-8 rype 304 stainless steeL Flange shall be AWWA C207 Class D, ANSI 1501b drilling, epo� coated finish. Gasket shall be Grade 60 concave wedge gasket. Bolts and nuts shall be 18-8 type 304 stainless steel. 7. Service Pi�es and Fittin�s A. Corporation fittings • LF 1 CC X PE PJ BALL CORP(HDPE) ■ Ford Meter Box Compan`- Part FB10014NL or Equal "OR" • LF 1 CC X FLR BALL CORP (Copper) OO City of Elk River, Minnesota — All rights reserved 9 City of Elk River Design Standards ■ Ford Meter Box Company Part FB6004NL or Equal "IF REQUIRED" • LF FCTH X PE COb1P COUP (HDPE adapter) ■ Ford Meter Bo� Company Part C0644NL or Equal B. Curb Stop • LF 1 BALL CURB ST PE PJ (HDPE) ■ Ford Meter Box Company Part B66444MNL or Equal • LF 1 BALL CURB ST FLR X FLR (Copper) ■ Ford Meter Box Company� Part B22444MNL or Equal C. Curb Box • 1-1/4 X 8 X 1'/z NLINN CURB BOX (HDPE OR COPPER) ■ AY McDonald Part 5614 or 5615 or Equal • 72 STNRY ROD (HDPE OR COPPER) ■ AY McDonald Part 566072" Rod D. Service Pipes ■ 1" IPS SIDR 7 HDPE BLUE PIPE • ENDOT Industries o ENDOPURE Water Service Pipe (IPS) — ASTM D2239 (SIDR 7) or Equal ■ Siz e: 1 " ■ NominalOD:1.359 ■ NominalID:1.049 ■ Minimum Wall: .150 • Poly Technology o Blue Ultra Water Senice Pipe — ASTM D2239 (SIDR 7) or Equal ■ Siz e: 1 " ■ NominalOD:1.349 ■ NominalID:1.049 ■ Minimum Wall: .150 •' • 1" TYPE K SOFT COPPER TUBE ■ Type K Soft Copper Tube must meet the standards set forth in ASTM B88 8. Fire H��drants A. Fire hydrants shall meet or exceed ANSI/AV VWA C502, latest revision and shall be certified byNSF to comply with the criteria ofNSF/ANSI 61-G. Rated working pressure shall be 250 psig. The production test pressure shall be 500 psig. B. Hydrant nozzle section and standpipe shall be prime coatedwith an epo�y coating. Hydrant top coat shall be a catalyzed two-part red poly-urethane. The poly�urethane coating shall achie�re a 58 Adhesion rating per ASTM D 3359, Test Method "B" (Cross-CutTape), shall e�ibit no salt spray corrosion at 500 hours per ASTM 8117, provide an initial minimum specular gloss rating per ASTM 8523 of 90 (at beam axis60) and 80 (at beam aYis 20), retain 80% ofinitial gloss rating per ASTM 2565 with an overall change of Delta 3.0 or less. OO City of Elk River, Minnesota — All rights reserved I 0 City of Elk River Design Standards Fusion bond epo�-�� on the upper barrel is not allowed. Lower hy-drant barrel shall be constructed of centrifugallv cast ductileiron and shall be coated with an asphalt �rarnish. The hy�drant shoe shall also be constructed of ductile iron and shall be fusion bond epoxy coated inside and outprior toassemblyforcorrosionresistance. C. The main val�re closure shall be of the compression type, opening against the pressure and closingwith the pressure. Nozzle section to be designed for easy 360-degree rotation by the loosening of no more than four bolts. D. Thevalve opening diameter shall be 5%-inch. The h�rdrant must be designed so that removal of all �vorking parts can be accomplished without excavating. The bronze seat shall be threaded into mating threads of bronze for easy field repair. E. All hydrants shall have a minimum 5-1 /4" diameter valve opening. All hydrants shall be configured, unless otherwise noted to have (2) 2-%" hose nozzles and (1) 4-W' steamer nozzle, 1-%" pentagon bronze opera�ing nuts, 6" diameter mechanical joint (MJ) inlet connection. Nozzles shall be retained by a ductile iron collar. Retention of the nozzle by set screws is not allowed. Caps shall be furnished with non-kink chains. r1ll hy�drant bolting materials shall comply with the applicable portions of Paragraph3.2.17 of ANSI/A�X�WA G502 requiring compliance with ANSI 818.2.1. Metric bolts are not allowed. r�ll bolting below-grade shall be stainless steel. F. The draining sy-stem of the hvdrant shall be bronze and be positively activated b� the main operating rod. H��drant to be furnished with a sliding bronze drain valve. Sliding drain �ralves made of rubber, plastic, composition material or leather will not be allowed. G. Hydrant must have an internal travel stop nut located in the top housing of the hydrant. r1ll hydrant operating threads to be factory-lubricated. 0-rings shall be furnished to help keep operating threads lubricated and protected from line fluid and from the weather. H. Hydrant must ha�-e a traffic flange design allowing for quick and economical repair of damage resulting from a vehicle's impact. I. r�ll depth of bury lines shall be clearly and permanently marked on the lower barrel of the hvdrant. All e�tensions shall ha�re the abilin� to be installed without need to shut off the water and limited to one per hydrant To insure proper fit and tolerances all extensions shall be manufactured b�� the original hydrant manufacturer. After market e�tensions and/or parts will not be allowed. J. All fire hydrants shall be the 5%" Waterous Pacer Model W867-250, as manufactured by AMERICAN Flow Control, or Engineer pre-approved equal. 9. Valves A. Val�res 2" - 12" shall be of the Resilient Wedge Gate Valve type design. All gate val�res shall be rated for 250 psig cold water working pressure, with zero leakage. The rating shall be indelibly marked on the casting. The valves shall compl5r full5�, in all applicable sizes, with the latest edition ofANSI/A1��A C-595, as well as all requirements detailed herein. The manufacturer shall pro�ride drawings and/or an affidavit detailing compliance with all applicable standards and specifications, if so requested by the Engineer. r1ll �ralves shall be of the same manufacturer and shall clearly bear the manufacturer's name and val�re size. B. Valves larger than 12-inch shall be butterfly valves. C. All ferrous components of the �ral�re shall be constructed of ductile iron. All �ral�res shall be castwith the words "DI" or "Ductile Iron". The wrench nut shall be constructed of ductile iron, shall have four flats at stem connection to insure even transfer of torque to the stem. D. The wedge shall be ductile iron. It shall be fully� encapsulated with EPDM rubber, symmetrical in design and shall seat equally well with flow in either direc�ion. In sizes 4" - 48" the wedge shall incorporate the use of guides encapsulated with an engineered plastic. Double di.rc, �netal.rtyle .rolid u�edge valves, or design.r e�nploying a�netal plou� .rtyle de.rign are not allo�a�e�l The valve body guide tYack shall be of shallow rectangular trough-sryle OO City of Elk River, Minnesota — All rights reserved I I City of Elk River Design Standards design. Guide tracks employing multiple tracks or of a male n�pe design are not allowed. The wedge to stem design on 4" - 48" shall emplov the use of an independent stem nut. An integral stem nut design in those sizes is not allowed. E. All body to body bolting material shall be Type 304 SS, de�Telop the ph��sical strength characteristics ofASTMr�307 and shall have the dimensional requirements ofAWWr� G 515 and ANSI 18.2.1. All body to bonnet bolting shall be of the same size and length. All bolts shall have square or hexagonal heads. 1�letric bolts, socket headcap screws, or recessed alien-head ty�pe bolts filled with hot-melt ty�pe wax will not be allowed. F. Designs employing two-piece independent thrust collars will not be allowed. All stem diameters and the prescribed number of turns to open shall be as detailed in the applicable portions of Table 4 of AWWA G515. The stem o-rings above the thrust collar shall be replaceable with the valve fully open and while subjected to full working pressure. 0-rings set in a cartridge rype design will not be allowed. Valve shall be equipped with thrust washers above and below the thrust collar to reduce the operating torque of the valve. G. All internal and external surfaces of the valve shall be coated prior to assembly, with epo��y-. All val�re body- gaskets shall be of a pressure energized o-ring design. H. All valves 14" and larger shall be equipped with lifting lugs or eyebolts for lifting. All valves 16" and larger shall be equipped with bevel gearing for horizontal or spur gearing forvertical installation to reduce operating torque. Valves equipped with bevel gears shall be equipped with flushing ports on each wedge guide channel. Where allowable, �ralves should be i�istalled in the vertical position. Valves employing the use of an external and/or integral by--pass for torque reduction are not allowed. I. Valves shall be manufactured bv a company domiciled in the United States, as well as have a history- in manufacturing Resilient Wedge Gate Val�res greater than 25 years. All Resilient Wedge Gate Val�res shall be American Flow Control Series 2�00 or Engineer pre- approved equal. J. Valve boxes shall be 5'/4" diameter shaft suitable for 7'-6" of cover over the top of the watermain. Bo�es shall be cast iron screw type two-piece boxes with the word "WATER" on the lid. Valve bo�es shall be Ty�ler 6850 with 5'/4" Drop Lid, or equal. K. All valve boxes shall be installed upon the valve with the use of a Gate Valve Adaptor as manufactured by� r�daptor Inc. or approved equal. The adaptor shall be considered incidental to the valve box installation. 10. Trace Wire A. Open Trench - Trace wire shall be #12 AWG Copper Clad Steel, High Strength with minimum 4501b. break load, with minimum 30 mil HDPE insulation thicl�ness. B. Directional Drilling/Boring - Trace wire shall be #12 AWG Copper Clad Stee1, Extra High Strength with minimum 1,1501b. break load, with minimum 30 mil HDPE insulation thickness. C. Trace wire — Pipe Bursting/Slip Luiing - Trace wire shall be 7 x 7 Stranded Copper Clad Steel, Extreme Strength with 4,7001b. break load, with minimum 50 ml HDPE insulation thickness. Construction 1. Wet Ta� with Valve The tapping sleeve and resilient seated gate valve assembly shall be installed on the watermain pipe after thoroughly cleaning the pipe to be tapped. The sleeve shall be assembled on the pipe and the bolts tightened per the manufacturer's specifications. Shell cutters shall be the maximum size allowed for the tap being made. Size on size taps shall utilize an inch undersized shell cutter. OO City of Elk River, Minnesota — All rights reserved I 2 City of Elk River Design Standards Electrical conductivity straps shall be pro�rided to by-pass the tapping sleeve assembl�. Upon completing the installation all exposed bolts and nuts shall be completely coated with an approved bituminous rust preventative coal tar material. The entire tapping sleeve and val�Te assembly shall be polyethylene encased. 2. Water Service Installa�ion Water service lines shall be installed in accordance with Nlinnesota Department of Health standards. Where water service lines are installed alongside of sanitary or storm sewer service lines, installation shall maintain the minimum specified clearances between pipelines and provide proper and adequate bearing for all pipes and appurtenances. Unless otherwise specified, inst�illation of water service lines shall provide for not less than seven- and one-half feet of cover over the top of the pipe and for not less than 18 inches of clearance between pipelines. Also, at least 6 inches of clearance shall be maintained in crossing over or under other structures. Where the service pipe may- be exposed to freezing due to insufficient cover or e�posure from other underground structures, the water pipe shall be insulated as directed by ERMU. Service trenches shall be restored and compacted as specified for pipelines. A. No dry tapping shall be allowed. Unless otherwise indicated, tap service piping may be laid direcd� on any solid foundation soil that is relati�rely free of stones and hard lumps. Tap service piping shall be installed in one piece without intermediate joint couplings between the corporation stop at the watermain tap and the curb stop. r�ll copper pipe and appurtenances shall be joined by means of appro�red flared n�pe threaded couplings. Connection of tap service lines to the watermain shall be made with an approved corpora�ion stop, with the watermain tap being made from horizontal to an angle of not more than 15 degrees from the horizontal. (2:30 and 9:30). Expansion loops shall be directed horizontally�, not �rertically from the tap. A minimum of 3 full threads of the corpora�ion stop must engage in ductile iron watermain or a saddle must be used for the connection as noted in the following table. OO City of Elk River, Minnesota — All rights reserved I 3 City of Elk River Design Standards The flaring of copper tubing ends shall be accomplished only with the use of the proper size and t��pe of tools as designated for the purpose, and will provide accurate sizing and rounding of the ends. Tubing shall be cut squarely and all edge roughness shall be removed prior to flaring. All couplings shall be tightened securely, so the flared end fits snugly- against the be�rel of the fitting without leakage. The flared joint couplings shall be made up without the use of jointing compounds. Unless otherwise indicated, tap service lines shall be installed on a straight line at right angles to the watermain or property- line. The ser�rice line shall be terminated with a curb stop and box at the property line. When the service lines are to be terminated beyond the curb stop and box at the properry line, then the senice line extension shall be terminated with a compression fitting and cap, suitable to pressure test against. This longer ser�rice line may be required to avoid future sidewalk disruption or conflicts with utility lines within the utilit�� easement along the front of the lot line. The service pipe and curb stop coupling depth shall be such as to maintain not less than 7.5-foot minimum cover, or in locations where conflict may� occur with storm sewer, service pipe shall be placed at least 3 feet below the storm sewer invert or shall be insulated. The service bo� shall be screwed onto the curb stop coupling and be firmly supported on a concrete block. Service boxes shall be installed plumb and be braced effectively to remain vertical during and after completion of backfilling. The service bo�es shall be brought to final surface grade when the final ground surface has been established. 3. Setting Valves, Hvdrants, and Fittin�s H�-drants shall be installed plumb. The large pumper nozzle shall be oriented squarely facing the street. If the hy-drant installation results in the pumper nozzle not facing the street, the hy-drant head shall be rotated accordingly. The traffic flange of the hy�drant shall be set with the bottom of the flange 2 inches above finish grade. When a hy�drant barrel extension is installed the traffic flange shall be adjusted to remain at 2 inches above the finish grade. OO City of Elk River, Minnesota — All rights reserved I 4 City of Elk River Design Standards A drainage pit of a minimum �rolume of one cubic vard shall be constructed around the hydrant base and filled with 3/4 to 1.5- inch drain rock firmly compacted under and around the hy�drant base and to 6 inches above the hvdrant drain hole. The drain rock shall be covered with geote�tile fabric, 6 mil polyethylene, or two layers of tar paper prior to backfilling. Hydrant drain holes shall normally- be left open. Hy�drants located where the groundwater is above the drain hole shall have the oudet factory plugged to ensure proper plug installa�ion. The hydrant shall have a permanent tag attached stating "Pump After Use". The pumper nozzle shall be factory painted in accordance with the Ciry standard to identify the hydrant as having a plugged drain hole and needing to be pumped out after use. New hydrants shall ha�re hydrant locating devices and flags. Valves shall have a piece of geotextile fabric, 4 feet by 4 feet, placed centered over the valve body�, prior to installing the bottom section of the valve box, to prevent soil migration into the val�-e bo� assembly. The �-alve box shall be centered over the operating nut of the valve, installed plumb, and the box cover set to finish grade in accordance with the pavement requirements. Val�re boxes shall be installed so as to not transmit shock or stress to the valve. The Contractor shall take extra care in backfilling and compacting around the valve box assembly to ensure plumbness and ease of keying the valve upon final installation. Valve boxes installed independent of a hydrant outside the paved roadway shall be marked with a 4-foot-high signpost with a 4 x 8-inch reflectorized marker with a GV labeling on it The marker post shall be installed two feet back of and facing the valve box, to allow operation of the valve wrench without hit�ing the marker post. All dead-end lines shall be terminated with a plug or cap and restrained, rodded, or thrust blocked. If the pipe size is reduced near the end of the line, restraints shall be sized for the pipe size prior to the reduction. A 4-inch x 4-inch x 6-foot wood post marker shall be installed at the end of the line. The marker shall be installed with 4 feet buried in the ground and 2 feet exposed abo�re the ground. 4. Tracer Wire Tracer Wire Requirements: Tracer wires shall be installed along all nonmetal mainline pipe runs and all senices unless noted othenvise. A. Connectors a. All mainline tracer wires must be interconnected in intersections, at mainline tees and ma�nline crosses. At tees, the three wires shall be joined using a single 3-way lockable connector. At crosses, the four wires shall be joined using a 4-way connector. Use of two 3-way connectors with a short jumper wire between them is an acceptable alternative. b. Direct bury wire connectors — shall include 3-way� lockable connectors and mainline to lateral lug connectors specifically manufactured for use in underground trace wire installation. Connectors shall be dielectric silicon filled to seal out moisture and corrosion, and shall be installed in a manner so as to pre�rent any uninsulated wire exposure. c. Non-locking friction fit, twist on or taped connectors are prohibited. B. Termination/Access a. All trace wire termination points must utilize an appro�red trace wire access box (aboveground access box or grade level/in-ground access box as applicable), specifically manufactured for this purpose. b. All grade level/in-ground access bo�es shall be appropriately identified with "sewer" OO City of Elk River, Minnesota — All rights reserved I 5 City of Elk River Design Standards or "water" cast into the cap and be color coded. c. A minimum of 2 ft. of e�cess/slack wire is required in all trace wire access bo�es after meeting final elevation. d. All trace wire access boxes must include a manually interruptible conductive/connecti�re linl� between the terminal(s) for the trace wire connection and the terminal for the grounding anode wire connection. e. Grounding anode wire shall be connected to the identified (or bottom) terminal on all access boxes. £ Service Laterals on public property - Trace wire must terminate at an approved grade level/in- ground trace wire access box, located at the edge of the road right-of-way, and out of the roadway. g. Service Laterals on private property - Trace wire must terminate at an approvedabove- ground trace wire access box, affixed to the building exterior direcdy above where the utiliry enters the building, at an elevation not greater than 5 vertical feet above fu�ished grade, or terminate at an approved grade level/in-ground trace wire access box, located within 2 linear feet of the building being ser�-ed by the utilit�. h. Hydrants — Trace wire must terminate at an approved above-ground trace wire access box, properly affixed to the hydrant grade flange. (affixing with tape or plastic ties shall not be acceptable) i. Long-runs, in excess of 500 linear feet without service laterals or hydrants - Trace wire access must be pro�rided utilizing an approved grade le�rel/in-ground trace wire access box, located at the edge of the road right-of-way, and out of the roadway. The grade level/in-ground trace wire access bo� shall be delineated using a minimum 48" poly�ethylene marker post, color coded per APWA standard for the specific utilitv being marked. C. Grounding a. Trace wire must be properl� grounded at all dead ends/stubs. b. Grounding of trace wire shall be achieved by use of a drive-in magnesium grounding anode rod with a minimum of 20ft of #14 red HDPE insulated copper clad steel wire connected to anode (minimum 0.5 lb.) specifically manufactured for this purpose and buried at the same elevation as the utility. c. When grounding the trace wire at dead ends/stubs, the grounding anode shall be installed in a direction 180 degrees opposite of the tYace wire, at the ma�mum possible distance. d. When grounding the trace wire in areas where the trace wire is continuous and neither the mainline trace wire or the grounding anode wire will be terminated at/above grade, install groundinganode directiv beneath and in-line with the trace wire. Do not coil excess wire from grounding anode. In this installation method, the grounding anode wire shall be trimmed to an appropriate length before connecting to trace wire with a mainline to lateral lug connector. e. Where the anode wire will be connected to a trace wire access box, a minimum of 2 ft. of excess/slack wire is required after meeting final ele�ration. D. Installation a. Trace wire installation shall be performed in such a manner that allows proper access for connection of line tracing equipment, proper locating of wire without loss or deterioration of low frequency� (512Hz) signal for distances in excess of 1,000 linear feet, and without distortion of signal caused by multiple wires being installed in close pro�mity to one another. b. Trace wire systems must be installed as a single continuous wire, except OO City of Elk River, Minnesota — All rights reserved I 6 City of Elk River Design Standards where using approved connectors. No looping or coiling of wire is allowed. c. Any damage occurring during installation of the tYace wire must be immediatel�7 repaired by removing the damaged wire, and installing a new section of wire with approved connectors. Taping and/or spray coating shall not be allowed. d. Trace wire must be properly� grounded as specified. e. Trace wire on all service laterals/stubs must terminate at an appro�red trace wire access box located direcdy above the utiliry, at the edge of the road right-of-way, but out of the roadway. (See Trace wire Termination/Access) £ At all mainline dead-ends, trace wire shall go to ground using an appro�red connection to a drive-in magnesium grouncling anode rod, buried at the same depth as the trace wire. (See Grounding) g. Mainline trace wire shall not be connected to e�sting conductive pipes. Treat as a mainline dead- end, ground using an approved waterproof connection to a grounding anode buried at the same depth as the trace wire. h. All service lateral trace wires shall be a single wire, connected to the ma�nline trace wire using a mainline to lateral lug connector, installed without cutting/splicing the mainline trace wire. i. In occurrences where an existing trace wire is encountered on an e�isting utility that is being extended or tied into, the new trace wire and existing trace wire shall be connected using approved splice connectors, and shall be properly grounded at the splice location as specified. j. A mainline trace wire must be installed, with all service lateral trace wires properly connected to the mainline trace wire, to ensure full tracing/locating capabilities from a single connection point. k. Lay mainline trace wire continuously, by-passing around the outside of valves and fittings on the North or East side. 1. Trace wire on all water ser�rice laterals must terminate at an approved trace �vire access bo� color coded blue and located directly abo�re the service lateral at the edge of road right of way. m. All conductive and non-conductive service lines shall include tracer wire. E. Testing a. All new trace wire installations shall be located using t�Tpical low frequency (512Hz) line tracing equipment. This verification shall be performed prior to final acceptance of the project. b. Continuity testing in lieu of actual line tracing shall not be accepted. Testing Hvdrostatic Testing of Pressure Pi�e Each section of watermain that can be isolated by �-alving shall be subjected to a separate t�vo- hour pressure test. Testing for the two-hour duration for watermain shall be with hydrants closed, and valves on hydrant leads and dead-end lines open for watermain. When service lines ha�re stubs extending beyond the curb stops or �ral�res, the curb stops or �ralves shall be in the open position and the pressure test conducted against the capped extension. Once this portion of the test is completed, the valve on the hydrant leads and dead-end water lines shall be closed and hydrants opened. The specified test pressure shall be applied, and the test repeated for 15 minutes to establish the condition of the hydrant lead valves. OO City of Elk River, Minnesota — All rights reserved 17 City of Elk River Design Standards When watermain is constructed, separated from the active sy-stem, the Contractor shall still be required to chlorinate, pressure test, and flush the new work in accordance with the specifications. This may require additional work operation to fill and flush the system. The Contractor shall furnish the pump, pipe connections, gauges, and measuring equipment, and shall perform the testing in the presence of ERMU. The pressure gauge for the test shall be an Ashcroft Model 1082 with 4 1/2-inch dial face at 1 psi increments or approved equal. Where permanent air vents are not provided, the Contractor shall pro�ride and install corporation cocks at the high points as needed for release of air as the line is filled with water. Any defective joints, pipe, fittings, valves, or hydrants revealed during the testing or before final acceptance of the work shall be satisfactorily corrected and the tests shall be repeated until the specified requirements have been met. A. Pressure Test: The section being tested shall be slowly� filled with water and the specified test pressure shall be applied after all air has been expelled from the pipe. A hydrostatic pressure of 150 pounds per square inch, gauge pressure, measured at the lowest point of elevation, shall be applied by means of a pump connected to the pipe in a satisfactory manner. The gauge pressure shall be checked after a minimum of two hours. A pressure drop of 1 psi or less over a 2 hour period shall be considered acceptance for the test section. If the pressure drop is greater than 1 psi the Contractor shall investigate the cause and take corrective action. The Contractor must make e�-ery effort to expel all air in the test section which may- be causing a test failure. This may� require the Contractor to tap a corporation at a high point of the main on the top of the pipe to release trapped air. Service pipe shall tvpicallv be tested in conjunction with the main line testing. However, services may� be tested separately- at 100 psi, with the corporation stops open. The Contractor ma�- ha�re to perform additional pressure testing if during the flushing operation there is evidence of debris being flushed out of the system. This may be due to poor construc�ion practices and result in valves not closing tight after having done the original pressure test. Retesting shall be at the discretion of the Water Superintendent. 2. Disinfection of Watermains Before being placed in service, the completed watermain installation shall be disinfected and flushed, and after the final flushing the water shall be tested for bacteriologic qualin� and found to meet the standards prescribed by the Minnesota Department of Health. The disinfection materials and procedures and the collection and testing of water samples shall at a minimum be in accordance with the provisions of A�X��X�A C651, Disinfecting Watermains, and as well as meet the requirements of the Minnesota Department of Health. Where an existing watermain is cut for the installation of a hydrant, for lowering the watermain, or for reasons determined by the Engineer, the pipe and fittings proposed to be installed shall be disinfected prior to installation as follows: (1) The interior of the pipe and fittings shall be cleaned of all dirt and foreign material. (2) The interior of the pipe and fittings shall be thoroughly swabbed or sprayed with a 1 percent minimum hy-pochlorite solution. OO City of Elk River, Minnesota — All rights reserved I 8 City of Elk River Design Standards A. Plu.rhing: After the applicable retention period, heavily chlorinated water shall not remain in prolonged contact with the pipe. Chlorinated water shall be flushed from the main until chlorine concentration is no higher than generally� in the sy stem for domestic use. The environment to which the chlorinated water is to be discharged shall be inspected. The Contractor shall be responsible to ensure that the receiving area is not damaged by the chlorinated water and shall use a reducing agent for neutralization when necessary. B. Bacteriological Te.rt.r: After final flushing and before the watermain is placed in service, samples of water shall be collected from the end of the main and each branch line for testing for bacteriological qualit�� in accordance with Standard Methods for the Exainination of Water and Wastewater, and shall show the absence of coliform organisms. Samples shall be at a rate of one per every 1000 feet of pipe. Two consecutive sets of acceptable samples, taken at least 24 hours apart, must be collected from each sample point on the new main. The first sample must be taken a minimum of 24 hours after flushing. A higher rate of sampling may be required to include all branch line. If water in the pipe does not meet the Minnesota Department of Health requirements, disinfection procedure shall be repeated until meeting the requirements. The pulling of all samples shall be witnessed by a representative of Elk River Municipal Utilities. 3. Electrical Conductivin� Tests A conductivity test within one week after comple�ion of pressure testing of the watermain on all ductile iron pipe watermain will be required. On watermain reconstruction projects, the Contractor shall perform the conductivity test prior to ser�rice line reconnections to ensure main line isolation from house ser�rices. The system (pipeline, �ralves, fittings and hydrants) shall be tested for electrical continuin� and current capaciry. The electrical test shall be made after the hydrostatic pressure test and while the line is at normal operating pressure. Backfilling shall ha�re been completed. The line may� be tested in sections of convenient length as approved by ER1�ZU. Direct current of 350 amperes plus or minus 10%, shall be passed through the pipeline for 5 minutes. Current flow through the pipe shall be measured continuously� on a suitable ammeter and shall remain steady without interruption or fluctua�ion throughout the 5-minute test period. Insufficient current or intermittent current or arcing, indicated by large fluctuation of the ammeter needle, shall be evidence of defective contact in the pipeline. The cause shall be isolated and corrected. Thereafter, the section in which the defective test occurred shall be retested as a unit and shall meet the requirements. Sources of D.C. for these tests may be motor generators, arc welding machines, or other appro�red sources. All such equipment shall be furnished by� the Contractor. Cables from the power source to the section of system under test should be of sufficient size to carry the test current without o�rerheating or excessive �roltage drop. Electrical conductivity testing shall not be performed on plastic or HDPE watermain. Tracer (location) testing of all watermain shall be completed after all service installations have been completed. OO City of Elk River, Minnesota — All rights reserved I 9 City of Elk River Design Standards END OF SECTION 3400 Section 4000 — Sanitary Sewer Design Design Criteria Sanitary sewer design shall conform to the latest edition of the Ten State Standards, APWA, and MPCA standards. 2. Sanitary Sewer S�-stem installation and testing shall be in accordance with CEAM standard specifications e�cept as modified herein. 3. Sanitary sewer extensions shall consider each residence to include 3.3 people on the average. 4. Sewage flow design rates shall be 110 gallons per person per day. 5. 1��inimum flow �relocities for sanitary sewer shall be 2.5 fps; maximum flow velocities shall be 10.0 fps. 6. Commercial and industrial developments shall consider design flows on a case-by-case basis. 7. All sanitary sewer extensions shall be laid as low as practical to m;nimize the need for future lift stations. 8. Connections to e�sting sanitary sewer manholes shall be core drilled and fitted with water�ight elastomeric rubber boots. 9. All drop sanitar5- sewer manholes over two feet shall be constructed as outside drops; inside drops will be allowed on a case-by--case basis as approved by the City Engineer. Only In�saFlowOO inside drops will be considered. 10. Sanitary sewer manholes shall be located on street centerline whenever possible. When manholes are not located on centerline, a station/offset shall be shown on the Plans to ensure that manholes are not located within wheel paths. 11. Sanitary sewer manholes will not be allowed in rear or side yards. 12. Sanitary sewer manholes shall have a 1-foot section under the cone. 13. Sanitary sewer services shall not be extended from manholes. 14. Sanitary sewer manholes shall be provided with a minimum 0.10-foot drop from inlet to outlet pipe. 15. All sanitary sewer manholes shall utilize Cretex Pro-Ring or approved equal for �ill grade adjustments. OO City of Elk River, Minnesota — All rights reserved 20 City of Elk River Design Standards Materials Pipe and fittings for non-pressure gravity sewers and ser�rices shall conform to the requirements of ASTM D 1784 and D 3034, or ASTM F 789 and D 3034, and have push-on joints with elastometric gaskets, as follows: A. SDR 35 for depths up to 18-ft. B. SDR 26 for depths 18-ft to 30-ft. C. Ductile Iron Pipe, as specified below, for depths greater than 30-ft. 2. Pipe and fittings for pressure forcemains shall conform to the requirements of ASTM D 1784 and the following supplementary- provisions: A. For pipes 12" in diameter and smaller, the pipe, fittings and accessories shall be C900 and have a minimum dimension ratio (DR) of 18 corresponding to a worl�ing pressure of 150 psi. For pipes 14" in diameter and larger, the pipe, fittings and accessories shall be C905 and have a minimum dimension ratio (DR) of 25 corresponding to a working pressure of 165 psi. B. Joints shall be push-on n�pe with elastometric gaskets. C. Forcemain pipe shall have location tracer wire placed with it. Location wire shall be 8- gauge plastic jacket rype TW or THW. Splices shall be made using 3M cast kits and shall not occur more frequently than one per 250 feet of pipe. 3. All ductile iron pipe shall conform to the requirements of AWWA C 151 (ANSI A21.51) and as follows: A. CL 52 for depths 30-ft to 60-ft. B. CL 54 for depths greater than 60-ft. 4. For service pipe placed at a depth of 30 feet or greater, the pipe material shall match the mainline pipe as called for in item B3 abo�re. Service pipe placed shallo�ver than 30 feet of depth shall be SDR 26. 5. All manhole and catch basin adjustments shall be Cretex Pro-Ring or appro�red equal. Manhole and catch basin adjustments shall consist of a variery of heights (thicknesses), diameters and shapes all conforming to the following requirements: A. Grade adjustments — The grade adjustments shall be manufactured from ARPRO Expanded Polypropylene (EPP) black, 5000 series meeting ASTM D3575 and ASTM D4819-13; B6D7G4L3M24S2T17W7. The grade adjustments shall be manufactured using a high compression molding process to produce a finished density of 120 g/1 (7.5 pc�. The grade adjustments shall meet or exceed the load rating requirements of AASHTO M306, HS-20 and HS-25. B. "Grade" adjustments may- contain either an upper and lower key-�vay (tongue and groove) for vertical alignment and/or an adhesive trench on the underside with a flat top. C. "Finish" or "Flat" adjustments may either have a key�way (groove) on the underside for vertical alignment and/or an adhesi�re trench with a flat upper surface. These adjustments shall be a�railable in heights (thicl�nesses) which will allow final adjustments of the frame and cover or grate to within'/4" (one quarter inch) of the specified final elevation. "Finish" adjustments may also have a ke�vay on the upper surface of the inner diameter to facilitate installation of an "Angle" adjustment. D. "Angle" adjustments may� either have an upper or lower key�vay (tongue and groove) for vertical alignment and/or an adhesive trench on the underside. When required, the "Angle" adjustments shall allow final adjustment of the frame and cover or grate to within'/4" (one quarter inch) of the specified final elevation. OO City of Elk River, Minnesota — All rights reserved 21 City of Elk River Design Standards E. Adhesive/Sealant installation of Crete� Pro-Ring shall conform to the following requirements: a) Any adhesive or sealant used for watertight installation of the grade adjustment rings shall be M-1 Structural Adhesive/Sealant, Rapid Set Flexible Construction Adhesive & Sealant or equal meeting these applicable performance standards: a. ASTM G920, Type S, Grade NS, Class 35. Uses NT, T1, M, G, A and O. b. ASTM E84, Class A c. Federal Specification TT-S-00230-C Type II, Class B d. Corps of Engineers CRD-G541, Type II, Class B e. Canadian Standards Board CAN 19, 13-M82 b) Other adhesives or sealants may only be used with owner's written authorization. ROUND RINGS 40" O.Q. X 27 " I.D. PART NUMBER RING TYPE RING HEIGHT 40-27F Q75 40-27F-16fl 4Q-27F-125 4d-27F-150 40-27F-175 40-27F-26Q 40-27F 225 4Q-27F 250 4�-27F-460 4Q-27F-6DQ 40-27A-100 4Q-27G-200 4Q-27G-4Qd 4�-27G-600 Installation FINISH RNISH FINISH FINISH FINISH FINISH FINISH FINISH FINISH FINISN ANGLE GRAD� GRADE GRADE 3!4° �„ 1-1/4" 1-1/2" 1-3/4" 2° z-7 ra„ 2-1/2„ 4" 6" 3/4" TO 1-3/4" 2�, 4" 6° 1. Cretex Pro-Ring manhole and catch basin grade adjustment rings: B. C. D. E. Lift Station 1. Site A. Installation and surface preparation shall be in accordance with the manufacturer's instructions. The joint between the first grade ring and the top of the manhole, catch basin or utility structure shall be sealed using the specified sealant/adhesive. If the top of the manhole, catch basin, or utilit�� structure is not level or is irregular, then a bed of specified mortar or grout shall be placed on the top surface of the utilit�� structure and the first grade ring shall be embedded and leveled into the bed of material. The remaining joints between all grade adjustments and the frame and cover or grate shall be sealed using the specified adhesive/sealant. No other materials shall be used in the construction of the grade adjustment area beyond those specified abo�re. Prohibited materials include, but are not limited to wood or wood shims of any kind, concrete, brick, block, stones, etc. A. Drainage: the top slab of the wet well and valve vault should be set high enough to allow drainage away from the lift station structure. B. Access: an access driveway that is 12' wide � 20' long shall be provided for the lift station. C. A hvdrant should be located within 50 feet of the lift station. OO City of Elk River, Minnesota — All rights reserved 22 City of Elk River Design Standards D. A streetlight should be installed at each lift station. 2. General Configuration — the plan must indicate the proposed location of the Control Panel which is subject to approval by the Wastewater Superintendent and City Engineer. 3. Structures A. Minimum Size — 72" is to be a minimum diameter for both the wet well and valve vault. Depending on the size of the pumps, the wet well mav need to be larger. B. The bottom of the valve vault is to be provided with 4" of slope across the vault to the drain oudet. The drain line should exit the valve vault horizontally through the wall instead of vertically through the floor. A backflow check valve needs to be installed on the drain line to pre�rent backflow of water and gas from the wet well to the �ralve �rault. A trap should also be located in the drain line as a back up to the check valve for preventing gas flow back into the vault. C. All pipe work and fittings shall be contained within the valve manhole. Short-radius 90- degree bends and tee should be use. D. A 4-inch drain with grate from the valve manhole to the lift station shall be provided. A threaded Zurn Z-509 outlet and Zurn Z-1099 ball float ty�pe backwater valve or approved equal is required. E. The vent pipe for the wet well needs to be cast into the concrete top slab. 4. Access Hatch A. blinimum Size — 30" x 48" B. Access hatch frames should be angle frame-rype with hasp and staple for a padlock. 5. Pi�ing and Valves - Resilient wedge gate valves and the external lever and weight rype check valves should be supplied. 6. Pu�ps A. Acceptable pump manufacturers shall be KSB. B. A lifting hook or approved equal should be provided for pulling the pumps. 7. Controls and Control Panel A. Simple Floats and Relays should be specified for small stations. B. Floats should be hanging n�pe — not anchored. C. Five Floats should be provided (include low level alarm float). D. Run-time meters ('/4" minimum size) — hour meters, no minute meters. E. Control Panels are to be stainless steel. F. Light in panel should be porcelain incandescent lamp. G. A reel strobe light alarm with buzzer shall be included on top of the control panel with reset switch. The reset switch shall be located inside the control panel. A battery backup with charger shall be provided for the alarms. H. No alarm horn should be included with the panels. I. Use tape tvpe heaters in the panel. J. Auto Dialer — In the lift station panel design, leave a 16" x 20" space for the auto dialer box. K. An oudet needs to be included on the front side of panel. L. Magnetic fasteners for the inside dead-front panel shall be supplied. M. Installation of SCADA systems and equipment in accordance with City s�stem. Testing 1. Low-Pressure r�ir Test All gravity sanitary� sewer lines, including service connections, shall be substantiallv watertight OO City of Elk River, Minnesota — All rights reserved 23 City of Elk River Design Standards and shall be tested for e�cessi�re leakage upon completion and before connections are made to the service by Others. Each test section of the sewer shall be subjected to e�filtration testing b� the ASTM F1417 (low pressure air) test method regardless of pipe material. The requirements set forth for ma�mum leakage shall be met as a condition for acceptance of the sewer section represented by the test. All testing shall be performed by- the Contractor without any direct compensation being made therefore, and the Contractor shall furnish all necessary equipment and materials, including plugs and standpipes as required. The sewer pipe section under test shall be clean at the time of testing but the pipe may be wetted. Pneumatic balls shall be used to plug the pipe ends at manholes. Low pressure air shall be introduced to the plugged line until the internal air pressure reaches three and one half (3.5) psi greater than the average back pressure of any ground water pressure that may submerge the pipe. At least two (2) minutes shall be allowed for the air temperature to stabilize before readings are taken and the timing started. During this time the Contractor shall check all plugs to detect plug leakage. If plugs are found to leak, air shall be bled off, the plugs shall be re�ightened, and the air shall be rein�soduced into the line. The formula below calculates the specified minimum time required for a 1.00 psig pressure drop from a starting pressure of 3.5 psig to a final pressure of 2.5 psig using a leakage rate of 0.0015 cubic feet/minute/square foot of internal surface. Calculate all test times by the following formula: T= 0.085 DK/Q where: T= shortest time allowed for the air pressure to drop 1.0 psig, sec. K= 0.000419 DL but not less than 1.0, Q =1eak rate = 0.0015 CFM/SF, D= measured average inside diameter of sewer pipe, in., and L= length of test section, ft. 2. Mandrel Deflection Test Deflection tests shall be performed on all plastic gravit�� sewer pipes. The test shall be conducted after the sewer trench has been backfilled to the desired finished grade and has been in place for thi�ty (30) days. The deflection test shall be performed by pulling a rigid ball or nine-point mandrel (MnDOT Technical blemorandum 98-24-B-01 or latest revision) through the pipe without the aid of mechanical pulling devices. The ball or mandrel shall have a minimum diameter equal to ninety five percent (95%) of the actual inside diameter of the pipe. The ma�mum allowable deflection shall not exceed five percent (5%) of the pipe's internal diameter. The line will be considered acceptable if the mandrel can progress through the line without binding. The time of the test, method of testing, and the equipment to be used for the test shall be subject to the approval of the Engineer. All testing shall be performed b� the Contractor at his expense without any direct compensation being made therefore, and he shall furnish all necessary equipment and materials required. 3. Televisin� Sewer line televising is required, at the cost of the ContYactor, for all newly constructed lines. The full �rideo reports shall be submitted to the cit�� via USB flash drive. OO City of Elk River, Minnesota — All rights reserved 24 City of Elk River Design Standards END OF SECTION 4000 OO City of Elk River, Minnesota — All rights reserved 25 City of Elk River Design Standards Section 5000 - GIS Information Requirements All developments that are constructed are required to submit electronic data based on as-built information in addition to hard copies of the as-builts. A development's 2-y-ear warranty- period shall not begin until all required information is received. The information will be used to update the City of Elk River's GIS map. The required electronic data consists o£ 1. As-built record drawings of each plan sheet. The as-built drawings shall conform to the attached "Checklist for Elk River as-built review." Drawing files shall be in Tagged Image File Format (TIFF) or ADOBE PORTABLE DOCUMENT FOR1l�T (PDF). 2. An o�rerall map of the development that labels all applicable items with the I.D. Number assigned. I.D. Numbers should be assigned as detailed below. An 11" x 17" plan set needs to be submitted for review with the electronic data. Once approved, a 22" x 34" Mylar set of as-builts will be submitted. 3. AutoCAD drawing file containing all Right of Way, Lot Lines, Street Lines, Storm Sewer, Sanitary Sewer, and Water Main or GIS shapefile(s) for each. 4. Field collected coordinates of all watermain appurtenances including valves, hy�drants, curb stop boxes, tracer wire boxes, etc. shall be provided as part of the as-built records. END OF SECTION 5000 OO City of Elk River, Minnesota — All rights reserved 26 City of Elk River Design Standards Elk River As-built Review Checklist 1. All sheets must show "record plan" with signature and date. 2. Cover sheet must list general contractor and utilit�r contYactor and developer. 3. Sanitary sewer and water main sheets must show ties to all services, curb stops, clean outs, and valves. 4. Sanitary sewer and water main sheets must show rim and invert elevations, size, slope, and length on each pipe, riser height, invert elevation of all sanitary services, and all ser�rice lengths. 5. All changes to fittings on water main must be shown. 6. All wye locations must be shown. 7. Storm sewer sheets must show rim and invert elevations, slope, size and length on each pipe. 8. Any draintile must be shown. 9. Any �rariation from the rypical section must be shown on the street construction sheets. OO City of Elk River, Minnesota — All rights reserved 27 City of Elk River Design Standards Development Plan Requirements 1. Lot and block numbers. 2. Street names. 3. Storm sewer alignment with top and invert eleva�ions. Also Flared ends with invert elevations. 4. Centerline Street elevations at 100 foot stations with high and low points. 5. Centerline street percent grades. 6. Cul-de-sac percent grade along curb. 7. Building setback lines. 8. Final contours. 9. All proposed dri�reway- slopes. 10. House pads with house sryle and elevations. 11. Front and rear lot corner elevations. 12. Spot elevations at the rear of the house pads if the drainage is to be directed around the house pad to the front. 13. Typical lot detail indicating where lot and house elevations are shown to. 14. Legend with rype of house styles and grade difference for garage floor to walkouts or lookouts. 15. Lot dimensions to the nearest foot. 16. Typical street section. 17. Drainage arrows at high points and major grade changes. 18. Existing and proposed easements. 19. Emergency o�rerflows should be labeled and shown with spot elevations and drainage arrows. Emergencv overflows must be established for catch basins in the street and in rear yards. Areas along rear lot lines which are below emergency overflows elevations shall be designated as drainage easement on the final plat. 20. Wetland boundaries must be accurately- shown. 21. Development plan must be signed by a registered Land Surveyor or Engineer. OO City of Elk River, Minnesota — All rights reserved 28 City of Elk River Design Standards Items Needed to Start Utility Construction 1. Site grading is completed. 2. Approved construction plan. 3. Approved construction specifications. 4. Hold preconstruction meeting. 5. SWPPP approved and signed. 6. NPDES permit for grading. 7. MPCA permit. 8. MDH water permit. 9. County access permit (if necessary). 10. Erosion con�sol is in place. 11. Developer's agreement has been executed. 12. Permit fees paid to City. 13. Surety posted with City. 14. Cost of Public Improvements provided to City broken down into 4 categories: A. Sanitary sewer B. Watermain C. Storm sewer D. Street construction OO City of Elk River, Minnesota — All rights reserved 29 � � I � 0 Q I ^� � � � � � Q v a. D D. . I 10 1 /2" � SERVICE STAMP LOCATION ��, \ � \�a � �2>> G� o \� \� � D v �' D N p. � . � 4 a \D . � Q 0 � � a D a \. � � � D . ..� . a �. � . a � � 4 D a a 17 1 /2" I I � 2 8 ��I 2899 SURMOUNTAB�E CONCRETE CURB AND GUTTER 3" RADIUS � �2" RADIUS SERVICE STAMP LOCATION 6" 3" RADIUS � � 1 /2" RADIUS a SLOPE 3/4" PER FT 3 a ° ° � D b N . v � . p . . . � . . a � Q \ � � . . . . .. . . : � . . D p � ° r7 � 4 ° - 4 . � . N a o a \ a D a .: 0 . � � Q. � . � � 0 � � � � . . . . . .a � . �... .. �.. . �. 4. 18" � 8„ �T� B618 CONCRETE CURB AND GUTTER C' •, SURMOUNTABLE AND B618 CONCRETE CURB AND GUTTER REV: 3/2006 STANDARD PLATE N0. 2000 ° .\ . �ad a .. . 6 1 /2" MIN. v d. BELLY FLOW CHANNEL TO FORM SMOOTH TRAFFIC CROSSING, NOT AN ABRUPT TRANSITION. 3-N0. 4 BARS @ 15" O.C. 3/4"/FOOT 3/4"/FOOT ' , • . a• . • 'a • � • � . • , a. . . 3" 3 1 /2" 18" 18" SECTION B-B 1 WIDTH VARIES SECTION A-A PROPERTY LINE O� �� +QP�� � ,o\ . �A .•_a 4, a . -A CONCRETE CURB AND GUTTER �A ' � a d� � • � �A EXPANSION JOINTS PLAN PROPERTY LINE ��� � � o/ s/o � �TS�\ 4 '� a . . • , a ' •i QUADRANT TO BE POURED INTEGRALLY WITH CURB REV: 3/2006 C1J CONCRETE "V" GUTTER STANDARD PLATE N0. 2001 �.�:��.�a►���ev� 12' MINIMUM � 24' MAX. RESIDENTIAL � 32' MAX. COMMERCIAL 1/2" EXPANSION JOINT� a Q d a a ° CO�ICRE E; APRON ° ° a e . . � d . a _ d o : , a . � � CVNTRACT��I�{' d' a d° d N °. 4a° aJ.01 N Taa-=—► . a � ° d. q a. a a a. a � � � DEPRESSED CURB � � I 3' - _► ELEVATION 4' MINIMUM 3/4" RISE � MIN. SLOPE _ �% � MAX. SLOPE = 10� d �. 4 CURB AND GUTTER a ° 6" CONC. RESIDENTIAL a ° aa 8" CONC. COMMERCIAL Q G T � APPROVED SUBGRADE r 1/2" EXPANSION JOINT SECTION_ REV: a./2021 � DEPRESSED CURB WITH DRIVEWAY APRON STANDARD PLATE N0. 2��2 �� , �� ��������� ��� �� A � SURMOUNTABLE C ° _ o. � � -;� .. ... , �-c p� ' p �D . a EXPANSION JOINT BEGIN TRANS. TO TYPE B618 CURB AND GUTTER 10'-0" 2—N0. 4 BARS DESIGN GUTTER �INE GRADE — NON—SHRINK MORTAR � MEETWG CORPS OF 6" ENGWEERS SPEC. y CRD—C-621 REQUIRED I IF SHIMS ARE USED. �; � SEE SPECIFICATIONS. - - n� , � D 4 �� . . . � e . o . . ' ' . . o . o. a P .p 1 „ a. , : � EXP. JOINT , D° OP N�NG °, EXP. JOINT � �G = GUTTER FLOW LWE '�` WHEN BASE OF FRAME IS LEVEL TRANSVERSELY, 2—N0. 4 BARS �„ � _— � , .. .. . ��„ < a: a.. . � EXP. JOINT � � _� 11 \_CHIMNEY SEAL � AROUND RINGS D 4"-12" CRETEX PRO—RING RT 36-24 SECTION B—B CJJ . . . . : ll . . >.e � , EXP. JOINT 1 SUMP FROM FLOWLWE RESULTS SECTION A—A 11" � � FRONT TOP EDGE OF FRAME FRONT TOP EDGE OF GUTTER � 9 � P'� : 2—N0. 4 BARS A � �. o e ^ � � Q � DD � p b Q D D � I g—�•—� FRAME, GRATE AND CURB DIRECTION OF FLOW BOX: NEENAH R-3067—V, � ESS S— 330 HC OR EQUAL FRAME TIPPED TO MATCH STREET GRADE PROFILE PLAN 36 1 /2" 10'-0" » � 6" � —I � � � ,> � }' 0 SECTION C—C PLAN RIM ELEVATION � �» � MATCH EDGE OF GUTTER CATCH BASIN FRAME PLACEMENT SURMOUNTABLE CURB AND GUTTER REV:2/2023 STANDARD PLATE N0. 2005 � ROAD EDGE BITUMINOUS PAVEMENT EDGE GRAVEL SHOULDER � EDGE BITUMINOUS PAVEMENT EDGE GRAVEL SHOULDER CUT SECTION VAR. � i,. . - 20' RADIUS - PAVEMENT 15' RADIUS - GRAVEL BASE - I - TAPER TO MATCH EXISTING AT R/W PAVED DRIVEWAY ENTRANCE 25' 25' � ROAD - 2' � 15' RADIUS - GRAVEL BASE VA IES TAPER TO MATCH EXISTING AT R/W GRAVEL DRIVEWAY ENTRANCE � ROAD 0. 5' � � � USE 6:1 SIDE SLOPES ROAD APPROACH - 50'(25' MIN.) FARM ENTRANCE - 25'(15' MIN.) FIELD ENTRANCE - 15' MIN. � ROAD CULVERT IF NECESSARY C1J FILL SECTION 0. 5' J CROSS SECTION RURAL DRIVEWAY ENTRANCE REV: 3/2006 STANDARD PLATE N0. 2007 R/W 10' DRAINAGE & U TI LI TY EASEMENT � � z' �• Mp -�.,1 CLASS 7 SHOULDER 6"TOPSOIL WITH SEE� AND EROSION CONTROL BLANKET R/W MIN. 2.00% SLOPE —� —► R/W 10' DRAINAGE & U TI LI TY EASEMENT � 2' CLASS 7 SHOULDER MIN. 2.04% �—ci nPF R/W 66' � 2' 16' �- 2.00% 16 2.00%-� 2' L 1.5" WEARING COURSE MIXTURE TACK COAT 2.5" NONWEARING COURSE MIXTURE 8" CLASS 5 AGGREGATE BASE APPROVED SUBGRADE BOULEVARD DRAINAGE AWAY FROM ROADWAY 66' � SURMOUNTABLE CONCRETE CURB AND GUTTER* r �� � 1.5" WEARING COURSE MIXTURE 6"TOPSOIL WITH TACK COAT SEED AN� EROSION CONTROL BLANKET** 2.5" NONWEARING COURSE MIXTURE 8" CLASS 5 AGGREGATE BASE APPROVED SUBGRADE BOULEVARD DRAINAGE TO ROADWAY NOTE: *B618 CONCRETE CURB AND GUTTER SHALL BE PLACED AROUND RADII AND AT STORM SEWER STRUCTURES. **SILT FENCE & BLANKET SHALL BE INSTALLED BEHIND THE CURB DURING CONSTRUCTION BEFORE CLASS 5 AGGREGATE BASE IS CONSTRUCTED. REV: 2�20� 7 STANDARD TYPICAL NON—URBAN PLATE RESIDENTIAL STREET SECTION No. 2011 � � TRAIL TYPICAL CROSS SECTIO PROPOSED GRADE 10' .,�2. Q%M_ AX � .. �� 2> A•T��� A,�, �c� ��'F O RESTORE DISTURBED AREA WITH 4" TOPSOIL (MINIMUM). SEEDING, FERTILIZING, AND PLACEMENT OF EROSION CONTROL BLANKET. SEED MIX TO BE TYPE 50A WITH APPLICATION RATE OF 50 LBS/ACRE OF RY SEED i _ �� _ i TRAIL TYPICAL SECTIO 0.6� TO 5.0� ALLOWABLE LONGITUDINAL GRADE IF WHEELCHAIR ACCESSIBLE. 8� ABSOLUTE MAXIMUM ALLOWABLE LONGITUDINAL GRADE. REV: 4/2021 C�� BITUMINOUS TRAIL TYPICAL SECTION STANDARD PLATE N0. 2012 HI-'I-'KUVtU, I;UIVII-'Hl; ItU JUtfIiKHUt NOTE: ROCK ENTRANCE NEEDS TO BE INPLACE (MIN 10' IN LENGTH) WITH ENOUGH MATERIAL ON HAND AT SITE TO COMPLETE TO GARAGE AFTER BACKFILL IN ORDER TO PASS INITIAL INSPECTION. � ROCK CONSTRUCTION ENTRANCE c�lk .�., BUILDING PERMIT v REV: 7/2007 STANDARD PLATE N0. 2015 I I� L I V L VVlIJI ILLJ ROCK CASTING CHIMNEY SEAL AROUND RINGS 4"-12" CRETEX PRO—RING RT 36-24 4 ,� � � � x Q � 0 I � G�a v 5" 24" X 36" ° � � � . .a 2�� a � I I WALLS TO BE CONSTRUCTED OF PRECAST SECTIONS OR CONCRETE SEWER BLOCK. BLOCK SHALL BE PLASTERED ON INTERIOR AND EXTERIOR. 3" 6" CONCRETE BASE POURED IN PLACE OR 4" MINIMUM PRECAST BASE. NOTE: REINFORCING SHALL CONSIST OF A SINGLE LINE OF STEEL WIRE FABRIC HAVING AN AREA OF NOT LESS THAN 0.17 SQ. IN. PER FOOT OF HEIGHT. c� � a� , � :� �: � � � : ..a a a � a . � . . . ' d • SHALLOW CATCH BASIN REV: 2/2023 STANDARD PLATE N0. 2500 �_� U 0 � 0 STEPS PER SPECIFICATIONS 0 ECTION A- 4"-12" CRETEX PRO—RING 40-27 STANDARD CASTING PRECAST ECCENTRIC CONE — 1' BARREL SECTION BELOW CONE PRECAST CONCRETE 4'-0" THIS AREA MAY BE PRECAST OR BLOCK Q CHIMNEY SEAL COLLAR AROUND RINGS 2" ,� � 3" , 3„ � . � a MANHOLE FLOOR SHALL BE � ����. ��� �� � � � �D� ' � V" SLOPED TO PROVIDE SMOOTH �~ 5'-4" � 1 FLOW FROM INLET TO OULET. �. � CONCRETE SLAB—CRETEX TYPE II OR EQUAL c�il�(,,�� STANDARD MANHOLE � v `�_ � 27" � � A C � � � 0 I � a � � � � ► REV: 2/2023 STANDARD PLATE N0. 2501 CONCRETE SLAB — CRETEX TYPE II OR EQUAL �� a.� .< � A 'a . ' e . n a � ► . \ r STANDARD CASTING CHIMNEY SEAL AROUND RINGS � 4"-12" CRETEX PRO—RING 40-27 ■-� � � �I � � N�� WALLS TO BE CONSTRUCTED OF PRECAST SECTIONS. � � ---_.� .aa ' ,- � e d Q� a , . ,a. d . . . .' a . . . . .e . . . CONCRETE SLAB — CRETEX TYPE II OR EQUAL � s� � 1�. d. ° �� � a'°4 OFFSET STEPS AROUND PIPE. MAXIMUM DISTANCE FROM FLOOR TO BOTTOM STEP = 16" MANHOLE FLOOR SHALL BE SLOPED TO PROVIDE SMOOTH FLOW FROM INLET TO OUTLET. NOTE: THIS TYPE MANHOLE SHALL BE USED WHEN SPECIFIED OR WHEN THE MANHOLE DEPTH IS LESS THAN EIGHT FEET. c�11�(,,�� � SLAB TOP MANHOLE \ �r..` � REV: 2/2023 STANDARD PLATE N0. 2502 c� PIPE THREAD SIZE DIAMETER 12 15 5�g» � 8 ROLLED THREADS 21 (SEE NOTE 4) 24 27 30 33 36 42 3/4" 48 CUT OR ROLLED 54 60 66 �2 78 84 90 1" 96 CUT OR ROLLED 102 108 120 132 60° 60° 60° 60° R2 �� ROUND PIPE ARCH PIPE EDGE OF OUTSIDE JOINT � 16" 16" � TAPERED HOLES PERMITTED WHEN PRECAST PLACEMENT OF HOLES v CANOPY TIE a , a , , ° a. a a _ ° ' _ � _ 2" MAX. 2" MAX. _ I� �I 32"f AS REQUIRED FOR ACCEPTABLE JOINT U BOLT TIE WELDED EYE OR APPROVED EQUAL EYE BOLT TIE N 0 TE: 1. HOLES SHALL BE CAST—IN OR DRILLED 16" FROM OUTSIDE EDGE OF JOINT. 2. NUTS AND WASHERS ARE NOT REQUIRED ON INSIDE OF PIPE WITH 27" DIAMETER OR LESS. 3. TIES ARE NOT REQUIRED FOR BELL PIPE 24" AND SMALLER. ON OTHER SIZES, TIE MAY BE INSERTED FROM INSIDE. 4. CUT THREADS MAY BE USED IF WASHER AND NUT ARE USED. 5. PIPE SIZES LISTED ARE INSIDE DIAMETER OF ROUND PIPE OR EQUIVALENT DIAMETER OF REV: 3�2006 PIPF ORrN CONCRETE PIPE JOINT TIES STANDARD PLATE N0. 2503 � � 32" (ADJ. f1 1 /2" MIN.) � � _ 32" (ADJ. f1 1 /2" MIN.) _ RIP—RAP 12" � -_ `���.�1�. � N . � �.. � FILTER BLANKET � `,: ,,:; ��...::.::` : .> :..:::.�.;,'. '; SECTION B—B TABLE OF QUANTITIES PRAP AT RCP OUTLETS PLAN N OTE: RIP-RAP SHALL BE INSTALLED TO PROVIDE EASY REMOVAL OF TRASH GUARD. � � � o � � � RIP-RAP � FILTER BLANKET �..,..`:�:..:: `.,. ..�.;.:'�. '. :.•.; :..:::.:...�......:. SECTION A—A CLASS IV d50=12" DIA. 12' OF 24" DEPTH ROUND L DEPTH GRANULAR PIPE RIPRAP FILTER (iN.) (�r.) (cu. v�s.) (cu. vns.) 12 8 5.5 2.8 15 8 5.8 2.9 18 10 7.8 3.9 21 10 8.4 4.2 24 12 11.0 5.5 27 12 11.6 5.8 30 14 14.5 7.3 36 16 18.3 9.2 42 18 21.7 10.9 48 20 25.8 12.9 GEOTEXTILE FABRIC REV: 3/2006 c� ver RIP-RAP INSTALLATION STANDARD PLATE N0. 2505 INSTALL C WITH BOLT EXPOSED 36 1 /2" CURB BOX ADJUSTABLE 6" TO 9" 8" » — 5" � 6 � 6 17 3/4" �'� � � � � 15 1 /2" � 24" 31" c� CASTINGS SHALL BE NEENAH R-3067—V OR EQUAL v STANDARD INLET CASTING REV: 3/2006 STANDARD PLATE N0. 2507 i � 36" �� 43" RADIAL OR � \ �TRAPEZOIDAL CHANNEL � \� � - - - i / CROSS SECTIONAL VIEW �STORM WATER SHALL BE CONTAINED � TO THE CHANNEL / / � EXISTING GROUND PRIOR TO INSTALLING HEADWALL, USE CONCRETE SAW ANCHOR TRENCH INITIAL LEADING TO CUT MAT TO EXACT EDGE OF MAT 18", FILL AND SHAPE AND SIZE COMPACT ANCHOR TRENCH. INSTALL HEADWALL OVER MAT � ❑ ❑ ❑ ❑ ❑ Ci` ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ ❑ ❑ �.: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ % ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ���������� MAXIMUMGRADE i� pppppppppppp PERMFGSPECIFICATIONS � ❑ ❑ ❑ ❑ ❑ ❑ C;` ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ ❑ ❑ ❑ C��7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ �nnnnnnnnnnnnnnnnnn nnn PLAN CONCRETE MAT CONSTRUCTION NOTES: 1. GRADE OUTFALL AREA SO THAT WATER WILL FLOW DOWN THE CENTER OF THE CHANNEL AND BE CONTAINED TO THE CHANNEL. ALL SUBGRADE SURFACES PREPARED FOR PLACEMENT OF MATS SHALL BE SMOOTH AND FREE OF ALL ROCKS, STICKS, ROOTS, OTHER PROTRUSIONS, OR DEBRIS OF ANY KIND. THE PREPARED SURFACE SHALL PROVIDE A FIRM UNYIELDING FOUNDATION FOR THE MATS WITH NO SHARP OR ABRUPT BREAKS IN THE GRADE. 2. APPLY SEED DIRECTLY TO THE PREPARED SOIL PRIOR TO CONCRETE MAT INSTALLATION. USE SEED PER PROJECT SPECIFICATIONS. 3. PRIOR TO INSTALLING HEADWALL, ANCHOR TRENCH INITIAL LEADING EDGE OF MAT 18", FILL AND COMPACT ANCHOR TRENCH. INSTALL HEADWALL OVER MAT. 4. INSTALL CONCRETE MAT ROLLS. AVAILABLE WIDTHS ARE 5.5', 8', 10', 12', & 16' AVAILABLE IN CUSTOM LENGTHS. A CONCRETE SAW SHALL BE USED TO CUT THE MAT TO EXACT SIZE AND SHAPE. 5. APPLICATIONS WHERE OUTFALLS FLOW INTO RETENTION PONDS, EXTEND CONCRETE MAT A MINIMUM OF 3' BELOW LOW WATER ELEVATION. REV: 2/2017 c� CONCRETE MAT ver CONCRETE EROSION MAT OUTLET INSTALLATION DETAIL STANDARD PLATE N0. 2513 NOZZLE SECTION — OPERATING NUT — 1" PENTAGON 2 1/2" HOSE CONNECTION (THREAD SIZE 3 1/16" O.D., 7 1/2" T.P.I.) 4 1 /2" PUMPER CONNECTION (THREAD � SIZE 5 9/16" O.D., 4" T.I.P.) � � I �NUT CAP �J TYP E WI TH co CHAINS � \ _ M N N � N � � \ ���/i��% I � � �8„ 8 IIIII�8„ � I � � \ � �ZLE ARRANGEMENT � ..J 2 1 /2" NOZZLE PLUS PUMPER NOZZLE WITH 1" PENTAGON OPERATING NUTS NOMINAL GROUND LINE N STANDPIPE :• •u � i� \ N OTE: 1. 16" BREAKOFF SECTION 2. LEFT HAND OPERATING NUT (1 1 /2" POINT TO FLAT) 3. PAINT BARREL SECTION RED TO GRADE. 4. DO NOT PLUG DRAIN HOLES. � 5 1/4" 7 3/8" ���8°° ROUND HOLES � NOTE: "HYDRAFINDER" HYDRANT LOCATING DEVICES REQUIRED — SEE SPECIFICATIONS. REV: 3/2006 C' •, PACER HYDRANT DETAIL STANDARD PLATE N0. 3401 5'-0" EDGE OF MAT OR BACK OF CURB - "HYDRAFINDER" MINIMUM COVER AS REQUIRED IN SPECIFICATIONS OR AS SHOWN ON PLANS. TRACER WIRE VALVE WITH MECHANICAL JOINT TEE AND VALVE BOX MECHANICAL JOINT TEE FOR SIZE FIRE HYDRANT LINE , TRACER WIRE ACCESS BOX AND GROUNDING ROD SAME AS FOR WATER SERVICE SHOWN IN DETAIL 3408 JOINT RESTRAINING COUPLING-TWO 3/4" ALL THREAD RODS 0.75" - 1.5" DRAIN ROCK CONCRETE BLOCK N OTE: ALL HYDRANT LEADS SHALL BE RESTRAINED FROM THE MAIN TO THE HYDRANT THROUGH THE USE OF THREADED RODS OR MEGALUGS AS RESTRAINTS IN ACCORDANCE WITH THE STANDARD DETAIL PLATES. REV: 2/2017 C' •, HYDRANT RESTRAINT DETAIL STANDARD PLATE N0. 3402 DRAINAGE AND UTILITY EASEMENT 10' BEYOND THE RIGHT-OF-WAY LINE � STREET 2" X 4" WOOD MARKER WITH STEEL FENCE POST I PAINTED BLUE � w > O U � � � Z � � � � w > O U � � CURB B�X z AND STOP � i� � SERVICE PIPE CONCRETE BRICK ' COPPER "PIGTAIL" CRIMPED � O WATERMAIN PROVIDE ONE - 1.0' HORIZONTAL LOOP IN SERVIC� ' '"'r 1 E.y�:��l[y��l» NOTE: TRACER WIRE NOT SHOWN. INSTALL PER PLATES 3408 & 3409 C' •, TYPICAL SERVICE DETAIL PLAN REV: 2/2017 STANDARD PLATE N0. 3403 OINSTALL ONE LENGTH OF WATERMAIN PIPE WITH THE APPROPRIATE MATERIAL ADAPTORS. CENTER AT CROSSINGS. � 24" � O.D.� 24" PROPOSED SEWER COMPACTED SAND 3" RIGID FOAM INSULATION , ........ .... . •... 8» MIN. �� � �� , . . _. . . �8» M I N . � MEGALUGGED BENDS AS REQUIRED— PROPOSED WATERMAIN WATERMAIN INSTALLATION UNDER SANITARY OR STORM SEWER CENTER ONE LENGTH OF WATERMAIN AT CROSSING MEGALUGGED BENDS AS � REQUIRED 3" RIGID FOAM INSULATION SEE NOTE oA TRANSITION TO SPECIFIED DEPTH (TYP.) INSTALL VETICAL BEND AS REQUIRED PROPOSED WATERMAIN : :: �8" MIN. � ....:. . ... : .. �8" MIN. COMPACTED SAND PROPOSED SEWER WATERMAIN INSTALLATION OVER SANITARY OR STORM SEWER C' •, NOTES: WHEN WATERMAIN COVER IS LESS THAN 7.5 FEET, INSTALL WATERMAIN UNDER SANITARY SEWER. WATERMAIN CROSSING REV: 2/2017 STANDARD PLATE N0. 3404 r.�, �C I �U 3LE MATERIAL GRAINED MATERIAL) NATURAL GROUND THE BOTTOM OF THE TRENCH SHALL BE SHAPED TO FIT THE PIPE BARREL FOR AT LEAST 50% OF THE OUTSIDE DIAMETER. THE REMAINDER OF THE PIPE IS SURROUNDED TO A HEIGHT OF AT LEAST 6" ABOVE ITS TOP BY SELECT FILL MATERIALS, PLACED BY HAND TOOLS AND COMPACTED TO COMPLETELY FILL ALL SPACES UNDER AND ADJACENT TO THE PIPE. NOTE: ALL COSTS OF EXCAVATION BELOW GRADE AND PLACEMENT OF GRANULAR BEDDING SHALL BE INCLUDED IN THE BID PRICES FOR PIPE ITEMS. REV: 3/2006 c� STANDARD PLATE CLASS C PIPE BEDDING No. 3405 z � N Bc / / / / / / %/ %/�� / COMPACTED SUITABLE MATERIAL (FINE GRAINED MATERIAL) 6" OR 1/4 Bc WHICHEVER IS LARGER (12" MAXIMUM) j SPRING LINE i .. . " / � / . � / :�/i�/i�/i /i�/i /i�/ /i�/i�/i /i . /i�/i� 4" OR Bc/8 WHICHEVER IS LARGER NATURAL GROUND COMPACTED GRANULAR BEDDING NOTE: ALL COSTS OF EXCAVATION BELOW GRADE AND PLACEMENT OF GRANULAR BEDDING SHALL BE INCLUDED IN THE BID PRICES FOR PIPE ITEMS. REV: 3/2006 C1J 1V CLASS B PIPE BEDDING STANDARD PLATE N0. 3406 � 1.0' MAX � 1.0' MAX � 5.0' MAX � GRADE LEVELIN GROUND TRACER WIRE ACCESS BOX AND DRIVE-IN MAGNESIUM � GROUNDING ANODE (SEE � WATERMAIN DETAIL 3408) 12 AWG COPPER CLADSTEEL BLUE (TYP) � MAINLINE TO LATERAL LUG CONNECTOR � SERVICE SADDLE ` WATER SERVICE RIGHT-OF-WAY m � LINE N � � �DRIVE IN MAGNESIUM GROUNDING ANODE ROD CURBSTOP BOX � NOTES: TAPE OR PLASTIC WIRES SHOWN AWAY FROM PIPE FOR CLARITY. WIRE SHALL BE INSTALLED TIE (TYP) IMMEDIATELY ADJACENT TO THE SERVICE PIPE.THE WIRES SHALL BE FASTENED TO THE PIPE WITH A TAPE OR PLASTIC TIES WATER SERVICE PLANVIEW AT 5' INTERVALS. I I 1.5' MAX � FINISHED GRADE ~I I~ GRADE LEVELIN GROUND TRACER WIRE ACCESS BOX AND DRIVE-IN MAGNESIUM GROUNDING ANODE (SEE DETAIL 3408) COIL 2' OF EXTRA RED AND BLUE WIRE IN AN ACCESS BOX. RED WIRE IS FROM GROUNDING AND BLUE WIRE IS TRACER WIRE ON SERVICE PIPE THAT CONNECTS TO THE MAIN LINEWIRE. 12 AWG COPPER CLADSTEEL RED FACTORY CONNECTED TO GROUND ROD DRIVE IN MAGNESIUM � GROUNDING ANODE ROD � CURBSTOP BOX 12 AWG COPPER CLADSTEEL BLUE (TYP) DO NOT SECURE WIRES TO CURB STOP BOX AS TO TO ALLOW FOR ADJUSTMENTS WITHOUT DAMAGING WIRE CURBSTOP WIRE CONTINUES WITH WATER SERVICE AND CONNECTS TO MAIN LINE WIRE SEE PLAN VIEW ABOVE) WATER SERVICE SECTION VIEW REV: 2/2017 cP� TRACER WIRE DETAIL STANDARD PLATE N0. I •' • m N TRACER WIRE ON NORTH SIDE OF WATERMAIN PIPE ., _ �TRACER WIRE ON EAST SIDE OF WATERMAIN PIPE 4—WAY CONNECTOR OR TWO 3—WAY CONNECTORS WITH SHORT JUMPER WIRE I I I WATERMAIN WATERMAIN _ (TYP) CROSS � WATERSERVICE (TYP) GRADE LEVEL IN GROUND TRACER WIRE ACCESS BOX AND DRIVE—IN MAGNESIUM GROUNDING ANODE (SEE DETAIL 3408) �I HYDRANT �� HYDRANT VALVE N OTE: WIRES SHOWN AWAY FROM PIPE FOR CLARITY.WIRE SHALL BE INSTALLED ON THE BOTTOM SIDE OF THE PIPE BELOW THE SPRING LINE. THE WIRE SHALL BE FASTENED TO THE PIPE WITH TAPE OR PLASTIC TIES AT 5' INTERVALS. REV: 2/2017 c� I MAINLINE TO LATERAL LUGCONNECTOR (TYP) GRADE LEVEL IN GROUND TRACER WIRE ACCESS BOX AND DRIVE-IN MAGNESIUM GROUNDING ANODE (SEE DETAIL 3408) _� 12 AWG COPPER CURBSTOP CLAD STEELOBLUE (TYP) (TYP) � DRIVE IN MAGNESIUM GROUNDING ANODE(TYP) TRACER WIRE LAYOUT DETAIL STANDARD PLATE N0. � • �� NEENAH CASTING R-1733 OR EQUAL COVER SHALL HAVE TWO CONCEALED PICK HOLES SLAB SHALL BE CRETEX TYPE II —� w J m Q � Q > . . .Q ° � � �� � a . a . . � d m v a. , a. a � ..a � � � 27» � � � �CHIMNEY SEAL AROUND RINGS � � —12 CRETEX � PRO—RING 40-27 0 STEPS AS PER SPECIFICATIONS a WALLS TO BE CONSTRUCTED OF � PRECAST SECTIONS WITH CX4 JOINTS :: w � Q m a. a a.a MANHOLE INVERT SHALL a BE SLOPED TO PROVIDE � SMOOTH FLOW FROM INLET TO OUTLET. F 0 a � f�. a . , .. " . � . . . v.d a a a . . . . n a � . . • � • . �d : . . v � . . _ . . „ INTEGRAL BASE � N 0 TE: THIS TYPE MANHOLE SHALL BE USED WHEN SPECIFIED OR WHEN THE MANHOLE DEPTH IS LESS THAN EIGHT FEET. SLAB TOP MANHOLE REV: 2/2023 STANDARD PLATE N0. 4001 GROUT BOTTOM TO SLOPE TOWARD 4"-12" CRE . . j � � , � � INSIDE DROP MANHOLE (TWO FEET OR LESS) I� 2/2023 STANDARD PLATE N0. 4002 ALL ANCHOR BOLTS, NUTS AND WASHERS TO BE STAINLESS STEEL PER MNDOT SPEC. 3312 4"-12" CRETEX PRO—RING 40-27 ! . � a d � .. 4Ia e A .m .D� ' �o . Do � .:a�"o. fl . c�� �- � STEEL TRANSITION COUPLER CL 52 D.I.P. FROM TEE - °�a TO UNDISTURBED SOIL � d MJ—PE DIP TEE � OINRSSTRAINED 1 RECAST SECTIONS (� a ASTM C-478 � STEPS AS PER SPECIFICATIONS A i/��i ° �� UNDISTURBED � SOIL �� COMPACTED '. . GRANULER FILL MONOLITHIC � PRECAST DROP > ' INLET BASE ON . 4" SAND CUSHION � °° G. G.. AA� o' �—MIN. 0.1' SLOPE 90° BEND e��.. .D . .. e . . D . . .. � .. . . . �p . � � . � . � . . _ . , . n . . . . . _ . 3" 14 GA. HOT—DIPPED GALV. STRAP 6'-0" O.C.— MIN. 2 FASTEN TO MH WITH 4-3/8"X6" ANCHOR BOLTS 3" EMBED. ~' CL 52 DIP RISER PIPE 12" SOLID CONC. BLOCK SPACER CUT TO SIZE SECTION A—A 'a 2�" CHIMNEY SEAL AROUND RINGS Q.. d OUTSIDE DROP MANHOLE MANHOLE INVERT SHALL BE SLOPED TO PROVIDE SMOOTH FLOW FROM INLET TO OUTLET REV: 2/2023 STANDARD PLATE N0. 4004 2" SCREENED GOOSENECK VENT w � m Q � Q > z � � � O ° d ..a • ..a a a. . ��a a a� .a NEENAH CASTING R-1758—E (FROST RETARDANT CASTING) OR EQUAL � d � . 9 . Q ' . 48�� d a. � � ,_ CHIMNEY SEAL AROUND RINGS i 4"-12" CRETEX PRO—RING 40-27 STEPS AS PER SPECIFICATIONS 1f2" SHUT OFF VALVE � a� QUICK DISCONNECT . WALLS TO BE COUPLING ° CONSTRUCTED OF � PRECAST SECTIONS BACK FLUSHING WITH CX4 JOINTS HOSE AIR & VACUUM VALVE � (APCO MODEL 400) �. ° 1" BLOW OFF VALVE 2" SHUT OFF VALVE .a � 24" � a �� . � a . . . a.. ..a. e a a . a a a . . � CRUSHED ROCK MANHOLE SLAB SHALL BE CRETEX TYPE II � STANDARD AIR RELIEF MANHOLE R E V: 2/2023 STANDARD PLATE N0. 4005 z � N m / COMPACTED SUITABLE MATERIAL (FINE GRAINED) 6" OR 1/4 Bc WHICHEVER IS LARGER (12" MAXIMUM) j SPRING LINE i ... ' � / / ,... :. , ,: , . j ,. :: . i :/i../i../i../i../i../i../i i../i../i../i.. ./i../i../. 4" OR Bc/8 WHICHEVER IS LARGER / / ��� NATURAL GROUND COMPACTED GRANULAR BEDDING NOTE: ALL COSTS OF EXCAVATION BELOW GRADE AND PLACEMENT OF GRANULAR BEDDING SHALL BE INCLUDED IN THE BID PRICES FOR PIPE ITEMS. REV: 3/2006 c� CLASS B PIPE BEDDING STANDARD PLATE N0. I � � • 10' PAST PROPERTY LINE TO DRAINAGE AND UTILITY ESMT 2" X 2" WOOD MARKER WITH STEEL FENCE POST PAINTED GREEN i� PLUG 0 SERVICE PIPE 45° BEND 1 � MIN. SLOP� Q�Q� �� ��� � 5' 45° BEND �� THIS SECTION OF PIPE ON UNDISTURBED SOIL 4" OR 6" AS SPECIFIED 45° BEND GRANULAR BEDDING (CONCRETE IF OVER 15' OF DEPTH) TEE OR WYE AS SPECIFIED SEWER MAIN �l��:l��I.y��1_[.Y.y�:��l[y�K�l�l�l���[�l�[.Y�7���7��»I�1� REV: 2/2017 c� SERVICE RISER SECTION STANDARD PLATE N0. � � � i