8.1 SR 02-21-2023�J
Elk s�-
River
Request for Action
To Item Number
Ma�Tor and Ci T Council 8.1
Agenda Section Meeting Date Prepared by
GeneYal Business Februar�r 21, 2023 ustin FemYite P.E., Public WoYks DirectoY
Item Description Reviewed by
High`va�r 10 Corridor StudyT Cal Pormer, Ci r Administrator
Reviewed by
Action Requested
Approve, byT motion, High�vayT 10 Corridor StudyT
Background/Discussion
Initiated in April of 2020, the Highwa�T 10 Corridor Stud�T has progressed to final completion. The main findings
identifyT the vision of the high`vayT to become a free`vayT styTle corridor `vith grade separated access points. This
Yemains consistent with previous plannings efforts surYounding the 171 s` Focused Area Study but fuYtheY extends
the free`vayT concept easterlyT to meet the visioned free`vayT styTle highway corridor through r�noka County.
Since last reviewing a draft of the studyr in August of 2022, the report has been modified to more closely represent
and address concerns raised during the continued public engagement period. The largest change incorporates a
communityr supported option on the north end of the studyr are preserving access at 171s` Avenue and 173Ta
Avenue. We recognize that MnDOT staff has their suppoYted option which is also included in the final report
`vhich identifies closure of these access points.
We held an Open House on l�londayr February 6 to present the final dYaft of the study to the communityr. There
`vere about 35 residents/business o`vners `vho attended, manyT of whom `vere involved in August of 2022 `vith
conceYns about the d�aft study at that time. The consensus at this Open House was that of appYeciation for
listening to feedback and incorporating a communit�r supported option in the final studyT.
Financial Impact
None
Mission/Policy/Goal
Meet Changing Needs - Agile
Attachments
■ High�vayT 10 Corridor Study — Executive Summar�T
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�itb T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engageynent that encou�ages and inspiz•es pTo�pe�zty.
row�REo er
���V��
Update�l• January 2023
Final Report
Executive Summary
Prepared by SRF Consulting Group
SRF
January 2023
SHE�BURNE �►
cour�ry
�- _, _,a ,
�lk - DEPARTMENT OF ANOKA � �
�lvl�r TRANSPORTATION COUN7'Y
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
EXECUTIVE SUMMARY
The City of Elk River along with its partners from MnDOT, Sherburne and Anoka Counties and the City
of Ramsey completed the Highway 10 Corridor Study. The goal of the study was to develop a long-
term 20+ year vision for the Highway 10 corridor and then build consensus around this vision. The
long-term vision would be something that would be implemented over time as opportunities arise
and funding becomes available. The goal of the long-term vision is to ensure safe and efficient
operations along the Highway 10 corridor while supporting economic development within the area
and region. The study included the following public engagement to facilitate the analysis process:
• Virtual open houses
• Targeted stakeholder focus group meetings
• Community surveys
• Study specific website
The study was guided by the Project Management Team (PMT), which was comprised of
representatives from the City of Elk River, MnDOT District 3, and MnDOT Metro. The PMT played an
integral part in the study by providing oversight and input on technical analyses, concept alternatives
development and evaluation and the public engagement process. Additionally, the project included a
Technical Advisory Board (TAB) that served as a sounding board and provided input and guidance at
key project milestones. Members of both the PMT and TAB are identified in the Acknowledgements
section of this report.
Existing Conditions Summary
A comprehensive analysis of the conditions along the Highway 10 corridor within the study area was
completed. The assessment included a review of existing planning documents, preliminary
environmental review, analysis of existing and future traffic operations and safety, and review of the
multimodal system. Highway 10 is an important corridor for personal and freight transportation,
connecting local and regional users to greater Minnesota. After analysis of the current conditions
along the roadway, the following concerns were identified:
• All study intersections currently operate at an overall LOS C or better.
• Sides-street access to Highway 10 is challenging, with most stop-
controlled approaches operating at LOS E or worse during the peak
periods.
OPERATIONS • Existing ADT volumes on Highway 10 are approaching the facility's
planning-level capacity.
• There are limited or no adequate gaps for motorists to safely access
Highway 10 duringthe peak periods.
• Vehicles were observed using the shoulders as acceleration lanes to
access Highway 10.
• 200 crashes have occurred within the study area during the past
5-yea rs.
• The study corridor has crash and severity rates that are statistically
SAFETY significant compared to locations with similar characteristics.
• The 171st Avenue intersection has crash and severity rates that are
statistically significant compared to locations with similar
characteristics.
�GHW4Y
`� ■ _
�Rp.IhJRih`o
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
• The Intersections of 173rd Avenue and 165th Avenue had crash rates
just under the statewide expected crash rate.
• Majority of the crashes occurred at intersections
(61 percent) and were mostly rear end and angle crash types. Majority
of the rear end crashes were for westbound vehicles at the signalized
intersection of 171st Avenue.
ACCESS • Current access along Highway 10 does not meet the MnDOT guidelines
for access spacing.
• Most land adjacent to Highway 10 is agricultural and impacts on this
land should be minimized.
SOCIAL, • Several water resources are in the study area. Future
ENVIRONMENTAL, recommendations should minimize impacts to floodplains, wetlands, or
AND ECONOMIC drinking water supply management areas.
CONTEXT • The roadway is close to many potentially contaminated sites and must
minimize interaction with these sites.
• The Oliver Kelley Farm, a nationally registered historic property, is
located directly adjacent to the corridor.
Alternatives Considered
The alternative development process was multifaceted using a range of inputs including technical
data, public comments, design parameters, and guidance from the PMT and TAB. The primary goal
was to identify a unified vision for the Highway 10 corridor that can be implemented over time as
opportunities arise and funding becomes available. Given the complexity and needs of the area, this
vision may take 20+ years and significant fiscal investment to realize. Therefore, this study is the
first step in the process and additional planning, environmental, design, and engagement efforts will
be needed in the future.
The initial long-term alternatives that were considered include:
• A No Build alternative, which is also known as the do-nothing option.
• Alternative 1, which is an at-grade signalized corridor alternative that would include the
addition of new traffic signals along the corridor coupled with access modifications and
acceleration lanes.
• Alternative 2 represents a more innovative at-grade corridor alternative, which includes a
combination of reduce conflict intersections (also known as RCIs) along with potentially
more traffic signals, access modifications, and acceleration lanes.
• Alternative 3 is a grade-separated corridor alternative that provides a free flow option for
Highway 10 motorists. This free flow corridor would be accomplished through a series of
new interchanges, bridges, and/or on or off ramps. This alternative would also include
access closures along Highway 10.
A comprehensive evaluation of each alternative was completed. Evaluation criteria was developed
based on the existing conditions analysis and centered around safety, mobility and convenient
access being high priorities for the corridor. Bike and pedestrian accommodations, project costs and
right-of-way impacts were also used in the evaluation process. The results of the preliminary
evaluation showed that alternative 3, which is the grade-separated corridor alternative, meets the
majority of the evaluation criteria well, with the exception of cost. This alternative has the highest
costs; however, it provides the best safety and mobility for all users.
�GHW4Y
`� ■ _ ,
�Rp.IhJRih`o
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
Long-Term Vision
Following the second round of stakeholder and public engagement, additional discussions with the
PMT occurred to confirm the long-term vision for the Highway 10 Corridor would be a grade-
separated corridor with interchanges at Highway 169 (existing), Twin Lakes Road and Adams Street
(see Figure E-�. Additionally, access closure and a robust local roadway network will be needed to
support this long-term vision (see Figure E-2�. MnDOT and the City will need to have additional
coordination to determine the final access configuration for 173rd Avenue and 171st Avenue. At the
conclusion of this study consensus was not reached. The configuration shown in FigureE-2is the
City's preferred Highway Local Roadway Network. MnDOT's preference would be to have full access
closures at 173rd Avenue and 171stAvenue (see FigureE-,�.
Figure E-1. Highway 10 Long-Term Vision
�GHW4Y
`� ■ _
�Rp.IhJRih`o
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
Figure E- 2. Highway Local Roadway Network — Community Supported
�
A p
� � 1 1 1 � 1
s+-
��',
�t, �� , - � � 1 . 1 1 ! � 1 • i , i '
t
l
173rdAvlW �(d I � ►.� f ' 1 ' 1 1
�p
�'�a
� � .� � ,
f ��
171stAue 4`-
� � l�' ��..
� � ' . ,
, ,
� .
.
., .� �
. .:.
. .
♦• �� ' �,� -�. ,. •� i :�1 ,� +�
, ,,.
� � ,+�, � �� � r�
/, �� -�.�•� ,.� �, �
� � �#'``�""�ra ��r.+�r� {.'i�, � _ « oPF.�, ti , r;,
� � ,� : _ � _ . �} Kt C
„ i _ ' _,_,.��`� �` . f ..� �:f � �' �-�'.
} i 'y � ���'fl�z.
_ �F •�� - � .w. . \ „n., ,41., y o` �x, .
�
.N
`. � � .. n _�,1 r r � ; `r ,�� � � ; _ � t'
r :: •,.i '� � � � ��t•'' ,— ' ` - 1 � �
���� • � � i
�
� . , „ ,
� �
�,� ' I , .'� �.._..., j � I. � �
�- L� _ ` . i i--- , i
... � i� � � � ... � ' .� .. 4 �
`` � � , � 765thAveNW
� `• �.. �IY� .k
, 1�Slb�'ae � , �� � .
'�Q ��rc n y�r►:`'`�' � �L, -'" .. � `- .. � �• .
, � � � � 4i� ��"�''� , � � �- g
�,a ' �r�� .• n� .. - � � �u� � � �
,��4 _ . � . ._ � _ . .._._... . �� ' � �
�. .if
a ConsitlerJarvis Street �
��' • � 10 realignment •
�.: .�
+ �ro
�I ��
r.: �a -�
1ld � �
r,�'�'. " � y�,
.,�, �` � a. . �,,,,�` �. � . i` � �j J ,mya
�1+�
, �
� � �.. a...k. �* .o�� '�� ^� ' "'� �+ � v
� ��� �
� �
�... �n,. ' - .
��P�..��,,.��'�"' •1 " _
. ''+""+�'' • ,
�. ¢ �, Extend South Frontage . � _, k,
� ,���a .'�����,
ro =-_ �� •'' t Road as opportunities
' 1�—w � � arise �
z ... _ 2 „ ;
�� � ? ___. � �••
�
r� W R
'�`� ConsitlerWeighStationupgradesor � R �
'— � . relocation to Kelly Farm Road � �
1
,� Page � 4
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
Figure E- 3. Highway Local Roadway Network— MnDOT Supported
�
A p
� � 1 1 1 � 1
s+-
�L'�. � � •�i - � � 1 . 1 1 ! � 1 ' i
t >
� ��
�r 173 rd Rve NW ld,� I � 1.� 1 , 1•
p��%
a
� � .�
w 10
�
- (� i7i5tav� 4�.
� � � l`�" �R�:.
� � '� - . ,
, ,
! .
.
., . �
. .:.
.,
♦• �� ' �,� -�. .. •� i :�1 ,� �
, ,,
! � '+��� � �� � r�
/, �� -�.�•� ,.� �, �
� � �#'``�""�ra ��r.+�r� {.'i�, � _ « oPF.�, ti , r;,
� � ,� : _ � _ . �} Kt C
„ i _ ' _,_,.��`� �` . f ..� �:f � �' �-�'.
} i 'y � ���'fl�z.
_ �F •�� - � .w. . \ „n., ,41., y o` �x, .
�
.N
`. � � .. n _�,1 r r � ; `r ,�� � � ; _ � t'
r :: •,.i '� � � � ��t•'' ,— ' ` - 1 � �
���� • � � i
�
� . , „ ,
� �
�,� ' I , .'� �.._..., j � I. � �
�- L� _ ` . i i--- , i
... � i� � � � ... � ' .� .. 4 �
`` � � , � 765thAveNW
� `• �.. �IY� .k
, 1�Slb�'ae � , �� � .
'�Q ��rc n y�r►:`'`�' � �L, -'" .. � `- .. � �• .
, � � � � 4i� ��"�''� , � � �- g
�,a ' �r�� .• n� .. - � � �u� � � �
,��4 _ . � . ._ � _ . .._._... . �� ' � �
�. .if
a ConsitlerJarvis Street �
��' • � 10 realignment •
�.: .�
+ �ro
�I ��
r.: �a -�
1ld � �
r,�'�'. " � y�,
.,�, �` � a. . �,,,,�` �. � . i` � �j J ,mya
�1+�
, �
� � �.. a...k. �* .o�� '�� ^� ' "'� �+ � v
� ��� �
� �
�... �n,. ' - .
��P�..��,,.��'�"' •1 " _
. ''+""+�'' • ,
�. ¢ �, Extend South Frontage . � _, k,
� ,���a .'�����,
ro =-_ �� •'' t Road as opportunities
' 1�—w � � arise �
z ... _ 2 „ ;
�� � ? ___. � �••
�
r� W R
'�`� ConsitlerWeighStationupgradesor � R �
'— � . relocation to Kelly Farm Road � �
1
,� Page � 5
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT
Next Steps
The critical next step for this study is to complete significant environmental review, as required by
the National Environmental Policy Act (NEPA), to fully analyze these conceptual alternatives and
implementation strategies. Through this environmental process, interchange design and
implementation will be determined. The environmental review process also includes additional
opportunities for public input. Following the environmental review, the project would move into
preliminary and final design.
The goal of the study was to identify a long-term 20+ year vision for the Highway 10 corridor ensures
safe and efficient operations along the Highway 10 corridor while supporting economic development
within the area and region. Implementation of the long-term vision will take commitment and
collaboration from all study partners. The cities, counties, and MnDOT will need to continue to
collaborate to determine next steps such as environmental review, preliminary and final design, and
agency cost sharing and coordination.
�GHW4Y
`� ■ _ •
�Rp.IhJRih`o
City Council
City Council andElk River Chamber of CommerceEngaged Elk River Community Members
City Council.Gills MT 32 Pt–Title
City Council VisionTerm-LongSupportedCommunity
City Council VisionTerm-LongSupportedMnDOT
City Council at grade access locationsRemoves all MnDOT Supported Option Avenue (right in/out)rd 173(3/4 access) st 171Retains access points at: Community Supported Option Differences…The
City Council Construction (2 years)•Way Acquisition-of-Right•Preliminary Design•Community InvolvementEnvironmental Review and Additional ••process AFTER Funding is secureyear Project
Development -Minimum 4Secure Funding •Identify Funding Opportunities (State and Federal)•changing needs along the Corridor Continue Community Discussion about the •Approve Final Study
(Tonight)•Future Efforts