6.1g ERMUSR 03-14-2023 UTILITIES COMMISSION MEETING TO: ERMU Commission FROM: Chris Sumstad – Electric Superintendent MEETING DATE: March 14, 2023 AGENDA ITEM NUMBER: 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Installed 6 new residential services, which involves the connection of a secondary line once the customer requests service. • Crews finished the County Road 35 overhead rebuild with the exception of removing the old poles which will happen when the frost melts. • Tree trimming continues for ERMU crews and our contractor, Carr’s Tree Service. • Infrastructure equipment checks along with GIS mapping continued this past month. An infrared camera is used during these checks to find components that are heating up giving us the opportunity to perform maintenance before a possible outage occurs. • We currently have Station 14 Bank 4 substation transformer deenergized and back fed with Station 14 Bank 3 transformer. This was done so Great River Energy could perform work on their transmission side. Their work is scheduled to be completed March 15. • Annual DOT inspections of our trucks and trailers are underway. These are performed by the City of Elk River mechanics. • Lead Lineworker Curt Wark attended Meter School in Marshall, MN February 8-10. This event was hosted by Minnesota Municipal Utilities Association. • We purchased additional automated external defibrillator machines for the field service building and a vehicle. One of which was purchased with donated funds from the Zimmerman Fire Department. These have been installed and training on their operation was provided by Renae Hamdorf from Heartsafe/Allina. • Work continues with the transition process from CAD mapping to GIS mapping. • Orders have recently been placed on numerous inventory items that we will need for the upcoming construction season. 256