Loading...
8.1 SR 02-21-2023�J Elk s�- River Request for Action To Item Number Ma�Tor and Ci T Council 8.1 Agenda Section Meeting Date Prepared by GeneYal Business Februar�r 21, 2023 ustin FemYite P.E., Public WoYks DirectoY Item Description Reviewed by High`va�r 10 Corridor StudyT Cal Pormer, Ci r Administrator Reviewed by Action Requested Approve, byT motion, High�vayT 10 Corridor StudyT Background/Discussion Initiated in April of 2020, the Highwa�T 10 Corridor Stud�T has progressed to final completion. The main findings identifyT the vision of the high`vayT to become a free`vayT styTle corridor `vith grade separated access points. This Yemains consistent with previous plannings efforts surYounding the 171 s` Focused Area Study but fuYtheY extends the free`vayT concept easterlyT to meet the visioned free`vayT styTle highway corridor through r�noka County. Since last reviewing a draft of the studyr in August of 2022, the report has been modified to more closely represent and address concerns raised during the continued public engagement period. The largest change incorporates a communityr supported option on the north end of the studyr are preserving access at 171s` Avenue and 173Ta Avenue. We recognize that MnDOT staff has their suppoYted option which is also included in the final report `vhich identifies closure of these access points. We held an Open House on l�londayr February 6 to present the final dYaft of the study to the communityr. There `vere about 35 residents/business o`vners `vho attended, manyT of whom `vere involved in August of 2022 `vith conceYns about the d�aft study at that time. The consensus at this Open House was that of appYeciation for listening to feedback and incorporating a communit�r supported option in the final studyT. Financial Impact None Mission/Policy/Goal Meet Changing Needs - Agile Attachments ■ High�vayT 10 Corridor Study — Executive Summar�T The Elk River Vision A 2a�elcolning co�nlnunity 2a�itb T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engageynent that encou�ages and inspiz•es pTo�pe�zty. row�REo er ���V�� Update�l• January 2023 Final Report Executive Summary Prepared by SRF Consulting Group SRF January 2023 SHE�BURNE �► cour�ry �- _, _,a , �lk - DEPARTMENT OF ANOKA � � �lvl�r TRANSPORTATION COUN7'Y HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT EXECUTIVE SUMMARY The City of Elk River along with its partners from MnDOT, Sherburne and Anoka Counties and the City of Ramsey completed the Highway 10 Corridor Study. The goal of the study was to develop a long- term 20+ year vision for the Highway 10 corridor and then build consensus around this vision. The long-term vision would be something that would be implemented over time as opportunities arise and funding becomes available. The goal of the long-term vision is to ensure safe and efficient operations along the Highway 10 corridor while supporting economic development within the area and region. The study included the following public engagement to facilitate the analysis process: • Virtual open houses • Targeted stakeholder focus group meetings • Community surveys • Study specific website The study was guided by the Project Management Team (PMT), which was comprised of representatives from the City of Elk River, MnDOT District 3, and MnDOT Metro. The PMT played an integral part in the study by providing oversight and input on technical analyses, concept alternatives development and evaluation and the public engagement process. Additionally, the project included a Technical Advisory Board (TAB) that served as a sounding board and provided input and guidance at key project milestones. Members of both the PMT and TAB are identified in the Acknowledgements section of this report. Existing Conditions Summary A comprehensive analysis of the conditions along the Highway 10 corridor within the study area was completed. The assessment included a review of existing planning documents, preliminary environmental review, analysis of existing and future traffic operations and safety, and review of the multimodal system. Highway 10 is an important corridor for personal and freight transportation, connecting local and regional users to greater Minnesota. After analysis of the current conditions along the roadway, the following concerns were identified: • All study intersections currently operate at an overall LOS C or better. • Sides-street access to Highway 10 is challenging, with most stop- controlled approaches operating at LOS E or worse during the peak periods. OPERATIONS • Existing ADT volumes on Highway 10 are approaching the facility's planning-level capacity. • There are limited or no adequate gaps for motorists to safely access Highway 10 duringthe peak periods. • Vehicles were observed using the shoulders as acceleration lanes to access Highway 10. • 200 crashes have occurred within the study area during the past 5-yea rs. • The study corridor has crash and severity rates that are statistically SAFETY significant compared to locations with similar characteristics. • The 171st Avenue intersection has crash and severity rates that are statistically significant compared to locations with similar characteristics. �GHW4Y `� ■ _ �Rp.IhJRih`o HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT • The Intersections of 173rd Avenue and 165th Avenue had crash rates just under the statewide expected crash rate. • Majority of the crashes occurred at intersections (61 percent) and were mostly rear end and angle crash types. Majority of the rear end crashes were for westbound vehicles at the signalized intersection of 171st Avenue. ACCESS • Current access along Highway 10 does not meet the MnDOT guidelines for access spacing. • Most land adjacent to Highway 10 is agricultural and impacts on this land should be minimized. SOCIAL, • Several water resources are in the study area. Future ENVIRONMENTAL, recommendations should minimize impacts to floodplains, wetlands, or AND ECONOMIC drinking water supply management areas. CONTEXT • The roadway is close to many potentially contaminated sites and must minimize interaction with these sites. • The Oliver Kelley Farm, a nationally registered historic property, is located directly adjacent to the corridor. Alternatives Considered The alternative development process was multifaceted using a range of inputs including technical data, public comments, design parameters, and guidance from the PMT and TAB. The primary goal was to identify a unified vision for the Highway 10 corridor that can be implemented over time as opportunities arise and funding becomes available. Given the complexity and needs of the area, this vision may take 20+ years and significant fiscal investment to realize. Therefore, this study is the first step in the process and additional planning, environmental, design, and engagement efforts will be needed in the future. The initial long-term alternatives that were considered include: • A No Build alternative, which is also known as the do-nothing option. • Alternative 1, which is an at-grade signalized corridor alternative that would include the addition of new traffic signals along the corridor coupled with access modifications and acceleration lanes. • Alternative 2 represents a more innovative at-grade corridor alternative, which includes a combination of reduce conflict intersections (also known as RCIs) along with potentially more traffic signals, access modifications, and acceleration lanes. • Alternative 3 is a grade-separated corridor alternative that provides a free flow option for Highway 10 motorists. This free flow corridor would be accomplished through a series of new interchanges, bridges, and/or on or off ramps. This alternative would also include access closures along Highway 10. A comprehensive evaluation of each alternative was completed. Evaluation criteria was developed based on the existing conditions analysis and centered around safety, mobility and convenient access being high priorities for the corridor. Bike and pedestrian accommodations, project costs and right-of-way impacts were also used in the evaluation process. The results of the preliminary evaluation showed that alternative 3, which is the grade-separated corridor alternative, meets the majority of the evaluation criteria well, with the exception of cost. This alternative has the highest costs; however, it provides the best safety and mobility for all users. �GHW4Y `� ■ _ , �Rp.IhJRih`o HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT Long-Term Vision Following the second round of stakeholder and public engagement, additional discussions with the PMT occurred to confirm the long-term vision for the Highway 10 Corridor would be a grade- separated corridor with interchanges at Highway 169 (existing), Twin Lakes Road and Adams Street (see Figure E-�. Additionally, access closure and a robust local roadway network will be needed to support this long-term vision (see Figure E-2�. MnDOT and the City will need to have additional coordination to determine the final access configuration for 173rd Avenue and 171st Avenue. At the conclusion of this study consensus was not reached. The configuration shown in FigureE-2is the City's preferred Highway Local Roadway Network. MnDOT's preference would be to have full access closures at 173rd Avenue and 171stAvenue (see FigureE-,�. Figure E-1. Highway 10 Long-Term Vision �GHW4Y `� ■ _ �Rp.IhJRih`o HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT Figure E- 2. Highway Local Roadway Network — Community Supported � A p � � 1 1 1 � 1 s+- ��', �t, �� , - � � 1 . 1 1 ! � 1 • i , i ' t l 173rdAvlW �(d I � ►.� f ' 1 ' 1 1 �p �'�a � � .� � , f �� 171stAue 4`- � � l�' ��.. � � ' . , , , � . . ., .� � . .:. . . ♦• �� ' �,� -�. ,. •� i :�1 ,� +� , ,,. � � ,+�, � �� � r� /, �� -�.�•� ,.� �, � � � �#'``�""�ra ��r.+�r� {.'i�, � _ « oPF.�, ti , r;, � � ,� : _ � _ . �} Kt C „ i _ ' _,_,.��`� �` . f ..� �:f � �' �-�'. } i 'y � ���'fl�z. _ �F •�� - � .w. . \ „n., ,41., y o` �x, . � .N `. � � .. n _�,1 r r � ; `r ,�� � � ; _ � t' r :: •,.i '� � � � ��t•'' ,— ' ` - 1 � � ���� • � � i � � . , „ , � � �,� ' I , .'� �.._..., j � I. � � �- L� _ ` . i i--- , i ... � i� � � � ... � ' .� .. 4 � `` � � , � 765thAveNW � `• �.. �IY� .k , 1�Slb�'ae � , �� � . '�Q ��rc n y�r►:`'`�' � �L, -'" .. � `- .. � �• . , � � � � 4i� ��"�''� , � � �- g �,a ' �r�� .• n� .. - � � �u� � � � ,��4 _ . � . ._ � _ . .._._... . �� ' � � �. .if a ConsitlerJarvis Street � ��' • � 10 realignment • �.: .� + �ro �I �� r.: �a -� 1ld � � r,�'�'. " � y�, .,�, �` � a. . �,,,,�` �. � . i` � �j J ,mya �1+� , � � � �.. a...k. �* .o�� '�� ^� ' "'� �+ � v � ��� � � � �... �n,. ' - . ��P�..��,,.��'�"' •1 " _ . ''+""+�'' • , �. ¢ �, Extend South Frontage . � _, k, � ,���a .'�����, ro =-_ �� •'' t Road as opportunities ' 1�—w � � arise � z ... _ 2 „ ; �� � ? ___. � �•• � r� W R '�`� ConsitlerWeighStationupgradesor � R � '— � . relocation to Kelly Farm Road � � 1 ,� Page � 4 HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT Figure E- 3. Highway Local Roadway Network— MnDOT Supported � A p � � 1 1 1 � 1 s+- �L'�. � � •�i - � � 1 . 1 1 ! � 1 ' i t > � �� �r 173 rd Rve NW ld,� I � 1.� 1 , 1• p��% a � � .� w 10 � - (� i7i5tav� 4�. � � � l`�" �R�:. � � '� - . , , , ! . . ., . � . .:. ., ♦• �� ' �,� -�. .. •� i :�1 ,� � , ,, ! � '+��� � �� � r� /, �� -�.�•� ,.� �, � � � �#'``�""�ra ��r.+�r� {.'i�, � _ « oPF.�, ti , r;, � � ,� : _ � _ . �} Kt C „ i _ ' _,_,.��`� �` . f ..� �:f � �' �-�'. } i 'y � ���'fl�z. _ �F •�� - � .w. . \ „n., ,41., y o` �x, . � .N `. � � .. n _�,1 r r � ; `r ,�� � � ; _ � t' r :: •,.i '� � � � ��t•'' ,— ' ` - 1 � � ���� • � � i � � . , „ , � � �,� ' I , .'� �.._..., j � I. � � �- L� _ ` . i i--- , i ... � i� � � � ... � ' .� .. 4 � `` � � , � 765thAveNW � `• �.. �IY� .k , 1�Slb�'ae � , �� � . '�Q ��rc n y�r►:`'`�' � �L, -'" .. � `- .. � �• . , � � � � 4i� ��"�''� , � � �- g �,a ' �r�� .• n� .. - � � �u� � � � ,��4 _ . � . ._ � _ . .._._... . �� ' � � �. .if a ConsitlerJarvis Street � ��' • � 10 realignment • �.: .� + �ro �I �� r.: �a -� 1ld � � r,�'�'. " � y�, .,�, �` � a. . �,,,,�` �. � . i` � �j J ,mya �1+� , � � � �.. a...k. �* .o�� '�� ^� ' "'� �+ � v � ��� � � � �... �n,. ' - . ��P�..��,,.��'�"' •1 " _ . ''+""+�'' • , �. ¢ �, Extend South Frontage . � _, k, � ,���a .'�����, ro =-_ �� •'' t Road as opportunities ' 1�—w � � arise � z ... _ 2 „ ; �� � ? ___. � �•• � r� W R '�`� ConsitlerWeighStationupgradesor � R � '— � . relocation to Kelly Farm Road � � 1 ,� Page � 5 HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT Next Steps The critical next step for this study is to complete significant environmental review, as required by the National Environmental Policy Act (NEPA), to fully analyze these conceptual alternatives and implementation strategies. Through this environmental process, interchange design and implementation will be determined. The environmental review process also includes additional opportunities for public input. Following the environmental review, the project would move into preliminary and final design. The goal of the study was to identify a long-term 20+ year vision for the Highway 10 corridor ensures safe and efficient operations along the Highway 10 corridor while supporting economic development within the area and region. Implementation of the long-term vision will take commitment and collaboration from all study partners. The cities, counties, and MnDOT will need to continue to collaborate to determine next steps such as environmental review, preliminary and final design, and agency cost sharing and coordination. �GHW4Y `� ■ _ • �Rp.IhJRih`o City Council City Council andElk River Chamber of CommerceEngaged Elk River Community Members City Council.Gills MT 32 Pt–Title City Council VisionTerm-LongSupportedCommunity City Council VisionTerm-LongSupportedMnDOT City Council at grade access locationsRemoves all MnDOT Supported Option Avenue (right in/out)rd 173(3/4 access) st 171Retains access points at: Community Supported Option Differences…The City Council Construction (2 years)•Way Acquisition-of-Right•Preliminary Design•Community InvolvementEnvironmental Review and Additional ••process AFTER Funding is secureyear Project Development -Minimum 4Secure Funding •Identify Funding Opportunities (State and Federal)•changing needs along the Corridor Continue Community Discussion about the •Approve Final Study (Tonight)•Future Efforts