08-06-1973 TBM
ELK RIVER TOWN BOARD MEETING
AUGUST 6, 1973
The meeting was called to order by the chairman EL Specht with all members present.
The first order of business was the opening of bids on the Horvath job. The bids were as follows.
Laurence Kreger Construction 7282.00
BiCon Construction Co 12,126.00
Walt Ham Properties 13,930.00
W.G. Rehblein Brothers 8,858.00
It was moved by F. Madsen seconded by Earl Schulke that the contract for the Horvath road be
awarded to Laurence Kreger with a stipulation that a separate contract for a completion date be
th
drawn. The motion so carried. The starting time is to be Aug 25 with 35 working days of 5 day
weeks.
Next the bids were opened for the road from Cargill farm out to Highway (ten) part with Ramsey
Township the bids were as follows.
Elk River Blacktop 19,817.00
H&S Asphalt Co 17568.44
Frank Madsen moved seconded by E. Schulke that the above bids be tabled subject to clarification
by the town engineer of the wording of the bids. Motion so carried.
Next business was Earl Beard asked if the dispute on lot lines in Gary Santwire Addit. Would hold
up the Anna Meyer road surfacing. He was assured it would not.
Next Gary Santwire appeared. The question he had in mind was asking the township to pay the
difference to have his road hot mix instead of cold rolled. Frank Madsen moved that the Township
will pay the difference if cost for hot mix on Gary Santwire road over cold mix. Gary is to pay
2880.40 toward cost. Earl Schulke seconded. Motion so carried. Earl Sculke moved seconded by EL
Specht that the engineer check. This road be class 5 gravel and shaping. Motion carried. Frank
moved that be accepted bid of Elk River Blacktop for $4975.00 to pave the street in Village Estate.
This road to run from corner at Eldon Beard West and North to County Road 35 seconded by Earl
Schulke. Motion so carried.
Next Bruce Schwan appeared in behalf of a group in Lloyd Anderson addition. Brenteson son
appeared for Big Lake Gravel Co. He stated that they were removing road laid in this area and plan
to relay new coat. Brenteson stated they are correcting the situation and job will meet the town
board requirements there being no further business the following bills were ordered paid. A motion
to adjourn was made and carried.
EV Rathbun
Clerk
Revenue
Star News 26.08
Village Elk River 2325.00
EL Specht 192.00
DR Moldenhauer 32.00
Frank Madsen 144.00
Earl Schulke 144.00
EV Rathbun 96.70
2959.78
Bal 7-2 8845.52
Paid out 2959.78
Deposit 7936.98
Bal 13822.72
Road and Bridge
Big Lake Gravel Co 403.00
L. Kreger Constr. 251.25
Sherburne Co Highway 139.30
793.55
Bal 7-2-73 24,045.77
Dep 8-7-73 7300.18
Paid out 8-6-73 793.55
Bal 8-6-73 30,552.40
Fed Rev Sharing
Bal 8-6-73 10,447.00