Loading...
7.2. EDSR 02-21-2023 Request for Action To Item Number Economic Development Authority 7.2 Agenda Section Meeting Date Prepared by General Business February 21, 2023 Brent O’Neil, Economic Development Director Item Description Reviewed by General Updates Cal Portner, City Administrator Reviewed by Action Requested Item presented for information and discussion purposes. Background/Discussion This item is an opportunity to share updates and discuss non-action items. Among the topics are: th EDA Property at 170 Street Recent RFI Submissions Tax Abatement Application – Beaudry Lubricants Committee Updates Development Minute Placer.ai EDA and HRA Website Financial Impact N/A Mission/Policy/Goal Support Elk River’s existing businesses through relationship building, programmatic offerings, and high-quality city services. Attract new business development to Elk River to build the City’s economic vibrancy, job offerings and tax base. Attachments  Exhibit – Beaudry Lubricants Project The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: January 2023 PROJECT LOCATIONSITEMINNESOTABEAUDRY ELK RIVER ADDITIONSITE IMPROVEMENT PROJECTELK RIVER, MNCITY OF ELK RIVER, MNSHERBURNE COUNTYSITESITESITE3030 County Road 101 NorthPlymouth, MN 55447Stephen D. Krausestevek@sdk-architects.com763-331-5178SDK ARCHITECTS LLCINDEX OF CIVIL SITE DRAWINGS: CIVIL ENGINEERINGSITE DESIGN L=678.34,R=1212.09N 3 1 °0 2 '4 7 "W313.6 0 N 3 1 °0 2 '4 7 "W273.6 034.2556.53BLOCK 1LOT169.3466.31S89°04'00"W103.61E L K L A K E R O A D N W C .S .A .H . N O . 1 9159209 0 6907908909911912913914916917918919 9109159079089099119129139149169179189159159139139149149169169179179189189199109159209119129139149169169169179179179189199199199219 1 0 9109109069079089099099 1 0 91 0 9109069069079079089 0 8 9099 0 9 9 0 9 9119 1 1 9 1 1912 9129129139109079089099119129139149159139139149169159149169 1 7915914914916 9 1 5 91391 4916916916917 N 2 4 °0 2 '5 2 "W 2 5 5 .8 6N88°37'36"E258.68N0°34'17"E858.49N 3 1 °0 2 '4 7 "W273.5 5N0°33'25"E171.03N 3 1 °0 2 '4 7 "W216.0 8 N89°01'49"E1058.54L=741.43,R=1272.09TMax Kickout 0.033ft15' - 0"truck parking (16)T/ SLAB EL: 917.00(PROPOSED)916.50916.00TC: 916.90BC: 916.40917.00917.00ACCESS #1(MODIFIED EXISTING)ACCESS #2(PROPOSED)596'north edge ofdriveway5' buffer betweenpavement edge & truck53' trailer(73.50' total length)18' wide OHDFUTUREOFFICE BUILDING25,000 sf / STORY100 STALLS24' - 0"Scale:Project Number:Date:Drawn By:Checked By:R E V I S I O N STHIS DRAWING, SPECIFICATION OR REPORT WAS PREPARED FOR BIDDING PURPOSES ONLY. FINAL DESIGN & DOCUMENTATION OF THIS PORTION OF THE PROJECT WILL BE COMPLETED VIA THE DESIGN/BUILD APPROACH BY LICENSED DESIGN PROFESSIONALS REGISTERED IN THE STATE OF MINNESOTA.5075 Holly Lane North -Unit 7Minneapolis, Minnesota 55446(763) 331-5178info@sdk-architects.com1" = 60'-0"PR-1ARCHITECTURALSITE PLAN22-001New Storage / Warehouse Facility forBeaudry Oil & PropaneJUL 25, 2022SDKElk River, MNIssued for Owner ReviewSCALE:1" = 60'-0"PR-11ARCHITECTURAL SITE PLANNORTH# Description Date T/ SLAB (ML)917' - 6"TFE913' - 6"T/ WALL946' - 9"29' - 3"AWNING ??TYPE ??SIZE ??RETAINING WALL(EACH SIDE OF LOADING DOCKS)PAVEMENT SLOPE @ LOADING DOCKS5PR-3T/ SLAB (ML)917' - 6"TFE913' - 6"T/ WALL946' - 9"FENCE ??TYPE ??HEIGHT ??RETAINING WALL(EACH SIDE OF LOADING DOCKS)PAVEMENT SLOPE @ LOADING DOCKS5PR-3T/ SLAB (ML)917' - 6"TFE913' - 6"T/ WALL946' - 9"FENCE ??TYPE ??HEIGHT ??T/ SLAB (ML)917' - 6"TFE913' - 6"T/ WALL946' - 9"FENCE ??TYPE ??HEIGHT ??15243LOW POINT 22'-0" ABOVE SLABScale:Project Number:Date:Drawn By:Checked By:R E V I S I O N STHIS DRAWING, SPECIFICATION OR REPORT WAS PREPARED FOR BIDDING PURPOSES ONLY. FINAL DESIGN & DOCUMENTATION OF THIS PORTION OF THE PROJECT WILL BE COMPLETED VIA THE DESIGN/BUILD APPROACH BY LICENSED DESIGN PROFESSIONALS REGISTERED IN THE STATE OF MINNESOTA.5075 Holly Lane North -Unit 7Minneapolis, Minnesota 55446(763) 331-5178info@sdk-architects.com1" = 10'-0"PR-3BUILDING ELEVATIONSBUILDING SECTION22-001New Storage / Warehouse Facility forBeaudry Oil & PropaneJUL 25, 2022SDKElk River, MNIssued for Owner Review# Description DateSCALE:1" = 10'-0"PR-31EAST BUILDING ELEVATIONSCALE:1" = 10'-0"PR-32WEST BUILDING ELEVATIONSCALE:1" = 10'-0"PR-33SOUTH BUILDING ELEVATIONSCALE:1" = 10'-0"PR-34NORTH BUILDING ELEVATIONSCALE:1" = 10'-0"PR-35BUILDING SECTION #1