Loading...
9.0 PRSR 03-08-2023 Memorandum To: Parks and Recreation Commission From: Michael Hecker, Recreation Manager Date: March 8, 2023 Subject: Manager’s Report This report is a monthly highlight of department activities related to recent collaborations, strategic planning, staff changes/developments, and park operations. Orono Park Pickleball Shade Structures At the February meeting, Commissioner Anderson asked if the Commission had reviewed and approved the current size of the Orono Park pickleball structures that were installed in January. On February 15, I sent the Commission an email showing that the current size was approved two different times by the Commission. The Commission approved a 10’ x 16’ fabric shade structure on November 10, 2021. The Commission then approved the current red metal roof structure also 10’ x 16’ at the April 13, 2022, meeting. Pictures of the two shade structures that were presented to the Commission are attached to this report. Youth Sports Associations Annual Meeting On March 1, city staff and local youth associations met to discuss the upcoming field season, updates to fields/facilities, important dates, and a new billing system. Staff reported that the meeting went very well. Lions John Weicht Park Playground Staff continues to work with Flagship Recreation on playground concepts for Lion John Weicht Park. At the October 2022 meeting, the Commission recommended a budget of $200,000 for the playground. At the December 14 meeting, the Commissioners expressed concern that a budget of $200,000 would not be enough for a potential signature type playground. Staff is reviewing additional concepts with price points of $200,000, $300,000, and $400,000 for comparison purposes. We hope to present these concepts to the Commission at the April 12 meeting. Annual Board and Commission Appreciation Dinner The appreciation dinner for board and commission members was rescheduled for Thursday, March 30 at 6:30 pm. The time, location and menu will all remain the same as the original date. Please RSVP by Tuesday, March 14, even if you did previously with the original February date. Item: 9 Outdoor Ice Rinks The outdoor rink season came to a halt with the recent winter storm on February 22. Rinks were maintained 63 days throughout this past season. The table below shows the approximate number of hours per day staff spent clearing snow, sweeping, and flooding by rink. Staff has observed that the two neighborhood rinks, Mississippi Oaks Parks and Riverplace Park were not used this season by evidence of no skate marks when temps were below freezing. Staff is recommending the permanent closure of these two rinks. This decision will free up our maintenance staff and equipment to provide a higher level of service to Handke and Spectrum rinks. We are planning to send out post cards to the neighbors of these two rinks with a QR code linked to a brief survey about the city’s neighborhood rinks to assist us in deciding whether or not to continue maintaining these rinks. Information about the rink discussion/recommendations discussion on the Parks and Recreation Commission Agenda for April 12 will also be included on the cards. Spectrum High School Outdoor Rink On February 27, staff met with the Spectrum High School Executive Director and Athletic Director to discuss and evaluate the joint use agreement. A joint powers agreement was created in September 2020 for a three-year term with an automatic renewal on an annual basis. Staff expressed maintenance concerns about the rink, and it seems Spectrum is willing to address them. One major concern is the ground elevation of the rink making it difficult for flooding. If Spectrum makes the improvements mutually agreed upon before September, staff has no concerns about renewing the agreement for the 2023-24 season.