4.3 SR 03-20-2023�,
Elk s �-
River
Request for Action
To Item Number
Ma Tor and CinT Council 4.3
Agenda Section Meeting Date Prepared by
Consent A enda MaYch 20, 2023 Zack Carlton, Communittr Develo ment DirectoY
Item Description Reviewed by
Resolution: Foster Propert�r Environmental Cal Pormer, Ci r Administrator
Assessment Worksheet Findings Reviewed by
Action Requested
Adopt, byT motion, a resolution approving a negative declaration of need for an environmental impact statement
for the Foster PYopeYtyr Development.
Background/Discussion
In NovembeY of 2022, Lennar submitted a complete Environmental Assessment Worksheet (EA� for their
pYoposed residential development The EAW was Yequired per Minnesota rules and evaluated potenrial impacts to
the natural and building environments as a result of their project The city, acting as the LGU, coordinated the
formal revie�v and public comment period `vith the Environmental QualityT Board and relevant outside agencies.
The public comment period ran from December 13, 2022, to Januaryr 12, 2023. In total, staff received fouY
responses, `vith relevant comments requiring a response from one, the DNR.
The applicant's consulting engineer prepared a formal response to comments and staff reviewed the EAW, public
comments, and the response in their entiretyT to determine if a more intense environmental review (Environmental
Impact Statement) `vas required. Staff's revie`v and analyTsis did not identifyT a need for the additional
environmental review and recommends Council adopt the attached resolution confirming those findings.
Additional information, along with a Finding of Fact, are attached for review. This is a required review due to the
size of the pYoject and does not supeYsede the city's land use and zoning reviews.
Financial Impact
None
Mission/Policy/Goal
Support the growth and development of the communityT.
Attachments
■ Resolution
■ FosteY PYoperty Development EAW
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty.
rowEREo ar
�I'1 ����
Update�l• January 2023
Ci_y �I
E1k -
River ~
City of Elk River
City Council
Resolution 23-
A Resolution of the City Council of the City of Elk River Approving Record of
Decision and the Negative Declaration of Need for an Environmental Impact
Statement for the Foster Property Development
WHEREAS, Lennar ("Applicant") proposes to develop a residential subdivision that
includes appro�mately 433 single-family homes and 180 multi-familyT homes along �uith the
required infrastructure such as roads, utilities, side`valks, trails, and stormwater
ponds("PYoject"); and
WHEREAS, the PYoject falls within the mandatory environmental assessment woYksheet
("EAW") categoryr of iVlinn. Rules paYt 4410.4300, Subd. 19 D; and
WHEREAS, the City of Elk River is the Responsible Governmental Unit ("RGU"); and
WHEREAS, an EAW `vas prepared byT ISG, on behalf of the Applicant, `vho submitted
completed data poYtions of the EAW to the Cityr of Elk RiveY consistent with l��inn. Rules
PaYt 4410.1400; and
WHEREAS, the Cit�T of Elk River submitted a copyT of the EAW to all public agencies on
the EAW distribution list and published the EAW availabilityT in the EQB Monitor on
DecembeY 13, 2022, in accordance with applicable state laws, rules, and regulations; and
WHEREAS, the EAW comment period lasted from December 13, 2022, to Januar�r 12,
2023, and regulatoryT agencies submitted written comments during the comment period; and
WHEREAS, the City of Elk River acknowledges the comments received from Minnesota
Department of Natural Resources, Minnesota Department of Transportation, Minnesota
State Historic Preservation Office, and ArmyT Corps of Engineers; and
WHEREAS, CityT staff revie�ved the proposed Record of Decision and finds it to be
consistent with the evidence submitted to the cit�T and the applicable statutes and regulations,
to the best of their knowledge, and recommends the Cit�T Council approve the Findings of
Fact and Record of Decision dated MaYch 16, 2023, and deteYmine that no environmental
impact statement ("EIS") is necessar�r, Yeasonable oY warYanted with Yespect to the pYoject
under the circumstances; and
WHEREAS, the City Council desires to make findings of fact and a record of decision
that no EIS is Yequired with Yespect to the PYoject ("Negative DeclaYation").
rowER�o �r
������
NOW, THEREFORE, BE IT RESOLVED byT the CityT Council of the CityT of Elk
River, Minnesota, as follo�vs:
Adopt and approve the Findings of Fact and Record of Decision on the Foster
PYopeYty Development Environmental Assessment WoYksheet in the foYm which is
attached hereto as E�ibit A and hereb�T makes the Findings of Fact and
Conclusions �vhich are contained therein; and
2. Find and determine that, based upon the Findings of Fact and Record of Decision,
no environmental impact statement is required for the Project pursuant to the
Minnesota Environmental Policy Act of Minnesota Rules PaYts 4410.0200 to
4410.6500.
Passed and adopted this 20th dayr of MaYch 2023.
John J. Dietz, Mayor
ATTEST:
Tina Allard, CityT Clerk
rowER�o �r
������
Exhibit A
Foster Property Development
Findings of Fact and Record of Decision
I. Administrative Background
Lennar Corporation is proposing construction of a residential development located at in the CityT of
Elk River, Sherburne Count�r, Minnesota. The project will include the construction of appro�matel�r
433 single-familyT homes and 180 multi-family housing units as well as infrastructure such as roads,
utilities, `valks/trails, and storm`vater ponds.
The CityT of Elk River is the Responsible Governmental Unit (RGU) for this project. An
Environmental Assessment Worksheet (EA� has been prepared in accordance `vith the iVlinnesota
Rules Chapter 4410. The EAW was mandator�r peY Minnesota Rules, Part 4410.4300, Subd. 19 D.
The EAW was filed with the Minnesota Environmental QualityT Board (EQB) and circulated for
review and comment to the required EAW distribution list. A notice of availabilityT was published in
the E�B Monito�� on December 13, 2022. A notice was also published in the StaY News. The notice
included a description of the project, information on `vhere copies of the EAW `vere available, and
invited the public to provide comments.
The EAW was made available electronically on the City of Elk River's website at
htt�s://����.elkrivermn.g�o�r/DocumentCenter/View/11562/Foster-Pro�ert��-EA�X� and in hard
copy at Elk RiveY City= Hall, 13065 Orono Parkway NW, Elk River, MN 55376.
The EAW comment period extended fYom DecembeY 13, 2022, to Januar�r 12, 2023. Written
comments `vere received from four agencies during the comment period. All comments received
were considered in determining the potential for significant environmental impacts. Comments and
responses to comments are included in Appendix A.
Based on the information in the record, �vhich is composed of the EAW for the proposed project,
the comments submitted during the public comment period, the responses to the comments, and
other supporting documents, the CinT of Elk River makes the follo`ving Findings of Fact and
Conclusions.
2. Findings of Fact
2.1 Project Description
Lennar Corporation is proposing construction of a residential development located at in the CityT of
Elk River, Sherburne CountyT, Minnesota. The project �uill include the construction of approximatel�T
433 single-family- homes and 180 multi-family housing units as well as infrastructure such as roads,
utilities, walks/trails, and storm`vater ponds.
2.2 Corrections to the EAW or Changes to the Project since the EAW was
Published.
There have been no changes or updates to the EAW since publication on DecembeY 13, 2023. The
summary of impacts and mitigation outlined belo�v reflect the current proposed design.
2.3 Agency and Public Comments on the EAW
The CityT of Elk River received written comments during the comment period from the following
four agencies:
■ l��innesota DepaYtment of TranspoYtation
■ Mirinesota Department of Natural Resources
■ Minnesota State Historic PYeservation Office
■ ArmyT Corps of Engineers
Consistent with state environmental review rules, Yesponses have been pYepaYed foY all substantive
comments submitted during the comment period. Written responses have been provided for
substantive comments pertaining to analyTsis conducted for and documented in the EAW (see
Appendix A). Original comments in their entiretyT are included in Appendix B.
2.4 Decision Regarding Need for an Environmental Impact Statement
The CityT of Elk River finds that the analyTsis completed for the EAW and the additional information
considered in this Findings of Fact and Conclusions document are adequate to determine whether
the pYoject has the potential foY significant environmental effects based on consideYation of the fouY
criteria identified in Minnesota Rules, Part 4410.1700, Subd. 7(described in the sections that follo`v).
2.4.1 Type, Extent, and Reversibiliry of impacts
The CityT of Elk River finds the analyTsis completed for the EAW is adequate to determine whether
the pYoject has the potential for significant environmental effects. The EAW described the tyrpe and
extent of impacts to the natural and built environment anticipated to result from the proposed
project The proposed design for the project includes features to mitigate the identified impacts.
Based on the EAW analyrsis and mitigation commitments, the pYoposed pYoject is not anticipated to
result in substantial impacts.
Belo�v is a summaryT of the findings regarding potential environmental impacts of the proposed
project and the design features included to avoid, minimize, and mitigate those impacts.
2.4.1.1 Land Use
The project will be compatible with the land uses identified in the adopted comprehensive plan,
Mixed Residential, and those adjacent to the project area. The project will include design features to
mitigate impacts to adjacent public streets and improve pedestrian and bic�rcle mobility. The project
is anticipated to be developed as a Planned Unit Development to allow fle�bilityT in residential
design features `vhile still maintaining compliance `vith the Land Use designation.
2.4.1.2 Geology, Soils, and Topography
Geologp
Minnesota Geological Survey data within the PYoject site lists the bedYock as Wonewoc Sandstone
and Eau Claire Formation with depths to the bedrock ranging from appro�mately 50 to 350 feet.
There are no known or mapped sinkholes, shallow limestone, shallow aquifers, oY karst features
identified within oY neaY the pYoject aYea.
Soils and Topography
There are appro�mately 110 acres of land within the project with a soil farmland classification rating
of either "Farmland of State`vide Importance" or "All Areas are Prime Farmland". Ho`vever, there
is currentlyT no land within the Project site that is cultivated for agricultural production. As a result,
no faYmland will be taken out of production as a Yesult of the pYoject.
The erosion capabilities of the soils are susceptible as described byT the NRCS Soil Erodibility-
(K`v) Factor rating `vhich ranges across the site from 0.02 to 0.37. Construction activities will
temporarilyT expose soils to an increased risk of erosion from wind and precipitation. Appropriate
erosion and sediment control best management practices (BMPs) will be selected based on curYent
site conditions and maintained thYough the duration of each construction phase to reduce the
potential of sedimentation occurring to surface `vater resources or migrating offsite.
TempoYaryr BMPs will be inspected and maintained (peY the NPDES Construction StoYmwateY
Permit) until permanent vegetation and stabilization has occurred. PeYmanent BMPs will be
incorporated into project design to minimize erosion during routine operational activities (post-
construction�.
A geotechnical evaluation of the site has been completed which included 22 soil borings across the
site. A map of the boring locations and detailed description of the soils observed at each is included
in E�ibit B— Geotechnical Report.
TopographyT of the Project site, collected via LiDAR, is illustrated on Appendix A— Figure 6. Site
elevations were shown ranging from 896 to 946 msl. Site topograph�r generally slopes downward
towards the basin located neaY the centeY before continuing to the south. Some aYeas of steep slopes
(12% oY gYeater) are pYesent within the site.
2.4.1.3 Water Resources
Surfa ce Wa ters
There is one DNR Public Waters `vatercourses, Trott Brook (M-063-001.5), located within the
project aYea. TYott BYook meandeYs in and out of the pYoject site along its westeYn and southeYn
boundaries. There are no DNR Public Waters basins, designated wildlife lakes, migratoryT waterfowl
feeding/Yesting areas, trout streams/lakes, MPCA oY MDNR listed calcaYeous fens, outstanding
resource value waters, and countyT or jurisdictional ditches within or adjacent to the project area.
PYominent wateY features located witl�in 1 mile of the pYoject site include the aforementioned Trott
BYook as well as two DNR Public WateYs wetlands. These wetlands weYe KlieveY MaYsh (71000300)
located appro�mately 0.6 miles south of the project site, and an unnamed basin (71023800) located
approximatelyT 0.8 miles to the north. There are no MPCA Section 303d listed impaired waters
located within a 1-mile Yadius of the project site.
12 wetland areas, totaling appro�matelyT 71 acres, were delineated on the main Project site and
approved by the Local Government Unit (CityT of Elk River) of the Minnesota Wetland
ConseYvation Act (Minnesota Rules 8420). A Notice of Decision was issued on November 10, 2021
(LGU PYoject No. W-21-21).
Groundwater
The depth to ground water appears to varyT greatly across the site. During the geotechnical
evaluation of the site 22 soil borings were completed across the site. Water tables, when they were
observed, ranged from 894.4' to 908.5' MSL. These `vater tables `vere all observed in borings taken
within or immediatelyT adjacent to wetlands or to open water on site. Water tables tyTpically were not
observed within borings taken within upland areas. The deepest of which was taken to a depth of
887.3' MSL with no observed water table. A map of the boring locations and boring logs
documenting water tables observed is included in Exhibit B— Geotechnical Report.
The Minnesota Department of Natural Resources Cooperative Groundwater Monitoring Website
maintains data on gYound wateY levels. The closest observation well to the Project site is DNR
Observation Well #86017 (MDH #708372), which is located appro�matelyT 2.8 miles southwest of
the Project site. The wateY level in the most Yecent data record (l�ZaYch 29, 2022) was measured at
859.51' MSL.
A majorityT of the Project site is located within the Elk River Wellhead Protection Area (WHPA).
The boundar�T of the ELK River WHPA is illustrated on Appendix A— Figure 8.
According to the Minnesota DepaYtment of Health — Minnesota Well Index, theYe aYe no identified
wells located within the Project site. Multiple domestic wells were mapped on adjacent properties,
the neaYest of �uhich,lVIDH #551578, was located appro�matelyr 140 feet east of the Project site.
Wastewater
Waste`vater generated from the site `vill be discharged into the CityT of Elk River's sanitaryT sewer
syrstem and flow to the Cityr of Elk RiveY WastewateY TYeatment Facility (Facilityr) located at 248
Railroad Drive, Elk RiveY. The Facilityr is described as follows within its NPDES PeYmit
(MN0020788):
"The FacilityT has a continuous discharge (SD 001) to the iVlississippi River (Class 1C, 2Bdg, 3C, 4A,
4B, 5, 6 water). This is a Class A facilityT.
The Facilit�T is designed to treat an average dryT `veather design flo�v of 3.98 million gallons per da�T
(MGD), an average wet weather (AW� design flow of 4.54 MGD, and a peak hourly wet weather
flo`v of 7.27 1�1GD. Based on the r�WW design flo�v, the FacilityT is designed for a five-dayT
carbonaceous biochemical oxygen demand of 203.8 milligrams per liter (mg/L), a total suspended
solid of 263.7 mg/L, a total phosphorus of 7.2 mg/L, and a total Keldahl nitYogen of 36.0 mg/L.
The Facilit�r consists of inechanicall�r cleaned baY scYeens, an influent PaYshall flume, voYtex grit
removers, t�vo anaerobic selector tanks for phosphorous removal, six extended aeration activated
sludge cells in three pairs, three final clarifiers, six effluent sand filters, and UV disinfection. The
Facilit�T also adds chlorine for filter maintenance, sulfur dio�de for removal of residual chlorine, and
ferric chloride for phosphorous removal. Biosolids treatment consists of four aerated storage tanks
(aerobic digesters), which is then processed in a screw press to produce a biosolids cake �vhich is
landfill disposed."
Construction of new sanitary sewer lines will be Yequired to service the pYoject but no expansions to
the CityT's WWTP are anticipated to be required.
Stormwater
The qualit�r of e�sting storm�uateY runoff from the pYoject is t�rpical of foYested land. StoYmwater
runoff flows from upland aYeas to loweY elevations on site as sheet flow wheYe it geneYally gets
conveyed into the large wetland complex located near the center of the site. This wetland ultimately
outlets into Trott Brook.
The quality of stormwateY runoff fYom the pYoject post construction will be tyrpical of an urban land
use with impervious surfaces and la`vn/landscaping generallyT generating higher concentrations of
total suspended solids and total phosphorus. Stormwater runoff is proposed to be conve�Ted into
permanent constructed stormwater treatment infrastructure (e.g. infiltration basins, filtration basins,
holding ponds, vegetated swales, etc.) across the site for treatment prior to discharge.
TemporaryT erosion and sediment control best management practices (BiVIPs) will initiallyT be
installed (per the project's SWPPP), maintained/repaired, and amended throughout the construction
phases as required to remain compliant `vith the applicant's NPDES Construction Stormwater
Permit. BMPs mayT include (but are not limited to) silt fence, bio-rolls/filter logs, rock construction
entrances, mulch/hyTdro mulch, and permanent native seeding or turf seeding in appropriate areas.
L�aterAppropriat�on
No appYopriations of suYface wateYs aYe proposed as paYt of the PYoject. WateY will be sourced from
the Cit�T of Elk River's e�sting public `vater suppl�T s�Tstem (PWS #1710004). The CityT's PWS is
currentlyr souYced from eight groundwateY wells (MDH #s 255153, 221176, 481794, 537682, 580320,
664852, 694499, and 757624). Construction of new watermains `vill be required to service the
project but no expansions to the CityT's PWS are anticipated to be required.
Short-term temporaryT construction de`vatering of surface or ground `vaters mayT be required at the
time of construction (depending on current field conditions) to facilitate construction activities (e.g.,
utilityr installation, etc.). If dewatering is anticipated to exceed 10,000 gallons per dayr oY 1,000,000
gallons per �Tear, the contractor `vill be required to obtain a Water Appropriations Permit from the
Department of Natural Resources (iVIDNR) Division of Waters prior to initiating such activities.
Measures to avoid, minimize, or mitigate the environmental effects from construction related to
dewatering are unknown at this time, and therefore �vill be determined when developing the
dewatering plan as required by a Stormwater Pollution Prevention Plan amendment of the NPDES
Construction Storm`vater Permit.
L�etlands
12 wetland areas, totaling appro�mately 71 acres, were delineated on the main Project site and
approved byT the Local Government Unit (CityT of Elk River) of the iVlinnesota Wetland
Conservation Act (Minnesota Rules 8420). A Notice of Decision was issued on November 10, 2021
(LGU Project No. W-21-21).
Appro�mately 18 acYes of the curYent wetland aYea on site consists of land that had previously been
mined as part of a gravel pit These aYeas would meet the defu�irion of an "incidental wetland" undeY
Minnesota Admitustrative Rule 8420.0105 and theYefoYe aYe not Yegulated undeY the Minnesota
Wetland Conservation Act. Additionally, poYtions of these aYeas have depths up to appro�matelyr
20'. As a Yesult, these aYeas funcrion moYe as deep-wateY habitats YatheY than wetlands.
Wetland impacts were avoided to the extent possible during the preliminaryT design phase of the
overall site plan (Exhibit A). The final design ��ill attempt to avoid and/or minimize impacts to the
extent possible. Should unavoidable impacts remain, the proper permitting processes will be
follo`ved in accordance �vith the WCA and/or Section 404 of the Clean Water Act as applicable.
This process `vould involve applyTing for a replacement plan potenriallyT requiring compensatoryT
mitigation. The area of wetland impact and jurisdictional status of the `vetlands will be determined
b�T the proper governmental agencyT during the permitting process follo`ving conclusion of the
environmental review process.
Other Surface L�a ters
No other surface water features (lakes, streams, intermittent channels, or
count�T/jurisdictional ditches) will be phyTsicall�r or indirectlyT altered during the construction or
operation of the proposed pYoject The only wateY feature located on the project site is the DNR
Public Waters �vatercourse Trott Brook `vhich meanders in and out of the project site along its
western and southern boundaries. Trott Brook was avoided during the preliminaryT design phase of
the overall site plan (Exhibit A). TemporaryT erosion and sediment control best management
pYactices (BMPs) will inirially be installed (peY the pYoject's SWPPP), maintained/repaired, and
amended throughout the construction phases to avoid indirect impacts to Trott Brook. BMPs may
include (but are not limited to) silt fence, bio-rolls/filter logs, rock construction entrances,
mulch/hyTdro mulch, and permanent native seeding or turf seeding in appropriate areas. Follo`ving
construction, permanent constructed storm`vater treatment infrastructure (e.g. infiltration basins,
filtration basins, holding ponds, vegetated s`vales, etc.) �vill protect help Trott Brook. This will
provide storage and treatment to waters prior to discharging into Trott Brook.
2.4.1.4 Contamination/Hazardous and Materials/Wastes
Pre-ProjectSste Condstlons
Minnesota Pollution Control Agency (MPCA) records do not indicate any current or former
contamination sites within or immediatelyr adjacent to the project aYea. The MPCA's What's In My
Neighborhood database of knotivn sites within pro�mityr of the pYoject aYea is illustrated on
Appendix A— Figure 10. TheYe was one documented petroleum leak within one-half mile of the
project site. This leak occurred at the Holzen Residence site located appro�mately 0.4 miles north
of the project site. This site was issued regulatoryT site closure on March 27, 2009.
The project proposer anticipates a minimal risk of encountering contaminated materials or
ground`vater during construction based on the lack of past land uses and due to geographic location
of the listed leak sites in Yelarion to the project area. PYoject construction and opeYation is not
expected to cause or exacerbate a pre-project contaminated condition(s); therefore, no measures are
planned to avoid, minimize, or mitigate adverse effects from e�sting contamination or potential
environmental hazards.
If potentially contaminated materials (or other environmental hazards) are discovered during
construcrion activiries, the project proposer/contractor `vill immediatel�T cease activities in the area,
then take appropriate and reasonable actions to contain and reduce the human
health/environmental risk prior to contacring the State of Minnesota Dut�T Officer, Sherburne
CountyT, and project proposer's representative. The development of a Contingency Plan or Response
Action Plan will be initiated if analyTtical results characterize the discovered materials as a regulated
contaminated waste.
Project-Related Generation/Storage ofSolsd Wastes
Solid and liquid wastes generated from construction materials and equipment are expected in
minimal amounts during periods of active construction. Wastes mayT include sediment laden
construction dewatering or tyrpical construction debris associated with Yesidential development
(lumber, siding, roofing materials, etc.).. The contractor will be required to immediatelyT haul offsite
and/or temporarilyT store and dispose (or rec�rcle) of all waste in accordance with MPCA regulations
and the NPDES Construction Storm`vater Permit.
Project-Related Use/Storage ofHazardous Materials
Hazardous materials (portable fuel tanks and lubricants) mayT be used for equipment operarions
during construction and temporarily placed onsite in sealed containers (at all times) and under
secured restricted access during non-working hours. These materials will onl�T be used during active
construcrion for refueling and maintenance of construcrion equipment To ensure that fuel spills do
not contaminate surface and ground `vaters, construction and maintenance activities would occur at
Yeasonable distances from surface wateYs and steep sloped aYeas. The contractoY will be YequiYed to
abide byT the Pollution Prevention Management Measures (Part N.F.2) of the NPDES Construction
Stormwater Permit All hazardous materials will be removed from the Project site upon completion
of construction.
Project-Related Generatlon/Storage ofl�azardous L�astes
Hazardous waste stoYage and disposal associated with construction activities will comply with the
NPDES Storm Water Pollution Prevention Plan during periods of construction. Following
construcrion, the development will not geneYate hazaYdous wastes.
2.4.1.5 Fish, Wildlife, Plant Communities, and Sensitive Ecological Resources (Rare
Features)
Fish and Wlldlife Resources
Ecological land units foY the pYoject aYea have been mapped and defined in the Ecological
Classification SyTstem (ECS), which has been adopted byT the Minnesota DNR. The project location
occurs in the Anoka Sand Plain subsection (222Mc). The Anoka Sandplains subsecrion laYgely
consists of a broad, flat, sandyT lake plain that historically consisted of oak savanna and upland
Prairies. The Project occurs within the northern Twin Ciries metropolitan area and surrounding
lands now largelyT consist of urban development.
The Project site itself largelyT consists of wooded and wetland areas. Appro�mately 160 acres of
�vooded lands are present across the site. Based on historic aerial photograph�T approximatel�T 62 of
those wooded acYes used to be cultivated foY agricultural pYoduction through 2005, afteY which the
land was left uncultivated and naturallyT developed into its current state.
Wetlands comprise approximately 71 acres of the site. This includes multiple wetland communities
including TyTpe 1— Floodplain Forest, TyTpe 2— Fresh (wet) Meadow, and TyTpe 5— Shallow Open
Water. Approximately 18 acres of the current wetland area on site consists of land that had
previousl�T been mined as part of a gravel pit. Portions of these areas have depths up to
approximatel�r 20'. As a result, these areas function more as deep-water habitats rather than
wetlands.
Rare Features
There �vere t��o areas of iVlinnesota CounnT Biological Surve�T Sites of BiodiversityT Significance
located within the pYoject area. These areas weYe both paYt of the MBS site "Elk RiveY 36
Westcentral" and were given a biodiversityT significance rank of `Below". A U.S. Fish & Wildlife
Service Official Species List foY the PYoject site listed one fedeYally listed threatened species, the
Northern Long-Eared Bat, and one candidate species, the Monarch Butterfly, that may potentially
be affected by the PYoject TheYe weYe no critical habitats mapped tivitl�in the pYoject site. The U.S.
Fish & Wildlife Service Official Species List can be seen in Exhibit C.
Natural Heritage Information Sy stem (NHIS) data for Sherburne CountyT has been obtained byT ISG
via a license agreement with the Minnesota DNR (L.A-1040). A review of the database identified 1
rare feature within the immediate vicinityT of the Project site that could have the potential to be
adversely affected by the pYoposed project This raYe feature was the Black Sanshell musseL The
Project site was located entirely within the mapped element occurrence of the Black Sandshell. Since
no `vork `vill be taking place within the banks of Trott Brook and erosion control BMPs `vill be
implanted during construction to prevent indirect impacts to the stream no adverse impacts to Black
Sandshell populations aYe anticipated to result from the PYoject
IdentilYed Fssh, Wlldlife, Plant Co�munstles, Rare Features, and Ecosyste�s
Existing plant communities will be affected by the change in land use. Approximately 148 acres of
wooded land will be cleared to allow for construction of the Project. Based on historic aerial
photographyT appro�matelyT 62 of those wooded acres used to be cultivated for agricultural
production through 2005, after which the land was left uncultivated and naturallyT developed into its
current state. It should be noted that manyT of the trees onsite are fallen, damaged, or in poor
condition.
AdditionallyT, an appro�mate 3.92 acres of unavoidable permanent �vetland impacts are anticipated
to occur as a Yesult of construction of the Project including the ghost plat areas. This includes the
following:
li�iu Pr�o"�ect G�ust Plats
??���_� �E�`;7i:�ia:`� `7� ??'kar.'i��'�i7J 7 — ;J � 7
�.Ir��i�r�t�c�a��� 1��cid�r�rc�� i��F�cr��fxs �+.5� G.GG
Since there aYe no critical habitats located within the Project site this change in land use should not
result in an�r negative effects to anyT threatened or endangered species.
Measures to prevent the spread of invasive species during construction include working in non-
infested areas first before moving to infested areas, thoroughlyT cleaning equipment after working in
infested aYeas and before mobilizing to a diffeYent poYtion of the project site or a diffeYent pYoject
and revegetating disturbed areas as soon as possible after construction is completed in an area.
Mlt�gation Measures
Unavoidable wetland impacts will be minimized to the greatest extent feasible, considering the site
constraints of each proposed wetland impact and surrounding area (such as special considerations
per MN Rules 8420.0515). It is estimated that the pYoject mayr result in up to appro�matelyr 3.92
acres of permanent `vetland impacts that will occur as a result of construction of the Project
including the ghost plat areas.
Wetland impacts were avoided to the extent possible during the preliminaryT design phase of the
overall site plan (Exhibit A). The final design will attempt to avoid and/or minimize impacts to the
extent possible. Should unavoidable impacts remain, the proper permitring processes will be
followed in accoYdance with the WCA and/oY Section 404 of the Clean WateY Act as applicable.
This process �vould involve appl�Ting for a replacement plan potentiall�T requiring compensator�T
mitigation. The aYea of wetland impact and jurisdictional status of the wetlands ��ill be deteYmined
byT the proper governmental agencyT during the permitting process follo`ving conclusion of the EAW
process.
An estimated 148 acYes of wooded land will be cleaYed to allow foY construction of the PYoject.
Based on historic aerial photography appro�matelyr 62 of those wooded acres used to be cultivated
for agricultural production through 2005, after which the land was left uncultivated and naturally
developed into its curYent state. It should be noted that many of the trees onsite are fallen, damaged,
or in poor condition. A tree preservation plan `vill be submitted to the CityT of Elk River for approval
prior to commencing construction.
2.4.1.6 Historic Properties
Information `vas requested and received from the ��innesota Historical SocienT State Historic
Preservation Office (SHPO). Upon conducring a search of the i��innesota Archaeological Inventor�T
and Historic Structures InventoryT, no previously known archaeological sites or historic
properties/structures were identified within the same sections or adjacent sections of the proposed
project The proposed project `vill have no direct or indirect adverse impacts to archaeological sites
or historical properties. SHPO also submitted written comments during the public comment period
stating there are no records of historical significance.
2.4.1.7 Visual
There is a large open water area that was formerlyT a pit resulting from past mining operations
present within the Project site. This water body is currently landlocked within private propertyT and is
not visible to the public from existing Rights-of-WayT. Development of the Project will avoid
impacting this area to the extent feasible and will provide scenic views of the water bodyT `vithin the
future neighborhood from roads, sidewalks, homes, and yTards.
The completed Project will not create any significant visual nuisances such as intense light pollution
or vapor plumes. Visual impacts `vill consist of nighttime lighting consisting of streetlamps and �Tard
lights ty-pical of residenrial development and required for public safenT reasons.
2.4.1.8 Air
Statlonary Source E�isssons
The Project is not anticipated to result in anyT temporaryT or permanent stationaryT sources of air
emissions. There are no e�sting permitted air facilities or sensitive receptors `vithin the vicinityT of
the pYoposed Project.
TTehicle Emissions
The pYoject will Yesult in an incYease to local traffic. This will Yesult in an incYease to local vehicle air
emissions. A number of recommended improvements to the public roadwayT net�vork have been
included within the Traffic Impact Analysis Report. Examples include adding dedicated turn lanes to
intersections and reevaluating posted speed limits to aid in traffic circulation and reduce stationaryT
idling times.
Dustand Odors
Dust common to construction and earth moving practices is expected (in the form of fugitive dust)
during periods of dryT `veather. Dust `vill be visuallyT monitored and recorded in conjunction `vith the
NPDES Construction StoYmwateY Permit inspections. AppYopriate dust control best management
practices (such as soil wetting, misting/water vapor, and hydraulic additives) mayT be implemented
(upon inspection or public complaint) byT the contractor as necessaryT to control dust from leaving
the Project site during all phases of construction. Specific dust control best management pYactices
will be determined based on severity-, weather conditions (i.e. wind speed), and current site
conditions.
Dust and odors caused from vehicles parked within drivewayTs and along streets will varyT depending
on the number and t�Tpes of vehicles activel�T moving in one area and current weather conditions.
Pollutants generated from vehicle exhausts may- concentrate and linger (possibl�r where vehicles
congregate) which mayT cause a short-term odor that eventuallyT dissipates.
2.4.1.9 Noise
E�sting noise in the PYoject aYea includes vehicle traffic fYom adjacent Yoads and noise generated
fYom the outdooY YecYeational facilityr to the south.
Sensitive receptors located within pro�mityT to the project site include adjacent residential homes.
Exterior noise while construction is taking place mayT range from 65-95 dBA. Post-construction
exterior noise is anticipated to be generated from inteYmittent traffic and recreational activities. All
exterioY noise is expected to be less than the State of Minnesota noise rules in a Yesidential land use
setting (<65 dBA daytime &<55 dBA nighttime).
NearbyT residential homes may experience a temporary increase in noise duration and frequency
during construction; however, these noises will be conducted during restricted hours. Post
construction noise `vill be tyTpical of surrounding residenrial areas and �vill not exceed the State of
iVlinnesota statutoryT limits for residential receptors (NAC 1), iVlinnesota Rules 7030.0040, therefore,
an�- noise anticipated from standard operations and construction activities `vill not result in a
decreased qualit�T of life.
2.1.1.10 Transportation
Currentlyr the site has no paYking stalls. Post construction theYe will be, including the ghost plats, 609
housing units which will all have garages and drivewa�Ts for parking. Additionally, street parking will
be available across much of the Project site. A detailed breakdown of site parking is available in the
Parking StudyT included in Exhibit F—Parking Study.
A detailed breakdown of site traffic is available in the Traffic Impact Analysis Report is included in
the EAW. The pYoject is estimated to geneYate 441 trips at peak hour traffic on �ueekda�r mornings
(7:00 AM to 8:00 AlV� and 548 trips at peak hour on weekdayT afternoons (3:00 PM to 4:00 PiVI).
Estimates weYe generated utilizing the ITE Trip GeneYation Manual (11 th Edition).
The project `vill result in an increase to local traffic. A number of recommended improvements to
the public roadwa�T net�vork have been included `vithin the Traffic Impact Anal�Tsis Report.
Examples include adding dedicated turn lanes to intersections and Yeevaluating posted speed limits.
Alternative methods of transportation include public transportation. The MetroTransit Elk River
station is located approximately two miles south of the project site. Additionally, abundant sidewalks
and bike trails are located throughout the City of Elk River.
2.4.2 Cumulative Potential Effects of Related or Anticipated Future Projects
Cumulative effects result from the incremental impact of the pYoposed project when added to otheY
past, present, and reasonablyT foreseeable future actions, regardless of �vhat agency or person
undertakes such other action. Anal`Tsis of cumulative effects are summarized below.
Site preparation work is anticipated to begin as soon as the Fall of 2022. Site construction will take
place over the course of four phases �vhich may last up to multiple �Tears dependent upon market
conditions. Construction activities will include tree removals, site earthwork, utilityT installarion, and
the construction of housing units, roads, walks/trails, and storm`vater ponds.
It is estimated that the project mayr result in up to appro�mately 3.92 acres of permanent wetland
impacts that will occur as a result of construction of the Project including the ghost plat areas. This
includes the follo`ving:
liaiu Pr�a"�ect �G�ost Pl:�ts
??��.;� �: t?Fi:lia�:'_7� :T�Eatt,ia77[7:; } �r � 7
�Ir��ir��t'c���c� 1a�ciciera�r� �t'���cr.Ra�ts �.,5� G.G+�
Wetland impacts were avoided to the extent possible during the preliminaryT design phase of the
overall site plan (Exhibit A). The final design will attempt to avoid and/or minimize impacts to the
extent possible. Should unavoidable impacts remain, the proper permitting processes will be
followed in accordance with the WCA and/or Section 404 of the Clean Water Act as applicable.
This process �vould involve applyTing for a replacement plan potentiallyT requiring compensatoryT
mitigation. The area of wetland impact and jurisdictional status of the wetlands will be deteYmined
byT the proper governmental agency during the permitting process follo`ving conclusion of the
environmental revie�v process.
An estimated 148 acYes of wooded land will be cleaYed to allow foY construction of the PYoject.
Based on historic aerial photography appro�matelyr 62 of those wooded acres used to be cultivated
for agricultural production through 2005, after which the land `vas left uncultivated and naturallyT
developed into its current state. It should be noted that many of the trees onsite aYe fallen, damaged,
or in poor condition. A tree preservation plan will be submitted to the CityT of Elk River for approval
prior to commencing construct�on.
Reasonably Foreseeable Future Pro�ects
Reasonably foYeseeable futuYe projects that mayr inteYact with environmental effects of the pYoposed
Project potentially include adjacent residential developments. The CityT of Elk River Comprehensive
Plan pYojects the cityr to experience consistent population growth through the yeaY of 2035. The
growing popularion will Yesult in an increased need for housing. Properties adjacent to the PYoject
site aYe curYently zoned foY single-famil�r Yesidential use and as a Yesult will likely be looked at as
potential sites for development. Due to the lengths of planning and design anyT adjacent
developments likelywill not occur during the same timeframe as the construcrion of the PYoject.
Following construction, the Project is not anticipated to contribute to any additional environmental
effects resulting in cumulative potential effects. TheYefoYe, the PYoject is not anticipated to
contribute to anyT significant environmental effects due to cumulative effects.
In addition to the potential environmental impacts addressed byr items 1 to 18, the economic and
sociological impacts of the pYoject were consideYed. The economic and social impacts of the pYoject
on the local communityT are anticipated to be beneficial by bringing additional housing opportunities
and propertyT/sales tax income following construction.
2.4.3 Extent to which the Environmental Effects are Subject to Mitigation by
Ongoing Public Regulatory Authority
The mitigation of environmental impacts `vill be designed and implemented in coordination with
regulatory agencies and will be subject to the plan approval and permitting process. Permits and
approvals that have been obtained or may be required prior to project construction are outlined
below:
Cnit of n��erame�t T� � Of 8 L1fiRC1L�R �t�t�u�
�,�iJi�:2'.�L7:.;' r�L�i�.i[7�� �'�JiTI'v7! �_r�i.J �O:iSTF'21: R��i
�c+.t}E .SP�wPrPi �'z:d
_3ae�ati� �_'�1FC'_�, Sic7r��t:�e'7.��' rer�rPi.
Ti�z�draradCa��st.fi-e�r�;ion�ict- :5iab�a��tterfr��ri�vpa•�k�ecP
�T'e�d�rri r� L��2i.v��n 7aa i
T� e�2r�r�rl C'orrsG�,�ra�iorr .3: � -
1 o he Su��r�ir�`�
C7:-k� a€'�{:w r�'ik°er� 2T'et�:a7ir�1'�� �a�t.�*aerr� a�r��i
. . F2a��'t�frrrn :°a�a�+ai� 1� he Sr,w�MiYtr� (r�'daeu�'�.dl
,�a�ifd�.�r —r'�esic��.xa�aa{ 1c� be Src�Prrr��.r�
Sewa�- rra�� 2Ter,er� �o �e Su&f�rr�ed
�f�na�esotra
D�y�rr�•rxra�ri��i Ti',�t��.-�,�r�opaza7orrs �o �e .SRr,�Prrr;�� /r;f`Faet.r���l
:ti:r*����rrd R�;aar�°��s
f 3:i''r�L7 �,'R,a
2.4.4 Extent to which Environmental Effects can be Anticipated and Controlled as
a Result of Other Environmental Studies
The CityT of Elk River has previous single-famil�r and mixed residential development experience, and
similar projects have been designed and constructed within the communityT. The closes similar
projecting immediately abuts the project on the north boundaryT. Design and construcrion staff are
familiar with the project area. No problems are anticipated in `vhich staff has not encountered and
successfull�r solved previouslyr in similaY projects in oY neaY the pYoject aYea. The cityr finds that the
environmental effects of the project can be anticipated and controlled as a result of environmental
review and experience on similar projects.
3. Conclusions
1. All requirements for environmental xeview of the proposed project have been met.
2. The EAW and the pernut development processes related to the pxoject have generated
informati.on that is adequate to deterxnine whether the project has the potential for
significant environmental effects.
3. Axeas wheYe potential environmental effects have been identified will be addressed during
the final design of the project. Mirigarion will be provided where impacts axe expected to
result from project construction, opexation, or maintenance. Mitigation measures are
incorpoxated into project design and have been or will be coordinated with state and fedeYal
agencies during the permit process
4. Based on the critexia in Minnesota Rules, part 4410.1700, the project does not have the
potential for significant environmental effects.
5. An Environmental Impact Statement is not required for the proposed pxoject.
Fox the City of Elk Rivex
-�
.�
., � -�
ack Carlton
Community Development Dixector
/���-c-� � �, ��� �
Date y
Appendix A: Responses to Substantive Comments
FEBRUARY 15, 2023
RE: RESPONSE TO COMMENTS RECEIVED DURING ENVIRONMENTAL ASSESSMENT WORKSHEET PUBLIC
COMMENT PERIOD FOR THE FOSTER PROPERTY - ELK RIVER
The Environmental Assessment Worksheet (EAW) for the Foster Property development in Elk River was published and released
for public review on Tuesday, December 13, 2022. The 30-day public comment period closed on Thursday, January 13, 2023.
Acknowledgements of the EAW were received by four agencies. Three of which contained no formal comments to address.
These were from the U.S. Army Corps of Engineers (USACE), Minnesota Department of Transportation (MnDOT), and the
Minnesota State Historic Preservation Office (SHPO). Copies of the written acknowledgments are attached for reference.
The Minnesota Department of Natural Resources (DNR) submitted a plan review letter dated January 12, 2023 in response to
the EAW. A copy of the letter is attached for reference. Please note that each review item is restated below along with our
corresponding response.
1. Page 5, Zoning. It is not clear from the EAW if the subdivision does comply with R1D zoning. This section says the site is,
"zoned as R1D Single Family Residential. The Plan defines the purpose of R1D districts as follows: `This district is intended to
accommodate single-family residential dwellings with large lots and higher quality housing within the municipal sewer and water
access area. This district is explicitly for areas that possess significant natural features and is intended to encourage the design
of subdivisions that protect these natural features."'
Based on this zoning description and intent to protect natural features, the destruction of nearly 148 acres of forest, along with
nearly four acres of wetland impacts does not seem consistent with this intent. It is unclear if the site will be mass graded in
such a way that removes nearly all existing natural features from individual lots. It is also unclear what attempts at tree
preservation will be made, such as conducting a tree inventory and identifying high quality resources to preserve during the
development process, and/or offsetting tree destruction through compensatory tree planting/restoration efforts.
Response: The project site is located within a residentially zoned district. While the R-1D district does "encourage" the
protection of natural features it is ultimately intended for residential development, not solely land conservation.
The project both meets the city's requirements for site densities and includes natural feature protection as part of the
project. Within the 253-acre site, approximately 134 acres of land will remain in a natural state within outlots following
construction. This includes over 67 acres of wetland, including an area of over 42 contiguous acres. Planting of new
trees across the site will offset the tree removals required to construct the project infrastructure. A planting plan has
been developed in compliance with the City of Elk River's City Code (Sec. 30-934) which includes the planting of 1,575
new trees. It should be noted that much of the project site has previously been disturbed by mining and row crop
production and many of the young trees onsite consist of non-desirable species. Additionally, a significant amount of
the mature trees on-site are either rotted or have fallen as well.
2. Page 5, Zoning. It appears that portions of the proposed development will be located within 300 feet of Trott Brook, a public
water. It is unclear how the project will comply with local shoreland ordinances regarding setbacks, impervious surFaces, and
vegetation removal.
Response: Within the City of Elk River's City Code (Sec. 30-2042), Planned Unit Development (PUD) is a permissible
type of development within shoreland districts. All housing units that fall within the shoreland district will abide by the
required setback of 50' from rivers for sewered structures (Sec. 30-2022) and any other applicable requirements.
7900 International Drive + Suite 550 + Bloomington, MN 55425
952.426.0699 + ISGlnc.com
Architecture + Engineering + Environmental + Planning
3. Page 10, Stormwater. Blanding's turtles, a protected state-listed threatened species, have been documented within the
vicinity of the project. Stormwater features may be colonized by Blanding's turtles in the area, therefore we recommend
incorporating measures to avoid impacting this species into stormwater management. In years when the stormwater features
will be dredged to remove excess sediment, please draw down water levels by September 15th in order to allow turtles to find
overwintering habitat elsewhere.
Response: The City will ultimately be responsible for management of the stormwater features in the future and will
make every attempt to draw down water levels by September 15t" when feasible during years when stormwater
features will be dredged.
4. Page 10, Stormwater. We recommend that BWSR-approved, weed-free, native seed mixes be used to the greatest degree
possible in stormwater features and development landscaping in order to provide pollinator habitat. Native plants also require
less irrigation and soil inputs than traditional landscaping.
Response: Seeding of stormwater features will consist of a combination of BWSR approved MnDOT seed mixes as well
as ISG custom designed seed mixes, both of which are weed-free native seed mixes. Seed mixes were
chosen/designed on a feature-to-feature basis based on soils and planned hydrology for each stormwater feature. The
specified MnDOT seed mixes match typical hydrological conditions for stormwater features. The ISG custom designed
seed mixes are created by Plant Ecologists and utilize native species that are sand specialists or able to handle
extreme hydrology events. All stormwater features will serve as pollinator habitat. Additionally, pollinator friendly
habitat is also planned as part of the project in and around the trail system and other open spaces within the
development.
5. Page 10, Stormwater. The significant increase in impervious surFaces will also increase the amount of road salt used in the
project area. Chloride released into local lakes and streams does not break down, and instead accumulates in the environment,
potentially reaching levels that are toxic to aquatic wildlife and plants. Consider promoting local business and city participation
in the Smart Salting Training offered through the Minnesota Pollution Control Agency. There are a variety of classes available for
road applicators, sidewalk applicators, and properry managers. More information and resources can be found at this website.
Many winter maintenance staff who have attended the Smart Salting training — both from cities and counties and from private
companies — have used their knowledge to reduce salt use and save money for their organizations.
We encourage local governments to request that project proposers who wish to significantly increase impervious surFaces
develop a chloride management plan that outlines what BMP's and strategies will be used to reduce chloride use within the
project area, and then tie that plan to City 0&M agreements. We also encourage cities and counties to consider how they may
participate in the Statewide Chloride Management Plan and provide public outreach to reduce the overuse of chloride. Here are
some educational resources for residents as well as a sample ordinance regarding chloride use.
Response: The City Trains plow drivers to the standards outlined in the Statewide Chloride Management Plan. The city
also has their own chloride management plan and closely monitors the amount of salt applied during a storm event.
6. Page 15, Rare Features. This section should describe common wildlife that utilizes the project area.
Response: According to the Ecological Classification System (ECS) adopted by the DNR, the project site is located
within the Anoka Sandplain subsection. The ECS Subsection Profile for the Anoka Sand Plain lists well-known species
within the subsections as sandhill cranes, trumpeter swans, bald eagles, bobolinks, and lark sparrows.
Page 2 of 4
952.426.0699 + ISGlnc.com
7. Page 15, Rare Features. If rare features are identified within one mile of a project area using a license agreement, then a
concurrence and next steps from DNR must be obtained by coordinating through Minnesota Conservation Explorer. Only DNR
can make a determination on whether or not a project is likely to impact a state-listed species.
Response: A Natural Heritage Review request has been submitted for the project through the Minnesota Conservation
Explorer. The project is currently "In Queue" for further review. Attached is a copy of the Formal Natural Heritage
Review - Cover Page.
8. Page 15, Rare Features. Recently U.S. Fish and Wildlife Service made the decision to up-list the northern long-eared bat
(NLEB) from the status of federally threatened to federally endangered. This new status goes into effect January 30th, 2023.
This follows precipitous declines of more than 90% since the species federal listing as threatened in 2015. NLEB are known to
occur in Sherburne County and throughout Minnesota. Tree removal is an activity that could negatively impact this species,
therefore it is important that the project proposer coordinates with USFWS regarding potential impacts to the NLEB, and follows
the instructions for consultation provided within the appendix. Please see the USFWS website for more information: Northern
Long-eared Bat (Myotis septentrionalis) � U.S. Fish & Wildlife Service (fws.gov)
Response: The determination key for NLEB Consultation and 4(d) Rule Consistency was completed for the project
using the USFWS IPaC system. An otficial Consistency Letter for the project was issued stating "this letter verifies that
the Action is not likely to result in unauthorized take of the northern long-eared bat."A copy of this letter is attached.
The project site is not located within a 0.25-mile radius of a known northern long-eared bat hibernacula, doesn't
include any known occupied maternity roost trees, and isn't within a 150-foot (45-meter) radius from any known
maternity trees. Therefore, the project is not subject to tree removal timeline restrictions.
9. Page 15, Rare Features. Blanding's turtles (Emydoidea blandingii), a state-listed threatened species, have been documented
in the vicinity of the proposed project. Blanding's turtles use upland areas up to and over a mile distant from wetlands,
waterbodies, and watercourses. Uplands are used for nesting, basking, periods of dormancy, and traveling between wetlands.
Factors believed to contribute to the decline of this species include collisions with vehicles, wetland drainage and degradation,
and the development of upland habitat. Any added mortality can be detrimental to populations of Blanding's turtles, as these
turtles have a low reproduction rate that depends upon a high survival rate to maintain population levels. This project does have
the potential to impact this rare turtle through direct fatalities and habitat disturbance/destruction due to excavation, fill, and
other construction activities associated with the project.
Minnesota's Endangered Species Statute (Minnesota Statutes, section 84.0895) and associated Rules (Minnesota Rules, part
6212.1800 to 62122300 and 6134) prohibit the take of threatened or endangered species without a permit. As such, the
following avoidance measures are required:
• Avoid aquatic impacts during hibernation season, between October 15th and April 15th, unless the area is unsuitable
for hibernation.
• The use of erosion control blanket shall be limited to `bio-netting' or `natural-netting' types, and specifically not
products containing plastic mesh netting or other plastic components. Please update project plans so that this
information is given to contractors.
o Also, be aware that hydro-mulch products may contain small synthetic (plastic) fibers to aid in their matrix
strength. These loose fibers could potentially re-suspend and make their way into Public Waters. As such,
please review mulch products and not allow any materials with synthetic (plastic) fiber additives in areas that
drain to Public Waters.
Page 3 of 4
952.426.0699 + ISGlnc.com
• Areas where there will be construction, especially aquatic areas, should be checked for turtles before the use of heavy
equipment or any ground disturbance.
o The Blanding's turtle flyer must be given to all contractors working in the area.
o Monitor for turtles during construction and report any sightings to the DNR Nongame Specialist, Erica
Hoaglund at 651-259-5772 or Erica.Hoaglund@state.mn.us.
o If turtles are in imminent danger they must be moved by hand out of harm's way, otherwise, they are to be left
undisturbed.
If the above avoidance measures are not possible, please contact NHIS.Review@state.mn.us as further action may be needed.
For additional information, see the Blanding's turtle fact sheet, which describes the habitat use and life history of this species.
The fact sheet also provides two lists of recommendations for avoiding and minimizing impacts to this rare turtle. Please refer to
both lists of recommendations and apply those that are relevant to your project. For further assistance regarding the Blanding's
turtle, please contactthe DNR Regional Nongame Specialist, Erica Hoaglund.
Response: The avoidance measures listed above will be included within the construction specifications for the project
in order to educate contractors in an attempt to minimize any potential impacts on protected species. It should be
noted that all pond outlets that are a part of the project were designed to the state standard for aquatic organism
passage and that the wetland preservation within outlets will provide habitat onsite.
10. Page 16, Rare Features. The project plans to destroy 148 acres of contiguous forested habitat. The EAW states multiple
times that 62 acres of the forested area has only established since 2005, and that fallen or dead trees are present indicating
that the forested habitat is of poor quality. Please be aware that fallen or dead trees as well as relatively recent forest
established within the past 20 years all provide significant wildlife habitat to many species. This level of tree removal would be a
huge impact to wildlife in the area. Minnesota has lost much of the deciduous forests that used to present within the region to
development, which makes retaining forest, even the small and isolated remnants on the landscape, especially important for
wildlife habitat, clean water, and for the recreation/aesthetic values to the residents of the development. Therefore, we
recommend minimizing the amount of tree removal to the greatest extent possible and not conducting tree and shrub removal
during key nesting periods from April through July.
Response: Tree removal will be avoided to the extent feasible during the key nesting period of April through July. As
stated previously, approximately 134 acres of land within the 253-acres site will remain in a natural state within outlots
following construction. Planting of new trees across the site will otfset the tree removals required to construct the
project infrastructure. A planting plan has been developed in compliance with the City of Elk River's City Code (Sec. 30-
934) which includes the planting of 1,575 new trees. It should be noted that much of the project site has previously
been disturbed by mining and row crop production and a many of the young trees onsite consist of non-desirable
species. A significant amount of the mature trees on-site are either rotted or have fallen as well.
Page 4 of 4
952.426.0699 + ISGlnc.com
� Architecture + Engineering + Environmental + Planning
Foster Property Development
MCE #: 2023-00035
Page 1 of 4
�C�E �l�RT�EhIT �F
�1�1T�F��L ��5���'�E�
Formal Natural Heritage Review - Cover Page
See next page for results of review. A draft watermark means the project details
have not been finalized and the results are not official.
Project Name: Foster Property Development
Project Proposer: US Home, LLC
Project Type: Development, Residential
Project Type Activities: Tree Removal;Wetland impacts (e.g., discharge, runoff, sedimentation, fill,
excavation)
TRS: T33 R26 S35, T33 R26 S36
County(s): Sherburne
DNR Admin Region(s): Central
Reason Requested: State EAW
Project Description: US Home, LLC is proposing construction of a residential development located at in
the City of Elk River, Sherburne County, Minnesota. The project will ...
Existing Land Uses: Existing land use of the site consists primarily of wooded upland and wetland areas
with some areas of grassland.
Landcover / Habitat Impacted: The landcover/habitat type that will be impacted is predominantly consisted
of wooded land. Areas of wetland will be impacted as well.
Waterbodies Affected: Waterbodies that will be impacted consist entirely of wetland areas. Impacts will
consist of areas of fill.
Groundwater Resources Affected: Water for the project will be sourced from the City of Elk River's
existing public water supply system (PWS #1710004). Construction of new watermains ...
Previous Natural Heritage Review: No
Previous Habitat Assessments / Surveys: No
SUMMARY OF AUTOMATED RESULTS
Category Results Response By Category
Project Details No Comments No Further Review Required
Ecologically Significant Area Comments Local Conservation Value - Comment
State-Listed Endangered or Needs Further State-protected Species in Vicinity
Threatened Species Review
State-Listed Species of Special Comments Recommendations
Concern
Federally Listed Species No Records Visit IPaC For Federal Review
1/16/2023 04:18 PM
Foster Property Development
MCE #: 2023-00035
Page 2 of 4
�C�E �l�RT�E�IT �F
�I�T���L �E����'�E�
January 16, 2023
Project Name: Foster Property Development
Project Proposer: US Home, LLC
Project Type: Development, Residential
Project ID: MCE #2023-00035
AUTOMATED RESULTS: FURTHER REVIEW IS NEEDED
As requested, the above project has undergone an automated review for potential impacts to rare features.
Based on this review, one or more rare features may be impacted by the proposed project and further
review by the Natural Heritage Review Team is needed. You will receive a separate notification email when
the review process is complete and the Natural Heritage Review letter has been posted.
Please refer to the table on the cover page of this report for a summary of potential impacts to rare features.
For additional information or planning purposes, use the Explore Page in Minnesota Conservation Explorer
to view the potentially impacted rare features or to create a Conservation Planning Report for the proposed
project.
If you have additional information to help resolve the potential impacts listed in the summary results, please
attach related project documentation in the Edit Details tab of the Project page. Relevant information
includes, but is not limited to, additional project details, completed habitat assessments, or survey results.
This additional information will be considered during the project review.
1/16/2023 04:18 PM
Foster Property Development
MCE #: 2023-00035
Page 3 of 4
u
Foster Propert� Develapment
Aerial Imagery �th Locatar Map
`� � _.... . � � tli ' 1, • . .
s 7
, °Y p r �i
( Eri f� - . t •. . r � _���-��r _
. .l'" _ �r# � r � � �� �� f �r � ' ��, . � '
�r.� ���T.`,���'��~�� ..� jj��-
��}�' . �� -..� `' t.:�' i
t� . „ � � iV l
��� - . . $. � � , y � i`.,�1
..,�. �
.'�, _c .j���� '�
ls''�.3 � . I r � � � i �,�„ ; �
y,��
p.;�����,�'�-, 1� .��_ , �s� ` � rya.11- �
�,, t �, }� � It ��� �Y
�. t, � 4 � - �, ■ .. � -... '^"'.r7 d
�r'.��� i� � � �:� � �. . j
'� � f' ��
�� '�,�'--��,� ,�*� _ • �
��' J � � - '1; f� N.�,� , _ � + �/ 4 -,� "� ` i' � `._ �� �'�
�) [� is.4 ���y �, - r.� . . � ,� !�
� ^ ��� ��1� _i3; ' . .� � s • � • 1� r • .
r L'[7 " " :..�.+� , • , ' j .
j'�� �'� �� i .� � ',' � �" ' •e;
,::
f �r��� � . '�� . . � �, .�JF � r , �
., i . �r 'N�, i.a � . . y
� '� � � � f . � _ �^ �-��k . � • +�.,�°�� �
�0 �� `i. :� ,w ° • 1 ` ` , �w
i- .a. y, �jw y• , �I ` ` ����x� ' Q� . . ^. i! } � 9i
��j '�'�'i' r ' : � r (I v '.j'� fi { • . C4 � � J =� � .
tr �� r „ �J X d � !+ r' � �+ ' . � . .
s �'y` ! ' ! , € y < �•' ��+ ,�, �+�y� 1-I
- .� y � ?.. '� ° . .�`� k � �• � {� ����!.�f
.� � �M` ` � �,�f�i� � ,'� *i + , ,,��"a?. ,f , . �, 1 , 1-
�`��;� s �9r �, ,t♦ .�r a �s i �+�..' �.-� ...1
C P: 4 �. r � .' �- �
:�'�,�, . 3�� "�� ��!���� �. ;< � ° � �'. �? . i �r a!� � ►� c
�:�` � �� ' � � `��Y � � , ��. • ,w,,,. °� � � ,� � ,�� � - _ , �
� � ` 't flC?'d�3� _ . , � �' f f� ',�, , � , �. ' �' �. 1.
. '
,: . _ . .
, .
� �� ^ '. T �; # � ,�'1' , x '; v 5.{T� r "�, • �� � �� '... r I
� �. � : � � !�•. y �t � � � � .:
�r?@ � „ f �� •'• ����� � ,9r��� - �� (~� x �' .. 4�`R q�, �,` ,��,d�� �h,,
l , � W ^ 4 Y� P w. � M1. � .A� ��� . ��. ,� ,�� � ��i� y f �r� �"," +' � �M1 �..�1 } - � L }�! � .� � _ ��. r.,�L�Of`Y
i , ��I I �� � � 4 = • ' � r � . f . �i� i���� .l . , �.t�,'. � _
� .
r � � �
� � �. - - _ .� ..
, , � , ..
.�, � ��, � . . *: ��. ; , �: . �',r�►�,� � f���.�,�� � �.:
, _
� ��i } 'n; � ` 4 r�' ' �' ���A �y � � ��_ ` v t � �
.
� . ,
. •
��. . r
� ,� •
�
� ' � � �
<< � R, . .r . � . � . � :.�„�,t��. . ' � ..� �'.1 , ��., ' -
� � . � .�'' . ` ; ` ; `.'�"" :�` '�
� �' • , �' .� ��r .`� t ,,��" ,
. �� � ` .� a � ��,
` �.. � � . �
; ' � �` , . ,�. . �,�--,,. J
> � ;.r« � ���1' _ �"'�` ,�' � '�._�, `' �
1�' `� �t'�:e`� • � ,` �� � • -,• `�� �+ � t� R+` � rc•
�
,,N .. .� E
S
� Project Baundary
' ,a. ��•
�} Cl.1J fl.3 {).Ei {}.9 1.�
N9iles
Proj�ct Type: Development, Residential
Project 5ize (acres)� 267_93
Counly(s}: 5herburne
TRS: T33 R26 535, T33 R26 S36
Sherl�umF (]nun#ylv1l-! GIS, f4�lax�3r
Esri, HERE c;��riliin, FAt=�: Id��r�,. USGS EPA
A�1etrupcdit�n G'ounci1, fv1etroGl4, Esri, HE�E, [;armin, SareGr�aph.
.i- �T' - = l` ���".erwv- �
!'t7innesota
� Minneapolis
0
1/16/2023 04:18 PM
Foster Property Development
MCE #: 2023-00035
Page 4 of 4
Foster Property Devela�ment
U5A Topo Basemap With Lacatar ap
„�z�� rr -
� � ,.
_ _=t
13
13
�Lakes Road Northwes�
_.ir.I-i i��t��._d
. I .i . .i .n• '�., l�.- _Sr.
�169y
:..i'�.;:.,:....:� C:i'�.Y
P�ii'.:.
�.
�
_ m
in
�
0
.f�� � 'fj 4
�
975th Awenue Northwest
?1��
�
3
�
`o
Z
�
�
h
y
0
�
i
i
� 9�zh
I •
I
I
I
I
i
I
I
I
I
I
�
�
I
f
I
I
I�
�a
I
N (} C7.15 fl.3 fl.6 0.9 1.�
,� ..._ ��`E N9iles
�
S
� Project Baundary
Proj�ct Type: Development, Residential
Project 5ize (acres)� 267_93
Counly(s}: 5herburne
TRS: T33 R26 535, T33 R26 S36
i.sn, rinsn: rica, ��scss € €:�::va
Esri, HERE G��riliin, F,40: fd��P�,, USGS EPA
1v1etrupcdit�n G'ounci1, fv1etroGl�., Esri, HE�E, [;armin, SareGr�aph.
`` �
i,,. ,�:.
1
!'t7innesota
� Minneapolis
0
1/16/2023 04:18 PM
�,j�y "�
��
_{.
. ._�
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Minnesota-Wisconsin Ecological Services Field Office
3815 American Blvd East
Bloomington, MN 55425-1659
Phone: (952) 858-0793 Fax: (952) 646-2873
In Reply Refer To:
Project code: 2022-0016504
Project Name: Foster Property
� ..�.
rt:�a r w ��� ��.irfi:
.%7'lk�'fl'fi
��
t
January 16, 2023
Subject: Consistency letter for the 'Foster Property' project indicating that any take of the
northern long-eared bat that may occur as a result of the Action is not prohibited
under the ESA Section 4(d) rule adopted for this species at 50 CFR §17.40(0).
Dear Jeremy Groskreutz:
The U.S. Fish and Wildlife Service (Service) received on January 16, 2023 your effects
determination for the 'Foster Property' (the Action) using the northern long-eared bat (Myotis
septentrionalis) key within the Information for Planning and Consultation (IPaC) system. You
indicated that no Federal agencies are involved in funding or authorizing this Action. This IPaC
key assists users in determining whether a non-Federal action may cause "take"� of the northern
long-eared bat that is prohibited under the Endangered Species Act of 1973 (ESA) (87 Stat.884,
as amended; 16 U.S.C. 1531 et seq.).
Based upon your IPaC submission, any take of the northern long-eared bat that may occur as a
result of the Action is not prohibited under the ESA Section 4(d) rule adopted for this species at
50 CFR §17.40(0). Unless the Service advises you within 30 days of the date of this letter that
your IPaC-assisted determination was incorrect, this letter verifies that the Action is not likely to
result in unauthorized take of the northern long-eared bat.
Additionally, please note that on March 23, 2022, the Service published a proposal to reclassify
the northern long-eared bat (NLEB) as endangered under the Endangered Species Act. The U.S.
District Court for the District of Columbia has ordered the Service to complete a new final listing
determination for the NLEB by November 2022 (Case 1:15-cv-00477, March l, 2021). The bat,
currently listed as threatened, faces extinction due to the range-wide impacts of white-nose
syndrome (WNS), a deadly fungal disease affecting cave-dwelling bats across the continent. The
proposed reclassification, if finalized, would remove the current 4(d) rule for the NLEB, as these
rules may be applied only to threatened species. Depending on the type of effects a project has on
NLEB, the change in the species' status may trigger the need to re-initiate consultation for any
actions that are not completed and for which the Federal action agency retains discretion once the
new listing determination becomes effective (anticipated to occur by December 30, 2022). If
your project may result in incidental take of NLEB after the new listing goes into effect this will
01/16/2023
first need to be addressed in an updated consultation that includes an Incidental Take Statement.
If your project may require re-initiation of consultation, please contact our office for additional
guidance.
Please report to our office any changes to the information about the Action that you entered into
IPaC, the results of any bat surveys conducted in the Action area, and any dead, injured, or sick
northern long-eared bats that are found during Action implementation.
If your Action proceeds as described and no additional information about the Action's effects on
species protected under the ESA becomes available, no further coordination with the Service is
required with respect to the northern long-eared bat.
The IPaC-assisted determination for the northern long-eared bat does not apply to the following
ESA-protected species that also may occur in your Action area:
• Monarch Butterfly Danaus plexippus Candidate
• Tricolored Bat Perimyotis sub flavus Proposed Endangered
You may coordinate with our Office to determine whether the Action may cause prohibited take
of the animal species listed above.
[1]Take means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to
attempt to engage in any such conduct [ESA Section 3(19)].
01/16/2023
Action Description
You provided to IPaC the following name and description for the subject Action.
1. Name
Foster Property
2. Description
The following description was provided for the project'Foster Property':
New housing development.
Approximate location of the project can be viewed in Google Maps: https://www.google.com/
maps/(c�45.305281949999994,-93.52499179120149,14z
�,�
=gF.
�y.�{�
���h
hba5a�.
::r.4+ d f
4r
F '.
Tratt
R�r,rsk
f 4�
F'orki .
�'�a.
L! f�
:_ f
_,�
��
I �
�
I
I
I
I I
� 1!!1sIA.r.h�Mr '���
., w � I
� 1i4�.c� �
±� S nM�� Finf�:s �F kp
,v�� rr.v6�- �
Determination Key Result
This non-Federal Action may affect the northern long-eared bat; however, any take of this
species that may occur incidental to this Action is not prohibited under the final 4(d) rule at 50
CFR § 17.40(0).
3
Determination Key Description: Northern Long-eared Bat 4(d) Rule
This key was last updated in IPaC on May 15, 2017. Keys are subject to periodic revision.
This key is intended for actions that may affect the threatened northern long-eared bat.
The purpose of the key for non-Federal actions is to assist determinations as to whether proposed
actions are excepted from take prohibitions under the northern long-eared bat 4(d) rule.
If a non-Federal action may cause prohibited take of northern long-eared bats or other ESA-listed
animal species, we recommend that you coordinate with the Service.
01/16/2023
Determination Key Result
Based upon your IPaC submission, any take of the northern long-eared bat that may occur as a
result of the Action is not prohibited under the ESA Section 4(d) rule adopted for this species at
50 CFR § 17.40(0).
Qualification Interview
l. Is the action authorized, funded, or being carried out by a Federal agency?
No
2. Will your activity purposefully Take northern long-eared bats?
No
3. [Semantic] Is the project action area located wholly outside the White-nose Syndrome
Zone?
Automatically answered
No
4. Have you contacted the appropriate agency to determine if your project is near a known
hibernaculum or maternity roost tree?
0
Location information for northern long-eared bat hibernacula is generally kept in state
Natural Heritage Inventory databases — the availability of this data varies state-by-state.
Many states provide online access to their data, either directly by providing maps or by
providing the opportunity to make a data request. In some cases, to protect those resources,
access to the information may be limited. A web page with links to state Natural Heritage
Inventory databases and other sources of information on the locations of northern long-
eared bat roost trees and hibernacula is available at www.fws.gov/media/nleb-roost-tree-
and-hibernacula-state-specific-data-links-0.
Yes
Will the action affect a cave or mine where northern long-eared bats are known to
hibernate (i.e., hibernaculum) or could it alter the entrance or the environment (physical or
other alteration) of a hibernaculum?
No
6. Will the action involve Tree Removal?
Yes
7. Will the action only remove hazardous trees for the protection of human life or property?
No
8. Will the action remove trees within 0.25 miles of a known northern long-eared bat
hibernaculum at any time of year?
No
01/16/2023
9. Will the action remove a known occupied northern long-eared bat maternity roost tree or
any trees within 150 feet of a known occupied maternity roost tree from June 1 through
July 31?
No
01/16/'L023
Project Questionnaire
If the project includes forest conversion, report the appropriate acreages below.
Otherwise, type `0' in questions 1-3.
l. Estimated total acres of forest conversion:
148
2. If known, estimated acres of forest conversion from April 1 to October 31
0
3. If known, estimated acres of forest conversion from June 1 to July 31
0
If the project includes timber harvest, report the appropriate acreages below.
Otherwise, type `0' in questions 4-6.
4. Estimated total acres of timber harvest
0
5. If known, estimated acres of timber harvest from April 1 to October 31
0
6. If known, estimated acres of timber harvest from June 1 to July 31
0
If the project includes prescribed fire, report the appropriate acreages below.
Otherwise, type `0' in questions 7-9.
7. Estimated total acres of prescribed fire
0
8. If known, estimated acres of prescribed fire from April 1 to October 31
0
9. If known, estimated acres of prescribed fire from June 1 to July 31
0
If the project includes new wind turbines, report the megawatts of wind capacity
below. Otherwise, type `0' in question 10.
10. What is the estimated wind capacity (in megawatts) of the new turbine(s)?
0
01/16/'L023
IPaC User Contact Information
Agency: ISG
Name: Jeremy Groskreutz
Address: 115 East Hickory Street, Suite 300
City:
State:
Zip:
Email
Phone:
Mankato
MN
56001
j eremy. groskreutz@isginc. com
5073876651
Appendix B: Original Comments
�DEPARTMENT OF
NATURAL RESOURCES
Division of Ecological and Water Resources
Region 3 Headquarters
1200 Warner Road
Saint Paul, MN 55106
January 12, 2023
Zachary Carlton, Planning Director
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
Dear Zachary Carlton,
Transmitted by Email
Thank you for the opportunity to review The Foster Property Development Environmental Assessment
Worksheet (EAW) in Sherburne County. The DNR respectfully submits the following comments for your
consideration:
1. Page 5, Zoning. It is not clear from the EAW if the subdivision does comply with R1D zoning.
This section says the site is, "zoned as R1D Single Family Residential. The Plan defines the
purpose of R1D districts as follows: 'This district is intended to accommodate single-family
residential dwellings with large lots and higher quality housing within the municipal sewer and
water access area. This district is explicitly for areas that possess significant natural features and
is intended to encourage the design of subdivisions that protect these natural features."'
Based on this zoning description and intent to protect natural features, the destruction of
nearly 148 acres of forest, along with nearly four acres of wetland impacts does not seem
consistent with this intent. It is unclear if the site will be mass graded in such a way that
removes nearly all existing natural features from individual lots. It is also unclear what attempts
at tree preservation will be made, such as conducting a tree inventory and identifying high
quality resources to preserve during the development process, and/or offsetting tree
destruction through compensatory tree planting/restoration efforts.
2. Page 5, Zoning. It appears that portions of the proposed development will be located within
300 feet of Trott Brook, a public water. It is unclear how the project will comply with local
shoreland ordinances regarding setbacks, impervious surfaces, and vegetation removal.
3. Page 10, Stormwater. Blanding's turtles, a protected state-listed threatened species, have been
documented within the vicinity of the project. Stormwater features may be colonized by
Blanding's turtles in the area, therefore we recommend incorporating measures to avoid
impacting this species into stormwater management. In years when the stormwater features
will be dredged to remove excess sediment, please draw down water levels by September 15th
in order to allow turtles to find overwintering habitat elsewhere.
4. Page 10, Stormwater. We recommend that BWSR-approved, weed-free, native seed mixes be
used to the greatest degree possible in stormwater features and development landscaping in
order to provide pollinator habitat. Native plants also require less irrigation and soil inputs than
traditional landscaping.
5. Page 10, Stormwater. The significant increase in impervious surfaces will also increase the
amount of road salt used in the project area. Chloride released into local lakes and streams
does not break down, and instead accumulates in the environment, potentially reaching levels
that are toxic to aquatic wildlife and plants. Consider promoting local business and city
participation in the Smart Salting Training offered through the Minnesota Pollution Control
Agency. There are a variety of classes available for road applicators, sidewalk applicators, and
property managers. More information and resources can be found at this website. Many winter
maintenance staff who have attended the Smart Salting training — both from cities and
counties and from private companies — have used their knowledge to reduce salt use and save
money for their organizations.
We encourage local governments to request that project proposers who wish to significantly
increase impervious surfaces develop a chloride management plan that outlines what BMP's
and strategies will be used to reduce chloride use within the project area, and then tie that plan
to City O&M agreements. We also encourage cities and counties to consider how they may
participate in the Statewide Chloride Mana�ement Plan and provide public outreach to reduce
the overuse of chloride. Here are some educational resources for residents as well as a sample
ordinance regarding chloride use.
6. Page 15, Rare Features. This section should describe common wildlife that utilizes the project
area.
7. Page 15, Rare Features. If rare features are identified within one mile of a project area using a
license agreement, then a concurrence and next steps from DNR must be obtained by
coordinating through Minnesota Conservation Explorer. Only DNR can make a determination on
whether or not a project is likely to impact a state-listed species.
8. Page 15, Rare Features. Recently U.S. Fish and Wildlife Service made the decision to up-list the
northern long-eared bat (NLEB) from the status of federally threatened to federally
endangered. This new status goes into effect January 30th, 2023. This follows precipitous
declines of more than 90% since the species federal listing as threatened in 2015. NLEB are
known to occur in Sherburne County and throughout Minnesota. Tree removal is an activity
that could negatively impact this species, therefore it is important that the project proposer
coordinates with USFWS regarding potential impacts to the NLEB, and follows the instructions
for consultation provided within the appendix. Please see the USFWS website for more
information: Northern Lon�-eared Bat (Mvotis septentrionalis) I U.S. Fish & Wildlife Service
fws. ov
9. Page 15, Rare Features. Blanding's turtles (Emydoidea blandingii), a state-listed threatened
species, have been documented in the vicinity of the proposed project. Blanding's turtles use
upland areas up to and over a mile distant from wetlands, waterbodies, and watercourses.
Uplands are used for nesting, basking, periods of dormancy, and traveling between wetlands.
Factors believed to contribute to the decline of this species include collisions with vehicles,
wetland drainage and degradation, and the development of upland habitat. Any added
mortality can be detrimental to populations of Blanding's turtles, as these turtles have a low
reproduction rate that depends upon a high survival rate to maintain population levels. This
project does have the potential to impact this rare turtle through direct fatalities and habitat
disturbance/destruction due to excavation, fill, and other construction activities associated with
the project.
Minnesota's Endangered Species Statute (Minnesota Statutes, section 84.0895) and associated
Rules (Minnesota Rules, part 6212.1800 to 6212.2300 and 6134) prohibit the take of threatened
or endangered species without a permit. As such, the following avoidance measures are
required:
o Avoid aquatic impacts during hibernation season, between October 15th and April 15th,
unless the area is unsuitable for hibernation.
o The use of erosion control blanket shall be limited to'bio-netting' or'natural-netting'
types, and specifically not products containing plastic mesh netting or other plastic
components. Please update project plans so that this information is given to
contractors.
■ Also, be aware that hydro-mulch products may contain small synthetic (plastic)
fibers to aid in their matrix strength. These loose fibers could potentially re-
suspend and make their way into Public Waters. As such, please review mulch
products and not allow any materials with synthetic (plastic) fiber additives in
areas that drain to Public Waters.
o Areas where there will be construction, especially aquatic areas, should be checked for
turtles before the use of heavy equipment or any ground disturbance.
■ The Blandin�'s turtle flyer must be given to all contractors working in the area.
■ Monitor for turtles during construction and report any sightings to the DNR
Non�ame Specialist, Erica Hoaglund at 651-259-5772 or
Erica.Hoa�lund@state.mn.us.
■ If turtles are in imminent danger they must be moved by hand out of harm's
way, otherwise, they are to be left undisturbed.
If the above avoidance measures are not possible, please contact NHIS.Review@state.mn.us
as further action may be needed.
For additional information, see the Blandin�'s turtle fact sheet, which describes the habitat use
and life history of this species. The fact sheet also provides two lists of recommendations for
avoiding and minimizing impacts to this rare turtle. Please refer to both lists of
recommendations and apply those that are relevant to your project. For further assistance
regarding the Blanding's turtle, please contact the DNR Regional Nongame Specialist, Erica
Hoaglund.
10. Page 16, Rare Features. The project plans to destroy 148 acres of contiguous forested habitat.
The EAW states multiple times that 62 acres of the forested area has only established since
2005, and that fallen or dead trees are present indicating that the forested habitat is of poor
quality. Please be aware that fallen or dead trees as well as relatively recent forest established
within the past 20 years all provide significant wildlife habitat to many species. This level of tree
removal would be a huge impact to wildlife in the area. Minnesota has lost much of the
deciduous forests that used to present within the region to development, which makes
retaining forest, even the small and isolated remnants on the landscape, especially important
for wildlife habitat, clean water, and for the recreation/aesthetic values to the residents of the
development. Therefore, we recommend minimizing the amount of tree removal to the
greatest extent possible and not conducting tree and shrub removal during key nesting periods
from April through July.
Thank you again for the opportunity to review this document. Please let me know if you have any
questions.
Sincerely,
_ .��'j�.�.��� ���'+%u�r"�`�-�'
l/
Melissa Collins
Regional Environmental Assessment Ecologist � Ecological and Water Resources
Minnesota Department of Natural Resources
Phone: 651-259-5755
Email: melissa.collins@state.mn.us
CC: Joe Jablonski, US Home, LLC
Equal Opportunity Employer
4
�dEPARTIMAENT OF
ADMINISTRATION
STATE �-IISTORIC PRESERVATION OFFICE
January 10, 2023
Zachary Carlton
Planning Director
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: EAW — Foster Property Development
T33 R26 536, Elk River, Sherburne County
SHPO Number: 2023-0595
Dear Zachary Carlton:
Thank you for providing this office with a copy of the Environmental Assessment Worksheet (EAW) for
the above-referenced project.
Based on our review of the project information, we conclude that there are no properties listed in the
National or State Registers of Historic Places, and no known or suspected archaeological properties in
the area that will be affected by this project.
Please note that this comment letter does not address the requirements of Section 106 of the National
Historic Preservation Act of 1966 and 36 CFR § 800. If this project is considered for federal financial
assistance, or requires a federal permit or license, then review and consultation with our office will need
to be initiated by the lead federal agency. Be advised that comments and recommendations provided by
our office for this state-level review may differ from findings and determinations made by the federal
agency as part of review and consultation under Section 106.
Please contact Kelly Gragg-Johnson, Environmental Review Program Specialist, at 651-201-3285 or
kellv.�ra��iohnson@state.mn.us if you have any questions regarding our review of this project.
Sincerely,
Sarah J. Beimers
Environmental Review Program Manager
MINNESOTA STATE HISTORIC PRESERVATION OFFICE
50 Sherburne Avenue Administration Building 203 Saint Paul, Minnesota 55155 651-201-3287
mn.gov/admin/shpo mnshpo@state.mn.us
AN EQUAL OPPORTUNITY AND SERVICE PROVIDER
From: Cruikshank, Thomas (DOT)
To: Carlton. Zachary
Cc: Voss. Steven (DOT)
Subject: FW: EAW Public Comment Period - Lennar/City of Elk River
Date: Friday, December 16, 2022 8:20:17 AM
Attachments: imaae001.nna
Hi Zack,
I received this EAW for review. Congratulations on further growth in Elk River. I do not see any
substantive issues related to MnDOT highway or right of way due to the development other than the
additional traffic that will be driven to US 169, which does have sufficient capacity to accommodate
the development related traffic. Let me know if you think otherwise or if you need anything further
from MnDOT.
Thanks,
Tom Cruikshank
Principal Planner � District 3
3725 12th Street North, St. Cloud, MN 56303-2107
Phone: (320) 223-6526 I Cell: (320) 267-9859
Email: thomas.cruikshank�state.mn.us
mndot-email-signature
u
From: Lind, Katherine (DOT) <Katherine.Lind@state.mn.us>
Sent: Thursday, December 15, 2022 6:53 PM
To: Cruikshank, Thomas (DOT) <Thomas.Cruikshank@state.mn.us>; Voss, Steven (DOT)
<steve.voss@state.mn.us>
Subject: FW: EAW Public Comment Period - Lennar/City of Elk River
The following Environmental Assessment Worksheet (EAW) has been
forwarded for your District's possible review and comment.
Due to large file size, the EAW is accessible or�line �r:
htt�,[�w-ww.elkrivermn.�f DocumentCenter�Viewf 11562/Foster-Pro� ert�r-EAW
Any transportation or MnDOT right of way concerns the District may have
should be provided directly to the Responsible Governmental Unit (RGU)
indicated on the transmittal (highlighted in the forwarded email, below or
accessed via the weblinks to the EAW).
Please note the comment period for this EAW closes on: J�nu�r�-12, 2023
Katherine Lind
Environmental Review Specialist
Office: 651-366-4296
Katherine.LindC�state.mn.us
Minnesota Department of Transportation
Central Office � Office of Environmental Stewardship (OES)
395 John Ireland Blvd, Mail Stop 620
St Paul, MN 55155
From: Carlton, Zachary<zcarltonC�ElkRiverMN.�ov>
Sent: Monday, December 12, 2022 4:24 PM
To: Lind, Katherine (DOT) <Katherine.LindC�state.mn.us>
Subject: EAW Public Comment Period - Lennar/City of Elk River
This message may be from an external email source.
Do not select links or open attachments unless verified. Report all suspicious emails to Minnesota IT Services Security
Operations Center.
Lennar Corporation has proposed development of 267 unimproved acres into a residential
subdivision consisting of approximatelyT 433 single-familyT homes and 180 multi-familyT homes.
The project area is south of the iVliske Meado�vs subdivision and generally- south of Twin Lakes
PaYk��ay NW and west of CR 40 (Cleveland Ave N�. The pYoject also includes infrastructuYe
improvements such as roads, utilities, sidewalks, trails, and stormwater ponds.
The subject site is within Section 36, Township 33, Range 26, SheYbuYne Countyr, Minnesota.
Tax PaYcel Numbers include: 75-136-1300, 75-136-2400, 75-136-3100, 75-136-3200, 75-136-4200,
& 75-136-4300.
EAW can be reviewed at:
■ Elk River Cityr Hall, Planning and Zoning Office, 13065 OYono PaYkway NW, Elk RiveY,
MN 55330
■ Online at: htt�,�/«�������.elkrivermn.g�v f D�cumentCenter/Viewf 11562 f F�ster-Pr� er =-
EAW
(�n1�T written c�mments can he accented. Please mail �r email b��anua ,r�T 12, 2023, at 430 ��•m•
Zack Carlton, Communit�- Development Director
CityT of Elk River
13065 OYono PaYkway NW
Elk River, MN 55330
763.635.1035 or zcarltonn.ElkRi�rerMN. o�r
E(�B M�nit�r Publicati�n Date — December 13, 2022
Comment Period Ends — January 12, 2023
Zacic Carlton, AICP
Community Development Director
13065 Orono Parkway, Elk River, MN 55330
763.635.1035 E1kRiverMN.gov
From: Chambers. Andrew R CIV USARMY CEMVP (USA)
To: Carlton. Zachary
Subject: RE: EAW Public Comment Period - Lennar/City of Elk River
Date: Tuesday, December 13, 2022 7:53:50 AM
Zack,
Thank you for sending the EAW to the Corps. I think this is associated with 2021-02193-DWW,
please let me know if that's not correct.
We don't plan on submitting formal comments at this time, but I am reaching out to highly
recommend scheduling a pre-application meeting with the WCA TEP and the Corps to discuss the
replacement plan and 404 permitting process, when you're at that point. Those meetings are very
helpful to get everyone on the same page and inform all parties of what's to come.
Feel free to reach out with any questions.
Thanks again,
Andy
Andrew Chambers
Regulatory Project Manager
U.S. Army Corps of Engineers
Duluth Field Office
600 South Lake Avenue, Suite 211
Duluth, MN 55802
(218) 788-6407
Information on Corps of Engineers Regulatory Program status during the COVID-19 pandemic can be
found at: https://www.mvp.usace.army.mil/missions/re ul� ator�
We are pleased to introduce our new paperless communication procedures in Minnesota. Requests
for action (pre-application consultations, permit applications, requests for delineation concurrences,
requests forjurisdictional determinations, and mitigation bank proposals) should be sent directly to
the following email: usace_requests_mn�usace.army.mil
<mailto:usace_requests_mn anusace.army.mil> . Please include the county name in the subject line
of the email (e.g. Washington County). These changes will improve efficiency, reduce costs and
reduce the environmental footprint. Additional information can be found in our public notice
located here: http://www.mvp.usace.army.mil/Missions/Regulatory.aspx
From: Carlton, Zachary <zcarltonC�ElkRiverMN.�ov>
Sent: Monday, December 12, 2022 4:25 PM
To: USACE_Requests_MN <USACE_Requests_MNC�usace.army.mil>
Subject: [URL Verdict: Neutral][Non-DoD Source] EAW Public Comment Period - Lennar/City of Elk
River
Lennar Corporation has proposed development of 267 unimproved acres into a residential
subdivision consisting of appro�matelyT 433 single-familyT homes and 180 multi-familyT homes.
The project area is south of the iVliske Meado�vs subdivision and generallyT south of Twin Lakes
PaYkway NW and west of CR 40 (Cleveland Ave N�. The pYoject also includes infrastructuYe
improvements such as roads, utilities, sidewalks, trails, and stormwater ponds.
The subject site is within Section 36, Township 33, Range 26, SherbuYne Countyr, Minnesota.
Tax PaYcel Numbers include: 75-136-1300, 75-136-2400, 75-136-3100, 75-136-3200, 75-136-4200,
& 75-136-4300.
EAW can be reviewed at:
■ Elk River CityT Hall, Planning and Zoning Office, 13065 Orono Parkwa�T NW, Elk River,
MN 55330
■ Online at: htt�s:,�/���n�.elkri�rermn.�,/DocumentCenter, Vie«�, 11562/Foster-Pro erte-
El�_ ,
(�n1�- written c�mments can he accented. Please mail �r email h��anua ,r�T 12, 2023, at 4:30 ��•m•
Zack Carlton, CommunityT Development Director
CityT of Elk River
13065 Orono PaYk�vay NW
Elk RiveY, MN 55330
763.635.1035 or zcarltonna.ElkRiverl�ZN.�
�B MonitoY Publication Date — DecembeY 13, 2022
Comment Period Ends — Januar�r 12, 2023
Zack Carlton, AICP
Community Development Director
13065 Orono Parkway, Elk River, MN 55330
763.635.1035 Ell�RiverMN.go�r
ENVIRONMENTAL ASSESSMENT WORKSHEET
This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are available at the
Environmental Quality Board's website at:
http:Uwww.eqb.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information
about a project that may have the potential for significant environmental effects. The EAW Guidelines
provide additional detail and resources for completing the EAW form.
Cumulative potential effects can either be addressed under each applicable EAW Item, or can be
addresses collectively under EAW Item 19.
Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period
following notice of the EAW in the EQB Monitor. Comments should address the accuracy and
completeness of information, potential impacts that warrant further investigation and the need for an EIS.
1. Proj ect title: Foster Property Development
2. Proposer:
US Home, LLC
Contact person: .Ioe .Iablonski
Title: Director ofLand Development
Address: 16305 36th Avenue North, Suite 600
City, State, ZIP: Plymouth, M1V 55446
Phone: 952.249.3014
3. RGU
City of Elk River
Contact person: Zachary Carlton
Title: Planning Director
Address: 13065 Orono Parkway
City, State, ZIP: Elk River, M1V 55330
Phone : 763. 635.1035
Fax: Fax:
EmaiL .Ioe..Iablonski(a�Lennar.com Email: zcarlton(a�ElkRiverMlV.gov
4. Reason for EAW Preparation: (check one)
Required: Discretionary:
❑ EIS Scoping ❑ Citizen petition
� Mandatory EAW ❑ RGU discretion
❑ Proposer initiated
If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s):
MNRules 4410.4300, Subp. 19 D
5. Project Location:
County: Sherburne
City/Township: City of Elk River
PLS Location ('/4, '/4, Section, Township, Range): Sec 36, T33N, R26W
Watershed (81 major watershed scale): Rum River (21)
GPS Coordinates: 45.306355, -93.516208
Tax Parcel Number(s): 75-136-1300, 75-136-2400, 75-136-3100, 75-136-3200, 75-136-4200, &
75-136-4300
Page 1
At a minimum attach each of the following to the EAW:
• County map showing the general location of the project; (See Appendix A— Figure 1)
• U.S. Geological Survey 7.5 minute, 124,000 scale map indicating projectboundaries (photocopy
acceptable); (See Appendi� A— Figure 2)
• Site plans showing all significant project and natural features. Pre-construction site plan and post-
construction site plan. (See ExhibitA)
6. Project Description:
a. Provide the briefproject summary to be published in the EQB Monitor, (approximately 50
words).
Lennar Corporation is proposing construction of a residential development located at in the City
ofElkRiver, Sherburne County, Minnesota. The project will include the construction of
approximately 433 single family homes and 180 multi family housing units as well as
infi^astructure such as roads, utilities, walks/ti^ails, and stormwater ponds.
b. Give a complete description of the proposed project and related new construction, including
infrastructure needs. If the project is an expansion include a description of the existing facility.
Emphasize: 1) construction, operation methods and features that will cause physical
manipulation of the environment or will produce wastes, 2) modifications to existing equipment
or industrial processes, 3) significant demolition, removal or remodeling of existing structures,
and 4) timing and duration of construction activities.
1) Construction activities that will manipulate the environment will include tree removals,
site earthwork, utility installation, and the construction of housing units, roads,
walks/trails, and stormwater ponds.
2) N/A
3) Removal of existing structures will consist of the demolition of an existing pole barn
shed.
4) Site preparation work is anticipated to begin as soon as the Fall of 2022. Site
construction is anticipated to take place over the course offour phases which will occur
over the course of multiple years dependent upon market conditions.
c. Project magnitude:
Total Project Acreage 252.47 (Main Project)
15.25 (Ghost Plats)
267.72 (Total)
Linear roject len th N/A
Number and type of residential units 41 S Single Family Homes (Main Project)
120 Multi-Family Homes (Main Project)
14 Single Family Homes (Ghost Plats)
60 Multi-Family Homes (Ghost Plats)
429 Single Family Homes (Total)
180 Multi-Famil Homes (Total)
Page 2
Commercial buildin area (in s uare feet) 0
Industrial buildin area (in s uare feet) 0
Institutional buildin area (in s uare feet) 0
Other uses — s eci (in s uare feet) 0
Structure hei ht(s) <30'
d. Explain the project purpose; if the project will be carried out by a governmental unit, explain the
need for the project and identify its beneficiaries.
The purpose of this project is to create new housing opportunities within the City ofElkRiver.
This project is not being carried out by a governmental unit. The need for this project is
demonstrated by the following goal of the Housing Plan laid out in The City of Elk River
Comprehensive Plan (October 18, 2021), hereinafter referred to as The Plan: `Encourage
residential development with a variety of housing types that fosters high quality, livable
neighborhoods to address the �reeds of existing and future residents ". Development of this project
would help the city meet these goals by providing new housing opportunities for existing and
future residents ofElk River looking for single family or multi family housing options.
e. Are future stages of this development including development on any other property planned or
likely to happen? ❑ Yes � No
If yes, briefly describe future stages, relationship to present proj ect, timeline and plans for
environmental review.
Construction of this project will occur in phases. Additionally, two ghost plats are included in the
project area that may or may not end up as part of the project. This EAW is covering the project
as a whole and includes the ghost plat areas in order to incorporate all potential future impacts.
£ Is this project a subsequent stage of an earlierproject? ❑ Yes � No
If yes, briefly describe the past development, timeline and any past environmental review.
N/A
7. Cover types: Estimate the acreage of the site with each of the following cover types before and after
development:
Before After
Main Project: 70.72 Main Project: 67.12
Wetlands Ghost Plats: 0.80 Ghost Plats: 0.48
Total: 71.52 Total: 67.60
Main Project: 0.65 Main Project: 0.65
Deep water/streams Ghost Plats: 0.00 Ghost Plats: 0.00
Total: 0.65 Total: 0.65
Mai�r Project: 151.33 Main Project: 11.38
Wooded/forest Ghost Plats: 8.65 Ghost Plats: 0.91
Total: 159.98 Total: 12.29
Page 3
Before After
Main Project: 28.40 Main Project: 10.34
Brush/Grassland Ghost Plats: 0.94 Ghost Plats: 0.00
Total: 29.34 Total: 10.34
Main Project: 0.00 Main Project: 0.00
Cropland Ghost Plats: 0. 00 Ghost Plats: 0. 00
Total: 0.00 Total: 0.00
Main Project: 0.51 Main Project: 88.31
Lawn/landscaping Ghost Plats: 4.44 Ghost Plats: 7.47
Total: 4.95 Total: 95. 78
Main Project: 0.86 Main Project: 59.64
Impervious surface Ghost Plats: 0.42 Ghost Plats: S. 73
Total: 1.28 Total: 65.37
Main Project: 0.00 Main Project: 15.03
Stormwater Pond Ghost Plats: 0. 00 Ghost Plats: 0. 66
Total: 0.00 Total: 15.69
Main Project: 0.00 Main Project: 0.00
Other (describe) Ghost Plats: 0.00 Ghost Plats: 0.00
Total: 0.00 Total: 0.00
Main Project: 252.47 Main Project: 252.47
TOTAL Ghost Plats: 15.25 Ghost Plats: 15.25
Total: 267. 72 Total: 267. 72
Existing land cover can be seen in Appendi� A- Figure 3. Proposed land cover can be seen in
Appendi� A - Figure 4.
8. Permits and approvals required: List all known local, state and federal permits, approvals,
certifications and financial assistance far the project. Include modifications of any existing permits,
governmental review ofplans and all direct and indirect forms ofpublic financial assistance including
bond guarantees, T� Increment Financing and infrastructure. All of these final decisions are
prohibited until all appropriate environmental review has been completed. See Minnesota Rules,
Chapter 4410.3100.
Unit of overnment T e of a lication Status
Minnesota Pollution Control NPDES Co�rstruction To be Submitted
A enc (MPCA) Stormwater Permit
Wetland Conservation Act - Submitted and approved
Wetland Delineation
Wetland Conservation Act - To be Submitted
City of Elk River Wetla�d Re lacement Plan
Flood lain Permit To be Submitted (i needed)
Buildin - Residential To be Submitted
Sewer and Water To be Submitted
Minnesota
Department of Water Appropriations To be Submitted (if needed)
Natural Resources
(MnDNR)
Page 4
Cumulative potential effects may be considered and addressed in response to individual EAW Item
Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19.
If addressing cumulative effect under individual items, mal�e sure to include information requested
in EAW Item No. 19
9. Land use:
a. Describe:
i. Existing land use of the site as well as areas adjacent to and near the site, including parks,
trails, prime or unique farmlands.
Existing land use of the site consists primarily of wooded upland and wetland areas with
some areas ofgrassland. A gravel road is present near the northwest corner of the site and
multiple driving ti^ails are present throughout the site. A sheet metal pole shed is also
present along the eastern boundary of the site. Existing land cover on site can be seen in
Appendix A— Figure 3. Adjacent land consists primarily of residential developme�rt with
natural woodecl ancl wetland areas. Aclditionally, there are outdoor recreational facilities
located to the south�.
ii. Plans. Describe planned land use as identified in comprehensive plan (if available) and any
other applicable plan for land use, water, or resources management by a local, regional,
state, or federal agency.
The Land Use Plan within the The City ofElkRiver Comprehensive Plan (October 18,
2021), hereinafter referred to as The Plan, h�as the project site listed for "Mixed
Residential" use. Mixed residential was defined i�r The Plan as follows: "The mi�ed
residential category consists of neighborhoods with multiple housing types, including
single family detached, townhomes, duplexes, and small scale multi family buildings.
Mixed residential areas should include existing residential neighborhoods where a gentle
increase in density is appropriate such as surrounding the down-town as well as new
neighborhood subdivisions. "
iii. Zoning, including special districts or overlays such as shoreland, floodplain, wild and
scenic rivers, critical area, agricultural preserves, etc.
The Foster Property Development site is zoned as RID Single Family Residential. The Plan
defines the purpose ofRID districts as follows: "This district is intended to accommodate
single family reside�rtial dwellings with large lots and high�er quality h�ousing within the
municipal sewer and water access area. This district is explicitly for areas that possess
significant natural features and is intended to encourage the design of subdivisions that
protect these natural features. "
Th�ere are areas of FEMA floodway, 100 Year Floodplain and 500 Year Floodplain
mapped within the project site. There are no wild and scenic river segments, critical areas,
agricultural preserves, or airport safety zones located within or adjacent to the project site.
Page 5
b. Discuss the project's compatibility with nearby land uses, zoning, and plans listed in Item 9a
above, concentrating on implications for environmental effects.
There are no identified compatibility conflicts between the proposed project ancl nearby lancl uses
or any local or regional plans. There are no zoning conflicts for the proposed land use of the site.
c. Identify measures incorporated into the proposed project to mitigate any potential incompatibility
as discussed in Item 9b above.
There are no incompatibility measures to mitigate.
10. Geology, soils and topography/land forms:
a. Geology - Describe the geology underlying the project area and identify and map any susceptible
geologic features such as sinkholes, shallow limestone formations, unconfined/shallow aquifers,
or karst conditions. Discuss any limitations of these features for the project and any effects the
project could ha�e on these features. Identify any project designs or mitigation measures to
address effects to geologic features.
Minnesota Geological Survey data within the Project site lists the bedrock as Wonewoc
Sandstone and Eau Claire Formatio� with depths to the bedrock ranging fi^om approximately 50
to 350 feet. There are no known or mapped sinkholes, shallow limestone, shallow aquifers, or
karst features identified within or near the project area.
b. Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and
descriptions, including limitations of soils. Describe topography, any special site conditions
relating to erosion potential, soil stability or other soils limitations, such as steep slopes, highly
permeable soils. Provide estiuiated volume and acreage of soil excavation and/or grading.
Discuss impacts from project activities (distinguish between construction and operational
activities) related to soils and topography. Identify measures during and afterproject construction
to address soil limitations including stabiliaation, soil corrections or other measures.
Erosion/sedimentation control related to stormwater runoff should be addressed in response to
Item ll.b.ii.
NRCS soil classifications with the Project Site and are illustrated on Appendi� A— Figure S, soils
u�rit characteristics are provided in the followi�rg table.
S mbol Soil Unit Name SI �oes HEL* Hydrologic Hydric Farmland
y (° ) Group** Rating*** Classification
32B Nebish fine sandy 2_6 NHEL B Predominately All Areas are
loam Non-H dric Prime Farmland
Nebish fine sandy Predominately Farmland of
32C 6-12 PHEL B Statewide
loam Non-Hydric
Im ortance
32D Nebish fine sandy 12-18 HEL B P�'edominately Not Prime
loam Non-H dric Farmland
Page 6
S mbol Soil Unit Name SI �oes HEL* Hydrologic Hydric Farmland
y (° ) Group** Rating*** Classification
125 Beltrami fine sandy 0-3 NHEL B/D P�"edominately All Areas are
loam Non-H dric Prime Farmland
Zimmerman fine Predominately Not Prime
158B sand 1-6 NHEL A Non-H dric Farmland
346 Talmoon loam 0-2 NHEL C/D P�"edominately Prime Farmland
H dric i Drained
540 Seelyeville muck 0-1 NHEL A/D Hydric Not Prime
Farmland
544 Cathro muck 0-1 NHEL B/D Hydric Not Prime
Farmland
Sanburn fine sancly Predominately Farmland of
730B 2-6 NHEL A Statewide
loam Non-Hydric
Im ortance
Seelyeville and Predominately Not Prime
799 Bowstring soils, 0-1 NHEL A/D
re uentl ooded Hydric Farmland
1028 Udorthents-Pits, N/A PHEL N/A N/A Not Prime
ravel, com lex Farmland
1253B �tonelake-Sanburn 1-6 NHEL A P�'edominately Not Prime
com lex Non-H dric Farmland
1260C Stonelake-Nebish 6-12 PHEL A P�'edominately Not Prime
com lex Non-H dric Farmland
1288 Seelyeville-Markey 0-1 NHEL A/D Hydric Not Prime
com lex, onded Farmland
Fordum-Winterfield Predominately Not Prime
1946 complex, frequently 0-2 NHEL A/D
ooded Non-Hydric Farmland
W Water N/A N/A N/A N/A Not Prime
Farmland
*Hi,�hlv��rodibleLand **1n�iltrationXate **�YercentHvdricXating
HEL: Highly Erodible Land fI: >0.30 in/hr Hydric: 100%
PHEL: Potentially Highly Erodible Land B: 0.15-0.30 in/hr Predominately Hydric: > 67% &<I00%
NHEL: Not Highly Erodible Land C: 0.05-01 S ins/hr Partially Hydric: > 33 %&<67%
D: <0.05 in/hr Predominately Non-Hydric: <1 % & <33%
Not Hydric: 0%
There are approximately 110 acres of land within the project with a soil farmland classification
rating of either ` Farmland of Statewide Importance " or `All Areas are Prime Farmland ".
However there is currently no land within the Project site that is cultivated for agricultural
production. As a result, no farmland will be taken out of production as a result of the project
The erosion capabilities of the soils are susceptible as described by the NRCS Soil Erodibility
(Kw) Factor rating which ranges across the site fi^om 0.02 to 0.37. Construction activities will
temporarily expose soils to an increased risk of erosion fi^om wind and precipitation. Appropriate
erosion ancl secliment conti^ol best management practices (BMPs) will be selected based on
current site conditions and maintained through the duration of each construction phase to reduce
the potential of sedimentation occurring to surface water resources or migrating offsite.
Page 7
Temporary BMPs will be inspected and maintained (per the NPDES Consti^uction Stormwater
Permit) until permanent vegetation a�rd stabilization has occurred. Permanent BMPs will be
incorporated into project design to minimize erosion during routine operational activities (post-
construction).
A geotechnical evaluation of the site has been completed which included 22 soil borings across
the site. A map of the boring locations and detailed description of the soils observed at each is
included in Exhibit B— Geotechnical Report.
Topography of the Project site, collected via LiDAR, is illusti^ated on Appendix A— Figure 6. Site
elevations were shown ranging fi^om 896 to 946 msl. Site topography generally slopes downward
towards the basin located near the center before continuing to the south. Some areas of steep
slopes (12% or greater) are present within the site.
NOTE: For silica sand projects, the EAW must include a hydrogeologic investigation assessing the
potential groundwater and surface water effects and geologic conditions that could create an increased
risk of potentially significant effects on groundwater and surface water. Descriptions of water
resources and potential effects from the project in EAW Item 11 must be consistent with the geology,
soils and topography/land forms and potential effects described in EAW Item 10.
11. Water resources:
a. Describe surface water and groundwater features on or near the site in a.i. and a.ii. below.
i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial ditches.
Include any special designations such as public waters, trout stream/lake, wildlife lakes,
migratory waterfowl feeding/resting lake, and outstanding resource value water. Include
water quality impairments or special designations listed on the current MPCA 303d Impaired
Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory
number(s), if any.
There is one DNR Public Waters watercourses, Ti^ott Brook (M-063-001.5), located within
the project area. Ti^ott Brook meanders in and out of the project site along its western and
southern boundaries. There are no DNR Public Waters basins, designated wildlife lakes,
migratory waterfowl feeding/resting areas, ti^out streams/lakes, MPCA or NIDNR listed
calcareous fens, outstandi�g resource value waters, and county or jurisdictional ditches
within or adjacent to th�e project area.
Prominent water features located within 1 mile of the project site include the aforementioned
Ti^ott Brook as well as two DNR Public Waters wetlands. These wetlands were Kliever Marsh
(71000300) located approximately 0.6 miles south of the project site, and an unnamed basin
(71023800) located approximately 0.8 miles to the north. Th�ere are no MPCA Section 303d
listed impaired waters located within a 1-mile radius of the project site.
12 wetland areas, totaling approximately 71 acres, were delineated on the main Project site
and approved by the Local Government Unit (City ofElkRiver) of the Minnesota Wetland
Conservation Act (Minnesota Rules 8420). A Notice ofDecision was issued on November 10,
2021 (LGUProjectNo. W-21-21).
Surface water resources located within and adjacent to the Project site are illustrated on
Appendix A — Figure 7.
Page 8
ii. Groundwater — aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if proj ect is
within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells,
including unique numbers and well logs if available. If there are no wells known on site or
nearby, explain the methodology used to determine this.
1) The depth to ground water appears to vary greatly across the site. During the
geotechnical evaluation of the site 22 soil borings were completed across the site. Water
tables, wh�en th�ey were observed, ranged fi^om 894.4' to 908.5' MSL. These water tables
were all observed in borings taken within or immediately adjacent to wetlands or to open
water on site. Water tables typically were not observed within borings taken with�in
upland areas. The deepest of which was taken to a depth of 887.3' MSL with no observed
water table. A map of the boring locations and boring logs documenting water tables
observed is included in Exhibit B— Geotechnical Report.
Th�e Minnesota Department of Natural Resources Cooperative Groundwater Monitoring
Website maintains clata on ground water levels. The closest observation well to the
Project site is DNR Observation Well #86017 (MDH #708372), which is located
approximately 2.8 miles southwest of the Project site. The water level in the most recent
data record (March 29, 2022) was measured at 859. SI ' MSL.
2) A majority of the Project site is located within the Elk River Wellhead Protection Area
(WHPA). The boundary of the ELK River WHPA is illustrated on Appendix A— Figure 8.
3) According to the Minnesota Department of Health — Minnesota Well Index, there are �o
identified wells located within th�e Project site. Multiple domestic wells were mapped on
adjacent properties, the nearest of which, MDH #SSI578, was located approximately 140
feet east of the Project site. Groundwater resources located within and adjacent to the
Project site are illustrated on Appe�dix A— Figure 8.
b. Describe effects from project activities on water resources and measures to minimize or mitigate
the effects in Item b.i. through Item b.iv. below.
Wastewater - For each of the following, describe the sources, quantities and composition
of all sanitary, municipal/domestic and industrial wastewater produced or treated at the
site.
1) If the wastewater discharge is to a publicly owned treatment facility, identify any
pretreatment measures and the ability of the facility to handle the added water and
waste loadings, including any effects on, or required eXpansion of, municipal
wastewater infrastructure.
Wastewater ge�rerated fi^om the site will be discharged into the City ofElkRiver's
sanitary sewer system and flow to th�e City ofElkRiver Wastewater Ti^eatment
Facility (Facility) located at 248 Railroad Drive, ElkRiver. The Facility is described
as follows within its NPDESPermit (M1V0020788):
"The Facility has a continuous discharge (SD 001) to the Mississippi River (Class
1 C, 2Bdg, 3C, 4A, 4B, 5, 6 water). This is a Class A facility.
Page 9
The Facility is designed to ti^eat an average dry weather design flow of 3.98 million
gallons per day (MGD), an average wet weather (AWW) design flow of 4.54 MGD,
and a peak hourly wet weather fZow of 7.27 MGD. Based on the AWW design_flow,
the Facility is designed for a five-day carbonaceous biochemical oxygen demand of
203.8 milligrams per liter (mg/L), a total suspended solid of 263. 7 mg/L, a total
phosphorus of 7.2 mg/L, and a total Kjeldahl nitrogen of 36.0 mg/L.
The Facility consists of inechanically cleaned bar screens, an influent Parshall flume,
vortex grit removers, two anaerobic selector tanks for phosphorous removal, six
extended aeration activated sludge cells in three pairs, three final clarifiers, six
effluent sand filters, and UV disinfection. The Facility also adds chlorine for filter
maintenance, sulfur dioxide for removal of residual chlorine, and ferric chloride for
phosphorous removal. Biosolids treatment consists offour aerated storage tanks
(aerobic digesters), which is then processed in a screw press to produce a biosolids
cake which is landfill disposed. "
Construction of new sanitary sewer lines will be required to service the project but
no expansions to the City's YVWTP are anticipated to be required.
The location of the Elk River WWTP is illustrated on Appendix A— Figure 9.
2) If the wastewater discharge is to a subsurface sewage treatment systeins (SSTS),
describe the system used, the design flow, and suitability of site conditions for such a
system.
N/A
3) If the wastewater discharge is to surface water, identify the wastewater treatment
methods and identify discharge points and proposed effluent limitations to mitigate
impacts. Discuss any effects to surface or groundwater from wastewater discharges.
�/I
ii. Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to
and post construction. Include the routes and receiving water bodies for runoff from the
site (major downstream water bodies as well as the immediate receiving waters). Discuss
any environmental effects from stormwater discharges. Describe stormwater pollution
prevention plans including temporary and permanent runoff controls and potential BMP
site locations to manage or treat stormwater runof£ Identify specific erosion control,
sedimentation control or stabilization measures to address soil limitations during and
after project construction.
The quality of existing stormwater runoff fi^om the project is typical of forested land.
Stormwater runoff flows fi^om upland areas to lower elevations on site as sheet flow
where it generally gets conveyed into the large wetland complex located near the center
of the site. This wetland ultimately outlets into Ti^ott Brook.
Page 10
The quality of stormwater runoff fi^om the project post consti^uction will be typical of an
urban land use with impervious surfaces and lawn/landscaping generally ge�rerating
higher conce�rtrations of total suspended solids and total phosph�orus. Stormwater runoff
is proposed to be conveyed into permanent constructec� stormwater treatment
infi^astructure (e.g. infiltration basins, filtration basins, holding ponds, vegetated swales,
etc.) across the site for treatment prior to discharge.
Temporary erosion and sediment co�rtrol best manageme�rt practices (BMPs) will initially
be installed (per the project's SWPPP), maintained/repaired, and amended through�out
the construction phases as required to remain compliant with the applicant's NPDES
Construction Stormwater Permit. BMPs may include (but are not limited to) silt fence,
bio-rolls/filter logs, rock construction entrances, mulch/hydro mulch, and permanent
native seeding or turf seeding in appropriate areas.
iii. Water appropriation - Describe if the project proposes to appropriate surface or
groundwater (including dewatering). Describe the source, quantity, duration, use and
purpose of the water use and if a DNR water appropriation permit is required. Describe
any well abandonment. If connecting to an existing municipal water supply, identify the
wells to be used as a water source and any effects on, or required expansion of, municipal
water infrastructure. Discuss environmental effects from water appropriation, including
an assessment of the water resources a�ailable for appropriation. Identify any measures to
a�oid, minimize, or mitigate environmental effects from the water appropriation.
No appropriations of surface waters are proposed as part of the Project. Water will be
sourced fi^om th�e City of Elk River's existing public water supply system (PWS
#1710004). The City's PWS is currently sourced fi^om eight groundwater wells (MDH #s
255153, 221176, 481794, 537682, 580320, 664852, 694499, and 757624). Construction
of new watermains will be required to service the project but no expansions to the City's
PWS are anticipated to be required.
Short-term temporary construction dewatering of surface or ground waters may be
required at the time of construction (depending on current field conditions) to facilitate
construction activities (e.g., utility installation, etc.). If dewatering is anticipated to
exceed 10, 000 gallons per day or 1, 000, 000 gallons per year, the contractor will be
required to obtain a Water Appropriations Permit fi^om the Department of Natural
Resources (N�NR) Division of Waters prior to initiati�rg such activities. Measures to
avoid, minimize, or mitigate th�e environmental effects fi^om construction related to
dewatering are unknown at this time, a�d therefore will be determined when developing
the dewatering plan as required by a Stormwater Pollution Prevention Plan amendment
of the NPDES Construction Stormwater Permit.
Page ll
iv. Surface Waters
a) Wetlands — Describe any anticipated physical effects or alterations to wetland
features such as draining, filling, permanent inundation, dredging and vegetative
removal. Discuss direct and indirect environmental effects from physical
modification of wetlands, including the anticipated effects that any proposed wetland
alterations may have to the host watershed. Identify measures to avoid (e.g.,
available alternatives that were considered), minimiae, or mitigate environmental
effects to wetlands. Discuss whether any required compensatory wetland mitigation
for unavoidable wetland impacts will occur in the same minor or major watershed,
and identify those probable locations.
12 wetland areas, totaling approximately 71 acres, were delineated on the main
Project site and approved by the Local Government Unit (City of Elk River) of the
Minnesota Wetland Conservation Act (Minnesota Rules 8420). A Notice ofDecision
was issued on November 10, 2021 (LGUProjectNo. W-21-21).
Approximately 18 acres of the current wetland area on site consists of land that had
previously been mined as part of a gravel pit. These areas would meet the definition
of an "incidental wetland" under Minnesota Admi�ristrative Rule 8420.0105 and
therefore are not regulated under the Minnesota Wetland Conservation Act.
Additionally, portions of these areas have depths up to approximately 20'. As a
result, these areas function more as deep-water habitats rather than wetlands.
Wetland impacts were avoided to the extent possible during the preliminary design
phase of th�e overall site plan (ExhibitA). The final design will attempt to avoid
and/or minimize impacts to the extentpossible. Should unavoidable impacts remain,
the proper permitting processes will be followed in accordance with the WCA and/or
Section 404 of the Clean Water Act as applicable. This process would involve
applying for a replacement plan potentially requiring compensatory mitigation. Th�e
area of wetland impact and jurisdictio�al status of the wetlands will be determined
by the proper governmental agency during the permitting process following
conclusion of the environmental review process.
b) Other surface waters- Describe any anticipated physical effects or alterations to
surface water features (lakes, streams, ponds, intermittent channels, county/judicial
ditches) such as draining, �lling, permanent inundation, dredging, diking, stream
diversion, impoundment, aquatic plant removal and riparian alteration. Discuss
direct and indirect environmental effects from physical modification of water
features. Identify measures to avoid, minimize, or mitigate environmental effects to
surface water features, including in-water Best Management Practices that are
proposed to a�oid or minimize turbidity/sedimentation while physically altering the
water features. Discuss how the project will change the number or type of watercraft
on any water body, including current and projected watercraft usage.
Page 12
No other surface water features (lakes, sti^eams, intermittent channels, or
county/jurisdictional ditches) will be physically or indirectly altered during the
construction or operation of the proposed project. The only water feature located on
the project site is the DNR Public Waters watercourse Ti^ott Brook which meanders
in and out of th�e project site along its western and southern boundaries. Ti^ott Brook
was avoided during the preliminary design phase of the overall site plan (ExhibitA).
Temporary erosion and sediment control best management practices (BMPs) will
initially be installed (per the project's SWPPP), maintained/repaired, and amended
throughout the construction phases to avoid indirect impacts to Ti^ott Brook. BMPs
may include (but are not limited to) silt fence, bio-rolls/filter logs, rock consti^uction
entrances, mulch/hydro mulch, and permanent native seeding or turf seeding in
appropriate areas. Following construction, permanent consti^ucted stormwater
treatment infi^astructure (e.g. infiltration basins, filtration basins, holding ponds,
vegetated swales, etc.) will protect help Ti^ott Brook. This will provide storage and
treatment to waters prior to discharging into Ti^ott Brook.
12. Contamination/Hazardous Materials/Wastes:
a. Pre-project site conditions - Describe existing contamination or potential environmental hazards
on or in close proximity to the project site such as soil or ground water contamination, abandoned
dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or gas
pipelines. Discuss any potential environmental effects from pre-project site conditions that would
be caused or exacerbated by project construction and operation. Identify measures to a�oid,
minimiae or mitigate adverse effects from eXisting contamination or potential environmental
hazards. Include development of a Contingency Plan or Response Action Plan.
Minnesota Pollution Control Agency (MPCA) records do not indicate any current or former
contamination sites within or immediately adjacent to the project area. The MPCA's What's In
My Neighborhood database of known sites within proximity of the project area is illustrated on
Appendi� A— Figure 10. There was one documented petroleum leak within one-half mile of th�e
project site. This leak occurred at the Holzen Residence site located approximately 0.4 miles
north of the project site. This site was issued regulatory site closure on March 27, 2009.
The project proposer anticipates a minimal risk of encountering contaminated materials or
groundwater during construction based on the lack of past land uses and due to geographic
location of the listed leak sites in relation to the project area. Project consti^uction and operation
is not expected to cause or exacerbate a pre project contaminated condition(s); th�erefore, �ro
measures are plan�red to avoid, minimize, or mitigate adverse effects fi^om existing contamination
or potential environmental hazards.
Ifpotentially contaminated materials (or other environmental hazards) are discovered during
construction activities, the project proposer/contractor will immediately cease activities in the
area, the� take appropriate and reasonable actions to contain and reduce the human
health/environmental risk prior to contacting the State of Minnesota Duty Officer Sherburne
Cou�ty, and project proposer's represe�rtative. The developme�rt of a Contingency Plan or
Response Action Plan will be initiated if analytical results characterize the discovered materials
as a regulated contaminated waste.
Page 13
b. Project related generation/storage of solid wastes - Describe solid wastes generated/stored during
construction and/or operation of the proj ect. Indicate method of disposal. Discuss potential
environmental effects from solid waste handling, storage and disposaL Identify measures to
avoid, minimize or mitigate adverse effects from the generation/storage of solid waste including
source reduction and recycling.
Solid and liquid wastes generated fi^om construction materials and equipment are expected in
minimal amounts during periods of active construction. Wastes may include sediment laden
construction dewatering or typical consti^uction debris associated with� residential development
(lumber, siding, roofing materials, etc.).. The contractor will be required to immediately haul
offsite and/or temporarily store a�d dispose (or recycle) of all waste in accordance with MPCA
regulations and the NPDES Construction Stormwater Permit.
c. Project related use/storage of haaardous materials - Describe chemicals/hazardous materials
used/stored during construction and/or operation of the project including method of storage.
Indicate the number, location and siae of any above or below ground tanks to store petroleum or
other materials. Discuss potential environmental effects from accidental spill or release of
hazardous materials. Identify measures to a�oid, minimize or mitigate adverse effects from the
use/storage of chemicals/haaardous materials including source reduction and recycling. Include
development of a spill prevention plan.
Hazardous materials (portable fuel tanks and lubrica�ts) may be used for equipment operations
during consti^uction and temporarily placed onsite in sealed containers (at all times) and under
secured restricted access during non-working hours. These materials will only be used during
active construction for refueling and maintenance of construction equipment. To ensure that fuel
spills do not contaminate surface and ground waters, co�rstruction and maintenance activities
would occur at reasonable distances fi^om surface waters and steep sloped areas. Th�e contractor
will be required to abide by the Pollution Prevention Management Measures (Part IV.F.2) of the
NPDES Construction Stormwater Permit. All hazardous materials will be removed fi^om the
Project site upon completion of constr�uction.
d. Project related generation/storage of hazardous wastes - Describe hazardous wastes
generated/stored during construction and/or operation of the project. Indicate method of disposal.
Discuss potential environmental effects from hazardous waste handling, storage, and disposal.
Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of
hazardous waste including source reduction and recycling.
Hazardous waste storage and disposal associated with construction activities will comply with
th�e NPDES Storm Water Pollution Prevention Plan during periods of construction. Following
construction, the development will not generate hazardous wastes.
Page 14
13. Fish, wildlife, plant communities, and sensitive ecological resources (rare features):
a. Describe fish and wildlife resources as well as habitats and vegetation on or near the site.
Ecological land units for the project area have been mapped ancl defined in the Ecological
Classification System (ECS), which has been adopted by the Minnesota DNR. The project location
occurs in the Anoka Sand Plain subsection (222Mc). The Anoka Sandplains subsection largely
consists of a broad, flat, sandy lake plain that historically consisted of oak savanna and upland
Prairies. The Project occurs within the north�ern Twin Cities metropolitan area and surrounding
lands now largely consist of urban development.
The Project site itself largely consists of wooded and wetland areas. Approximately 160 acres of
wooded lands are present across the site. Based on historic aerial photography approximately 62 of
those wooded acres used to be cultivated for agricultural production through 2005, after which the
land was left uncultivated and naturally developed into its current state.
Wetla�ds comprise approximately 71 acres of the site. This includes multiple wetland communities
including Type 1— Floodplain Forest, Type 2— Fresh (wet) Meadow, and Type S— Shallow Open
Water. Approximately 18 acres of the current wetland area on site consists of land that had
previously been mined as part of a gravel pit. Portions of these areas have depths up to
approximately 20'. As a result, these areas function more as deep-water habitats rather than
wetlands.
Describe rare features such as state-listed (endangered, threatened or special concern) species,
native plant communities, Minnesota County Biological Survey Sites of Biodiversity
Significance, and other sensitive ecological resources on or within close proximity to the site.
Provide the license agreement number (LA-� and/or correspondence number (ERDB
) from which the data were obtained and attach the Natural Heritage letter from
the DNR Indicate if any additional habitat or species survey work has been conducted within the
site and describe the results.
There were two areas ofMinnesota County Biological Survey Sites ofBiodiversity Significance
located within the project area. These areas were both part of the MBS site "Elk River 36
Westcentral" and were given a biodiversity significance rank of "Below ". A U.S. Fish & Wilcllife
Service Official Species List for the Project site listed one federally listed threatened species, the
Northern Long-Eared Bat, and one candidate species, the Monarch Butterfly, that may
potentially be affected by the Project. There were no critical habitats mapped within the project
site. The U.S. Fish & Wildlife Service Official Species List can be seen in Exh�ibit C.
Natural Heritage Information System (NHIS) data for Sherburne County h�as been obtained by
ISG via a license agreement with the Mi�nesota DNR (LA-1040). A review of the database
ide�rtified 1 rare feature within th�e immediate vicinity of th�e Project site that could have the
potential to be adversely affected by the proposed project. This rare feature was the Black
Sanshell mussel. The Project site was located entirely within the mapped element occurrence of
the Black Sandshell. Since no work will be taking place within the banks of Ti^ott Brook and
erosion control BMPs will be implanted during consti^uction to prevent indirect impacts to the
stream no adverse impacts to Black Sandshell populations are anticipated to result fi^om the
Project.
Page 15
b. Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be
affected by the project. Include a discussion on introduction and spread of invasive species from the
project construction and operation. Separately discuss effects to known threatened and endangered
species.
Existing plant communities will be affected by the change in land use. Approximately 148 acres of
wooded land will be cleared to allow for construction of the Project. Based o�r historic aerial
photography approximately 62 of those wooded acres used to be cultivated for agricultural
production through 2005, after which the land was left uncultivated and naturally developed into
its current state. It should be noted that many of the trees onsite are fallen, damaged, or in poor
co�dition.
Additionally, an approximate 392 acres of unavoidable permanent wetland impacts are
anticipated to occur as a result of construction of the Project including the ghost plat areas. This
includes the following:
Main Pro'ect Ghost Plats
WCA Re z�lated Wetlands 2. 71 0.32
Minin Pond Incidental Wetlands 0.89 0.00
Since there are no critical habitats located within the Project site this change in la�d use should
not result in any negative effects to any threatened or endangered species.
Measures to prevent the spread of invasive species during construction include working in non-
infested areas first before moving to infested areas, thoroughly cleaning equipment after working
in infested areas and before mobilizing to a different portion of the project site or a different
project and revegetating disturbed areas as soon as possible after construction is completed in an
area.
c. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish,
wildlife, plant communities, and sensitive ecological resources.
Unavoidable wetland impacts will be minimized to the greatest extent feasible, considering the
site constraints of each proposed wetland impact and surrounding area (such as special
considerations per M1V Rules 8420. OSI S). It is estimated that the project may result in up to
approximately 392 acres of permanent wetland impacts that will occur as a result of
construction of the Project including the ghost plat areas.
Wetland impacts were avoided to the extent possible during the preliminary design phase of the
overall site pla� (ExhibitA). The final design will attempt to avoid and/or minimize impacts to the
extent possible. Should unavoidable impacts remain, the proper permitting processes will be
followed in accordance with the WCA and/or Section 404 of the Clean Water Act as applicable.
This process would involve applying for a replacement plan potentially requiring compensatory
mitigation. Th�e area of wetland impact and jurisdictional status of the wetlands will be
determined by the proper governmental agency during the permitting process following
conclusion of the environmental review process.
Page 16
An estimated 148 acres of wooded land will be cleared to allow for consti^uction of the Project.
Based on historic aerial photography approximately 62 of those wooded acres used to be
cultivated for agricultural production through 2005, after which the land was left uncultivated
and naturally developed into its current state. It should be noted that many of the ti^ees onsite are
fallen, damaged, or in poor condition. A tree preservation plan will be submitted to th�e City of
Elk River for approval prior to commencing construction.
14. Historic properties:
Describe any historic structures, archeological sites, and/or traditional cultural properties on or in
close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3)
architectural features. Attach letter received from the State Historic Preservation Office (SHPO).
Discuss any anticipated effects to historic properties during project construction and operation.
Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic
properties.
Information was requested and received fi^om the Minnesota Historical Society State Historic
Preservation Office (SHPO). Upon conducting a search of the Minnesota Archaeological Inventory
and Historic Structures Inventory, no previously known archaeological sites or historic
properties/structures were identified within the same sections or adjacent sections of the proposed
project. The proposed project will h�ave no direct or indirect adverse impacts to archaeological sites
or historical properties. A copy of the SHPO correspondence can be seen in Exhibit D.
15. Visual:
Describe any scenic views or vistas on or near the project site. Describe any project related visual
effects such as vapor plumes or glare from intense lights. Discuss the potential visual effects from the
project. Identify any measures to avoid, minimiae, or mitigate visual effects.
There is a large open water area that was formerly a pit resulting fi^om past mining operations
present within the Project site. This water body is currently landlocked within private property and is
not visible to the public fi^om existing Rights-of-Way. Development of the Project will avoid impacting
th�is area to the extent feasible and will provide scenic views of the water body within the future
neighborhood fi^om roads, sidewalks, homes, and yards.
The completedProject will not create any significant visual nuisances such as intense lightpollution
or vapor plumes. Visual impacts will consist of nighttime lighting consisting of streetlamps and yard
lights typical of residential development and required for public safety reasons.
16. Air:
a. Stationary source emissions - Describe the type, sources, quantities and compositions of any
emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air
pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including
any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of
any methods used assess the project's effect on air quality and the results of that assessment.
Identify pollution control equipment and other measures that will be taken to avoid, minimize, or
mitigate adverse effects from stationary source emissions.
Page 17
The Project is not anticipated to result in any temporary or permanent stationary sources of air
emissions. There are �ro existing permitted air facilities or sensitive receptors within the vicinity
of the proposed Project.
b. Vehicle emissions - Describe the effect of the project's traffic generation on air emissions.
Discuss the project's vehicle-related emissions effect on air quality. Identify measures (e.g. traffic
operational improvements, diesel idling minimiaation plan) that will be taken to minimize or
mitigate vehicle-related emissions.
The project will result in an increase to local traffic. This will result in an increase to local
vehicle air emissions. A number of recommended improvements to the public roadway network
have been included within the Ti^affic ImpactAnalysis Report. Examples include adding
dedicated turn lanes to intersections and reevaluating posted speed limits to aid in traffic
circulation and reduce stationary idling times. The Ti^affic ImpactAnalysis Report is included in
Exhibit E— Ti^affic Impact Analysis.
c. Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and
odors generated during project construction and operation. (Fugitive dust may be discussed under
item 16a). Discuss the effect of dust and odors in the vicinity of the project including nearby
sensitive receptors and quality of life. Identify measures that will be taken to minimize or mitigate
the effects of dust and odors.
Dust common to construction and earth moving practices is expected (in the form of fugitive dust)
during periods of dry weather. Dust will be visually monitored and recorded in conjunction with
the NPDES Construction Stormwater Permit inspections. Appropriate dust control best
management practices (such as soil wetting, misting/water vapor, and hydraulic additives) may
be implemented (upon inspection or public complaint) by the co�rtractor as necessary to conti^ol
dust fi^om leaving the Project site during all phases of construction. Specific dust conti^ol best
management practices will be determined based on severity, weather conditions (i.e. wind speed),
and current site conditions.
Dust and odors caused fi^om vehicles parked within driveways and along streets will vary
depending on the number and types of vehicles actively moving in one area and current weather
conditions. Pollutants generated fi^om vehicle exhausts may concenti^ate and linger (possibly
where vehicles congregate) which may cause a short-term odor that eventually dissipates.
17. Noise
Describe sources, characteristics, duration, quantities, and intensity of noise generated during project
construction and operation. Discuss the effect of noise in the vicinity of the project including 1)
existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state noise
standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the
effects of noise.
1) Existing noise in the Project area includes vehicle ti^affic fi^om adjacent roads and noise
generated fi^om the outdoor recreational facility to the south.
2) Sensitive receptors located within proximity to the project site include adjacent residential
homes.
Page 18
3) Exterior noise while construction is taking place may range fi^om 65-95 dBA. Post-
construction exterior noise is anticipated to be generated fi^om intermittent traffic and
recreational activities. All exterior noise is expected to be less than the State ofMinnesota
noise rules in a residential land use setting (<65 dBA daytime &<SS dBA nightime).
4) Nearby residential homes may experience a temporary increase in noise duration and
fi^eque�rcy duri�rg construction; however, these noises will be conducted during restricted
hours. Post construction noise will be typical of surrounding residential areas and will not
exceed the State of Minnesota statutory limits for residential receptors (NAC 1), Minnesota
Rules 7030.0040, therefore, any noise anticipated fi^om standard operations and consti^uction
activities will not result in a decreased quality of life.
18. Transportation
a. Describe traffic-related aspects ofproject construction and operation. Include: 1) existing and
proposed additional parking spaces, 2) estimated total a�erage daily traffic generated, 3)
estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip
generation rates used in the estimates, and 5) availability of transit and/or other alternative
transportation modes.
1) Currently the site has no parking stalls. Post construction there will be, including the
ghost plats, 609 housing units which will all have garages and driveways for parking.
Additionally, street parking will be available across much of the Project site. A detailed
breakdown of site parking is available in the Parking Study included in Exhibit F—
Parking Study.
2) A detailed breakdown ofsite traffic is available in the Ti^affic ImpactAnalysis Report
included in Exh�ibit E— Ti^affic ImpactAnalysis.
3) The project is estimated to generate 441 trips at peak hour traffic on weekday mornings
(7: 00 AM to 8: 00 AM) and 548 trips at peak hour on weekday afternoons (3: 00 PM to
4: 00 PM).
4) Estimates were generated utilizi�g the ITE Ti^ip Generation Manual (11 th Edition).
S) Alternative methods of transportation include public transportation. The MetroTi^ansit
Elk River station is located approximately two miles south of the project site.
Additionally, abundant sidewalks and bike trails are located throughout the City of Elk
River.
b. Discuss the effect on traffic congestion on affected roads and describe any traffic improvements
necessary. The analysis must discuss the project's impact on the regional transportation system.
If the peak hour traffic generated exceeds 250 vehicles or the total daily ti^ips exceeds 2, 500, a
traffic impact study must be prepared as part of the EAW. Use the format and procedures
described in the Minnesota Department of Transportation's Access Management Manual, Chapter
5(available at: http://www.dot.state.mn.us/accessmanagement/resources.html) or a similar local
guidance,
Page 19
The project will result in an increase to local traffic. A number of recommended improvements to
th�e public roadway network have been included within the Ti^affic ImpactAnalysis Report.
Examples include adding dedicated turn lanes to intersections and reevaluating posted speed
limits. The Ti^affic ImpactAnalysis Report is included in Exhibit E— Ti^affic ImpactAnalysis.
c. Identify measures that will be taken to minimize or mitigate project related transportation effects.
A number of recommended improvements to the public roadway network have been included
within th�e Ti^a�c ImpactAnalysis Report. Examples include adding dedicated turn lanes to
intersections and reevaluating posted speed limits. The Ti^affic ImpactAnalysis Report is included
in Exh�ibitE— Ti^affic ImpactAnalysis.
19. Cumulative potential effects: (Preparers can leave this item blank if cumulative potential effects are
addressed under the applicable EAW Items)
a. Describe the geographic scales and timeframes of the project related environmental effects that
could combine with other environmental effects resulting in cumulative potential effects.
Site preparation work is anticipated to begin as soon as the Fall of 2022. Site construction will
take place over the course of four phases which may last up to multiple years dependent upon
market conditions. Construction activities will include tree removals, site earthwork, utility
installation, and the construction of housing units, roads, walks/trails, and stormwater ponds.
It is estimated that the project may result in up to approximately 392 acres of permanent wetland
impacts that will occur as a result of construction of the Project including the ghost plat areas.
This includes the following:
Main Pro'ect Ghost Plats
WCA Re ulated Wetlands 2. 71 0.32
Minin Pond Incidental Wetlands 0.89 0.00
Wetland impacts were avoided to the extent possible during the preliminary design phase of the
overall site plan (ExhibitA). The final design will attempt to avoid and/or minimize impacts to the
extent possible. Should unavoidable impacts remain, the proper permitting processes will be
followed in accordance with the WCA and/or Section 404 of the Clean Water Act as applicable.
This process would involve applying for a replacement plan potentially requiring compensatory
mitigation. The area of wetland impact and jurisdictional status of the wetlands will be
determined by th�e proper governmental agency during the permitting process following
conclusion of the environmental review process.
An estimated 148 acres of wooded land will be cleared to allow for consti^uction of the Project.
Based on historic aerial photography approximately 62 of those wooded acres used to be
cultivated for agricultural production through 2005, after which the land was left uncultivated
and naturally developed into its current state. It should be noted that many of the ti^ees onsite are
fallen, damaged, or in poor condition. A tree preservation plan will be submitted to the City of
Elk River for approval prior to commencing construction.
Page 20
b. Describe any reasonably foreseeable future projects (for which a basis of expectation has been
laid) that may interact with environmental effects of the proposed project within the geographic
scales and timeframes identified above.
Reasonably fo��eseeable future projects that may interact with environmental effects of the
p��oposed Project potentially include adjacent residential developments. The City of Elk River
Comprehensive Plan projects the city to experience consistent population growth through the
year of 2035. The growing population will �•esult in an increased need foi� housing. Properties
adjacent to the Project site are currently zoned foY single family residential use and as a Yesult
will likely be looked at as potential sites for development. Due to the lengths ofplanning and
desig�a any adjacent developments likely will faot occui� durin.g the same timeframe as the
constr-uction of the Project.
c. Discuss the nature of the cumulative potential effects and summarize any other available
information relevant to determining whether there is potential for signiiicant environmental
effects due to these cumulative effects.
Following construction, the P��oject is not anticipated to contribute to any additional
environmental effects resulting in cumulative potential effects. TheYefore, the Project is not
anticipated to contribute to any significant environmental effects due to cumulative effects.
In addition to the potential environmental impacts addressed by items 1 to I8, the economic and
sociological impacts of the project were considered. The economic and social impacts of the
project on the local community are anticipated to be beneficial by bringing additional housing
opportunities and property/sales tax income following construction.
20. Other potential environmental effects: If the project may cause any additional environmental
effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will
be affected, and identify measures that will be taken to minimize and mitigate these effects.
There are no other known oY potential environmental effects that were not disczcssed in EAYV items 1
to 19.
RGU CERTIFICATION. (The Environmental Quality Board will only accept SIGNED Environmental
Assessment Worksheets for public notice in the EQB Monitor.)
I hereby certify that:
• The information contained in this document is accurate and complete to the best of my
knowledge.
• The EAW describes the complete project; there are no other projects, stages or components other
than those described in this document, which are related to the project as connected actions or
phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively.
• Copies of this EAW are being sent to the entire EQB distribution list.
'"� i�'� �%��da�
Signature - � �_ _ �- ���- �- Date ,�" �
Title � f MM . �% - I� 1+'�G �0 �
Page 21
� Architecture + Engineering + Environmental + Planning EAW
�-._ i`+ i5 $ 17 ,�6`— IS 14 13 ic ic in
� I �T`34N � T`�: �
� i�2fi�,n,! .; pn�dke � EII< Riv� � = �
z `� _ kw�' � � �
21 22 23 24 �-
Sherburne °�So ' '
�
� 28 Z7 26 25 �
County
�� �
o a
F y
33 s9 35 36 � o
4i � S.ird �.
��o A�e , �
4 3 2 I J�l.e L��G�.l.��n qp
- 181st --� ��/
� � ���coln 1805 Ave NW ��
9 10 I I I Z � � J St � �
�
14 13 18 17 16 IS 14 13 IS 17 16 IS 14 13 IS
-- Nowthen
-I 23 24 19 20 21 22 23 24 19 20 21 22 23 24 19
� Elk River
26 _
- �, 28 2/ "L6 25 30
10 169 �� �r� �����r���
?5 �I �� __ � 31 32 _� _, 35 36 31
I 6 5 4 I 0 -�
wrlght • � " 2 I 6 5 4 3 2 �
14 13 18 �� 16 I5 �� �
14
0
II 12 O 7 8 9 10 II 12 7 5
23 24 19 20 21 22 2� �
Otsego �� Ramsey _
14 13 IS 17 Ib IS I! 13 18 `
� Z 29 I �
� 20 21 22 23 24 19
- =6 6
� 52 � 3� _
29 28 27 26 �5 30
6 �i/70kQ �
5
52 �� y 33
;;�`� �� ����pj� 169 31
II II 12 7 8 9
10
� a I =��. � II 10
I 4 � 3 I � �C� Cll �1 Z� I � I 6 I 5 I 4 ����' 6
S � �
�j Anoka ' ��
5 Roger� Dayton �Z
24 7
23 24 19 20 21 �_ __ I`i 20 21 22 23 2=} �
19
18
26 25 30 29 28 27 26 25 �� 30 29 �R �� �� ,c �
� I u.0 . . �,._� � � ��I�..mb � ��_
F i u re I
N g Source s :
0 I 2 ' Municipalities (MnDOT, 2016)
Miles �
PrO�eCt �OCa.tlOfl Map Roads�Mn�o-r,zozo�
Lal<es (MN DNR, 2020)
I in = 2 mlles �OSte1" ��"Q�e1"t�/ Counties (MN DNR, 2013)
EII< River, Sherburne County, Minnesota P�ss �us�s�
` " - "� ,� � • � f - - � Legend
, . .�
. ' �• ■ �,
� � � Project Area
%� "! ��j Ghost Plat Areas
�I� �f�� � r
�
}+ '4 ► 4r � � � ' '` ��` -
` �` {,1 �� "'a . r. � �
' � �
� - � � t ��l?
a y, . -
� , �' s - - � '� -' ,'� ��"��► � - � � * .
TW � p�� , �
, �� M ,-�'y '�+ ., � �.
T`� ``Y � � ��� ' t
;�� r � - -
�1. 'E �f _ + •
.. '�� , ' `'� � . ` ♦ �
,�
i �
� s �
�
- _ !�"� Y� _ . .
�� 4�
_ '� ' r ,•f..�F'1a,�'��,��E ; !
IJy •�"��S _ �? �Y� ^ �r�a+• •re ' .
�� ���.> � �f i�
• . J !� r
� . �� . � „ . � �� — ,i Y���. '� F ` *
�+ .R����� .��'� i �� �ri��,�'Rt'�` , - �� • ,
r
`"�' ��} +-� �^`� ��. � � ��u','�' ,�� r � ,� . �
��'� r � !!'�: � � � ,I'' � E
� ^ i". - _ , � ,g � +��`. ,:' a
. � �. - - - r.r�� ., � ••# - � F
.� � • !' ' � �ti«-- � " f _ f '.rr� �■ • o
1+ '��`r. � -_.`.,^�t��' •� . . ��,%/• ,,�' . �
, ,}• 1 �"w - r y � .` � � �_ frf/ � � �. l7
�.� 4 'k� .• d . X � �� ., � , �' j � / . I �
�-� � : !.l � Y,.� �' � / '` 1 N
�. f��'-'�`_ ` s'�, ''' �!� yLi' � �f ���%� .i
; i u
r •r .f�,' _ / � �>
i : ' �� � >
+ � - . �, ~ f,r�, �
�' - � /;���/ � ��� ' I Q
� " .r� 'l ~ � i �1 �
` ��a� �� ft � � � ��
,�.f ' � - �,{ ' � � i � �
' � _ �� ` �
• �` � ' �,1. ■
� �� 1 x+�i1h� _'� 7R.� .� �� __ l�-� �� �rr - � - � "z
- F
� � v
�- ' � .. M � �� � ' � • �- C
�I J
- � r y
, s � 'ti r
�
t { � ♦ +
� � [l � � s
6
�,, � � • . , �� \
� � j!��, ��� �
Y ' � ! • � •
I • � � � ~ .. a �� � � �,
� • r�y �
'J �
•�• - _ •. ■«._--'► -- �- "�".,��!"R_-� •.- • �,r ,�-. �..M._ ..,• .. , .s. .�� '■ _ _� �r�g
� �
. � �� _ • �' �� � + �
;�. . __ � �• . � • o
'--.`, i • . . ; - �
; �.,� r • ': -- � ` �
r'( , ��. . � � � • � ' ■ �
� ��� � I ` „ � ' �
I . ti �
�t. � ,+�' - '""� , � ��., �, �,sa i ` . � .
Tn���sday� May s, zoZZ �� �iz�� N��,�e� zv�ws� �'
Figu re 2
° 500 ',°°° N USGS Topographic Map Sour�eS:
� �
I in = I,000 ft Foster Property 241<USGS Quads (USA Topo Maps)
EII< River, Sherburne County, Minnesota
- � ;
-�-r�:. .. �. - ' na�
�
�L
(%
d�
q.
��~ ' . �'"` i � �'�.'6 3 `^! � . - �2��,�`
� .. - ��-,.�„�; + - — : - _� • 'i `. , � . � � v Y:7 � g- n
T�, ^ ' , �'�, � -� sx .� t� _ r :`' � t � a, ' r� � '
_�pk�,yykes `4ir\ _ _ ��� �� 1 . � .� �- �� .. ��, � � ��'°'zy�_ i �' .
�- �y�, �'^.r _'/s-j ,- i _ f��l� �! �� `:il
r � � :i�'' �: "'`� { . •t.._ __. '? \ h
kr�� , � - V * �+-_ y - � 40 �
� � �t ��` ",1 '�s • ��� ^ ' ' [' �y' 'f, -i�� �
.a.. �^ n: �_ S�,• !. �" � / .
* �` �r���- e i , � i
. �.' ��� 1 F { ! . 1 `
,� .` � �. ,-��r,�,�= � ' , - -`F,t� .�" `'� i�' , v" ��,�"
.�r 't � r 4 rl , } S� ?� _'y� ! � �'' ♦
� T• 'f'. f� '7 - -��• �_.
� •, ,,
e `'ti ` I � `�'
` �, �4 - - � � -. < ,:� �` ,�, � � �#
. � �•-`, h �at . ..r " _
• . _ _ ,1 t �la%y � �. .. . _ a..r� ' ,�� . - ,� .
.•f �;.4 L` � - ``�"` - �-'�. � •��_ �'* !� �
-�� ` s � . �- ��N i'a't ♦ . �' T' ' -i
�':.i � , " �� , ': . - �.{
���i t � ..;,si �.c' ' � :ci f �.�'e � � � Y.S�� � , v .f-.,
a - , ..M t �._ (�. a � R
'# _ . ����+'�� � 1 .
-rw!'t _...._ � .�•i �4�'w-,} � _ �k ai.l ��'y - :1_,_
�� . . . � G- fi: Y . � . S�y��.
� }I:� ` "� � _
t,�� , ,��� � �J
�. , �
. in�'�yj �. r-+ -- � � ��
� �' � ' '
, , /'� � /
in ��# � i ! t / rf..! � y
��+ � 3"� I y 4 ,� .` - f. ��
'�p . r - - - � "_• , ,�� - -' � - -. L; �' / -
�0�� .te. . . . . j. r � � �� ; �. - . . . . - � � .,,
� � � �. •. �� ,}� � ��
..� . . _ ?�, � �� �,/�% _
�,n � Y. ' y r: . _..��A ._��'�l�t�i . . , +
`` ' � , �► t,rs���
� 1 -: � '
"� 1 ` f � ,; �* y
,�s�'� � , — —. � �-` . _ _3- — ' � ; � . A �.,,�
��`� w. , � �z: - r. -
783rd,'q� { ��' � � � t . '' � ` �' �
^rn� / . .� '�?� , _ �. . `'a
.� _ � �`
���j ` ��� � • `4 �._ _ _T.. � � I �'• , 1
..�,. ". .. � , _ . • J",;� .-� .
,� r,-.• � , � ---- �r� .
Legend � �" ," - .
Q Project Area ,`s'.� � ,�_ �
, � � ' � � ` � n I ,�.
, //i Ghost Plat Areas ,. .� `' �` �� t• �
�' ,. . e M .. a .
Land Use ��: , "� 3 �`''` � �
t�j _ _ -
Brush/Grassland -' " -
�tT��.r�+'• ;.
� Deep Water/Streams . O 181st Ave NW
"�. --
Impervious Surface = � ��_ . _ , �
z
�dwn ,., Lincoln St � 180th La 2� �n
� Wetl� ,� 3 Q � o
D � � # �T'- 3 "
WOOC . " ._ < o � �� v
- s �.rh - � � m � . ! f, i� . . '��„��� o
�
Monday, Odober 24, 2022 Project N��mbec 2b25553 �
Figu re 3
0 300 600 N
ft Existing Land Use Map Sources:
� Orthophoto (ISG Drone, 2022)
� �n = 60o ft Foster Property
EII< River, Sherburne County, Minnesota
_ � � �
-�-r�:. .. �. - ' na�
�
�L
(%
d�
q.
�. �j , . ���� . - ,s "T' - . . . ,qti•,6 7 =•, �. .� . - �2/.-��
� �`��. ' , '_ _ . V. `• , � . � , � Y�7 � Z T�--. Y*
y. � �.- � -" � r . L�C.\ �
T w�n �akes� � °� ,� '��l"� 1 . �'�., - � a, �,�, �, ,� '
Pki,yy �� , " �
��� ��- � r•'t ; ������f�
_
6 �v'�.� • � . r �. 'S•. f.„ �
- .Y. R S � .. . _ � � ' : ' _ - -' ' r .
�= , __J�_ i� � � �„ i - r - � � .
. -: ,
,
^" _. .- �� y`lj� � rj� ��� -� r,
�,.. . .., � '.;`}� 4 �', � -�� C., , �� 1'u�1 l{�,��-�- . - _ - I 4 ��
- . _ I.� t L.�. I � �� �� � . �. i .
'' � '�a'� II � � � .�: i'. �_.. - . � `� � � ��I'��. ����,�.i: `� � � �
. '� � .. _ . _ }� .,_ -' , �� -•�, Y'
� • 'at :. !f }}� .. Ii,ti��Y����� . . ., . y -.� -�. l�y �h,�r r: R
.-�1"; .� ¢:' � � ,.�' f��'` .C� i �� {� ,, ,,-.,,_,�y ,. �I�I �1� ' � �_�� r �;r� '' '
�� ,�r �' S _ } _ � -%��,�J��rs i�'1 Il �'�1:� � , � �'I���y,�,J � � .�.`
� tl,. � � � db C',6� t� t .�` !� '� t� �, �' � -i�. � . _ ��-
�
��� •' ' . . _ 'd°y �' .��1 � I I I �� - � rsL
� r �,� �_� ,
� �r �.. � � �� ,
,�
_ � - _ .��� ��s� r� �� �u._ .. r ° , �.,� ,
� ��; ���j^�5�r � �
� � =�F utJ� l� if j � - �..�� � }s'1'"�1�,�� �*�•� '�r j z � -
� .-
,. {� �� `
0� . ' k �.�i �� � .S� .r �i �` . '�' ,r�...;�'�'�}`��� � � s.s' _ �..-. r - -
., 4P , r , _
, � � � ..� , ,
*� r ' � � . "�,'�,� .� t� �,'�'` i _ _ � �";'' 4�� •`; - �
•� �. ;�. .
"_
ti ,�. .
� ` ! i ^i _- � < '' � � ;� . � � _
j� _. L.. � " � �1' �"1'',�L�` ' � �, ,��" � �:r� � r ; `� H • -
+�=�' !--i k'--, r �t� L4 i��_; ,����t`, � " s .�� �� s �:J�.
d F`� -'-1 � � .us^, ,:�' "y-
�� L ���� �- ��-��I !� (`. �, �.: £' - _ - ,. �`��
� -�'. `�j��.J i��i ���,�,, �a��:�` :- --'fI rf' y��yj,.w�C I4�j� 7}5—
. � � f_ � __, _ - i � ' �i � �`"Y1 � � _ _ _.� � :
� .�"`� 1 �, L _ ' � �__I . _—I L r {
'�i► '_—. ��- � ';� �' :J `� '� � � h , �,�1 �
__
4 � ' �' , - `���� , ��: �� j/���,�
� � �,�,�
:�` � 'r� - � =- :�^���, E � ,� ��j`� ,,� �,.+�'
i1r � . ,. �, A E � -- - - - � , s - - ' w: xs u b tl c; f:..rY r- i � � .
q �'�,.,�' - � � � �� - _ w� �� . . � � as -� R F1C �,X�.. ���. �� �
_' �� • —�f�,�� � ,� E;
7,!� °r`�r I � � -' � . . - _ � � �` ,:� I , � '+ /�� - - �/��'f
�� � �� _ _ . . � � t ' -i - I i '�� ��✓f,Ff �. � . ' ..
y° � ' :t i � �� ' • ' . - - . _ . . 3a � ,' , ��
���- I 'r�` • • ' . i �� � � ffij f ,+rfl. �,
O p e� � *r '_-.✓�, !� / J _
f �, r : � , � ���`� �,� �i' !��
.��; _� � -•�.w _ • _ � _ ,,� - � '" r, , ,
�� " _ . ' `� ��: � '�--- � - � � ,; J � J �i���T� � " c �
� ' � �'.l. � . � ,�, � ` ��.,-� I ; i; , ,
i
� ,. F � l� I;,_I
� �_ t� '�,�'` �
� _ � ''' �� , - _ ., �
�
j� 83r ,;' f �� f� '- r. � 4i"'� ti' - ° �
�(f7i�. dqve ,�i� �'�/ ',,�f � ��" ; $ . •.J -
4:. �.o� � ;.�;ir.��''�'r'�'���F ._ � �' . ' .. . " �,- . -
— Legend �
Q Project Area
//i Ghost Plat Areas
- Land Use
� Brush/Grassland
b � Deep Water/Streams
- Impervious Surface
Lawn/Landscaping
, Stormwater Pond
� Wetland
Wooded/Forest
r.
_ � ` � �'� .� -
Wednesday, October 19, 2022
0 300 600
ft
I in=600ft
Lincoln St � 180th La
�
�
G
m
Z�
O %
0
�
3
z
v
E
i�
� I � � �
�' � '
�
,•d Y y "��
�:�p �-�
�� ���-. _
��.'�'°'' r��
�� � f��,,, '
^�rf "sf.�..`��� �o
Projed Number�. 2b26553 �
Figu re 4
N
Proposed Land Use Map Source s:
� Orthophoto QSG Drone, 2022)
Foster Property
EII< River, Sherburne County, Minnesota
. ' �w . yA�. •
�
. 3
?� . �-_ _ _. _ " Yi . '11
.�-
� ..ft
�. 4 �
������
v181stAve NW
'� � percent slopes . �� complex, 2 to.6 � .� ,,�: ' .:�. -- ��- -. - �
� �' , �� . . , . percentslopes �S _ . 1, .. ��
,� � �, W - VLLater �.. `•
32C+ - Nebish �� �se - � ' � - �d� � � '� �
.sandy loam, 8>to _;Talmoon � �� - �tbum'fm ' _ '��' N '
. 12 pe'�rc'�""ent`slopeS . R �ndy Ioam, 2 tai6 - � ;,. . �
�,.
3. . �+► ` Ioatn10�2�' _ ,�- � �R _ PeY`ee�opes - _ �' ' mY
� �rl'Y�, . P?r'ceeitrs[4pes -
,� ,j, .� � ,
,, �, , , - '"" -
�y ,,` +' szc ,. � t��� �,�,� �:; �,
�� �- �Nebisti'fine��� .�� r .
^ a�' � � ti�i: • } : � ' '�i ■ Z� �.
� s< : j �
. .i y - • . ,t Z a� � U f � k . ry S�: , � t+- � fine
. � � ii Y' y
. 4K,4�� �I�,iD. �., . � .
•`' �� 730B Sanbum'ri � �'��u��� � '� �� , �r � �. . 1to6�
fine sandy,loam 2 to � �'�� �. � i� ` ' •�- � tiy "� ���� - ,yer�enf
f�i� t� �. ; u 32B Netiish Ts r ..., � -', W = sb �
� 6percentslopes r,L �, � . �5 f_ _.�
; � ,. w, ��� � percent slopes . , = , r ; C S fine�sandy loam 2 i �i��; • Water � r _
j � 1� ( 7�,.� �1 to'6 per�ceq•anf�t slopes ^ � }�� �
t"! .�h . ' }. ;1.'f , �y -.. i�lr.i � le i . ,1.�'�F�� �
1 =� � � � .'.t- .
�
' �r�r . . . . . �
,q. 799� i :. � , . �. .. • . . � �;'
1 �
� ,i�Seetye"vdle.. . � p'f.' -� . � a '„ . . �i�' � . I .
and Bowstnng , � �- a �, 't �+� � ,;A� `s!'� � , . '
sods 0 to 1 ,� Y �` � �� ��t�� _ - �
peecent slopes;�-y � 32C ,Nebis � � � �. +r. ' � .�' '.. t ` 1253B -
fre uentl ° ; ". �� - � �� " "32B Nebish fine„ - �4„-'Cathro . � _ �+�+�' . ' �,�
.a, . 4 „ Y �� �fine'sandy loam, 6 to � �� �� -�.,'� � �'
t; flooded � . . `!''sandyJoam'2 to � .: � ���,:�=4tiO ��R ' �'�� . . :, � . .�' •� �h Stanelake- ':
12 percent slopes � r � - 1 percent•slopes- - _ . � � ' � Sanbum .
p � - , _ 6'percent�slopes �y •� ..
!"'. , ., .. � . ' � +�w 6 � 5' � c°mp. .
f f Y ,:Z '. -` , w � '�` _ � .�t°'Y�F L 1028 Udorthents;Pits, •� : pe cenf"
Y- � ; � � ' � . � gravel; complex
� ' ,�` '�4. .. � i' + � .. . '� w- WateT � ' . ` s`lopes
;, �� �+�, �+L, �` ,�.. y r _ 4, � ,�
. . '�+� • �' ;� • ,: .. ' �,,��.
. � � , - . �y�;; 54� - Cathro � . I , :`.',�", �.
.� � y.'� .muck,Oto1 � 5*„� �i
•i ;>.��.. . - � � . �percent . .� �� �'i
✓
` . ,�f: � �' _ .. Y ,�. :"�;� . ,,^ � �- slopes -`32C Neb�sitf c
�4 G�f �B-- ebsh'�fine s'`andyloam,;�6:t 1::
� �� rri, 2�to �, pe!'esntts�Pe
e '� •c. �' - ,slopes .. �Pl�t?i5h e �'
+ . �' ��7� r.� .; ':"i ". w,� �Imnon _ � �e�n�'so�pes
� �' - �'�
C' ; '�
� � 3�C' �Neb� �me , �,� 540�",,8eelyeville - � � {a � ; � �',�!++�'%�
_ , san�ir.�m B�tts � � ���k' �0,Y,�g - . t slopes �� ..
3 12�per�entslopies . ���� 1'percexit%sl�pes ,
h .�, 1288 �� y` _ - � . . - � � '�
�� Seelyevdle-Markey -•..` . ���
'+c - - - '+5::= .
��F%X, �Po„�d d� b _ 125� B2ltlami - � ,
0 tor9 peGcent �s• - fine sandy, IQam�'�'�. � �� ���
� � slo�� �� ` �. �� 0 to 3 p icent : •_- '��
� � ..� - � w} � � � ` slopest' `32B�Nebish fine
�-346-Talmoon�'"� = 9 ��� - _ � ..r �-sandyloam'�`2�to �
'7 � . � � � a-' �' 6 percentfslopes
� ,-,;loam, 0 to 2 , � � � � ; y, "1946 Fordur V�Rflt8e6#�1 32D - Nebish' � , �,
•� , percentslopes'��.- �;, t �'i1 �� , compleX,Qto2 fine�sandyloam, > - '
�• y ' ` � � - _ � peecent sio es, � 12 to';1.8rperc`ent � �-qi
' . . �. �. � _: � . 9 Y. pe
, �. i -� � ''�-� , �, fre uentl flovded.l�� `x= .slo s + �� �„�' +
4 ., � ' 4, ,. � "i
. �
� / .. - a " _ � 'i �
/ �,i.. � i. i
540 Seelyevdle ,
mtick�`,�to
� �;�,�� �� - 1 pe�cenY�slopes .
• , �i, r 4,
346-Talmoon -., �' 4_ �}'� �
Ioam,Oto2 Y', ,-- ,, � � ,�r,�� . �.y�.�_ . �
percentslapes MF ��� ` . #,. �
k� ��
- 1254 - Ricelake fine ��
5 - Blafl(vn loam, - _,�� �s ��• .
depressional, 0 ta sandy I�, 0 to �Z ,
1 percent.slopes 3�peroent4slopes - � ,/�rw��
f :1' _
I�� -
w '`jS��,... � 1 �,yr ` , , } � �� � e `: s'�. .. ' e���� `��
�i �.� l, �
, F . l y e e . s� '� w..:. � o "�
r'F� i':r�t''� �a��..• . �^ m -.� 0-,� �'.�p �S� B a�� �y �`
��v rF .i .'1 � e� � �5 " �� ... � B ��� /
.
�j " .� � °i � ri/'�
� ..{� ' r ,� ' ,. r..
� . . - j � � !I � / - � _, �', s' �.+r�p'- � �' ;
..-o �... . ..k ' r { .. � y �� -��,.y�� �` W �� .
e , _ � ��
, �� ', . � :f e ��b�� ��
,� ; � u . ' m 4 ` " o �:� '
� ° ` � a � �� � - _� ° O - � �t • � =:s� t $ � � er,
r ��
,� ; D r'•,`. � - - ., -_, �•i
_ _ 1'
r -."
, . � . .
. . '�'
_ .....,
. .
�
� � { . i ���,, , - - �', •v
. ;, . � ,. tr
t
� „
.
i..
. : - • • . , . iJ" _
r1
. J � . . . � .... � � � �t �.
Rr�', . 1' .. �;. ,� ..� � � ` �:�r'� F� ��
� '� � ' � e�3 � i�J
�� � 3 � �`.' �
�h�: � �' ��, �?�.� , � �(� `�,4 —'� � .�
� r Q: '�: � . r . . ' ` �� .�
. , �, - i
• � �, ; ,
; y , `k'
' rr. �yY�/y �C n' � '- � I �'' � �� �" � !. �
� n/ / � •.� ,� I �• ��,y.4, . W' .. �`�I � 4 .I� t e...
� � I i 7
v 'r . � '' r, i- � •
� �� � � �� �!S
� r � J ' I � ` ` � � — ,�"�, i'' ` � 'f '' - 9'
0 3 • - -�} .�rw-r�� � tl ��f � ��^ ,��- � �t. ('�,� 3
�� � � � �� - � . �� , � . � _ � '�� � �
j �,
1 ; � h'� i� .J
� � '
� �� r ��. , . �- �� �' .. fi� �' r, i ..
..
� . . . Y�y!. .��,�1 � . . .i..
.
�� 4 � . � ... . .,
, k
,
�.,. . ';�" •r-, � � ..,' '_ : :..
, �� r- _ -__- �> �•,��ec 'C�.
' , r�Yt���: � � {.. � . ..� p - e •��i��'O
1�y� A
a � �! �', �
. , � . .� � �� �� �. � �
. • O ' . . _ . " �., � .. f _
e F. � ,. ' � f � .'A.._ • � /r�� `J �•,� ,� / . ...i
�O ' �
� _� a �, #�, 4 s�y-�;:X �,. � { .
r ;� � � : f r ' . ���,'."` j ', `,,,, ! . .-
_ ". ' `� r � � -, I ; �'���r'� ��.�f �' `r¢
O ,i (}��'� ' �:� �' � ".
� °e _ 1� � f.&:� tk" .r� � r,r��,..�
� ,� , �� � -
, � �` °as �, ,¢ .
� ,,_
� � � � � �' �
�/ [7" �`� ,,
. ('. . - . �� r , p
i '. �.. . . { ; ' .: �
. ..� . _. .... . ,t� .
4 � : „ �.- - - _ ,�.
,_.�r e0e . �.:� Q �
ve � � �, cs�
e �p -
� � � � �1 •ae � , �
�. ° � f
w � °oo
Leger�ci s a a � �
� � Project Area } � ^ � �
� s��,f Ghost Plat Areas '4 - � �.� �°B � °°�
�v
; � •�
10' Lidar Contour ;� .���_ =t . eo . #
k
�` 2' Lidar Contour ;�oo ! � � � ,� r
� ,�� i',' �', _ : n r
Thursday, May 5, 2022
Figu re 6
0 30o boo N LiDAR Elevations
Source s :
ft � and Hillshade Maj� �°nt°���"'�T°P°,Z°">
I In = 600 ft i f-lillshade (MnTopo, 201 I)
Foster Property
EII< River, Sherburne County, Minnesota
' 1 � Rr i �� i • /r, + I.'� G, .s,f , -� i,
' �".__,;���`i� � �
. - � h �L
... .��.'�. � 1���� . � �5 (�
�
: d�
..� � � � - . � � �. � ... �
� I :.. �
� .' � '_ ,� - ,
$. ,. : �j �2/" . �
f � ey
z� �,
: ' �,� s " r � „
�: . , � �
- Tw�n �ak , - - .4�Y , x � �
Pk es R '
� _.,� =� � ^'F_. �.^3¢_ _ ��+�?
— - �- �_- _ �.-, � _ 40 �
. � „
. ' c�'" �, .
o-
'� ' yr •... �`
,. � _
�� - y� . -�! :,�:, I .
,i�2 �fi "�� ... J'( �
�� t� -
�' ;�
�
��,F " zr-
" - `�
n, '•-
�� � � � < . �
� _ ; G _ 4 � �„�
� -� �� ��
�;;� �s -.. � �
��;� �� { � �
�� , �-. -
w�`�� � . r.���,�;��� ,, `' * �
,--. , �`�� , -" ;" � �- ,�
�4 T.
,, ;�. � . _
�A , - -
:,.
-�T _
;�`� .r ±'�.a; , �' � _� �` �" -
z .� ^-;g� • . � S , r t. . � .
_4"y � "i. �, 1 .� � � . � � • �/j' ' ��C` �
. �?�i .��.�� � � / �'�'` ��' f ✓ !
�. , r �. �. � , � .� ,% F
. � � � * � , Y + � ';�,y �l ,.: r .� � f, . ..t''. � � �..
k' �,�F � t � �, . -y t,��: :� s, ,� ' , ,,
� / %
}"'� y�e, .�. �_. / i 1 # �� ,� �/' r �
��C..�^� .Y�.r#.. %���1.�" ���I'I-�I`f ��' � �'. j�f` r j..
�yo � r � ,�p �� �/ �� `�i e',�" , � � � � r f �i . z
� ,�' r ,/►
y�� � a� :�'. a � ,�"� • „�s�t� • �,'' , . � � : � ,,%� ` ,�
`i ' � � �S i .i ` . � ''� 4 f /�'�
t � � �,, :t �. �1:
.+,��s: ��, � � . '�, � - � � - �
I � " . - ��. ' . . � r
_ l I : : * �� � �� 4' , . � _... " , +� "
� .
� .� � _ 'y { � � _ �. , � "
: � ! .jY�te'.., r .
�' e
�..
.� .
. �� _ � . . . ..
. , � �r fi �
�8 . ' • , y.- .f � .. �" ' . � � ��f �: � '. _
��rdAve , f, '�P � ,,.�;� �� rr�f'si: ., a '°'+' '' �, J ��
^� ,�'�� , ,�` � sy";;a +�� , ,, � t�� �
r�n��,�' � , �' Trott'� � ' � j i`�
+� �: q,� :� - . :Brook '�: � ,�,•.`, - �' G�
� �-�:- - �„ � ,�-�
,. .- •
I�, �� I f�� • �- �� � � � . �, . ��� . ��. '- -
.a'e� ! � • ���� " �
� C —_ -� - .��s-= � ,F�� �
�' � `--� - �� �
,
Legend �� 4� , -
■ �_
- - - =-�- - �� �� �.� ;�
_ Q Project Area �/, Impaired Basins
//, Ghost Plat Areas National Wetland Inventory ""' ��
ave NW '
� Wetland Delineation 0 Freshwater Emergent Wetland �'
Aoproximate Wetland Boundary � Freshwater Forested/Shrub Wetla ' � -= ` z ���°���_ - . � "'�*i�i'
� �DNR Public Watercourses �� '^
� Freshwater Pond _
v
_ -DNR Public Waters Basins Riverine Q � � �� �{ ;i,
�` �Impaired Streams ° � �/ .a; ' � � � ,�+, _;
r, � �•�; r' v �.�y,,� �
-- �` - .� � _ .. _ �.'� . ;t`i .r �� .� r', ._. / .h
Tuesday, October I I, 2022 � � �'v �n��� ��e553�
Figu re 7 Source s:
0 300 600 N Orthophoto QSG Drone, 2022)
ft Surface Water Resources Map wet�a�doe��neat�on�a�obSon,ZOZ�;
� NWI (MnDNR, 2019)
I In = 600 ft F�$te�^ PC'Q�e�"t�/ PWI (MnDNR, 2020)
Impaired Waters (MPCA, 2020)
EII< River, Sherburne County, Minnesota
� �, _
� �:
�
Ii
� �
�r�
, .. i
�� �.
m ` ;L firy �
r y 3�:
�`��� �e�h � 4
rI. , '�,"`� j ' ,'�
I� K � .`. `�_
* � � r�
9 + � y . "���q i►
R ^�j . •sj:i
i1, x
�169 y � M �F �r'
� � 4 � ,+,�:'`�►` !z
4, y � t��
� � �� r
yVp +�''� �
,. � ` - � �, �a r
■
� � N � r �
4 � ��r
�i� �:
F �
�-- ° �� � � ,
� , t -
� . '"=.
�� , ;
� � � � � �� �� � �
,,.. . ''a"' �� �'�`'.�...� �- _
Tuesday, October I I, 2022
o i,000 z,000
ft
I in = 2,000 ft
� — -- ..,r..yrt' _ . _ +.• � .. . p�... °'.i-.:.' 4
-.,+�r� : �� � �i� � �i!
- i .�''�{
,�.h � i,4 ,�' � �,`�..k� i � �� � i �' � I .
9 _ � 1� � � � � �� _,�_
F
� i r.._ .. ..�..'A�
a � �.�-,� r Y•�� �f ��. . �y�' �
� ` �I �,: .,. ♦ r'7
� �.�-' . -+. , -� � �f �.�
� ��- '. �'��'
.
� � k �� t r i� y��� � i
f� � `�
� � � ,�' w`�� � €; * ; _ . _ � �
*` F
� �;��� ,��j =� � ���.:�
��$.;; � �� r�� � �� -ii P � � h , i �
��+ ;r x E �
� •�i� - � *.
+I�w�} 91r � �r•i �� y. .
. . \
f . T�� ��t t _ :^��'£�• _ �M�' . ,.:,.. i .
�" 40 * ��.t,+� �� J� s WY_,_ � i
«7)
uar� rr+�
43'� �•
- " . r � � � � � . ..
�° - �'�`-` y'� • � ��1{ � . .. T'.*y .. �
���� � Y 4 � O,R'j q p r'''y 1
� N �
�� � ��� � ���,a
��`,�
r� '��+:_ �'s�,� t` `':, �65 � .'l��'
!� F°� m �a. � s��,
� ..�1� � . � •; ��, ' d'
,. ! '• �s � � � i P;, Y�y{ � J
� - ����.� i 5 �- 'y9" i� ��} � �tl1�'" , k {� I
1� 1' � S{ �''� . � ^'�: f
�-; h" ;{ �
`- _.�, � ,��,4 ��
��
s � • a, � , : ,
. �! �� � y �+.� ' �I�x!�'r� i . �
ti �
�•.: -. : 0 � �Y"y ' J . 4
. { •
. - ' � ° �� . �� * _ � y � � I
.
� � � � .;� � -
. _
. �. - � �; '
� � � �
/:%�� ' �'� :
5 �.. . . '_.r— �r '���-s T ,: ,� F ��. r � Xa.;
�� { �
�
. f �- +�l,r,..'. . . �A'� % �w* .e'��.+t'L.fi' � j 0 1Fv � J"�.�
_ , ., �d k � ;;�� '�� �''- � ��1
+ � l ,�, ' Il �� �, pi � �# � ,
, ��
�� �� : y�,i ,. � � i� r�
.. . , `���I'����� � • � �F++...
F y' � . ; � .'+; _ � { �£63 �� *
i ... ,4� �+ � �;� � � � �x'
'I � �
_. . . F s,� � � a � 4 ..
� ,�i% ; !3,°a� �3+�y`'...
� ti ' . 64
� ;.`.. . ' r , , . ��� �`
�
� '9ge �r �i.` i ���'.�� � � �'�o t i � �f � � �.�
1 '
1
-t � k
.3f� � � , � �I �. � � �; _. !—! d"�. � � '
� �
`} �fr�� � � iy''�� �y,� �,.�. 3 � .. � j �y.
� �
_. ��;•'��, , 4;„�r ' d ';� ,"�,
�, q �i � R
` � JK. •..� 7 ��; `,��4� ��� + j�� �Y� �°Y `'�+.,��.
�" .�". , ' � ,v�i �z ,� ,�: a� `' : - ' ? ti,� i .■ #�� ` �,{N�.is ��.3
.� �� '� ..7N� � � . . ., � �3..�� a�. _ .. �iL3Yi .
` a �., r ,�'�^., .
�
�it�"..-�' . , � �.,';�� n.� e �� - ;
0 0 0 0 0 ':��''� ;, ..�' �Y � ,. � � �li
_ ,���,�`,; ,."`, ' �{ � ���
. .
�
,. - a.,.�. , � �, , �.,
._ �
���' ., �
��r'�` ' � +r � ■ ����'$' , � r.
. y
f o w++ ., �'
i�� 4 �r �`��
� . . . � 4 � ' � • ,
,�,d -
- i � .s�..
wetia�d ,� � - .
� F}�-; �,,r ��'�
I,i��.�i `� '�'•`�.�`�°�
� � �± . �
i }: - � .�,,,�,�.,�,
.,� �. ��
Figu re 7a Source s:
N o�hopnaca �Fsa, zozi�
Surface Water Resources Map wet�a�doe��neat�on�a�obSon,ZOZ�;
� NWI (MnDNR, 2019)
F�$tel� PI�O�ei'ty PWI (MnDNR, 2020)
Impaired Waters (MPCA, 2020)
EII< River, Sherburne County, Minnesota
�`�`�`.�``��,,�.���n``,��.�`�,.\.��`�``,,��;�•.���' �� �`� .`\� \�`��` �\`\��,��:��� ��,`��`��:
- � \ '� . ` �: . `�� �w � '�,'`\.�\ �� ,,.' � ?� �.�
. .
, .
, .
_. , ,r, .` r `� ��
�., �
�,,
.
. . .. � . `
•�� �
F ,� � a # . . � ,.. . _ - 2���
�' � , : -- ` - .� � .ii
y�? '14� �:'�'�r • - 3. �- � ' .•r: �+.` - , t, µ n _ ,
' `. � �'�,�• '�' �►_, - .. c'` � � �'
,Twin �akw � _ '2" � r \.. � �. , �` , � � ,
Pk�j' �s ��� � � �� �� � � ' �
� •., _
. � , . `i` �` � J�v
,a
� `.
` � P ,: , _i��a 40 r_'P��'►�
a � *i:: lt� ,�;:_ '� r X�+���i'�� ���������� _... . . ; �
, .T� �. � I�J _ .t.v b � _r � �r _ y ,`.:'66
Y �.
. �w�i4� _ E� , ������ - . � _ • � 1,�4; ���i `�1f •v' R '.
, '��i-. -. . ti ' .. ��'- � t a` tiatS .�� �
7 ..�'s�, 4S' , y F,r ,
��n a . lf�F ; .. ' , �
. , �
k �y � r�i•" �� � � �7 _ ��!'-? 't- .�: s . � ' � � •
�+{c � �(1 �
I� : '` -t 1 v:. � J� v . (� j�' � � � ' �. � '�
.�. { �f �,�.' '�+1 {I p`i��.r�)l� r'�h`J� �4 � �`�M1`3 � 1 `1 }}�� .
.J� � �4e� ��S]��v��' . � � ���� '��� � � •�� �' �� �_£ \
4. , " ..�-:�, . �)�'�' - �.�;-,_ y G_� :1�; .�f11 . � - p.
� r y '1 ��'s �, � _.. _ t. :� . � , `� � i�� � ;
{�- R
I + � " . . � . 1( .� Tr ; ..;�:���?h�.•l�: • 11
r S .''�.. . , ,.. . � , h � �i�
` ..,�� .�`j . i• • . � 1�a -...�o r,lj t �+` 1 �\
F . �•' '�� � `��4s � �'� �Elk River � '� �;' , �:, � .
"�. , z- .�. , - - Wellhead' Protection Area , , � \
w . ;f� �_. . —• � „ ; ,r ; ` ,
1 � . �;.= , _; ' — M. i; '.,
;� r. � + � � ., �
'�., *'�' . - ;. � '. � u ti.Ajs: l�' 'it C t
� �' - } �� � J}
-r- ., ; � �y,'
�� ,� 'f� .l �' .♦ � ���,~ � -. ��`
� ��� �j _ , "f �� . � � .�� ,1 . T �-zi t j'��! f f���.
.� r � '
ti : �
�` ° . � ; 4 , =-� � -'�''-•,� �► y �y` `fj f �� � '
"� � r - + " •; ` f/
� � �`� . " t e ,m �,� � � �r� ' � !,. :� � ,�.�/% �%��,
:r � # Y
'},� � M � 4 ~ ���� �
`� �3'�c ,' i �;"'. Y; J �� .`� � ''� . _ �: f-� .. . „��..� � ,�� ` � `f�j��' �, . � , .-,�,'
yo � �fi"�F � a��C•� nr:� -- �. y'` a� � �,�1: f ' f
y��\SS J �S}.F � M s •� - � � � �,: ti � ; ' �''4 F , ' ,�{ `�yF ���` '. � � n . � ' .rj t .,
!' t r � � . `4'�L`'� , �y t ' � ' ���e � 5
, . . .
.
',, � . , r ;,� � ,
� �= - � �
. : . �,-. jy ,
�i� ! '� �s�t �� 1 � ' g ti ,� _ � � � � '�� � ` �° c, t f _
� � � �+�il. • � ,�' .1 d�� _ �• � .'!� � :y��j..�'. ' _ � .w, . � •,.'� ���}`t �q ry 3 .< �;i
{ „ ..a�y�� -- �3t,l � . ���� � : R + . - • +y,. �.. . , �7
� ) a�� _ 1 _ s, _ _ .'�.�. � ' ` �1 9�' '. ,.:- r
�t �r 4� "�� � ;�. �=i� i '.�v� r �� Q ` �' ``�y
�83dA� �'• ` • ti� �.� ~ j,�,4 � F +i
. ^� �� A - �e f . � ' � Ns e. _a�i � y -- �: � - . .
��t ;j +�� • e � . � . f-'�/ i' i �,..
� ` ,.L.� �•M 'L' � r � �,hA�1•r • I- s;� `# ,! ~ _
N
l � ,� � �'� f , �" `'I - - �/
. � � � I'� '�.+_.� d '��� � . ., i. .
�� oA , yR �' �_�.J�� S_ � � ., r � __ "' ' � ' ' H .
t � • ��. � .. _ .. !., . -'�� Ys x+�. . �;, e r � , .
'\ "\ ti -�' � ,` `�� ' ��r - , ' �-
' ,`� ,�.\```��' i� ,
. ]i
4 ��5� �
��� `, \ l �. � � �� � \ �� � ��\�` � .. ..��. � � � � �� }`q �� .' � a . �
\ . . � . . \� ` . ' � .. :-0 ... ..+ '�•.• . -:'dr}��` ' . .
78 \ O � � ��\�\,��•�. �� I� � � � �1 1 � � � �'�i � (]�%,: . .
�� :� � . i` RT
�/
%f� � �� .. .Y��. � .- .� • . �'� _ y , _ . .
�1.��.�.`���� \ � � ��r _ �
\`� . . .. � , m '-���� . ��` �\\\ _ �I'!! � j•
181st Ave NW '
Legend ��., *. �\ `` ♦ .\,. �. ' .i�
\ . �. �. .,.\` '�
Q Project Area � , • � ti � ", z ..��. �
Lincoln St � 180th La ��. ` '� � Z'. ,;,
�/i Ghost Plat Areas � � � �z v ,-
�Wellhead Protection Areas ��� � � ,.�,� �\, ��\�' . O o .�a .# �
3
O Minnesota Well Index �� -��'�m��S `t � � �\ � •. ��'� � • ��� o
��`�,\.\ ti� �''�.,�\�� "���,\\ , �}� • `�-
l _ � . :. \ \'L � ��� \ \.�l `•. .,.. �,d ' i'���� � �
Thursday, May 5, 2022 Project N��mbec 2b25553 �
0 300 600
ft
I in=600ft
Figu re 8
N
Groundwater Resources Map
� Foster Property
EII< River, Sherburne County, Minnesota
Source s :
Orthophoto (ISG Drone, 202� �
MWI (MDA, 2020)
WHPf� (MDA, 2020)
'� =��y '��* �y � ��� � � � ��.:���+�N� �
Y4 � � � �rt � �
� - a � f ' •f ' ' "' - „� 1 "'`� - '
.�
� ,w � wtt � �' `��� . .
,, �. s < •� —�.
��.. -�ar..- x.,..,�o- � � �r e l at r, � - _ .. � i�'� • -` .� � �,*� �--9 ����R �
-a.' r-.'� =� r. ti . .
� - ��r 5,;; � • ,., : ;- . . ` •_ � :�fi � � li 6' .
.
�, � �
a . _� :
; . .� �� � �� ����:�� � ,�� � . . .. � ,
.� _�
i >
,} � r� � � � . S"'r� � ,� y � +� lJ - . k'`..
� * �- �,, :�'' �'`r�r ,. ` � _ r. . ,n ' .
�^ ,t�� • , � �, • 7i ,�: .. t_ .�ri � . , t
1�� F � � _ �� �'�'��y ��� ��� � ` y
� ` .� � �r'�^k �l3. � '� • n ' � r £� '` y. a , i. �,�,�, ,_'�;`1� � �: �� '�. �. '�
� r'd�:`.�' ��r . � .c : �,,; , �y��ll'=ti ' ,� r , �"• �, I s.r.�' + a ""T ,�r y, , .,r+,� �r �' t
T Y! r yia
�r .t �a� ���, - e} i�� .� � � i '' +�.�^ `s'. `� + Q T �� I �'..
ry� � f � b�a� �. '� •1� , } � �i� .� � s �..
�i� �,� �* '� i '°s v.,�' . i / � . r �� _ , i, '� ��� •� �� �. �r �t ..
yy�� � �.�'" �". �� ��: �.�y..: .. � 4! � 1 � �-'�F �� }'z�� r'��� ��ataa��ry,'.� I
� _�� . _ . i.',• ��� ^ _ ' _ _ .� ! �T1 T� ��
� i� � � 1�, � I'.' r� 1f.r'-` �'.' ^ t ,' A l 5 1l `�..
. . .
..• .:.'- � �.- � - . . `�
� Y� .T
�.� f ... `�, R,_ 6�!. ._ ' M �w. •�I
� _ �T ,p J. -... � �, �'.` � �` �. � iL4,�., '�'T°..r,t • �ta' � �.�1�' �,� .�Xj
S $�� { ! �
�.� V �. k��Y f - `'4 - ; ? �, e ,
��.'�jPi � �-r� .� -�� {r�� r .,r,;� .�L ,3'�• ._' . ' �x��.
.� �*` � ' � � , 4 3 , ,r � � _ - 1'i = . �
.,,:� r��
a �.�. :� JY i'ea `.'� `��x ``- .} �. . �� , '
� _ ' 4".- _ "�Y' � .. " _ .
+ � '. � ± ',- � ; r s y 40'.
.
. ,
.
�. � 9 _ . x •I�.�.��.,�y, �''"�� � _ �' 't . '�
,� ' tiY P . �'� ', `-�_ ` s-n �4r � f+.,_ _ _ . .--e
�j �Y � „ .� ��t a. � µ,` �I ('� x � �
- F. � � �, �' °�� s ,, +� .'`�.!.�, 1 � 5�r �, fu
�+7 a . ..(
�t � . - , �'.j' . . � .
. t .�ii
.. �l � . . . L. 9 .
... . . . � . . ]
- i � h i.
. � . . . "Y s .. � �, f i
_ . . i ��. r . �
i4Rw'�'� � :� � , ;�� � � c�.:, ;;�. I � 1�,:�1ti.
Y � _ . _e
�
S�r�'� :�. •.r � - .�� �, - - �� �'T . �ti. `r . . t � .
� '' - � �,� ..�1'.. , i�. �i, _ .�
���� � �`� �. :1�'�� �, ;;� 'T.#� �� . '� y +�� �� � �{� � ��^ \ t 1�ti� �r��y.� .
Y� +� �
�y ��; � ':r I � ,x :..'' P�'�� y ��>:'ry c� � ,: � �.- ., +� �. 1,°w,:! �7t� �,.. ...F �ff
�.
e �: � � . y � -
1..� � ��.I.q � � � ��'�' ^�.y4. . � . piew�"�,� �� -- �� ''L.': `� �• � F � �" ° , . � t� � �! `R
r-� - �� r��� zs� � ' i � 4 ,1. .� �, . _ 7f � - � � ,
y ' T�. '�'�"' .kp� i �`•tl y, � r �- � 2 `'� � 4 •.5 t .
: 4 � J'� � �!�7� �' '"" x r. '� � � ° f- .',� °', ` �.��'�v- �^c�2�+�J � � �
� �,F.+� - I i��� �� .�"-" .y� r�"=� :-��.� ,oyr ��.��• ti �.
'k�f,�� , • a w .� � ,r'� +�ti f ¢" {1-�'#��' �'�,� 4� ,�� �,
' rK ,
/
� r � �.• � � i. � . ` � ��. -; # t � . .r Y. � 4>��. f,
I� � �� � r�� e m � "v l �6 , ' i : r ry .•r � - �' . �° . d'� r
�5��� 169 4 _'� ` �.�",,, i K' .*..+��R �1 +f• ;� a�'sa* � _ _ �� '��
: . . . � � . �... - r s� F a� ,, e - �� i� y . ry - t, -'��,�`i. .
`��' n � -,,�t' _ f� �q ��'�'�� ; �i'- a-„" . �t. ;�.
�"� 7� � � ��.. "� ���� �,�k�R ,,,d� 4�,� r •�....* p�� e r `_ �.� i _ + _ _
''�I�''� ��•:� l� 'i3 •-a � �i � ir �,qrs=�,� ti ' d# �a � . � i , ,_.
�' c"� - ��
�� g'� . , ` . Y, �s � +� a� �;'�,` �` - °� � �� �$� .�'4'�� . t�'. ° l ' 1' ,
*�'� p�� .;i ' .', . .. .� r� � - � �4
_
�� � ' ~ fi
r � �
• �+i. . r � " r �'v r .: ' ' �;� � �IPd�
-�, � , f s� rs r � i_
r r ... _. ��� � � �"� �� . � . �Yf . � �� v�t'
`5y �--.�+--�.. �n d" _ �.. � � 711. •."5 ` � R -'
, . � ��.q� } .5 '" �� ' _ - -
. ' _` 3 �� -- :j
� �1 �. n
�� � a`W�� -.� 4' ��'( � � �
�� :���- � �
_y � ; " �' �5 .y��._;�� -
� � �� s• ., ��;
. �k., � � - ' �
sr�',� + . 1� � �� �. le "f'�,-.
� �p� �� .. e �4 � S ,
�R�i W. . :� � �'�.�
��
. m � ; �, . ,�� �„
_ � �i � S Y� ' �� �i' ''�1��''.�3^� 6�T; � '�Y . � 44 '��:
� '� A Z{ /
f! 6 � `{4 'A '�J6 -. 'e -. � �- -Y � . .y i.,.--�,
.. f}�t f.,�'c C ij'��j .'Y F{V � 4 � }° i
�� � �• � a.
a � a; iy+r� S�� b1 �Ri y, (�� T a � � �.
1 '�_�','' ��y ry I .,},r� ,�+'+p �y �� '�w:: � .L �`- ;
�� � � � � � p,�� ' K^ �� � ^ih .} .
r � G �-r � 4. � ' �
*� • ,�}`��r�, -s� ° �` _
- ��- t� �°' . �„-
4 � g�^ 1y�► y :�'� � .�'��
s -��
� : T : -� �r ' S`
,� � . � ;.+� �'� �E-�. �
� : �� r �' �
w1 .. � R.. - _ _.sY,� _�f x �.. ,•7 , A.� .1,;� y��;,, ���y�'�
� A�� �. y 10 �y. .j} � � "''� ',! � � r �7.' ' "'. � P �i1j -i � 4 .v �,., x � h� � ��5, 'y�1• + �
Ri1 : ��-` ` ti¢
. �.
: a . .,, .'b _ : ;, �z.: - � . .a*,
„ :
.
h � � - _ �� �`� � � � ��
�*i � � . ���' - .._.-.� � . •- a,, ' �_�� .q�p' r; x�•,� � N. .r`:: �t� :+� .
. 'ar°�` � _ � ir�,'.�^'�,� �..'�+�ss, �, y� ��'. �.
Lege� : � _�;:1 -� r . '� ",,�,•i,�' ��_ ��� ,,'�
;i,..', � � ; a � . �� -t�' z•,�S` s_�.
,
Q Project Ar ea > : : ,,�� �, 1 �; , �. • • � .
� � , .��� -�^ _ . �7 �_ _ �.: _ ..�`�' �:�, �'� :,>`- � � ' ,
,
�// Ghost Plat Areas ry g''�, `"� ��- � �i ��� ��r�,;. `" �
. ' i .k '� � � '"'�" — . „.,�, �a� � i .. _
0 EII< River WWTP +y�;"�'� � �r ' � �� �.��'" ' - _
�•" �r�' .t � �. . t'��.'^�d '�`r:' -� .. .- . . .
o �so i,soo
ft
I in = I ,500 ft
Figu re 9
N
Wastewater Features Map
� Foster Property
EII< River, Sherburne County, Minnesota
"', � -
r K�.
�.' ..3._:..�
Thursday, May 5, 202L � �
Source s :
Orthophoto (FSA, 2021)
�._.���
� � �'
,
�, �. � �
_„ ,
� �
� r1UISdaV, May 5, 2�22
� �`-.�` � .��
�
r- •- � , aq,
�� �,��, , "
,- "�. �«�c" �'
`' 7 Grace:
- fi ` of Go�
f" � ��,+
-s�.� ' � � o�r P�e ±�
.�� .q��7 N �, '
1�c t'�n;16c�� `�"'� o `�.`7�� ' s '� �q
'' � � C,�C - c^ � J�e c ' } . �`.a fi :
1
'��' �s��r r i�aath".`�� . �,�.
�� � �"` S� ,Ave,� . � O � FJ _ .,�; � 4 ��
/so +
C,; :�; �, n St .�� m. ,�,N
. �� .
����'�F' o� ? ' � �� ''�183'�"���* - �.�+'� �,t'.
..,�: � VQ
.. $ � v. � ,rn.� -...:s:,� } :.
.�782nd P�e - �;.,�o + .^= � � ^ ` �'�Spectrt
.. '� � ' �`� Atlilet c"�f
fi � -: °
`� a, �8 � : velt _. °�'� � r�= Improverr
����st ��� - 181st�a ;CSAH12 �`'�"��,�
� �',:'�"'�_` . a v � �.. . �;.. �. �- Improvements
r� �-ct. � - �,• � �.. 181stAveNW
� r EI.k�River�.. , o \� �h�oh . �
; c, D`ump I � ' `. , , ;
v � o a, 180th ��' ,;
m, '�� 1��9th Ave. �� � 2 �t ''� ,, 7gpt
> Qye , o �� �,,�." v\� � „��" �' �' "--.
s x�
� `z- s:� . , ° ':�....179tIi:P
� .� ���'- ��� r � � ��. .�. �
"� � ��9 - �� =,Eagles Ma
. � �,.,, ,
� :.��� � * ' " TihirdAddi
� Eagles Marsh . � ,�
8th��r�` 3rd Addition.� , ,�
-.�'�' . ��°�_ - it. - _ • � , � Ci ,: "�7, .
� `�
. . 7'�
.. _ ♦ , _ e . 7 �. ��3t� . .
} . ,� .
C
. _r , �..
Le end - • . _ °` ^' ;;,' :
g �:i � � -
�: �- � `S -„ o #�.
Q Project Area "
,+ ' 9 ' .� " ,�+�i ; 7�6 �' ^
�/� Ghost Plat Areas .: , o� . th., �Ca"
MPCA Sites �r 'si:'�h'�so' ' ��6tFi q�e
r�� , ��
>' � Multiple Programs q ��.,y sr ; "�
■ Hazardous Waste YO— ' �
' � ,_ -�� ,:1�7�th Ct �.���
• Investigation and CleanuF. ` '+
175th Ave NW , _ ;-_- 7y�,
� StOYIYlWdt2Y �. �� ' li +�, ��''�''.
� SSTS ,t�,.'�� �-
� �' � " q�� . -
n� .. .... f . IL•_. _.� _ �I
`. 4
G.� �� ��'`si-yt .� �
�� � ` ��.
: �.
a;�y C q�`
i i � ��}�
. V. ��, s.a.�
. "� '' *s'�
. �.� ���"
� -� � � � �r
� , p,��Y
y 1 ��.'� 5� '" �. � � �,' ��
''"E'�k;,1�'7� �' �::1�7n.,.:,��1: 33
�. r
-`�,��, y
s"1 M '�"�M�� �
��,�' � -�i �-4�i
_' ' s�.�
Figu re I 0
° 'S° ',5°° N What's In My Neighborhood Map o�hop o�o`�FSA,ZOZ�,
ft �
WIMN (MPCA, 2020)
� �n = �,Soo ft Foster Property
EII< River, Sherburne County, Minnesota
�
.•� ��i � � � S
��� s �4a"` a �.
� �.
��' � � .J � - _
� � �._
�'�: _, .. __d,;. , _ .�
s �
��
d
�
f
�i
�'
�
'a � k
��� ,�, �,' �'�a p� �.�
ion ,,�` �� .
- . - _ � � ��i�� �rf , � � •.�
. y " ' 2 •.��i �-% I 1 � ...-� f � .
� -�' _ s �i`�' ` /z % � F. �`Y ���'� � �E:,' 88thq�e NW � '''
� a�,. -..,4 . s�.� . . a � ,.
�t.
�r�g �o- � _ � I F.r- }Y. � ;Y_'
r �- � I 9 t ',
�`-'� �- ' -.+� _,�CSAH 13 Roundabouts �- ;
+l• (CR401ntersection
'River Park'` ���� � _ _
3rdA�ddttio�,�}.:192nd Y# ���' 40 . � � r •
� LfN NINX � il I�ti. � I'` r
Q River Park; '. ISD 728�Twin i �
*�, , -,�-•�
'� Meadows �� Lakes Elementary
�. . .
'� � 19.1 st LN NW SCh001 -
`�°� � , � -; • ``�� ,
�� � s z 19oth rJ �' ,, ��, Holzen.
� � "�N Nw �~' °� Residence
+ � � - Z �.
.�{: -, -� _; i � � � �
-, i
-�'__+', � �
� � _ � , ��gOth,AVE NW �
/}y4 �T'�F� � � F I
V'� y ~y _• . ' C� � ,
r � [ � ; Muske �'�j1�� ` �
� Marty Bro
.�;:� � � � Meadows d
�`� � South � o. Construct
�� `Nw : , . . �'�,.
�d � � s ,',' 1� .. �i
�" ' 187th A�P :.
�e �+�`.' • :�.��� . �
�+�� s�• �c,' " �
� �' , :,
� 186th Ave�, ; , ,� „�o
� � -+., ��s4� � �
�i � ��a �• �t;.
�+ •� � �� � 6R N
,�; . '�'�7� � c �'s. , �
� Architecture + Engineering + Environmental + Planning EAW
�� — �� y � s �,: � �,J �_r 1—L ' y' �
� � ' �I—I��T �� � ���� '
c < � � C ��-�I 1J ll I ��`^:-a• � � � .. �a \y�� � � , ��� \
fi � � 1717r1I�I�f�I�I�C1� � —�;.�� �
� �; �� UU�UUIJLJLJLJ❑LJLJLJLJLJ❑ C (f �U
� 'a s R , 'r �� � LJLJCJLJLJLJLJLJL]I�IJIJUUU `" G� ��J �
�nnnnnnnnnnnnnnnnnn C ° �O C
' r� �. nnnnnnon C� nnnnn �, G u0 �C
�r�� - � ° � � � v�� uuuuuuuuuuW .-nn���<`
`� ��� , � uuuuuu❑ � � �U
'��: � i � r �� � �� � �� �� ����0!> " �G onnnnnnnc��` ' uu �
s��`� ' � C� nnnnnn C J �i G vuvU U
,; ��� � � � � j C «k�?'� �OU����� ���nnn
'�t� � � � � G,��� C �<� � ��°. v�� nnnn�
�� �,�R� � �G � C U❑ -.. . � ��On �
�� , � � � � �� u � � � " n� '� .
,�, r .. � `4: ' � C � n �` �. J � 0���,������ . . - J
�._ f� � � c � nn nn ' �J� � , J
fi � � s> . �JJ c� � ` vUUUIJ�Jv� ��O'� \ % � �vJ
�' '`� .. * .II II � c uuu� ��� " % �� �� C' J� �d..
�� � �� c � ... ��nClrl�l - � �J
r � C `3 + J �
• ���. "�t' �,K `� +'�� � � C �..w`, s@� � , 'F. � �%�� � �i��i
�i:, �4i4�. �L. A�< �^ � � C . k�- ���,,' ; � ,� , (�� JUUU�J � �9 e � ; ��i
� ��', � c n_ ' Y��, # �II �� � �a �:
+� .r n�i� C � �- �
1 r y�. . . ��.zo,��� � C .� r ._„ � �
� � r � � r / '� G � �� ��n��nn� m��
�R � � �
+ � � �, �� - , � F..
v►,: i� t� C�, �7��GGC _ , $ �' � � �
;�;� � �'- , � ,- �`
A�.% ���, � ��� �' -, � C � _ �
_ �ta�� �a� O
� ���� _ -
�� � �`
.�
� � � _...
�� �G �
� ❑
� % ,JJJ �` C� l
C���
� --
• � � ° � �q' �J� �� � C '
. �
,�: ��L, � �„' _ n . � � � �
"T �f � �n rl ��
'�4 / A T^ . ' i.l�� �oo �_
�� ���l� y � a .�. � a8//� �"
.� !' t �� r• <;»`- ;'��5• � ll -
, � �'
,
�"t Y � �r � l y„�.r � 7 � * � �� ,, � ,: � ,�, ,�,
���%� � ` �°�'�: . � ��" '�.. '."� a �. a - - �U� 1s1t
�'
�y _ � /
' -- � tr,- Z, ti.� . '7�'-
1
CONCEPTUALLAYOUT
�a
`` '
. .. M,.�.�f
Easn��PzoPERr �� �;�
i
£:
,��..�� o .00 �
� FOSTER PROPERTY DEVELOPMENT
Archltecture + Engineenng+ Emironmental + Planning E�K aivEa, mwvEso,a-eoeznoiii ISGlnc.com
�sc aR�Ecr rvo. zz-zessa
� - -'4�
*,�"'
•� :
� � � 0 ��
' g �5�--'�WFr� . �^
\ V ` ✓/
�\� �
r
�� �� �
� � ,�i � � --- �
�` � � � ���
\'��� .
j ��, � :
,----T , ❑ � ❑ ��
� � PROPERn�NEnP � , � a
� � __
, ,
, s�o�,�
, s.oR �,.Eaa�� ,� —�.�.
� �; ,
� �
�_���� � � �
, �I �,,=;
,,, ❑!❑i0!❑! ��" �� , �
����E�no�,�,a, o , � ' _ _ � _ � _ _ � _ � " � �/�� %" '
� _ - ,i� V" � i
T � � � � „s��o Ev ��v o.s _ � --
� — — — � `�� �,
� �,��
� �� -- I�%
�,, ❑I❑ ❑I�I�\ y���� �
i �= � �
� o-- � '�
,���,, o��rs�r�NE �o �mo: _, �� ,�
��� �— �,
,� F��F�ooP�� „a',�= � ; r�,—
, ,, � ��o, ---- m �, ,,
� �- . = , ," -- ,
__�,00_-- ���' —°��" � i
_����,��EOF.Ro..aRoo� ��
�
, ,
�------ �o�:��. � � ,
; �`
,� i '��
_�
�
� �= ��
GHOST PLATTED AREAS
/ � �\� _ _ . _ __ ,, � I
" � i�� -
- --- -------
� � `�u � — _ f _ _ f _ _ � �
_. _. —� L — .__ ' IL — .— ' IL _ _ ' I I
— �
RaPE=r��NENP. z'i �
_� ; �,,__-- — ----_ � oo.o,u ,' �
� ,�
— — � ,��i��, � ����i ����, x' i
, � � — — —�— _ � ��
_ _ �� ',�I�'',,I,,�}�,I''�, �� >� i
,
I' � , � � �
��
� ����� ��� � '�� � I � �', � � 1 �'�� � � I �
� � �� � ''�� � � , i
_ _ ' � � I I' I, '',, � � I
� � � I '���I�', �I�, � ,,� � � I
— — , I
�',����', � ��� �
' � ��� � ''�� � 1�� I � 1�� I �''� � � �'�
�� �,�� y � ' � '�� ���� � �'� i
, ��, � � � i
� � � �� � ���� � � ��
— ����� ' � ���'� , '
�'��� 'i ooRo„ i ---- , �
��
1I
��
�
,
� ��
���
�I�
I^
���.,, m ° �° N
�' I
— I I
— ' —�I—
�
� nrcnitecmre+engineering+environmental+alann�ing FOSTER PROPERTY DEVELOPMENT ISGlnc.com
�: ioen. imnesar,�- ize
�sc aamEcr No. zazessa
� Architecture + Engineering + Environmental + Planning EAW
Geotechnical Evaluation Report
Foster Property
181st Avenue and Cleveland Road NW
Elk River, Minnesota
Prepared for
Lennar Corporation
Professional Certification:
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision
and that I am a duly Licensed Professional Engineer
under the laws of the State of Minnesota.
� �����.t�KY f v� p ��ii
�..� ; � ' . . '
'N'I �f j {" �� t� � 0~1, � � � �'.
' • �.� J
Henry Vloo, PE � � ���� .. � =
Senior Engineer � ; ��E���' �
� �i1NEER �
License Number: 21140 +�+� : ���� .: �Q.�
.
August 11, 2022 '�,'�r''••.....•••'' y4;
�
�i���� it► t` ���
Project B2202158
�������� Braun Intertec Corporation
. . i
.
I NT� �T�C
The Science You Build On.
August 11, 2022
Mr. Collin Coffman
Lennar Corporation
16305 36th Avenue North, Suite 600
Plymouth, MN 55446
Re: Geotechnical Evaluation
Foster Property
181st Avenue and Cleveland Road NW
Elk River, Minnesota
Dear Mr. Coffman:
Braun Intertec Corporation
11001 Hampshire Avenue S
Minneapolis, MN 55438
Project B2202158
Phone: 952.995.2000
Fax: 952.995.2020
Web: braunintertec.com
We are pleased to present this Geotechnical Evaluation Report for the proposed residential development
at the Foster Property in Elk River, Minnesota.
Thank you for making Braun Intertec your geotechnical consultant for this project. If you have questions
about this report, or if there are other services that we can provide in support of our work to date, please
contact Henry Vloo at 952.995.2234 (hvloo@braunintertec.com) or Ray Huber at 952.995.2260
(rhuber@braunintertec.com).
Sincerely,
BRAUN INTERTEC CORPORATION
�
ii :4� ,rj t. F� 'J ,f ,
Henry Vloo, PE
Senior Engineer
����`�J
�
Ray�Huber, PE
Vice President, Principal Engineer
c: Mr. Paul Tabone, Lennar Corporation
Mr. Jerremy Foss, ISG, Inc.
Ms. Whitney Behny, ISG, Inc.
Table of Contents
Description
A. I ntroduction ................................................................................................
A.1. Project Description ........................................................................
A.1.a. Structural Loads ................................................................
A.1.b. Pavement and Traffic Loads .............................................
A.2. Site Conditions and History ...........................................................
A.3. Purpose ..........................................................................................
A.4. Background Information and Reference Documents ....................
A.S. Scope of Services ...........................................................................
B. Results ........................................................................................................
B.1. Geologic Overview ........................................................................
B.2. Boring Results ................................................................................
B.3. Groundwater .................................................................................
B.4. LaboratoryTest Results .................................................................
C. Recommendations .....................................................................................
C.1. Design and Construction Discussion .............................................
C.1.a. Building Subgrade Preparation ........................................
C.1.b. Reuse of On-Site Soils .......................................................
C.1.c. Groundwater ....................................................................
C.1.d. Construction Disturbance .................................................
C.2. Site Grading and Subgrade Preparation ........................................
C.2.a. Building Subgrade Excavations .........................................
C.2.b. Road Crossing and Box Culvert .........................................
C.2.c. Excavation Oversizing .......................................................
C.2.d. Excavated Slopes ..............................................................
C.2.e. Excavation Dewatering .....................................................
C.2.f. Pavement and Exterior Slab Subgrade Preparation.........
C.2.g. Pavement Subgrade Proofroll ..........................................
C.2.h. Engineered Fill Materials and Compaction ......................
C.3. Spread Footings .............................................................................
C.3.a. Embedment Depth ...........................................................
C.3.b. Subgrade Improvement ...................................................
C.3.c. Net Allowable Bearing Pressure .......................................
C.3.d. Settlement ........................................................................
C.4. Below-Grade Walls ........................................................................
C.4.a. Drainage Control ..............................................................
C.4.b. Selection, Placement and Compaction of Backfill............
C.4.c. Configuring and Resisting Lateral Loads ...........................
C.S. Interior Slabs .................................................................................
C.S.a. Moisture Vapor Protection ..............................................
C.S.b. Radon ...............................................................................
C.6. Frost Protection .............................................................................
C.6.a. General .............................................................................
C.6.b. Frost Heave Mitigation .....................................................
C.7. Pavements and Exterior Slabs .......................................................
C.7.a. Design Sections ................................................................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
.............................. .
.............................. .
...............................
.............................. .
...............................
.............................. .
...............................
.............................. .
.............................. .
.............................. .
...............................
.............................. .
.............................. .
...............................
...............................
.............................. .
.............................. .
.............................. .
.............................. .
...............................
..... ................ ..........
..... ................ ..........
..... ..........................
.............. ................
.............. ................
..... .......... ...... ..........
.............. ................
..............................
.............. ................
..............................
.............. ................
..............................
�����
INTERTE�
Page
..1
..1
..1
..1
..1
.. 2
.. 2
..3
.. 4
.. 4
.. 4
..6
..6
..7
..7
.. 7
..7
.. 8
..8
.. 8
..8
10
10
11
12
12
12
13
14
14
15
15
15
15
15
17
18
19
19
19
19
19
19
21
21
Table of Contents (continued)
Description
�
E
C.7.b. Bituminous Pavement Materials ..............................
C.7.c. Subgrade Drainage ...................................................
C.7.d. Performance and Maintenance ...............................
C.8. Utilities ..................................................................................
C.8.a. Subgrade Stabilization ..............................................
C.8.b. Corrosion Potential ..................................................
C.9. Stormwater ............................................................................
Proced u res ..........................................................................................
D.1. Penetration Test Borings .......................................................
D.2. Exploration Logs ....................................................................
D.2.a. Log of Boring Sheets .................................................
D.2.b. Geologic Origins .......................................................
D.3. Material Classification and Testing .......................................
D.3.a. Visual and Manual Classification ..............................
D.3.b. LaboratoryTesting ...................................................
D.4. Groundwater Measurements ................................................
Qualifications......................................................................................
E.1. Variations in Subsurface Conditions ......................................
E.1.a. Material Strata .........................................................
E.1.b. Groundwater Levels .................................................
E.2. Continuity of Professional Responsibility ..............................
E.2.a. Plan Review ..............................................................
E.2.b. Construction Observations and Testing ...................
E.3. Use of Report .........................................................................
E.4. Standard of Care ....................................................................
Appendix
Soil Boring Location Sketch
Log of Boring Sheets ST-1 to ST-21, ST-7A
Descriptive Terminology of Soil
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
Page
................. 22
.................22
.................22
................. 23
................. 23
................. 23
................. 23
................. 24
................. 24
................. 24
................. 24
.................25
.................25
................. 25
.................25
................. 25
.................26
................. 26
.................26
.................26
................. 26
................. 26
.................27
.................27
................. 27
B�auM
INTERTE�
A. Introduction
A.1. Project Description
This Geotechnical Evaluation Report addresses the proposed design and construction of a residential
development, denoted as the Foster Property, located in Elk River, Minnesota. The subject site consists
of 6 parcels of land totaling about 252 acres. All 6 parcels of land are mostly wooded with some ponds
and wetlands.
The preliminary development sketch provided shows plans to construct both single-family and
townhome type house pads, associated streets, underground utilities, and retention/infiltration ponds.
The preliminary house types, as well as garage and basement elevations, were not available at the time
of this report.
A.1.a. Structural Loads
We have assumed that the construction will likely consist of one- to two-story, wood-framed homes or
townhomes with full basements, supported on poured concrete foundations. Foundation styles will
consist of walk-out, look-out, and full basements. Some of the single-family homes and townhomes may
also be constructed as slab-on-grade buildings, that is without basements. We have assumed that
bearing wall loads associated with the proposed residential construction will range from 3 to 4 kips
(3,000 to 4,000 pounds) per linear foot (klf) and column loads, if any, will be no greater than 50 kips per
column.
A.1.b. Pavement and Traffic Loads
We have assumed that bituminous pavements, typical of residential neighborhoods, will be subject to
normal traffic conditions over an assumed design life of 20 years.
A.2. Site Conditions and History
Currently and historically, the site has been mostly wooded. There are some wetlands and ponds on the
site. Some of the ponds appear to have been artificially. Based on aerial imagery, it appears that no
structures or farmsteads have been present on the property in the past. The site is rolling with current
surface elevations at the borings ranging from approximately 898 to 941 feet Mean Sea Level (MSL).
Figure 1 below depicts the proposed site concept plan.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 2
. -.
��.����...
�
''���i��wi�.��' .�
� 4 �t; �� ..:I a�iil�=�
�'
�
� �
� '•
}. �
, -_ �
,� �
� �
� � 'r -
` },
� �-_
�a'ri' .�: fJ'
:. � � �; t�,�
�%f� AF ��.�
��� t.
� ��
� r, :.�
-�
Figure provided by ISG, Inc.
A.3. Purpose
:�
�
� �``�T - _ ..�
, ��� �,- �„r�� � - ` �,
' j
� �- •- —�-� - ` ..a.. .. _
•� ', , '�_ .
� 1-�- - ��
?� , • } � � � _
i� :�, . '� l �
5, �
`� ,t��i ��,R.� '. . , . � _' • .
� r -:� ��'"'�"�'� . ! �� �� � �
� � �� . �--t",� {4; 4 .
} ,�� . f � ..w�.. �. •—
�� `,� � v 4 �7- . �,�"�., y^ i
��� � �
r, �. . �� � l/
� �► r ��, ,t� � 4
�■ " ���
F 6 e -• `v` ` y � �
�' � � � � �
��� _ "� � �'' �,
�� .._ �=•��� � �.�z
= .�__—.� = _—
— �.-�--�.:
- +��::� �r�r ��c� , : �:n r� S�r€_ n,er.�
The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions at
selected exploration locations, evaluate their impact on the project, and provide geotechnical
recommendations for the design and construction of proposed residential development.
A.4. Background Information and Reference Documents
We reviewed the following information:
■ Existing topographic map prepared by MnTOPO.
����M
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 3
■ Communications with Lennar Corporation and ISG, Inc. regarding the proposed development
design and proposed soil boring locations.
■ The available surficial geology maps for this area.
We have described our understanding of the proposed construction and site to the extent others
reported it to us. Depending on the extent of available information, we may have made assumptions
based on our experience with similar projects. If we have not correctly recorded or interpreted the
project details, the project team should notify us. New or changed information could require additional
evaluation, analyses and/or recommendations.
A.S. Scope of Services
We performed our scope of services for the project in accordance with our Proposal QTB150444 to
Lennar Corporation, dated January 11, 2022. The following list describes the geotechnical tasks
completed in accordance with our authorized scope of services.
■ Reviewing the background information and reference documents previously cited.
■ Staking and clearing the exploration location of underground utilities. The project team
selected and we staked the new exploration locations. We acquired the surface elevations
and locations with GPS technology using the State of Minnesota's permanent GPS base
station network. The Soil Boring Location Sketch included in the Appendix shows the
approximate locations of the borings.
■ Performing 22 standard penetration test (SPT) borings, denoted as ST-1 to ST-21 and ST-7A,
to nominal depths of 15 to 20 feet below grade across the site. The borings were completed
in two phases. The first phase was completed at the locations that our drill rig could access.
The second phase was completed after some tree clearing was done to allow our drill rig to
access the remaining locations.
■ Install piezometers at 3 selected boring locations from which groundwater levels could be
measured.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 4
■ Performing laboratory testing on select samples to aid in soil classification and engineering
analysis.
■ Preparing this report containing a boring location sketch, logs of soil borings, a summary of
the soils encountered, results of laboratory tests, and recommendations for structure and
pavement subgrade preparation and the design of foundations, floor slabs, exterior slabs,
utilities, stormwater improvements and pavements.
Our scope of services also included environmental services consisting of a Phase I ESA and a Limited
Environmental soil sampling. Both of those reports were sent under separate cover. No other
environmental services or testing were completed on this site. We can provide additional environmental
services or testing at your request.
B. Results
B.1. Geologic Overview
We based the geologic origins used in this report on the soil types, in-situ and laboratory testing, and
available common knowledge of the geological history of the site. Because of the complex depositional
history, geologic origins can be difficult to ascertain. We did not perform a detailed investigation of the
geologic history for the site.
B.2. Boring Results
Table 1 provides a summary of the soil boring results in the general order we encountered the strata.
Please refer to the Log of Boring sheets in the Appendix for additional details. The Descriptive
Terminology sheet in the Appendix includes definitions of abbreviations used in Table 1.
s�auw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 5
Table 1. Subsurface Profile Summary*
Soil Type - Range of
ASTM Penetration
Strata Classification Resistances Commentary and Details
■ Predominantly silty sand with lesser amounts
of lean clay, clayey sand, and organic clay.
Topsoil/Topsoil SM SC CL OL NA ' Thicknesses at boring locations varied from
fill ''' 1/2 to 4 feet.
■ Dark brown to black in color.
■ Moisture condition generally moist.
■ Only present in Borings ST-7, ST-7A, ST-10,
ST-13 and consisted of silty sand, poorly
SM SP SC-SM 4 to 25 Blows per graded sand, silty clayey sand, and lean clay.
Fill soil CL Foot (BPF) Some wood encountered in Boring ST-13.
■ Extended to depths of about 4 to 9 feet.
■ Brown, dark brown and black in color.
■ Moisture condition generally moist.
■ Encountered by Boring ST-5 from depths of
about 12 to 17 feet, and Boring ST-13 from
Swamp OH OL 6 BPF depths of about 9 to 12 feet.
deposits ' ■ Mostly organic silt and organic clay.
■ Black in color.
■ Moisture condition generally moist.
■ Only encountered by Borings ST-5 and ST-18.
■ Consisted of a mixture of silty sand, lean clay,
Alluvial SM, CL, CH 2 to 11 BPF and fat clay.
deposits ■ Some soils judged to be slightly organic.
■ Brown, gray, and black in color.
■ Moisture condition generally moist to wet.
■ Encountered by all the borings and consisted of
SP, SP-SM, 2 to 23 BPF a mixture of sandy and clayey soil with lesser
SM, SC-SM amounts of silt.
Glacial deposits • Intermixed layers of glacial outwash and till.
■ Variable amounts of gravel; may contain
cobbles and boulders.
CL, SC, ML 2 to 43 BPF . grown, reddish brown and gray in color.
■ Moisture condition generally moist to wet.
*Abbreviations defined in the attached Descriptive Terminology sheet.
For simplicity in this report, we define existing fill to mean existing, uncontrolled, or undocumented fill.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 6
6.3. Groundwater
Table 2 summarizes the depths where we observed groundwater. They include water observed while
drilling as well as water observed in the piezometers. Table 2 only includes those borings where water
was observed. The attached Log of Boring sheets in the Appendix also include this information and
additional details.
Table 2. Groundwater Summary
Measured or Estimated Corresponding
Surface Depth to Groundwater Groundwater Elevation
Location Elevation (ft) (ft)
ST-3 927.6 20 907 1/2
ST-5 912.8 20 893
ST-7 913.5 13 900 1/2
ST-7A 913.5 8 905 1/2
3 1/2* 907 1/2*
ST-8 911.1 9 1/2 ** 901 1/2 **
ST-9 911.3 7 904 1/2
ST-12 906.5 7 1/2 899
ST-13 904.1 4 1/2* 899 1/2*
6 1/2 * * 897 1/2 * *
ST-16 900.4 6 894 1/2
ST-18 898.3 1 897 1/2
*Piezometer reading from June 1, 2022. The piezometer in Boring ST-20 was dry.
**Piezometer reading from August 2, 2022. The piezometer in Boring ST-20 was dry.
Project planning should anticipate seasonal and annual fluctuations of groundwater.
6.4. Laboratory Test Results
The boring logs show the results of laboratory testing we performed, next to the tested sample depth.
The Appendix contains the results of these tests.
s�auw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 7
The moisture content (ASTM D2216) of the selected samples varied from approximately 3 to 66 percent,
indicating that the clayey soils tested were likely near or above their probable optimum moisture
content. The sandy soils were likely dry of their probable optimum moisture content.
Our mechanical analyses tests through the number 200 sieve only (ASTM C 117) indicated that the
selected soil samples contained 2 to 15 percent silt and clay by weight. These tested soil samples were
classified as poorly graded sand, poorly graded sand with silt, or silty sand.
One organic content test (ASTM D2974) was completed on a soil sample from the 10-foot depth of
Boring ST-5. The test results showed that the selected soil sample contained approximately 10 percent
organic material, indicating the tested soil sample was organic.
Pocket penetrometer tests were completed on selected clayey soil samples to estimate the soils'
unconfined compressive strengths. The results ranged from 1/2 to 1 ton per square foot (tsf).
C. Recommendations
C.1. Design and Construction Discussion
C.1.a. Building Subgrade Preparation
Based on the results of our subsurface exploration and evaluation, spread footing foundations bearing on
engineered fill and/or native soils can support the proposed homes, after performing typical subgrade
preparation. Typical subgrade preparation includes removing existing vegetation, topsoil, organic soils,
fill soils, soft clays/loose silts, and any existing structures.
Based on the current site contours, we anticipate cuts and fills to be less than 10 feet from existing
grades. Any soil correction work could add or subtract to the cut and fill depths.
C.1.b. Reuse of On-Site Soils
Based on the results of the soil borings, the on-site, non-organic soils should be suitable for reuse as
engineered fill but may require moisture conditioning prior to reuse and compaction. Some of the clayey
soils may be above their optimum moisture content and would require space, time, and favorable
weather to dry the material for reuse. Any materials used as engineered fill should be tested and
approved by the geotechnical engineer prior to placement.
s�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 8
C.1.c. Groundwater
We observed groundwater within some of the borings and could be encountered during the site grading
activities. Some of the soils, such as silty sands, clayey sands, and clay, can also collect water from
precipitation or if water drains to the site. We recommend the contractor remove any water that collects
in work areas before performing further work.
C.1.d. Construction Disturbance
The contractor should note that some of the on-site silty and clayey soils are highly susceptible to
disturbance, due to repeated construction traffic. Disturbance of these soils may cause areas that were
previously prepared, or that were suitable for pavement or structure support, to become unstable and
require moisture conditioning and compaction. Subcutting and replacing the disturbed material with
crushed, coarse gravel, free of fines is also an alternative. The contractor should use means and methods
to limit disturbance of the soils.
C.2. Site Grading and Subgrade Preparation
C.2.a. Building Subgrade Excavations
We recommend removing unsuitable materials from beneath house pads and oversize areas. We define
unsuitable materials as vegetation, topsoil, fill, organic soils, existing structures, existing utilities, and
soft/loose soil. Table 3 shows the anticipated excavation depths and bottom elevations at each of the
current soil boring locations. As final plans are not available at this time and the site layout may change,
we have included all borings, even those currently in ponding areas, in the table below.
Table 3. Building Excavation Depths
Measure Surface Anticipated Excavation Anticipated
Elevation Depth Bottom Elevation
Location (ft MSL) (ft) (ft MSL)
ST-1 908.4 1/2 908
ST-2 941.1 1/2 940 1/2
ST-3 927.6 1/2 927
ST-4 932.5 1/2 932
ST-5 912.8 17 895 1/2
ST-6 938.1 1/2 937 1/2
ST-7 913.5 9 904 1/2
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 9
Measure Surface Anticipated Excavation Anticipated
Elevation Depth Bottom Elevation
Location (ft MSL) (ft) (ft MSL)
ST-7A 913.5 4 909 1/2
ST-8 911.1 1 910
ST-9 9113 4 907 1/2
ST-10 926.0 4 922
ST-11 913.5 1-4* 912 1/2-909 1/2*
ST-12 906.5 1 1/2 905
ST-13 904.1 12 892
ST-14 909.5 3 906 1/2
ST-15 920.9 1 920
ST-16 900.4 4 896 1/2
ST-17 901.8 4-7* 897 1/2-894 1/2*
ST-18 8983 1-13* 897-885*
ST-19 916.3 1 1/2 914 1/2
ST-20 926.9 4 923
ST-21 931.8 1/2 931
*To be determined in the field at the time of excavation.
Excavation depths will vary between the borings. Portions of the excavations may also extend deeper
than indicated by the borings. In addition, extra excavations will likely be needed to remove tree roots
from the heavily wooded areas of the site. A geotechnical representative should observe the excavations
to make the necessary field judgments regarding the suitability of the exposed soils.
The contractor should use equipment and techniques to minimize soil disturbance. If soils become
disturbed or are wet, we recommend excavation and replacement.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 10
C.2.b. Road Crossing and Box Culvert
Because of access issues on site, we could not drill soil borings directly on the apparent man-made dykes
between the on-site ponds. One of these dykes will be used to construct a new road and trail crossing. A
box culvert will be constructed under the new road and trail, connecting the bodies of water. A new
sanitary sewer will be constructed under the proposed trail. We have assumed that it will be below the
box culvert.
Soil correction work to construct the box culvert will likely involve damming up the water in the ponds on
either side of where the box culvert will need to be placed and then removing the water (see Excavation
Dewatering in Section C.2.e) from the construction zone. Soil correction, if needed, can then be
completed beneath the footprint and oversize areas of the box culvert. We recommend that the
excavations be completed such that at least 18 inches of bedding sand or gravel be placed under the box
culvert.
To limit any frost heave potential, we recommend that the box culvert be backfilled with clean sand fill,
with less than 50 percent passing the number 200 sieve and less than 5 percent passing the number 200
sieve. This material should also be used over the box culvert and under the road and trail section. In
addition, we recommend a groundwater cut-off wall below the culvert, to prevent groundwater seepage
below the culvert, which has potential to undermine the structure. At a minimum, there should be a cut-
off wall on the high side of the culvert, but consideration should be given to a cut-off wall on both sides
depending on the final pond design.
C.2.c. Excavation Oversizing
When removing unsuitable materials below structures or pavements, we recommend the excavation
extend outward and downward at a slope of 1H:1V (horizontal:vertical) or flatter. See Figure 2 for an
illustration of excavation oversizing.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 11
Figure 2. Generalized Illustration of Oversizing
1. Engineered fill as defined in C.2.g
2. Excavation oversizing minimum of 1 to 1
(horizontal to vertical) slope or flatter
3. Engineered fill as required to meet
pavement support or landscaping
requirements as defined in C.2.g
4. Backslope to OSHA requirements
EXCAVATE�N
6ACI(SL�F'E �
\ �.'
\
\
\
'�J �\� �
�` �xisrirv�
t soi�s
\
\
\
t
5UI7ABLE EXCAV{1TION SC7TTaM
A5 dETERG411NED 16V THE FIELd
EXCAVATIt]N OVERSIZINC SKE'iCH
NbT T� SCALE
C.2.d. Excavated Slopes
Based on the borings, we anticipate on-site soils in excavations will consist of a mixture of clayey and
sandy soils. The clayey soils are typically considered Type B Soil under OSHA (Occupational Safety and
Health Administration) guidelines. OSHA guidelines indicate unsupported excavations in Type B soils
should have a gradient no steeper than 1H:1V. The sandy soils are typically considered Type C Soil under
OSHA (Occupational Safety and Health Administration) guidelines. OSHA guidelines indicate unsupported
excavations in Type C soils should have a gradient no steeper than 1.5H:1V. Slopes constructed in this
manner may still exhibit surface sloughing. OSHA requires an engineer to evaluate slopes or excavations
over 20 feet in depth.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 12
An OSHA-approved qualified person should review the soil classification in the field. Excavations must
comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, "Excavations and Trenches." This
document states excavation safety is the responsibility of the contractor. The project specifications
should reference these OSHA requirements.
C.2.e. Excavation Dewatering
We recommend removing groundwater from the excavations. Project planning should include temporary
sumps and pumps for excavations in low-permeability soils, such as clays.
We recommend dewatering of high-permeability soils (e.g., sands) prior to excavation with well points.
Any dewatering from within the excavation with conventional pumps has the potential to loosen the
soils, due to upward flow. A well contractor should develop a dewatering plan; the design team should
review this plan.
C.2.f. Pavement and Exterior Slab Subgrade Preparation
We recommend the following steps for pavement and exterior slab subgrade preparation. Note that
project planning may need to require additional subcuts to limit frost heave.
1. Strip unsuitable soils consisting of vegetation, topsoil, organic soils, existing fill, and soft clays
down to native soils.
2. Have a geotechnical representative observe the excavated subgrade to evaluate if additional
subgrade improvements are necessary.
3. Place pavement engineered fill to grade and compact in accordance with Section C.2.g to
bottom of pavement and exterior slab section.
4. Scarify, moisture condition and surface compact the subgrade with at least 3 passes of a
large roller with a minimum drum diameter of 3 1/2 feet.
5. Proofroll the pavement subgrade as described in Section C.2.f.
C.2.g. Pavement Subgrade Proofroll
After preparing the subgrade as described above and prior to the placement of the aggregate base, we
recommend proofrolling the subgrade soils with a fully loaded tandem-axle truck. We also recommend
having a geotechnical representative observe the proofroll. Areas that fail the proofroll likely indicate
soft or weak areas that will require additional soil correction work to support pavements.
s�auw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 13
The contractor should correct areas that display excessive yielding or rutting during the proofroll, as
determined by the geotechnical representative. Possible options for subgrade correction include
moisture conditioning and re-compaction, subcutting and replacement with soil or crushed aggregate,
chemical stabilization and/or geotextiles. We recommend performing a second proofroll after the
aggregate base material is in place, and prior to placing bituminous or concrete pavement.
C.2.h. Engineered Fill Materials and Compaction
Table 4 below contains our recommendations for engineered fill materials.
Table 4. Engineered Fill Materials*
Possible Soil
Engineered Fill Type Additional
Locations To Be Used Classification Descriptions Gradation Requirements
< 2% Organic
■ Below foundations SP, SP-SM, SM, 100% passing 3-inch sieve Content (OC)
■ Below interior Structural fill SC, CL < 25% passing #200 Sieve Plasticity Index (PI)
slabs
< 20%
■ Below-grade wall
backfill; drainage ■ Free draining 100% passing 1-inch sieve
layer ■ Non-frost- GP, GW, SP, SW < 50% passing #40 sieve < 2% OC
■ Non-frost- susceptible fill < 5% passing #200 sieve
susceptible
Behind below-grade
walls, beyond Retained fill SP, SW, SP-SM, 100% passing 3-inch sieve < 2% OC
drainage layer SW-SM, SM < 20% passing #200 sieve PI< 4%
Pavements Pavement fill SP, SP-SM, SM, 100% passing 3-inch sieve < 2% OC
SC, CL < 30% passing #200 Sieve PI < 20%
Below landscaped
surfaces, where Non-structural SP, SP-SM, SM,
subsidence is not a fill SC, CL, ML 100% passing 6-inch sieve < 10% OC
concern
*More select soils comprised of coarse sands with < 5% passing #200 sieve may be needed to accommodate work occurring in
periods of wet or freezing weather.
We recommend spreading engineered fill in loose lifts of approximately 8 to 12 inches thick. We
recommend compacting engineered fill in accordance with the criteria presented below in Table 5. The
project documents should specify relative compaction of engineered fill, based on the structure located
above the engineered fill, and vertical proximity to that structure.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 14
Table 5. Compaction Recommendations Summary
Relative Compaction, Moisture Content Variance from Optimum,
percent percentage points
(ASTM D698 — < 12% Passing #200 Sieve > 12% Passing #200 Sieve
Reference Standard Proctor) (typically SP, SP-SM) (typically CL, SC, ML, SM)
Below foundations, less 95 * -1 to +3
than 10 feet of fill
Below foundations,
greater than 10 feet of 98 * -1 to +3
fill
Below pavements, within
3 feet of top of subgrade 100 * -2 to +1
elevations
Below pavements, more
than 3 feet below 95 * -1 to +3
subgrade elevations
Below landscaped *
surfaces 92 -1 to +5
*The minimum moisture content should be no less than 5 percent and no more than 3 percentage points over optimum.
The project documents should not allow the contractor to use frozen material as engineered fill or to
place engineered fill on frozen material. Frost should not penetrate under foundations during
construction.
We recommend performing density tests in engineered fill to evaluate if the contractors are effectively
compacting the soil and meeting project requirements.
C.3. Spread Footings
C.3.a. Embedment Depth
For frost protection, we recommend embedding perimeter footings of the structures, including attached
garages, a minimum of 42 inches below the lowest exterior grade. Interior footings may be placed
directly below floor slabs unless they will be subjected to freezing. We recommend embedding building
footings not heated during winter construction, and other unheated footings associated with porches,
decks, or stoops 60 inches below the lowest exterior grade.
s�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 15
C.3.b. Subgrade Improvement
If a small amount of groundwater is present within the footing excavation, or if the footing subgrade soils
become disturbed prior to placing forms or reinforcement, we recommend subcutting the soft or wet soil
and placing a 6- to 8-inch layer of clear rock, which should be compacted into the subgrade. The clear
rock will provide a stable working surface and will allow for the flow of water to a drain tile or sump
pump.
C.3.c. Net Allowable Bearing Pressure
We recommend sizing spread footings to exert a net allowable bearing pressure of up to 2,000 pounds
per square foot (psf). This value includes a safety factor of at least 3.0 with regard to bearing capacity
failure.
C.3.d. Settlement
We estimate that total and differential settlements among the footings will amount to less than 1- and
1/2-inch, respectively, under the assumed loads. If there are areas where more than 10 feet of fill is
required, higher settlements could occur, unless the deeper fill areas are only filled with granular fill
(consisting of SP or SP-SM soils).
C.4. Below-Grade Walls
The following sections address soil parameters for basement wall design. Although construction of
retaining walls has not been specified for this project to date, the following recommendations can also
be used for preliminary retaining wall design. We recommend that additional soil borings be completed
for final retaining wall design.
C.4.a. Drainage Control
We recommend installing drain tile to remove water behind the below-grade walls at the location shown
in Figure 3. The below-grade wall drainage system should also incorporate free-draining, engineered fill
or a drainage board placed against the wall and connected to the drain tile.
Even with the use of free-draining, engineered fill, we recommend general waterproofing of below-grade
walls that surround occupied or potentially occupied areas because of the potential cost impacts related
to seepage after construction is complete.
�����
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 16
Figure 3. Generalized Illustration of Wall Engineered Fill
SL❑PE� AWAY FRDlv1 THE BUIL�ING
TO MRliVTAIN LDNG TERM DRAINAGE
� I �
DRAINTILE
Ex15TING
SC]EL
1. 2-foot wide area of Free-
Draining Engineered Fill or
Drainage Board
2. Retained Engineered Fill
3. 1 foot of Low-Permeability
Soil or Pavement
WALL BACKFILL SKETCH
NDT T4 SCAL�
The materials listed in the sketch should meet the definitions in Section C.4.b. Low-permeability material
is capable of directing water away from the wall, like clay, topsoil or pavement. The project documents
should indicate if the contractor should brace the walls prior to filling and allowable unbalanced fill
heights.
As shown in Figure 2, we recommend Zone 2 consist of retained, engineered fill, and this material will
control lateral pressures on the wall. However, we are also providing design parameters for using other
engineered fill material. If final design uses non-sand material for engineered fill, project planning should
account for the following items:
■ Other engineered fill material may result in higher lateral pressure on the wall.
■ Other engineered fill material may be more difficult to compact.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 17
■ Post-construction consolidation of other engineered fill material may result in settlement-
related damage to the structures or slabs supported on the engineered fill. Post-construction
settlement of other engineered fill material may also cause drainage towards the structure.
The magnitude of consolidation could be up to about 3 percent of the wall fill thickness.
C.4.b. Selection, Placement and Compaction of Backfill
Unless a drainage composite is placed against the backs of the exterior perimeter basement walls, we
recommend that backfill placed within 2 horizontal feet of those walls consist of sand having less than
50 percent of the particles, by weight, passing the #40 sieve and less than 5 percent of the particles, by
weight, passing the #200 sieve. Sand meeting this gradation appears to be present on the site although
the readily available quantities of this material was not determined. We recommend that the balance of
the backfill placed against exterior perimeter walls also consist of sand, though it is our opinion that the
sand may contain up to 20 percent of the particles, by weight, passing a#200 sieve.
If clay must be considered for use to make up the balance of the below-grade wall backfill (assuming a
drainage composite or sand is placed against the backs of the walls), post-compaction consolidation of
the clay occurring under its own weight can be expected to continue beyond the end of construction. The
magnitude of consolidation could amount to between 1 and 3 percent of the backfill thickness, or wall
height, and if not accommodated could cause slabs or pavements to settle unfavorably or be damaged.
Should clay still be considered for use as backfill, however, we further recommend that:
■ The bottoms of the excavations required for basement wall construction are wide enough to
accommodate compaction equipment.
■ Backfill is placed at moisture contents at least equal to, but not more than, 3 percentage
points above its optimum moisture content.
■ Backfill is placed in loose lifts no thicker than 6 inches prior to compaction.
■ The relative compaction of the backfill is measured through density testing at intervals not
exceeding one test per 50 horizontal feet for each 2 vertical feet of backfill placed.
We recommend using a walk behind compactor to compact the backfill placed within about 5 feet of the
basement walls. Further away than that, a self-propelled compactor can be used. Compaction criteria for
basement walls should be determined based on the compaction recommendations provided above in
Section C.2.
�����
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 18
Exterior wall backfill not capped with slabs or pavement should be capped with a low-permeability soil to
limit the infiltration of surface drainage into the backfill. The finished surface should also be sloped to
divert water away from the walls.
C.4.c. Configuring and Resisting Lateral Loads
Below-grade wall design can use active earth pressure conditions if the walls can rotate slightly. If the
wall design cannot tolerate rotation, then design should use at-rest earth pressure conditions. Rotation
up to 0.002 times the wall height is generally required for walls supporting sand. Rotation up to 0.02
times the wall height is required when wall supports clay.
Table 6 presents our recommended lateral coefficients and equivalent fluid pressures for wall design of
active, at-rest and passive earth pressure conditions. Table 6 also provides recommended wet unit
weights and internal friction angles. Designs should also consider the slope of any engineered fill and
dead or live loads placed behind the walls within a horizontal distance that is equal to the height of the
walls. Our recommended values assume the wall design provides drainage so water cannot accumulate
behind the walls. The construction documents should clearly identify what soils the contractor should
use for engineered fill of walls.
Table 6. Recommended Below-Grade Wall Design Parameters — Drained Conditions
Wet Unit Friction Equivalent Active Equivalent At-Rest Equivalent Passive
Weight, Angle, Fluid Pressure* Fluid Pressure* Fluid Pressure*
Retained Soil pcf degrees (pcf) (pcf) (pcf)
Sand (SP, SP-SM) 120 33 35 55 N/A
Silty Sand (SM) 130 30 42 62 390
Clay (SC, CL) 125 26 50 70 345
*Based on Rankine model for soils in a region behind the wall extending at least 2 horizontal feet beyond the bottom outer
edges of the wall footings and then rising up and away from the wall at an angle no steeper than 60 degrees from horizontal.
Sliding resistance between the bottom of the footing and the soil can also resist lateral pressures. We
recommend assuming a sliding coefficient equal to 0.3 between the concrete and mostly clayey soil.
The values presented in this section are un-factored.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 19
C.S. Interior Slabs
C.S.a. Moisture Vapor Protection
Excess transmission of water vapor could cause floor dampness, certain types of floor bonding agents to
separate, or mold to form under floor coverings. If project planning includes using floor coverings or
coatings, we recommend placing a vapor retarder or vapor barrier immediately beneath the slab. We
also recommend consulting with floor covering manufacturers regarding the appropriate type, use and
installation of the vapor retarder or barrier to preserve warranty assurances.
C.S.b. Radon
We recommend installing a radon mitigation system in occupied spaces in accordance with local building
code. Our certified and licensed radon mitigation professionals can assist in this design, at your request.
C.6. Frost Protection
C.6.a. General
Clayey and silty sand soils will underlie all or some of the exterior slabs, as well as pavements. We
consider these soils to be moderately to highly frost susceptible. Soils of this type can retain moisture
and heave upon freezing. In general, this characteristic is not an issue unless these soils become
saturated, due to surface runoff or infiltration, or are excessively wet in situ. Once frozen, unfavorable
amounts of general and isolated heaving of the soils and the surface structures supported on them could
develop. This type of heaving could affect design drainage patterns and the performance of exterior slabs
and pavements, as well as any isolated exterior footings and piers.
Note that general runoff and infiltration from precipitation are not the only sources of water that can
saturate subgrade soils and contribute to frost heave. Roof drainage and irrigation of landscaped areas,
in close proximity to exterior slabs, pavements, and isolated footings and piers, contribute as well.
C.6.b. Frost Heave Mitigation
To address most of the heave related issues, we recommend setting general site grades and grades for
exterior surface features to direct surface drainage away from buildings, across large, paved areas and
away from walkways. Such grading will limit the potential for saturation of the subgrade and subsequent
heaving. General grades should also have enough "slope" to tolerate potential larger areas of heave,
which may not fully settle after thawing.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 20
Even small amounts of frost-related differential movement at walkwayjoints or cracks can create
tripping hazards. Project planning can explore several subgrade improvement options to address this
condition.
One of the more conservative subgrade improvement options to mitigate potential heave is removing
any frost-susceptible soils present below the exterior slab areas down to a minimum depth of 4 feet
below subgrade elevations. We recommend filling the resulting excavation with non-frost-susceptible fill.
We also recommend sloping the bottom of the excavation toward one or more collection points to
remove any water entering the engineered fill. This approach will not be effective in controlling frost
heave without removing the water.
An important geometric aspect of the excavation and replacement approach described above is sloping
the banks of the excavations to create a more gradual transition between the unexcavated soils
considered frost susceptible and the engineered fill in the excavated area, which is not frost susceptible.
The slope allows attenuation of differential movement that may occur along the excavation boundary.
We recommend slopes that are 3H:1V, or flatter, along transitions between frost-susceptible and non-
frost-susceptible soils.
Figure 4 shows an illustration summarizing some of the recommendations.
Figure 4. Frost Protection Geometry Illustration
�PAVEMENT OR SLAB
FR95T
aEPTH Y NC]N-FftOS�-SLISCEPTIBLE FILL
_
t3H:1V SL.QPE IN
� . FRDST-SUSCEP7IBLE TRANSfTIONS
MAl`ERfAL5
SL{]P� TO �RRIN TILE /
WHERE SUBGRADE��
W�UL� COLEEGT WATER DRAW TILE RpUTEp Tp $UfTABL�
DISPOSAL SITE V4'H�N SUBGRADE
UVQIJL� CpLLEGT WAT�R
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 21
Another option is to limit frost heave in critical areas, such as doorways and entrances, via frost-depth
footings or localized excavations with sloped transitions between frost-susceptible and non-frost-
susceptible soils, as described above.
Over the life of slabs and pavements, cracks will develop, and joints will open up, which will expose the
subgrade and allow water to enter from the surface and either saturate or perch atop the subgrade soils.
This water intrusion increases the potential for frost heave or moisture-related distress near the crack or
joint. Therefore, we recommend implementing a detailed maintenance program to seal and/or fill any
cracks and joints. The maintenance program should give special attention to areas where dissimilar
materials abut one another, where construction joints occur and where shrinkage cracks develop.
C.7. Pavements and Exterior Slabs
C.7.a. Design Sections
Our scope of services for this project did not include laboratory tests on subgrade soils to determine an
R-value for pavement design. Based on our experience with similar clayey and silty soils anticipated at
the pavement subgrade elevation, we recommend pavement design assume an R-value of 12. Note, the
contractor may need to perform limited removal of unsuitable or less suitable soils to achieve this value.
Based upon the aforementioned traffic loads and an R-value of 12, we recommend a bituminous
pavement section for the local residential streets that includes a minimum of 3 1/2 inches of bituminous
pavement (a 1 1/2-inch surface course over a 2-inch base course), over 8 inches of aggregate base
material, and 18 inches of select granular fill. The City of Elk River may have a standard pavement section
that is different in which we recommend following the City Standard Plates.
For the bituminous trails, we recommend a pavement section of 6 inches of aggregate base overlain by
3 inches of bituminous wear course. If there are soft areas during trail construction, some subgrade soil
correction work may be needed. An alternative would be to use additional aggregate base or use a
separation fabric between the subgrade and aggregate base.
For concrete sidewalks, we recommend a minimum of 4 inches of concrete underlain by a minimum of
4 inches of aggregate base.
The ongoing performance of bituminous pavements is impacted by conditions under which the
pavement is asked to perform in. These conditions include the environmental conditions, the actual use
conditions and the level of ongoing maintenance performed. Because of normal thermos-expansion and
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 22
contraction, it is not unusual to have cracking develop within the first few years of placement and for the
cracking to continue throughout the life of the pavement. A regular maintenance plan should be
developed for filling cracks to lessen the potential impacts for cold weather distress due to frost heave or
warm weather distress due to wetting and softening of the subgrade. It is also not unusual for the
pavement to require a seal coat within the first 5 to 10 years to increase the long-term performance of
the bituminous pavement.
C.7.b. Bituminous Pavement Materials
Appropriate mix designs are critical to the performance of flexible pavements. We can provide
recommendations for pavement material selection during final pavement design.
C.7.c. Subgrade Drainage
We recommend installing perforated drainpipes throughout pavement areas at low points, around catch
basins, and behind curb in landscaped areas. We also recommend installing drainpipes along pavement
and exterior slab edges where exterior grades promote drainage toward those edge areas. The
contractor should place drainpipes in small trenches, extended at least 8 inches below the granular
subbase layer, or below the aggregate base material where no subbase is present.
C.7.d. Performance and Maintenance
We based the above pavement designs on a 20-year performance life for bituminous. This is the amount
of time before we anticipate the pavement will require reconstruction. This performance life assumes
routine maintenance, such as seal coating and crack sealing. The actual pavement life will vary depending
on variations in weather, traffic conditions and maintenance.
It is common to place the non-wear course of bituminous and then delay placement of wear course. For
this situation, we recommend evaluating if the reduced pavement section will have sufficient structure to
support construction traffic.
Many conditions affect the overall performance of the exterior slabs and pavements. Some of these
conditions include the environment, loading conditions and the level of ongoing maintenance. With
regard to bituminous pavements in particular, it is common to have thermal cracking develop within the
first few years of placement and continue throughout the life of the pavement. We recommend
developing a regular maintenance plan for filling cracks in exterior slabs and pavements to lessen the
potential impacts for cold weather distress due to frost heave or warm weather distress due to wetting
and softening of the subgrade.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 23
C.g. UtI�It12S
C.8.a. Subgrade Stabilization
Earthwork activities associated with utility installations located inside the building areas should adhere to
the recommendations in Section C.2.g.
For exterior utilities, we anticipate the soils at typical invert elevations will be suitable for utility support.
However, if construction encounters unfavorable conditions such as soft clay, organic soils or perched
water at invert grades, the unsuitable soils may require some additional subcutting and replacement
with sand or crushed rock to prepare a proper subgrade for pipe support. Project design and construction
should not place utilities within the 1H:1V oversizing of foundations — this may require special
consideration where utilities are placed along lot lines between house pads.
C.8.b. Corrosion Potential
Based on our experience, the soils encountered by the borings are moderately corrosive to metallic
conduits, but only marginally corrosive to concrete. We recommend specifying non-corrosive materials
or providing corrosion protection, unless project planning chooses to perform additional tests to
demonstrate the soils are not corrosive.
C.9. Stormwater
We estimated infiltration rates for some of the soils we encountered in our soil borings, as listed in Table
7. These infiltration rates represent the long-term infiltration capacity of a practice and not the capacity
of the soils in their natural state. Field testing, such as with a double-ring infiltrometer (ASTM D3385),
may justify the use of higher infiltration rates. However, we recommend adjusting field test rates by the
appropriate correction factor, as provided for in the Minnesota Stormwater Manual or as allowed by the
local watershed. We recommend consulting the Minnesota Stormwater Manual for stormwater design.
Table 7. Estimated Design Infiltration Rates Based on Soil Classification
Infiltration Rate *
Soil Type (inches/hour)
Sands 0.80
Silty sands, silty gravelly sands 0.45
Silts, very fine sands, silty or clayey fine sands 0.2
Clayey sands and clays 0.06 or less
*From Minnesota Stormwater Manual. Rates may differ at individual sites.
B�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 24
Fine-grained soils (silts and clays), topsoil or organic matter that mixes into or washes onto the soil will
lower the permeability. The contractor should maintain and protect infiltration areas during
construction. Furthermore, organic matter and silt washed into the system after construction can fill the
soil pores and reduce permeability over time. Proper maintenance is important for long-term
performance of infiltration systems.
This geotechnical evaluation does not constitute a review of site suitability for stormwater infiltration or
evaluate the potential impacts, if any, from infiltration of large amounts of stormwater.
D. Procedures
D.1. Penetration Test Borings
We drilled the penetration test borings with an all-terrain mounted core and auger drill equipped with
hollow-stem auger. The first phase of borings was completed from March 28 through 29, 2022. The
second phase of borings was completed from May 19 through 20, 2022. We performed the borings in
general accordance with ASTM D6151 taking penetration test samples at 2 1/2- or 5-foot intervals in
general accordance with ASTM D1586. The boring logs show the actual sample intervals and
corresponding depths.
We sealed penetration test boreholes meeting the Minnesota Department of Health (MDH)
Environmental Borehole criteria with an MDH-approved grout. We will forward a sealing record for those
boreholes to the Minnesota Department of Health Well Management Section.
D.2. Exploration Logs
D.2.a. Log of Boring Sheets
The Appendix includes Log of Boring sheets for our penetration test borings. The logs identify and
describe the penetrated geologic materials and present the results of penetration resistance and other
in-situ tests performed. The logs also present the results of laboratory tests performed on penetration
test samples, and groundwater measurements.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 25
We inferred strata boundaries from changes in the penetration test samples and the auger cuttings.
Because we did not perform continuous sampling, the strata boundary depths are only approximate. The
boundary depths likely vary away from the boring locations, and the boundaries themselves may occur as
gradual rather than abrupt transitions.
D.2.b. Geologic Origins
We assigned geologic origins to the materials shown on the logs and referenced within this report, based
on: (1) a review of the background information and reference documents cited above, (2) visual
classification of the various geologic material samples retrieved during the course of our subsurface
exploration, (3) penetration resistance and other in-situ testing performed for the project, (4) laboratory
test results, and (5) available common knowledge of the geologic processes and environments that have
impacted the site and surrounding area in the past.
D.3. Material Classification and Testing
D.3.a. Visual and Manual Classification
We visually and manually classified the geologic materials encountered based on ASTM D2488. When we
performed laboratory classification tests, we used the results to classify the geologic materials in
accordance with ASTM D2487. The Appendix includes a chart explaining the classification system we
used.
D.3.b. Laboratory Testing
The exploration logs in the Appendix note the results of the laboratory tests performed on geologic
material samples. We performed the tests in general accordance with ASTM procedures.
D.4. Groundwater Measurements
The drillers checked for groundwater while advancing the penetration test borings, and again after auger
withdrawal. We then filled the boreholes or allowed them to remain open for an extended period of
observation, as noted on the boring logs.
s�auM
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 26
E. Qualifications
E.1. Variations in Subsurface Conditions
E.1.a. Material Strata
We developed our evaluation, analyses, and recommendations from a limited amount of site and
subsurface information. It is not standard engineering practice to retrieve material samples from
exploration locations continuously with depth. Therefore, we must infer strata boundaries and
thicknesses to some extent. Strata boundaries may also be gradual transitions, and project planning
should expect the strata to vary in depth, elevation, and thickness, away from the exploration locations.
Variations in subsurface conditions present between exploration locations may not be revealed until
performing additional exploration work or starting construction. If future activity for this project reveals
any such variations, you should notify us so that we may reevaluate our recommendations. Such
variations could increase construction costs, and we recommend including a contingency to
accommodate them.
E.1.b. Groundwater Levels
We made groundwater measurements under the conditions reported herein and shown on the
exploration logs and interpreted in the text of this report. Note that the observation periods were
relatively short, and project planning can expect groundwater levels to fluctuate in response to rainfall,
flooding, irrigation, seasonal freezing and thawing, surface drainage modifications and other seasonal
and annual factors.
E.2. Continuity of Professional Responsibility
E.2.a. Plan Review
We based this report on a limited amount of information, and we made a number of assumptions to help
us develop our recommendations. We should be retained to review the geotechnical aspects of the
designs and specifications. This review will allow us to evaluate whether we anticipated the design
correctly, if any design changes affect the validity of our recommendations, and if the design and
specifications correctly interpret and implement our recommendations.
e��a�uw
INTERTE�
Lennar Corporation
Project B2202158
August 11, 2022
Page 27
E.2.b. Construction Observations and Testing
We recommend retaining us to perform the required observations and testing during construction as
part of the ongoing geotechnical evaluation. This will allow us to correlate the subsurface conditions
exposed during construction with those encountered by the borings and provide professional continuity
from the design phase to the construction phase. If we do not perform observations and testing during
construction, it becomes the responsibility of others to validate the assumption made during the
preparation of this report and to accept the construction-related geotechnical engineer-of-record
responsibilities.
E.3. Use of Report
This report is for the exclusive use of the addressed parties. Without written approval, we assume no
responsibility to other parties regarding this report. Our evaluation, analyses and recommendations may
not be appropriate for other parties or projects.
E.4. Standard of Care
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality.
No warranty, express or implied, is made.
s�auw
INTERTE�
Appendix
BRAUN
II�TERTEC
..--�,� � � --�,.�. ��. ��,��•,.
�� \
r .: w �a �
�'�
� ^•�
_��
b : rt�:
;. �:._,.
�
�a�.
�
p
� y q. k' _
.. . .+x�,4�=.!
" � z1
. - i. u�, a °
� .. Y_.F.i°'�
� � ..,
� .r j,°«�
�� � �
�� „ �
� �� .
�+ ... � •�1���
� �..�"�� .� `�111.L.�:?w •n'-sp� .�� � 3 � - '
., ��� �
� � �
- '�. $� : � <.�,,,�' � �! !�c+ s -
� � m �' 4�: ��r�, P ' .. R� � ^ � �, f' �,�--'a, .. ,�w �
- �A e, tr^, `. �,� �D t` °5"°A,: �. � ..' L�7 .�,��s�.-' . �€ . . /
� UENOTESAPPROXIMATELOCATION OF I
STANOARO PENETRATION TEST BORING
�
zso� o soo�
SCALE�. 1"=500'
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-�
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 221357 EASTING: 590758
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/28/22 END DATE: 03/28/22
SURFACE g08.4ft RIG: 7506 METHOD: 31/4"HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. ; LEAN CLAY CL , black, moist TOPSOIL
0.2 ���;� SANDY LEAN CLAY (CL), brown and gray,
'; moist, medium(GLACIALTILL)
�/ 2-4-3
X ��) 18
/� 13"
2-3-4
5 � (�)
/� 11"
901.4 5-5-8
7.0 : CLAYEY SAND (SC), trace Gravel, brown to � �13� 12
;: dark brown, moist, stiff (GLACIAL TILL) 14"
3-7-9
:;Y 10 � �15 �
t': ;i: ,'
`: r' �i ;;' 4-6-8
F'�, � � (14)
� ; : ,'
;;: ;': , : � 3��
894.4 ' t`:i':;'�
14.0 !�,�' �'; SANDY LEAN CLAY (CL), gray, moist, very stiff 11-18-8
�''��`�; (GLACIALTILL) 15 � (26)
,�,
' i % , 18��
;
�/ 9-10-11
887 4 �th SAND layer at 20 feet 20 X (21)
/� 14" Water not observed while
21.0 END OF BORING drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-1 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-2
Geotechnical Evaluation LOCATION: Boring offset 10 feet north of staked location. See
Foster Property attached sketch.
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 221450 EASTING: 591814
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/28/22 END DATE: 03/28/22
SURFACE g41.1 ft RIG: 7506 METHOD: 31/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. SILTY SAND (SM), fine-grained, dark brown,
0.1 moist TOPSOIL
! POORLY GRADED SAND with SILT (SP-SM),
! fine-grained, brown, moist, loose to medium 1-2-5
dense (GLACIAL OUTWASH) � ���
13"
�] 3-4-5
5 X �9) 4 P200=10%
L� 12"
4-5-5
� (10)
13"
4-6-6
�th CLAYlayer at 10 feet �� � (12)
12"
929.1 3-3-5
12.0 POORLY GRADED SAND (SP), fine-grained, �] �8�
light brown to brown, moist, loose (GLACIAL �� 14"
OUTWASH)
2-3-6
15 � �9�
11"
3-4-6
20 � ��p�
920.1 � 3" Water not observed while
21.0 END OF BORING drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-2 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-3
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 221556 EASTING: 592706
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/28/22 END DATE: 03/28/22
SURFACE 92�.6 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. SILTY SAND (SM), fine-grained, trace roots,
0.3 dark brown, moist TOPSOIL FILL
: SILTY SAND (SM), fine-grained, brown, moist,
� loose (GLACIAL OUTWASH) �] 1-3-3
� ' X �6) 9
923.6 : ; /� 13"
4.0 POORLY GRADED SAND (SP), fine to 6-5-4
medium-grained, with Gravel, brown, moist, 5� �g�
loose (GLACIAL OUTWASH) 14"
920.6 4-5-5
7.0 : CLAYEY SAND (SC), trace Gravel, brown, � ��p� 12
moist, stiff (GLACIAL TILL) 13"
6-6-9
:;Y 10 � �15 �
t': ;i: ,'
`: r' �i ;;' 3-6-8
F'�, � � (14)
� ; : ,'
;;: ;': , : � 3��
913.6 ' t`:i'':;'�
14.0 : SILTY SAND (SM), trace Gravel, brown, moist 6-5-7
: j to wet, medium dense (GLACIAL OUTWASH) 15 � (12)
13"
5-10-13
� ::: :: 20 � �23�
906.6 ��" Water observed at 20.0 feet
21.0 END OF BORING while drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-3 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-4
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 221353 EASTING: 593709
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/28/22 END DATE: 03/28/22
SURFACE gg2.5 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
,,',° °',° SILTY SAND (SM), fine-grained, trace roots,
0.5 dark brown, moist TOPSOIL
: SILTY SAND (SM), fine-grained, trace Gravel,
� brown, moist, loose (GLACIAL OUTWASH) 4-4-4
: ; ; . (g�
928.5 �th Clay seam at 3 feet 13"
4.0 POORLY GRADED SAND (SP), fine to 3-4-5
medium-grained, light brown to brown, dry to 5� �g� 3 P200-3%
moist, loose to medium dense (GLACIAL 11"
OUTWASH)
2-2-3
� (5)
14"
2-3-3
10 � �6)
13"
3-3-4
� (7)
14"
4-6-8
15 � (14)
13"
4-6-10
20 � �16�
911.5 � 3" Water not observed while
21.0 END OF BORING drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-4 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-S
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 221015 EASTING: 594261
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/29/22 END DATE: 03/29/22
SURFACE g12.8 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. SILTY SAND (SM), fine-grained, trace roots,
0.3 brown, moist TOPSOIL
: SILTY SAND (SM), fine-grained, trace roots,
: brown to black, moist, loose to medium dense �/ 4-5-6
; (ALLUVIUM) X (11)
: : ,' . /� 18��
,.
�] 2-3-2
�th Clay seam at 5 feet 5 X (5)
L� 18"
3-3-2
� (5)
17"
4-4-4
�o � (g)
18"
900.8
12.0 ORGANIC SOIL (OH), slightly organic, trace
fibers, black, moist (SWAMP DEPOSIT) � 3-3-3
{{ (6) 66 OC=10%
�s 15"
� 15
895.8 ��
17.0 i:: SILTY SAND (SM), fine-grained, with Clay
�: lenses, brown, wet, loose (GLACIAL TILL)
2-3-3
� ::: : 20 � (6)
891�8 ���� Water observed at 20.0 feet
21.0 END OF BORING while drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-5 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-G
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220240 EASTING: 594333
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/29/22 END DATE: 03/29/22
SURFACE ggg.1 ft RIG: 7506 METHOD: 31/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. : SILTY SAND (SM), fine-grained, trace roots,
0.2 dark brown, moist TOPSOIL
: SILTY SAND (SM), fine-grained, brown, moist,
� loose (GLACIALTILL) �] 1-4-2
: ;. X �6)
934.1 : ' /� 17"
4.0 �' POORLY GRADED SAND with SILT (SP-SM), 4-4-9
' fine-grained, brown, moist, medium dense 5� (13)
; : ! (GLACIAL OUTWASH) � ���
5-6-6
� (12)
929.1 � 8��
9.0 POORLY GRADED SAND (SP), fine to 4-5-6
medium-grained, trace Gravel, brown, dry to 10 � ��� � 3 P200-2%
moist, loose to medium dense (GLACIAL 15"
OUTWASH)
4-5-5
� (10)
15"
5-5-5
15 � (10)
18"
6-7-9
20 � �16�
917.1 � 8" Water not observed while
21.0 END OF BORING drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-6 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-T
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220203 EASTING: 593625
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/29/22 END DATE: 03/29/22
SURFACE g13.5 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Grass WEATHER: Sunn
ELEVATION: y
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
912.5 SILTY SAND (SM), fine-grained, trace roots,
1.0 � dark brown, moist TOPSOIL FILL
„���" FILL: SILTY SAND (SM), fine to medium-
� grained, trace Gravel, with Clay seams, dark 9-15-10
��,k` brown, moist � �16 ) 6
x h
'i� , 5 6-4-4
� (8)
16"
906.5 ��� "
7.0 ,��� FILL: POORLY GRADED SAND (SP), fine to �/ 4�4-�1�2 4
medium-grained, trace Gravel, with inclusions �� 15"
904.5 of black Clayey Sand, brown, moist
9.0 POORLY GRADED SAND (SP), fine-grained, g_g_�
with Silt seams, brown, moist, medium dense 10 � (15)
(GLACIAL OUTWASH) � g��
901.5
12.0 : SILTY SAND (SM), fine-grained, brown, moist
4:::�; to wet, loose (GLACIAL OUTWASH) 4-4-4
899.0 ' � �8)
� 8�� Water observed at 13.0 feet
14.5 END OF BORING 15 while drilling.
Boring then backfilled with auger cuttings
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-7 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-TA
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220203 EASTING: 593625
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g13.5 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Swam WEATHER: Sun
ELEVATION: p
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
�� � CLAYEY SAND (SC), slightly organic, dark
0.5 �x�,,� brown, moist TOPSOIL FILL
`,�"'� SILTY SAND (SM), fine to coarse-grained, 6-8-14
x'`x� brown, moist, medium dense (POSSIBLE FILL)
��`�� �22) 9 P200=13%
>
909.5
� 17"
4.0 % CLAYEY SAND (SC), trace Gravel, gray, moist, 3-5-14
�-' r very stiff (GLACIAL TILL) 5� ��g� 13
15"
�:' / ; � 8-11-10
� � ;' ;,: ;; , � �2 � �
904.5 �
9.0 i SANDY LEAN CLAY (CL), contains lenses of 2-2-2
�";' ,, Silty Sand, brown, moist, soft (GLACIAL TILL) 10 � �4�
% ; 14"
�i
'� r
900. 5 5-5-3
13.0 POORLY GRADED SAND (SP), fine to �]
899 0 medium-grained, trace Gravel, gray, wet, loose 8
GLACIAL OUTWASH �, � 8) Water observed at 8.0 feet
14.5 while drillin
END OF BORING 15 g
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-7A page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-H
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220501 EASTING: 593030
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/20/22 END DATE: 05/20/22
SURFACE g11.1 ft RIG: 8503 METHOD: 31/4" HSA SURFACING: Woods WEATHER: Clouds
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
.`''° �,'`° ORGANIC SOIL (OL), black, moist (TOPSOIL)
910.0 ° ',''` .
1.1 �' ' SILTY, CLAYEY SAND (SGSM), fine to
' medium-grained, trace Gravel, brown, moist, �/ 1-2-3
� loose (GLACIALTILL) X (5) 19
� ::
/� 17"
2-4-4
5 � 18)'
904.1 4-5-7
7.0 : CLAYEY SAND (SC), trace Gravel, grayish � �12� 14
;: brown to gray, moist, stiff (GLACIAL TILL) � 8„
4-4-5
:;Y 10 � 18)�
t': ;i: ,'
��> �;'
898.1 '' :''; : '
13.0 SANDY SILT (ML), gray, moist, loose �/ 3-5-5
896.6 (GLACIALTILL) 10
�� (� 8�) Water not observed while
14.5 END OF BORING 15 drilling.
Installed piezometer.
Water measured at a depth
of 3.7 feet (elevation 907.4)
on June 1, 2022.
20 Water measured at a depth
of 9.5 feet (elevation 901.6)
on August 2, 2022.
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-8 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-9
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220550 EASTING: 592128
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g11.3 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Woods WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
.`''° .,'`° ORGANIC SOIL (OL), black, moist (TOPSOIL)
.,��,.
,,.,n,. >,�,;�
>,��,.
<.,�,, ..,��: 1-1-1
,,�,< , �
<.,��. .,��,. (2)
���<< . 5��
907.3 .�ir< >>Ir„
4.0 POORLY GRADED SAND with SILT (SP-SM), 2-3-4
fine to medium-grained, trace Gravel, brown, 5� �7� 16 P200-7%
' moist, loose (GLACIAL OUTWASH) 16"
4 : 2-3-2
� (5)
902.3 � 8��
9.0 ;' CLAYEY SAND (SC), trace Gravel, contains 2-2-3
:_- �, � lenses of Silty Sand, gray, moist, medium to 10 � �5� 14
,�:,�`;�'; stiff(GLACIALTILL) �g��
t.,.,
F, t,,
,�:, .
�;
; r �] 2-4-5
896.8 ; �; �;:'; x �9)
L� 17" Water observed at 7.0 feet
14.5 END OF BORING 15 while drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-9 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-�O
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220583 EASTING: 590982
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/28/22 END DATE: 03/28/22
SURFACE g26.0 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. SILTY SAND (SM), fine-grained, trace roots,
0.3 dark brown, moist TOPSOIL FILL
� FILL: SANDY LEAN CLAY (CL), trace Gravel,
?5��, brown, moist 5-10-14
(24)
922.0 ��� 8
4.0 % CLAYEY SAND (SC), brown, dry, hard 8-15-17
,-' ;-, (GLACIAL TILL) 5 � (32) 7
14"
919.0 11-11-15
7.0 : CLAYEY SAND (SC), brown, moist, very stiff to � �26� 11
hard (GLACIAL TILL) 10"
10-14-16
:;Y 10 �/ �1 p�
t � �;,'! � /�
F,t,
;':, .
' ' '� 18-22-21
,� ' �
(43)
911.5 ; l�l ; 13��
14.5 END OF BORING Water not observed while
15 drilling.
Boring then backfilled with auger cuttings
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-10 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-11
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220236 EASTING: 590669
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/20/22 END DATE: 05/20/22
SURFACE g13.5 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Woods WEATHER: Clouds
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°,',° °''`° SILTY SAND (SM), fine-grained, organic, black,
912. 5 , .,'�, .
1.0 moist TOPSOIL
LEAN CLAY with SAND (CL), brown, moist, soft
�%; (GLACIALTILL) �/ 1-2-2
X �4) 0.75 23
909.5 /� 18"
4.0 % CLAYEY SAND (SC), trace Gravel, brown to 5-7-11
,-`:;-, grayish brown, moist, very stiff (GLACIALTILL) 5� ��g� 13
0"
�:' / ; � 6-10-14
� (24)
18"
6-9-12
:; Y 10 �/ (� 8 )
�� ' /�
t': ;i: ,'
F, t,,
,�:, .
�;
;;: r: i'� 3-9-10
; ;,; ; ,� � (19)
899.0 ; l�l ; 18��
14.5 END OF BORING Water not observed while
15 drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-11 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-�2
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220003 EASTING: 591941
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/20/22 END DATE: 05/20/22
SURFACE g06.5 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Woods WEATHER: Clouds
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°`''° °''`° SILTY SAND (SM), fine-grained, organic, black,
.,��,,
905.0 =�'�< ,,���„ moist (TOPSOIL)
1.5 : SILTY SAND (SM), fine-grained, brown, moist, 3-3-4
: loose (GLACIAL OUTWASH) � (7) 13 P200-15%
902. 5 16"
4.0 POORLY GRADED SAND (SP), fine to 2-4-4
medium-grained, brown, moist to wet, loose 5� �g�
(GLACIAL OUTWASH) � g��
4-3-4
� ; ::� : � ���
897.5 � 8��
9.0 ; SANDY LEAN CLAY (CL), trace Gravel, gray, g-5-5
�";' ,, moist, stiff (GLACIAL TILL) 10 � (10)
% ; 16"
�i
894.5
12.0 POORLY GRADED SAND (SP), fine to
medium-grained, trace Gravel, brown, wet, very 1-2-2
loose (GLACIAL OUTWASH) � (4)
892.0 � 8" Water observed at 7.5 feet
14.5 END OF BORING 15 while drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-12 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-13
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219730 EASTING: 592676
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g04.1 ft RIG: 8503 METHOD: 31/4" HSA SURFACING: Woods WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
�� � SILTY SAND (SM), fine to medium-grained,
0.5 �, slightly organic, dark brown, moist (TOPSOIL
X� k FILL 3-3-2
;?��c� FILL: SILTY, CLAYEY SAND (SGSM), fine to �] �5�
� medium-grained, brown and black, moist �� 14"
x h
�`✓�'/,
� `` " 2-7-8
�� " �th wood at 5 feet 5� (15)
12"
;�,� � �'
1-2-2
� f � (4)
895.1 %� �I�
9.0 � ORGANIC SOIL (OL), black, moist (SWAMP 2-2-4
1�J DEPOSIT) 10 �6�
16"
892.1 S ��
12.0 ,'', j>i;` SILTY, CLAYEY SAND (SGSM), fine to
! medium-grained, gray, moist, loose (GLACIAL 2-3-3
;'�: TILL
889.6 I; ;>` ) 18)' 12 Water not observed while
14.5 END OF BORING 15 drilling.
Boring immediately backfilled Installed piezometer.
Water measured at a depth
of 4.5 feet (elevation 899.6)
on June 1, 2022.
20 Water measured at a depth
of 6.5 feet (elevation 897.6)
on August 2, 2022.
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-13 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-14
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219607 EASTING: 593445
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g09.5 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Woods WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°`''° °''`° SILTY SAND (SM), fine-grained, slightly
.,��,,
�:.���,, �,��;� organic, black, moist (TOPSOIL)
>,��,.
<.,�,, ..,��:� 2-3-4
,,�<< ,
906.5 �.���< .��,,, (7)
3.0 " SILTY, CLAYEY SAND (SGSM), fine-grained, 18"
' grayish brown, moist, loose (GLACIAL TILL)
�/ 2-4-4
5 X �8) 15
/� 18"
902.5
7.0 �: SILTY SAND (SM), fine-grained, with layers of 4-3-3
LEAN CLAY, gray, moist, loose (GLACIAL TILL) � �6�
900.5 � 8��
9.0 SANDY SILT (ML), gray, moist, loose 2-3-5
(GLACIALTILL) 10 � �g� 13
18"
897.5
12.0 ': SILTY, CLAYEY SAND (SGSM), fine-grained,
trace Gravel, gray, moist, medium dense 5-6-5
;';; (GLACIALTILL) � (11)
895.0 � 8" Water not observed while
14.5 END OF BORING 15 drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-14 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-15
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219093 EASTING: 594192
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g20.9 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Woods WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°,',° °'',° CLAYEY SAND (SC), slightly organic, dark
919. 9 , .,'�, .
1.0 i brown, moist TOPSOIL
; SILTY, CLAYEY SAND (SGSM), fine to
� 3-5-5
�` medium-grained, reddish brown to brown,
�, `: ` moist, loose (GLACIAL TILL) �� �� 15
17"
�] 2-3-3
5 X 16)
/�
913.9 9-10-9
7.0 SILTY SAND (SM), fine-grained, contains �]
�19) 5
_: lenses of Clayey Sand, brown, moist, medium �, 18"
'. : dense (GLACIAL TILL)
8-8-5
10 � (13)
17"
908.9
12.0 POORLY GRADED SAND (SP), fine to
medium-grained, light brown, moist, loose 4-4-4
(GLACIAL OUTWASH) � (8)
906.4 � �" Water not observed while
14.5 END OF BORING 15 drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-15 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-16
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 218739 EASTING: 594227
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g00.4ft RIG: 8503 METHOD: 31/4"HSA SURFACING: Swam WEATHER: Sun
ELEVATION: p
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
.`''° .,'`° ORGANIC SOIL (OL), black, moist (TOPSOIL)
.,��,.
,,.,�,,. >,�,;�
898.4 ,�' .
2.0 CLAYEY SAND (SC), trace fibers, and roots, �/ 1-1-1
,: ; gray, moist, soft to medium (GLACIAL TILL) 2
X 18
/� 10"
�] 2-3-3
5 y (6)
894.4 � 18"
6.0 4. /�' POORLY GRADED SAND with SILT (SP-SM),
' fine-grained, brown, wet, very loose (GLACIAL 1-1-1
OUTWASH) � (2)
17"
1-1-2
10 � �3)
18"
1-2-3
885.9 �5�
'�th layers of SILTY, CLAYEY SAND at 14 � � 8" Water observed at 6.0 feet
14.5 feet 15
while drilling.
END OF BORING
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-16 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-�T
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219173 EASTING: 593591
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE g01.8 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Grass WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°,',° °,'`° CLAYEY SAND (SC), organic, black, moist
900.8 , .,'�, .
1.0 TOPSOIL
CLAYEY SAND (SC), grayish brown, moist, soft
� �' �. to medium (GLACIAL TILL) �/ 1-1-1
X (2) 19
L� � �„
�/ 1-2-3
5 X �5) 16
/� 17"
894. 8 3-3-3
7.0 ' POORLY GRADED SAND with SILT (SP-SM), �] �6�
' fine-grained, brown, wet, very loose to loose �� 10"
; ; (GLACIAL OUTWASH)
1-1-1
10 � �2)
13"
2-3-3
887.3 � �6)
� 8�� Water not observed while
14.5 END OF BORING 15 drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-17 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-�H
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219290 EASTING: 593010
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/19/22 END DATE: 05/19/22
SURFACE 89g g ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Grass WEATHER: Sun
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°`''° °''`° LEAN CLAY (CL), organic, black, moist
.,��,.
897.0 � ��>���,..���;� TOPSOIL
1.3 LEAN CLAY (CL), trace fibers, gray, moist,
% . medium (ALLUVIUM) �/ 1-2-3
X �5) 1 41
/� 17"
�] 2-2-3
5 y (5)
� 18"
891.3
7.0 FAT CLAY (CH), gray, moist, soft (ALLUVIUM) �/ 1-2-2
X �4) 1 65
/� 18"
� 1-1-1
10 �2�
18"
885.3
13.0 SILTY SAND (SM), fine to medium-grained,
;; gray, wet, very loose to loose (ALLUVIUM)
1-2-2
15 � �4)
18"
�] 1-2-4
877 3 �th Cobble at 20 feet 20 X (6)
L� 1" Water observed at 1.0 feet
21.0 END OF BORING while drilling.
Boring immediately backfilled with bentonite
grout
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-18 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORiN�: ST-19
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219064 EASTING: 590831
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/20/22 END DATE: 05/20/22
SURFACE g16.3 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Swam WEATHER: Sun
ELEVATION: p
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
°`''° °''`° CLAYEY SAND (SC), slightly organic, dark
.,��,,
914.8 ��',, .,��,;; brown, moist (TOPSOIL)
1.5 % CLAYEY SAND (SC), trace Gravel, grayish 1-3-3
brown, moist, medium(GLACIALTILL) � (6) 19
18"
�/ 2-2-6
5 X �8) 18
/� 12"
909. 3 8-8-9
7.0 ' SILTY, CLAYEY SAND (SGSM), fine to �] ����
medium-grained, trace Gravel, and Cobbles, �, 0"
°. reddish brown, moist, medium dense (GLACIAL
':�: TILL) 31-14-12
10 � (26)
17"
904.3
12.0 ;" ; SANDY LEAN CLAY (CL), trace Gravel, gray,
% / / moist, stiff (GLACIAL TILL) 6-6-7
� (13)
901.8 � 8" Water not observed while
14.5 END OF BORING 15 drilling.
Boring immediately backfilled
20
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-19 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-ZO
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 219245 EASTING: 590746
DRILLER: J. Tatro LOGGED BY: H. Vloo START DATE: 05/20/22 END DATE: 05/20/22
SURFACE g26.9 ft RIG: 8503 METHOD: 3 1/4" HSA SURFACING: Grass WEATHER: Clouds
ELEVATION:
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
,,',° °'',° CLAYEY SAND (SC), trace organic, dark
0.5 � %� %;� brown, moist TOPSOIL
, LEAN CLAY (CL), trace fibers, with layer of
SILTY SAND, brown, moist, soft (GLACIAL �] 2-1-2
%� -� / TILL) X �3) 0.5
922.9 L� 17"
4.0 <;' SILTY, CLAYEY SAND (SGSM), fine to 1-2-6
':i medium-grained, brown and reddish brown, 5� �g� 16
`;' moist, loose to medium dense (GLACIAL TILL) ����
9-14-15
� (29)
18"
6-10-16
10 � (26)
18"
7-7-9
� (16)
912.4 � 8" Water not observed while
14.5 END OF BORING 15 drilling.
Installed piezometer.
Water not observed to
bottom of piezometer
(elevation 912.7) on
20 June 1, 2022.
Water not observed to
bottom of piezometer
(elevation 912.7) on
August 2, 2022.
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-20 page 1 of 1
B RAU N LOG OF BORING
INTERTEC
'°e'O1eROeTO°n"°°"" See Descriptive Terminology sheet for explanation of abbreviations
Project Number B2202158 BORING: ST-2�
Geotechnical Evaluation LOCATION: See attached sketch
Foster Property
181st Avenue NW and Cleveland Road NW
Elk River, Minnesota NORTHING: 220912 EASTING: 593634
DRILLER: B. Kammermeier LOGGED BY: P. Anderson START DATE: 03/29/22 END DATE: 03/29/22
SURFACE 931.8 ft RIG: 7506 METHOD: 3 1/4" HSA SURFACING: Soil WEATHER: Wind cold
ELEVATION: y�
Description of Materials �,
Elev./ Blows
� (Soil-ASTM D2488 or 2487; Rock-USACE EM �- qP MC
Depth m 1110-1-2908) � (N-Value) tsf o�o Tests or Remarks
ft � Recovery
. SILTY SAND (SM), fine-grained, trace roots,
,.,. .,
0.1 "=`%':; dark brown, moist TOPSOIL
;' ;° CLAYEY SAND (SC), brown, moist, medium
i;: %'; (GLACIALTILL) 2-3-4
927.8
� 17)'
4.0 POORLY GRADED SAND (SP), fine to 3-3-3
medium-grained, trace Gravel, brown, dry, 5� �g� 3 P200-3%
loose (GLACIAL OUTWASH) �g��
924. 8 5-8-12
7.0 SILTY SAND (SM), fine to medium-grained, � (20)
_: trace Gravel, brown, moist, medium dense 18„
; : (GLACIAL OUTWASH)
8-7-7
10 � (14)
17"
919.8 8-8-9
12.0 POORLY GRADED SAND (SP), fine-grained, �] ����
light brown to brown, moist, medium dense �� 18"
(GLACIAL OUTWASH)
5-9-7
15 � (16)
18"
6-8-11
20 � ��g�
910.8 � 8" Water not observed while
21.0 END OF BORING drilling.
Boring then grouted
25
30
B2202158 Braun Intertec Corporation Print Date:08/10/2022 ST-21 page 1 of 1
s Rau N
INTERTEC
The 6cLnw Yw 8ulld On.
Criteria forAssigning Group Symbols and Soil Classifiwtion
q Group
Group Names Using LaboratoryTests S mbol Group Namee
Gravels CleanGravels C„>_4and1<C<<3° GW Well-gradedgravelE
° More than 50% of �
( (Less than 5% fines ) C„ <4 and/or (C<< 1 or C�> 3)° GP Poorly graded gravelE
� coarse fraction
O1 c retainedonNo.4 GravelswithFines FinesdassifyasMLorMH GM SiltygravelEF�
c� � sieve) (Morethanl2%fines�) FinesClassifyasCLorCH GC ClayeygravelEF�
�o � Sands CleanSands C„>_6and1<C<<3° SW Well-gradedsand�
` Y z 50% or more coarse (Less than 5% fines") C„ <6 and or C<<1 or C�> 3 SP Poorl
o � ( / ( )° ygradedsand�
� `o fractionpassesNo.4 F�i
� Sands with Fines Fines classify as ML or MH SM Silty sand
— sieve) (Morethanl2%fines") FinesclassifyasCLorCH SC ClayeysandF��
PU 7 and plots on or above "A" line� CL Lean dayrc �M
SiltsandClays Inorganic NLm
PI <4 or plots below "A" line ML Silt
� (Liquid limit less than
i°n � 50) LiquidLimit-ovendried Organicday"�^^"
Organic <OJS OL
- Liquid Limit- not dried Organic silt "�^^ o
m�� PI plots on or above "A" line CH Fat dayrc �m
o Inorganic
� o z Silts and Clays pl plots below "A" line MH Elastic siltrc�M
LL o (Liquidlimit50or
— more) LiquidLimit-ovendried Organicday"�^^'
Organic <OJS OH
Liquid Limit - not dried Organic silt "�^^ n
HighlyOrganic5oils Primarilyorganicmatter,darkincolor,andorganicodor PT Peat
A. Based on the material passing the 3-inch (75-mm) sieve.
B. If field sample contained cobbles or boulders, or both, add "with cobbles or boulders,
or both" to group name.
C. Gravels with 5 to 12% fines require dual symbols:
GW-GM well-graded gravel with silt
GW-GC well-graded gravel with clay
GP-GM poorly graded gravel with silt
GP-GC poorly graded gravel with clay
D. C� _ �eo/ �io �� _��a�Z /��io x �eo)
E. If soil contains>_ 15% sand, add "with sand" to group name.
F. If fines classify as CL-ML, use dual symbol GC-GM or SC-SM.
G. If fines are organic, add "with organic fines" to group name.
H. Sands with 5 to 12% fines require dual symbols:
SW-SM well-graded sand with silt
SW-SC well-graded sand with clay
SP-SM poorly graded sand with silt
SP-SC poorly graded sand with clay
I. If soil contains>_ 15% gravel, add "with gravel" to group name.
J. If Atterberg limits plot in hatched area, soil is CL-ML, silty clay.
K. If soil contains 15 to < 30% plus No. 200, add "with sand" or "with gravel", whichever is
predominant.
L. Ifsoil contains>_ 30% plus No. 200, predominantlysand, add "sandy" to group name.
M. If soil contains>_ 30% plus No. 200 predominantly gravel, add "gravelly" to group name.
N. PI >_ 4 and plots on or above "A" line.
0. PI < 4 or plots below "A" line.
P. PI plots on or above "A" line.
Q. PI plots below "A" line.
50
sn
ao
30
zo
to
�
a
0
�Quto uMrr(t�.�
Laboratory Tests
DD Dry density, pcf qP Pocket penetrometer strength, tsf
WD Wet density, pcf q� Unconfined compression test, tsf
P200 % Passing #200 sieve LL Liquid limit
MC Moisture content, % PL Plastic limit
OC Organic content, % PI Plasticity index
Descriptive Terminology of Soil
Based on Standards ASTM D2487/2488
(Unified Soil Classification System)
Particle Size Identification
Boulders .............. over 12"
Cobbles ................ 3" to 12"
Gravel
Coarse ............. 3/4" to 3" (19.00 mm to 75.00 mm)
Fine ................. No. 4 to 3/4" (4.75 mm to 19.00 mm)
Sand
Coarse .............. No. 10 to No. 4(2.00 mm to 4.75 mm)
Medium........... No. 40 to No. 10 (0.425 mm to 2.00 mm)
Fine .................. No. 200 to No. 40 (0.075 mm to 0.425 mm)
Silt ........................ No. 200 (0.075 mm) to .005 mm
Clay ...................... <.005 mm
Relative Proportions�, "'
trace ............................. 0 to 5%
little .............................. 6 to 14%
Wlth .............................. > 15%
Inclusion Thicknesses
lens ............................... 0 to 1/8��
i i
seam ............................. 1 8' to 1'
layer .............................. over 1��
Apparent Relative Density of Cohesionless Soils
Very loose ..................... 0 to 4 BPF
Loose ............................ 5 to 10 BPF
Medium dense .............. 11 to 30 BPF
Dense ............................ 31 to 50 BPF
Very dense .................... over 50 BPF
Consistency of Blows Approximate Unconfined
Cohesive Soils Per Foot Compressive Strength
Very soft ................... 0 to 1 BPF................... < 0.25 tsf
Soft ........................... 2 to 4 BPF................... 0.25 to 0.5 tsf
Medium .................... 5 to 8 BPF .................. 0.5 to 1 tsf
Stiff ........................... 9 to 15 BPF................. 1 to 2 tsf
Very Stiff ................... 16 to 30 BPF............... 2 to 4 tsf
Hard .......................... over 30 BPF................ > 4 tsf
Moisture Content:
Dry: Absence of moisture, dusty, dry to the touch.
Moist: Damp but no visible water.
Wet: Visible free water, usually soil is below water table.
Drilling Notes:
Blows/N-value: Blows indicate the driving resistance recorded
for each 6-inch interval. The reported N-value is the blows per
foot recorded by summing the second and third interval in
accordance with the Standard Penetration Test, ASTM D1586.
Partial Penetration: If the samplercould not be driven
through a full 6-inch interval, the numberof blows forthat
partial penetration is shown as #/x" (i.e. 50/2"). The N-value is
reported as "REF" indicating refusal.
Recovery: Indicates the inches of sample recovered from the
sampled interval. For a standard penetration test, full recovery
is 18", and is 24" for a thinwall/shelbytube sample.
WOH: Indicates the sampler penetrated soil under weight of
hammer and rods alone; driving not required.
WOR: Indicates the sampler penetrated soil under weight of
rods alone; hammerweight and driving not required.
Water Level: Indicates the water level measured by the
drillers either while drilling (�_ ), at the end of drilling ( �),
or at some time after drilling (�).
Sample Symhols
�}� St.andard Rane[raS���� Tast � Rn�k Cnre
eModidied California jMCy . Thinw.all (iW}�Shelhy Pube �SHj
is Auger � rexas Cnne Penezrpmeter
7
�'� Grah Sani�sle � t�ysiamic Cone Penetrometer
�`r
5/2021
� Architecture + Engineering + Environmental + Planning EAW
.7�
�.,_ __��� . . � �
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Minnesota-Wisconsin Ecological Services Field Office
4101 American Blvd E
Bloomington, MN 55425-1665
Phone: (952) 252-0092 FaY: (952) 646-2873
http://www.fws. gov/midwest/Endangered/section7/s7process/step l.html
In Reply Refer To:
Project Code: 2022-0016504
Project Name: Foster Property
t_a.
1� �'F] 1 h ri�l1��SlY.
ti$-7R'W'R
��
� J
March 07, 2022
Subject: List of threatened and endangered species that may occur in your proposed project
location or may be affected by your proposed project
To Whom It May Concern:
This response has been generated by the Information, Planning, and Conservation (IPaC) system
to provide information on natural resources that could be affected by your project. The U.S. Fish
and Wildlife Service (Service) provides this response under the authority of the Endangered
Species Act of 1973 (16 U.S.C. 1531-1543), the Bald and Golden Eagle Protection Act (16
U.S.C. 668-668d), the Migratory Bird Treaty Act (16 U.S.C. 703-712), and the Fish and Wildlife
Coordination Act (16 U.S.C. 661 et seq.).
Threatened and Endangered Species
The enclosed species list identifies threatened, endangered, proposed and candidate species, as
well as proposed and final designated critical habitat, that may occur within the boundary of your
proposed project and may be affected by your proposed project. The species list fulfills the
requirement for obtaining a Technical Assistance Letter from the U.S. Fish and Wildlife Service
under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et
seq.).
New information based on updated surveys, changes in the abundance and distribution of
species, changed habitat conditions, or other factors could change this list. Note that under 50
CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species
list should be verified after 90 days. The Service recommends that verification be completed by
visiting the ECOS IPaC website at regular intervals during project planning and implementation
for updates to species lists and information. An updated list may be requested through the ECOS
IPaC system by completing the same process used to receive the enclosed list.
Consultation Technical Assistance
Please refer to the Midwest Region S7 Technical Assistance website for step-by-step instructions
for making species determinations and for specific guidance on the following types of projects:
03/07/2022
projects in developed areas, HUD, CDBG, EDA, pipelines, buried utilities, telecommunications,
and requests for a Conditional Letter of Map Revision (CLOMR) from FEMA.
2
Using the IPaC Official Species List to Make No Effect and May Affect Determinations for
Listed Species
If IPaC returns a result of "There are no listed species found within the viciniry of the project,"
then project proponents can conclude the proposed activities will have no effect on any federally
listed species under Service jurisdiction. Concurrence from the Service is not required for No
Effect determinations. No further consultation or coordination is required. Attach this letter to
the dated IPaC species list report for your records. An example "No Effect" document also can be
found on the S7 Technical Assistance website.
l. If IPaC returns one or more federally listed, proposed, or candidate species as potentially
present in the action area of the proposed project — other than bats (see below) — then
project proponents must determine if proposed activities will have no effect on or may
affect those species. For assistance in determining if suitable habitat for listed, candidate,
or proposed species occurs within your project area or if species may be affected by
project activities, you can obtain Life History Information for Listed and Candidate
Species through the S7 Technical Assistance website. If no impacts will occur to a species
on the IPaC species list (e.g., there is no habitat present in the project area), the appropriate
determination is No Effect. No further consultation or coordination is required. Attach this
letter to the dated IPaC species list report for your records. An example "No Effect"
document also can be found on the S7 Technical Assistance website.
2. Should you determine that project activities may affect any federally listed, please contact
our office for further coordination. Letters with requests for consultation or
correspondence about your project should include the Consultation Tracking Number in
the header. Electronic submission is preferred.
Northern Long-Eared Bats
Northern long-eared bats occur throughout Minnesota and Wisconsin and the information below
may help in determining if your project may affect these species.
This species hibernates in caves or mines only during the winter. In Minnesota and Wisconsin,
the hibernation season is considered to be November 1 to March 31. During the active season
(April 1 to October 31) they roost in forest and woodland habitats. Suitable summer habitat for
northern long-eared bats consists of a wide variety of forested/wooded habitats where they roost,
forage, and travel and may also include some adjacent and interspersed non-forested habitats
such as emergent wetlands and adjacent edges of agricultural fields, old fields and pastures. This
includes forests and woodlots containing potential roosts (i.e., live trees and/or snags >_3 inches
dbh for northern long-eared bat that have exfoliating bark, cracks, crevices, and/or hollows), as
well as linear features such as fencerows, riparian forests, and other wooded corridors. These
wooded areas may be dense or loose aggregates of trees with variable amounts of canopy
closure. Individual trees may be considered suitable habitat when they exhibit the characteristics
of a potential roost tree and are located within 1,000 feet (305 meters) of forested/wooded
habitat. Northern long-eared bats have also been observed roosting in human-made structures,
such as buildings, barns, bridges, and bat houses; therefore, these structures should also be
03/07/2022
considered potential summer habitat and evaluated for use by bats. If your project will impact
caves or mines or will involve clearing forest or woodland habitat containing suitable roosting
habitat, northern long-eared bats could be affected.
Examples of unsuitable habitat include:
• Individual trees that are greater than 1,000 feet from forested or wooded areas,
• Trees found in highly developed urban areas (e.g., street trees, downtown areas),
• A pure stand of less than 3-inch dbh trees that are not mixed with larger trees, and
• A stand of eastern red cedar shrubby vegetation with no potential roost trees.
If IPaC returns a result that northern long-eared bats are potentially present in the action area of
the proposed project, project proponents can conclude the proposed activities may affect this
species IF one or more of the following activities are proposed:
• Clearing or disturbing suitable roosting habitat, as defined above, at any time of year,
• Any activity in or near the entrance to a cave or mine,
• Mining, deep excavation, or underground work within 0.25 miles of a cave or mine,
• Construction of one or more wind turbines, or
• Demolition or reconstruction of human-made structures that are known to be used by bats
based on observations of roosting bats, bats emerging at dusk, or guano deposits or stains.
I f none o f the above activities are proposed, project proponents can conclude the proposed
activities will have no effect on the northern long-eared bat. Concurrence from the Service is not
required for No Effect determinations. No further consultation or coordination is required.
Attach this letter to the dated IPaC species list report for your records. An example "No Effect"
document also can be found on the S7 Technical Assistance website.
I f any o f the above activities are proposed, please use the northern long-eared bat determination
key in IPaC. This tool streamlines consultation under the 2016 rangewide programmatic
biological opinion for the 4(d) rule. The key helps to determine if prohibited take might occur
and, if not, will generate an automated verification letter. No further review by us is
necessary. Please visit the links below for additional information about "may affect"
determinations for the northern long-eared bat.
NLEB Section 7 consultation
Kev to the NLEB 4(dl rule for federal actions that mav affect
Instructions for the NLEB 4(d) assisted d-keX
Maternitv tree and hibernaculum locations bv state
Other Trust Resources and Activities
Bald and Golden Eagles - Although the bald eagle has been removed from the endangered
species list, this species and the golden eagle are protected by the Bald and Golden Eagle Act and
the Migratory Bird Treaty Act. Should bald or golden eagles occur within or near the project area
please contact our office for further coordination. For communication and wind energy projects,
please refer to additional guidelines below.
03/07/2022 4
Migratory Birds - The Migratory Bird Treaty Act (MBTA) prohibits the taking, killing,
possession, transportation, and importation of migratory birds, their eggs, parts, and nests, except
when specifically authorized by the Service. The Service has the responsibility under the MBTA
to proactively prevent the mortality of migratory birds whenever possible and we encourage
implementation of recommendations that minimize potential impacts to migratory birds. Such
measures include clearing forested habitat outside the nesting season (generally March 1 to
August 31) or conducting nest surveys prior to clearing to avoid injury to eggs or nestlings.
Communication Towers - Construction of new communications towers (including radio,
television, cellular, and microwave) creates a potentially significant impact on migratory birds,
especially some 350 species of night-migrating birds. However, the Service has
developed voluntary �uidelines for minimizing impacts.
Transmission Lines - Migratory birds, especially large species with long wingspans, heavy
bodies, and poor maneuverability can also collide with power lines. In addition, mortality can
occur when birds, particularly hawks, eagles, kites, falcons, and owls, attempt to perch on
uninsulated or unguarded power poles. To minimize these risks, please refer
to guidelines developed by the Avian Power Line Interaction Committee and the Service.
Implementation of these measures is especially important along sections of lines adjacent to
wetlands or other areas that support large numbers of raptors and migratory birds.
Wind Energy - To minimize impacts to migratory birds and bats, wind energy projects should
follow the Service's Wind Energev Guidelines. In addition, please refer to the Service's Ea le
Conservation Plan Guidance, which provides guidance for conserving bald and golden eagles in
the course of siting, constructing, and operating wind energy facilities.
State Department of Natural Resources Coordination
While it is not required for your Federal section 7 consultation, please note that additional state
endangered or threatened species may also have the potential to be impacted. Please contact the
Minnesota or Wisconsin Department of Natural Resources for information on state listed species
that may be present in your proposed project area.
Minnesota
Minnesota Department of Natural Resources - Endangered Resources Review Homepage
Email: Review.NHIS(a�state.mn.us
Wisconsin
Wisconsin Department of Natural Resources - Endangered Resources Review Homepage
Email: DNRERReview(u�wi.gov
We appreciate your concern for threatened and endangered species. Please feel free to contact
our office with questions or for additional information.
Attachment(s):
• Official Species List
03/07/2022
• USFWS National Wildlife Refuges and Fish Hatcheries
• Migratory Birds
• Wetlands
03/07/'L022
Official Species List
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the
requirement for Federal agencies to "request of the Secretary of the Interior information whether
any species which is listed or proposed to be listed may be present in the area of a proposed
action".
This species list is provided by:
Minnesota-Wisconsin Ecological Services Field Office
4101 American Blvd E
Bloomington, MN 55425-1665
(952) 252-0092
03/07/2022
Project Summary
Project Code: 2022-0016504
Event Code: None
Project Name: Foster Property
Project Type: Residential Construction
Project Description: New housing development.
Project Location:
Approximate location of the project can be viewed in Google Maps: https://
www.google.com/maps/(a�45.305281949999994,-93.52499179120149,14z
.,;�
�
��'','„rr
Ft�rch
M1'4ado'h
�Y� k�
�'7•
TrUlt
[�rxl
F a���,.4
Poi 1: ..v.'r
_ .�
- ��
�� �
ip i
�:� 1 sl ,;. K: P+fS'F �' �+
�.,
..:w � I
1{4�,o-i �
,� !. n� Fwirt ��:�%n�
a�,�
�".a4 � Faik.
2
Counties: Sherburne County, Minnesota
03/07/2022
Endangered Species Act Species
There is a total of 2 threatened, endangered, or candidate species on this species list.
Species on this list should be considered in an effects analysis for your project and could include
species that exist in another geographic area. For example, certain fish may appear on the species
list because a project could affect downstream species.
IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA
Fisheries1, as USFWS does not have the authority to speak on behalf of NOAA and the
Department of Commerce.
See the "Critical habitats" section below for those critical habitats that lie wholly or partially
within your project area under this office's jurisdiction. Please contact the designated FWS office
if you have questions.
l. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an
office of the National Oceanic and Atmospheric Administration within the Department of
Commerce.
Mammals
N AN1L
Northern Long-eared Bat Myotis septentrionalis
No critical habitat has been designated for this species.
Species profile: https://ecos.fws. ov/ecp/species/9045
Insects
NAME
Monarch Butterfly Danaus plexippus
No critical habitat has been designated for this species.
Species profile: https://ecos.fws.gov/ecp/species/9743
STATliS
Threatened
STATUS
Candidate
Critical habitats
THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S
JURISDICTION.
03/07/2022
USFWS National Wildlife Refuge Lands And Fish
Hatcheries
Any activity proposed on lands managed by the National Wildlife Refu�e system must undergo a
'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to
discuss any questions or concerns.
THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA.
03/07/2022
Migratory Birds
Certain birds are protected under the Migratory Bird Treaty Actl and the Bald and Golden Eagle
Protection ActZ.
Any person or organization who plans or conducts activities that may result in impacts to
migratory birds, eagles, and their habitats should follow appropriate regulations and consider
implementing appropriate conservation measures, as described below.
l. The �ratory Birds Treat.�� of 1918.
2. The Bald and Golden Eagle Protection Act of 1940.
3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
The birds listed below are birds of particular concern either because they occur on the USFWS
Birds of Conservation Concern (BCC) list or warrant special attention in your project location.
To learn more about the levels of concern for birds on your list and how this list is generated, see
the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that
every bird on this list will be found in your project area. To see exact locations of where birders
and the general public have sighted birds in and around your project area, visit the E-bird data
ma�ing tool (Tip: enter your location, desired date range and a species on your list). For
projects that occur off the Atlantic Coast, additional maps and models detailing the relative
occurrence and abundance of bird species on your list are available. Links to additional
information about Atlantic Coast birds, and other important information about your migratory
bird list, including how to properly interpret and use your migratory bird report, can be found
below.
For guidance on when to schedule activities or implement avoidance and minimization measures
to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE
SUMMARY at the top of your list to see when these birds are most likely to be present and
breeding in your project area.
f►��► f�
Bald Eagle Haliaeetus leucocephalus
This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention
because of the Eagle Act or for potential susceptibilities in offshore areas from certain types
of development or activities.
Black-billed Cuckoo Coccyzus erythropthalmus
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA
BREEDING
SEASON
Breeds Dec 1 to
Aug 31
Breeds May 15
to Oct 10
and Alaska.
https://ecos.fws.gov/ecp/species/9399
03/07/2022
NAME
Canada Warbler Cardellina canadensis
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA
and Alaska.
Golden-winged Warbler Vermivora chrysoptera
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA
and Alaska.
https://ecos.fws.gov/ecp/species/8745
Red-headed Woodpecker Melanerpes erythrocephalus
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA
and Alaska.
BREEDING
SEASON
Breeds May 20
to Aug 10
Breeds May 1
to Jul 20
Breeds May 10
to Sep 10
Probability Of Presence Summary
The graphs below provide our best understanding of when birds of concern are most likely to be
present in your project area. This information can be used to tailor and schedule your project
activities to avoid or minimize impacts to birds. Please make sure you read and understand the
FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting
to interpret this report.
Probability of Presence ( )
Each green bar represents the bird's relative probability of presence in the lOkm grid cell(s) your
project overlaps during a particular week of the year. (A year is represented as 12 4-week
months.) A taller bar indicates a higher probability of species presence. The survey effort (see
below) can be used to establish a level of confidence in the presence score. One can have higher
confidence in the presence score if the corresponding survey effort is also high.
How is the probability of presence score calculated? The calculation is done in three steps:
l. The probability of presence for each week is calculated as the number of survey events in
the week where the species was detected divided by the total number of survey events for
that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee
was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is
0.25.
2. To properly present the pattern of presence across the year, the relative probability of
presence is calculated. This is the probability of presence divided by the maximum
probability of presence across all weeks. For example, imagine the probability of presence
in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12
(0.25) is the maximum of any week of the year. The relative probability of presence on
week 12 is 0.25/0.25 = l; at week 20 it is 0.05/0.25 = 0.2.
3. The relative probability of presence calculated in the previous step undergoes a statistical
conversion so that all possible values fall between 0 and 10, inclusive. This is the
probability of presence score.
Breeding Season ( )
03/07/2022
Yellow bars denote a very liberal estimate of the time-frame inside which the bird breeds across
its entire range. If there are no yellow bars shown for a bird, it does not breed in your project
area.
3
Survey Effort (I)
Vertical black lines superimposed on probability of presence bars indicate the number of surveys
performed for that species in the lOkm grid cell(s) your project area overlaps. The number of
surveys is expressed as a range, for example, 33 to 64 surveys.
No Data (—)
A week is marked as having no data if there were no survey events for that week.
Survey Timeframe
Surveys from only the last 10 years are used in order to ensure delivery of currently relevant
information. The exception to this is areas off the Atlantic coast, where bird returns are based on
all years of available data, since data in these areas is currently much more sparse.
probability of presence breeding season � survey effort — no data
SPLCIES
Bald Eagle
Non-BCC
Vulnerable
Black-billed
cu�koo
BCC Rangewide
(CON)
Canada Warbler
BCC Rangewide
(CON)
Golden-winged
Warbler
BCC Rangewide
(CON)
Red-headed
Woodpecker
BCC Rangewide
(CON)
JAN FLB MAR APR MAY JUN JUL AUG SLP OCT NOV DEC
li�� ��li liil liii ii�. .,., ,... ,.—i iiii I�„ ,.., ,..,
li�� ��li liil liii ii�. .,., ,... ,.—i iiii I�„ ,.., ,..,
li�� ��li liil liii ii�. .,., ,... ,.—i iiii I�„ ,.., ,..,
li�� ��li liil liii ii�. .,., ,... ,.—i iiii I�„ ,.., ,..,
li�� ��li liil liii ii�. .,., ,... ,.—i iiii I�„ ,.., ,..,
Additional information can be found using the following links:
• Birds of Conservation Concern http://www.fws.�ov/birds/mana�ement/mana�ed-species/
birds-of-conservation-concern.ph�
• Measures for avoiding and minimizing impacts to birds http://www.fws.�ov/birds/
mana ement/project-assessment-tools-and-guidance/
conservation-measures.DhD
03/07/2022 4
• Nationwide conservation measures for birds http://www.fws.gov/migratore b�pdf/
management/nationwidestandardconservationmeasures.pdf
Migratory Birds FAQ
Tell me more about conservation measures I can implement to avoid or minimize impacts
to migratory birds.
Nationwide Conservation Measures describes measures that can help avoid and minimize
impacts to all birds at any location year round. Implementation of these measures is particularly
important when birds are most likely to occur in the project area. When birds may be breeding in
the area, identifying the locations of any active nests and avoiding their destruction is a very
helpful impact minimization measure. To see when birds are most likely to occur and be breeding
in your project area, view the Probability of Presence Summary. Additional measures or ermits
may be advisable depending on the type of activity you are conducting and the type of
infrastructure or bird species present on your project site.
What does IPaC use to generate the migratory birds potentially occurring in my specified
location?
The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern
BCC and other species that may warrant special attention in your project location.
The migratory bird list generated for your project is derived from data provided by the Avian
Knowledge Network (AKN�. The AKN data is based on a growing collection of surve�, bandin�,
and citizen science datasets and is queried and filtered to return a list of those birds reported as
occurring in the lOkm grid cell(s) which your project intersects, and that have been identified as
warranting special attention because they are a BCC species in that area, an eagle (Eagle Act
requirements may apply), or a species that has a particular vulnerability to offshore activities or
development.
Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your
project area. It is not representative of all birds that may occur in your project area. To get a list
of all birds potentially present in your project area, please visit the AKN Phenolog_y Tool.
What does IPaC use to generate the probability of presence graphs for the migratory birds
potentially occurring in my specified location?
The probability of presence graphs associated with your migratory bird list are based on data
provided by the Avian Knowledge Network (AKN�. This data is derived from a growing
collection of survev. banding, and citizen science datasets .
Probability of presence data is continuously being updated as new and better information
becomes available. To learn more about how the probability of presence graphs are produced and
how to interpret them, go the Probability of Presence Summary and then click on the "Tell me
about these graphs" link.
How do I know if a bird is breeding, wintering, migrating or present year-round in my
project area?
To see what part of a particular bird's range your project area falls within (i.e. breeding,
wintering, migrating or year-round), you may refer to the following resources: The Cornell Lab
03/07/2022
of Ornithologev All About Birds Bird Guide, or (if you are unsuccessful in locating the bird of
interest there), the Cornell Lab of Ornithologev Neotropical Birds guide. If a bird on your
migratory bird species list has a breeding season associated with it, if that bird does occur in your
project area, there may be nests present at some point within the timeframe specified. If 'Breeds
elsewhere" is indicated, then the bird likely does not breed in your project area.
What are the levels of concern for migratory birds?
Migratory birds delivered through IPaC fall into the following distinct categories of concern:
l. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern
throughout their range anywhere within the USA (including Hawaii, the Pacific Islands,
Puerto Rico, and the Virgin Islands);
2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation
Regions (BCRs) in the continental USA; and
3. "Non-BCC - Vulnerable" birds are not BCC species in your project area, but appear on
your list either because of the Eagle Act requirements (for eagles) or (for non-eagles)
potential susceptibilities in offshore areas from certain types of development or activities
(e.g. offshore energy development or longline fishing).
Although it is important to try to avoid and minimize impacts to all birds, efforts should be made,
in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC
species of rangewide concern. For more information on conservation measures you can
implement to help avoid and minimize migratory bird impacts and requirements for eagles,
please see the FAQs for these topics.
Details about birds that are potentially affected by offshore projects
For additional details about the relative occurrence and abundance of both individual bird species
and groups of bird species within your project area off the Atlantic Coast, please visit the
Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides
birds that may be helpful to you in your project review. Alternately, you may download the bird
model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical
Modeling and Predictive Ma�ing of Marine Bird Distributions and Abundance on the Atlantic
Outer Continental Shelf project webpage.
Bird tracking data can also provide additional details about occurrence and habitat use
throughout the year, including migration. Models relying on survey data may not include this
information. For additional information on marine bird tracking data, see the Diving Bird StudX
and the nanota studies or contact Caleb Spie�el or Pam Lorin�.
What if I have eagles on my list?
If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid
violating the Eagle Act should such impacts occur.
Proper Interpretation and Use of Your Migratory Bird Report
The migratory bird list generated is not a list of all birds in your project area, only a subset of
birds of priority concern. To learn more about how your list is generated, and see options for
identifying what other birds may be in your project area, please see the FAQ "What does IPaC
use to generate the migratory birds potentially occurring in my specified location". Please be
03/07/2022
aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that
overlap your project; not your exact project footprint. On the graphs provided, please also look
carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no
data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey
effort is high, then the probability of presence score can be viewed as more dependable. In
contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of
certainty about presence of the species. This list is not perfect; it is simply a starting point for
identifying what birds of concern have the potential to be in your project area, when they might
be there, and if they might be breeding (which means nests might be present). The list helps you
know what to look for to confirm presence, and helps guide you in knowing when to implement
conservation measures to avoid or minimize potential impacts from your project activities,
should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell
me about conservation measures I can implement to avoid or minimize impacts to migratory
birds" at the bottom of your migratory bird trust resources page.
03/07/2022
Wetlands
Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section
404 of the Clean Water Act, or other State/Federal statutes.
For more information please contact the Regulatory Program of the local U. S. Arme�ps of
Engineers District.
Please note that the NWI data being shown may be out of date. We are currently working to
update our NWI data set. We recommend you verify these results with a site visit to determine
the actual extent of wetlands on site.
WETLAND INFORMATION WAS NOT AVAILABLE WHEN THIS SPECIES LIST WAS GENERATED.
PLEASE VISIT HTTPS://WWW.FWS.GOV/WETLANDS/DATA/MAPPER.HTML OR CONTACT THE FIELD
OFFICE FOR FURTHER INFORMATION.
03/07/2022
IPaC User Contact Information
Agency: ISG
Name: Jeremy Groskreutz
Address: 115 East Hickory Street, Suite 300
City:
State:
Zip:
Email
Phone:
Mankato
MN
56001
j eremy. groskreutz@isginc. com
5073876651
� Architecture + Engineering + Environmental + Planning EAW
From: MN_MNIT_Data Request SHPO <DataRequestSHPO@state.mn.us>
Sent: Friday, March 11, 2022 4:11 PM
To: Jeremy Groskreutz
Subject: RE: Search Request
Hello Jeremy,
Our database has no archaeological or historical records for the given project area.
Jim
��EPARTMENT QF
ao�iNis�RAriaN
y1Ai� YIi�fG�J1C Pft�S.CR`±AS10P1 CF� ['_
SHPO Data Requests
Minnesota State Historic Preservation Office
50 Sherburne Avenue, Suite 203
Saint Paul, MN 55155
(651) 201-3299
datarequestshpo@state.mn.us
Notice: This email message simply reports the results of the cultural resources database search you requested.
The database search is only for previously known archaeological sites and historic properties. IN NO CASE DOES
THIS DATABASE SEARCH OR EMAIL MESSAGE CONSTITUTE A PROJECT REVIEW UNDER STATE OR FEDERAL
PRESERVATION LAWS — please see our website at https://mn.�ov/admin/shpo/protection/ for further information
regarding our Environmental Review Process.
Because the majority of archaeological sites in the state and many historic/architectural properties have not been
recorded, important sites or properties may exist within the search area and may be affected by development
projects within that area. Additional research, including field surveys, may be necessary to adequately assess the
area's potential to contain historic properties or archaeological sites.
Properties that are listed in the National Register of Historic Places (NRHP) or have been determined eligible for
listing in the NRHP are indicated on the reports you have received, if any. The following codes may be on those
reports:
NR— National Register listed. The properties may be individually listed or may be within the boundaries of a
National Register District.
CEF — Considered Eligible Findings are made when a federal agency has recommended that a property is eligible for
listing in the National Register and MN SHPO has accepted the recommendation for the purposes of the
Environmental Review Process. These properties need to be further assessed before they are officially listed in the
National Register.
SEF — Staff eligible Findings are those properties the MN SHPO staff considers eligible for listing in the National
Register, in circumstances other than the Environmental Review Process.
DOE — Determination of Eligibility is made by the National Park Service and are those properties that are eligible
for listing in the National Register, but have not been officially listed.
CNEF — Considered Not Eligible Findings are made during the course of the Environmental Review Process. For the
purposes of the review a property is considered not eligible for listing in the National Register. These properties
may need to be reassessed for eligibility under additional or alternate contexts.
Properties without NR, CEF, SEF, DOE, or CNEF designations in the reports may not have been evaluated and
therefore no assumption to their eligibility can be made. Integrity and contexts change over time, therefore any
eligibility determination made ten (10) or more years from the date of the current survey are considered out of
date and the property will need to be reassessed.
If you require a comprehensive assessment of a project's potential to impact archaeological sites or
historic/architectural properties, you may need to hire a qualified archaeologist and/or historian. If you need
assistance with a project review, please contact Kelly Gragg-Johnson, Environmental Review Specialist @ 651-201-
3285 or by email at kellv.�ra��iohnson@state.mn.us.
The Minnesota SHPO Archaeology and Historic/Architectural Survey Manuals can be found at
https://mn.�ov/admin/shpo/identification-evaluation/.
Given the Governor's implementation of Stay Safe MN, SHPO staff will continue to work
remotely and be available via phone and email, and the SHPO office will be closed to visitors
and unable to accommodate in-person research and deliveries. Mail is being delivered to the
office via USPS, FedEx and UPS, however, staff have limited weekly access to sort and process
mail. Our office will continue to take file search requests via DataRequestSHPO@state.mn.us.
Check SHPO's webpa�e for the latest updates and we thank you for your continued patience.
�� �
From: Jeremy Groskreutz <Jeremy.Groskreutz@ISGlnc.com>
Sent: Wednesday, March 9, 2022 4:40 PM
To: MN_MNIT_Data Request SHPO <DataRequestSHPO@state.mn.us>
Subject: Search Request
This message may be from an external email source.
Do not select links or open attachments unless verified. Report all suspicious emails to Minnesota IT Services Security
Operations Center.
SHPO,
I am in need of a database search of any archaeological, historical or architectural resources at the site
of a proposed housing development. The site is located within Section 36 of Elk River Township (T33N,
R26W) in the City of Elk River, Sherburne County, MN. I have attached a shapefile for your
reference. Thank you for your assistance with this matter.
���
Jeremy Groskreutz
Environmental Scientist
Emp(�a��e �au�r���
'' 507.387.6651
E JeremV.GroskreutzC�ISGInc.com
A 115 East Hickory Street + Suite 300 + Mankato, MN 56001
W ISGlnc.com
� 1 r't 11 a
� Architecture + Engineering + Environmental + Planning EAW
Arc�ftiiiec�z�r� �_.; �� v K � F�:_i R:
En ineerin F R 0 M:
$ g LENNAR HOMES ISG
Enviranmental Paul Tabone
Planning Whitney M.S. Behny, PE
Land Development Manager 7900 International Dr., Suite 550
ISGlnc.com
Bloomington, MN 55425
22-26553 TRAFFfC IMPACT ARIALYSIS - DRAFT
FO.STER PROPERTY RESIDEIVTIAL DEVELOPIR�EIVT -ELK RIVER, MN
SIGNATURE SHEET
I HEREBY CERTIFY THAT THESE CALCULATIONS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A
DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
Whitney M.S. Behny PE,
Project Engineer
License No. 60768
My license renewal date is June 30, 2024
Documents covered by this seal:
Foster Properry Residential Development Traffic Impact Analysis
ISG
7900 International Dr., Suite 550
Bloomington, MN 55425
Foster Properry Residential Development
Elk River, Minnesota
Engineer's Project Number: 22-26553
Dated this 10th day of November 2022
� . ., i�:`:'.,..�'_ . _i i�i�� ..., i i� .a L:-i. �.. � 11�i i.a -. u -rl� , _a�� �-i
22-26553 iRAi=FiC IIVIPACT ANALYSIS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
TABLE OF CONTENTS
ExecutiveSummary ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------1
Studied Intersection Description and Location -----------------------------------------------------------------------------------------------------------------------------------1
Fi nd i ngs--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------3
Introduction-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------3
Purposeof Report ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------3
StudyObjectives------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------3
ExistingConditions------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------4
HousingData, Zoning, and Land Use---------------------------------------------------------------------------------------------------------------------------------------------------4
AreaRoadway System---------------------------------------------------------------------------------------------------------------------------------------------------------------------------4
Existing Traffic Volumes and Analysis Assumptions----------------------------------------------------------------------------------------------------------------------------6
ProposedConditions------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 19
SiteTraffic------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 20
OtherTraffic ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 22
TotalFuture Traffic ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 22
TrafficAnalysis --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 23
Capacity and Level of Service at Studied Intersections ................................................................................................................... 23
CrashAnalysis ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 30
Recommendations--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 30
�� �i�e�ture = ngineerin� � nvlr�niment� + lanning rage u
22-26553 TR1�rFiC 1�1PACT ANA�YSiS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
APPENDICES
Appendix A: Preliminary Site Concept + Ghost Plat + Intersection Study Map ....................................................................................A
Appendix B: Elk River and Sherburne County Roadway Classification Map ..........................................................................................B
Appendix C: Elk River City, Zoning, and Land Use Map --------------------------------------------------------------------------------------------------------------------------�
Appendix D: Traffic Impact Report for Orrin Thompson Homes EAW .....................................................................................................D
Appendix E: Hourly Traffic Volume, Classification, and Speed Counts perFormed by Sherburne County ............................................ E
Appendix F: Turning Movement Assignments for Intersection 6, 7, and 8 ............................................................................................ F
Appendix G: No Build (2022, 2023, 2026, 2046) Synchro Analysis Worksheets ...............................................................................G
Appendix H: No Build Twin Lakes Parkway Northwest Connection (2023, 2026, 2046) Synchro Analysis Worksheets ...................H
Appendix I: Proposed Development Trip Distributions (2023, 2026, 2046) ......................................................................................... I
Appendix J: Opening (2023) Synchro Analysis Worksheets --------------------------------------------------------------------------------------------------------------------�
Appendix K: Full Build (2026) Synchro Analysis Worksheets .................................................................................................................K
Appendix L: Full Build (2046) Synchro Analysis Worksheets ................................................................................................................. L
� � iii�i,tiafE: ; naiflEPi`iYla "- Ii'�'1Yv�liliEYlCc -!- lai'lflina �G�Iff
22-26553 TR1�rFiC 1�1PACT ANA�YSiS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
TABLE OF FIGURES
Figure 1 Sherburne County within the state of Minnesota . ................................................................................................ 4
Figure 2 Highway Capacity Manual (HCM), 2016 Signalized Intersection LOS . ............................................................................... 13
Figure 3 Highway Capacity Manual (HCM), 2016 Unsignalized Intersection LOS . ............................................................................13
Figure 4 Historical and Forecasted AADT of Cleveland Street NW (C.R. 40) ......................................................................................15
Figure 5 Historical and Forecasted AADT of 181St Avenue NW (C.S.A.H 12) ......................................................................................15
Figure 6 Historical and Forecasted AADT of Cleveland Street NW (C.R. 40) ......................................................................................16
Figure 7 Historical and Forecasted AADT of Twin Lakes Road NW (C.S.A.H. 13) ............................................................................... 16
Figure 8 Sherburne County Twin Lake Road Corridor Study Final Report (2019) ............................................................................. 17
Figure 9 Sherburne County Transportation Plan (2007) --------------------------------------------------------------------------------------------------------------------- 17
Figure10 US Census Bureau---------------------------------------------------------------------------------------------------------------------------------------------------------------- 18
Figure 11 ITE Trip Generation for the proposed residential development . ........................................................................................ 20
Figure 12 ITE Trip Generation for the ghost plats formally mentioned ............................................................................................... 20
� � iii�i,tiafE: ; naiflEPi`iYla "- Ii'�'1Yv�liliEYlCc -!- lai'lflina �G��4�
22-26553 TR1�rFiC 1�1PACT ANA�YSiS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
TABLE OF TABLES
Table 1 Existing (2022) LOS, Capacity, and Delay Comparison .............................................................................................................8
Table 2 No Build (2023) LOS, Capacity, and Delay Comparison . ..........................................................................................................8
Table 3 No Build (2026) LOS, Capacity, and Delay Comparison . ..........................................................................................................9
Table 4 No Build (2026) LOS, Capacity, and Delay Comparison . ..........................................................................................................9
Table 5 30% of Total Trips assumed to be redistributed to Intersections 2 and 3 upon completion of Twin Lakes Parkway
Northwest. Note this does not factor in the potential for total trip redistribution across the adjacent roadway network . ............. 10
Table 6 Twin Lakes Parkway Nortwest Connection No Build (2023) LOS, Capacity, and Delay Comparison .................................. 11
Table 7 Twin Lakes Parkway Nortwest Connection No Build (2026) LOS, Capacity, and Delay Comparision . ................................12
Table 8 Opening (2023) LOS, Capacity and Delay Comparison .......................................................................................................... 23
Table 9 Full Build (2026) LOS, Capacity and Delay Comparison ........................................................................................................ 24
Table 10 Full Build (2046) LOS, Capacity and Delay Comparison ...................................................................................................... 24
� �i�"liii�i,tiaf'� -� �laifi�Pf'i(la "- 'ii'elYvtliliE(ltc -!- -lai'lfli�la ����
�Zp-`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
EXECUTIVE SUMMARY
Studied Intersection Description and Location
This study has been prepared in anticipation of the proposed residential development, known as the Foster Property. A
development name has not been determined at the time of writingthis report, but it is likely one will be given as the project moves
into final development within the City of Elk River's due process. A parking study has been prepared in conjunction to this report
by ISG by request of City planning and council at the concept level of this development. Refer to the study in regard to development
pa rk i ng.
The property is comprised of multiple parcels within Sherburne County (75-136-2400, 75-136-1300, 74-136-3200,75-136-3100,
75-136-4200). The site is currently an open undeveloped land with tree coverage and wetlands. The site was historically used for
farming and mining operations. The mining pits have remained open and created a water feature of three ponds / basins within
the southeast of the existing site. The ponds were established between 1960 and 1985 based on historical imaging. The site is
surrounded by;
• Cleveland Road Northwest/ County Road 40 (C.R. 40) alongthe east property boundary.
• An existing residential development to the north called Miske Meadows.
• Trott Brook on the west that weaves in and out of the property. The stream provides a natural buffer between the site
and an existing residential development.
• A wetland and open land to the south property boundary.
The site is within the city limits of Elk River and close to the border of Elk River and Ramsey (east of the site). Miske Meadows is
within its final phase of construction, and it is anticipated that Twin Lakes Parkway Northwest will be connected across Trott Brook
to Twin Lakes Road Northwest/ County State Aid Highway 13 (C.S.A.H 13), this summer (by the end of fall 2022). The site is within
close proximity to Twin Lakes Elementary, located within the northeast corner of Miske Meadows, and the Spectrum High School
Athletic Field, located due south.
The proposed development is anticipated to be mixed-residential with the concept anticipating 415 single family and 120 multi-
family home units within the approximate 260-acres. Construction for the new residential development is expected to be
completed in a conservative 4-phases. It is plausible that the site may be constructed in additional phases. For the sake of the
study the conversative amount of 4 is utilized as it would have the quickest impact on the surrounding roadway network.
It is conservatively assumed that 5% of the development would be completed by 2023 (Opening Condition) and the development
is fully built by 2026 (Full Build). Additional growth is anticipated within the surrounding parcels and throughout the county.
Information pertaining to growth trends along Twin Lakes Road Northwest (C.S.A.H 13), Cleveland Road Northwest (C.R. 40), Twin
Lakes Parkway Northwest, and 181St Avenue Northwest (C.S.A.H. 13) can be found within the Roadway Historical Growth Rate
section of this report.
� Architecture + Engineering + Environmental + Planning Page 1 of 32
2Z-`���:�' �����,�Fi�; iPv�i��a�i ,�i�,��YSi� — ��1�F1�
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
This Traffic Impact Analysis (TIA) studied current, projected, and future traffic conditions at eight locations in the City of Elk River,
Sherburne County, Minnesota. These locations included:
• Intersection 1- Access A and Twin Lakes Parkway Northwest
• Intersection 2- Access B and Twin Lakes Parkway Northwest; Extension of 191StAvenue Northeast/ Ivanhoe Street Northwest
• Intersection 3- Access C and Twin Lakes Parkway Northwest; Extension of 188th Ave Northeast
• Intersection 4- Access D and Cleveland Road Northwest (C.R. 40); Extension of 191StAvenue Northeast/ Ivanhoe Street Northwest
• Intersection 5- Access E and Cleveland Road Northwest (C.R. 40)
• Intersection 6- Twin Lakes Road Northwest (C.S.A.H. 13) and Twin Lakes Parkway Northwest
• Intersection 7- Twin Lakes Road Northwest (C.S.A.H. 13) and Cleveland Road Northwest (C.R. 40)
• Intersection 8- Cleveland Road Northwest (C.R. 40) and 181StAvenue Northwest (C.S.A.H. 12)
It should be noted that at the time of writing, the COVID-19 virus pandemic has ongoing impacts on travel behavior, although
COVID-19 restrictions have lifted throughout the state of Minnesota. As a result, the collected data is most likely impacted by the
subsiding effects ofthe pandemic with workingfrom home and distance learning becomingtypical. It is unknown when local travel
patterns will return to what was considered normal pre-COVID-19, the volumes collected are compared with pre-pandemic
historical traffic counts.
Traffic counts were collected for this study via pneumatic tubes by Sherburne County on May 3rd _ 5t", 2022, on:
• Cleveland Road Northwest (C.R. 40) at 191St Avenue Northwest,
• Cleveland Road Northwest (C.R. 40) at 190th Avenue Northwest,
• And Cleveland Road Northwest at 181St Avenue Northwest (C.S.A.H. 12).
Data collection contained vehicle classification, speed, and volume of traffic. The traffic counts contained passenger vehicle and
heavy vehicle. The counts were perFormed on Tuesday - Thursday intentionally to avoid lower volume traffic that may occur due to
weekend travel, Monday, Fridays, and days abutting a Holiday were avoided. Lastly, school was in session during the counts and
buses were counted as heavy vehicles for the study. Additional information pertaining to the intersections can be found within the
Area Roadway System section of this report.
� Architecture + Engineering + Environmental + Planning Page 2 of 32
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Findings
For the completed traffic study, multiple scenarios were evaluated using version 11 Synchro and SimTraffic traffic modeling
software. The background traffic growth throughout the development is expected to cause increased delays throughout the study
area. As traffic continues to increase, longer delays will be experienced but will be minor.
According to the completed traffic modeling, the new traffic generated as a result of the proposed residential development will
increase to varying degrees at the studied intersections;
• Intersection 1, 2, 3, 4, and 5 will operate at a LOS A for all scenarios.
• Intersections 6, 7, and 8 are currently operating at a LOS A. As background traffic continues to increase, the approaches
will experience longer delays and operate at a LOS C. The traffic queue lengths are not expected to exceed storage bay
capacities at intersection 6 and 7. Intersection 8 will experience queue lengths longer than the existing storage bay.
Additional discussion on delay and LOS is provided within the TrafFcAnalysis section of this report.
INTRODUCTION
Purpose of Report
The purpose of this report is to document the methodologies, findings, recommendations, and conclusions of the Foster Property
residential developmenttraffic impact analysis study, includingthe basis forall assumptions, traffic parameters, and conclusions.
This report presents data in a logical format including tables and figures in order to accurately and clearly convey the data and its
meaning.
Study Objectives
The objectives of this study include the following:
1. Provide sufficient access for the proposed development.
2. Identify the impacts to the transportation system and immediate area as a result of the proposed development.
3. Recommend necessary improvements to the adjacent transportation system to minimize crash risk and maintain an
efficient system.
� Architecture + Engineering + Environmental + Planning Page 3 of 32
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FO.STER PROPERTY RESIDEIVTIAL DEVELOPIR�EIVT -ELK RIVER, MN
EXISTING CONDITIONS
Housing Data, Zoning, and L�nd Use
This repoit studies the impa�cts of a proposed residential development in the City of Elk River, Sherburne County,
Minnesota. A preliminarysite plan is provided in Append'IxAas "Conceptual Layout". A project location and
roadway function classification map are provided in Append'Ix B. More details
� � regarding site traffic and trip generation are provided in later sections of this
� report.
�
According to the 2040 Sherburne County Long-Range Transportation Plan, that the City of
Elk River is anticipated to experience significant growth now until 2030. This is consistent with
the City of Elk Rivers Comprehensive Plan outlining growth for residential development as well as
business development. For this study growth was calculated based on historical MnDOT AADT and
previously completed reportingfrom the City and County. The growth used forthis study is explained
� within FBaadway Historical Growth Rate section of this report in detail.
�
The City of Elk River's existing city, zoning, and land use maps are provided in Append'Ix
Figure 1 Sherburne County within the C. Land use of the proposed development property is zoned as Mixed Residential. At the
stateofMinnesota. time of the study, all 415 single and 120 multi-family units are proposed that will be connected
to the local roadway network by utilizing 5 access points:
• Intersection 1- Access A and Twin Lakes Parkway Northwest.
• Intersection 2- Access B and Twin Lakes Parkway Northwest; Extension of 191st Avenue Northeast/ Ivanhoe Street
Northwest.
• Intersection 3- Access C and Twin Lakes Parkway Northwest; Extension of 188th Avenue Northeast.
• Intersection 4- Access D and Cleveland Road Northwest (C.R. 40); Extension of 191stAvenue Northeast/ Ivanhoe
Street Northwest.
• Intersection 5- Access E and Cleveland Road Northwest (C.R. 40).
Area Roadway System
Through and adjacent to the study area:
• Cleveland Road Northwest (C.R. 40) is a north-south county urban collector roadway
• Twin Lakes Road Northwest (C.S.A.H. 13) is a northeast-southwest minor arterial roadway
• 181St Avenue Northwest (C.S.A.H. 12) is a west-east minor arterial roadway
• Twin Lakes Parkway Northwest is a local roadway
Ur�n Coll�tor Ro�dways and Conn�tions to the Study Area
Cleveland Road Northwest (C.R. 40) is a north-south "county urban collector" within the Sherburne County Roadway network.
Collector roadways are major and minor roadways that connect local roadway and streets to arterial roadways. Collectors provide
less mobility than arterials at lower speeds and for shorter distances. They balance mobility with land access. The posted speed
limit on collectors is usually between 35 and 55 miles per hour (mph).
Cleveland Road Northwest (C.R. 40 serves as a collector for the existing and proposed residential homes that front or access the
road. The roadway also serves Twin Lakes Elementary School. Cleveland Road Northwest (C.R. 40) connects to two (2) minor
county arterial roadways; Twin Lakes Road Northwest (C.S.A.H. 13) and 181St Avenue Northwest (C.S.A.H. 12). The connection to
� Architecture + Engineering + Environmental + Planning Page 4 of 3�
�Zp—`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
the Twin Lakes Road Northwest (C.S.A.H. 13) is an unsignalized intersection, forming a three-leg roundabout (Intersection 7). The
roundabout was a result of the recommendations provided within the Twin Lakes Road / C.S.A.H. 13 Corridor Study that was
completed by the County and City in 2019. There were a series of crashes at the intersection, indicating that the geometrics of
the previous t-intersection needed improvement. The connection to 181St Avenue Northwest (C.S.A.H. 13) forms a three-leg stop
control intersection (Intersection 8). Stop control is on the southbound movement only, allowing the arterial roadway to flow free.
The urban collector is currently a 2-lane asphalt roadway that varies between being undivided and divided at access points for
the existing residential development and school. The posted speed limit varies between 45 to 55 mph, with reduced speeds
posted to the north at the previously mentioned access points. In addition, by-pass lanes are established for northbound left-
turning vehicles and southbound dedicated right-turn lanes. The road section has paved shoulders on both sides of the roadway
and a shared use trail along the west. The by-pass lanes are consistent with the recommendations within the Twin Lakes Road /
C.S.A.H. 13 Corridor Study that was completed by the County and City in 2019.
With the proposed residential development, the two access at Intersections 4 and 5, will need to comply with Sherburne County
Access Spacing Guidelines. Within the current roadway classification of collector and the area classified as an urban / urbanizing
area due to surrounding development the access spacing would fall under 6B (Table 21 within the Sherburne County
Transportation Plan) in accordance with MnDOT Access Spacing Guidelines. Primary intersection for public street shall be spaced
1/8 of a mile apart and signals every 1/4 of a mile.
Sherburne County does have separate access spacing guidelines that are more restrictive than MnDOTs where collector roadways
within a posted speed limit of 50-55 mph may have intersection spacing every 1/2 of a mile and conditional secondary access
every 1/4 of a mile. If speed limits were reduced to 40-45 mph access spacing can be reduced to 1/4 of a mile for full / primary
access.
Minor Ar�erial Roadways and Connections to the Study Are�
Both Twin Lakes Road Northwest (C.S.A.H. 13) and 181St Avenue Northwest (C.S.A.H. 12) are minor arterial roadways within the
Sherburne County roadway network. The minor arterials connect urban service area with cities and towns outside the Twin Cities
region and serve medium to long distance trips. Per the Sherburne County 2007 Long-Range Transportation Plan, it is planned
that Twin Lakes Road Northwest (C.S.A.H. 13) will be extended to connect to Jarvis Street (C.S.A.H. 19). This is anticipated to be
completed within 2024 and beyond.
The proposed development will not access either of these minor arterial roadways directly and will connect to them via the
intersections with Cleveland Road Northwest (C.R. 40), as mentioned in the section above (Intersections 7 and 8). The two arterial
roadways have posted speed limits of 55 mph and paved shoulders. The roadways have dedicated right-turn lanes at access
points and bypass lanes at intersections where the mainline of traffic is free flowing. No pedestrian facilities are provided on either
arterial roadway.
Local Roadways and Connections to the Study Area
Twin Lakes Parkway Northwest is a local roadway that currently serves a residential development located west of the proposed
development. The roadway does not have full connectivity and currently dead ends to the east at Trott Brook and access to the
minor arterial roadway of Twin Lakes Road Northwest (C.S.A.H. 13) to the west (Intersection 6).
� Architecture + Engineering + Environmental + Planning Page 5 of 32
�Zp-`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
The intersection of Twin Lakes Road Northwest (C.S.A.H. 13) and Twin Lakes Parkway Northwest form a four-legged, single circle
roundabout (Intersection 6). This improvement was completed recently by the County and City. The roundabout was a result of
the recommendations provided within the Twin Lakes Road / C.S.A.H. 13 Corridor Study that was completed by the County and
City in 2019.
The construction this summer will extend Twin Lakes Parkway Northwest across Trott Brook and connect into the residential
development north of the proposed development (Miske Meadows) to Cleveland Road Northwest (C.R. 40). The local roadway
expansion will provide connectivity to the existing and proposed residential development and will likely impact the surrounding
roadway network (Intersections 6, 7, and 8) as traffic redistributes and utilizes the new roadway.
There are no known residential access spacing requirements with the City of Elk River. The proposed development is planned to
have three access points (Intersection 1, Intersection 2, and Intersection 3) on Twin Lakes Parkway Northwest which will align
with the access locations to the north or to an existing roadway.
ExistingTrafFic Volumes and Analysis Assumptions
The existing condition of the site is impacted by on-going construction of the residential development to the north. The Traffic
Impact Analysis of the existing residential development was completed in 2004 and does not represent the development that has
been constructed. In addition, a complete copy of the report is not accessible. For reference, a copy of the report has been
provided in Appendix D. To establish existing traffic patterns, traffic count data was collected by Sherburne County at:
• Cleveland Road Northwest (C.R. 40) at 191St Avenue Northwest,
• Cleveland Road Northwest (C.R. 40) at 190th Avenue Northwest,
• And Cleveland Road Northwest at 181St Avenue Northwest (C.S.A.H. 12).
The traffic counts were completed by pneumatic tubes on May 3ra _ 5th on a week where school was in session. A copy of the
collected data can be found within Appendix E. The morning (AM) peak hour traffic occurred from 7:00 AM to 8:00 AM and the
evening (PM) occurred from 3:00 PM to 4:00 PM. This is consistent with the school's schedule, which is typically the largest
generator of trips. In addition, the provided traffic volumes show thatthe PM Peak Hour results in a higher volume of traffic. Within
this report the PM Peak Hour shall be used for the analysis as this is consistent with the number of generated for the proposed
development.
The collected traffic volume was compared with Historical AADT volumes from MnDOT's Traffic MappingApplication usingthe PM
peak hour volume, a K factor was determined using the following equation:
DHV
K=
AADT
K is the factor of the proportion of the annual average daily traffic (AADT) in an hour.
Traffic volumes were not collected at intersection 6 or alongTwin Lakes Road Northwest (C.S.A.H 13) and 181St Avenue Northwest
(C.S.A.H. 12) therefore historical MnDOT volumes were used. The traffic volumes were projected with background growth rates to
achieve 2022 traffic volumes from 2018 data. The turning movements were assigned using the TURNS5 Turing Movement
Analysis Tool. A copy of the work completed can be found in Appendix F.
� Architecture + Engineering + Environmental + Planning Page 6 of 32
2Z-`���:�' �����,�Fi�; iPv�i��a�i ,�i�,��YSi� — ��1�F1�
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT -ELK RIVER, MN
Traffic volumes were not collected at intersections 1, 2, 3, 4, and 5 as they will be constructed with the expansion of Twin Lakes
Parkway Northwest (1, 2, 3) or with the development (4, 5). The intersections (1, 2, 3) will be modified with the proposed
development to add a fourth approach, northbound, for each intersection. The traffic generated at these intersections will be
comprised of the traffic from residential development to the north, Miske Meadows, and school traffic. There was no traffic study
completed for the expansion of Twin Lakes Parkway and the Study completed in 2004, provided in Appendix D, does not reflect
the surrounding or existing roadway network as it is in existing or proposed condition.
The No Build conditions assume that the roadway construction of Twin Lakes Parkway Northwest is not completed and the
background traffic that would be created from this construction is reflected in the proposed conditions (Opening and Full Build).
Modeling of the traffic that will likely access Twin Lakes Parkway Northwest at Intersections 1, 2, 3 are discussed within the Twin
Lakes Parkway I�orthwest Connection Volumes and Analysis Assumptions of this report.
Intersections 4 and 5 will be established in the future construction phases of the proposed residential development along
Cleveland Road Northwest (C.R. 40). The residential development will be constructed in phases, and it is assumed that the
Intersections (4 and 5) will not be established with the 2023 Opening. The intersections are shown within the 2026 and 2046
Full Build conditions.
To analyze the traffic conditions within the study area, Synchro version 11's Synchro Control Delay (Percentile Method) and the
Highway Capacity Manual 10th Edition delay methods were utilized for this report. Intersections 1-8 were modeled for the entire
study area. The resulting Synchro analysis worksheets were prepared for the existing conditions (Intersections 6 and 7 are not
included within the existing tables as they will be a result of the proposed development) and are provided in Appendix G. Tables
1- 4 show the existing level of service (LOS) and delay for Intersection 6, 7, and 8 for PM Peak Hour period of 3:30 PM - 4:30
PM for Existing 2022, No Build 2023, No Build 2026, and No Build 2046. The tables will be used as a comparison to understand
the impacts of the proposed development.
� Architecture + Engineering + Environmental + Planning Page 7 of 32
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
E�ension of 191st Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
Eztension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
Eztension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 1815�
Avenue Northwest (C.S.A.H.12)
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
E�ension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
E�ension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
E�ension of 1915� Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 181St
Avenue Northwest (C.S.A.H.12)
2022 Existin Condition
Intersection Intersection
Number LOS (Level of
Service)
2023 No Build Condition
Intersection Intersection
Number LOS (Level of
Servicel
Intersection
Capacity
Utilization (%
Intersection
Capacity
Utilization (%
Intersection
Delay (seconds)
Intersection
Delay (seconds)
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
E�ension of 191st Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
Eztension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
Eztension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 1815�
Avenue Northwest (C.S.A.H.12)
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
E�ension of 191st Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
E�ension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
E�ension of 191st Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 181st
Avenue Northwest (C.S.A.H.12)
2026 No Build Condition
Intersection Intersection
Number LOS (Level of
Service)
Intersection
Capacity
Utilization (%
Intersection
Delay (seconds)
2046 No Build Condition
Intersection Intersection
Number LOS (Level of
Intersection
Capacity
Utilization (°/a
Intersection
Delay (seconds)
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Using Synchro version 11, multiple delay computation methods are available, includingthe Percentile Delay Method, the Highway
Capacity Manual 10th Edition methodology, Highway Capacity Manual 2020 Edition methodology, and Highway Capacity Manual
2000 Edition methodology. Synchro's core delay calculation, the Percentile Delay Method, which is recommended by Synchro
when evaluating actuated signals, produced delay results much closer to SimTraffic microsimulation model results than other
delay computation methods. Observed queue lengths were reported to be closer to the 95th percentile queue lengths provided
by SimTraffic and printed in the analysis worksheets in the Appendices.
Twin Labces Parkway Northwest Connection Volumes �nd An�lysis Assumptions
It is anticipated that the roadway connection of Twin Lakes Parkway Northwest across Trott Brook will commence the summer of
2022 and completed in 2023. With the connection of the roadway, it is anticipated that traffic patterns will be modified. A traffic
analysis of the impact of this connection was not completed with this proposed roadway project that is being completed in tandem
with 8th phase of Miske Meadows residential development. To factor the impact the roadway connection may have on the
surrounding roadway network, a separate model was created and evaluated from the existing condition.
It was assumed that 30% of the trip generated from the overall completed Miske Meadows would utilize the access points at
Intersections 2 and 3. To approximate the generated trips from the residential development, the ITE Trip Generation, 11t" Edition
was used for the single family and multi-family lots within the development. A copy of the overall trips that are assumed from the
development can be provided upon request. The 30% of trips re-distributed for the AM and PM Peak Hour of Trip Generation are
presented below in Table 5.
Table 5 30% of Total Trips assumed to be redistributed to Intersections 2 and 3 upon completion of Twin Lakes Parkway Northwest. Note this does not factor in
the potential for total trip redistribution across the adjacent roadway network.
The volumes shown in Table 5 assume that the primary trips along Twin Lakes Parkway are for the homes constructed within the
Miske Meadows Development. It is likely that additional impacts to the surrounding roadway network may occur as residents may
use the roadway for bypass routes or access to Twin Lakes Elementary. Additional modeling beyond this report is recommended
to determine the impacts of Twin Lakes Parkway Northwest expansion as it is not within scope of this traffic impact analysis.
To analyze the traffic conditions within the study area, Synchro version 11's Synchro Control Delay (Percentile Method) and the
Highway Capacity Manual 10t" Edition delay methods were utilized for this report. Intersections 1-8 were modeled for the entire
study area. The resulting Synchro analysis worksheets were prepared for the 2023, 2026, and 2046 conditions (Intersections 4
and 5 are not included within the existingtables as they will be a result of the proposed development) and are provided in Appendix
H.
� Architecture + Engineering + Environmental + Planning Page 10 of 32
22-26553 TRAFFIC IMPACT ANALYSIS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT -ELK RIVER, MN
Tables 6- 9 show the existing level of service (LOS) and delay for Intersection 2, 3, 6, 7, and 8 for PM Peak Hour period of 3:30
PM - 4:30 PM for No Build 2023, No Build 2026, and No Build 2046. Note that No Build is used in reference to the proposed
residential development and not the completion of Miske Meadows Residential Development.
In addition, Intersection 1 would not generation turning movement trips as the Miske Meadows development does not generate
traffic to the southern leg and will operate as a thru movement for most vehicles with the potential for vehicles to use the roadway
connection as a turn-around. The volume is assumed to be negligible and not listed below. The tables will be used as a comparison
to understand the impacts of the proposed development.
TWIN LAKES PARKWAY NORTHWEST CONNECTION - NO BUILD 2023
� Architecture + Engineering + Environmental + Planning Page 11 of 32
Table 6 Twin Lakes Parkway Nortwest Connection No Build (2023) LOS, Capacity, and Delay Comparison.
Twin Lakes
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
Extension of 1915t Avenue Northeast / Ivanhoe Street
Northwest
Access C and Twin Lakes Parkway Northwest;
Extension of 188� Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
Extension of 1915t Avenue Northeast / Ivanhoe Street
Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 1815tAvenue
Northwest(C.S.A.H.121
Twin Lakes
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
Extension of 191st Avenue Northeast / Ivanhoe Street
Northwest
Access C and Twin Lakes Parkway Northwest;
Extension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
Extension of 191st Avenue Northeast / Ivanhoe Street
Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 181st
Avenue Northwest (C.S.A.H. 12)
Northwest Connection - 2026 No Build Condition
Intersection Intersection Intersection Intersection
Number LOS (Level of Capacityo Delay (seconds)
Servicel Utilization (/ol
Northwest Connection - 2046 No Build Condition
Intersection Intersection Intersection Intersection
Number LOS (Level of Capacityo Delay (seconds)
Servicel Utilization (/ol
22-2655� TR1�rFiC fi�1PA�T ANA�YSiS - �RAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Using Synchro version 11, multiple delay computation methods are available, including the Percentile Delay Method, the Highway
Capacity Manual 10th Edition methodology, Highway Capacity Manual 2020 Edition methodology, and Highway Capacity Manual
2000 Edition methodology. Synchro's core delay calculation, the Percentile Delay Method, which is recommended by Synchro
when evaluating actuated signals, produced delay results much closer to SimTraffic microsimulation model results than other
delay computation methods. Observed queue lengths were reported to be closer to the 95th percentile queue lengths provided
by SimTraffic and printed in the analysis worksheets in the Appendices.
� �='v°➢� � � r ;>� �� 1 �. ;�-_, � � � � �'��:��`�°�
For this report the Level of Service (LOS) will be analyzed. For signalized intersection, the LOS is defined in terms of the average
total vehicle delay of all movements through an intersection. Vehicle delay is a method of quantifying several intangible factors,
including driver discomfort, frustration, and lost travel time. Specifically, LOS criteria is stated in terms of average delay per
vehicle during specified time period (PM peak hour). Vehicle delay is a complex measure based on variables including signal
phasing, signal cycle length, and traffic volumes with respect to intersection capacity. Figure 3 shows the LOS table for
signalized intersections.
Ta61e 1. Level of Servi�e Criteeia For Signalized In[ersecxions
Le�el af A�erage Controf �elay Gcnerai �escription
5ervi�e ise�fvehl FSignakized Interse�t4ans]
A � I U FreN Fluv+
6 �10 2G Staqle Fsow�slighc delays7
C �2D � 35 $tahle Elnw {ar�eptahle delays}
� Apprdach�ng uns[a61e flow Rolerahle delay, aceas�ianally svan
a35 - 55 throuyh more than one s�gnal �ytle helore pro[eedang}
E a55 • 8� llns[able flow {into�erabie de�ayl
F a8G Forted flow {�ammedl
Figure 2 Highway Capacity Manual (HCM), 2016 Signalized Intersection LOS.
For unsignalized intersections LOS criteria can be further reduced into two intersection types: all-way-stop-controlled and two-way-
stop-controlled. All-way, stop-controlled intersection LOS is expressed in terms of the average vehicle delay of all of the
movements, much like that of a signalized intersection. Two-way, stop-controlled intersection LOS is defined in terms of the
average vehicle delay of an individual movement(s). This is because the perFormance of a two-way, stop-controlled intersection is
more closely reflected in terms of its individual movements, rather than its terms of its individual movements. Figure 4 shows the
LOS table for unsignalized intersections.
Table 2. Le+vel nf Service Cri[eria for llnsigna4ized Intersedions
Levei of Sen+ice kveragE Con[rol Oelay (se[Iveh)
a u - i ��
6 Ip IS
C �15 - 25
D �2S 35
E .35-5�
F ,50
Figure 3 Highway Capacity Manual (HCM), 2016 Unsignalized Intersection LOS.
� Architecture + Engineering + Environmental + Planning Page 13 of 32
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
The existing study area is operating at a high LOS per each intersection with the lowest LOS rating of C in the future conditions at
Intersections 6, 7, and 8.
l���.���r � fn'i�� �I ���E���_. ��'� B� F�.�T�
The growth rate was back-calculated using the historical traffic counts along Cleveland Street Northwest (C.R. 40), Twin Lakes
Road Northwest (C.S.A.H. 13), and 181St Avenue Northwest (C.S.A.H. 12) in the study area using the following equation:
F = C(1 + i)n
where: C= the current AADT
F= the f uture AADT
i= percent growth in decimal f orm
n= number o f years between C and F
The historical AADT (Figures 4, 5, 6, 7) were utilized to forecast future AADT volumes to year 2046, 20-years from the assumed
condition where all homes (2026) are established of the residential development (denoted as "Full Build").
Based on historical imaging and reporting, the roadway network has seen significant changes at the following timeframes:
• 2006 — 2007 � The establishment of the first phase of the residential development to the north of the proposed site,
Miske Meadows, and construction of Twin Lakes Park Elementary School.
• 2006 — 2008 � Realignment of Cleveland Street Northwest (C.R. 40) to Twin Lakes Road Northwest (C.S.A.H. 13). The
work completed modified the intersection from a Y to a T intersection along the arc of Twin Lakes Road Northwest
(C.S.A.H. 13).
• 2018 — 2019 � Intersection of Cleveland Street Northwest (C.R. 40) and Twin Lakes Road Northwest (C.S.A.H. 13) is
modified from a T intersection to a roundabout. Pedestrian crossings are established at the roundabout.
• 2017 — 2021 � The residential development to the north of the proposed site, Miske Meadows, develops phase by phase,
establishing multiple access points along Cleveland Street Northwest (C.R. 40). By-pass lanes are established at access
points. A bituminous shared-use trail is established from the intersection of Cleveland Street Northwest (C.R. 40) to the
south edge of the residential development. The trail is located on the west side of Cleveland Street Northwest (C.R. 40).
The development and geometric modifications listed above can be seen in the historical AADT, with an increase in traffic seen in
2010. The future AADT was forecasted using the historical volumes from 2010 to 2018 due to the change in traffic volume after
the construction and is illustrated in Figures 4 and 7. This resulted in an annualized growth ranging from 0.7 - 2.5%the roadways.
� Architecture + Engineering + Environmental + Planning Page 14 of 32
22-26553 TRAFFIC IMPACT ANALYSIS - DRAFT
FO.STER PROPERTY RESIDEIVTIAL DEVELOPIR�EIVT -ELK RIVER, MN
Historical and Forecasted AADT of
Cleveland Street NW (C.R. 40) at 181st Avenue NW (C.S.A.H. 12)
2500
2000
1500
H
�a
Q
1000
500
0
y = 117.73x + 66.951
RZ = 0.9831
�e � � � I
1995 1999 2003 2007 2010 2014 2018 2022 2023 2026 2030 2034 2038 2042 2043
Year
� Historical AADT - Forecast(Historical AADT) ��������m Linear (Forecast(Historical AADT))
Figure 4 Historical and Forecasted AADT of Cleveland Street NW (C.R. 40)
Historical and Forecasted AADT of
181st Avenue NW (C.S.A.H. 12) at Cleveland Street NW (C.R. 40)
sz000
10000
8000
0
a 6000
a
4000
2000
0
y = 31135x + 5440.5
RZ = 0.9831
1995 1999 2003 2007 2010 2014 2018 2022 2023 2026 2030 2034 2038 2042 2043
Year
� Historical AADT Forecast(Historical AADT) Linear (Forecast(Historical AADT))
Figure 5 Historical and Forecasted AADT of 1815t Avenue NW (C.S.A.H 12)
� Architecture + Engineering + Environmental + Planning Page 15 of 3�
22-26553 TRAFFIC IMPACT ANALYSIS - DRAFT
FO.STER PROPERTY RESIDEIVTIAL DEVELOPIR�EIVT -ELK RIVER, MN
4000
3500
3000
2500
H
a z000
a
1500
1000
500
0
Historical and Forecasted AADT of
Cleveland Street NW (C.R. 40) at Twin Lakes Road NW (C.S.A.H. 13)
y=216.75x-71.413
RZ = 0.9831
� � �e � I
1995 1999 2003 2007 2010 2014 2018 2022 2023 2026 2030 2034 2038 2042 2043
Year
� Historical AADT � Forecast(Historical AADT) ••••••••• Linear (Forecast(Historical AADT))
�
Figure 6 Historical and Forecasted AADT of Cleveland Street NW (C.R. 40)
14000
12000
10000
� 8000
�
a
6000
4000
2000
0
Historical and Forecasted AADT of
Twin Lakes Road NW (C.S.A.H. 13) at Cleveland Street NW (C.R. 40)
y = 381.29x + 4211.9
RZ = 0.9629
1995 1999 2003 2007 2010 2014 2018 2022 2023 2026 2030 2034 2038 2042 2043 2044 2045
Year
� Values � Forecast ......... Linear (Forecast)
Figure 7 Historical and Forecasted AADT of Twin Lakes Road NW (C.S.A.H. 13)
� Architecture + Engineering + Environmental + Planning Page 16 of 3�
22-26553 TRAFFfC IMPACT ANALYSIS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
In addition to looking at MnDOT historical AADT's, the Comprehensive Plans for the City of Elk River and Sherburne County were
evaluated. Both the City and County listed a projected growth within the County, City, and general community.
- e'' - .
. .
2016 23,743.00
2020 26,600.00 3%
2030 31960 2%
2040 34,890.00 1%
AVERAGE 1.8796
Figure 8 Sherburne County Twin Lake Road Corridor Study Final Report (2019)
- -.
;:.
1970 4,098.00
1980 6,785.00 5%
1990 11143.00 5%
2000 16,447.00 4%
AVERAGE 4.74°�
Figure 9 Sherburne County Transportation Plan (2007)
� Architecture + Engineering + Environmental + Planning Page 17 of 32
22-26553 TRAi=FfG IMPACT ARIALYSIS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
• - - - �.
•.. - . .
2011 22,790.00
2012 23,011.00 1%
2013 23174.00 1%
2014 23,346.00 1%
2015 23,563.00 1%
2016 23,743.00 1%
2017 23,924.00 1%
2018 24,211.00 1%
2019 24,522.00 1%
AVERAGE 0.92%
Figure 10 US Census Bureau.
Upon discussion with the City and County and the data shown within Figures 4 through 10 the following growth rates were
applied to the background traffic for Opening (2023), No Build (2023, 2026, 2046), Full Build (2026, 2046);
. +1.4% along Twin Lakes Parkway Northwest
. +2.5% along Cleveland Street Northwest (C.R. 40)
. +1.4% along 181St Avenue Northwest (C.S.A.H. 12)
. +1.5% along Twin Lakes Road Northwest (C.S.A.H. 13)
� Architecture + Engineering + Environmental + Planning Page 18 of 32
2Z-`���:�' �����,�Fi�; iPv�i��a�i ,�i�,��YSi� — ��1�F1�
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
PROPOSED CONDITIONS
As formerly mentioned, existing traffic was projects to create a 1-year (2023) Opening Scenario. It is conservatively assumed that
5% of the development would be built at this time frame. Note this is dependent on the plan approval process, the construction
of Twin Lakes Parkway Northwest, bidding, and other external factors. It is conservatively assumed that by 2026 the entire
development would be built out (Full Build) as shown on the concept. A 20-year (2046) Full Build traffic was also created to
demonstrate the impacts the background traffic has on the current roadway network. Traffic was projected forward using the
growth percentages listed above for 2026 and 2046. The future volumes that were calculated within the Twin Lakes Parkway
Northwest Connection section of this report as future volume have been added to the background traffic volumes at the
intersections.
The method for determining these traffic projects included trip generation and distribution analyses based on estimates from the
ITE Trip Generation Manual 11th Edition and existing traffic data.
����`� F����
The proposed residential development, as shown in Appendix A, shows two local roadway connections that could be used for
future development. The areas are not currently a portion of the development nor show signs of expected future development. At
the request of the City of Elk River a"Ghost Plat" has been created of what these areas could look like for future development.
The areas are provided in Appendix A.
The ghost plat of PID: 75-136-3300 is envisioned to connect the proposed development to 183rd Avenue Northwest which is an
existing residential development. The connection would increase internal connectivity of the existing and proposed residential
development. The ghost plat is proposed to construct 14 single family home units.
The ghost plat of PID: 75-136-4205 is envisioned to expand the proposed developments multi-family area by 60 units. This would
be consistent with the proposed lot style transition on the concept. It should be noted that this lot is currently a resident's home.
The ghost plat would likely increase traffic volumes at Intersection 5 of the proposed development based on quickest route
analysis.
The ghost plats are discussed within the report and projected trips are shown but the proposed development results do not factor
in the trips generated by the potentially developable areas.
� Architecture + Engineering + Environmental + Planning Page 19 of 32
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Site Traffic
iF�I� �,��"��� `iI��1
The residential development, a proposed 539-unit development, is anticipated to start earthwork construction in fall 2022 and
be constructed in phases from 2022 to 2026. It is expected that by 2026 the development will be completed and operating at
full capacity, conservatively. The additional traffic created as a result of the proposed development will be composed of new trips
generally created by the new residents and visitors. For this study, a trip is defined as a one-way movement between an origin
and a destination. The expected number of trips the proposed development will generate was estimated using the ITE Trip
Generation Manual 11th Edition.
ITE Code 220 Multifamily Housing (Low-Rise) 120 Dwelling Units
# of
#of Generated #of #of New #of New
Average Rate / Fitted Generated % % Trips Generated Trips Trips #of
Curve Equation Trips Entering Exiting Entering Trips Exiting Entering Exiting R^2 Studies
Weekday AM (AM Peak Hour of Generator) T=0.35(X)+28.13 70 24% 76% 17 53 17 53 0.76 40
WeekdayPM(PMPeakHourofGenerator) T=0.42(X)+34.78 85 62% 38% 53 32 53 32 0.8 38
Note: Sums may not add as expected due to roundfng. Utflfzed Trfp Generatfon Manual, 11th Editfon.
Figure 11 ITE Trip Generation for the proposed residential development.
ITE Code 220 Multifamily Housing (Low-Rise) 60 Dwelling Units
# of
#of Generated #iof #of New #iof New
AverageRate/Fitted Generated % % Trips Generated Trips Trips #of
Curve Equation Trips Entering Exiting Entering Trips Exiting Entering Exiting R^2 Studies
Weekday AM (AM Peak Hour of Generator) T=0.35(X)+28.13 49 24% 76% 12 37 12 37 0.76 40
WeekdayPM(PMPeakHourofGenerator) T=0.42(X)+34.78 60 62% 38% 37 23 37 23 0.8 38
Note: Sums may not add as expected due to rounding. Utilized Trip Generation Manual, 11th Edition.
Figure 12 ITE Trip Generation for the ghost plats formally mentioned.
� Architecture + Engineering + Environmental + Planning Page �0 of 32
Note: Sums may not add as expected due to rounding. Utilized Trip Generation Manual, 11th Edition.
Note: Sums may not add as expected due to rounding. Utilized Trip Generation Manual, 11th Edition.
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
�ITE ��GE��
Proposed site access is being evaluated and following Sherburne County access guidelines. Access guidelines define a starting
point for balancing property access, safety, and mobility concerns. Access guidelines can be used to improve communication,
enhance safety, and maintain the capacity and mobility of transportation corridors. In addition, access guidelines may be used to
respond to access requests and promote good access practices such as:
• Aligning access with other existing access points.
• Providing adequate spacing to separate and reduce conflicts.
• Encouraging indirect access over direct access on high-speed, high-volume arterial routes.
The proposed accesses for this development meet minimum county access spacing guidelines between accesses (Intersections
4 and 5) along the Cleveland Road Northwest (C.R. 40) if the roadway speed limit is reduced to 45 as perFormed in the north of
the county roadway near the existing residential development. There are no know access spacing guidelines for the residential
development on the local roadway of Twin Lakes Parkway Northwest. The three access points (Intersections 1, 2, and 3) are
proposed at locations of existing roadways or aligned with existing intersections.
���� ���°�'���.��`�9���1 �� �� ����� ������z;.�,.
It is assumed that the residential development new trips would follow similartraffic patterns within the study area. It is anticipated
that some traffic will be redistributed and utilize Twin Lakes Parkway Northwest to the west and use Intersection 6. It should be
noted that no traffic study was completed for the expansion of Twin Lakes Parkway Northwest. Based on distance and Existing
(2022) Level of Service (LOS) ratings, it is anticipated that internal traffic on the local roadways will continue to access the minor
arterial roadways via the quickest route rather than taking an extended route through the connecting local roadway system to
avoid signals.
The conservative assumption was provided in all models to represent the worst-case scenario. The exhibit of the Trip Distributions
for the proposed traffic during the AM / PM period are provided in Appendix I. Trip distribution was completed for 2023 Opening
conditions where it is assumed the development would utilize the access points of Intersections 1, 2 and 3.
Trip distribution for 2026 and 2046 was split based on intersection access location, connecting to either Twin Lakes Parkway
Northwest or Cleveland Road Northwest / C.R. 40. Trips assigned to the intersection within Synchro can be seen in the analysis
reports as "Future Vol". These trips are included in the LOS analyses.
�i� �r.`°� ���w ������ � « ��E�" ��r a����`���I ��„J
Based on the data collected along Cleveland Road Northwest (C.R. 40) the percentage of heavy vehicles was documented as
being low across the three days of collection. A 2.0% of heavy vehicles has been applied on all county collector and arterial
roadways with 1.0% of heavy vehicles on the internal local roadways.
� Architecture + Engineering + Environmental + Planning Page �1 of 32
22-265�� �Y��,��=iG 1��1P,��T� ,�N,��YSi� - �i�l��T
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Other Traffic
���� ���N�
Bituminous trails or sidewalk connections are provided throughout the study area. A map showing the existing sidewalk and
shared use trails are within in Appendix A. As the residential development is constructed, making connections to the City's
sidewalk and trails should continue where feasible. Currently the proposed development is planning on constructing sidewalk on
both sides of the roadway at Intersection 2 and 4. Sidewalk is provided on one side of the roadway within the remainder of the
development. A shared use trail is proposed to be expanded with the development on the west side of Cleveland Road Northwest
(C.R. 40). The shared use trail is proposed to connect to trail network around the center three basins.
Streets that do not have pedestrian walkways are recommended to construct pedestrian facilities to provide a refuge for
pedestrian traffic. This would not only benefit students walking home but improve safety for pedestrian walking throughout the
neighborhood to localized facilities (cluster mailboxes, trails or localized parks) or out for walk.
No known public bus routes are within the area, and it is likely with the connection of Twin Lakes Parkway that the school bus
routes will be modified through the area's roadway network. It was confirmed at the public hearingfor this development that the
City will work with the School District as the development continues with the City permitting process.
Total Future Traffic
The trip generation, trip distribution, and traffic assignment analysis and calculations result in the PM peak hour volume for each
study period. Appendix J shows the 2023 Opening PM peak volumes with 5% of the proposed development with the Synchro
Analysis Worksheets. Appendix K and L for the 2026 Full Build and 2046 Full Build.
� Architecture + Engineering + Environmental + Planning Page �2 of 32
22-26553 TRAFFIC IMPACT ANALYSIS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
TRAFFIC ANALYSIS
Capacity and Level of Service at Studied Intersections
The PM peak hour volumes for each study period were analyzed within Synchro (Percentile and HCM 6th Edition delay methods)
for capacity and LOS at the study roadways and intersections. Tables 8-10 show the 2023 Opening, 2026 Full Build, 2046 Full
Build condition LOS, delay, and intersection capacity.
OPENING 2023
� Architecture + Engineering + Environmental + Planning Page �3 of 32
Table 8 Opening (2023) LOS, Capacity and Delay Comparison.
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
Eztension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
Eztension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
E�ension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 1815�
Avenue Northwest (C.S.A.H.12)
Intersecting Roadways
Access A and Twin Lakes Parkway Northwest
Access B and Twin Lakes Parkway Northwest;
Eztension of 191St Avenue Northeast / Ivanhoe
Street Northwest
Access C and Twin Lakes Parkway Northwest;
E�ension of 188th Ave Northeast
Access D and Cleveland Road Northwest (C.R. 40);
E�ension of 1913t Avenue Northeast / Ivanhoe
Street Northwest
Access E and Cleveland Road Northwest (C.R. 40)
Twin Lakes Road Northwest (C.S.A.H.13) and Twin
Lakes Parkway Northwest
Twin Lakes Road Northwest (C.S.A.H.13) and
Cleveland Road Northwest (C.R. 40)
Cleveland Road Northwest (C.R. 40) and 181St
Avenue Northwest IC.S.A.H.121
2026 Full Build Condition
Intersection Intersection
Number LOS (Level of
Servicel
2046 Full Build Condition
Intersection Intersection
Number LOS (Level of
Servicel
Intersection
Capacity
Utilization (%
Intersection
Capacity
Utilization (%
Intersection
Delay (seconds)
Intersection
Delay (seconds)
22-26553 TR1�rFiC 1�1PACT ANA�YSiS - DRAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
The background traffic growth throughout the development is expected to cause increased delays throughout the study area. As
traffic continues to increase, longer delays will be experienced. According to the completed traffic modeling, the new traffic
generated as a result of the proposed residential development will increase to varying degrees at the studied intersections.
(�� ���� � � �����J���f"���� �i�F��#�� `��� i�����1���%`�"���i`i �� i������; ��� ����`�'��` f�i��7F������
The no build condition for this study assumes that the connection of Twin Lakes Parkway Northwest is not completed for the
(existing) 2022, 2023, 2026, or 2046 condition. As a result:
Intersection 6
• Operating at an overall intersection LOS of A in 2022, 2023, 2026, and 2046.
• Lowest approach LOS is a B forthe northeast movement as listed in the Synchro and Sim Traffic reporting. This would
be considered the northbound approach when utilizing primarily cardinal directions.
Intersection 7
Operating at an overall intersection LOS of A in 2022, 2023 and 2026. The intersection operates at a LOS B in 2046.
Lowest approach LOS is a B for the southwest-bound movement as listed in the Synchro and Sim Traffic reporting. This
would be considered the southbound approach when utilizing primarily cardinal directions.
Intersection 8
Operating at an overall intersection LOS of A in 2022, 2023, 2026, and 2046.
Lowest approach LOS is a C in 2022, 2023, and 2026 forthe southbound movement. In 2046 the approach will
operate in a LOS D in 2046.
o As traffic on the major approach increases the LOS will continue to decrease as gap-time for drivers to perForm
the movement will decrease.
Refer to Appendix G for the Synchro and Sim Tratfic reporting.
�
The no build condition for this study assumes that the connection of Twin Lakes Parkway Northwest is completed for the 2023,
2026, or 2046 condition. As a result:
Intersection 2
Operating at an overall intersection LOS of A in 2023, 2026, and 2046.
Lowest approach LOS is an A.
Intersection 3
• Operating at an overall intersection LOS of A in 2023, 2026, and 2046.
• Lowest approach LOS is an A.
Intersection 6
• Operating at an overall intersection LOS of A in 2023. The intersection operates at a LOS B in 2026 and 2046.
• Lowest approach LOS is a B for the northeast-bound movement as listed in the Synchro and Sim Traffic reporting in
2023 and 2026. The approach operates at a LOS C in 2046. This would be considered the northbound approach when
utilizing primarily cardinal directions.
� Architecture + Engineering + Environmental + Planning Page �5 of 32
22-265a� TR1��FiG fivrl��a�T ,�I�IA�YSiS - �R/��1�
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Intersection 7
• Operating at an overall intersection LOS of A in 2023 and 2026. The intersection operates at a LOS B in 2046.
• Lowest approach LOS is a B for the southwest approach as listed in the Synchro and Sim Traffic reporting in 2023 and
2026. The approach operates at a LOS C in 2046.This would be considered the southbound approach when utilizing
primarily cardinal directions.
Intersection 8
Operating at an overall intersection LOS of A in 2022, 2023, 2026, 2046.
Lowest approach LOS is a C in 2022, 2023, and 2026 forthe southbound movement. In 2046 the approach will
operate in a LOS D in 2046.
o As traffic on the major approach increases the LOS will continue to decrease as gap-time for drivers to perForm
the movement will decrease.
Refer to Appendix H for the Synchro and Sim Tratfic reporting.
�' �:'����s�a� ���,"�i� �a �e`;'w .�� �`�:�
�
The opening condition for this study assumes that the connection of Twin Lakes Parkway Northwest is completed for the 2023
condition and that 5% of the proposed development is built out. As a result:
Intersection 1
Operating at an overall intersection LOS of A.
Lowest approach LOS is an A.
Intersection 2
Operating at an overall intersection LOS of A.
Lowest approach LOS is an A.
Intersection 3
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an A.
Intersection 6
Operating at an overall intersection LOS of A.
Lowest approach LOS is a B for the northeast-bound movement as listed in the Synchro and Sim Traffic reporting. This
would be considered the northbound approach when utilizing primarily cardinal directions.
Intersection 7
Operating at an overall intersection LOS of A.
Lowest approach LOS is a B for the southwest-bound approach as listed in the Synchro and Sim Traffic reporting. This
would be considered the southbound approach when utilizing primarily cardinal directions.
Intersection 8
Operating at an overall intersection LOS of A.
Lowest approach LOS is a D for the southbound movement as listed in the Synchro and Sim Traffic reporting.
o As traffic on the major approach increases the LOS will continue to decrease as gap-time for drivers to perForm
the movement will decrease.
Refer to AppendaJ for the Synchro and Sim Traffic reporting.
� Architecture + Engineering + Environmental + Planning Page �6 of 32
22-2655� TR1�rFiC fi�1PA�T ANA�YSiS - �RAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
F�LL �lJIL� ��f��� � I➢�� ��{���1
The opening condition for this study assumes that the connection of Twin Lakes Parkway Northwest is completed for the 2026
condition and conservatively the entire development is built out. As a result:
Intersection 1
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an A.
Intersection 2
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an A.
Intersection 3
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an A.
Intersection 4
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the eastbound movement as listed in Synchro and Sim Traffic.
Intersection 5
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the eastbound movement as listed in Synchro and Sim Traffic.
Intersection 6
• Operating at an overall intersection LOS of B.
• Lowest approach LOS is a C for the northeast-bound movement as listed in the Synchro and Sim Traffic reporting. This
would be considered the northbound approach when utilizing primarily cardinal directions.
Intersection 7
• Operating at an overall intersection LOS of B.
• Lowest approach LOS is an B for the southwest-bound approach as listed in the Synchro and Sim Traffic reporting. This
would be considered the southbound approach when utilizing primarily cardinal directions.
Intersection 8
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is a D for the southbound movement as listed in the Synchro and Sim Traffic reporting.
o As traffic on the major approach increases the LOS will continue to decrease as gap-time for drivers to perForm
the movement will decrease.
Refer to Appendix K for the Synchro and Sim Traffic reporting.
� Architecture + Engineering + Environmental + Planning Page �7 of 32
22-2655� TR1�rFiC fi�1PA�T ANA�YSiS - �RAFT
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
��i��� nRr�a�u�r�t��r�� .�l
The opening condition for this study assumes that the connection of Twin Lakes Parkway Northwest is completed for the 2046
condition and the entire development is built out. As a result:
Intersection 1
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the northbound movement as listed in Synchro and Sim Traffic.
Intersection 2
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the southbound movement as listed in Synchro and Sim Traffic.
Intersection 3
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the southbound movement as listed in Synchro and Sim Traffic.
Intersection 4
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the eastbound movement as listed in Synchro and Sim Traffic.
Intersection 5
• Operating at an overall intersection LOS of A.
• Lowest approach LOS is an B for the eastbound movement as listed in Synchro and Sim Traffic.
Intersection 6
• Operating at an overall intersection LOS of C.
• Lowest approach LOS is a D for the northeast-bound movement as listed in the Synchro and Sim Traffic reporting. This
would be considered the northbound approach when utilizing primarily cardinal directions.
Intersection 7
• Operating at an overall intersection LOS of C.
• Lowest approach LOS is an C for the southwest-bound approach as listed in the Synchro and Sim Traffic reporting. This
would be considered the southbound approach when utilizing primarily cardinal directions.
Intersection 8
• Operating at an overall intersection LOS of C.
• Lowest approach LOS is a F for the southbound movement as listed in the Synchro and Sim Traffic reporting.
o As traffic on the major approach increases the LOS will continue to decrease as gap-time for drivers to perForm
the movement will decrease.
Refer to Appenda L for the Synchro and Sim Traffic reporting.
� Architecture + Engineering + Environmental + Planning Page �8 of 32
2Z-`���:�' �����,�Fi�; iPv�i��a�i ,�i�,��YSi� — ��1�F1�
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
Summary
• Intersections 1, 2, and 3 will be constructed with the extension of Twin Lakes Parkway Northwest and with the proposed
development. The intersections will continue to operate at a high LOS for 2023, 2026, and 2046. It is recommended that
as Twin Lakes Parkway is developed that the surrounding traffic volumes are evaluated as the road will be providing an
east-west connection that is not currently present. It is likely that due to the location of the school, that trip distribution
with the surrounding roadway network will impact Intersection 6, 7, and 8. Traffic queues for the intersections do not
exceed the storage length provided.
• Intersections 4 and 5 will be created with the proposed development and will likely not be constructed within the first
phase of the residential development, as reflected in the 2023 reporting. Intersections 2 and 4 are planned to connect
the existing developments as a north-south throughfare for the existing residential development. It is likely that as traffic
continues to increase, longer delays onto the adjacent collector roadways will be experienced. At the intersections of 4
and 5, it is likely that a by-pass lane or dedicated left-turn lane is needed for northbound traffic and a dedicated right-
turn lane. The intersections will operate at a high level of service in 2023, 2026, 2046. Traffic queues forthe intersections
do not exceed the storage length provided.
• Intersections 6, 7, and 8 will operate at a similar condition as the No Build scenarios. The traffic produced from the
development will minorly impactthe delay and capacity of the intersections. All three intersections will be within an overall
acceptable level of service and decline as background traffic increases. Intersection 8 will need to be reevaluated in the
future to determine the best intersection control improvement as the southbound left turn lane with decrease in level of
service as the background traffic increases. Traffic queues for the intersection 8 may exceed the storage length provided
if the intersection control is not improved in the future.
The addition of the proposed traffic as a result of the residential development will have minimal effect on level of service and
delay currently experienced and projected to be experienced.
� Architecture + Engineering + Environmental + Planning Page �9 of 32
�Zp-`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT -ELK RIVER, MN
Crash Analysis
Crash data was obtained from the Minnesota Crash Mapping Analysis Tool for the past 10 years within the vicinity of the study
area. The crash types are defined in the Guide to MN Crash Data Files and the MN Law Enforcement Accident Report Instruction
Manual as described in the following table.
Type K Killed
Type A
Type B
Type C
Type I�
Intersection 6
Afatality resulted.
Any injury, other than a fatal injury, which prevents the injured person from walking,
Incapacitating injury driving, or normally continuing the activities the person was capable of perForming
before the injury occurred.
Non-incapacitating Any injury, other than a fatal injury or an incapacitating injury, which is evident to the
injury
Possible injury
No apparent injury
observers at the scene of the accident in which the injury occurred.
Any injury reported or claimed which is not a fatal injury, incapacitating injury or non-
incapacitating evident injury.
Property damage only.
At Intersection 6, four crashes have been reported within the vicinity of the intersection. The four crashes were reported as a Type
C and N. One crash did not involve another vehicle and was a collision with a deer. The second crash was the result of snow-
covered roadways where the driver lost control and went off the roadway. The third collision was a rear-end, where the secondary
vehicle failed to brake within sufficient time. The final collision occurred when a vehicle traveling northbound came to a stop at
the intersection and was waiting for a gap to turn right onto Twin Lakes Road. The driver proceeded with their movement when a
second vehicle approached the intersection along the major leg of traffic. In doing so an angle collision between the two veh icles
occurred. Note this crash occurred prior to the roundabout, where sight lines at the intersection may have been impeded. The
recorded crash data does not indicate a need for geometric or traffic control changes to the intersection due to safety.
Intersection 7
At Intersection 7, ten crashes have been reported within the vicinity of the intersection. The ten crashes that were reported as
Types A, B, C, N. The first crash was a rear end collision where within the roundabout one vehicle rear ended a trailer being pulled
by the preceding vehicle. Minor injuries were sustained by the drive who failed to brake. The second crash was the result of snow-
covered roadway conditions where the driver lost control and collided with an off-street light pole. The third collision reported
occurred south of the intersection and was weather related with road conditions reported with packed ice, snow, and heavy wind.
A driver reduced their speed around the curve, lost control, and shifted into the opposing lane of traffic where they collided with
oncoming traffic. The crash occurred prior to the construction of the roundabout and no driver was taken to the hospital. The
fourth collision was prior to the construction of the roundabout, where a motorcyclist lost control of his vehicle along the curve on
the former Y-intersection and spun out. This collision was reported as a single vehicle run off road with serious injury. The fifth,
sixth, and seventh collisions were a result of snow-covered roadways, where the driver lost control and went off the road. These
� Architecture + Engineering + Environmental + Planning {�ab�� ;��i o�f ��
�Zp—`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
were also prior to the roundabout construction. Collision eight occurred along the approach of the roundabout with two rear end
collisions stacking prior to entering the intersection. It was recorded to be at the end of the school day when congestion occurred.
Collision nine occurred due to a driver striking a deer within the roadway. No other injuries to the driver were reported. The tenth
crash was occurred outside of the intersection were a vehicle perFormed an illegal pass along the shoulder due to a vehicle
stopping traffic flow while waiting to perForm a left-turn into a private drive. The vehicle perForming the illegal pass collided with
the preceding vehicle via a rear end crash.
From the crashes reported, the roundabout construction has addressed most geometric concerns. No additional modifications
are recommended with the provided crash data above.
Intersection 8
At intersection 8, 15 crashes have been reported within the vicinity of the intersection. The fifteen crashes that were reported as
Types B, C, and N. Crash one and two were reported where both drivers drove off the roadway due to ice conditions. No additional
vehicle was encountered within the reports. Collision three was reported as a rear-end collision within the westbound travel lane.
It was recorded that an eastbound vehicle began perForming a left-turn movement in front of the westbound thru travel lane
causing a secondary westbound vehicle to collide with the preceding vehicle that was yielding to the left-turning vehicle. Collision
four is reported as a rear end crash where an eastbound traveling vehicle was waiting to perForm a left-turn. A secondary
eastbound traveling vehicle perFormed an illegal pass along the shoulder and struck the corner of the vehicle. The fifth crash was
due to debris falling off a trailer and hittingthe following vehicle. Collision five was a result of snow/ ice alongthe roadway where
the driver lost control and collided with a secondary vehicle due to crossing the travel lane. The collision was at an angle and
minor injuries were reported. The sixth collision was a result of slush conditions where the eastbound vehicle was unable to stop
prior to perForming a left-turn movement. The opposing westbound vehicle proceed through the intersection resulting in an angle
collision. The seventh reported crash was the result of a distracted driver who drove off the roadway into the ditch. Collision eight,
nine, and ten were the result of a deer entering the roadway and the vehicle unable to avoid the animal. Collision eleven was a
result of a driver failing to brake prior to rear-ending a stopped southbound at the intersection. Minor damages were reported to
the vehicles. Collision twelve was the result of southbound vehicle entering the intersection with insufficient clearance and a
westbound vehicle struck the driver side door. No injuries or towing were reported. Collision thirteen was an angle crash that was
the result of eastbound vehicle failingto yield when perForming a left-turn and a westbound vehicle struck the car. Possible injuries
were reported. Collision fourteen and fifteen was the result of a deer running into a vehicle.
A majority of the crashes are a result of weather and deer. From the crashes reported above there is no indication that
improvements are needed for geometric or traffic control changes to the intersection.
� Architecture + Engineering + Environmental + Planning Page 31 of 32
�Zp-`�S�:�i;� I'Y=�1�,i�Y�iCE iiv'i�'�;i;i' r�l°�f�iLY�I` - Y�IZ1�F1..
FQSTER PROPERTY RESIDENTIAL DEVELQPIVIEIVT —ELK RIVER, MN
RECOMMENDATIONS
The proposed single-family residential development located along Cleveland Road Northwest (C.R. 40) with indirect access to
Twin Lakes Road Northwest (C.S.A.H. 13) and 181St Avenue Northwest (C.S.A.H 12) will utilize five (5) access points that connect
the development to local and collector roadways. At the time of this study it is recommended to evaluate these improvements to
the public roadway network:
• To reduce delay it is recommended that intersections 4 and 5 are established with dedicated southbound right-turn lanes
and a dedicated northbound left-turn lanes or by-pass lanes. This will reduce delay for vehicles perForming a thru-
movement at the intersections along the higher speed collector roadway. It is recommended that intersections 4 and 5
are established as two-way stop-controlled intersections with stop signs on the minor volume approach.
• As the development continues to be constructed in phases, it is recommended that the County and City revaluates the
posted speed limit to Cleveland Road Northwest (C.R. 40) as the posted speed limit varies across the 2-mile stretch
between 45 and 55 mph.
o With the reduction of the posted speed, Intersections 4 and 5 would comply with Sherburne County Access
Spacing guidelines along Cleveland Road Northwest (C.R. 40). Note there has been expressed interest that the
City obtain control of Cleveland Road Northwest (C.R. 40). It is recommended that a separate analysis is
perFormed by the local government units.
• It is recommended that the City and County evaluate the impacts of the extension of Twin Lakes Parkway Northwest to
the surrounding roadway network. The extension that is planned to be completed the summer of 2022, will likely impact
the surrounding roadway network, specifically Intersections 6, 7, and 8 that were mentioned within this report. This may
result in relief to Intersection 8 that is expressed below.
• It is recommended that Intersections 1, 2, and 3 are signed as two-way stop-controlled intersections. Stop signs are
recommended on the northbound and southbound approaches. In addition, the northbound approaches are
recommended to aligned with the southbound approaches at Intersections 2 and 3.
• Local roadways shall be designed to the City of Elk River's minimum local design speed of 30-mph.
• The background traffic and developmenttrafficwill result in an unacceptable level ofserviceforthe southbound approach
of Intersection 8. The approach will likely function in a low level of service by 2046 if the anticipated growth rate and trip
distribution is sustained. This is the result of increase traffic volumes for the southbound approach unable to perForm a
completed movement in the intersection as gap-time along the major approaches decrease due to the increase in
projected trips. It is recommended that an intersection control evaluation (ICE) is perFormed by City and County upon
completion of the extension of Twin Lakes Parkway Northwest and when 50 percent of the proposed development is
completed.
• The existing and proposed residential development serves pedestrian and bicycles throughoutthe study area with shared
use trails, sidewalks, and parks. To accommodate pedestrian and cyclist:
o Install sidewalk on one side of the roadway as shown in the Concept. Install sidewalk on both sides ofthe roadway
at Intersections 2 and 4 to match the existing roadway section within the residential development to the north.
o Stripe pedestrian crosswalks at intersections to increase visibility to drivers. Additionally, ensure between the
developer and City that sight triangles for all intersections are not impeded by vegetation. Once pedestrian
facilities are installed at the proposed development, a similar agreement should be established. Bicycle and
pedestrian signage can also be established throughout the study area.
� Architecture + Engineering + Environmental + Planning Page 32 of 32
� Architecture + Engineering+ Environmental + Planning AppendixA
y � ` �,: � �,y ��r �� � �' �, y �
��� rf I��T �y� �y� T
c � � C �A-�� �� 1J ll I ��`^:-a• � � .. �a _ Ay�� � � , <�� \
� I �""` � 1717r1I�I�f�I�I�C1� � —�=�.�� �
� �' : • '_ � � �� UU�UUIJLJLJLJ❑LJLJLJLJLJ❑ C (f� � �U
� 'a i R , � LJ❑LJLJLJLJLJLJL]l�I��UUU � G� -� �J�% G
���q � m. �nnnnnnonnnnnnnnnnn
' y� �� nnnnnnon � n��nn � GG u0� �C
�:��� - ti j° � c � v��uv uuuuuuuuuuu"v .-nn���<`
s uuuuuu❑ �
a�y� � "; . � ' �� � �' �� ����0!> " �G onnnnnnnc�� ' �� �
+t',R�`� , • � C nnnnnn C' � \\\� " ` v�i �' vUVU�� �/
�� � � �� C' �) � C� � � � �VUUU� � nCll1 �
� `�� ,��F�R�F � '� ��% �GG�/�� CC u� �` '",. ' e, �vJ � �On����� ���'
. � � G U � ' ��
�� � r .. ��>- ; ' O� C ,� n � � j J � ��n( ,��� `:. 5
� C � �n n�l " �i
�. f �� &� t �JJ CCC uvg VUIJIJL�1Jv������ � �' ��U�vJJ
I�% % \A
�-�,�Y� � � ��.. �nn�nn�� � � �jJ`�
t,�� r `�� � � � « O �
;.t`L�,�: t K * ` � C � w` �� � ' 7% JO`� � ��,
�t;,��4 � �L��s �� ,� � C � e�. �,y_!�'e",'y�' r � � �� - ;.,4 �� 1111 II ��%UUU�J � L� e � ; �li
� ��.., � ` � ,� C �rr- 'q�.'t Y �j�/, _ # ���� � �� \ �e � �
+� .r r��\
1 I y�. . . C ., � . � r ._", ❑ � � � �
i � r � � r �' z,�' � G ' r � � �� ���nnnn� m.�
+ ��' �� � , � F..
� �kc � ,��"' // ���� GGC $ � � �� �
�,. �; , �,��
��;.% ��`, -,i� �� „ � � �� _ �
_ �tF�� ,�� o
� ���� _ -
- �`�"�' -, ��
.:
� � �T
�� �G �
� ❑
� % ,JJJ �` C� l
;> �i �C �
'. � � ` � - �e� o�� �� o c �
� �
�: y� � �„� _ ., , � � � �
^� �,�; �n n ��
'�4 / A T^ . ' i.l�� �oo �_
�� ���l� y � a .�. � a8//� �"
.� !' t �� r• <;»`- ;'��5• � ll -
, � �'
,
�"t Y � �r � l y„�.r � 7 � * � �� ,, � ,: � ,�, ,�,
���%� � ` �°�'�: . � ��" '�.. '."� a �. a - - �U� 1s1t
�'
' �Y _ � /
�� �_. C. �~�`'.,�,... . . '�''-
CONCEPTUALLAYOUT
�a
`` . _ _
i . � ��� M��
Asn��PzoPERr �,�
,
£,
,��..�� o .00 �
� FOSTER PROPERTY DEVELOPMENT
Archltecture + Engineenng+ Emironmental + Planning E�K aivEa, mwvEso,a-eoeznoiii ISGlnc.com
�sc aR�Ecr rvo. zz-zessa
.. - -'�
*,�"'
•� :
� � � 0 ��
' g �5�--'�WFr� . �^
\ V ` ✓/
�\� �
r
�� �� �
� � ,�i � � --- �
�` � � � ���
\'��� .
j ��, � :
,----T , ❑ � ❑ ��
� � PROPERn�NEnP � , � a
� � __
, ,
, s�o�,�
, s.oR �,.Eaa�� ,� —�.�.
� �; ,
� �
�_���� � � �
, �I �,,=;
,,, ❑!❑i0!❑! ��" �� , �
����E�no�,�,a, o , � ' _ _ � _ � _ _ � _ � " � �/�� %" '
� _ - ,i� V" � i
T � � � � „s��o Ev ��v o.s _ � --
� — — — � `�� �,
� �,��
� �� -- I�%
�,, ❑I❑ ❑I�I�\ y���� �
i �= � �
� o-- � '�
,���,, o��rs�r�NE �o �mo: _, �� ,�
��� �— �,
,� F��F�ooP�� „a',�= � ; r�,—
, ,, � ��o, ---- m �, ,,
� �- . = , ," -- ,
__�,00_-- ���' —°��" � i
_����,��EOF.Ro..aRoo� ��
�
, ,
�------ �o�:��. � � ,
; �`
,� i '��
_�
�
� �= ��
GHOST PLATTED AREAS
/ � �\� _ _ . _ __ ,, � I
" � i�� -
- --- -------
� � `�u � — _ f _ _ f _ _ � �
_. _. —� L — .__ ' IL — .— ' IL _ _ ' I I
— �
RaPE=r��NENP. z'i �
_� ; �,,__-- — ----_ � oo.o,u ,' �
� ,�
— — � ,��i��, � ����i ����, x' i
, � � — — —�— _ � ��
_ _ �� ',�I�'',,I,,�}�,I''�, �� >� i
,
I' � , � � �
��
� ����� ��� � '�� � I � �', � � 1 �'�� � � I �
� � �� � ''�� � � , i
_ _ ' � � I I' I, '',, � � I
� � � I '���I�', �I�, � ,,� � � I
— — , I
�',����', � ��� �
' � ��� � ''�� � 1�� I � 1�� I �''� � � �'�
�� �,�� y � ' � '�� ���� � �'� i
, ��, � � � i
� � � �� � ���� � � ��
— ����� ' � ���'� , '
�'��� 'i ooRo„ i ---- , �
��
1I
��
�
,
� ��
���
�I�
I^
���.,, m ° �° N
�' I
— I I
— ' —�I—
�
� nrcnitecmre+engineering+environmental+alann�ing FOSTER PROPERTY DEVELOPMENT ISGlnc.com
�: ioen. imnesar,�- ize
�sc aamEcr No. zazessa
�:�",'�� ��e 3.�.�m��`�. --- �"'-��,;+�!
�� � �4
,* 1 ��i
;T .� �
,� �
a���,
��� ��K �.�
�'�'��; .
�•
.. �
��.�"�y�_���;
� igi
�f € i
V �� �
��ii ~�
�; � �
, ;�� � � '
� ' � +�
���,,
�� �
.�� - ��
'`I _
� l��
�_; ��_�_i�_1�1
�I ��f l�l TI�, �
�� �-L l� I rn L�r
'F j� L � ��, � � �` � Po . ��'���
� 0.
; %��; � „ • ,�
�—�� � m� g%
._�,��� � e: � .. �
Y' __ i / Po � — � 1�
I �JJ. �, $ ' � �
-^�-----�w ---� ---�— ;' _.
�
— C� '- _' � --
� � ,�— _ __ . '�
��.� ��-� '� �— � � � -
�� �., �t , � � -�
��
TRAFFIC STUDY INTERSECTION LOCATIONS-ONSITE
� Architecture+EnBineerin6+Emironmental+Planning
FOSTER PROPERTY DEVELOPMENT
eu RiveR, Minneso„�-zozziosios
�sc ae�ecr No. zzaeesa
�� 1l� 3 I g'6 r
�, �
,.. -
-, .: + - - _
� Y
� �� ��--�.--
' l �� � � �l � ^, _ .
� � ��� i �''�, �
�,�1 _ �� - -
❑
� _ _ .� �.�
�.1L7�� ��; o �o� � 4
I�
� ��, .,�
�7T� � �• �
� , __-
� � . ..
�
O ��I �.� �f r. :
. - -. '. - . . ,.
� , ��
;y ^ o°°°�� ���,�, :> ��P:oPE: ..
�
LLiI "'. � _NMF'�'- �.Ar'1� -
— �R�� �
, � �;
i �
; � s�
� �, �F-�,� .
,. , �„ r,1
w�.,• I;,���` "` ,.�', �,
���..,� o .00 �
�
��-` u;`d�i 1 u'���` �;—;_� � ��,��—ri�'l� I I I 11J_I11_I_I�I_LL�. -
P�����J
��' ., •_.���,i"`�`�.�`�"��. .' _ .' 7 � ;
� � ` �i^ 7. . r '� r,a� ��= ( , .
:��' � . �, ��" s .— ,, � .
°�'� ` _ .:� =''�,, 1 �� ��!' S
' � � � qt �,. +'`,# � 1., s v 4 �,, �
���� � ,y ��" :�� '�' '� '`'" `� y�: _ �
1£'` „�, � �-�� fT �� � � , � � �„ `, �a �
` � �����.. . '�. f • > .�� � { y�. � � y �`1,:
t '�,, • ` x `:� �,�' ` ,��� ` 'ti � `� ;
vrp.- , �"' . �r �- � 4 AA�''; � r: a
,!� ��` . '�..,�� �+�'I'�h ...{�'���- ,,5.� �� :�<, ��t.`-�- y,,i�
f �. � `�. r y
�� � o ..� �i { � �Y.4�,� ����r.�'� � ����`.._ 'S. \
. �"` ��/ ky�A '�'k�� ��`� . �i �l�FY�-�� i . y'�w"'� �
f f� �. q� �al �s a'
r �
�4�e� �q,',. yw��"�` �•,' �1� T�`_ �.
�r � ,
` i 1j�, �� � �t � �� f� i° �,�� �� �
{� �+�'�Z r �.s ��� ��' � r���. �� ,s•=+' A '�"S� r6 �� , a
�Y � �� �
� ��� i�+�� ��'�- .Fr� h !� � et',t+k�„ ��.�_ --' „r, '*
,,+ „� r � �r :, c � , � _ �
f ,� `� . �, F , f "1� j �����'."YA�� � �-. tii j4 -�. .�'� A � � � ..
t
�. f }�� �'f-� r�� k �7��� � ��f r� . - �
� � y
3 t�. �� f� � � . ' � �_� � � ' ,• ,
�`�i 'w��. pA. 6,T�•P�n`6
s��= �u �i�a'�'�.�'K� a cf'��'s: ^ � ,..r- �F ��,��w� dk t���zZ� ,��''�i �� �
� --`�t '•';.; � ..' Yrr �� �t' � ,� ��?-T- � �t��'.�71�a'� �._ _ . . .;.
'�,: a+'' .� rt f �� ,r'�f ,1�,,.' � r�yy:��y�ry4 , G,► y_ _ '
r �` f �'� '" ' ~r � � �.'
{�+�,� � ,-�.�« ��'' :"�
¢�r .p*: 4�a�- r �rw:` T'�T���� . - Y.� y�r5 . � {�%'�� � � f�
j'� t
�r� �� s' ea�i �x"�;� .' ���` " l7�i��'}..• '������'�''-� ..-.
i � �� . � a j, - o"u w' a�+i' �, d,n f ?. ��
�.C�,,,� t � �` ,d' ���,. , F .� Y�t{� �4 y - � '� • `'�'',; ;�'
fi' ��� �, �' e��pg� *�d �`� ,�''.4i Gr� J :r �'� �����`�r
�'��N AS:� ,1` �'�" '�,�y �'� � 7 �, ,�+ .� +
� �� F b�� � _ ;' �-�.. i:.,ah 'J' . n a ;r"� �'-. !° �.. �.
�
�, '7 „� � +i�",�ie�. +.
� _ ,�f.y�".A1 J � ,��"� '}' ��,.y �•'r. ' �
� `, .�-�%� �..3 . `: t� � t . � � �,+Ki
e , �:i
�`�•''` . �� • _ � y� � _� � _,.'�;Yf�i�i� ��t' ^
' � �� � ar� e� - ' . -._ .
�. i � ,.� �"�:a� ..�:.� �-
TRAFFIC STUDY INTERSECTION LOCATIONS-OFFISTE
� nrchitecture+enBineering+emimmnental+Plann��ng FOSTER PROPERTY DEVELOPMENT
�: iveR, Minneso„�-zozziosios
�sc ae�ecr No. zzaeesa
�
� Architecture + Engineering+ Environmental + Planning Appendix B
/ .�^� \•���,/ �J ,. .L�Ib �.E 1�� Oe b4ILLELAeCSVCOU\NI�'Y.�
r � d � � � V�
� � � � � �v .. . . � �
�� -- �� �
� - � r ° .�. � .., �
\J
0.
ee �m \\ � e q e m I� ,�m �'�—' �� � . A'�-o
N '�•p, �� .. " L L ., —�'' e �
� e 1 r � ti
�,. „ r � � LL r �
"L
o m e, °-, - r., m e
� � � ��
'n ,L rr- � m� e Z n_r�
� � 4 ... . � c-�
de
� ��\ : 0. -� 4 m_..,�, � � ----- -
�•a m -r � -
� � r.
' ,. ��..,�. m ..
m --r e � •
�� 1 � tr �
T � �� � !r ���
r d
m t '�
� ,- �
� ����.
��r ,
, oo� �" m'� �,., � �l ' m� ¢
- !-, � . _ . �, �
'�'a e c✓ 1 �) L � �
_,
� `° e..� �P 1;Je
° �' �- �
, �� �
� �,� �
� �,
I�I /('� 'V'.J✓ � HEA'NEPIN cm [�NTY..._� ��
I \
ill �—�
I /
FUNCTIONAL
CLASSIFICATION MAP
SHERBURNE
COLJNTY
MINNESOTA
MI\"�E90TADEPARTME\T OF TRA.\9PORT.ITIO\
OF£RCE OF TRA\"9PORT2T[O\ 9Y9TEM P,L1\2(iEME\"T
L.S. DEP2,RTb7ENT OF�1R2,NSPORTATION
FEDER2,L. HIGH4VAY ADbfINISTR2,TION
� �,e�b "��� ' a �a "
s
�tirE�,,,.r . /�
0 oA E. aEssw.,. .. . �i
-.. M a.,�-o,EA ... ..�i
M er.oa
n ecma. _. .. _. .. /�✓
m' ,,.„„op,.,,a„ Fuxcrionu c�assiFicariox ntiae SHERBURNE COUNTY nnNnasora 71
35 36 31 32 239T Ave 33 34 � 35 36
�- -- - - - ^
x N
M�d . 22ITH AVE q >
� 225TH CT Q 226TH CT �s� ¢
Z � 225iH AVE 6 5 �L,9T 2�r 4 p 22vTH AV mP Z 1 226TH AVE �
Z
, sO�C yCT A .
i Z
� = F
� B � �I
79 � � 223RD AVE 223RD CT y� e w N
�
O� RICE � ' o �
� 222NDCT �c� _ K z
z
��STAVE �P lAl(EPARK p 8'� o
,,,.��°"��—� 221 ST AVE !,� ,� � - � � �
. FIDGE 70
AVE .. PARK �
, ] 218THAVE
11 �Z _ RANCH'RO __ BURR 8 21�HAVE 9 �O Z���VE 11 1'1 �
33 �
CIR j OAK 'I�L
V , 215TH CT 42 PRRK �,� 215iH AVE
j � 27Cry �
� 214i`AVE �
d � Z 0 O
' OUE CT Q p � 213TH AVE �
N� .� AVE z � G z13TH AVE
--- �! 32 zizrHcr � � �
U ryNDS R o � I��� g
y� ��c I
. , 211TH AVE G 2 TH C ����� ,�r�'���P v Z �
1�THAVE 4
14 zo9rH nve � 18 �17 ' ar 16 15 14 i 13 z rH nWe
OR 208iH AVE p �
13 � o
� au 69 ,
� o Z��H A�E 20]TH AVE 2 7H CIR HOOVER CT A i
�P J -1 i
NavE �' � 1 � zosr �
. �(� OLD CSAH 33 �
JG �nqq �P�N TOPOFTHE 34 �
204iH AVE V\G1T WORLD PARK 33 � � 2�`� i
' � WOODf.ANO N yLF i
za Ro n E ��� �� raa�s aa �;c 21 �� 22 c� ��
N 2o2NOq�E ------- Ro� A�F I� 2a1STGIR
23 o Z4 19 p JACKS N IR '1'3 20 T AVE i
r' ��TH AVE 72 ,Lp15TAVE A 1 V '14 TW/ll
i99THA E 4� � Lake
� I � ,P� F >
198TH A �
+g Nq y w ° 13
F � '� —
� � � 33
0
�9s °—° w i
i a
26 ��� 35 { , �s3 25 ��
i Tc�. �25 30 "� � 26 R�q �N
F ` 792NDAVE- ' jJe � z O '
o'� � p o m E ��
� See+Elk R�i�ver=q- "°"A` `2T�= S�" ,
Q HARR � �' VALCEY S >
qVF � ISLAND ` ' \ + r. — PARK i
N189T N � I 1\ 1
PARK �i i
��
�� � Do �n�town) Map I ���� ���
��
a� �
� � �� �AMP u J � S
� � �azY —
t O I � L BIkCH MERDO
m s�, d NPARK I _. I � - —� � N p� �
a 36 p Nq �F ,.� t. � I , � � � � —� cn . ;
35 a ` 31 — 35. � i 36 �
iasrH nve L � r
�
WEA N U � �ySGENTERDR '� �� I ��/�Qc � �i
OAKS P � 8 5 I.,..: �/ i
AVE � � 1� RD AVE I I� 1� ��� � 1 � 1 \ ` �8 E TT i
1
P OODGOL y.T BRO K.A.Blb95PARK i
a
V EWOOD �p�pF� � i
30 �i �� � UGV GT r�
� � COURSEG�O B� . �iBT
2 N 1 a 45 T '�S, o i"s�- � �� HILLSIDE � C E� I �
MississippiRiver �I < ary o os� 9 N vE
I 1�8 H G R p 1� 7]STH PJ� �
���.. PARK � ��(
' Z LIEVER i � ��,P��'
I . .. . .. ��� '1 � MARSH� 16T LM G��`� �
� arshPARK 6 AV
� � � � � � � � � � � � � � � � � r � �
�� j 1ISTH CT 15 �N
D 1�STH AVE T 1 4jH PVE
Proposed Development < o
City of Elk River �ocation � �m '
� D s
0
K �
VALE C���;:. � � � i
1 ]OTH {�V
Roads � „ ,z i
Haven Palmer 'Santiago�� Blue Hill Baldwin � '){ ��
— US Highway ,
. ,s,T �
Clear Lake - Stat2 Hlghway '
Orrock �� Livonia � �
Becker _ County State Aid issrHAVEYourH
15
� Highway (CSAH) ATHLETIC
COMPLEN
Big Lake Elk River isaRo ave
Municipal State Aid —
� ° � Street (MSAS) �4 a 13 ,s,sTA�E
� —�
N County Road e� �
�
� o 0.5 1 — Township Road +� Railroad �` 10 y� ���','
y47z F, y$�
W �Q � City Street � �
�� Miles Section Lines 23 v
s Forest Road
� y�
oiscwMerz snem�me co��ry aoes �a waRa�� me a«��w �o� me �o��ea�ess 24 0 0 �5
rn me ���m�maoo� �o��med ��� m��s mav- i� ��s vo�� �esvo�sm�u�y io �enN me att�B�y Cltj7 j.1TT11tS Q
����s ���fo�a��o�_ �� � e�e�� w��� sne,e�me �o��� ee ���ae�e fo, a�Y dama9es. � � Refuge Road — P
������d��9�ossofe����ess°�o�P�ofi�.e����ess����e,�Pao�.�o�sofe�s��ess���fo�a��o� � w
o� o�ne� Pe����ary �o�s �n� m�9n� a�se f�om �,e ��e of �,��s maP o� �,e ���fo�maoo� ��� Park , 54T� A�E � I
�o��ams_ mav ���ro�maoo� ��s eer�e�ed m ee a�����e e�� a���B�v ��s �a e�a�a��eed_ PP1Vat2 ROaCI �
n�y e�o� o� om�ss�o�s snowd ee �evorced m snem�me co��ry P�eu� wo��_ �saaonve
Peth_ H 1GIS\GIS_MapsllntemetivlepslElkR�rver\EIkR�rvermxd i
Mep Greeted_ 6/25/2012 '
Mep Updeted_ 1/1/20�1
� Architecture + Engineering + Environmental + Planning Appendix C
�� ii
� \,
� � i � �I
32 ¢
u
Y
u
W 2215T AVE NW
� 221 ST AVE NW
169
�
1____ 727
�________
3 r_�___�___�___�__':�:-�- 7' 1
Z 1 / �
u�i i RANCH Rp N� � ,� ' �`S�
�
¢ i i i �
� � � i `----- � - � �
i
i �
¢ � \ i �4,�0 -
W 1 / \ / z
� 1 / /
� I �
1 ��
�---�----- -----� � �� 0 1 _,I —=�09TH�AVE�A/W�
� � � o �� 33 �
1 � /� a � /.
1 ______________ ', 1 '/
1 � 1� �
������^ �'
' �
/ � �
I � �
/ /
� ,
I ! 1
� � 3
\ i
32 I1I I 1 2! 1 �
i 1� 3 �
° �----y^--- `: � � �3t ---------- -� 2
� ------� A i a � 3
i � �'� i o p �� �
i � �i � ¢� y�
i � ,
� � 44 �� � � � �'93RDAIiE'�
� � � � �
-, N. � � _ �\ � �A � ., ���. � �
_ �.... 35� � �793N0"AVEyVW�-�.�_� Q ,�5�����
�\ 1 U .,,- �S � _ \� N �� : �i � . /� y �
�____\ / � z �
i �1i � ` _\�` J_ � i
1 / Ns � ti 1
1 N��__ i
�i �; � � ���� --'
, ; ., ,
I ♦ �-181ST-AVE=NW 72
� MISSISSIFFI-RD-NW�� 1 � '
1 � , �
: �� I , �
i� ��
����_ � . .
w
�����'___�'_'___'_' '�� " �i � l� � � u``i�-
�� � �
101 � �—tzsrH �veNw��
Land Use Plan - '�� C ;
LAND USE CATEGORY �� � �, "" �
�
Rural Residential ■ Business Park �
�
�
Traditional Single-Family Residential ■ Industrial �
�
� �
Mixed Residential , Parks & Open Space i ��,
; � 165�TH AVE NW
I Multifamily � Public/Semi-Public � � �
■ Mixed Use Agriculture �` 10 i
`��-----------' �I
Neighborhood Commercial Utilities & Railroads �G�, �
.;y� .
■ Highway Business i_� Future Urban ServiceArea G¢�y
y` ` �
. "�^ \.,y� ��
�`
`� ' �
\
� Architecture + Engineering+ Environmental + Planning Appendix D
�
�
1
�
�
�
TRAFFIC �MPA�T REPC}RT
FC�R
C�RR�N TH�]MPaC31� F��C3MES EA1N
�LI�[ I��IiER, M N
Prepared by Nlike Spack, P.E.
TD�
fi1 �-3�9-384�
April �0�4
�;���
������,
�
�
Tabie of Cvntents
' 'i, Pro�e+�t Description ... .............................................................................................1
� ..
'
'
�
1
1
i
1
'
1
1
�
'
�
�
�
1
2. Existing Cenditinns .................................................................................................1
3. Traffic Forecasts ...................................................................................................... 6
4. iraffic {3peratie�r�s Analysis .....................................................................................T
5. Nfitigation Measures ....................................................................................,..........15
G. Conclusions and Recomnne�dations ....................................................................16
List vf Fi ures
Figur� 1 - Location Maps .............................................................................................2
�igure 2 Propased Site Plan .....................................................................................3
Figure 3- Ex�sting Geome#ric� 8 Traffic Conteai .......................................................4
Figure 4- Existing Te�f�ic Volumes ............................................................................ 5
Fig�are 5 Trip Distriinutions ........................................................................................8
Figure 6- 201"f A.�II. Peak Hour Traffic Vnlumes .......................................................9
Figure 7- 2011 P.M. Pea4c Hour T�raffic Vol�umes ......................................................1D
�bgure 8- 2024 A.M. Peak Hour Traffic Volumes .....................................................11
Figure 9- 2024 P.M, �eak Hour Traffie Volumes ......................................................'12
Figure 10 - 2011 Daily Trafftc Vc�[urnes ......................................................................13
Figure � 1- 2U24 ❑aily Tra�fFc Volumes ......................................................................14
�Lis# of Tables
Table 1-�xisting AM Peak Hour LC]5 Results ............................................................6
Table 2- Existing PM Peak Hour LQS Results ............................................................ G
Tak�le 3 - Trip Generation ..............................................................................................fi
Tahle 4- Forecasted AM Peak Hour LQS Results ......................................................7
Table 5 Forecasted PINI Peak Hour L�S Results .....................................................15
Appendix A-1
Turning Mv�ement Cour�t aata
L�DS Calculati�ns
Orrin T�iompson Homes, E�k Rrver MN i EAW Appendix �4
Traffr� Impaci f2epart Apri! 204i4
1
'
1
1
�
�
1
�
7.PI4C]JECT DESCRlPT�QIV
(3rr�n Thompson Hame� is proposing to buiid a residential development on the
Nliske Praperty iocatecf south of County Raad 13 (Twirr Lakes Raad} and west ��
County f�oad 4C} �Davis Streei) in E!k R�ver, MN �se� Figure 1}. The site is
currer�tly accupie� by ane farmstead. The proposed development will includ�
547 single family homes and 174 towr�homes (see Figure 2). This rep�rt
addresses the tra#fic impact of the proposed deueiopment on the �rea rt�adway
netwark.
�. EX1S ilNG � C3N'Df TIC�IVrS
Traffi� operations were analyzed for the a.m. and p.m. peak hours at the
fo#lawing six int�rsecti�ns:
• Trunk Highway 169 and Cour�ty Road 12 (Main Str�et}
• Caunty Raad '�2 (Main 5tree�) and Cr��rnty Road 13 (Line Avent�elZane
' Avenue}
• Gounty Road 12 �Main 5treet} and County Road 4t� {�leveland 5treet)
• County Raad 13 �Twin Lakes Raad) and Gou�ty R�ad 4� �D�vis Street)
� • Caunty R�a� �[] �Davis Street} and praposed development Narth Raad
• Caunty Road 4{} (Davis 5treet) and prcap�sed develcapm�nt South Raad
i
1
�
�
�
�
�
1
The existing lan� canfigurations and traffic contral for the four existing
intersections are shQwrz in Figur� 3.
TDI staff co{lected a.m. arrd p.m. peak haur turn�ng mavement cr�unts at the four
existing study inters�ctions in April 2�D04. The data is included in the Appendix.
The existing peak haur traffic vofumes are s�own in Figure 4.
An intersection capacity analysis was conducted far the fo�r existing
dnterseciior�s per the Highway Capacify Mar�ual. The ir�tersectivr� is assigned a
"Lev�l of Service" letter grade based �n t�e intersectian �eometry, traffi�
val�mes, and tra�Fic carrt�al. Le�rel c+f Servic� A�L�� A} r��rese�ts light traffi�
flow (free f�aw eondi�ionsj while �evei of 5�r�ice F�LC�S F} represer�ts heavy
traffi� flaw �aver capacity ��nditians). LOS D is cr�nsidered a�ce�tabie in urbar�
conditions, �Ithough LQS C ar b�tt�r is preferred. A Level of Service grade is
also calculaied for eact� stvp cQntralled approach at a� unsignaliz�d ir,ters�ction.
The existing a.m. and p.m. pea� hour i.�S r�sults are shown in Tables 1 ar�d 2
�the LLS catculations are inc�uded in the Appendix}.
Qrrrn T�ompson Nomes, �lk �4iver, N1N � 1 EAW App�r�drx A
' Traffic fmpact R�part Rpril �0�4
�
1
'
1
,
1
1
�
1
,
1
�
�
1
'
r
'
�
1
��] iH4"�4�PSLLY rhetbur�z �Prinaeton '- --' g3 Branch W1illtrswn�
� �4'aAanal id� �Isanti
10 Lt+9�dfe - — - g �
fr'efuye
� ._ . � 4231t�1. (�-��y
,. . �� [. Iii�p ��j}�I _��'� St 1.. __
_ � L'ityr* .. _ �r
�71 �]
� Lake 4scQaia
Muntkce9 0 ; - _ _ � • Forest s
- �Rnnandale
+Pvlaple -- �+
Lake �Buffalo
H awa rd
*Lake — ----'Delana
5�
'Jhlinsted - �`-:.:��q
•
�15 km
Si}m-, -
O?003 Randl��y & :wrwany �
' Lake
� -- - 97
S4ia
�BIaI � �
G 81 .�amerset
]i��' �--
Fflr {�,f W'hrte ,
6ear iake —Stlllwater
+' al ¢�i�SP_V1��P"� 38 ��6aypdrt
!�q fiS_ � "1�'+— Hudson--
�
Site Locatian:
Orr�n Thampscsn Homes
E!k River, MN
�R�3�iCi hi�NA1.L�l ��etr� k�. v,
�
S� „°
F�sa' irirs
�.rfE3
�'�'�Y ��' Vikin� 96vd
;� -
���'d `�+ � ��
't6S)IIi.S`ry I�"�i� rl�� ���nd,�.� '��.�. �� Z�'�it�'t L!7
I.7�+erfreltl �'ii'��"C �i
� � ' , P.�nk 13 = .;i, .,�
.� , , J `q,� tr " .�
�� '�l,� F�t?th,�y ,:: � I.
S�[�denburg jFarker'i,3 r- ° E{
Junivr� g�erRa.ry, � �f a
SCikGOI �i �`CIlOO� '.fi F '% ; •
I uw�s3tfi ,�� � �' � '�
�
r' �
�tn v� _> '� j� �.,�. ,�=�' �
__ ;i ��l, st `,: � >• �. i���r, :�•�
---�_:'! h llAaia 5#'u _:� ,��ydaY:'
_ ��.�f ,�� �,� g,�m.�__—�
�., _
-,.-y� ,�:.
_� _
�� t..,, � �. _- - ia Fst:�,
9 . � ,, � ��- -_-- - — --��
� _
� �i� � �! `M Mo;sfde ! anhoe Av ���^,,, 83
� � �,;c3;', �' �.�p ,°'`�r-x �'� ' � � U ,
!_O�km ���� g�,g4a�` �t��; ;�: � _ ,
�a mr�� .`'• �. �, �
�r a I7['�tt� d,y { , :�ti* �r
O��U3 Rand i�tiaiky 8�' y O�802 G OT. inc 4
5ite Lo�ation: `
�Drri� Thampson Homes
Prepared by Tg! `
:`'� ��'-
April 2fl174 ��"��"� :-;�,
��
Figure 1 -
Locativn Nlaps
Omn Thompson EAW
Elk Riaer, MN
��
-:,��i?�`� �i
1�_l �� ;rr �:1 •
� �sYr
�i+�,. �x��:t �
��� ..
� „i''l,r �l`' �►'�' �
• �, • �►� � ��
,t* �� *��,*.,�
..
���/,�* f �•� ��i• .
1
w",��,.,+,��t��,L►,
:■,.,,,�..��.. _..:
„`.�i�'���:��►�l`�fl_;:^ ����.�:;i�:
:•_- :ril::.-.-.- _ ,
�
�
,..,.... �
�Ii�Uf� L �
Prnnosed S�te PI�
.
,
'
'
�
1
�
1
1
1
�
�
1
�
'
�
�
�
�
�
�
�
�
Na S C91e
Co
w� �
4 �
`" 51Gh
;I �
91 - --
� �I `I /
ZV fi+'al�i-+ +sil3 `814.4.i� , �, �., i. s. [.]
��tl -
�J,� .
rti�R�ar�} f7d !'4� t�� ��o,�� ���
v� �
„�`l� Ge eId �111e'Y
l� I � U I ;1�'., p �
� � �rh ,�v
lrtinsienburg ,�parker �'y � � f •r
Juii[ar F�y+ gemerita ;ty � r
S�hoal ;I Schvof ;i a �`
� Y.
j rror±sr3th �� j` � !�,
^th=�� P.srk '� ✓r
_- �il ��th St '' r
�"��-a�'==�� Main 5:,� ;{
-�-.��.l.r=— ��
�``� v �� �, s �
i����
�s .a kr„
D.5 mii�
p�3 Rand �N�y 3
�s
���
��
� �
� =�
"� .+�side
t;dy Pa�•
o.�raz �or. �
/
�
��
� � STQP
�a�1
1] win Lakss Rd � Co Rd 4p 4aris sy
f`.� mphl l� �1
� v���o srv�
_ ��— _—: =—
;j
1 ��4rh Ln
� �
� i �
f� �li �
w �'
Fr,
, 18-�th f+V i
�� ��� �� I
,_—�-
+� is ��.
_. � .
�_ �„ , .
_ - __ _-�.
t'r
lvanh�P A. . 5 '��t,� g3
n� L �/ � r . -y .
� ;�� 1-yl z�.�a.e,, w
Y g.
, � ; � ,�.v � , . . _ r.
ST�P "
CORd72�� �
(55 mPhl
Fl�lll"@ 3 -
Existing G�c�metrics
& Tr�ff�c C�ntrol
(7�rir� T�ampsora EAIN
E�k Ftiver, MN �
Rrepared by �C�I
A�ari3 2f704
y`
; �--.-r��
,� ��
1
1
�
1
�
�
1
1
1
1
�
1
'
1
�
�
1
1
t
i
No Scale
g E 1
8
7 � � � � \
N P'! C
F�F f'1 1V .� ���
� � � — 2st�i3Q�
Candt2iMainSti , - �`�j7
ti�0 mphl �
791199 - ,I ; '
1 rJ$/3L12 — � � �
� sar�ss --w � �, �,
�����
Er .
� � ��
� E
N �
I � � .—vr�
: s � 0I1
Rd 13 vin �,akps R¢} Ch Iid 4O {OiV16 Slj
ISS�p1�I ;55mph1
�$� -1 0
i is —
�R�,1+�D fvi�l�h1.LY' ,�-s::;r� ,.. ,
0
�aa ; } N
m 'N'
�s����5•� ' � �
n.af7i.a�n,� 17�I Y .
, i • '�,n .� _..
� :�� 75���' - . �
� ' I � D1 �` � � 13 �
, , ��I $ � �,� �h ,� , . �4o r.
Uandero�urg ; Parker :. �
{p
Jupior i�pn �emerika� _ y�,;[k ;
Scfiaol '
;i 5chaal '� �
t��.,y�29t : � .�
^�th-�.t,-� '�''�r{' ' �
, i �kth u ; ` u+
-_ �:'—��SJ ■
�q'�. �:r �
i �f - T7Q0 "--' —�4�80�k- �
� 1�3 � ,'= ra�Jsrde I.., r � l i c= .
ii�.�. 'ij��'� f ,� G�!`4'p3�' �
�1.{1 km 4 `,'`. .,
Q.$ rra i �,r: � e
O �S:fl3 Panci !r�!iariy � " �aii}�O ��u� GD7. '.nt
� � �N �
� �
n � � rnM
- JWE�
! � � — ���1$2
' — 33�11
��b fiE 1 �' ��Mi�M1 $1
1� mph)
���� - - '�,1 �
ff}7f287 — � � rn
77194 4 � �
mS.v��
�� v /
Legend
2�0� AM Peak Haur
� 2�a4 PN1 Peak Hour
xxx�Yr�r
� xxx = Daily traffic valumes frc�m MnfDC]T tra�� flow
maps. TH �69 caur�ts �re frvm �QQ2, �alf ot�ers
are fram 1999.
/i�W.'.fJ✓ "3:� ��{lRQ �7V1'�
�I
i �-Iih Lri
�
i
11
�1
il,
�•IB�th µv ;
a�,� p�fi i�
48�0 1'i I :t
� � 83 J
L�`'.., , . .
-rf.. ,�. . ..
N
Na"
i _' 1�
� — z,���
Nu P 2 -Yain St+
i� m�� /
7f7
151i337 -
Figure 4 -
�xisting Traffic
Vol u m�s
Orrin Thom�son EAW
Elk Ri�rer, MN •
�.`J� _
�;.�
,.f
, �,� �
�
Prepared by Tdl
April 2�04
�
1
�
i
'
�
�
�
1
�
Table 1— Exis#in AM Peak Hour LOS Resr�lts
fnt�ersect�on 2Q(�4 A,M. Pea1c Hvur
TH 169 �nd Count R�ad 12 (Main Street� B
County Road 12 �Main Street} ar�d Cr�unty Road R
13 [Line Avenue}
Gaunty �aad 12 (Main 5#reet� and County Road �,A,
40 (C1eveland Street
County Road 13 (Twin Lakes R�rad} and County �,�,
Raad 4{� (Davis Street�
The first L05 gi�es the Lt'�S for #he Enters��ti�n and the second LC}S gives tl�e 'L�S fQr the
stapped apprc�ach.
Table 2— Existin PM Pea'k Hvur L�JS Resul#s
Intersec#ian ` 20�4 P.M. Peak Hour
TH 1.69 and Count Rc�ad 12 (Mai� Street� C
Cou�ty Ro�d 1� 4Main Street} and Coun#y Roac! B
13 (Line Avenue}
County Rc�ad 12 (Mair� Stree#} and County Raad ��,
4f� [Cleveiand Streei}
C�unty Raad 13 (Twin Lak�s Road} and Cp�nty Ajg,
Rr�ad 4� {Qav�is Sire�t}
The first LDS gi��s the LC3S f�r the intersection and the seeond LDS giv�s the LUS fflr the
stapped approach.
The current Annual �ai}y Traffic Vc�lume (A�T) for the area ro�dways are shown
' in Figure 4. The TH 169 A�Ts are 2aa2 traffic volumes and the �esf af the ADTs
�re from 1999. T�rese AClTs are from the most current MnIDQT traffic flow maps.
�
'
�
�
�
�
�
�
�-, ����. 7�Ra FFlC FC7RECA S fS
u yr°�
`�'�` A trip generat3or� analysis was perf�rmed €ar the site based on ttte m�th�ds and
rates published pn the !T� Trrp GeneratrQn Mancral, 7r" Edition. T�e trip
g��eration for the prr��osed developme�t �s shown in Table 3.
Table 3 - Trip Gener�tivn
ITE Tri Rafes
Land Daily AM Peak H�ur PM Peak Hour
11s� Descri tivn Tri s* �n Out En C3u�
�� � Single Famiiy Homes ��4,� �,p� 30� 35�
�47 Units
��� ftesidential Townhornes �,��� �2 64 5�
('f74 Ur�its}
TDTAL A�aED TRIP� B2EQ 11fi 37{� 411
* Daily trips are round trips — one car in plus auf af the home {i.e. 1,fi�fl daily trips = 8�� vehicles}
2fl�
3 (l
�3�
�rrin Tlaornpsan Homes, �!k f2iver MN 5 �AW Appendix A
tTraffic lmpacf Report Aprr! �004
1
�
�
1
Traffic farecasts were developed for the year 2�11 and �Q24. A 3.5°�a ye�riy
growth rat� w2�s us�d to a�count for grawth in background traffic on the are�
roadways. This grflwth factor is cansist�nt with MnIDOT's current projection
fact�r fc�r Sherburne Gaunty as well as MnIDC}T's Hrghway fif19l7�9 Corrrdor Pfan
dated Aprif �a��.
The �irectional trip di�tributtc�ns fnr tt�e uses in Table 3 are shown in �igure 5.
� The trip c�istri�utians for the sit� are �ased on exisiing travel pafterns in the area.
The combinatian of �ackgraund traffic and tri�as generat�d �y the propqsed
develc�pment are sh4wn ir� the traffic �orecasts �n �igures 6 thr�ugk� 11.
�
i
'
�
1
�
�
�
1
�
1
1
�
�. r�aFF�c oPF�� f�vnrs anr�►L ysrs
Ti�e traffic f�r�Casts shown on Figures 6 thrc�ugh 9 were used with the existing
traffic cor�tro4 arrd lane �onfigurations shQwn in Figure 3 to �afcufate LQS grades
for the faur existir�g study intersectioras. It is assu�ned that the �roposed Nort�
R�ad and 5out� Rc��d ir�tersectiQe�s �n Caunty Road 40 will cansist of ane
eastbaund shared rightlthrnughlleft lane that is stop eflntrolled, sne north�b�und
throughf�eft �ane that is fr�e flr�w, and ane s�uthbaur�d thrflughlright lan� that is
free flow. The results �re sh�wn in Tables 4 and 5.
Tahle 4— Fvrecasteci AM Peak Haur L�S Results
Intersection 2Q11 2011 2D24 2b�4
No-Suild Build No-Buied �uild
TH 169 �nd County Raad 12 C � � �
MaFn Street
County I�c�ad 12 {Main 5treet} and A S g B
Caunt Ro�d 13 Line Avenue
�aunty 9�o�d 12 (Main Street} and ��' ,��'B' AlB� AIG'
Coun# �toad 40 {Cleveland 5tree#
Caun#y'�oad 13 {Twin Lakes Road} A!B' AIB, AIB, A1G'
and Gount Raad 4i} Davis Stree#
�aunty Rnad 4t} �Davis 5treet) and �!a AIA' nla AlA'
ro osed Nr�rth Road
Gaunty Raad 40 �Qavis 5treet} and �f� p,�q� nla AJA'
rQ osed South Road
"fhe first LOS gives the L(]S for the intersection and the second L(7S gi�es the L�5 for the
stopped approach.
' CJrrrrr Th�rnpson Homes, E�k River, I'VJN 7 EAW Appenclix A
Traf�ic tmpac� Report Aprrl 20t]4
v�i �� ���.� i � ir�GY�� . , ::;r
I BB __
+� .- � � �`r,
t4�
,i ry0
r-ii�ill.a��,n «.e •�: �.. J,O
; i':i �:r��rtn �;. ...,,..
n �� �ie�2!'l.2?� �� .. .
� � '��`� 13
J . �Q� E._�i.iih ?5 e
"{,r�ndenl�urg Parher. �Qa�D
. Ju�ior h;�, 9ernerrta,
SCIIUQI �: SCIlO9� �
i � � � `�
I z+urs�3tl3 � -
••Jitl' ��t.- Adffi
- II —�� -#tl"r wI .���,
� Main St: �
:��Y
' i.: . V '.. -'- __' _' _
1. ��il `~ �°I�U�isY dr`
�-r_v _,
� .. �?�ly�, 4- ".ilh
� I :0 �km
4.3 rnri� '':,,.:,,'",
a��3 Rand t�Na�y � C�rreyaiiy � ��� GQT, :nc
Si#e Location; �/
Drrir� Thom�rs�an Harnes
�35C rl{'FR
ar'rrs
�.��u.��w R'a�� Viking Bl�d
� QIG
1-:]^�Th I.�•
i
o �
a �I �,`
� I�� 113-Ftf� . �
��i
'��°�a - �����
__- � 1 � ! it .�:.�
- _ ---'� �-�
��;,nli+�e.�; .,, 83
����r `{�`, '
- _ e: •
r. _,.. . , ' . .�,+n �P�
Nate: 5°I'o af trips are internal.
Figure 5 -
Tri p D�stri k�utions
Qrrin Thompson ERW
E!k River, MN
��
Prepared by T�l r �`
�'�.- _. �
Aprif 2004 " `7` '�,
� W.�� :
ti�
�
'
�
1
1
�
�
1
'
�
1
1
1
,
�
�
1
�
�
�
1
No 5cak
� �� \
���s�
���
N C N - '�JI�S
,' I I` — 325r475
� __ _ 2{}�2�
Co Rd 1� �Main S��
�so �n> '
9aJ135 � ' ��� � '
5951245— o e� r
22SI225 - M � �
4��ryn
ti� I
'� �� �.•�� i � ii lI1 '. r=5
1�� �
^y3U,•3
ni�rtr;�n I; i II �r
.� L iIl , ".�� ,�.v 3�..�3'8
� ,,+ri.�l '`.�iP lA.� 's�� �i� F r..
�� � �a�i �'kx,
�:;: , ; �. ; � �n r1�
iPa�dwnhu� 'parker+.', �
School� 9emerrcary �
i. ': Schovl
,� i.art�tlr �t ;�� �' y'•
�5#h-Sic.-_ R� �� ��s -
-__ i� �th St :` F�
- i . �, Eh, , �,
`•-..i�-..::-�.::; biiilli $ ?.
���11 �3c��5 � � ,,.
�� �il . � ��,�I 7 � �_ ,
i41 `-: j I �`•= huS'side
'.�;�a 'k���� 1�� G'i3V fTdF�'
�1.o s��, :
a.� m:;j ::,�j
C7 :Q�03 Rand i�kHaiy 3� m�apany O �t�4? Gn'f. �re
Q Q�
o �nr �
u� � av
�' m � ` 741180
I I I' — Z�Q���
� � — 435l5�
� o ftd 0 y tM'ain $7
i+d mphl .. I r
45145 -- -
13i7114D '
�95195—, ���
1f11 p
a � � � 6
_ � /
Legend
2[�� 1 No-6uild
� ��i 1 Build
7CXXIYYY
� �
� ��
�
�� -
I , -- 5l10
— 5l16$
13 win Lokas RAy� Co Rd40 ({Tavis Stj
f55myhj [`��Gh1
12C1112i5 �' J
�50 � /
�St TJVt�
�!T 5
. �O C117 j+ f .777e`
/ �
�, -
�,
� � �� �
C �1
NaM Rd r I �
!]9 mphi .
n!al16� - - I
nlaf24 -. es �n
` e �
\ �.
Vikino 8lvd
]�3�ih Lr
�i� 18-1th A� �
8��xx—E
— — -- - — --- !I —v
_ 131st.-�
_ f.c—�^�
�v3iifla� .��v �� ���r� 83
.,�S,.J � c3��,�i - ...i9�S: °a � ��r
:: �.: I
�, 7 t h,:k ,. : :; S„ '�
� �
u'r
� a ��
� 4 U
�r�
I � _ - �,5
, . -- 2F5I255
Rtl 12 MsM S1'
{se �p�� �
rJ��JFJ .-�
19l31190 —
I �
�� A�
m�y � E
C u7 v
JI I � �_
G
Sauth Rd
��m�� . ,
nlal5 - -'
n1al1fi5—. I a
u'Y CV
� � S
Figure fi -
7�'I '� A.Itill. Peak
Haur Traffic Vvlume�
Qrt'in Thomps�rn EA1N
Eik River, MN •
;���
Prepared by TQ!
April 20Q4 �_�
'
�
'
�
'
1
�
1
�
�
1
'
�
1
�
1
'
1
�
�
l
N 6 $Cd�2
�t] 4 E �
N � � � `? �
�u"3a
r �L 'P -�. �Qi��
sQi
+ �� — 38014�5
l — zvrza
co ae , x rMa��
I49 rnph} r
��r�,� ___.f- '� 1
394I560 —
49�5149�5 - y N p
� � o � w
ti � � '
�nPwi�sJ k'TA'UII.W I ��!�]t� H�� =':1
� 4 =z
IBB �
' � � F,•�
1s-
�„s�n,.��,, ,,;� jl1 ., �'�
, �YI ��'ndA,y�y
�I iJ�P. �.Ei� ''15"�'t'F';,
o � 4�' j'�
� J �o � Ch[h lyy i lr
s
llandenhurg 'Parker�i`, r r;;9'�
Ju5 h4o� �emeritary � v
il5qhoaf - ^
�� lions�tYti vt ��,J `� .c.✓,'
�th=5�-.._ �� 4� �r� �r'"
-- ' -'� =�fh St i� �
I "r
_ .A" I �ilfl g�
��:��`.. _-- 3f
. .. �^ I�" ����I � y i:,.�. 16
'� 1' � � �II �..
',I �i' . I :. t�ikHS�dA
�,f � ;f � 4 ;+' �.1y f�.�'
�� 1.�1 km
0.5 me��
O ��@3 Pantl?�Na3y & �paeiy Q:�QS GAi. ��e
� � �
�u�r3
�' a' `� 3fiD1430
I � ^ 350137D
r r '� -- i��.i�
Ca Rd 17 �Main 5t �
140 mpnk ,
730I130 —+ I + II
3i�a _- -_
i �si„s � � �; ^
�E����
� v N
Legend
2D11 No-Build
�—�--- 2Q11 Bui{t�
x��r
� �
O Q
� =, aE
���
��
� V
Sanh Rd
!]0 mphl . .
nlal5 — '
nlal'S14 --. � �
` �d
`
Fi�ur� 7 -
� � 1 �I P. IVI . '�ea k
H�ur Traffi�c Vvlumes
qrrin T�ompsan EAW
Elk Ri►rer, MN • �.
Prepared by Taf
April 2004
_ �.
l.�'����;
, �
/ �
O 1 �
� E
Q �f] �f'
N 4F1 � ~-
� .— s�i o
,� ,Y � ^ si� os
37 i7+xn l�kes fid! Ca Rd d17 Oxris St1
�$5 �) p55 mph�
350f356 �' '
5118[7 �
l:ist �i�vr
i�kes
= i:aur�ty P.x�
/ a�
/ � �!
f r` $
0
� N o �
C O o
I � � n
�
Noim ate
faa m�n� t' I
ft���� �'
nIa170—. o �n
� �o
'v��,�o �i,�a
�n
jl �.
Ivanli�e .=�.,
18�th AV
��� pyvtK I
\ J i��5i.`�.
.. _ _....LJ-,;
i`',r
�r�� 83
�r` �}F• �� '�a�3 .._
vl
�'3th. ,;';t�� �
� � �
«
U �
ov �
� � V
. �- TJ`!��'iJ
, ^ 3601364
Ca Rd 12 Main St�
�� ��� _ !
101180 -
. 4201420 --
�
�
L�
�
�
�
�
�
�
1
�
r
�
�
,
�
�
1
�
��� 4 E �
�fY �i} tf7 Ei�^
� O � �
aJ �i1 �l3
C11fi f7 ._. ���20
� I — aa0�5so
E { I� - 25125
Rd 1$ {1Aain S
iso,�v��
� ^GUI� 6�J --' .� i Ir
2fi51395 -
345I305 --. n �" �
� �
�� �NT�
e .� �
� � �a
� E
� a u.
yn O
�� -
� . — 5t10
-- 51165
ftd r � CTw�n l�kez Ra), Co- Idd aa tflavis 5t1
�SSmpllj 155mph3
1641160 -' /
10155 — �
�IlP'LIYLf 11'I`SYILL.L3 �t-GiR � .
�a€� -
� ti'� �� '
,- ��'nl.ii�,7 r7�E �_'.;:
�, y . '. n i�:, i: �a a'.
y� ; �� l2.�J - ,. _ --. :.
�� , • i3
J ��� '.�,
/ �
� i�
f6COV � €
c �`n �
i �
lr �
NoM Rd
�70mp�j �
fl�ai'��-� . .I �
nfal2D -. o T
� �o
� E75t : dr+;-
: lkes
:'.•rmfv °.a.'� Vikinp 91rd
" �'��tf� !..'
� ;
��rn , �:
� �andentrurg Parirer . �. .
JuSchaol� �em�rnary n
� �chool ,
i�a^s�jkii �t �' ,/'',
7tl1�.4;i _ P31iS� a'�
N45cale �k�1 �l j I�-Itll.+'.� :
. ��:.:... iY�t�fi .�i . _ �=�pf�'i �I
� M
- - �?dt_ ��— --- �dfl�4 ---
��` ��;; �, I'8 I st .
I� i� - ''�1'T�.. ._ ..... ---��_
Ysl �
;I " "-� FbiYsirle I.�anfi�a B3
�s� jf�' Cdf��.�a � �� „
1.0 km ' �" ��
��!�i� Y ' � _. r.
o •'rr
02Ca3 Ra�3d 3�A�,Va�y 5; ��y O:;rG� G01', ta� �.,�sn �t,. ' ,�h �_�.
i`7 N 67 �
r � [}1
� N N
,oarzio
— 325f355
Co Rd 13 MslR�St ' + - $7Q���
lW�mvh1 ,. i
65165 — ' � �
�17p178d f
130I130 -, � � r�"
, ,� r- m
� � E~ � n /
Legenc�
2�24 Na-�uiid
� 2474 Build
xX�uY�'Y
�
o�
� E
"n v�
v
V1 N
� .-_. rJl�i'rJ
— 36513�65
Rd 12 N1ain 3'
(55 mph} �
SjTJ�J -' -'
255f255 --
� � ._
y
W�$�
� ��
! �V
SWth 1tq '
I]0 mphl !
nIa15 -- `` �
I
nJa1765 — . � o
N
� C �
Figure 8 R
�U�4 A.I�I. Peak
Haur Traffic Volumes
(]nrin Thpmpson EAW
Elk RiVer, MN •
�,��--�;_
Prepared by TQI : ��, `��
� ��' �
April 2044 �
1
� � Y�
��
���E
��
���
Hufh Rd `
,�
i39 mPn} ` I
Ill�l°i QQ —'" �
n1af7Q -. O sn
N �
� C �
�
I
No Srale
qTrt+'A�'1�./ �SWWIdR
6th-�
Cranho� =�°� fr� 83
,,7
o a�`'� r ' � �rL�l '9 i
�,'• e � �9
���th I7.�,� j -:.�h'�
181st,��
�
r� ii;,;
� .o k�
-�0 5 metl
IJ ��3 Ransi �a�aily 3
`? � � "= 3�+side
0' l:sfy �dl7�'
r�
paeiy C�3Z�Q2 GDT, �
��ec e �d
2Q24 No-Buiid
� 2D24 Build
xxx�YYY
` �
3 --
� E
Q � a
si
u� �
I I — �a5
� — 4901490
R�tl ] 2 hlain 5!�
fS5 mph3 �
3UJ�84 --'
5751575 --
18-+th .� �
Blyd
:.� 3r
/' ��n �
R � Q E
L �r
I I ��
Saulh Rd ' �
f70 mph] ,
nlaf5—' I I
�r�r,�a—, o a
� C a
Figure 9 -
��24 P.M. Peak
Hvur Traific V'olumes
Qnrin Thvmpsv� EAW
Efk Ri�er, MN �
r,
ff�
.� �.-..,�Y,�.
Prepared by TD! , :
�
April 2�04 �� � �
' L.3Sf {l!'�SR
idk25
c'a�nFy �at� V
��.�=--- — --
i !i
I €��FTh Lry
�
�
,
�
�
1
�
�
1
1
1
�
�
1
�
�
�
�
i
�
�
H o Sca�€
�RAND A�NAI.L7f ;¢i ,..Utr� .:;$ �.; $ �st ;w�
� p, _arv�s
189 `g __ Cuvnry f'a�ie
N � �_-_---:: �...
� ��;g3��`' ■ I
ni�nta�� fa,�, [fl - � S'�-1T
�r� �� '� �nu qy � •�' �� I I�
y � � i i arrfrefd � g - . ...- - — -- o i
�� �� ��''�' 1 3 3 � �
�_5' � 29t `;"., m a.�qtn .+a,� h �, i
1�'a�denhti�rg ;Parker'�� _ +�
Junior Ffi�qh gem�rrt ' r �i
ll chaal Fi Schma! � P� Oo� f l
� � i
llons�ith �t � o i,
�I P� �.s; � . � �
•°�th-a#�.- _ �.�•;'� e�
,y I
_:j; _ y. , �t i-• � �y i
_ _ ..�0�� r ��
r � _ � �� �7�0�l9500 SBDOff406 =
? ^ �t!- r�: _....._ , -=��
�, II _t . . �P�� ..
i I � l � � p6�T+�pp � v a n h c� 'r .K'v t sr; B 3
��:'$ L yj t3 � :�,Er F arde c, �� - F�.,� i
� 1.� !cm ' � J a�� �'��
0.5 rrilj J� "`'�w
O�{!L'3 F.and �.1�l�agy 3� Carama� O�;YO� G �T. nc �'� rh
m
Vikina 91rd
�: k
__- -4th .:t r}, � � � i8-4th kv
L, egend
2�11 No-Build
� 2011 Build
Y.X)CfYYY
� a » ,�..y
��: ''� �i S }: Y
„ � r.
Fic�ure �I � -
2�'I'f Da�ly
Traffic llolumes
i
Drrin Thampsvn EAVI! i
Elk River, MN � �
��
��'�- �,;..?
Prepared by T[]I ;�
�
Apnl 2C104 �` _ ;
�
I
Nq Scale
� Ft,4t�3D MsNA.[.i�
niyf7da � I� _� ill3
m ���
• fL'� � �1 '�7i
� :'n
'+n ;
1k�deniwr� rparker`
Juni�r l�igh �e��:
II chaol ;� �ehod
II fsons"3Sh � �
�thaat_ . Pa+�.
_ �I . . -tth :=�
� "i,. _ ��` •�: ws�
���4tI3 .4".'Z t�i 'G �'St fieNf
� -.. .'�.�i�L�'�
'I o „� 4-JlA=lY �.il3k' 1/i�L1I40 B�Yd
p�. .:- - � ..�-:.-._�,__
y+�' r � * F .."'_ .._...�.._-.__' —. —_
7�.. _;� �J-Fth Ln
<nb,ar f ;
--_�' � `f �': J' - - I,
,�'_—F2s`Ll ���-�. . -. --. q �
�
�' �. ��, pqrt' 1 ",+F
`� �7 Sjt i1',, pa7 � 1
r '_ � { yi�i
r I
7 �� ' �
� ,�s .
c'r� . � � o � rir ,
c � a � il
�� � � II
l 'T] � � �-� l8�tF1 :�Y
�'Y £�= ■ � s pha►yl�
, w�, ,sr I Flµ�-��'��
t�i 920Q1977D0 9Qp0i9i6Q0��—
_ 1$ist.=�;
j 7 �..�—� . . - - — T���-�-�
r1.�
■� ' I anha�. "'•„ 83
+f �'.��� � FG' �
v�`#r,v /l�,y ,: i�:5: i.:: .
�DiVV� iJ�T. �JC. ,�"� � ••�Ci1 :l'y I i �h �
1 �il
19 �
�i,�����,i
�1.� kFm "
0."� iiy�l '' ��.
� ��3 Pand !�ie "ia�y 3 C�
Leger�d
za24 �vo-s��id
� 2a�4 �B�,�Ea
X�}ilYYY
Figure 1'1 -
�4Z4 Uaiiy
Traffi�c V�lumes
(3rrin Thompson E�IW
Elk River, MN •
_ `,._>:.
,' �� � 4;
�
�r�pared by T�I
April 2DCi4
�
�
�
�
1
�
'
1
,
�
�
�
�
�
�
'
�
�
1
�
Table a— Forecasted PM Peak Hot�r LOS Results
[ntersection �01'� 2011 202� 2024
No-Build BGiICS N�-8uilc! Build
�H 1�9 and County Raad 12 E E F F
Main St�ee#y
Caunty Road 12 [Main Streetj and 8 C C D
Count Road �3 Line Avenu�
County Road �2 (Main 5tre�tj �nd ��, �,�, ��, ��;
Count Road 4CJ �C�eveiand Street
Caunty Rpad 13 (7win �akes Roadj �g' �G' AIB' AIC'
and Count i�oad 40 C]avis Street)
Cau�ty Ra�d 4� [i�a�is Streetj and n!� P,1�1 nla AIB'
pro osed Narth Raad
Caunty Rg�d 40 (C7avis Streety and nf� A!A' nfa AIA'
ro osed 5outh Road
The first LQ5 gives the L05 fpr the ir�t�rsect�on and the second L�S gives the Lc]S for the
stopped approach.
The Leve! of 5ervice Calculati�ns are in the Appendix. They include LDS
calculatiQns for each intersectian appraach.
Fc�r gene�al planning purposes, upgra�ing a#wo-lane raadway ta a fot�r-lane
roadway should be consi�ered w��n the AADT is apprmximate�y 1 �,(]QD vehfcfes.
An undivrded four-6ane raa�way s�au�d be cansidered for improvement to a
divic�ed f�ur-lane roadway when the AADT app�aach�s 18,OOQ vehicles. Thes�
are generai pGanning rules. TH �L1 aperates successfully south of TH 5 in Chaska
as � two-lane roadway and it Garries aver 1�,�0[� v�hicles p�r d�y. The number
af access points and the traffic cor�traE at the acc�:ss poi�ts generally dictat�s a
corrid�r's capacity. The �iaily traf�ic forecasts ar� shown in Figur�s 10 and 11.
The twa lane sections of Caunty Road 12 �Ma�n Street� and C�unty Road 13
�Line Aven�efTwir� L�kes Road} east of their intersectian are fQrecaste� to carry
approximately 1�,fl00 vehicles under the 2024 build scenaria and 9000 vehicles
urrder the na-build scenario.
5. Mifiga�r`vn lNeasures
TH 169lCount Road 12 Main Street Intersection
A!I of tF�e study interseGtions will operate at �05 D or better in the 2{]24 BuiEd
pe�k hours exGept the inters�ctior� af TH 169 and Caunty Raad �� (M�in Str�etJ.
This intersectian will aperate at an ur�acceptahle Leve! of Service E in 2011
whether the Orrin T�arr�pson Mames �re built Qr nat. 'Nlnl❑�T's Aprii 20D2
Nrghway 1Q71169 Corridor Plan dacumented strat�gies far prese�ring TH 169 as
an Int�rregiona! Carridar from Roge�s ia Princetor�. The plan �ocumer�ts tt�irteer�
patenti�l highw�y capaeity improvemer�# prajecfs �I�ng the carrida�. lJpgrading
the TH 1�'�1County Road 12 (Main Street) inters�ctiar� tfl ar� inter�char�ge and
adding an aver��ss at Schoal S#reet had the third b��t Benef�t-Cost Rat€o of the
Orrin Thom,�son Nomes, Elk F2iver, MN 15 EAW Appendix A
Traffrc Impac� Re,�art Apri� 2D04
'
�
'
�
1
�
�
�
�
thirteen �rajects. The intersection v+rill operate acceptably if an int�rchange is
cor�structed.
Gount Raad 13 Twin Lakes Rc�ad ICaunt Ro�d 4� Da�is �treet Intersection
Th�s intersection is �urr�r�tly a"y-intersec#ion" as shflwn in Figure 3, This is
c�rrently acce�ta�le because there is [itt4e traffic on Caunty Raad 4D. !t is
recommended that Caunty Road 4� �e recar��igured to tee inta Caun#y R�ad 1�
at a 90 degree an�le fc�r safety purpc�ses.
Count Road �� Main St�eet ICount Road 4(� Cfeveland Street In#ersectic�n
This int�rse�tion will operate at an acceptable Level c�f Service �n �024 with �he
existin� canfiguratian. Hawever, the increa�e in tra�fic with k�uild-out of the
develapment cQmbined with the 55-mph speed Irmit will pr�:sent a safety hazar�.
An e�stbound k�ypass lane shcruFd be built to County �tand�rds at �he
i�tersection.
Countv Road 12 (Main Street} �ast af Caunty I�oad 13 (Li�e Avenue�
Na impravements to the roadway are curr�:ntfy necessary, ��t this roadway
shauld be manitared over the nex� iw�nty years for prassible improvement. The
2024 �uild vol�mes may require additianal lan�s.
County Road 13 (L�ne Avenue� nflrth�east af Ga�nty Raad 12 (Mair� Street}
' Nfl impro��ments to the roadway are currer�tly necessary, �ut t'�is roadway
shaufd be morritored caver the next tweraty years for p�ss�ble impravement. The
2D�4 Build volumes may requ€re additia�ai ianes.
�
'
�
Gaunt R�ad 4� Cleveland 5t�eetlDavis Street between Count Ro�d 12 and
Caunty F�oad 13
This roadway v+rifl carry over 30�[l �e1�i�les per day when the develapment is
�uilt-out. It should be paved as a two-lane rural roadway.
6. Cvnclusiorrs and Recommerrda��vns
� drrrn Thompsan Homes is propasing tQ �uild a residentia! development on the
Miske Properky dacated sca�th c�f �ounty Raad � 3�Twin Lakes RQadj �nd west of
County Road 4q (Davis Str��t} in E3k Rdver, �VIN, The s�ie is currently �ccupied
by arte farmstead, T�he proposed develapment will include 547 single family
� hom�s and 174 town�omes. This repc�rk addresses the traffic impact af the
p{opased �evelr pment on th�e area roadway n�twork.
1
�
�
Bas�d an the �bQv� trafFic ar��lysis, foll�wing are au� recammendatians:
■ TH 1691Cou�ty Raad 12 �Ma�n Street} IntersectiaR: 'Upgrade the in�ersectian
to an interchar�ge pe� MnIDQT's A�ril 2QD� Nighw�y 10�I169 Corridor Plan.
The ir�ters�ctian wiil be t�ver �apacity with ar withaut thi� deuelc�pmer�� in
2011. T�his dev�lopment is nat respansible far the conges�ion at thi$
intersection.
�rrin T�rompson 1-fo.mes: Efk Rr�er, MN 1�6 EAW Appendix A
' Traffrc lmpact F2eporf April 2004
,
�
1
�
�
�
'
�
�
1
�
1
�
1
�
�
�
'
• Co�anty Road 13 (Twin Lakes Ro�d}ICounty Rr�ad 4D (aaUis Street)
Intersec#ion; Recanfigure County Road �CJ t❑ tee i�to County Road 13 at a 9D
degree angle.
• Gaunty Road 12 �Main Street)l��unty Rc�ad 4fJ �CleVeland 5treetj
Intersectian: Construct an east�oi�nd bypass lane to Cdunty standards at the
intersection.
• County Ro�� 1�(Main Street} east af County Ro�d 13 (�ine Avenue} and
County Rc�ad � 3(Line Avenue} northeast of County Raad � 2(Main Str�et}
Mo�itor these rc�adways o�rer the next twenty years far passibie improvement.
7he 2D24 Build volumes may require add�tiona{ fanes.
• Caunty Raad 4D (CCeveland S#reetlaaWis S#reet� between Cou�ty F�aad 1�
�nd Caunty Raad �3: This rQadway shc�uld be paved as a two-lane rural
raadway.
� Jrrin Thompson ff�mes, E!k River, IV1N 17 EAVf�Ap,nendrx A
Tra�frc lmpaci R�por� Aprrf 2(�04
� Architecture + Engineering + Environmental + Planning Appendix E
South Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/03/22 * * *
01:00 0 0 0
02:00 0 0 0
03:00 0 0 0
04:00 0 3 3
05:00 0 15 8
06:00 0 34 17
07:00 0 82 19
08:00 0 87 20
09:00 0 69 14
10:00 0 20 15
11:00 0 44 10
12 PM 0 40 9
13:00 0 31 9
14:00 0 49 17
15:00 0 88 37
16:00 1 76 19
17:00 0 72 20
18:00 0 50 13
19:00 1 45 20
20:00 0 38 12
21:00 1 25 2
22:00 0 8 2
23:00 0 8 0
Total 3 884 266
Percent 02% 71.1% 21.4%
AM 08:00 08:00
Peak
Vol. 87 20
PM 16:00 15:00 15:00
Peak
Vol. 1 88 37
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 6
0 1 1 0 1 0 0 0 0 0 0 26
0 2 0 0 0 1 0 0 0 0 0 54
1 2 1 0 0 0 0 0 0 1 0 106
1 1 0 0 0 0 0 0 0 1 1 111
2 2 1 0 2 0 0 0 0 1 0 91
0 3 0 0 0 0 0 0 0 1 2 41
1 2 0 0 1 0 0 0 0 1 1 60
1 0 1 0 1 2 0 0 0 1 1 56
0 3 0 0 1 0 0 0 0 1 3 48
1 3 2 1 1 0 0 0 0 0 1 75
4 3 0 0 0 0 0 0 0 � 5 138
1 4 2 0 2 0 0 0 0 0 4 109
0 0 0 0 0 0 0 0 0 0 1 93
0 3 0 0 0 0 0 0 0 0 0 66
0 0 0 0 0 0 0 0 0 0 0 66
0 0 0 0 0 0 0 0 0 0 1 51
0 0 0 0 0 0 0 0 0 0 1 29
0 0 0 0 0 0 0 0 0 0 0 10
0 0 0 0 0 0 0 0 0 0 0 8
12 29 8 1 9 3 0 0 0 8 21 1244
1.0°/a 2.3°/a 0.6°/a 0.1 °/a 0.7°/a 02°/a 0.0°/a 0.0°/a 0.0°/a 0.6°/a 1.7°/a
09:00 10:00 05:00 09:00 06:00
15:00 16:00 14:00 14:00 16:00 12:00
4 4 2 1 2 2
07:00 10:00 08:00
12:00 15:00 15:00
1 5 138
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
os:oo
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 2 0
0 1 0
0 1 0
0 0 2
0 3 1
1 16 11
0 44 22
0 85 23
0 86 28
0 70 23
0 33 18
0 30 18
0 42 14
0 38 12
1 46 17
0 87 28
1 65 20
1 93 26
0 62 26
3 47 10
0 36 14
0 24 5
0 9 1
0 2 2
7 922 321
0.5°/a 68.7°/a 23.9°/a
05:00
1
19:00
3
Buses
0
0
0
0
0
0
0
1
1
1
0
0
0
0
1
3
0
0
0
0
0
0
1
0
8
0.6°/a
08:00 08:00 07:00
86 28 1
17:00 15:00 15:00
93 28 3
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 1
0 0 0 1 0 0 0 0 0 0
1 1 0 0 0 0 0 0 1 0
3 0 0 0 0 0 0 0 1 1
3 0 0 0 0 0 0 0 1 0
1 1 0 0 0 0 0 0 1 1
1 2 0 1 0 0 0 0 0 0
3 2 0 0 0 0 0 0 1 1
1 1 0 1 3 0 0 0 1 0
1 3 0 1 0 0 0 0 1 0
4 3 0 1 0 0 0 0 1 3
2 0 0 1 0 0 0 0 1 7
0 1 0 0 0 0 0 0 0 3
2 0 0 1 0 0 0 0 0 2
4 1 0 0 0 0 0 0 0 1
2 0 0 1 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
28 15 0 8 3 0 0 0 9 21
2.1 °/a 1.1 °/a 0.0°/a 0.6°/a 02°/a 0.0°/a 0.0°/a 0.0°/a 0.7°/a 1.6°/a
07:00 10:00
3 2
14:00 13:00
4 3
05:00
1
12:00 12:00
1 3
Total
2
1
1
z
5
29
69
114
119
98
55
55
63
56
77
129
90
125
94
64
50
29
11
4
1342
06:00 04:00 08:00
1 1 119
12:00 15:00 15:00
1 7 129
SHERBURNE COUNTY PUBLIC WORKS Page 3
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 3 1 0 0 0 0 0 0 0 0 0 0 0 4
01:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 3
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 3
04:00 0 3 1 0 0 0 0 0 0 0 0 0 0 0 4
05:00 0 17 11 0 1 0 0 0 0 0 0 0 0 0 29
06:00 0 48 28 1 4 1 0 0 0 0 0 0 0 1 83
o�:oo 0 84 30 1 5 0 0 1 0 2 0 0 0 0 123
08:00 0 73 31 3 3 0 0 1 0 0 0 0 0 3 114
09:00 1 67 10 1 6 0 0 1 0 0 0 0 1 1 88
10:00 0 31 16 1 1 1 0 0 2 0 0 0 1 1 54
11:00 0 44 16 0 4 1 0 1 0 0 0 0 1 2 69
12 PM 0 41 12 0 4 1 0 0 3 0 0 0 1 0 62
13:00 1 54 17 1 4 2 0 0 0 0 0 0 1 1 81
14:00 0 47 14 1 4 2 0 0 1 0 0 0 0 2 71
15:00 3 82 42 3 5 2 0 1 2 0 0 0 1 9 150
16:00 2 81 20 0 2 0 0 0 1 0 0 0 0 2 108
17:00 0 82 27 1 1 0 0 0 0 0 0 0 0 4 115
18:00 2 56 16 0 4 1 0 0 0 0 0 0 0 0 79
19:00 0 39 14 0 2 0 0 0 0 0 0 0 0 0 55
20:00 0 43 8 0 2 0 0 0 0 0 0 0 0 0 53
21:00 0 25 9 0 1 0 0 1 0 0 0 0 0 0 36
22:00 0 13 4 0 0 0 0 0 0 0 0 0 0 0 17
23:00 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3
Total 9 939 330 13 53 11 0 6 9 2 0 0 6 26 1404
Percent 0.6°/a 66.9°/a 23.5°/a 0.9°/a 3.8% 0.8°/a 0.0°/a 0.4°/a 0.6°/a 0.1 °/a 0.0°/a 0.0°/a 0.4°/a 1.9°/a
AM 09:00 07:00 08:00 08:00 09:00 06:00 07:00 10:00 07:00 09:00 08:00 07:00
Peak
Vol. 1 84 31 3 6 1 1 2 2 1 3 123
PM 15:00 15:00 15:00 15:00 15:00 13:00 15:00 12:00 12:00 15:00 15:00
Peak
Vol. 3 82 42 3 5 2 1 3 1 9 150
Grand 19 2745 917 33 110 34 1 23 15 2 0 0 23 68 3990
Total
Percent 0.5°/a 68.8°/a 23.0°/a 0.8°/a 2.8°/a 0.9°/a 0.0°/a 0.6°/a 0.4°/a 0.1 °/a 0.0°/a 0.0°/a 0.6°/a 1.7°/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start
Time
05/03/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
os:oo
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 1 0
0 1 1
0 2 1
0 4 1
0 12 5
0 34 10
0 56 24
0 43 24
0 55 34
0 25 12
0 24 8
0 15 12
0 42 14
0 37 21
0 71 37
1 78 53
0 64 28
0 44 24
1 33 14
0 17 10
0 14 3
0 4 2
0 2 4
2 678 342
02°/a 58.0°/a 29.3°/a
07:00
56
16:00 16:00
1 78
Buses
0
0
0
0
0
2
3
0
6
0
1
1
0
3
3
2
0
0
0
0
0
0
0
21
1.8°/a
09:00 09:00
34 6
16:00 14:00
53 3
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
4 1 0 0 0 0 0 0 0 0
6 1 0 0 0 0 0 0 0 2
4 0 0 0 2 0 0 0 0 1
7 2 0 0 � o 0 0 0 0
4 0 0 0 2 0 0 0 0 0
4 0 0 1 1 0 0 0 0 0
5 1 0 0 1 0 0 0 0 0
4 0 0 1 1 0 0 0 0 1
5 1 0 0 2 0 0 0 0 0
11 2 0 0 2 0 0 0 0 7
8 1 0 0 0 0 0 0 0 5
5 0 0 1 0 0 0 0 0 1
7 0 0 0 0 0 0 0 0 0
2 0 0 1 0 0 0 0 0 1
2 0 0 0 0 0 0 0 0 1
1 0 0 0 0 0 0 0 0 1
1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
80 9 0 4 12 0 0 0 0 20
6.8% 0.8°/a 0.0°/a 0.3°/a 1.0°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.7°/a
09:00 09:00
7 2
15:00 15:00
11 2
11:00 08:00
1 2
13:00 14:00
1 2
Total
1
2
3
5
17
51
92
74
105
43
39
35
63
69
133
148
99
75
52
30
19
7
6
1168
07:00 09:00
2 105
15:00 16:00
7 148
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
os:oo
os:oo
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 1 0
0 1 0
0 1 1
0 1 0
0 2 0
0 11 8
0 30 10
0 54 27
0 50 21
0 60 30
0 19 16
0 30 25
0 31 13
1 23 10
2 47 19
1 74 31
2 84 68
0 82 37
0 40 19
1 28 16
0 29 3
0 13 5
0 8 1
0 3 2
7 722 362
0.5°/a 56.6°/a 28.4°/a
09:00
60
14:00 16:00
2 84
Buses
0
0
0
0
0
0
1
4
0
7
0
1
0
1
3
3
2
0
0
0
0
0
1
0
23
1.8°/a
09:00 09:00
30 7
16:00 14:00
68 3
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
3 1 0 0 2 0 0 0 0 0
9 2 0 0 2 0 0 0 0 1
� � o 0 2 1 0 0 0 4
4 0 0 2 2 0 0 0 0 0
3 0 1 1 2 0 0 0 0 1
6 1 0 1 1 0 0 0 0 0
6 3 0 2 2 0 0 0 0 0
5 3 0 1 1 0 0 0 0 4
6 2 0 1 0 0 0 0 0 4
14 1 0 3 1 0 0 0 0 2
10 1 0 3 0 0 0 0 0 0
3 1 0 1 0 0 0 0 0 0
8 2 0 1 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
93 18 1 17 15 1 0 0 0 16
7.3% 1.4°/a 0.1 °/a 1.3°/a 12°/a 0.1 °/a 0.0°/a 0.0°/a 0.0°/a 1.3°/a
08:00 08:00 11:00 10:00 07:00 09:00
9 2 1 2 2 1
16:00 13:00 16:00 13:00
14 3 3 2
Total
1
1
3
2
3
22
43
91
85
112
43
64
53
48
85
122
177
133
64
56
34
18
10
5
1275
09:00 09:00
4 112
14:00 16:00
4 177
SHERBURNE COUNTY PUBLIC WORKS Page 6
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 2 1 0 1 0 0 0 0 0 0 0 0 0 4
01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
02:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2
03:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
04:00 0 6 0 0 2 0 0 0 0 0 0 0 0 0 8
05:00 0 5 6 0 1 0 0 0 0 0 0 0 0 0 12
06:00 0 32 14 1 3 0 0 0 0 0 0 0 0 1 51
07:00 0 51 27 5 3 0 0 1 1 0 0 0 0 1 89
08:00 0 47 22 4 10 1 0 0 1 0 0 0 0 1 86
os:oo 0 67 28 6 s o 0 3 3 0 0 0 0 � 116
10:00 0 23 12 1 5 1 0 0 2 0 0 0 0 0 44
11:00 0 33 15 1 3 4 0 1 2 0 0 0 0 0 59
12 PM 0 32 11 0 8 2 0 1 2 0 0 0 0 1 57
13:00 0 28 15 1 5 1 0 3 2 0 0 0 0 0 55
14:00 0 48 24 4 11 4 0 2 4 0 0 0 0 1 98
15:00 0 85 39 4 15 2 0 1 1 0 0 0 0 6 153
16:00 2 97 50 3 s 1 0 2 3 0 0 0 0 0 166
17:00 0 75 37 0 16 2 0 2 0 0 0 0 0 1 133
18:00 1 37 21 0 7 1 0 0 0 0 0 0 0 0 67
19:00 0 37 9 0 6 0 0 0 0 0 0 0 0 0 52
20:00 0 21 11 0 3 0 0 0 0 0 0 0 0 0 35
21:00 0 15 8 0 0 0 0 0 0 0 0 0 0 0 23
22:00 0 4 3 0 0 0 0 0 0 0 0 0 0 0 7
23:00 0 5 3 0 0 0 0 0 0 0 0 0 0 0 8
Total 3 753 358 30 115 19 0 16 21 0 0 0 0 13 1328
Percent 02°/a 56.7°/a 27.0°/a 2.3°/a 8.7°/a 1.4°/a 0.0°/a 12°/a 1.6°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.0°/a
AM 09:00 09:00 09:00 08:00 11:00 09:00 09:00 06:00 09:00
Peak
Vol. 67 28 6 10 4 3 3 1 116
PM 16:00 16:00 16:00 14:00 17:00 14:00 13:00 14:00 15:00 16:00
Peak
Grand 12 2153 1062 74 288 46 1 37 48 1 0 0 0 49 3771
Total
Percent 0.3°/a 57.1 °/a 282°/a 2.0°/a 7.6°/a 12°/a 0.0°/a 1.0°/a 1.3°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.3°/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/03/22
01:00
02:00
03:00
04:00
05:00
06:00
o�:oo
os:oo
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 0 0
0 0 1
0 1 0
0 3 0
0 15 5
0 23 16
0 59 28
0 84 24
0 48 29
0 40 34
0 28 11
0 27 15
0 22 14
0 26 10
0 28 18
0 54 54
0 46 43
0 43 16
2 40 10
2 21 10
0 25 5
0 15 1
0 11 0
0 4 0
4 663 344
0.3°/a 51.0°/a 26.5°/a
07:00
84
18:00 15:00
2 54
Buses
0
0
0
0
0
0
0
0
0
1
1
0
1
0
0
6
2
1
0
0
0
0
0
0
12
0.9°/a
09:00 09:00
34 1
15:00 15:00
54 6
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
3 0 0 1 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
12 0 0 1 0 0 0 0 0 1
15 0 0 0 1 0 0 0 0 1
21 0 0 � o 0 0 0 1 0
12 0 0 1 0 0 0 0 1 1
15 0 0 3 2 0 0 0 � o
11 0 0 3 1 0 0 0 1 0
13 0 0 0 0 0 0 0 1 0
s o 0 2 2 1 0 0 1 2
9 0 0 1 1 0 0 0 1 1
14 1 0 2 0 0 0 0 1 2
19 0 0 2 0 0 0 0 0 4
19 2 0 4 0 0 0 0 0 4
14 0 0 0 0 0 0 0 0 2
8 0 0 1 0 0 0 0 0 2
9 0 0 0 0 0 0 0 0 0
9 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
216 3 0 22 7 1 0 0 8 20
16.6°/a 02°/a 0.0°/a 1.7°/a 0.5°/a 0.1 °/a 0.0°/a 0.0°/a 0.6°/a 1.5°/a
07:00
21
15:00 16:00
19 2
09:00 09:00
3 2
16:00 12:00 12:00
4 2 1
Total
0
1
1
7
23
53
104
131
92
96
56
56
53
49
66
139
120
76
63
42
39
16
13
4
1300
07:00 05:00 07:00
1 1 131
12:00 15:00 15:00
1 4 139
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
� 5:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 0 0
0 1 1
0 0 0
0 3 2
0 16 1
1 29 11
0 60 29
0 93 26
0 51 27
0 40 37
0 17 9
0 34 13
0 33 19
0 26 11
1 27 22
0 61 48
1 44 33
1 40 30
0 36 17
3 19 14
0 18 6
0 13 4
0 6 1
0 3 0
7 670 361
0.5°/a 49.9°/a 26.9°/a
05:00
1
19:00
3
Buses
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
9
2
0
0
0
0
0
0
0
13
1.0°/a
07:00 09:00 08:00
93 37 1
15:00 15:00 15:00
61 48 9
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
1 0 0 1 0 0 0 0 0 0
16 0 0 2 0 0 0 0 0 0
21 0 0 1 0 0 0 0 1 2
25 0 0 3 0 0 0 0 0 2
21 0 0 1 0 0 0 0 0 4
12 0 0 1 0 0 0 0 1 0
12 1 0 0 0 0 0 0 0 0
14 0 0 4 0 0 0 0 1 0
10 1 0 4 2 0 0 0 1 1
12 0 0 1 0 0 0 0 1 1
10 1 0 2 0 0 0 0 1 0
18 � o 0 0 1 0 0 0 0
18 2 0 0 0 0 0 0 0 2
14 0 0 2 0 0 0 0 0 3
10 0 0 2 0 0 0 0 0 0
9 0 0 0 0 0 0 0 0 0
s o 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
238 6 0 24 2 1 0 0 6 15
17.7°/a 0.4°/a 0.0°/a 1.8°/a 0.1 °/a 0.1 °/a 0.0°/a 0.0°/a 0.4°/a 1.1 °/a
07:00 10:00
25 1
15:00 16:00
18 2
11:00
4
12:00 12:00 15:00
4 2 1
Total
1
2
0
8
19
59
114
149
105
92
39
66
71
52
64
138
102
90
65
45
32
17
9
4
1343
06:00 08:00 07:00
1 4 149
12:00 17:00 15:00
1 3 138
SHERBURNE COUNTY PUBLIC WORKS Page 3
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
South Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 3 1 0 0 0 0 0 0 0 0 0 0 0 4
01:00 0 2 0 0 1 0 0 0 0 0 0 0 0 0 3
02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
03:00 0 5 1 0 3 0 0 0 0 0 0 0 0 0 9
04:00 0 10 7 0 3 0 0 0 0 0 0 0 0 0 20
05:00 0 33 12 0 17 0 0 0 0 0 0 0 0 0 62
06:00 0 55 28 3 23 0 0 3 0 0 0 0 0 0 112
o�:oo 0 90 2� � 30 0 0 2 1 1 0 0 0 2 154
08:00 0 28 50 1 28 0 0 1 0 0 0 0 0 5 113
09:00 0 27 60 0 19 0 0 2 0 0 0 0 1 0 109
10:00 1 19 23 1 18 0 0 0 1 0 0 0 1 0 64
11:00 0 23 25 0 8 0 0 3 0 0 0 0 1 2 62
12 PM 0 20 23 0 17 0 0 1 2 0 0 0 1 0 64
13:00 1 18 28 2 16 0 0 2 0 0 0 0 1 3 71
14:00 0 8 33 0 12 0 0 0 0 0 0 0 0 1 54
15:00 0 27 69 7 25 1 0 5 1 1 0 0 0 3 139
16:00 2 36 43 0 23 0 0 2 0 0 0 0 1 1 108
17:00 1 35 31 1 17 0 0 0 0 1 0 0 0 1 87
18:00 1 23 24 0 8 0 0 0 0 0 0 0 0 0 56
19:00 0 28 19 0 8 0 0 0 0 0 0 0 0 0 55
20:00 0 14 13 0 2 0 0 1 0 0 0 0 0 1 31
21:00 0 15 5 0 1 0 0 1 0 0 0 0 0 0 22
22:00 0 16 2 0 1 0 0 0 0 0 0 0 0 1 20
23:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Total 6 538 524 16 280 1 0 23 5 3 0 0 6 20 1422
Percent 0.4°/a 37.8°/a 36.8°/a 1.1 °/a 19.7°/a 0.1 °/a 0.0°/a 1.6°/a 0.4°/a 02°/a 0.0°/a 0.0°/a 0.4°/a 1.4°/a
AM 10:00 07:00 09:00 06:00 07:00 06:00 07:00 07:00 09:00 08:00 07:00
Peak
Vol. 1 90 60 3 30 3 1 1 1 5 154
PM 16:00 16:00 15:00 15:00 15:00 15:00 15:00 12:00 15:00 12:00 13:00 15:00
Peak
Grand 17 1871 1229 41 734 10 0 69 14 5 0 0 20 55 4065
Total
Percent 0.4°/a 46.0°/a 302°/a 1.0°/a 18.1 °/a 02°/a 0.0°/a 1.7°/a 0.3°/a 0.1 °/a 0.0°/a 0.0°/a 0.5°/a 1.4°/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
North Bound
Start
Time
05/03/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
os:oo
os:oo
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 1 0
0 0 0
0 1 1
0 0 0
0 0 1
0 1 1
0 19 8
0 25 19
1 50 41
2 19 15
0 13 15
0 15 11
2 16 8
0 30 18
1 38 22
0 50 45
1 57 42
0 55 34
0 40 32
2 35 28
1 28 16
0 19 15
0 15 7
0 3 2
10 530 381
0.8°/a 43.3°/a 31.1 °/a
09:00
2
12:00
2
Buses
0
0
0
0
0
0
2
2
5
0
0
0
0
0
3
5
1
0
0
0
0
0
0
0
18
1.5°/a
08:00 08:00 08:00
50 41 5
16:00 15:00 15:00
57 45 5
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
9 0 0 2 0 0 0 0 0 0
10 0 0 3 3 0 0 0 0 0
14 2 0 2 1 0 0 0 0 4
19 3 0 � 0 1 0 0 0 0
10 0 0 1 2 0 0 0 0 0
7 0 0 0 1 0 0 0 0 0
12 2 0 1 1 0 0 0 0 2
9 0 0 1 1 0 0 0 0 2
11 0 0 1 2 0 0 0 0 0
20 0 0 0 1 0 0 0 0 3
33 0 0 1 0 0 0 0 0 5
21 1 0 3 0 0 0 0 1 0
19 0 0 2 0 0 0 0 0 1
8 0 0 1 0 0 0 0 0 0
15 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
228 8 0 19 12 1 0 0 1 17
18.6% 0.7°/a 0.0°/a 1.6°/a 1.0°/a 0.1 °/a 0.0°/a 0.0°/a 0.1 °/a 1.4°/a
09:00 09:00
19 3
16:00 12:00
33 2
07:00 07:00 09:00
3 3 1
17:00 14:00
3 2
Total
2
0
4
0
2
3
40
62
120
so
41
34
44
61
78
124
140
115
94
74
60
36
25
6
1225
08:00 08:00
4 120
17:00 16:00 16:00
1 5 140
North Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/04/22 0 2 0
01:00 0 2 0
02:00 0 1 1
03:00 0 0 0
04:00 0 2 0
05:00 0 1 2
06:00 0 17 9
07:00 0 25 15
os:oo 0 49 44
09:00 0 14 18
10:00 0 13 10
11:00 0 17 17
12 PM 0 18 24
13:00 1 28 12
14:00 1 34 34
15:00 1 47 47
16:00 2 83 44
17:00 0 61 46
18:00 0 27 21
19:00 0 38 16
20:00 1 31 18
21:00 0 14 6
22:00 0 16 8
23:00 0 8 2
Total 6 548 394
Percent 0.5°/a 432°/a 31.1°/a
AM 08:00 08:00
Peak
Vol. 49 44
PM 16:00 16:00 15:00
Peak
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 1 0 0 0 0 0 0 0 0 0 3
0 0 0 0 0 0 0 0 0 0 0 2
0 2 0 0 0 0 0 0 0 0 0 4
0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 1 4
0 2 1 0 1 0 0 0 0 0 1 8
2 6 0 0 0 0 0 0 0 0 0 34
2 7 0 1 1 1 0 0 0 0 1 53
6 22 0 0 0 2 0 0 0 0 1 124
1 s o 0 3 2 1 0 0 0 0 47
0 8 0 0 0 2 0 0 0 0 0 33
0 10 0 0 1 2 0 0 0 0 0 47
1 10 0 0 0 2 0 0 0 0 1 56
0 11 1 0 1 2 0 0 0 0 0 56
4 16 1 0 1 1 5 0 0 0 0 97
6 17 2 0 2 2 1 0 0 0 3 128
2 41 0 0 5 0 0 0 0 0 1 178
0 22 1 0 1 0 0 0 0 0 1 132
0 18 1 0 0 0 0 0 0 0 0 67
0 18 0 0 1 0 0 0 0 0 0 73
0 9 0 0 0 0 0 0 0 0 0 59
0 6 0 0 0 0 0 0 0 0 0 26
0 2 0 0 1 0 0 0 0 0 0 27
0 0 0 0 0 0 0 0 0 0 0 10
24 237 7 1 18 16 7 0 0 0 10 1268
1.9°/a 18.7°/a 0.6°/a 0.1 °/a 1.4°/a 1.3°/a 0.6°/a 0.0°/a 0.0°/a 0.0°/a 0.8°/a
08:00 08:00 05:00 07:00 09:00 08:00 09:00 04:00 08:00
15:00 16:00 15:00 16:00 12:00 14:00 15:00 16:00
North Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/05/22 0 4 1
01:00 0 1 0
02:00 0 1 2
03:00 0 0 0
04:00 0 1 0
05:00 0 2 1
06:00 0 16 7
07:00 0 23 23
os:oo 0 24 64
os:oo 2 2� z�
10:00 0 11 20
11:00 0 14 18
12 PM 0 28 13
13:00 1 16 36
14:00 2 16 33
15:00 1 42 63
16:00 3 61 52
17:00 1 37 61
18:00 0 30 34
19:00 1 36 28
20:00 0 19 24
21:00 0 13 19
22:00 0 13 12
23:00 0 7 5
Total 11 436 543
Percent 0.8°/a 322°/a 402°/a
AM 09:00 08:00 08:00
Peak
Vol. 2 24 64
PM 16:00 16:00 15:00
Peak
Vol. 3 61 63
Grand 2� 1514 1318
Total
Percent 0.7% 39.4% 34.3%
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 6
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 2 0 0 0 0 0 0 0 0 0 7
0 0 0 0 0 0 0 0 0 0 0 1
0 1 0 0 0 0 0 0 0 0 0 4
0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 2
0 2 0 0 0 0 0 0 0 0 0 5
3 7 0 0 0 0 0 0 0 0 1 34
4 8 1 0 0 1 0 0 0 0 2 62
7 25 1 0 1 2 0 0 0 0 2 126
o �5 2 0 4 0 0 0 0 0 0 ��
2 12 1 0 1 2 0 0 0 0 1 50
1 7 0 0 2 4 0 0 0 0 2 48
0 11 1 0 1 2 0 0 0 0 0 56
1 16 2 0 2 1 0 0 0 0 1 76
4 15 2 0 2 2 0 0 0 0 1 77
7 33 0 0 1 1 0 0 0 0 4 152
3 39 3 0 1 2 0 0 0 0 2 166
0 25 0 0 1 1 0 0 0 0 1 127
0 18 0 0 0 0 0 0 0 0 0 82
0 10 0 0 0 0 0 0 0 0 1 76
0 5 0 0 1 0 0 0 0 0 0 49
0 4 0 0 0 0 0 0 0 0 0 36
0 4 0 0 1 0 0 0 0 0 1 31
0 2 0 0 0 0 0 0 0 0 0 14
32 262 13 0 18 18 0 0 0 0 19 1352
2.4°/a 19.4% 1.0°/a 0.0°/a 1.3°/a 1.3°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.4°/a
08:00 08:00 09:00 09:00 11:00 07:00 08:00
7 25 2 4 4 2 126
15:00 16:00 16:00 13:00 12:00 15:00 16:00
7 39 3 2 2 4 166
74 727 28 1 55 46 8 0 0 1 46 3845
1.9°/a 18.9°/a 0.7°/a 0.0°/a 1.4°/a 12°/a 02°/a 0.0°/a 0.0°/a 0.0°/a 12°/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/03/22
01:00
02:00
03:00
04:00
05:00
06:00
o�:oo
os:oo
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 0 0
0 0 1
0 0 0
0 2 0
0 15 2
0 19 16
0 46 34
0 60 36
0 35 37
0 31 42
0 20 14
0 24 16
0 21 16
0 16 14
0 24 17
0 49 56
0 37 46
0 36 21
2 29 21
2 13 17
0 15 11
0 8 6
0 7 4
0 2 2
4 509 429
0.3°/a 41.4°/a 34.9°/a
07:00
60
18:00 15:00
2 49
Buses
0
0
0
0
0
0
0
0
0
2
0
0
1
0
0
6
2
0
0
0
0
0
0
0
11
0.9°/a
09:00 09:00
42 2
15:00 15:00
56 6
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
3 0 0 1 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0 0
14 0 0 1 0 0 0 0 0 0
19 1 0 0 1 0 0 0 0 0
24 0 0 � o 0 0 0 1 0
15 0 0 1 0 0 0 0 1 0
14 0 0 2 2 0 0 0 0 3
12 0 0 2 1 0 0 0 1 1
14 0 0 1 0 0 0 0 1 0
s o 0 0 2 0 0 0 1 1
7 0 0 0 0 0 0 0 1 0
16 1 1 2 1 0 0 0 1 2
22 0 0 1 0 0 0 0 0 0
1s 3 0 4 0 0 0 0 0 1
13 0 0 0 0 0 0 0 0 0
9 0 0 2 0 0 0 0 0 0
9 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
231 5 1 18 7 0 0 0 7 8
18.8% 0.4°/a 0.1 °/a 1.5°/a 0.6°/a 0.0°/a 0.0°/a 0.0°/a 0.6°/a 0.7°/a
07:00 06:00 09:00 09:00
24 1 2 2
15:00 16:00 14:00 16:00 12:00
22 3 1 4 2
Total
0
1
0
6
22
50
101
122
89
96
51
56
50
38
65
134
111
70
63
41
33
14
13
4
1230
07:00 09:00 07:00
1 3 122
12:00 14:00 15:00
1 2 134
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 0 0
0 1 1
0 0 0
0 2 2
0 13 2
1 20 17
0 29 53
0 51 56
0 29 50
0 24 56
0 10 12
0 22 10
0 26 22
0 18 17
1 23 18
0 44 58
1 27 45
2 30 29
0 25 27
3 13 18
0 12 11
0 12 4
0 6 1
0 0 4
8 437 513
0.6°/a 342°/a 40.1 °/a
05:00
1
19:00
3
Buses
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
6
1
0
0
0
0
0
0
0
8
0.6°/a
07:00 07:00 09:00
51 56 1
15:00 15:00 15:00
44 58 6
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
1 0 0 0 1 0 0 0 0 0
18 0 0 2 0 0 0 0 0 0
28 1 0 1 0 0 0 0 1 0
27 0 0 2 0 0 0 0 1 4
20 1 0 2 0 0 0 0 1 2
10 2 0 1 0 0 0 0 1 2
9 1 0 1 0 0 0 0 0 0
14 1 0 5 0 0 0 0 1 0
10 1 0 3 3 0 0 0 1 0
10 1 0 1 0 0 0 0 1 0
10 1 0 2 0 0 0 0 1 0
20 0 0 1 0 0 0 0 1 0
17 3 0 0 0 0 0 0 0 1
15 0 0 3 0 0 0 0 0 2
12 1 0 1 0 0 0 0 0 0
9 0 0 1 0 0 0 0 0 0
10 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
249 13 0 26 4 0 0 0 9 11
19.5% 1.0°/a 0.0°/a 2.0°/a 0.3°/a 0.0°/a 0.0°/a 0.0°/a 0.7°/a 0.9°/a
06:00 09:00
28 2
15:00 16:00
20 3
11:00 04:00
5 1
12:00 12:00
3 3
Total
1
2
0
7
17
58
113
141
105
97
33
53
66
48
56
130
95
81
66
44
33
18
9
5
1278
06:00 07:00 07:00
1 4 141
12:00 17:00 15:00
1 2 130
SHERBURNE COUNTY PUBLIC WORKS Page 3
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
South Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 3 1 0 0 0 0 0 0 0 0 0 0 0 4
01:00 0 1 1 0 1 0 0 0 0 0 0 0 0 0 3
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 0 4 1 0 4 0 0 0 0 0 0 0 0 0 9
04:00 0 10 6 0 3 0 0 0 0 0 0 0 0 0 19
05:00 0 28 15 0 16 0 0 0 0 0 0 0 0 0 59
06:00 0 42 33 3 27 0 0 3 0 0 0 0 0 0 108
o�:oo 0 71 a2 � 33 0 0 � 0 2 0 0 0 0 150
08:00 0 30 53 1 23 0 0 2 0 0 0 0 0 1 110
09:00 0 33 57 0 16 0 0 1 0 0 0 0 1 0 108
10:00 0 22 16 1 16 0 0 0 2 0 0 0 1 0 58
11:00 0 22 22 0 6 1 0 1 0 0 0 0 1 1 54
12 PM 0 19 22 0 16 0 0 0 3 0 0 0 1 0 61
13:00 1 32 20 1 11 1 0 3 0 0 0 0 1 0 70
14:00 0 9 28 0 11 0 0 0 0 0 0 0 0 0 48
15:00 0 36 55 5 23 1 0 3 3 0 0 0 1 2 129
16:00 2 40 38 2 19 0 0 0 1 0 0 0 1 0 103
17:00 1 33 33 1 16 0 0 0 0 0 0 0 0 1 85
18:00 1 23 22 0 7 1 0 0 0 0 0 0 0 0 54
19:00 0 28 16 0 9 0 0 0 0 0 0 0 0 1 54
20:00 0 19 10 0 3 0 0 1 0 0 0 0 0 0 33
21:00 0 12 7 0 2 0 0 1 0 0 0 0 0 0 22
22:00 0 14 5 0 2 0 0 0 0 0 0 0 0 0 21
23:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Total 5 533 503 15 264 4 0 16 9 2 0 0 7 6 1364
Percent 0.4°/a 39.1 °/a 36.9°/a 1.1 °/a 19.4°/a 0.3°/a 0.0°/a 12°/a 0.7°/a 0.1 °/a 0.0°/a 0.0°/a 0.5°/a 0.4°/a
AM 07:00 09:00 06:00 07:00 11:00 06:00 10:00 07:00 09:00 08:00 07:00
Peak
Vol. 71 57 3 33 1 3 2 2 1 1 150
PM 16:00 16:00 15:00 15:00 15:00 13:00 13:00 12:00 12:00 15:00 15:00
Peak
Vol. 2 40 55 5 23 1 3 3 1 2 129
Grand 17 1479 1445 34 744 22 1 60 20 2 0 0 23 25 3872
Total
Percent 0.4°/a 382°/a 37.3°/a 0.9°/a 192°/a 0.6°/a 0.0°/a 1.5°/a 0.5°/a 0.1 °/a 0.0°/a 0.0°/a 0.6°/a 0.6°/a
North Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/03/22 0 1 0
01:00 0 0 0
02:00 0 1 2
03:00 0 0 0
04:00 0 1 1
05:00 0 3 1
06:00 0 21 7
07:00 0 39 13
os:oo 0 73 1s
os:oo 1 3s 19
10:00 0 24 7
11:00 0 23 6
12 PM 1 21 11
13:00 1 41 10
14:00 0 54 8
15:00 0 81 26
16:00 1 95 39
17:00 0 79 21
18:00 0 55 20
19:00 2 56 10
20:00 1 38 11
21:00 0 29 4
22:00 0 18 5
23:00 0 4 2
Total 7 792 241
Percent 0.6°/a 68.6°/a 20.9°/a
AM 09:00 08:00 09:00
Peak
Vol. 1 73 19
PM 19:00 16:00 16:00
Peak
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 1 0 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 3
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 4
2 2 0 0 1 0 0 0 0 0 0 33
3 0 0 0 3 3 0 0 0 0 0 61
5 6 2 0 1 1 0 0 0 0 0 106
o s 2 0 0 2 0 0 0 0 4 ss
0 3 0 0 0 2 0 0 0 0 0 36
0 4 0 0 0 1 0 0 0 0 0 34
0 2 2 0 1 2 0 0 0 0 1 41
0 2 1 0 0 1 0 0 0 0 2 58
2 3 0 0 0 2 0 0 0 0 1 70
5 4 0 0 0 1 0 0 0 0 2 119
1 2 0 0 0 0 0 0 0 0 2 140
0 2 0 0 3 0 0 0 0 0 3 1os
0 4 0 0 1 0 0 0 0 0 0 80
0 4 0 0 0 0 0 0 0 0 0 72
0 5 0 0 0 0 0 0 0 0 0 55
0 0 0 0 0 0 0 0 0 0 0 33
0 0 0 0 0 0 0 0 0 0 0 23
0 0 0 0 0 0 0 0 0 0 0 6
18 50 7 0 10 15 0 0 0 0 15 1155
1.6°/a 4.3°/a 0.6°/a 0.0°/a 0.9°/a 1.3°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.3°/a
08:00 08:00 08:00 07:00 07:00 09:00 08:00
15:00 20:00 12:00 17:00 12:00 17:00 16:00
North Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/04/22 0 2 0
01:00 0 2 0
02:00 0 1 2
03:00 0 0 0
04:00 0 2 1
05:00 0 2 3
06:00 0 15 7
o�:o0 0 28 10
os:oo 0 75 21
09:00 0 37 16
10:00 0 12 9
11:00 0 31 7
12 PM 0 32 15
13:00 1 30 9
14:00 3 50 16
15:00 1 78 30
16:00 2 107 44
17:00 1 102 29
18:00 0 44 17
19:00 0 43 14
20:00 1 45 12
21:00 0 21 6
22:00 0 21 4
23:00 0 10 2
Total 9 790 274
Percent 0.8°/a 65.9o�a 22 go�a
AM 08:00 08:00
Peak
Vol. 75 21
PM 14:00 16:00 16:00
Peak
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 1 0 0 0 0 0 0 0 0 0 3
0 0 0 0 0 0 0 0 0 0 0 2
0 0 0 0 0 0 0 0 0 0 0 3
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 3
0 0 0 1 0 0 0 0 0 0 o s
2 4 0 0 0 0 0 0 0 0 0 28
3 2 0 0 0 2 0 0 0 0 0 45
4 9 1 0 0 2 0 0 0 0 0 112
2 3 0 0 1 2 1 0 0 0 1 63
0 2 0 0 0 2 0 0 0 0 0 25
0 3 0 0 0 2 0 0 0 0 0 43
0 3 0 0 0 1 0 0 0 0 0 51
1 5 1 0 1 2 0 0 0 0 0 50
3 4 2 0 0 1 0 0 0 0 0 79
5 6 1 0 0 1 0 0 0 0 0 122
2 6 0 0 4 1 0 0 0 0 1 167
0 9 0 0 1 0 0 0 0 0 1 143
0 6 1 0 0 0 0 0 0 0 0 68
0 4 0 0 1 0 0 0 0 0 0 62
0 1 0 0 0 0 0 0 0 0 0 59
0 0 0 0 0 0 0 0 0 0 0 27
0 0 0 0 0 0 0 0 0 0 0 25
0 0 0 0 0 0 0 0 0 0 0 12
22 68 6 1 8 16 1 0 0 0 3 1198
1.8°/a 5.7°/a 0.5°/a 0.1 °/a 0.7°/a 1.3°/a 0.1 °/a 0.0°/a 0.0°/a 0.0°/a 0.3°/a
08:00 08:00 08:00 05:00 09:00 07:00 09:00 09:00 08:00
15:00 17:00 14:00 16:00 13:00 16:00 16:00
SHERBURNE COUNTY PUBLIC WORKS Page 6
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 2
Station ID:
CH 40--370ft South of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
North Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 3 1 0 1 0 0 0 0 0 0 0 0 0 5
01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
02:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 3
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
04:00 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2
05:00 0 2 3 0 0 0 0 0 0 0 0 0 0 0 5
06:00 0 21 7 3 1 0 0 0 0 0 0 0 0 1 33
07:00 0 41 11 5 3 1 0 0 1 0 0 0 0 0 62
os:oo 0 77 19 5 5 1 0 1 1 0 0 0 0 2 111
os:oo o sa 15 � 6 0 0 � 3 0 0 0 0 o so
10:00 0 29 8 0 4 1 0 1 2 0 0 0 0 0 45
11:00 0 29 8 0 1 1 0 2 3 0 0 0 0 1 45
12 PM 0 33 12 0 5 1 0 0 2 0 0 0 0 0 53
13:00 0 52 11 1 4 1 0 2 2 0 0 0 0 0 73
14:00 0 43 13 3 5 1 0 1 5 0 0 0 0 2 73
15:00 0 91 29 6 11 1 0 1 1 0 0 0 0 6 146
16:00 2 95 41 2 4 0 0 2 3 0 0 0 0 1 150
17:00 0 91 20 0 9 1 0 2 1 0 0 0 0 0 124
18:00 1 61 18 0 3 0 0 0 0 0 0 0 0 0 83
19:00 0 55 11 0 1 0 0 0 0 0 0 0 0 1 68
20:00 0 40 8 0 2 0 0 1 0 0 0 0 0 0 51
21:00 0 28 8 0 0 0 0 0 0 0 0 0 0 0 36
22:00 0 22 6 0 0 0 0 0 0 0 0 0 0 0 28
23:00 0 11 3 0 0 0 0 0 0 0 0 0 0 0 14
Total 3 882 254 26 65 9 0 14 24 0 0 0 0 14 1291
Percent 02°/a 68.3°/a 19.7°/a 2.0°/a 5.0°/a 0.7°/a 0.0°/a 1.1 °/a 1.9°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 1.1 °/a
AM 08:00 08:00 07:00 09:00 07:00 11:00 09:00 08:00 08:00
Peak
Vol. 77 19 5 6 1 2 3 2 111
PM 16:00 16:00 16:00 15:00 15:00 12:00 13:00 14:00 15:00 16:00
Peak
Grand 19 2464 769 66 183 22 1 32 55 1 0 0 0 32 3644
Total
Percent 0.5°/a 67.6°/a 21.1 °/a 1.8°/a 5.0°/a 0.6°/a 0.0°/a 0.9°/a 1.5°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 0.9°/a
South Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/03/22 * * *
01:00 0 0 0
02:00 0 0 0
03:00 0 1 0
04:00 0 5 2
05:00 0 13 8
06:00 0 27 11
o�:oo 0 51 22
08:00 0 48 19
09:00 0 45 27
10:00 0 13 15
11:00 0 22 13
12 PM 0 18 11
13:00 0 18 9
14:00 0 29 15
15:00 0 64 42
16:00 0 49 31
17:00 0 34 10
18:00 1 32 6
19:00 0 26 12
20:00 0 22 11
21:00 0 15 1
22:00 0 6 0
23:00 0 5 0
Total 1 543 265
Percent 0.1% 582% 28.4%
AM 07:00 09:00
Peak
Vol. 51 27
PM 18:00 15:00 15:00
Peak
Vol. 1 64 42
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 7
0 2 0 0 1 0 0 0 0 0 0 24
0 10 1 0 0 1 0 0 0 0 1 51
o s o 0 0 0 0 0 0 1 � s�
o s o 0 2 0 0 0 0 0 � �s
2 6 0 0 1 0 0 0 0 1 0 82
0 4 0 0 0 0 0 0 0 1 0 33
0 4 0 0 0 0 0 0 0 1 0 40
0 2 0 0 0 1 0 0 0 1 0 33
0 5 0 0 0 0 0 0 0 1 0 33
0 6 1 1 0 0 0 0 0 1 1 54
7 10 0 0 0 0 0 0 0 0 1 124
2 8 1 0 5 0 0 0 0 0 2 98
0 5 0 0 0 0 0 0 0 0 0 49
0 4 0 0 1 0 0 0 0 0 0 44
0 2 0 0 0 0 0 0 0 0 3 43
0 0 0 0 0 0 0 0 0 0 0 33
0 0 0 0 0 0 0 0 0 0 0 16
0 0 o a o 0 0 0 0 0 o s
0 0 0 0 0 0 0 0 0 0 0 5
11 80 3 1 10 2 0 0 0 7 10 933
12°/a 8.6°/a 0.3°/a 0.1 °/a 1.1 °/a 02°/a 0.0°/a 0.0°/a 0.0°/a 0.8°/a 1.1 °/a
09:00 06:00 06:00 08:00 06:00
15:00 15:00 14:00 14:00 16:00 12:00
7 10 1 1 5 1
07:00 06:00 09:00
12:00 19:00 15:00
1 3 124
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
South Bounc
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
o�:oo
os:oo
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 1 0
0 1 0
0 0 0
0 1 2
0 2 0
0 12 8
0 35 21
0 65 20
0 51 22
0 51 21
0 10 8
0 12 11
0 30 11
0 19 9
1 30 11
0 70 36
1 42 32
2 39 21
0 36 17
2 19 9
0 19 7
0 13 1
0 1 2
0 1 2
6 560 271
0.6°/a 56.8°/a 27.5°/a
07:00
65
17:00 15:00
2 70
Buses
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
5
1
0
0
0
0
0
0
0
7
0.7°/a
08:00 09:00
22 1
15:00 15:00
36 5
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 1
4 0 0 0 0 0 0 0 0 0
s 1 0 1 0 0 0 0 1 0
9 0 0 0 0 1 0 0 0 �
s o 0 0 0 0 0 0 � 3
6 1 0 1 0 0 0 0 1 3
9 1 0 1 0 0 0 0 0 0
3 1 0 1 0 1 0 0 0 0
5 0 0 3 3 0 0 0 1 1
3 1 0 2 0 0 0 0 1 0
9 2 0 3 0 0 0 0 1 1
5 0 0 1 0 0 0 0 1 0
7 1 0 0 0 0 0 0 0 0
3 0 0 3 0 0 0 0 0 2
7 1 0 0 0 0 0 0 0 0
2 0 0 1 0 0 0 0 0 1
2 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
91 9 0 17 3 2 0 0 7 13
92% 0.9°/a 0.0°/a 1.7°/a 0.3°/a 02°/a 0.0°/a 0.0°/a 0.7°/a 1.3°/a
07:00 06:00
9 1
14:00 14:00
9 2
06:00 07:00
1 1
12:00 12:00
3 3
Total
1
1
0
3
4
24
67
96
85
85
29
29
54
35
58
118
84
70
61
34
28
14
3
3
986
06:00 08:00 07:00
1 3 96
12:00 17:00 15:00
1 2 118
SHERBURNE COUNTY PUBLIC WORKS Page 3
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
South Bound
Start Cars & 2 Axle 2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Time Bikes Trailer Lonq Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
05/05/22 0 3 0 0 0 0 0 0 0 0 0 0 0 0 3
01:00 0 2 0 0 0 0 0 0 0 0 0 0 0 0 2
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
03:00 0 2 2 0 0 0 0 0 0 0 0 0 0 0 4
04:00 0 4 1 0 0 0 0 0 0 0 0 0 0 0 5
05:00 0 17 10 0 4 0 0 0 0 0 0 0 0 0 31
06:00 0 39 21 2 6 0 0 2 0 0 0 0 0 0 70
o�:oo 0 69 23 0 � � o 0 0 0 2 0 0 0 3 108
os:oo 0 30 40 2 12 0 0 3 0 0 0 0 0 � ss
09:00 0 44 30 0 12 0 0 2 0 0 0 0 1 2 91
10:00 0 21 9 0 11 1 0 0 2 0 0 0 1 0 45
11:00 0 31 7 1 6 1 0 2 0 0 0 0 1 0 49
12 PM 0 20 14 0 11 0 0 0 2 0 0 0 1 1 49
13:00 1 26 12 0 10 1 0 3 0 0 0 0 1 1 55
14:00 0 29 12 0 6 0 0 0 0 0 0 0 0 0 47
15:00 0 55 41 5 15 1 0 4 3 0 0 0 1 1 126
16:00 2 50 32 2 7 0 0 0 1 0 0 0 1 0 95
17:00 0 52 17 1 6 0 0 0 0 0 0 0 0 0 76
18:00 2 30 10 0 5 1 0 0 0 0 0 0 0 0 48
19:00 0 23 8 0 6 0 0 0 0 0 0 0 0 0 37
20:00 0 19 6 0 2 0 0 1 0 0 0 0 0 0 28
21:00 0 15 7 0 1 0 0 1 0 0 0 0 0 0 24
22:00 0 9 1 0 2 0 0 0 0 0 0 0 0 0 12
23:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
Total 5 591 303 13 133 5 0 18 8 2 0 0 7 9 1094
Percent 0.5°/a 54.0°/a 27.7°/a 12°/a 122°/a 0.5°/a 0.0°/a 1.6°/a 0.7°/a 02°/a 0.0°/a 0.0°/a 0.6°/a 0.8°/a
AM 07:00 08:00 06:00 08:00 10:00 08:00 10:00 07:00 09:00 07:00 07:00
Peak
Vol. 69 40 2 12 1 3 2 2 1 3 108
PM 16:00 15:00 15:00 15:00 15:00 13:00 15:00 15:00 12:00 12:00 15:00
Peak
Grand 12 1694 839 31 304 17 1 45 13 4 0 0 21 32 3013
Total
Percent 0.4°/a 56.2°/a 27.8°/a 1.0°/a 10.1 °/a 0.6°/a 0.0°/a 1.5°/a 0.4°/a 0.1 °/a 0.0°/a 0.0°/a 0.7°/a 1.1 °/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
North Bound
Start
Time
05/03/22
01:00
02:00
03:00
04:00
05:00
06:00
o�:oo
os:oo
os:oo
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 0 0
0 0 2
0 0 0
0 0 0
0 6 1
0 21 5
o zs zo
0 48 29
0 34 21
0 17 7
0 12 4
0 10 4
0 25 5
0 21 14
0 49 26
1 54 27
0 45 15
0 19 17
1 22 11
0 14 7
0 9 6
0 8 0
0 0 2
2 440 223
02°/a 512°/a 25.9°/a
08:00
48
16:00 16:00
1 54
Buses
0
0
0
0
0
0
3
4
1
0
0
0
0
3
6
1
0
0
0
0
0
0
0
18
2.1 °/a
08:00 08:00
29 4
16:00 15:00
27 6
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
6 1 0 1 0 0 0 0 0 0
9 � o � 2 0 0 0 0 3
7 0 1 1 0 0 0 0 0 1
9 1 0 1 1 0 0 0 0 1
4 0 0 0 2 0 0 0 0 0
4 0 0 0 1 0 0 0 0 0
7 1 0 0 1 0 0 0 0 0
6 0 0 2 1 0 0 0 0 0
6 0 0 0 2 0 0 0 0 0
18 1 0 0 1 0 0 0 0 1
18 1 0 0 0 0 0 0 0 2
11 1 0 2 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 1
6 0 0 1 0 0 0 0 0 1
5 0 0 1 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
138 7 1 10 11 0 0 0 0 10
16.0% 0.8°/a 0.1 °/a 12°/a 1.3°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 12°/a
07:00 06:00 08:00 06:00 07:00
9 1 1 1 2
15:00 12:00 13:00 14:00
18 1 2 2
Total
0
2
0
1
9
34
65
91
69
30
21
23
39
46
102
104
74
49
42
27
18
11
3
860
07:00 08:00
3 91
16:00 16:00
2 104
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
North Bound
Start
Time
05/04/22
01:00
02:00
03:00
04:00
05:00
06:00
o�:oo
os:oo
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
Total
Percent
AM
Peak
Vol .
PM
Peak
Vol .
Cars & 2 Axle
Bikes Trailer Lonq
0 1 0
0 1 0
0 0 0
0 0 0
0 1 0
1 4 5
0 17 7
0 26 17
0 47 31
1 35 22
0 11 9
0 16 11
0 14 9
1 19 7
3 33 13
1 49 29
2 60 26
0 56 25
0 21 13
0 20 4
0 24 5
0 8 2
0 9 0
0 0 2
9 472 237
0.9°/a 48.9°/a 24.6°/a
05:00
1
14:00
3
Buses
0
0
0
0
1
0
0
2
4
1
0
0
0
1
4
5
2
0
0
0
0
0
0
0
20
2.1 °/a
08:00 08:00 08:00
47 31 4
16:00 15:00 15:00
60 29 5
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
0 0 0 1 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 2
3 0 0 0 0 0 0 0 0 4
5 0 0 0 0 0 0 0 0 1
7 1 0 1 2 0 0 0 0 2
13 2 0 0 2 0 0 0 0 0
15 1 0 2 2 1 0 0 0 1
4 0 0 1 2 0 0 0 0 0
5 0 0 0 2 0 0 0 0 1
4 1 0 0 1 0 0 0 0 0
7 2 0 2 2 0 0 0 0 1
7 2 0 0 1 0 0 0 0 1
18 2 0 2 0 0 0 0 0 2
26 1 0 5 1 0 0 0 0 1
23 1 0 2 0 0 0 0 0 1
8 2 0 1 0 0 0 0 0 0
6 1 0 1 0 0 0 0 0 1
2 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
159 16 0 18 15 1 0 0 0 18
16.5% 1.7°/a 0.0°/a 1.9°/a 1.6°/a 0.1 °/a 0.0°/a 0.0°/a 0.0°/a 1.9°/a
09:00 08:00
15 2
16:00 13:00
26 2
09:00 07:00 09:00
2 2 1
16:00 13:00
5 2
Total
1
1
2
1
5
17
30
58
99
81
27
35
29
42
64
108
124
108
45
33
31
12
10
2
965
05:00 08:00
4 99
15:00 16:00
2 124
North Bound
Start Cars & 2 Axle
Time Bikes Trailer Lonq
05/05/22 0 3 0
01:00 0 0 0
02:00 0 0 0
03:00 0 0 0
04:00 0 1 0
05:00 0 2 1
06:00 0 19 6
07:00 1 2s 17
os:oo 0 45 38
os:oo o ao zz
10:00 0 16 8
11:00 0 20 6
12 PM 0 19 9
13:00 0 21 16
14:00 0 21 10
15:00 0 53 32
16:00 2 60 31
17:00 0 58 19
18:00 0 27 18
19:00 0 29 8
20:00 0 13 7
21:00 0 10 9
22:00 0 7 2
23:00 0 2 1
Total 3 494 260
Percent 0.3°/a 48.4°/a 25.5°/a
AM 07:00 08:00 08:00
Peak
Vol. 1 45 38
PM 16:00 16:00 15:00
Peak
Vol. 2 60 32
Grand 14 1406 720
Total
Percent 0.5% 49.4% 25.3%
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 6
Site Code: 3
Station ID:
CH 40--600ft south of 191st
power pole-east side
Latitude: 0' 0.0000 Undefined
2 Axle 3 Axle 4 Axle <5 Axl 5 Axle >6 Axl <6 Axl 6 Axle >6 Axl Not
Buses 6 Tire Sinqle Sinqle Double Double Double Multi Multi Multi Classe Total
0 1 0 0 0 0 0 0 0 0 0 4
0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
0 1 0 0 0 0 0 0 0 0 0 2
0 3 0 0 0 0 0 0 0 0 0 6
0 5 0 0 0 0 0 0 0 0 1 31
4 10 0 0 0 2 0 0 0 0 1 63
6 8 1 0 0 1 0 0 0 0 1 100
� 19 0 0 3 3 0 0 0 0 2 so
0 4 2 0 0 2 0 0 0 0 0 32
0 6 2 0 1 3 0 0 0 0 0 38
0 9 1 0 1 2 0 0 0 0 0 41
1 9 0 0 4 2 0 0 0 0 0 53
4 15 2 0 3 5 0 0 0 0 0 60
9 27 0 0 1 1 0 0 0 0 1 124
2 19 1 0 2 3 0 0 0 0 0 120
0 17 1 0 2 1 0 0 0 0 0 98
0 8 1 0 0 0 0 0 0 0 0 54
0 5 0 0 0 0 0 0 0 0 0 42
0 3 0 0 0 0 0 0 0 0 0 23
0 2 0 0 0 0 0 0 0 0 0 21
0 4 0 0 0 0 0 0 0 0 0 13
0 2 0 0 0 0 0 0 0 0 0 5
27 178 11 0 17 25 0 0 0 0 6 1021
2.6°/a 17.4% 1.1 °/a 0.0°/a 1.7°/a 2.4°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 0.6°/a
08:00 09:00 10:00 09:00 09:00 09:00 08:00
6 19 2 3 3 2 100
15:00 15:00 14:00 13:00 14:00 15:00 15:00
9 27 2 4 5 1 124
65 475 34 1 45 51 1 0 0 0 34 2846
2.3°/a 16.7°/a 12°/a 0.0°/a 1.6°/a 1.8°/a 0.0°/a 0.0°/a 0.0°/a 0.0°/a 12°/a
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
0
0
0
0
3
8
19
23
27
6
15
17
18
13
54
16
12
3
7
13
5
4
0
0
0
2
2
13
34
54
38
18
25
14
15
26
46
32
33
24
19
21
13
3
0
0
0
2
15
20
38
30
23
10
18
17
7
28
33
51
35
23
31
15
9
2
0
0
0
1
4
9
15
3
3
5
2
7
8
7
5
8
9
14
8
1
2
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
26
54
106
111
91
41
60
56
48
75
138
109
93
66
66
51
29
10
36-45
40-49
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
Percent 21.3% 35.0% 32.8% 8.9% 1.7% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 08:00 07:00 07:00 06:00 05:00 08:00
Vol. 27 54 38 15 4 1 111
PM Peak 15:00 15:00 16:00 18:00 17:00 12:00 15:00
Vol. 54 46 51 14 4 1 138
SHERBURNE COUNTY PUBLIC WORKS Page 2
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/04/22 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2 34-43 2
01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 29-38 1
02:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 39-48 1
03:00 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 39-48 2
04:00 2 2 0 0 1 0 0 0 0 0 0 0 0 0 5 36-45 2
05:00 1 6 16 5 1 0 0 0 0 0 0 0 0 0 29 36-45 22
06:00 5 17 32 13 2 0 0 0 0 0 0 0 0 0 69 36-45 49
07:00 9 39 46 19 1 0 0 0 0 0 0 0 0 0 114 36-45 85
08:00 24 56 35 4 0 0 0 0 0 0 0 0 0 0 119 36-45 91
09:00 27 40 21 10 0 0 0 0 0 0 0 0 0 0 98 36-45 61
10:00 9 22 19 5 0 0 0 0 0 0 0 0 0 0 55 36-45 41
11:00 18 20 16 1 0 0 0 0 0 0 0 0 0 0 55 36-45 36
12 PM 21 18 22 2 0 0 0 0 0 0 0 0 0 0 63 36-45 40
13:00 15 24 15 2 0 0 0 0 0 0 0 0 0 0 56 36-45 39
14:00 26 32 15 3 0 1 0 0 0 0 0 0 0 0 77 36-45 47
15:00 53 50 22 4 0 0 0 0 0 0 0 0 0 0 129 36-45 72
16:00 7 29 42 9 3 0 0 0 0 0 0 0 0 0 90 36-45 71
17:00 22 39 53 9 1 1 0 0 0 0 0 0 0 0 125 36-45 92
18:00 15 30 40 9 0 0 0 0 0 0 0 0 0 0 94 36-45 70
19:00 9 27 23 5 0 0 0 0 0 0 0 0 0 0 64 36-45 50
20:00 5 21 17 6 1 0 0 0 0 0 0 0 0 0 50 36-45 38
21:00 7 18 2 2 0 0 0 0 0 0 0 0 0 0 29 36-45 20
22:00 4 2 4 1 0 0 0 0 0 0 0 0 0 0 11 36-45 6
23:00 1 1 1 1 0 0 0 0 0 0 0 0 0 0 4 34-43 2
Total 280 495 443 112 10 2 0 0 0 0 0 0 0 0 1342
Percent 20.9% 36.9% 33.0% 8.3% 0.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 08:00 07:00 07:00 06:00 08:00
Vol. 27 56 46 19 2 119
PM Peak 15:00 15:00 17:00 16:00 16:00 14:00 15:00
Vol. 53 50 53 9 3 1 129
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 3
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/05/22 0 1 3 0 0 0 0 0 0 0 0 0 0 0 4 36-45 4
01:00 2 0 1 0 0 0 0 0 0 0 0 0 0 0 3 * 1
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
03:00 0 0 2 1 0 0 0 0 0 0 0 0 0 0 3 39-48 3
04:00 1 2 0 1 0 0 0 0 0 0 0 0 0 0 4 35-44 2
05:00 1 3 19 5 0 1 0 0 0 0 0 0 0 0 29 40-49 24
06:00 19 21 26 16 1 0 0 0 0 0 0 0 0 0 83 36-45 47
07:00 25 32 52 12 2 0 0 0 0 0 0 0 0 0 123 36-45 84
08:00 36 42 29 7 0 0 0 0 0 0 0 0 0 0 114 36-45 71
09:00 30 36 18 4 0 0 0 0 0 0 0 0 0 0 88 36-45 54
10:00 19 17 14 4 0 0 0 0 0 0 0 0 0 0 54 36-45 31
11:00 19 34 13 3 0 0 0 0 0 0 0 0 0 0 69 36-45 47
12 PM 27 22 12 1 0 0 0 0 0 0 0 0 0 0 62 36-45 34
13:00 22 33 21 3 2 0 0 0 0 0 0 0 0 0 81 36-45 54
14:00 28 24 12 3 3 1 0 0 0 0 0 0 0 0 71 36-45 36
15:00 82 46 21 1 0 0 0 0 0 0 0 0 0 0 150 36-45 67
16:00 23 26 47 11 1 0 0 0 0 0 0 0 0 0 108 36-45 73
17:00 10 41 50 13 1 0 0 0 0 0 0 0 0 0 115 36-45 91
18:00 5 27 38 6 3 0 0 0 0 0 0 0 0 0 79 36-45 65
19:00 6 16 22 10 1 0 0 0 0 0 0 0 0 0 55 36-45 38
20:00 7 21 20 5 0 0 0 0 0 0 0 0 0 0 53 36-45 41
21:00 7 12 14 2 1 0 0 0 0 0 0 0 0 0 36 36-45 26
22:00 1 7 8 1 0 0 0 0 0 0 0 0 0 0 17 36-45 15
Percent 26.4% 33.1% 31.5% 7.8% 1.1% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 08:00 07:00 06:00 07:00 05:00 07:00
Vol. 36 42 52 16 2 1 123
PM Peak 15:00 15:00 17:00 17:00 14:00 14:00 15:00
Vol. 82 46 50 13 3 1 150
Total 916 1396 1293 332 46 6 1 0 0 0 0 0 0 0 3990
Percent 23.0% 35.0% 32.4% 8.3% 1.2% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15th Percentile : 22 MPH
50th Percentile : 38 MPH
85th Percentile : 44 MPH
95th Percentile : 47 MPH
Stats 10 MPH Pace Speed : 36-45 MPH
Number in Pace : 2689
Percent in Pace : 67.4 %
Number of Vehicles > 45 MPH : 385
Percent of Vehicles > 45 MPH : 9.6 %
Mean Speed(Average) : 36 MPH
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
0
0
0
1
2
7
7
13
25
7
9
6
11
13
27
22
7
6
5
5
2
2
0
2
1
2
5
16
26
19
38
17
11
9
19
15
37
46
27
14
11
13
7
2
1
0
1
2
5
16
35
18
32
10
12
11
19
26
46
36
29
27
23
8
7
2
0
0
1
0
5
8
18
17
9
8
5
7
10
12
17
34
29
21
9
4
2
0
0
0
0
0
0
1
0
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
2
3
5
17
51
92
74
105
43
39
35
63
69
133
148
99
75
52
30
19
7
34-43
3039
34-43
35-44
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
36-45
41-50
41-50
36-45
36-45
36-45
36-45
Percent 15.4% 29.0% 31.4% 18.5% 4.5% 0.9% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 09:00 07:00 07:00 07:00 07:00 06:00 09:00
Vol. 25 38 35 18 4 2 1 105
PM Peak 15:00 16:00 15:00 16:00 16:00 13:00 17:00 16:00
Vol. 27 46 46 34 9 1 1 148
SHERBURNE COUNTY PUBLIC WORKS Page 5
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/04/22 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 29-38 1
01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 34-43 1
02:00 0 1 1 0 1 0 0 0 0 0 0 0 0 0 3 34-43 2
03:00 0 1 0 0 1 0 0 0 0 0 0 0 0 0 2 29-38 1
04:00 0 1 2 0 0 0 0 0 0 0 0 0 0 0 3 35-44 3
05:00 7 3 9 2 1 0 0 0 0 0 0 0 0 0 22 36-45 12
06:00 5 7 17 9 5 0 0 0 0 0 0 0 0 0 43 40-49 26
07:00 7 26 31 17 8 2 0 0 0 0 0 0 0 0 91 36-45 57
08:00 10 27 27 14 6 1 0 0 0 0 0 0 0 0 85 36-45 54
09:00 23 41 34 9 5 0 0 0 0 0 0 0 0 0 112 36-45 75
10:00 7 13 16 5 2 0 0 0 0 0 0 0 0 0 43 36-45 29
11:00 13 16 24 9 2 0 0 0 0 0 0 0 0 0 64 36-45 40
12 PM 7 15 23 6 1 1 0 0 0 0 0 0 0 0 53 36-45 38
13:00 7 13 21 5 2 0 0 0 0 0 0 0 0 0 48 36-45 34
14:00 20 15 30 16 4 0 0 0 0 0 0 0 0 0 85 41-50 46
15:00 20 42 37 19 3 1 0 0 0 0 0 0 0 0 122 36-45 79
16:00 14 53 69 31 8 2 0 0 0 0 0 0 0 0 177 36-45 122
17:00 17 30 49 30 6 1 0 0 0 0 0 0 0 0 133 41-50 79
18:00 9 19 26 9 1 0 0 0 0 0 0 0 0 0 64 36-45 45
19:00 14 19 13 8 2 0 0 0 0 0 0 0 0 0 56 36-45 32
20:00 6 9 12 4 3 0 0 0 0 0 0 0 0 0 34 36-45 21
21:00 2 5 8 2 1 0 0 0 0 0 0 0 0 0 18 36-45 13
22:00 2 0 4 4 0 0 0 0 0 0 0 0 0 0 10 41-50 8
23:00 1 2 1 1 0 0 0 0 0 0 0 0 0 0 5 36-45 3
Total 191 359 455 200 62 8 0 0 0 0 0 0 0 0 1275
Percent 15.0% 282% 35.7% 15.7% 4.9% 0.6% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 09:00 09:00 07:00 07:00 07:00 09:00
Vol. 23 41 34 17 8 2 112
PM Peak 14:00 16:00 16:00 16:00 16:00 16:00 16:00
Vol. 20 53 69 31 8 2 177
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 6
Site Code: 4
Station ID:
CH 40--570ft north of 191st
JCT signs--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
0
1
0
2
2
3
8
16
32
12
11
8
7
24
41
1
1
1
1
3
11
19
27
42
12
19
21
19
27
47
51
37
11
13
7
8
2
0
0
1
4
5
21
39
30
27
13
17
21
13
27
49
57
52
28
17
15
5
2
0
0
0
0
2
9
16
11
15
7
8
6
14
15
13
35
32
14
13
6
7
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
2
2
8
12
51
89
86
116
44
59
57
55
98
153
166
133
67
52
35
23
7
29-38 1
35-44 1
34-43 2
36-45 5
36-45 8
36-45 32
36-45 58
36-45 57
36-45 69
36-45 25
36-45 36
36-45 42
36-45 32
36-45 54
36-45 96
36-45 108
36-45 89
41-50 42
41-50 30
36-45 22
36-45 13
35-44 4
Percent 16.3% 28.8% 33.7% 17.0% 3.6% 0.5% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 09:00 07:00 07:00 06:00 07:00 09:00
Vol. 32 42 39 16 7 1 116
PM Peak 15:00 16:00 16:00 16:00 18:00 17:00 18:00 16:00
Vol. 41 51 57 35 6 3 2 166
Total 587 1080 1269 642 162 25 6 0 0 0 0 0 0 0 3771
Percent 15.6% 28.6% 33.7% 17.0% 4.3% 0.7% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15th Percentile : 33 MPH
50th Percentile : 40 MPH
85th Percentile : 47 MPH
95th Percentile : 50 MPH
Stats 10 MPH Pace Speed : 36-45 MPH
Number in Pace : 2349
Percent in Pace : 62.3 %
Number of Vehicles > 45 MPH : 835
Percent of Vehicles > 45 MPH : 22.1 %
Mean Speed(Average) : 39 MPH
SHERBURNE COUNTY PUBLIC WORKS Page 1
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/03/22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
01:00 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 39-48 1
02:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 2938 1
03:00 0 0 3 2 1 0 1 0 0 0 0 0 0 0 7 41-50 5
04:00 0 0 2 8 7 5 1 0 0 0 0 0 0 0 23 46-55 15
05:00 1 0 7 21 17 6 1 0 0 0 0 0 0 0 53 46-55 38
06:00 1 4 20 44 33 1 1 0 0 0 0 0 0 0 104 46-55 77
07:00 1 10 31 40 37 12 0 0 0 0 0 0 0 0 131 46-55 77
08:00 1 2 17 45 23 3 0 1 0 0 0 0 0 0 92 46-55 68
09:00 1 5 16 41 30 1 1 1 0 0 0 0 0 0 96 46-55 71
10:00 0 7 15 18 11 3 2 0 0 0 0 0 0 0 56 41-50 33
11:00 1 3 10 25 12 5 0 0 0 0 0 0 0 0 56 45-54 37
12 PM 2 7 16 15 9 3 1 0 0 0 0 0 0 0 53 41-50 31
13:00 5 5 16 15 5 3 0 0 0 0 0 0 0 0 49 41-50 31
14:00 2 6 13 18 22 2 3 0 0 0 0 0 0 0 66 46-55 40
15:00 3 8 35 65 20 8 0 0 0 0 0 0 0 0 139 41-50 100
16:00 5 5 17 54 35 4 0 0 0 0 0 0 0 0 120 46-55 89
17:00 1 1 8 29 29 8 0 0 0 0 0 0 0 0 76 46-55 58
18:00 2 0 8 22 27 4 0 0 0 0 0 0 0 0 63 46-55 49
19:00 1 3 12 14 11 1 0 0 0 0 0 0 0 0 42 41-50 26
20:00 1 8 13 12 4 0 1 0 0 0 0 0 0 0 39 41-50 25
21:00 1 0 7 6 1 1 0 0 0 0 0 0 0 0 16 41-50 13
22:00 1 2 3 1 3 3 0 0 0 0 0 0 0 0 13 50-59 6
23:00 0 0 0 1 2 0 1 0 0 0 0 0 0 0 4 45-54 3
Total 30 77 269 497 339 73 13 2 0 0 0 0 0 0 1300
Percent 2.3% 5.9% 20.7% 382% 26.1% 5.6% 1.0% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 05:00 07:00 07:00 08:00 07:00 07:00 10:00 08:00 07:00
Vol. 1 10 31 45 37 12 2 1 131
PM Peak 13:00 15:00 15:00 15:00 16:00 15:00 14:00 15:00
Vol. 5 8 35 65 35 8 3 139
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
0
0
1
0
0
2
3
4
1
0
2
2
3
3
3
2
3
0
0
1
1
1
0
0
0
1
2
5
12
11
3
2
4
12
3
1
7
3
5
4
1
1
0
0
1
0
3
5
6
21
22
30
30
10
19
12
11
18
20
19
10
15
7
4
4
1
0
0
0
3
27
55
58
34
30
19
30
22
19
27
72
44
35
22
20
15
8
5
0
0
3
6
16
28
46
19
21
6
9
20
13
9
30
26
30
15
12
9
4
1
1
0
1
3
8
2
7
6
4
1
1
3
3
5
5
8
6
7
5
2
0
1
0
0
0
1
0
1
0
0
1
1
1
0
0
1
0
0
1
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
8
19
59
114
149
105
92
39
66
71
52
64
138
102
90
65
45
32
17
9
34-43
51-60
44-53
46-55
46-55
46-55
41-50
41-50
41-50
41-50
46-55
46-55
41-50
46-55
46-55
46-55
41-50
46-55
46-55
46-55
44-53
Percent 2.4% 5.7% 20.0% 40.6% 24.3% 6.0% 0.7% 0.3% 0.0% 0.1% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 07:00 08:00 07:00 07:00 05:00 04:00 09:00 07:00 07:00
Vol. 4 12 30 58 46 8 1 2 1 149
PM Peak 13:00 12:00 15:00 15:00 15:00 16:00 18:00 15:00 15:00
Vol. 3 12 20 72 30 8 2 1 138
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 3
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
0
0
0
0
0
0
5
5
0
5
3
1
10
1
8
2
2
0
0
2
0
2
1
0
0
1
1
2
17
0
3
4
5
4
5
0
8
5
0
1
1
2
2
0
0
0
1
1
13
30
27
12
9
8
9
10
10
6
16
15
9
9
6
5
7
2
0
0
4
4
18
49
57
24
43
21
17
27
11
20
44
38
33
20
20
10
8
8
1
1
2
7
23
25
39
40
42
17
18
14
20
19
44
34
29
18
23
7
2
6
1
0
2
2
7
6
8
21
9
7
10
5
8
4
17
13
12
6
3
4
3
2
0
0
0
3
0
0
1
5
2
1
0
3
3
3
2
1
1
2
2
0
0
0
u
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
1
9
20
62
112
154
113
109
64
62
64
71
54
139
108
87
56
55
31
22
20
49-58
44-53
46-55
46-55
46-55
41-50
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
46-55
45-54
41-50
46-55
Percent 3.2% 4.4% 14.5% 33.5% 30.5% 10.5% 2.0% 0.6% 0.4% 0.1% 0.1% 0.1% 0.0% 0.0%
AM Peak 07:00 07:00 06:00 07:00 09:00 08:00 08:00 08:00 08:00 08:00 08:00 07:00
Vol. 5 17 30 57 42 21 5 2 2 1 1 154
PM Peak 13:00 15:00 15:00 15:00 15:00 15:00 12:00 13:00 13:00 13:00 15:00
Vol. 10 8 16 44 44 17 3 1 2 1 139
Total 108 217 744 1519 1099 303 51 15 5 2 1 1 0 0 4065
Percent 2.7% 5.3% 18.3% 37.4% 27.0% 7.5% 1.3% 0.4% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0%
15th Percentile : 41 MPH
50th Percentile : 48 MPH
85th Percentile : 53 MPH
95th Percentile : 57 MPH
Stats 10 MPH Pace Speed : 46-55 MPH
Number in Pace : 2618
Percent in Pace : 64.4 %
Number of Vehicles > 55 MPH : 378
Percent of Vehicles > 55 MPH : 9.3 %
Mean Speed(Average) : 48 MPH
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 4
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/03/22 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2 29-38 1
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
02:00 0 0 3 1 0 0 0 0 0 0 0 0 0 0 4 39-48 4
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 0 0 2 0 0 0 0 0 0 0 0 0 0 0 2 35-44 2
05:00 0 2 0 1 0 0 0 0 0 0 0 0 0 0 3 30-39 2
06:00 2 8 14 13 3 0 0 0 0 0 0 0 0 0 40 41-50 27
07:00 1 15 17 19 10 0 0 0 0 0 0 0 0 0 62 41-50 36
08:00 8 12 44 42 12 2 0 0 0 0 0 0 0 0 120 41-50 86
09:00 4 9 21 17 8 1 0 0 0 0 0 0 0 0 60 41-50 38
10:00 2 7 14 13 5 0 0 0 0 0 0 0 0 0 41 41-50 27
11:00 1 4 12 13 3 1 0 0 0 0 0 0 0 0 34 41-50 25
12 PM 7 1 17 12 7 0 0 0 0 0 0 0 0 0 44 41-50 29
13:00 5 11 22 16 5 2 0 0 0 0 0 0 0 0 61 41-50 38
14:00 2 13 26 29 8 0 0 0 0 0 0 0 0 0 78 41-50 55
15:00 5 8 32 50 19 9 1 0 0 0 0 0 0 0 124 41-50 82
16:00 5 5 23 60 36 10 0 0 0 1 0 0 0 0 140 46-55 96
17:00
18:00
19:00
20:00
21:00
22:00
4
1
1
0
0
0
115 41-50
94 41-50
74 41-50
60 41-50
36 41-50
25 36-45
Total 54 135 360 436 187 40 7 4 0 2 0 0 0 0 1225
Percent 4.4% 11.0% 29.4% 35.6% 15.3% 3.3% 0.6% 0.3% 0.0% 0.2% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 07:00 08:00 08:00 08:00 08:00 08:00
PM Peak 12:00 14:00 15:00 16:00 16:00 16:00 17:00 20:00 16:00 16:00
Vol. 7 13 32 60 36 10 4 3 1 140
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/04/22 2 1 0 0 0 0 0 0 0 0 0 0 0 0 3 35-44 1
01:00 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 44-53 1
02:00 0 1 2 0 0 1 0 0 0 0 0 0 0 0 4 35-44 3
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 1 0 2 0 1 0 0 0 0 0 0 0 0 0 4 35-44 2
05:00 2 1 3 1 1 0 0 0 0 0 0 0 0 0 8 41-50 4
06:00 1 6 9 15 3 0 0 0 0 0 0 0 0 0 34 41-50 24
07:00 3 3 18 20 9 0 0 0 0 0 0 0 0 0 53 41-50 38
08:00 5 13 39 53 13 1 0 0 0 0 0 0 0 0 124 41-50 92
09:00 0 5 14 20 8 0 0 0 0 0 0 0 0 0 47 41-50 34
10:00 2 6 13 10 2 0 0 0 0 0 0 0 0 0 33 41-50 23
11:00 1 8 19 14 3 2 0 0 0 0 0 0 0 0 47 41-50 33
12 PM 3 2 24 19 7 1 0 0 0 0 0 0 0 0 56 41-50 43
13:00 3 6 19 24 2 2 0 0 0 0 0 0 0 0 56 41-50 43
14:00 11 14 22 39 8 3 0 0 0 0 0 0 0 0 97 41-50 61
15:00 7 8 33 57 20 3 0 0 0 0 0 0 0 0 128 41-50 90
16:00 1 6 48 70 45 4 3 1 0 0 0 0 0 0 178 41-50 118
17:00 3 11 22 51 35 8 1 1 0 0 0 0 0 0 132 46-55 86
18:00 0 3 22 26 14 2 0 0 0 0 0 0 0 0 67 41-50 48
19:00 0 4 17 35 12 4 1 0 0 0 0 0 0 0 73 41-50 52
20:00 1 3 19 23 10 3 0 0 0 0 0 0 0 0 59 41-50 42
21:00 2 4 11 8 0 1 0 0 0 0 0 0 0 0 26 41-50 19
22:00 0 6 11 5 4 1 0 0 0 0 0 0 0 0 27 36-45 17
Percent 3.9% 9.0% 28.9% 39.0% 15.6% 3.1% 0.4% 0.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 08:00 08:00 08:00 08:00 11:00 08:00
PM Peak 14:00 14:00 16:00 16:00 16:00 17:00 16:00 16:00 16:00
Vol. 11 14 48 70 45 8 3 1 178
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 6
Site Code: 1
Station ID:
CH 40-542ft N of CSAH 12
NPZ sign--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 34-43 1
02:00 0 2 1 0 0 1 0 0 0 0 0 0 0 0 4 34-43 3
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 0 0 1 1 0 0 0 0 0 0 0 0 0 0 2 39-48 2
05:00 0 0 1 3 1 0 0 0 0 0 0 0 0 0 5 46-55 4
06:00 2 4 10 13 4 1 0 0 0 0 0 0 0 0 34 41-50 23
07:00 2 7 23 21 9 0 0 0 0 0 0 0 0 0 62 41-50 44
08:00 2 6 26 51 29 9 1 2 0 0 0 0 0 0 126 46-55 80
09:00 0 7 19 26 13 6 0 0 0 0 0 0 0 0 71 41-50 45
10:00 3 7 13 21 6 0 0 0 0 0 0 0 0 0 50 41-50 34
11:00 5 7 14 12 8 2 0 0 0 0 0 0 0 0 48 41-50 26
12 PM 0 2 20 22 11 0 0 0 1 0 0 0 0 0 56 41-50 42
13:00 5 4 16 24 19 5 2 1 0 0 0 0 0 0 76 46-55 43
14:00 5 11 12 26 19 4 0 0 0 0 0 0 0 0 77 46-55 45
15:00 5 3 43 70 25 6 0 0 0 0 0 0 0 0 152 41-50 113
16:00 5 6 37 56 50 8 2 1 1 0 0 0 0 0 166 46-55 106
17:00 2 3 28 51 37 5 1 0 0 0 0 0 0 0 127 46-55 88
18:00 3 1 20 35 19 2 1 1 0 0 0 0 0 0 82 41-50 55
19:00 1 3 11 38 18 3 1 0 0 0 0 0 1 0 76 46-55 56
20:00 2 2 13 23 9 0 0 0 0 0 0 0 0 0 49 41-50 36
21:00 0 2 9 17 6 1 1 0 0 0 0 0 0 0 36 41-50 26
22:00 1 5 7 11 6 1 0 0 0 0 0 0 0 0 31 41-50 18
23:00 1 0 3 7 1 2 0 0 0 0 0 0 0 0 14 41-50 10
Total 44 85 330 529 291 56 9 5 2 0 0 0 1 0 1352
Percent 3.3% 6.3% 24.4% 39.1% 21.5% 4.1% 0.7% 0.4% 0.1% 0.0% 0.0% 0.0% 0.1% 0.0%
AM Peak 11:00 07:00 08:00 08:00 08:00 08:00 08:00 08:00 08:00
PM Peak 13:00 14:00 15:00 15:00 16:00 16:00 13:00 13:00 12:00 19:00 16:00
Total 147 334 1057 1459 676 135 21 11 2 2 0 0 1 0 3845
Percent 3.8% 8.7% 27.5% 37.9% 17.6% 3.5% 0.5% 0.3% 0.1% 0.1% 0.0% 0.0% 0.0% 0.0%
15th Percentile : 40 MPH
50th Percentile : 46 MPH
85th Percentile : 52 MPH
95th Percentile : 54 MPH
Stats 10 MPH Pace Speed : 41-50 MPH
Number in Pace : 2516
Percent in Pace : 65.4 %
Number of Vehicles > 55 MPH : 172
Percent of Vehicles > 55 MPH : 4.5 %
Mean Speed(Average) : 46 MPH
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 29-38 1
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
03:00 4 0 1 1 0 0 0 0 0 0 0 0 0 0 6 41-50 2
04:00 3 7 5 1 3 2 1 0 0 0 0 0 0 0 22 36-45 12
05:00 5 12 9 6 3 10 4 1 0 0 0 0 0 0 50 36-45 21
06:00 10 22 16 12 18 16 5 2 0 0 0 0 0 0 101 36-45 38
07:00 6 25 20 9 32 18 10 2 0 0 0 0 0 0 122 51E0 50
08:00 6 12 11 12 27 16 4 0 1 0 0 0 0 0 89 51-60 43
09:00 9 9 11 15 30 15 7 0 0 0 0 0 0 0 96 46-55 45
10:00 7 7 9 11 9 5 3 0 0 0 0 0 0 0 51 46-55 20
11:00 4 14 8 10 10 10 0 0 0 0 0 0 0 0 56 36-45 22
12 PM 7 12 8 5 13 3 2 0 0 0 0 0 0 0 50 36-45 20
13:00 4 6 4 11 7 5 0 0 1 0 0 0 0 0 38 46-55 18
14:00 7 12 8 14 13 10 1 0 0 0 0 0 0 0 65 46-55 27
15:00 8 9 10 32 42 26 6 1 0 0 0 0 0 0 134 46-55 74
16:00 8 11 15 13 28 26 8 1 0 0 1 0 0 0 111 51-60 54
17:00 5 16 15 8 13 8 5 0 0 0 0 0 0 0 70 36-45 31
18:00 2 5 13 7 13 19 3 1 0 0 0 0 0 0 63 51-60 32
19:00 4 5 5 3 12 8 3 1 0 0 0 0 0 0 41 51-60 20
20:00 3 9 3 9 5 4 0 0 0 0 0 0 0 0 33 46-55 14
21:00 2 3 3 3 1 1 1 0 0 0 0 0 0 0 14 41-50 6
22:00 1 7 0 3 0 1 0 0 0 0 0 1 0 0 13 35-44 7
23:00 0 0 1 0 1 0 1 1 0 0 0 0 0 0 4 59-68 2
Total 105 204 175 185 280 203 64 10 2 0 1 1 0 0 1230
Percent 8.5% 16.6% 142% 15.0% 22.8% 16.5% 5.2% 0.8% 0.2% 0.0% 0.1% 0.1% 0.0% 0.0%
AM Peak 06:00 07:00 07:00 09:00 07:00 07:00 07:00 06:00 08:00 07:00
PM Peak 15:00 17:00 16:00 15:00 15:00 15:00 16:00 15:00 13:00 16:00 22:00 15:00
Vol. 8 16 15 32 42 26 8 1 1 1 1 134
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 2
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00
02:00
03:00
04:00
05:00
06:00
07:00
08:00
09:00
10:00
11:00
12 PM
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
1
0
3
5
5
4
6
13
11
6
7
1
4
3
4
6
7
5
1
2
2
3
0
0
1
3
14
17
26
9
7
7
11
14
5
7
11
4
9
5
6
7
3
3
0
0
0
5
10
23
19
8
11
2
8
12
9
3
9
16
16
7
6
5
4
0
0
0
1
0
4
6
15
16
8
3
7
12
11
12
22
15
11
11
10
3
3
1
0
0
1
1
10
20
30
24
31
4
16
19
14
17
43
32
17
19
12
10
2
0
1
0
1
2
7
18
26
27
20
9
4
6
4
10
37
17
16
14
9
5
4
2
0
0
0
0
7
20
13
4
9
1
0
2
0
3
4
5
5
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
7
17
58
113
141
105
97
33
53
66
48
56
130
95
81
66
44
33
18
9
49-58
51-60
36-45
36-45
36-45
51-60
51-60
51-60
51-60
46-55
46-55
46-55
46-55
51-60
50-59
51-60
51-60
46-55
50-59
40-49
36-45
Percent 7.9% 13.4% 13.5% 13.4% 25.3% 18.7% 6.0% 1.3% 0.3% 0.1% 0.1% 0.0% 0.0% 0.0%
AM Peak 08:00 07:00 06:00 08:00 09:00 08:00 06:00 06:00 04:00 08:00 07:00 07:00
Vol. 13 26 23 16 31 27 20 4 1 1 1 141
PM Peak 17:00 12:00 16:00 15:00 15:00 15:00 16:00 18:00 15:00
Vol. 7 14 16 22 43 37 5 2 130
SHERBURNE COUNTY PUBLIC WORKS Page 3
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
South Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/05/22 1 1 0 1 1 0 0 0 0 0 0 0 0 0 4 44-53 2
01:00 0 0 2 0 1 0 0 0 0 0 0 0 0 0 3 35-44 2
02:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
03:00 3 1 1 1 1 1 1 0 0 0 0 0 0 0 9 56E5 2
04:00 1 6 5 2 1 2 1 1 0 0 0 0 0 0 19 36-45 11
05:00 4 14 10 2 11 13 4 1 0 0 0 0 0 0 59 51-60 24
06:00 9 23 7 17 18 23 10 1 0 0 0 0 0 0 108 51-60 41
07:00 7 24 28 19 39 21 9 2 1 0 0 0 0 0 150 51Fi0 60
08:00 6 12 17 15 30 23 7 0 0 0 0 0 0 0 110 51-60 53
09:00 6 12 17 16 36 20 1 0 0 0 0 0 0 0 108 51Fi0 56
10:00 6 9 3 16 10 7 6 0 1 0 0 0 0 0 58 46-55 26
11:00 5 7 6 12 14 7 3 0 0 0 0 0 0 0 54 46-55 26
12 PM 5 4 10 8 22 9 2 0 1 0 0 0 0 0 61 49-58 31
13:00 7 10 21 10 14 6 1 1 0 0 0 0 0 0 70 41-50 31
14:00 2 5 8 10 10 6 5 2 0 0 0 0 0 0 48 45-54 20
15:00 5 11 14 21 42 30 5 1 0 0 0 0 0 0 129 51-60 72
16:00 5 9 9 16 20 33 11 0 0 0 0 0 0 0 103 51-60 53
17:00 6 9 12 11 18 25 4 0 0 0 0 0 0 0 85 51-60 43
18:00 4 7 8 9 15 10 0 0 0 1 0 0 0 0 54 49-58 25
19:00 6 11 3 12 9 10 3 0 0 0 0 0 0 0 54 46-55 21
20:00 4 3 4 6 8 5 2 1 0 0 0 0 0 0 33 46-55 14
21:00 1 6 4 6 4 1 0 0 0 0 0 0 0 0 22 46-55 10
22:00 4 6 2 0 4 4 1 0 0 0 0 0 0 0 21 51E0 8
23:00 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 35-44 1
Total 98 191 191 210 328 256 76 10 3 1 0 0 0 0 1364
Percent 7.2% 14.0% 14.0% 15.4% 24.0% 18.8% 5.6% 0.7% 0.2% 0.1% 0.0% 0.0% 0.0% 0.0%
AM Peak 06:00 07:00 07:00 07:00 07:00 06:00 06:00 07:00 07:00 07:00
Vol. 9 24 28 19 39 23 10 2 1 150
PM Peak 13:00 15:00 13:00 15:00 15:00 16:00 16:00 14:00 12:00 18:00 15:00
Vol. 7 11 21 21 42 33 11 2 1 1 129
Total 304 566 539 566 931 698 217 37 9 2 2 1 0 0 3872
Percent 7.9% 14.6% 13.9% 14.6% 24.0% 18.0% 5.6% 1.0% 0.2% 0.1% 0.1% 0.0% 0.0% 0.0%
15th Percentile : 37 MPH
50th Percentile : 49 MPH
85th Percentile : 57 MPH
95th Percentile : 61 MPH
Stats 10 MPHPaceSpeed: 51Fi0 MPH
Number in Pace : 1629
Percent in Pace : 42.1 %
Number of Vehicles > 55 MPH : 966
Percent of Vehicles > 55 MPH : 24.9 %
Mean Speed(Average) : 48 MPH
SHERBURNE COUNTY PUBLIC WORKS Page 4
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/03/22 0 1 1 0 0 0 0 0 0 0 0 0 0 0 2 34-43 2
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
02:00 0 1 1 1 0 0 0 0 0 0 0 0 0 0 3 34-43 2
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 0 1 0 1 0 0 0 0 0 0 0 0 0 0 2 29-38 1
05:00 0 1 1 1 1 0 0 0 0 0 0 0 0 0 4 34-43 2
06:00 3 2 9 9 8 2 0 0 0 0 0 0 0 0 33 41-50 18
07:00 6 7 16 19 12 1 0 0 0 0 0 0 0 0 61 41-50 35
08:00 12 10 24 46 12 2 0 0 0 0 0 0 0 0 106 41-50 70
09:00 11 11 14 21 12 0 0 0 0 0 0 0 0 0 69 41-50 35
10:00 3 7 6 14 6 0 0 0 0 0 0 0 0 0 36 46-55 20
11:00 4 11 12 7 0 0 0 0 0 0 0 0 0 0 34 36-45 23
12 PM 9 9 10 6 7 0 0 0 0 0 0 0 0 0 41 36-45 19
13:00 3 20 13 12 9 1 0 0 0 0 0 0 0 0 58 36-45 33
14:00 6 13 19 25 6 1 0 0 0 0 0 0 0 0 70 41-50 44
15:00 5 17 29 41 26 1 0 0 0 0 0 0 0 0 119 41-50 70
16:00 4 33 31 49 20 2 1 0 0 0 0 0 0 0 140 41-50 80
17:00 4 21 24 37 17 3 2 0 0 0 0 0 0 0 108 41-50 61
18:00 3 22 15 15 21 3 1 0 0 0 0 0 0 0 80 36-45 37
19:00 4 13 25 19 10 1 0 0 0 0 0 0 0 0 72 41-50 44
20:00 3 18 16 12 5 1 0 0 0 0 0 0 0 0 55 36-45 34
21:00 4 11 7 7 3 1 0 0 0 0 0 0 0 0 33 36-45 18
22:00 4 5 7 5 2 0 0 0 0 0 0 0 0 0 23 41-50 12
23:00 1 1 2 2 0 0 0 0 0 0 0 0 0 0 6 39-48 4
Total 89 235 282 349 177 19 4 0 0 0 0 0 0 0 1155
Percent 7.7% 20.3% 24.4% 302% 15.3% 1.6% 0.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 09:00 08:00 08:00 07:00 06:00 08:00
Vol. 12 11 24 46 12 2 106
PM Peak 12:00 16:00 16:00 16:00 15:00 17:00 17:00 16:00
Vol. 9 33 31 49 26 3 2 140
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 5
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Speed in Pace
05/04/22 1 2 0 0 0 0 0 0 0 0 0 0 0 0 3 35-44 2
01:00 1 0 0 0 1 0 0 0 0 0 0 0 0 0 2 44-53 1
02:00 1 0 1 0 1 0 0 0 0 0 0 0 0 0 3 34-43 1
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 0 0 1 2 0 0 0 0 0 0 0 0 0 0 3 40-49 3
05:00 1 0 2 3 0 0 0 0 0 0 0 0 0 0 6 41-50 5
06:00 0 1 7 7 7 6 0 0 0 0 0 0 0 0 28 41-50 14
07:00 1 3 11 14 9 7 0 0 0 0 0 0 0 0 45 41-50 25
08:00 3 9 17 55 24 4 0 0 0 0 0 0 0 0 112 46-55 79
09:00 6 2 12 24 15 4 0 0 0 0 0 0 0 0 63 46-55 39
10:00 1 6 3 8 7 0 0 0 0 0 0 0 0 0 25 46-55 15
11:00 3 8 10 13 8 1 0 0 0 0 0 0 0 0 43 41-50 23
12 PM 1 11 17 18 3 1 0 0 0 0 0 0 0 0 51 41-50 35
13:00 0 7 20 12 9 2 0 0 0 0 0 0 0 0 50 41-50 32
14:00 1 10 28 26 12 2 0 0 0 0 0 0 0 0 79 41-50 54
15:00 0 18 19 50 34 1 0 0 0 0 0 0 0 0 122 46-55 84
16:00 2 28 42 51 36 8 0 0 0 0 0 0 0 0 167 41-50 93
17:00 6 17 45 45 20 10 0 0 0 0 0 0 0 0 143 41-50 90
18:00 3 15 15 18 16 1 0 0 0 0 0 0 0 0 68 46-55 34
19:00 3 16 18 14 10 1 0 0 0 0 0 0 0 0 62 36-45 34
20:00 9 20 14 10 6 0 0 0 0 0 0 0 0 0 59 36-45 34
21:00 1 14 5 6 1 0 0 0 0 0 0 0 0 0 27 36-45 19
22:00 1 10 9 4 1 0 0 0 0 0 0 0 0 0 25 36-45 19
23:00 3 3 5 1 0 0 0 0 0 0 0 0 0 0 12 36-45 8
Total 48 200 301 381 220 48 0 0 0 0 0 0 0 0 1198
Percent 4.0% 16.7% 25.1% 31.8% 18.4% 4.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 09:00 08:00 08:00 08:00 08:00 07:00 08:00
PM Peak 20:00 16:00 17:00 16:00 16:00 17:00 16:00
Vol. 9 28 45 51 36 10 167
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 6
Site Code: 2
Station ID:
CH 40--370ft S of 190th
Power Pole--east side
Latitude: 0' 0.0000 Undefined
North Bound
Start 1 36 41 46 51 56 61 66 71 76 81 86 91 96 Pace Number
Time 35 40 45 50 55 60 65 70 75 80 85 90 95 999 Total Soeed in Pace
01:00 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 34-43 1
02:00 0 2 1 0 0 0 0 0 0 0 0 0 0 0 3 34-43 3
03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *
04:00 0 1 0 0 1 0 0 0 0 0 0 0 0 0 2 29-38 1
05:00 0 1 2 2 0 0 0 0 0 0 0 0 0 0 5 39-48 4
06:00 3 6 4 6 13 1 0 0 0 0 0 0 0 0 33 46-55 19
07:00 1 13 10 22 15 1 0 0 0 0 0 0 0 0 62 46-55 37
08:00 7 11 23 56 14 0 0 0 0 0 0 0 0 0 111 41-50 79
09:00 3 9 14 32 20 2 0 0 0 0 0 0 0 0 80 46-55 52
10:00 4 10 14 11 6 0 0 0 0 0 0 0 0 0 45 39-48 25
11:00 2 7 12 12 10 2 0 0 0 0 0 0 0 0 45 41-50 24
12 PM 2 9 23 13 6 0 0 0 0 0 0 0 0 0 53 41-50 36
13:00 2 12 26 16 14 3 0 0 0 0 0 0 0 0 73 41-50 42
14:00 4 13 22 17 13 4 0 0 0 0 0 0 0 0 73 41-50 39
15:00 8 19 30 55 30 4 0 0 0 0 0 0 0 0 146 41-50 85
16:00 5 17 35 60 28 5 0 0 0 0 0 0 0 0 150 41-50 95
17:00 2 18 39 39 24 2 0 0 0 0 0 0 0 0 124 41-50 78
18:00 4 19 20 22 16 2 0 0 0 0 0 0 0 0 83 41-50 42
19:00 2 18 15 20 10 3 0 0 0 0 0 0 0 0 68 41-50 35
20:00 3 18 15 12 2 1 0 0 0 0 0 0 0 0 51 36-45 33
21:00 2 5 15 12 2 0 0 0 0 0 0 0 0 0 36 41-50 27
22:00 3 15 6 2 2 0 0 0 0 0 0 0 0 0 28 36-45 21
23:00 1 4 3 5 1 0 0 0 0 0 0 0 0 0 14 41-50 8
Total 58 229 331 416 227 30 0 0 0 0 0 0 0 0 1291
Percent 4.5% 17.7% 25.6% 322% 17.6% 2.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
AM Peak 08:00 07:00 08:00 08:00 09:00 09:00 08:00
PM Peak 15:00 15:00 17:00 16:00 15:00 16:00
16:00
Total 195 664 914 1146 624 97 4 0 0 0 0 0 0 0 3644
Percent 5.4% 182% 25.1% 31.4% 17.1% 2.7% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15th Percentile : 37 MPH
50th Percentile : 45 MPH
85th Percentile : 51 MPH
95th Percentile : 54 MPH
Stats 10 MPH Pace Speed : 41-50 MPH
Number in Pace : 2060
Percent in Pace : 56.5 %
Number of Vehicles > 55 MPH : 101
Percent of Vehicles > 55 MPH : 2.8 %
Mean Speed(Average) : 44 MPH
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 4
Station ID:
CH 40--570ft north of 191st
Jct signs-east side
Latitude: 0' 0.0000 Undefined
Start 02-May-22 Tue Wed Thu Fri Sat Sun WeekAverage
Time South Bou North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo
12:00 AM * * 2 1 4 4 * " * 3 2
01:00 * 0 1 1 1 3 1 * * * 1 1
02:00 * 0 2 1 3 0 2 * * * 0 2
03:00 * 0 3 2 2 3 2 * ' * 2 2
04:00 * 6 5 5 3 4 8 * * * 5 5
05:00 * 26 17 29 22 29 12 * * * 28 17
06:00 * 54 51 69 43 83 51 * ' * 69 48
07:00 * 106 92 114 91 123 89 * * * 114 91
08:00 * 111 74 119 85 114 86 * " * 115 82
09:00 * 91 105 98 112 88 116 * * * 92 111
10:00 * 41 43 55 43 54 44 * * * 50 43
11:00 * 60 39 55 64 69 59 * * * 61 54
12:00 PM * 56 35 63 53 62 57 * " * 60 48
01:00 * 48 63 56 48 81 55 * * * 62 55
02:00 * 75 69 77 85 71 98 * * * 74 84
03:00 * 138 133 129 122 150 153 * * * 139 136
04:00 * 109 148 90 177 108 166 * * * 102 164
05:00 * 93 99 125 133 115 133 * * * 111 122
06:00 * 66 75 94 64 79 67 * * * 80 69
07:00 * 66 52 64 56 55 52 * * * 62 53
08:00 * 51 30 50 34 53 35 * " * 51 33
09:00 * 29 19 29 18 36 23 * * * 31 20
10:00 * 10 7 11 10 17 7 * * * 13 8
11:00 * 8 6 4 5 3 8 * * * 5 6
Lane 0 0 1244 1168 1342 1275 1404 1328 0 0 0 0 0 0 1330 1256
Day 0 2412 2617 2732 0 0 0 2586
AM Peak - - 08:00 09:00 08:00 09:00 07:00 09:00 - - - - - - 08:00 09:00
Vol. 111 105 119 112 123 116 115 111
PM Peak - - 15:00 16:00 15:00 16:00 15:00 16:00 - - - - - - 15:00 16:00
v„i _ _ �zn �na ��a ��� �Fn �Fa - - - - - - �za �Fn
Comb. 0 2412 2617 2732 0 0 0 2586
Total
ADT ADT 2,589 AADT 2,589
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 1
Station ID:
CH 40--542ft N of CSAH 12
NPZ sign--East side
Latitude: 0' 0.0000 Undefined
Start 02-May-22 Tue Wed Thu Fri Sat Sun WeekAverage
Time South Bou North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo
12:00 AM * 0 2 1 3 4 7 0 0 " * 1 3
01:00 * 1 0 2 2 3 1 * * * 2 1
02:00 * 1 4 0 4 1 4 * * * 1 4
03:00 * 7 0 8 0 9 0 * ' * 8 0
04:00 * 23 2 19 4 20 2 * * * 21 3
05:00 * 53 3 59 8 62 5 * * * 58 5
06:00 * 104 40 114 34 112 34 * ' * 110 36
07:00 * 131 62 149 53 154 62 * * * 145 59
08:00 * 92 120 105 124 113 126 * " * 103 123
09:00 * 96 60 92 47 109 71 * * * 99 59
10:00 * 56 41 39 33 64 50 * * * 53 41
11:00 * 56 34 66 47 62 48 * ' * 61 43
12:00 PM * 53 44 71 56 64 56 * * * 63 52
01:00 * 49 61 52 56 71 76 * * * 57 64
02:00 * 66 78 64 97 54 77 * " * 61 84
03:00 * 139 124 138 128 139 152 * * * 139 135
04:00 * 120 140 102 178 108 166 * " * 110 161
05:00 * 76 115 90 132 87 127 * * * 84 125
06:00 * 63 94 65 67 56 82 * * * 61 81
07:00 * 42 74 45 73 55 76 * * * 47 74
08:00 * 39 60 32 59 31 49 * * * 34 56
09:00 * 16 36 17 26 22 36 * * * 18 33
10:00 * 13 25 9 27 20 31 * * * 14 28
11:00 * 4 6 4 10 2 14 * " * 3 10
Lane 0 0 1300 1225 1343 1268 1422 1352 0 0 0 0 0 0 1353 1280
Day 0 2525 2611 2774 0 0 0 2633
AM Peak - - 07:00 08:00 07:00 08:00 07:00 08:00 - - - - - - 07:00 08:00
Vol. 131 120 149 124 154 126 145 123
PM Peak - - 15:00 16:00 15:00 16:00 15:00 16:00 - - - - - - 15:00 16:00
\/nl _ _ 1'2Q 1d(1 1'2R 17R 1'2Q 1RR _ _ _ _ _ _ 1'2Q 1R1
Comb. 0 2525 2611 2774 0 0 0 2633
Total
ADT ADT 2,635 AADT 2,635
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 2
Station ID:
CH 40--370ft south of 190th
Power pole-east side
Latitude: 0' 0.0000 Undefined
Start 02-May-22 Tue Wed Thu Fri Sat Sun WeekAverage
Time South Bou North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo
12:00 AM * 0 2 1 3 4 5 * " * 2 3
01:00 * 1 0 2 2 3 1 * * * 2 1
02:00 * 0 3 0 3 0 3 * * * 0 3
03:00 * 6 0 7 0 9 0 * ' * 7 0
04:00 * 22 2 17 3 19 2 * * * 19 2
05:00 * 50 4 58 6 59 5 * * * 56 5
06:00 * 101 33 113 28 108 33 * ' * 107 31
07:00 * 122 61 141 45 150 62 * * * 138 56
08:00 * 89 106 105 112 110 111 * " * 101 110
09:00 * 96 69 97 63 108 80 * * * 100 71
10:00 * 51 36 33 25 58 45 * * * 47 35
11:00 * 56 34 53 43 54 45 * ' * 54 41
12:00 PM * 50 41 66 51 61 53 * * * 59 48
01:00 * 38 58 48 50 70 73 * * * 52 60
02:00 * 65 70 56 79 48 73 * " * 56 74
03:00 * 134 119 130 122 129 146 * * * 131 129
04:00 * 111 140 95 167 103 150 * " * 103 152
05:00 * 70 108 81 143 85 124 * * * 79 125
06:00 * 63 80 66 68 54 83 * * * 61 77
07:00 * 41 72 44 62 54 68 * * * 46 67
08:00 * 33 55 33 59 33 51 * * * 33 55
09:00 * 14 33 18 27 22 36 * * * 18 32
10:00 * 13 23 9 25 21 28 * * * 14 25
11:00 * 4 6 5 12 2 14 * " * 4 11
Lane 0 0 1230 1155 1278 1198 1364 1291 0 0 0 0 0 0 1289 1213
Day 0 2385 2476 2655 0 0 0 2502
AM Peak - - 07:00 08:00 07:00 08:00 07:00 08:00 - - - - - - 07:00 08:00
Vol. 122 106 141 112 150 111 138 110
PM Peak - - 15:00 16:00 15:00 16:00 15:00 16:00 - - - - - - 15:00 16:00
\/nl _ _ 1'2d 1d(1 1'2(1 1C.7 1�Q 1F(1 _ _ _ _ _ _ 1'21 1F�
Comb. 0 2385 2476 2655 0 0 0 2502
Total
ADT ADT 2,505 AADT 2,505
SHERBURNE COUNTY PUBLIC WORKS
13880 Business Center Drive; Suite #100
Elk River, MN 55330
Page 1
Site Code: 3
Station ID:
CH 40--600ft south of 191 st
Power pole--east side
Latitude: 0' 0.0000 Undefined
Start 02-May-22 Tue Wed Thu Fri Sat Sun WeekAverage
Time South Bou North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo South Bo North Bo
12:00 AM * * 1 1 3 4 * " * 2 2
01:00 * 0 0 1 1 2 0 * * * 1 0
02:00 * 0 2 0 2 0 1 * * * 0 2
03:00 * 1 0 3 1 4 0 * ' * 3 0
04:00 * 7 1 4 5 5 2 * * * 5 3
05:00 * 24 9 24 17 31 6 * * * 26 11
06:00 * 51 34 67 30 70 31 * ' * 63 32
07:00 * 81 65 96 58 108 63 * * * 95 62
08:00 * 76 91 85 99 88 100 * " * 83 97
09:00 * 82 69 85 81 91 90 * * * 86 80
10:00 * 33 30 29 27 45 32 * * * 36 30
11:00 * 40 21 29 35 49 38 * * * 39 31
12:00 PM * 33 23 54 29 49 41 * " * 45 31
01:00 * 33 39 35 42 55 53 * * * 41 45
02:00 * 54 46 58 64 47 60 * * * 53 57
03:00 * 124 102 118 108 126 124 * * * 123 111
04:00 * 98 104 84 124 95 120 * * * 92 116
05:00 * 49 74 70 108 76 98 * * * 65 93
06:00 * 44 49 61 45 48 54 * * * 51 49
07:00 * 43 42 34 33 37 42 * * * 38 39
08:00 * 33 27 28 31 28 23 * " * 30 27
09:00 * 16 18 14 12 24 21 * * * 18 17
10:00 * 6 11 3 10 12 13 * * * 7 11
11:00 * 5 3 3 2 1 5 * * * 3 3
Lane 0 0 933 860 986 965 1094 1021 0 0 0 0 0 0 1005 949
Day 0 1793 1951 2115 0 0 0 1954
AM Peak - - 09:00 08:00 07:00 08:00 07:00 08:00 - - - - - - 07:00 08:00
Vol. 82 91 96 99 108 100 95 97
PM Peak - - 15:00 16:00 15:00 16:00 15:00 15:00 - - - - - - 15:00 16:00
v„i _ _ ��n �nn ��n ��n ��F ��n - - - - - - ��z ��F
Comb. 0 1793 1951 2115 0 0 0 1954
Total
ADT ADT 1,954 AADT 1,954
� Architecture + Engineering+ Environmental + Planning Appendix F
PROJECT TRAFFIC FOR Cleveland (C.R. 40) AT 181st Avenue NW (C.S.A.H. 12)
DESIGN HOURTURNING MOVEMENTS IN YEAR2022 DESIGN HOURTURNING MOVEMENTS IN YEAR 2023
Cleveland (C.R. 40) Cleveland (C.R. 40)
(2700) (2800)
143 147
54.878 0.0 0� 452fi5� � 184Cts Qes kZ) w 54.981 0.0°k0� 45.1fi6� �g1stA�enu14.9°k(C.S.A.H.
1
,� 434 854°k 508 (8100) ,� 439 85.1°k 516 (8200)
172°k 58 � 17.6°k 61 �
(8100) 339 82.8� (8200) 344 82.4�
0.0°k 0 0.0°k 0
181stAvenue N� 181stAvenue N�
C.S.A.H. 12) � 01 0� D Factors C.S.A.H. 12) � Ot 0� D Factors
(XXXXX) 2022AP,DT 0.0°k 0.0°k� 0.0°k 50.0%NB (XXXXX) 2023AP,DT 0.0°k 0.0°kl o.o� 50.0%NB
X)00C 2022DDHV 0 50.0%SB X)00C 2023DDHV 0 50.0%SB
KML= 10.50% 0 60.0%WB KML= 10.50% 0 60.0%WB
K SS = 10.50% ClevelarM(C.R.40) 40.0% EB K SS = 10.50% Cleveland (C.R. 40) 40.0% EB
DESIGN HOURTURNING MOVEMENTS IN YEAR2026 DESIGN HOURTURNING MOVEMENTS IN YEAR 2046
Cleveland (C.R. 40) Cleveland (C.R. 40)
(3000) (4400)
158 229
S�.OkI 0.0�1 45.0�� 55�Ok1 D.Ok1 45.Ok�
87 0 71 181stAvenueNW 126 0 103 181stAvenueNW(C.S.A.H.
(C.S.A.H. 12) 12)
83 15.4°k 120 17.7°k
45� 537 (8500) 55� 679 (11000)
0 0.0°k 0 0.0°k
182°k 65 � 20.9°k 95 �
(8500) 358 81.8� (11000) 453 79.1�
0.0°k 0 0.0°k 0
181stAvenue N� } 181stAvenue N� 1
C.S.A.H. 12) � OI 0� D Factors C.S.A.H. 12) � OI 0� D Factors
(XXXXX) 2026AP,DT 0.0°k 0.0°k� 0.0°k 50.0%NB (XXXXX) 2046AP,DT 0.0°k 0.0°kl o.o� 50.0%NB
X)00C 2026DDHV 0 50.0%SB X)00C 2046DDHV 0 50.0%SB
KML= 10.50% 0 60.0%WB KML= 10.50% 0 60.0%WB
K SS = 10.50% ClevelarM(C.R.40) 40.0% EB K SS = 10.50% Cleveland (C.R. 40) 40.0% EB
PROJECT TRAFFIC FOR Cleveland (C.R. 40) AT 181st Avenue NW (C.S.A.H. 12)
2022 INPUT TMCs COMPARED TO 2022 DHV 2022 INPUT TMCs COMPARED TO 2023 DHV
Cleveland (C.R. 40) Cleveland (C.R. 40)
0 0 0 0 0 0
78 0 65 81 0 66
� WA � WA 18��tsAe�u�Z)W � WA � WA 181stAvenu�Z�NW(C.S.A.H.
1 WA 74 0 WA 77 0
w�o w�o
wn o o wn o 0
o sa wn � o s� wn �
o za� w� 0 283 W�
0 own o ow�
181stAvenue N� 181stAvenue NW
C.S.A.H.12 WA WA WA C.S.A.H.12 WA WA WA
„ �oor „ �oor
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2022 DHV ClevelarM(C.R.40) X)OC Calculated 2023 DHV Cleveland (C.R. 40)
X.XX Ratio X.XX Ratio
2022 INPUT TMCs COMPARED TO 2026 DHV 2022 INPUT TMCs COMPARED TO 2046 DHV
Cleveland (C.R. 40) Cleveland (C.R. 40)
0 0 0 0 0 0
87 0 I 71 126 0 I 103
� WA 1 WA � WACts 83 �120W � WA 1 WA 181stwAenu120W(D.S.A.H.
1
w�o w�o
o �� w� � o �� w� �
0 293 N/A �, 0 358 N/A �,
0 OWA 0 OWA
181stAvenue N� 181stAvenue N�
C.S.A.H.12 WA WA WA C.S.A.H.12 WA WA WA
„ �oor „ �oor
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2026 DHV ClevelarM(C.R.40) X)OC Calculated 2046 DHV Cleveland (C.R. 40)
X.XX Ratio X.XX Ratio
PROJECT TRAFFIC FOR Cleveland (CR 40) AT Twin Lakes Road (CSAH 13)
DESIGN HOURTURNING MOVEMENTS IN YEAR2022 DESIGN HOURTURNING MOVEMENTS IN YEAR 2023
ClevelarM (CR 40) ClevelarM (CR 40)
0 0
0 0
0.0°k0 0.0 0� 0.0 0� Twin Lakes Road (CSAH 0.0°k0 0.0°k0� 0.0°k0� Twin Lakes Road (CSAH
13) ♦ 13)
1 0 0 0°k I 0 0 0°k
,� 387 83.9°k 461 (7300) ,� 391 83]°k 467 (7400)
74 16.1 °k 76 16.3°k
0.0°k 0 � 0.0°k 0 �
(7300) 307 80.5� (7400) 312 80.1�
19.5°k 60 19.9°k 62
Twin Lakes Road (� Twin Lakes Road (�
(XXXXX) 2022AP,DT 55.8°k 0.0°k� 442°k� 00%NB (XXXXX) 2023AP,DT 56.0°k 0.0°k� 44.0°k� 00%NB
X)00C 2022 DDHV 143 X)00C 2023 DDHV 147
K ML = 10.50% (2700) 60.0% WB K ML = 10.50% (2800) 60.0% WB
K SS = 10.50% Cleveland (CR 40) 40.0 % EB K SS = 10.50% ClevelarM (CR 40) 40.0% EB
DESIGN HOURTURNING MOVEMENTS IN YEAR2026 DESIGN HOURTURNING MOVEMENTS IN YEAR 2046
ClevelarM (CR 40) ClevelarM (CR 40)
0 0
0 0
0.0°k 0.0°k 0.0°k 0.0°k 0.0°k 0.0°k
�I 0 0� Twin Lakes Road (CSAH �I 0 0� Twin Lakes Road (CSAH
13) 13)
0 0.0°k 0 0.0°k
40� 488 (7700) 50� 626 (9900)
82 16.8°k 117 18.7°k
0.0°k 0 � 0.0°k 0 �
(7700) 325 79.8� (9900) 418 77.4�
20.2°k 66 22.6°k 94
Twin Lakes Road (� Twin Lakes Road (�
(XXXXX) 2026AP,DT SSB°k 0.0°k� 44.4°k� 00%NB (XXXXX) 2046AP,DT 55.9°k 0.0°k� M.1k� 00%NB
X)00C 2026 DDHV 158 X)00C 2046 DDHV 229
K ML = 10.50% (3000) 60.0% WB K ML = 10.50% (4400) 60.0% WB
K SS = 10.50% Cleveland (CR 40) 40.0 % EB K SS = 10.50% ClevelarM (CR 40) 40.0% EB
PROJECT TRAFFIC FOR Cleveland (CR 40) AT Twin Lakes Road (CSAH 13)
2022 INPUT TMCs COMPARED TO 2022 DHV 2022 INPUT TMCs COMPARED TO 2023 DHV
ClevelarM (CR 40) ClevelarM (CR 40)
0 0 0 0 0 0
0 0 0 0 0 0
WA WA WA Twin Lakes Road (CSAH WA WA WA Twin Lakes Road (CSAH
~ 13) ~ 13)
1 WA 0 0 WA 0 0
w�o w�o
wn �a o wn �s o
0 own � o own �
o za� w� 0 250 W�
o so wn o sz w�
Twin Lakes Road (� Twin Lakes Road (CSAH
13) WA WA 1 WA r 13) WA WA 1 WA r
80 0 I 63 I 82 0 I 65 I
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2022 DHV Cleveland (CR 40) X)OC Calculated 2023 DHV ClevelarM (CR 40)
X.XX Ratio X.XX Ratio
2022 INPUT TMCs COMPARED TO 2026 DHV 2022 INPUT TMCs COMPARED TO 2046 DHV
ClevelarM (CR 40) ClevelarM (CR 40)
0 0 0 0 0 0
0 0 I 0 0 0 I 0
� WA 1 WA Twin Lake �� ad (CSAH � WA 1 WA Twin Lake �)oad (CSAH
1 WA 0 0 T WA 0 0
w�o w�o
o �� w� � o �� w� �
0 259 N/A �, 0 324 N/A �,
0 66 WA 0 94 WA
Twin Lakes Road (� Twin Lakes Road (�
13) WA WA 1 WA r 13) WA WA 1 WA r
88 0 I 70 I 128 0 I 101 I
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2026 DHV Cleveland (CR 40) X)OC Calculated 2046 DHV ClevelarM (CR 40)
X.XX Ratio X.XX Ratio
PROJECT TRAFFIC FOR Twin Lakes Road NW (CSAH 13) AT Twin Lakes Parkway NW
DESIGN HOURTURNING MOVEMENTS IN YEAR2022 DESIGN HOURTURNING MOVEMENTS IN YEAR 2023
Twin Lakes Road NW (CSAH 13) Twin Lakes Road NW (CSAH 13)
(6900) (7000)
325 330
11.838 69.227I 18.Sfi0� Twin Lakes Parkway NW 11.839 70.232I 17.959� Twin Lakes Parkway NW
+ � 15 42.9°k + I 16 42.7°k
,� 3 82°k 36 (1100) ,� 3 82°k 37 (1100)
18 48.9°k 18 49.1°k
41.0°k 32 � 40.9°k 32 �
(1500) 78 12.3� (1600) 79 12.0�
46.7°k 36 47.1 °k 37
Twin Lakes Parkwa� 62 3211I 98 D Factors Twin Lakes Parkw� 63 328 97 D Factors
(XXXXX) 2022AP,DT 1� 66.8°kl 20.3°k� 55.0%NB (XXXXX) 2023AP,DT 1� 672°k� 19.8°k� 55.0%NB
X)00C 2022DDHV 481 45.0%SB X)00C 2023DDHV 488 45.0%SB
K ML = 10.50% (8300) 40.0% WB K ML = 10.50% (8500) 40.0%WB
K SS = 8.50% Twin Lakes Road NW (CSAH 13) 60.0 % EB K SS = 8.50% Twin Lakes Road NW (CSAH 13) 60.0% EB
DESIGN HOURTURNING MOVEMENTS IN YEAR2026 DESIGN HOURTURNING MOVEMENTS IN YEAR 2046
Twin Lakes Road NW (CSAH 13) Twin Lakes Road NW (CSAH 13)
(7300) (9400)
345 443
11.6°k 70.2°k 18.2°k 11.6°k 70.8°k 17.6°k
� 40I 242 63� Twin Lakes Parkway NW " 51I 314 78� Twin Lakes Parkway NW
16 42.7°k 21 42.5°k
� 38 (1100) � 49 (1400)
19 492°k 24 49.5°k
40.8°k 33 � 40.8°k 42 �
(1600) 82 12.1� (2000) 104 117�
47.1 °k 39 47.5°k 49
� �
Twin Lakes Parkway NW 65 3421I 103 D Factors Twin Lakes Parkway NW 84 4421I 128 D Factors
(XXXXX) 2026AP,DT 1� 67.1°kl 20.1°k� 55.0%NB (XXXXX) 2046AP,DT 1� 67.5°kl 19B°k� 55.0%NB
X)00C 2026DDHV 510 45.0%SB X)00C 2046DDHV 654 45.0%SB
K ML = 10.50% (8800) 40.0% WB K ML = 10.50% (11000) 40.0%WB
K SS = 8.50% Twin Lakes Road NW (CSAH 13) 60.0 % EB K SS = 8.50% Twin Lakes Road NW (CSAH 13) 60.0% EB
PROJECT TRAFFIC FOR Twin Lakes Road NW (CSAH 13) AT Twin Lakes Parkway NW
2022 INPUT TMCs COMPARED TO 2022 DHV 2022 INPUT TMCs COMPARED TO 2023 DHV
Twin Lakes Road NW (CSAH 13) Twin Lakes Road NW (CSAH 13)
0 0 0 0 0 0
3�227 � 60 � Twin Lakes Parkway NW 3� 232 � 59 � Twin Lakes Parkway NW
WA WA WA WA WA WA
1 WA 15 0 WA 16 0
w�o w�o
wn �a o wn �a o
o az wn � o az wn �
o �ow� o �ow�
o as wn o a� w�
Twin Lakes Parkwa� Twin Lakes Parkway NW
WA WA 1 WA r WA WA T WA r
62 321 I 98 I 63 328 I 97 I
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2022 DHV Twin Lakes Road NW (CSAH 13) X)OC Calculated 2023 DHV Twin Lakes Road NW (CSAH 13)
X.XX Ratio X.XX Ratio
2022 INPUT TMCs COMPARED TO 2026 DHV 2022 INPUT TMCs COMPARED TO 2046 DHV
Twin Lakes Road NW (CSAH 13) Twin Lakes Road NW (CSAH 13)
0 0 0 0 0 0
4� Z42 1 63 � Twin Lakes Parkway NW 5� 3� 4 1�$ � Twin Lakes Parkway NW
WA WA WA WA WA WA
1 WA 16 0 I WA 21 0
w�o w�o
o �� w� � 0 32�� w� �
0 10 N/A �, 0 13 N/A �,
0 39 WA 0 49 WA
Twin Lakes Parkwa� Twin Lakes Parkw�
WA WA 1 WA r WA WA T WA r
65 342 I 103 I 84 442 I 128 I
(XXX) 20221nput TMCs 0 0 0 (XX� 20221nput TMCs 0 0 0
X)OC Calculated 2026 DHV Twin Lakes Road NW (CSAH 13) X)OC Calculated 2046 DHV Twin Lakes Road NW (CSAH 13)
X.XX Ratio X.XX Ratio
� Architecture + Engineering + Environmental + Planning Appendix G
HCM 2010 Roundabout
6: Twin Lakes Road NW & Twin Lakes Parkway NW/Tyler Street NW osi22i2o22
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.6
A
�
�
�
�
Left
LTR
LTR
1.000
5.193
90
806
0.975
88
786
0.112
5.7
A
0
SE
1
1
88
90
338
113
3.186
0
1.000
5.7
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
40
713
0.999
40
712
0.056
5.6
A
0
NW
1
1
40
40
461
186
3.186
0
1.000
5.6
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
533
1008
0.981
523
989
0.529
10.3
B
3
NE
1
1
523
533
114
314
3.186
0
1.000
10.3
B
�
�
�
�
�
-
�
�
�
SW
1
1
353
360
91
410
3.186
0
1.000
7.2
A
Left
LTR
LTR
1.000
5.193
360
1032
0.981
353
1012
0.349
7.2
A
2
�
-
-
-
-
2022 No Build 9:41 am 04/18/2022 2022 Existing - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2022 Existing - No Build os�22�2022
Intersection: 6: Twin Lakes Road NW & Twin Lakes Parkway NW/Tyler Street NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2022 No Build
SE NW NE SW
LTR LTR LTR LTR
50 50 95 31
15 7 53 7
46 36 95 27
84 486 447 358
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.1
A
�
�
�
�
Left
LR
LR
1.000
5.193
339
1041
0.982
333
1023
0.326
6.8
A
1
EB
1
1
333
339
82
522
3.186
0
1.000
6.8
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
166
860
0.982
163
844
0.193
6.2
A
1
NW
1
1
163
166
273
148
3.186
0
1.000
6.2
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
511
1030
0.980
501
1009
0.496
9.5
A
3
SW
1
1
501
511
93
346
3.186
0
1.000
9.5
A
2022 No Build 9:41 am 04/18/2022 2022 Existing - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2022 Existing - No Build os�22�2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2022 No Build
EB NW SW
LR LR LR
56 31 80
30 17 27
66 42 74
581 772 545
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi22i2o22
Intersection
Int Delay, s/veh 3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 58 281 434 74 65 78
Future Vol, veh/h 58 281 434 74 65 78
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 63 305 472 80 74 89
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 552 0 - 0 903 472
Stage 1 - - - - 472 -
Stage 2 - - - - 431 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1018 - - - 308 592
Stage 1 - - - - 628 -
Stage 2 - - - - 655 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1018 - - - 289 592
Mov Cap-2 Maneuver - - - - 289 -
Stage 1 - - - - 589 -
Stage 2 - - - - 655 -
Approach EB WB SB
HCM Control Delay, s 1.5 0 16.5
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 1018 - - - 289 592
HCM Lane V/C Ratio 0.062 - - - 0.256 0.15
HCM Control Delay (s) 8.8 - - - 21.7 12.1
HCM Lane LOS A - - - C B
HCM 95th %tile Q(veh) 0.2 - - - 1 0.5
2022 No Build 9:41 am 04/18/2022 2022 Existing - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2022 Existing - No Build os�22�2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2022 No Build
EB SB SB
L L R
26 97 51
25 25 33
26 29 50
3857
200 200
SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW & Twin Lakes Parkway NW/Tyler Street NW osi22i2o22
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
9.2
A
�
�
�
�
Left
LTR
LTR
1.000
5.193
95
789
0.977
93
771
0.120
5.9
A
0
SE
1
1
93
95
359
119
3.186
0
1.000
5.9
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
43
692
0.999
43
691
0.062
5.9
A
0
NW
1
1
43
43
490
194
3.186
0
1.000
5.9
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
565
1003
0.982
555
985
0.563
11.1
B
4
NE
1
1
555
565
119
335
3.186
0
1.000
11.1
B
�
�
�
�
�
-
�
�
�
SW
1
1
374
381
97
436
3.186
0
1.000
7.5
A
Left
LTR
LTR
1.000
5.193
381
1025
0.981
374
1006
0.372
7.5
A
2
�
-
-
-
-
2026 No Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 No Build
EB SB SB
L L R
31 52 70
20 26 28
41 46 60
3857
200 200
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.6
A
�
�
�
�
Left
LR
LR
1.000
5.193
361
1032
0.981
354
1012
0.350
7.2
A
2
EB
1
1
354
361
91
552
3.186
0
1.000
7.2
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
184
847
0.978
180
829
0.217
6.6
A
1
NW
1
1
180
184
288
164
3.186
0
1.000
6.6
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
541
1020
0.980
530
1000
0.530
10.2
B
3
SW
1
1
530
541
102
370
3.186
0
1.000
10.2
B
2026 No Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 No Build
EB NW SW
LR LR LR
78 79 54
24 26 21
68 81 53
581 772 545
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi22i2o22
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 65 293 454 83 71 87
Future Vol, veh/h 65 293 454 83 71 87
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 71 318 493 90 81 99
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 583 0 - 0 953 493
Stage 1 - - - - 493 -
Stage 2 - - - - 460 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 991 - - - 287 576
Stage 1 - - - - 614 -
Stage 2 - - - - 636 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 991 - - - 266 576
Mov Cap-2 Maneuver - - - - 266 -
Stage 1 - - - - 570 -
Stage 2 - - - - 636 -
Approach EB WB SB
HCM Control Delay, s 1.6 0 17.8
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 991 - - - 266 576
HCM Lane V/C Ratio 0.071 - - - 0.303 0.172
HCM Control Delay (s) 8.9 - - - 24.3 12.5
HCM Lane LOS A - - - C B
HCM 95th %tile Q(veh) 0.2 - - - 1.2 0.6
2026 No Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 No Build
EB SB SB
L L R
25 52 90
14 30 36
34 45 78
3857
200 200
SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW & Twin Lakes Parkway NW/Tyler Street NW osi22i2o22
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
13.5
B
�
�
�
�
Left
LTR
LTR
1.000
5.193
121
712
0.981
119
698
0.170
7.1
A
1
SE
1
1
119
121
462
154
3.186
0
1.000
7.1
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
56
601
0.999
56
600
0.093
7.1
A
0
NW
1
1
56
56
632
244
3.186
0
1.000
7.1
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
725
972
0.980
710
952
0.746
17.7
C
7
NE
1
1
710
725
151
432
3.186
0
1.000
17.7
C
�
�
�
�
�
-
�
�
�
SW
1
1
481
491
125
563
3.186
0
1.000
9.7
A
Left
LTR
LTR
1.000
5.193
491
997
0.980
481
977
0.492
9.7
A
3
�
-
-
-
-
2046 No Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 6: Twin Lakes Road NW & Twin Lakes Parkway NW/Tyler Street NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 No Build
SE NW NE SW
LTR LTR LTR LTR
29 31 99 56
21 18 52 24
42 43 116 69
84 486 447 358
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
12.5
B
�
�
�
�
Left
LR
LR
1.000
5.193
463
992
0.981
454
973
0.467
9.2
A
3
EB
1
1
454
463
130
712
3.186
0
1.000
9.2
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
265
789
0.981
260
774
0.336
8.7
A
1
NW
1
1
260
265
359
234
3.186
0
1.000
8.7
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
694
974
0.980
680
955
0.712
16.1
C
6
SW
1
1
680
694
148
476
3.186
0
1.000
16.1
C
2046 No Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 No Build
EB NW SW
LR LR LR
78 136 150
33 50 82
68 116 160
581 772 545
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi22i2o22
Intersection
Int Delay, s/veh 6.5
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 95 358 559 120 103 126
Future Vol, veh/h 95 358 559 120 103 126
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 103 389 608 130 117 143
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 738 0 - 0 1203 608
Stage 1 - - - - 608 -
Stage 2 - - - - 595 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 868 - - - 204 496
Stage 1 - - - - 543 -
Stage 2 - - - - 551 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 868 - - - 180 496
Mov Cap-2 Maneuver - - - - 180 -
Stage 1 - - - - 478 -
Stage 2 - - - - 551 -
Approach EB WB SB
HCM Control Delay, s 2 0 33.6
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 868 - - - 180 496
HCM Lane V/C Ratio 0.119 - - - 0.65 0.289
HCM Control Delay (s) 9.7 - - - 56.1 15.2
HCM Lane LOS A - - - F C
HCM 95th %tile Q(veh) 0.4 - - - 3.8 1.2
2046 No Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 No Build
EB WB SB SB
L T L R
75 22 116 70
44 3 62 40
84 15 113 67
675 3857
200 - 200
�
SimTraffic Report
Page 1
Appendix H: No Build Twin Lakes Parkway Northwest Connection
(2023, 2026, 2046) Synchro Analysis Worksheets
ISG
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW os�22�2022
Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1
Mvmt Flow 9 9 0 0 6 36 0 0 0 22 0 6
Major/Minor Major1
Conflicting Flow All 42
Stage 1 -
Stage 2 -
Critical Hdwy 4.11
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.209
Pot Cap-1 Maneuver 1573
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1573
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 9
- 4.11
- 2.209
- 1617
- 1617
0
Minor1 Minor2
0 54 69 9 51 51 24
- 27 27 - 24 24 -
- 27 42 - 27 27 -
- 7.11 6.51 6.21 7.11 6.51 6.21
- 6.11 5.51 - 6.11 5.51 -
- 6.11 5.51 - 6.11 5.51 -
- 3.509 4.009 3.309 3.509 4.009 3.309
- 947 823 1076 951 842 1055
- 993 875 - 997 877 -
- 993 862 - 993 875 -
- 938 818 1076 946 837 1055
- 938 818 - 946 837 -
- 987 870 - 991 877 -
- 988 862 - 987 870 -
Approach E B
HCM Control Delay, s 3.7
HCM LOS
�
�
NB SB
0 8.8
A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1573 - - 1617 - - 967
HCM Lane V/C Ratio - 0.006 - - - - - 0.028
HCM Control Delay (s) 0 7.3 0 - 0 - - 8.8
HCM Lane LOS A A A - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy os�22�2022
Intersection
Int Delay, s/veh 2.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1
Mvmt Flow 22 0 6 0 0 0 9 22 0 0 36 36
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
94 94 54 97 112 22 72
54 54 - 40 40 - -
40 40 - 57 72 - -
7.11 6.51 6.21 7.11 6.51 6.21 4.11
6.11 5.51 - 6.11 5.51 - -
6.11 5.51 - 6.11 5.51 - -
3.509 4.009 3.309 3.509 4.009 3.309 2.209
892 798 1016 888 780 1058 1534
961 852 - 977 864 - -
977 864 - 957 837 - -
888 793 1016 879
888 793 - 879
955 852 - 971
971 859 - 952
SE NW
9.1 0
A A
775 1058 1534
775 - -
859 - -
837 - -
�
�
0
Major2
0 22
- 4.11
- 2.209
- 1600
- 1600
SW
0
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1534 - - - 912 1600 - -
HCM Lane V/C Ratio 0.006 - - - 0.03 - - -
HCM Control Delay (s) 7.4 0 - 0 9.1 0 - -
HCM Lane LOS A A - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0.1 0 - -
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 3: ROAD C& Twin Lakes Pkwy
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
9.4
A
�
�
�
�
Left
LTR
LTR
1.000
5.193
88
780
0.975
86
761
0.113
5.9
A
0
SE
1
1
86
88
370
121
3.186
0
1.000
5.9
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
51
693
0.999
51
693
0.074
6.0
A
0
NW
1
1
51
51
489
210
3.186
0
1.000
6.0
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
579
1002
0.982
569
984
0.578
11.4
B
4
NE
1
1
569
579
120
338
3.186
0
1.000
11.4
B
�
�
�
�
�
-
�
�
�
SW
1
1
380
387
104
436
3.186
0
1.000
7.7
A
Left
LTR
LTR
1.000
5.193
387
1018
0.981
380
999
0.380
7.7
A
2
�
-
-
-
-
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
SE NW NE SW
LTR LTR LTR LTR
30 30 31 55
17 9 21 40
40 31 43 72
71 406 317
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.5
A
�
�
�
�
Left
LR
LR
1.000
5.193
366
1024
0.981
359
1005
0.357
7.3
A
2
EB
1
1
359
366
98
526
3.186
0
1.000
7.3
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
174
845
0.977
170
826
0.206
6.5
A
1
NW
1
1
170
174
290
174
3.186
0
1.000
6.5
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
532
1030
0.979
521
1008
0.517
9.9
A
3
SW
1
1
521
532
93
371
3.186
0
1.000
9.9
A
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
EB NW SW
LR LR LR
31 52 52
9 16 21
32 48 52
552 772 517
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi22i2o22
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 61 283 439 77 66 81
Future Vol, veh/h 93 283 439 93 76 99
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 101 308 477 101 86 113
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 578 0 - 0 987 477
Stage 1 - - - - 477 -
Stage 2 - - - - 510 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 996 - - - 274 588
Stage 1 - - - - 624 -
Stage 2 - - - - 603 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 996 - - - 246 588
Mov Cap-2 Maneuver - - - - 246 -
Stage 1 - - - - 561 -
Stage 2 - - - - 603 -
Approach EB WB SB
HCM Control Delay, s 2.2 0 19
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 996 - - - 246 588
HCM Lane V/C Ratio 0.101 - - - 0.351 0.191
HCM Control Delay (s) 9 - - - 27.3 12.6
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.3 - - - 1.5 0.7
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
EB SB SB
L L R
26 42 54
18 24 33
36 43 53
1372
200 200
SimTraffic Report
Page 1
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW os�22�2022
Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 9 9 0 0 6 36 0 0 0 22 0 6
Major/Minor Major1
Conflicting Flow All 42
Stage 1 -
Stage 2 -
Critical Hdwy 4.12
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.218
Pot Cap-1 Maneuver 1567
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1567
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 9
- 4.12
- 2.218
- 1611
- 1611
0
Minor1 Minor2
0 54 69 9 51 51 24
- 27 27 - 24 24 -
- 27 42 - 27 27 -
- 7.12 6.52 6.22 7.12 6.52 6.22
- 6.12 5.52 - 6.12 5.52 -
- 6.12 5.52 - 6.12 5.52 -
- 3.518 4.018 3.318 3.518 4.018 3.318
- 944 822 1073 948 840 1052
- 990 873 - 994 875 -
- 990 860 - 990 873 -
- 935 817 1073 943 835 1052
- 935 817 - 943 835 -
- 984 868 - 988 875 -
- 985 860 - 984 868 -
Approach E B
HCM Control Delay, s 3.7
HCM LOS
�
�
NB SB
0 8.8
A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1567 - - 1611 - - 964
HCM Lane V/C Ratio - 0.006 - - - - - 0.028
HCM Control Delay (s) 0 7.3 0 - 0 - - 8.8
HCM Lane LOS A A A - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement SB
Directions Served LTR
Maximum Queue (ft) 26
Average Queue (ft) 16
95th Queue (ft) 34
Link Distance (ft) 185
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) _
Storage Blk Time (%)
Queuing Penalty (veh) �
2026 Full Build SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy os�22�2022
Intersection
Int Delay, s/veh 2.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 22 0 6 0 0 0 9 22 0 0 36 36
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
94 94 54 97 112 22 72
54 54 - 40 40 - -
40 40 - 57 72 - -
7.12 6.52 6.22 7.12 6.52 6.22 4.12
6.12 5.52 - 6.12 5.52 - -
6.12 5.52 - 6.12 5.52 - -
3.518 4.018 3.318 3.518 4.018 3.318 2.218
889 796 1013 885 778 1055 1528
958 850 - 975 862 - -
975 862 - 955 835 - -
885 791 1013 876
885 791 - 876
952 850 - 969
969 857 - 950
SE NW
9.1 0
A A
773 1055 1528
773 - -
857 - -
835 - -
�
�
0
Major2
0 22
- 4.12
- 2.218
- 1593
- 1593
SW
0
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1528 - - - 909 1593 - -
HCM Lane V/C Ratio 0.006 - - - 0.03 - - -
HCM Control Delay (s) 7.4 0 - 0 9.1 0 - -
HCM Lane LOS A A - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0.1 0 - -
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 3: ROAD C& Twin Lakes Pkwy
Movement SE
Directions Served LTR
Maximum Queue (ft) 26
Average Queue (ft) 18
95th Queue (ft) 37
Link Distance (ft) 250
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) _
Storage Blk Time (%)
Queuing Penalty (veh) �
2026 Full Build SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
��
�
�
�
�
Left
LTR
LTR
1.000
5.193
91
767
0.976
89
748
0.119
6.1
A
0
SE
1
1
89
91
388
124
3.186
0
1.000
6.1
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
53
679
0.980
52
666
0.078
6.3
A
0
NW
1
1
52
53
509
223
3.186
0
1.000
6.3
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
606
996
0.981
594
977
0.608
12.3
B
4
NE
1
1
594
606
126
353
3.186
0
1.000
12.3
B
�
�
�
�
�
-
�
�
�
SW
1
1
396
404
108
454
3.186
0
1.000
8.0
A
Left
LTR
LTR
1.000
5.193
404
1014
0.979
396
993
0.398
8.0
A
2
�
-
-
-
-
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
SE NW NE SW
LTR LTR LTR LTR
30 30 56 102
12 17 24 27
36 40 69 87
71 406 317
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
9.1
A
�
�
�
�
Left
LR
LR
1.000
5.193
366
1013
0.978
358
991
0.361
7.5
A
2
EB
1
1
358
366
109
569
3.186
0
1.000
7.5
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
185
847
0.989
183
838
0.218
6.6
A
1
NW
1
1
183
185
288
187
3.186
0
1.000
6.6
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
579
1023
0.981
568
1004
0.566
11.0
B
4
SW
1
1
568
579
99
374
3.186
0
1.000
11.0
B
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
EB NW SW
LR LR LR
125 75 160
22 34 72
93 77 151
552 772 517
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi2si2o22
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations � � � � � �
Traffic Vol, veh/h 65 293 454 83 71 87
Future Vol, veh/h 97 293 454 99 81 105
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 105 318 493 108 92 119
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 601 0 - 0 1021 493
Stage 1 - - - - 493 -
Stage 2 - - - - 528 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 976 - - - 262 576
Stage 1 - - - - 614 -
Stage 2 - - - - 592 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 976 - - - 234 576
Mov Cap-2 Maneuver - - - - 234 -
Stage 1 - - - - 548 -
Stage 2 - - - - 592 -
Approach EB WB SB
HCM Control Delay, s 2.3 0 20.3
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 976 - - - 234 576
HCM Lane V/C Ratio 0.108 - - - 0.393 0.207
HCM Control Delay (s) 9.1 - - - 30 12.9
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.4 - - - 1.8 0.8
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
EB SB SB
L L R
53 52 96
36 38 45
54 55 72
1372
200 200
SimTraffic Report
Page 1
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW os�22�2022
Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 9 9 0 0 6 36 0 0 0 22 0 6
Major/Minor Major1
Conflicting Flow All 42
Stage 1 -
Stage 2 -
Critical Hdwy 4.12
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.218
Pot Cap-1 Maneuver 1567
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1567
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 9
- 4.12
- 2.218
- 1611
- 1611
0
Minor1 Minor2
0 54 69 9 51 51 24
- 27 27 - 24 24 -
- 27 42 - 27 27 -
- 7.12 6.52 6.22 7.12 6.52 6.22
- 6.12 5.52 - 6.12 5.52 -
- 6.12 5.52 - 6.12 5.52 -
- 3.518 4.018 3.318 3.518 4.018 3.318
- 944 822 1073 948 840 1052
- 990 873 - 994 875 -
- 990 860 - 990 873 -
- 935 817 1073 943 835 1052
- 935 817 - 943 835 -
- 984 868 - 988 875 -
- 985 860 - 984 868 -
Approach E B
HCM Control Delay, s 3.7
HCM LOS
�
�
NB SB
0 8.8
A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) - 1567 - - 1611 - - 964
HCM Lane V/C Ratio - 0.006 - - - - - 0.028
HCM Control Delay (s) 0 7.3 0 - 0 - - 8.8
HCM Lane LOS A A A - A - - A
HCM 95th %tile Q(veh) - 0 - - 0 - - 0.1
2046 Future Build 1:58 pm 05/10/2022
Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy os�22�2022
Intersection
Int Delay, s/veh 2.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 0 0 0 0 0 0 0 0 0 0 0 0
Future Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 21 0 5 0 0 0 9 21 0 0 35 35
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
92 92 53 94 109 21 70
53 53 - 39 39 - -
39 39 - 55 70 - -
7.12 6.52 6.22 7.12 6.52 6.22 4.12
6.12 5.52 - 6.12 5.52 - -
6.12 5.52 - 6.12 5.52 - -
3.518 4.018 3.318 3.518 4.018 3.318 2.218
892 798 1014 889 781 1056 1531
960 851 - 976 862 - -
976 862 - 957 837 - -
888 793 1014 880
888 793 - 880
954 851 - 970
970 857 - 952
SE NW
9.1 0
A A
776 1056 1531
776 - -
857 - -
837 - -
�
�
0
Major2
0 21
- 4.12
- 2.218
- 1595
- 1595
SW
0
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1531 - - - 912 1595 - -
HCM Lane V/C Ratio 0.006 - - - 0.029 - - -
HCM Control Delay (s) 7.4 0 - 0 9.1 0 - -
HCM Lane LOS A A - A A A - -
HCM 95th %tile Q(veh) 0 - - - 0.1 0 - -
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 3: ROAD C& Twin Lakes Pkwy
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
-3
�
�
�
�
Left
LTR
LTR
1.000
5.193
121
702
0.981
119
689
0.172
7.2
A
1
SE
1
1
119
121
476
154
3.186
0
1.000
7.2
A
�
�
�
�
�
—
�
�
�
Left
LTR
LTR
1.000
5.193
69
601
0.970
67
582
0.115
7.6
A
0
NW
1
1
67
69
632
261
3.186
0
1.000
7.6
A
—
—
—
�
�
—
—
—
—
Left
LTR
LTR
1.000
5.193
738
968
0.980
723
949
0.763
18.7
C
8
NE
1
1
723
738
155
442
3.186
0
1.000
18.7
C
�
�
�
�
�
—
�
�
�
SW
1
1
485
495
135
566
3.186
0
1.000
9.9
A
Left
LTR
LTR
1.000
5.193
495
987
0.980
485
968
0.501
9.9
A
3
�
—
—
—
—
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
SE NW NE SW
LTR LTR LTR LTR
50 30 143 77
16 21 63 39
47 43 132 78
71 406 317
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
-3
�
�
�
�
Left
LR
LR
1.000
5.193
468
979
0.981
459
961
0.478
9.5
A
3
EB
1
1
459
468
143
713
3.186
0
1.000
9.5
A
�
�
�
�
�
—
�
�
�
Left
LR
LR
1.000
5.193
274
789
0.993
272
783
0.347
8.8
A
2
NW
1
1
272
274
359
252
3.186
0
1.000
8.8
A
—
—
—
�
�
—
—
—
—
Left
LR
LR
1.000
5.193
707
974
0.980
693
954
0.726
16.7
C
7
SW
1
1
693
707
149
484
3.186
0
1.000
16.7
C
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
EB NW SW
LR LR LR
54 77 149
20 44 70
60 78 148
552 772 517
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi2si2o22
Intersection
Int Delay, s/veh 9.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations � � � � � �
Traffic Vol, veh/h 95 358 559 120 103 126
Future Vol, veh/h 127 358 559 136 113 144
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
MvmtFlow 138 389 608 148 128 164
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 756 0 - 0 1273 608
Stage 1 - - - - 608 -
Stage 2 - - - - 665 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 855 - - - 185 496
Stage 1 - - - - 543 -
Stage 2 - - - - 511 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 855 - - - 155 496
Mov Cap-2 Maneuver - - - - 155 -
Stage 1 - - - - 456 -
Stage 2 - - - - 511 -
Approach EB WB SB
HCM Control Delay, s 2.6 0 48.6
HCM LOS E
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 855 - - - 155 496
HCM Lane V/C Ratio 0.161 - - - 0.828 0.33
HCM Control Delay (s) 10 - - - 90.4 15.8
HCM Lane LOS B - - - F C
HCM 95th %tile Q(veh) 0.6 - - - 5.5 1.4
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
06/22/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
EB SB SB
L L R
74 157 90
33 69 57
54 147 91
1372
200 200
SimTraffic Report
Page 1
� Architecture + Engineering + Environmental + Planning Appendix I
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Origin 1 (N)
Origin 2 (S)
Origin 3 (W)
Origin 4 (N)
Origin 5 (W)
Origin 6 (E)
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
A & Twin Lakes
B & Twin Lakes
C & Twin Lakes
AM Peak Hour
Entering Exiting
Single Family 4 11
Multi-Familv 0 0
Origin 1 (N)
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
Oriein 6 (El
PM Peak Hour
Entering Exiting
10 14
0 0
25% 25% 25% 25%
50% 50% 50% 50%
25% 25% 25% 25%
15%
5%
5%
15%
40%
20%
1
1
1
1
1
1
1
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0
1
0
0
0
0
0
0
0
0
1
0
1
2
1
1
1
1
Origin 1 (N)
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
Oriein 6 (El
15%
5%
5%
15%
40%
20%
0.00%
11.11%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.11%
0.00%
11.11%
22.22%
11.11%
11.11%
11.11%
11.11%
15%
5%
5%
15%
40%
20%
0
1
0
0
0
0
0
0
0
0
1
0
1
2
1
1
1
1
0.00%
11.11%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
11.11%
0.00%
11.11%
22.22%
11.11%
11.11%
11.11%
11.11%
15%
5%
5%
15%
40%
20%
1
1
1
0
0
0
0
0
0
1
1
1
1
3
1
1
1
1
7.14%
7.14%
7.14%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.14%
7.14%
7.14%
7.14%
21.43%
7.14%
7.14%
7.14%
7.14%
AM Peak Hour PM Peak Hour
Entering Exiting Entering Exiting
Single Family 22 46 66 37
Multi-Familv 17 53 53 32
Access D & CR 40
Access E & CR 40
Origin 1 (N)
Origin 2 (5)
Origin 3 (W)
Origin 4 (N)
Origin 5 (W)
Origin 6 (E)
Access D & CR 40
Access E & CR 40
Access D & CR 40
Access E & CR 40
Access D & CR 40
Access E & CR 40
Access D & CR 40
Access E & CR 40
Access D & CR 40
Access E & CR 40
Access D & CR 40
Access E & CR 40
D&CR40
E&CR40
D&CR40
E&CR40
D&CR40
E&CR40
D&CR40
E&CR40
D&CR40
E&CR40
D&CR40
E&CR40
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
65 %
35%
0%
0%
15%
15%
20%
25%
E�
E�
�
�
�
�
0.00%
0.00%
0.00%
0.00%
13.79%
6.90%
13.79%
6.90%
17.24%
10.34%
20.69%
10.34%
65 %
35%
0%
0%
15%
15%
20%
25%
0
0
0
0
10
5
10
5
13
7
16
9
0.00%
0.00%
0.00%
0.00%
13.33 %
6.67%
13.33 %
6.67%
17.33 %
9.33 %
21.33 %
12.00%
65 %
35%
0%
0%
20%
30%
30%
20%
0
0
0
0
15
8
23
12
23
12
15
8
0.00%
0.00%
0.00%
0.00%
12.93 %
6.90%
19.83 %
10.34%
19.83 %
10.34%
12.93 %
6.90%
65 %
35%
0%
0%
20%
30%
30%
20%
0
0
0
0
9
5
13
7
13
7
9
5
0.00%
0.00%
0.00%
0.00%
13. 24 %
7.35 %
19.12 %
10. 29 %
19.12 %
10. 29 %
13. 24 %
7.35 %
AM Peak Hour PM Peak Hour
Entering Exiting Entering Exiting
Single Family 59 168 184 104
Multi-Familv 0 0 0 0
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Origin 1 (N)
Origin 2 (S)
Origin 3 (W)
Origin 4 (N)
Origin 5 (W)
Origin 6 (E)
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
Access A & Twin Lakes
Access B & Twin Lakes
Access C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
s A & Twin Lakes
s B & Twin Lakes
s C & Twin Lakes
Origin 1 (N)
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
Ori�in 6 (El
Origin 1 (N)
Origin 1 (N)
Origin 1 (N)
Origin 2 (S)
Origin 2 (S)
Origin 2 (S)
Origin 3 (W)
Origin 3 (W)
Origin 3 (W)
Origin 4 (N)
Origin 4 (N)
Origin 4 (N)
Origin 5 (W)
Origin 5 (W)
Origin 5 (W)
Origin 6 (E)
Origin 6 (E)
Oriein 6 (E)
35% 35% 35%
35% 35% 35%
30% 30% 30%
20% 20% 20%
45% 45% 45%
5% 5% 5%
20% 20% 20%
5% 5% 5%
5% 5% 5%
4 12
4 12
4 10
9 26
9 26
8 23
1 3
1 3
1 3
4 12
4 12
4 10
1 3
1 3
1 3
1 3
1 3
1 3
59 170
13
13
11
29
29
25
3
3
3
13
13
11
3
3
3
3
3
3
184
6.78% 7.06%
6.78% 7.06%
6.78% 5.88%
15.25% 15.29%
15.25% 15.29%
13.56% 13.53%
1.69% 1.76%
1.69% 1.76%
1.69% 1.76%
6.78% 7.06%
6.78% 7.06%
6.78% 5.88%
1.69% 1.76%
1.69% 1.76%
1.69% 1.76%
1.69% 1.76%
1.69% 1.76%
1.69% 1.76%
7.07%
7.07%
5.98%
15.76%
15.76%
13.59%
1.63%
1.63%
1.63%
7.07%
7.07%
5.98%
1.63%
1.63%
1.63%
1.63%
1.63%
1.63%
35%
35%
30%
20%
45%
5%
20%
5%
5%
7
7
6
16
16
14
2
2
2
7
7
6
2
2
2
2
2
2
104
6.73%
6.73%
5.77%
15.38%
15.38%
13.46%
1.92%
1.92%
1.92%
6.73%
6.73%
5.77%
1.92%
1.92%
1.92%
1.92%
1.92%
1.92%
� Architecture + Engineering+ Environmental + Planning AppendixJ
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW os�22�2022
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Future Vol, veh/h 8 11 1 4 8 32 1 0 5 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1
Mvmt Flow 9 13 1 5 9 36 1 0 6 22 0 6
Major/Minor Major1
Conflicting Flow All 45
Stage 1 -
Stage 2 -
Critical Hdwy 4.11
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.209
Pot Cap-1 Maneuver 1570
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1570
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 14
- 4.11
- 2.209
- 1611
- 1611
0
Minor1 Minor2
0 72 87 14 72 69 27
- 32 32 - 37 37 -
- 40 55 - 35 32 -
- 7.11 6.51 6.21 7.11 6.51 6.21
- 6.11 5.51 - 6.11 5.51 -
- 6.11 5.51 - 6.11 5.51 -
- 3.509 4.009 3.309 3.509 4.009 3.309
- 922 805 1069 922 823 1051
- 987 870 - 981 866 -
- 977 851 - 983 870 -
- 911 798 1069 911 816 1051
- 911 798 - 911 816 -
- 981 865 - 975 863 -
- 969 848 - 972 865 -
Approach E B
HCM Control Delay, s 2.9
HCM LOS
�
�
NB SB
8.5 9
A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1039 1570 - - 1611 - - 937
HCM Lane V/C Ratio 0.007 0.006 - - 0.003 - - 0.029
HCM Control Delay (s) 8.5 7.3 0 - 7.2 0 - 9
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 1: ROAD A& Twin Lakes Pkwy NW
Movement NB
Directions Served LR
Maximum Queue (ft) 29
Average Queue (ft) 4
95th Queue (ft) 21
Link Distance (ft) 504
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) _
Storage Blk Time (%)
Queuing Penalty (veh) �
2023 Opening SimTraffic Report
Page 1
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW os�2s�2o22
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Future Vol, veh/h 8 11 1 4 8 32 1 0 5 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1
Mvmt Flow 9 13 1 5 9 36 1 0 6 22 0 6
Major/Minor Major1
Conflicting Flow All 45
Stage 1 -
Stage 2 -
Critical Hdwy 4.11
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.209
Pot Cap-1 Maneuver 1570
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1570
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 14
- 4.11
- 2.209
- 1611
- 1611
0
Minor1 Minor2
0 72 87 14 72 69 27
- 32 32 - 37 37 -
- 40 55 - 35 32 -
- 7.11 6.51 6.21 7.11 6.51 6.21
- 6.11 5.51 - 6.11 5.51 -
- 6.11 5.51 - 6.11 5.51 -
- 3.509 4.009 3.309 3.509 4.009 3.309
- 922 805 1069 922 823 1051
- 987 870 - 981 866 -
- 977 851 - 983 870 -
- 911 798 1069 911 816 1051
- 911 798 - 911 816 -
- 981 865 - 975 863 -
- 969 848 - 972 865 -
Approach E B
HCM Control Delay, s 2.9
HCM LOS
�
�
NB SB
8.5 9
A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 1039 1570 - - 1611 - - 937
HCM Lane V/C Ratio 0.007 0.006 - - 0.003 - - 0.029
HCM Control Delay (s) 8.5 7.3 0 - 7.2 0 - 9
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0 0 - - 0 - - 0.1
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
�
LTR LTR
53 26
22 15
65 35
514 185
SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy os�22�2022
Intersection
Int Delay, s/veh 2.4
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Future Vol, veh/h 19 0 5 1 0 3 8 27 0 2 38 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 1 1 1 1 1 1 1 1 1 1 1 1
Mvmt Flow 22 0 6 1 0 3 9 31 0 2 43 36
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
116 114 61 117 132 31 79
65 65 - 49 49 - -
51 49 - 68 83 - -
7.11 6.51 6.21 7.11 6.51 6.21 4.11
6.11 5.51 - 6.11 5.51 - -
6.11 5.51 - 6.11 5.51 - -
3.509 4.009 3.309 3.509 4.009 3.309 2.209
863 778 1007 862 761 1046 1526
948 843 - 967 856 - -
964 856 - 945 828 - -
855 773 1007 853
855 773 - 853
942 842 - 961
955 851 - 939
SE NW
9.2 8.7
A A
756 1046 1526
756 - -
851 - -
827 - -
NE
1.7
0
Major2
0 31
- 4.11
- 2.209
- 1588
- 1588
SW
0.2
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1526 - - 990 883 1588 - -
HCM Lane V/C Ratio 0.006 - - 0.005 0.031 0.001 - -
HCM Control Delay (s) 7.4 0 - 8.7 9.2 7.3 0 -
HCM Lane LOS A A - A A A A -
HCM 95th %tile Q(veh) 0 - - 0 0.1 0 - -
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 3: ROAD C& Twin Lakes Pkwy
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
SE NE
LTR LTR
26 30
18 9
37 31
250 116
SimTraffic Report
Page 1
HCM 2010 Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
9.5
A
�
�
�
�
Left
LTR
LTR
1.000
5.193
88
777
0.975
86
758
0.113
5.9
A
0
SE
1
1
86
88
374
121
3.186
0
1.000
5.9
A
�
�
�
�
�
-
�
�
�
Left
LTR
LTR
1.000
5.193
55
693
0.999
55
693
0.079
6.0
A
0
NW
1
1
55
55
489
211
3.186
0
1.000
6.0
A
-
-
-
�
�
-
-
-
-
Left
LTR
LTR
1.000
5.193
581
1002
0.980
570
982
0.580
11.5
B
4
NE
1
1
570
581
120
342
3.186
0
1.000
11.5
B
�
�
�
�
�
-
�
�
�
SW
1
1
380
387
108
436
3.186
0
1.000
7.7
A
Left
LTR
LTR
1.000
5.193
387
1014
0.981
380
995
0.382
7.7
A
2
�
-
-
-
-
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
SE NW NE SW
LTR LTR LTR LTR
29 31 80 56
4 13 27 29
21 38 80 63
84 419 330
SimTraffic Report
Page 1
HCM 2010 Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd I��(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Follow-Up Headway, s
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.5
A
�
�
�
�
Left
LR
LR
1.000
5.193
366
1023
0.981
359
1004
0.358
7.4
A
2
EB
1
1
359
366
99
526
3.186
0
1.000
7.4
A
�
�
�
�
�
-
�
�
�
Left
LR
LR
1.000
5.193
178
845
0.978
174
826
0.211
6.6
A
1
NW
1
1
174
178
290
175
3.186
0
1.000
6.6
A
-
-
-
�
�
-
-
-
-
Left
LR
LR
1.000
5.193
533
1030
0.979
522
1008
0.518
9.9
A
3
SW
1
1
522
533
93
375
3.186
0
1.000
9.9
A
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
Queuing and Blocking Report
2023 Opening - No Build osi22i2o22
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2023 Opening
EB NW SW
LR LR LR
51 57 54
7 25 17
37 56 51
552 772 517
SimTraffic Report
Page 1
HCM 6th TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osio2i2o22
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations � � � � � �
Traffic Vol, veh/h 61 283 438 78 67 82
Future Vol, veh/h 65 283 438 81 70 87
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 71 308 476 88 80 99
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 564 0 - 0 926 476
Stage 1 - - - - 476 -
Stage 2 - - - - 450 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 1008 - - - 298 589
Stage 1 - - - - 625 -
Stage 2 - - - - 642 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1008 - - - 277 589
Mov Cap-2 Maneuver - - - - 277 -
Stage 1 - - - - 581 -
Stage 2 - - - - 642 -
Approach EB WB SB
HCM Control Delay, s 1.7 0 17.1
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 1008 - - - 277 589
HCM Lane V/C Ratio 0.07 - - - 0.287 0.168
HCM Control Delay (s) 8.8 - - - 23.1 12.3
HCM Lane LOS A - - - C B
HCM 95th %tile Q(veh) 0.2 - - - 1.2 0.6
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) osi22i2o22
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 93 283 439 93 76 99
Future Vol, veh/h 93 283 439 93 76 99
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 101 308 477 101 86 113
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 578 0 - 0 987 477
Stage 1 - - - - 477 -
Stage 2 - - - - 510 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 996 - - - 274 588
Stage 1 - - - - 624 -
Stage 2 - - - - 603 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 996 - - - 246 588
Mov Cap-2 Maneuver - - - - 246 -
Stage 1 - - - - 561 -
Stage 2 - - - - 603 -
Approach EB WB SB
HCM Control Delay, s 2.2 0 19
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 996 - - - 246 588
HCM Lane V/C Ratio 0.101 - - - 0.351 0.191
HCM Control Delay (s) 9 - - - 27.3 12.6
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.3 - - - 1.5 0.7
2023 Opening 11:23 am 05/10/2022 2023 Opening - No Build Synchro 11 Report
Page 1
� Architecture + Engineering+ Environmental + Planning Appendix K
HCM 2010 TWSC
1: ROAD A& Twin Lakes Pkwy NW 10/18/2022
Intersection
Int Delay, s/veh 2.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations '� �' �
Traffic Vol, veh/h 16 0 0 10 0 0
Future Vol, veh/h 94 42 22 53 23 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 107 48 25 60 26 15
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 155 0 241 131
Stage 1 - - - - 131 -
Stage 2 - - - - 110 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1425 - 747 919
Stage 1 - - - - 895 -
Stage 2 - - - - 915 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1425 - 734 919
Mov Cap-2 Maneuver - - - - 734 -
Stage 1 - - - - 895 -
Stage 2 - - - - 899 -
Approach EB WB NB
HCM Control Delay, s 0 2.2 9.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 792 - - 1425 -
HCM Lane V/C Ratio 0.052 - - 0.018 -
HCM Control Delay (s) 9.8 - - 7.6 0
HCM Lane LOS A - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 1: ROAD A& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
WB NB
LT LR
32 31
4 18
22 43
189 504
SimTraffic Report
Page 1
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW 10/18/2022
Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Future Vol, veh/h 8 57 42 22 47 32 23 0 13 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 9 65 48 25 53 36 26 0 15 22 0 6
Major/Minor Major1
Conflicting Flow All 89
Stage 1 -
Stage 2 -
Critical Hdwy 4.12
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.218
Pot Cap-1 Maneuver 1506
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1506
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 113
- 4.12
- 2.218
- 1476
- 1476
0
Minor1 Minor2
0 231 246 89 236 252 71
- 107 107 - 121 121 -
- 124 139 - 115 131 -
- 7.12 6.52 6.22 7.12 6.52 6.22
- 6.12 5.52 - 6.12 5.52 -
- 6.12 5.52 - 6.12 5.52 -
- 3.518 4.018 3.318 3.518 4.018 3.318
- 724 656 969 718 651 991
- 898 807 - 883 796 -
- 880 782 - 890 788 -
- 707 640 969 694 635 991
- 707 640 - 694 635 -
- 893 802 - 878 782 -
- 859 768 - 871 783 -
Approach E B
HCM Control Delay, s 0.6
HCM LOS
�
�
NB SB
9.9 10.1
A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 783 1506 - - 1476 - - 740
HCM Lane V/C Ratio 0.052 0.006 - - 0.017 - - 0.037
HCM Control Delay (s) 9.9 7.4 0 - 7.5 0 - 10.1
HCM Lane LOS A A A - A A - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1 - - 0.1
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
�
LTR LTR
30 26
29 15
31 36
295 185
SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy 10/18/2022
Intersection
Int Delay, s/veh 2.8
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Future Vol, veh/h 19 0 5 20 0 12 8 45 36 20 76 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 22 0 6 23 0 14 9 51 41 23 86 36
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
247 260 104 243 258 72 122
150 150 - 90 90 - -
97 110 - 153 168 - -
7.12 6.52 6.22 7.12 6.52 6.22 4.12
6.12 5.52 - 6.12 5.52 - -
6.12 5.52 - 6.12 5.52 - -
3.518 4.018 3.318 3.518 4.018 3.318 2.218
707 645 951 711 646 990 1465
853 773 - 917 820 - -
910 804 - 849 759 - -
685 630 951 695
685 630 - 695
847 761 - 911
891 798 - 830
SE NW
10.1 9.8
B A
631 990 1465
631 - -
814 - -
747 - -
NE
0.7
0
Major2
0 92
- 4.12
- 2.218
- 1503
- 1503
SW
1.2
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1465 - - 782 727 1503 - -
HCM Lane V/C Ratio 0.006 - - 0.047 0.038 0.015 - -
HCM Control Delay (s) 7.5 0 - 9.8 10.1 7.4 0 -
HCM Lane LOS A A - A B A A -
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0 - -
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
�
LTR LTR
30 26
29 15
31 36
295 185
SimTraffic Report
Page 1
HCM 2010 TWSC
4: Cleveland Rd NW (C.R. 40) & ROAD D 10/18/2022
Intersection
Int Delay, s/veh 0
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations �i � �''F 'F i�
Traffic Vol, veh/h 0 0 0 148 148 0
Future Vol, veh/h 0 0 0 148 148 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 185 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 168 168 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 252 168 168 0 - 0
Stage 1 168 - - - - -
Stage 2 84 - - - - -
Critical Hdwy 6.63 6.23 4.13 - - -
Critical Hdwy Stg 1 5.43 - - - - -
Critical Hdwy Stg 2 5.83 - - - - -
Follow-up Hdwy 3.519 3.319 2.219 - - -
Pot Cap-1 Maneuver 726 875 1408 - - -
Stage 1 861 - - - - -
Stage 2 930 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 726 875 1408 - - -
Mov Cap-2 Maneuver 726 - - - - -
Stage 1 861 - - - - -
Stage 2 930 - - - - -
Approach EB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1408 - - - - -
HCM Lane V/C Ratio - - - - - -
HCM Control Delay (s) 0 - 0 0 - -
HCM Lane LOS A - A A - -
HCM 95th %tile Q(veh) 0 - - - - -
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
HCM 2010 TWSC
5: Cleveland Rd NW (C.R. 40) & ROAD E 10/18/2022
Intersection
Int Delay, s/veh 0
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations � �''F 'F i�
Traffic Vol, veh/h 0 0 0 148 148 0
Future Vol, veh/h 0 0 0 148 148 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 168 168 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 252 168 168 0 - 0
Stage 1 168 - - - - -
Stage 2 84 - - - - -
Critical Hdwy 6.63 6.23 4.13 - - -
Critical Hdwy Stg 1 5.43 - - - - -
Critical Hdwy Stg 2 5.83 - - - - -
Follow-up Hdwy 3.519 3.319 2.219 - - -
Pot Cap-1 Maneuver 726 875 1408 - - -
Stage 1 861 - - - - -
Stage 2 930 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 726 875 1408 - - -
Mov Cap-2 Maneuver 726 - - - - -
Stage 1 861 - - - - -
Stage 2 930 - - - - -
Approach EB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1408 - - - -
HCM Lane V/C Ratio - - - - -
HCM Control Delay (s) 0 - 0 - -
HCM Lane LOS A - A - -
HCM 95th %tile Q(veh) 0 - - - -
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
HCM 6th Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Follow-Up Headway, s
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
8.7
A
�
�
�
Left
LTR
LTR
1.000
2.609
4.976
91
828
0.976
89
808
0.110
5.6
A
0
SE
1
1
89
91
501
126
0
1.000
5.6
A
�
�
�
�
�
�
NW
1
1
- 124
126
� 509
356
- 0
1.000
6.0
A
Left
LTR
LTR
1.000
2.609
4.976
126
821
0.984
124
808
0.153
6.0
A
1
-
-
-
�
-
-
-
-
-
Left
LTR
LTR
1.000
2.609
4.976
648
1106
0.982
636
1086
0.586
10.8
B
4
NE
1
1
636
648
217
375
0
1.000
10.8
B
�
�
�
�
�
�
SW
1
1
- 488
497
� 130
505
- 0
1.000
7.2
A
Left
LTR
LTR
1.000
2.609
4.976
497
1209
0.981
488
1185
0.411
7.2
A
2
i
-
-
-
-
-
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
SE NW NE SW
LTR LTR LTR LTR
29 31 202 79
20 22 93 31
42 45 203 90
84 419 330
SimTraffic Report
Page 1
HCM 6th Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd N�(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Follow-Up Headway, s
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
7.7
A
�
�
�
Left
LR
LR
1.000
2.609
4.976
401
1148
0.980
393
1126
0.349
6.7
A
2
EB
1
1
393
401
180
591
0
1.000
6.7
A
�
�
�
�
�
�
NW
1
1
- 248
250
� 288
293
- 0
1.000
5.9
A
Left
LR
LR
1.000
2.609
4.976
250
1029
0.992
248
1020
0.243
5.9
A
1
-
-
-
�
-
-
-
-
-
Left
LR
LR
1.000
2.609
4.976
650
1220
0.980
637
1195
0.533
9.1
A
3
SW
1
1
637
650
121
417
0
1.000
9.1
A
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
EB NW SW
LR LR LR
72 100 102
39 47 65
74 87 116
552 772 517
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) 10/18/2022
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 97 293 454 99 81 105
Future Vol, veh/h 97 293 454 99 81 105
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 105 318 493 108 92 119
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 601 0 - 0 1021 493
Stage 1 - - - - 493 -
Stage 2 - - - - 528 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 976 - - - 262 576
Stage 1 - - - - 614 -
Stage 2 - - - - 592 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 976 - - - 234 576
Mov Cap-2 Maneuver - - - - 234 -
Stage 1 - - - - 548 -
Stage 2 - - - - 592 -
Approach EB WB SB
HCM Control Delay, s 2.3 0 20.3
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 976 - - - 234 576
HCM Lane V/C Ratio 0.108 - - - 0.393 0.207
HCM Control Delay (s) 9.1 - - - 30 12.9
HCM Lane LOS A - - - D B
HCM 95th %tile Q(veh) 0.4 - - - 1.8 0.8
2026 Full Build 1:46 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2026 Full Build
EB SB SB
L L R
74 70 70
28 39 44
62 67 69
1002
200 200
SimTraffic Report
Page 1
� Architecture + Engineering + Environmental + Planning Appendix L
HCM 2010 TWSC
1: ROAD A& Twin Lakes Pkwy NW 10/18/2022
Intersection
Int Delay, s/veh 2.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations '� �' �
Traffic Vol, veh/h 16 0 0 60 10 0
Future Vol, veh/h 94 42 22 94 28 17
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 107 48 25 107 32 19
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 155 0 288 131
Stage 1 - - - - 131 -
Stage 2 - - - - 157 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1425 - 702 919
Stage 1 - - - - 895 -
Stage 2 - - - - 871 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1425 - 689 919
Mov Cap-2 Maneuver - - - - 689 -
Stage 1 - - - - 895 -
Stage 2 - - - - 854 -
Approach EB WB NB
HCM Control Delay, s 0 1.4 10.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 761 - - 1425 -
HCM Lane V/C Ratio 0.067 - - 0.018 -
HCM Control Delay (s) 10.1 - - 7.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.2 - - 0.1 -
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 1: ROAD A& Twin Lakes Pkwy NW
Movement NB
Directions Served LR
Maximum Queue (ft) 50
Average Queue (ft) 21
95th Queue (ft) 44
Link Distance (ft) 504
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) _
Storage Blk Time (%)
Queuing Penalty (veh) �
2046 Future Build SimTraffic Report
Page 1
HCM 2010 TWSC
2: ROAD B& Twin Lakes Pkwy NW 10/18/2022
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations � � � �
Traffic Vol, veh/h 8 8 0 0 5 32 0 0 0 19 0 5
Future Vol, veh/h 8 61 42 22 43 32 18 0 17 19 0 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 9 69 48 25 49 36 20 0 19 22 0 6
Major/Minor Major1
Conflicting Flow All 85
Stage 1 -
Stage 2 -
Critical Hdwy 4.12
Critical Hdwy Stg 1 -
Critical Hdwy Stg 2 -
Follow-up Hdwy 2.218
Pot Cap-1 Maneuver 1512
Stage 1 -
Stage 2 -
Platoon blocked, %
Mov Cap-1 Maneuver 1512
Mov Cap-2 Maneuver -
Stage 1 -
Stage 2 -
0
Major2
0 117
- 4.12
- 2.218
- 1471
- 1471
0
Minor1 Minor2
0 231 246 93 238 252 67
- 111 111 - 117 117 -
- 120 135 - 121 135 -
- 7.12 6.52 6.22 7.12 6.52 6.22
- 6.12 5.52 - 6.12 5.52 -
- 6.12 5.52 - 6.12 5.52 -
- 3.518 4.018 3.318 3.518 4.018 3.318
- 724 656 964 716 651 997
- 894 804 - 888 799 -
- 884 785 - 883 785 -
- 707 640 964 689 635 997
- 707 640 - 689 635 -
- 889 799 - 883 785 -
- 863 771 - 860 780 -
Approach E B
HCM Control Delay, s 0.5
HCM LOS
�
�
NB SB
9.7 10.1
A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 812 1512 - - 1471 - - 736
HCM Lane V/C Ratio 0.049 0.006 - - 0.017 - - 0.037
HCM Control Delay (s) 9.7 7.4 0 - 7.5 0 - 10.1
HCM Lane LOS A A A - A A - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1 - - 0.1
2046 Future Build 1:58 pm 05/10/2022
Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 2: ROAD B& Twin Lakes Pkwy NW
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
WB NB SB
LTR LTR LTR
31 30 26
9 20 15
32 42 36
581 295 185
SimTraffic Report
Page 1
HCM 2010 TWSC
3: ROAD C& Twin Lakes Pkwy 10/18/2022
Intersection
Int Delay, s/veh 2.8
Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR
Lane Configurations � � � �
Traffic Vol, veh/h 19 0 5 0 0 0 8 19 0 0 32 32
Future Vol, veh/h 19 0 5 16 0 17 8 53 36 20 76 32
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, #- 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 22 0 6 18 0 19 9 60 41 23 86 36
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
HCM Control Delay, s
HCM LOS
Minor2 Minor1 Major1
258 269 104 252 267 81 122
150 150 - 99 99 - -
108 119 - 153 168 - -
7.12 6.52 6.22 7.12 6.52 6.22 4.12
6.12 5.52 - 6.12 5.52 - -
6.12 5.52 - 6.12 5.52 - -
3.518 4.018 3.318 3.518 4.018 3.318 2.218
695 637 951 701 639 979 1465
853 773 - 907 813 - -
897 797 - 849 759 - -
669 622 951 684
669 622 - 684
847 760 - 901
873 791 - 830
SE NW
10.3 9.7
B A
624 979 1465
624 - -
807 - -
746 - -
�
�.
0
Major2
0 101
- 4.12
- 2.218
- 1491
- 1491
SW
1.2
0
0
Minor Lane/Major Mvmt NEL NET NERNWLn1 SELn1 SWL SWT SWR
Capacity (veh/h) 1465 - - 810 713 1491 - -
HCM Lane V/C Ratio 0.006 - - 0.046 0.038 0.015 - -
HCM Control Delay (s) 7.5 0 - 9.7 10.3 7.5 0 -
HCM Lane LOS A A - A B A A -
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0 - -
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 3: ROAD C& Twin Lakes Pkwy
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
SE NW SW
LTR LTR LTR
26 27 30
7 8 0
27 28 0
250 307 179
SimTraffic Report
Page 1
HCM 2010 TWSC
4: Cleveland Rd NW (C.R. 40) & ROAD D 10/18/2022
Intersection
Int Delay, s/veh 1.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations �i � �''F 'F i�
Traffic Vol, veh/h 0 0 0 215 211 0
Future Vol, veh/h 22 22 39 227 231 39
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 185 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 92 88 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 25 24 44 258 263 44
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 480 263 307 0 - 0
Stage 1 263 - - - - -
Stage 2 217 - - - - -
Critical Hdwy 6.63 6.23 4.13 - - -
Critical Hdwy Stg 1 5.43 - - - - -
Critical Hdwy Stg 2 5.83 - - - - -
Follow-up Hdwy 3.519 3.319 2.219 - - -
Pot Cap-1 Maneuver 530 775 1252 - - -
Stage 1 780 - - - - -
Stage 2 799 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 508 775 1252 - - -
Mov Cap-2 Maneuver 508 - - - - -
Stage 1 748 - - - - -
Stage 2 799 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.2 1.3 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1252 - 508 775 - -
HCM Lane V/C Ratio 0.035 - 0.049 0.031 - -
HCM Control Delay (s) 8 0.1 12.5 9.8 - -
HCM Lane LOS A A B A - -
HCM 95th %tile Q(veh) 0.1 - 0.2 0.1 - -
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 4: Cleveland Rd NW (C.R. 40) & ROAD D
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
EB EB NB
L R LT
31 30 54
17 13 12
42 37 45
602 381
185
SimTraffic Report
Page 1
HCM 6th TWSC
5: Cleveland Rd NW (C.R. 40) & ROAD E 10/18/2022
Intersection
Int Delay, s/veh 0.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations � �''F 'F i�
Traffic Vol, veh/h 0 0 0 215 211 0
Future Vol, veh/h 12 12 20 254 233 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 100 88 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 14 14 20 289 265 23
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 450 265 288 0 - 0
Stage 1 265 - - - - -
Stage 2 185 - - - - -
Critical Hdwy 6.63 6.23 4.13 - - -
Critical Hdwy Stg 1 5.43 - - - - -
Critical Hdwy Stg 2 5.83 - - - - -
Follow-up Hdwy 3.519 3.319 2.219 - - -
Pot Cap-1 Maneuver 552 773 1272 - - -
Stage 1 779 - - - - -
Stage 2 829 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 542 773 1272 - - -
Mov Cap-2 Maneuver 542 - - - - -
Stage 1 764 - - - - -
Stage 2 829 - - - - -
Approach EB NB SB
HCM Control Delay, s 10.9 0.6 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1272 - 637 - -
HCM Lane V/C Ratio 0.016 - 0.043 - -
HCM Control Delay (s) 7.9 0.1 10.9 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 5: Cleveland Rd NW (C.R. 40) & ROAD E
Movement EB
Directions Served LR
Maximum Queue (ft) 22
Average Queue (ft) 6
95th Queue (ft) 23
Link Distance (ft) 424
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) _
Storage Blk Time (%)
Queuing Penalty (veh) �
2046 Future Build SimTraffic Report
Page 1
HCM 6th Roundabout
6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lake��ray NW/Ty
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Follow-Up Headway, s
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
-3
�
�
�
Left
LTR
LTR
1.000
2.609
4.976
121
760
0.981
119
745
0.159
6.5
A
1
SE
1
1
119
121
585
154
0
1.000
6.5
A
�
�
�
�
�
�
NW
1
1
— 126
128
� 632
394
- 0
1.000
7.0
A
Left
LTR
LTR
1.000
2.609
4.976
128
724
0.984
126
712
0.177
7.0
A
1
—
—
—
�
—
—
—
—
—
Left
LTR
LTR
1.000
2.609
4.976
779
1073
0.980
763
1051
0.726
15.6
C
7
NE
1
1
763
779
247
459
0
1.000
15.6
C
�
�
�
�
�
�
SW
1
1
— 575
587
� 152
608
- 0
1.000
8.6
A
Left
LTR
LTR
1.000
2.609
4.976
587
1182
0.980
575
1158
0.497
8.6
A
3
i
—
—
—
—
—
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 6: Twin Lakes Road NW (C.S.A.H 13)/Twin Lakes Road NW (C.S.A.H. 13) & Twin Lakes Pai
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
SE NW NE SW
LTR LTR LTR LTR
55 79 299 171
15 47 159 72
48 90 337 177
84 419 330
SimTraffic Report
Page 1
HCM 6th Roundabout
7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd N�(�9?$.A.H. 13)
Intersection
Intersection Delay, s/veh
Intersection LOS
Entry Lanes
Conflicting Circle Lanes
Adj Approach Flow, veh/h
Demand Flow Rate, veh/h
Vehicles Circulating, veh/h
Vehicles Exiting, veh/h
Ped Vol Crossing Leg, #/h
Ped Cap Adj
Approach Delay, s/veh
Approach LOS
Lane
Designated Moves
Assumed Moves
RT Channelized
Lane Util
Follow-Up Headway, s
Critical Headway, s
Entry Flow, veh/h
Cap Entry Lane, veh/h
Entry HV Adj Factor
Flow Entry, veh/h
Cap Entry, veh/h
V/C Ratio
Control Delay, s/veh
LOS
95th %tile Queue, veh
-3
�
�
�
Left
LR
LR
1.000
2.609
4.976
503
1098
0.980
493
1076
0.458
8.4
A
2
EB
1
1
493
503
224
736
0
1.000
8.4
A
�
�
�
�
�
�
NW
1
1
— 334
338
� 359
368
- 0
1.000
7.6
A
Left
LR
LR
1.000
2.609
4.976
338
957
0.988
334
945
0.353
7.6
A
2
—
—
—
�
—
—
—
—
—
Left
LR
LR
1.000
2.609
4.976
788
1158
0.981
773
1136
0.681
13.0
B
6
SW
1
1
773
788
172
525
0
1.000
13.0
B
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 7: Cleveland Road NW (C.R. 40) & Twin Lakes Rd NW (C.S.A.H 13) & Twin Lakes Rd NW (1
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
2046 Future Build
EB NW SW
LR LR LR
102 54 98
39 29 51
93 53 87
552 772 517
SimTraffic Report
Page 1
HCM 2010 TWSC
8: 181 st Ave NW (CSAH 12) & Cleveland Rd NW (C. R. 40) 10/18/2022
Intersection
Int Delay, s/veh 17.9
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations �i �` 'F � �i i�
Traffic Vol, veh/h 127 358 559 136 113 144
Future Vol, veh/h 163 358 559 159 127 164
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length 200 - - 200 0 200
Veh in Median Storage, #- 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 88 88
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 177 389 608 173 144 186
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 781 0 - 0 1351 608
Stage 1 - - - - 608 -
Stage 2 - - - - 743 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 837 - - - 166 496
Stage 1 - - - - 543 -
Stage 2 - - - - 470 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 837 - - -� 131 496
Mov Cap-2 Maneuver - - - - � 131 -
Stage 1 - - - - 428 -
Stage 2 - - - - 470 -
Approach EB WB SB
HCM Control Delay, s 3.3 0 85.4
HCM LOS F
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 SBLn2
Capacity (veh/h) 837 - - - 131 496
HCM Lane V/C Ratio 0.212 - - - 1.102 0.376
HCM Control Delay (s) 10.5 - - - 174.3 16.6
HCM Lane LOS B - - - F C
HCM 95th %tile Q(veh) 0.8 - - - 8.2 1.7
Notes
�: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
2046 Future Build 1:58 pm 05/10/2022 Synchro 11 Report
Page 1
Queuing and Blocking Report
10/18/2022
Intersection: 8: 181st Ave NW (CSAH 12) & Cleveland Rd NW (C.R. 40)
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB WB
L R
68 22
52 6
68 23
200 200
SB SB
L R
114 96
63 55
106 91
1002
2046 Future Build
200
SimTraffic Report
Page 1
� Architecture + Engineering + Environmental + Planning EAW
+�rC�T����� R E P 0 R T F 0 R:
FROM:
E��ineer,ng Lennar Foster Property ISG
F��uir�anm�nlal Elk River, MN 55330
f lanning Whitney M.S. Behny
<,,;�,,, ,,_,.�_, 7900 International Plaza Dr., Suite 550
Bloomington, MN 55425
22 26553 PAF�KING STUDY - DFtA1=T
FOSTER PFiOPEFiTY - ELK RIVCR, MN
SIGNATURE SHEET
I HEREBY CERTIFY THAT THESE CALCULATIONS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A
DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
V�d
4Vhit�uey M.S. Be��uy Pe,
Project Engineer
License No. 60768
My license renewal date is June 30, 2024
Documents covered by this seal:
Foster Property Parking Study
Foste� Property Deve�o�me�ut
Elk River, Minnesota
Engineer's Project Number: 22-26553
Dated this 18t" day of October, 2022
� Architecture + Engineering + Environmental + Planning Page i
2� 2�553 Fn�`r6Yf�f� STU�Y - �t�t;l��i�
FOST�R PFiOPEF�TY - ELK RIV[R, MN
TABLE OF CONTENTS
ExecutiveSummary ..................................................................................................................................................................................1
StudiedSite Description and Location .................................................................................................................................................1
Introduction...............................................................................................................................................................................................2
Purposeof Report .................................................................................................................................................................................2
StudyObjectives ....................................................................................................................................................................................2
Approach...................................................................................................................................................................................................2
Background...............................................................................................................................................................................................3
SiteInformation .....................................................................................................................................................................................3
Occupancy.............................................................................................................................................................................................4
Multi-Modal Transportation ..................................................................................................................................................................5
ParkingAnalysis ........................................................................................................................................................................................6
Conclusions............................................................................................................................................................................................... 7
APPENDICES
AppendixA: Preliminary Site Plan ............................................................................................................................................................A
AppendixB: Project Location Map ...........................................................................................................................................................B
Appendix C: Northstar Commuter Rail Map .............................................................................................................................................0
AppendixD: No Parking Area Exhibit .......................................................................................................................................................D
AppendixE: Parking Stall Counts ............................................................................................................................................................. E
� Architecture + Engineering + Environmental + Planning Page iu
�� G�:� s �'�'�(=;�e4�'�:; �"u"����u` - ����,�16__u�
FO�T�R PFiOPEFiTY - ELK RIV[R, MN
EXECUTIVE SUMMARY
Studied Site Description and Location
This Parking Study analyzed proposed parking throughout the Foster Property Development located in Elk River, Minnesota. ISG
used projections of population and average persons per household to estimate how many parking spaces will be needed for the
development. This study has been prepared in response to the development plan of Foster Property in Elk River, Minnesota and
comments from City Planning Commission and Council.
The proposed development will have evaluated as North and South with the division of the property being the existing mining pits
/ basins. This area provides a natural break of the overall development and is used as a transition zone for the development for
single family and mixed-use residential homes. The North is comprised with single-family homes providing a minimum of a 3-car
garage. There is an option for these single-family homes to upgrade to a 4-car garage iftheir lot size allows. The South is comprised
of single family and multifamily units with 2-car garages. The report will be modeled conservatively with the lower car garage
option assumed for all home types.
There are two ghost plats that were requested by City Staff to envision what future connectively and development could look like
within these areas. There are no known plans to develop these lots at the time of this report as they are not owned by the
developer. One ghost plat in the southwest is proposed to add 14 single-family units. The second ghost plat is in the east of the
proposed development and is proposed to contain 60 multi-family units. The report will be focused on the land currently being
designed out; however, due to the ghost plats potential to changing available parking numbers, they will be mentioned
intermittentlythroughoutthis report.
This report is being provided in tandem with a Traffic Impact Analysis completed by ISG, which is reviewing the existing and
proposed traffic generated by the development.
`�` Architecture + Engineering + Environmental + Planning Page 9� of i
2� 2�:�:,� f��i��`r{9i�t.; ��V"YJLV - i�i=��aF"�u
FOSTER PFiOPEFiTY - ELK RIVCR, MN
�_�_► �_�_�Z���l�_�_���
Purpose of Report
The purpose of this report is to document the methodologies, findings, recommendations, and conclusions of the Parking Study;
including the basis for all assumptions, analysis parameters, and conclusions. This report presents data in a logical format
including tables and figures in order to accurately and clearly convey the data and its meaning.
Study Objectives
The objectives of this study include the following:
1. Identify how much parking is provided within the sections of the development
2. Determine how existing and future demands relate to current capacity
APPROACH
At the time of writing, the development and some of the surrounding roadways are not constructed. As a result, ISG did not collect
occupancy and duration counts in preparation for this study. In orderto evaluate the number of parking spaces needed and those
that will be available within the development, a multitude of sources were used to gather data. The Comprehensive Housing Needs
Analysis for Shelburne County, the City of Elk River Comprehensive Plan, and the proposed site concept for Foster Property were
all used in tandem in order to create the parking analysis.
`�` Architecture + Engineering + Environmental + Planning Page � of i
'�� G�:�:,� w"�i�;'r{9i�iG �6�L`u" - ��=�t;f=_u
FO�T�R PF�OPEFiTY - ELK RIVCR, MN
� =�����_�Z�1��_► � ��
Site Information
This report studies the proposed parking at Foster Property Development. A preliminary site plan of the housing development is
provided in Ap�e�ud°ox A and a project location map is provided in A�pendix �. Foster Property is a proposed housing development
on approximately 260-acres of land within Elk River, Minnesota that offers 6 different sized products and 535 lots total. This does
not include the ghost plats formally mentioned
The population of Elk River has steadily increased since 2012 with 24,522 residents in 2019. It is anticipated that the city will
exceed this growth within future years. Fu�a��e �L provides a visual representation of the historical and projected population
numbers. Conservatively, this projection does not represent current economic trends that may impact future growth. For the intent
of this study, the future growth of residents will be assumed to maintain the shown trend.
r �u� I i�i�I�.�iL �f�U W�Ki3JIYtC. I tL3 F'i���L,�iW lt�f�
25,000
24,500
z
O
� 24,000
a
J
a 23,500
O
a
23,000
22,500
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
YEAR
♦ Population —Linear (Population)
Figure 1: Historical and Projected Population of Elk River
The proposed development is located on the eastern side of the City limits and contains three small ponds / basin like features.
Although there are no final designs on the development, there is a proposed shared use trail around the perimeter of these water
features that connect to a City maintained park. Programming and public parking for the park are under discussion with the
developer and City Staff.
Vehicles will navigate the development through a series of interconnected roads that are public and HOA maintained. The north
has 10 proposed public roadways, and the south has 14 proposed public roadways with 10 HOA maintained roadways. The overall
development is planned to have 5 access points to the surrounding roadway network, three in the north that will connect to Twin
Lakes Parkway Northwest and two onto Cleveland Road Northwest / County Road 40 (C.R. 40). Note that the extension of Twin
Lakes Parkway Northwest will be under construction the summer of 2022. The construction will extend the roadway across Trott
Brook to the east onto Cleveland Road Northwest (C.R. 40). Access points along this road are planned to be aligned with existing
i ntersections.
`�` Architecture + Engineering + Environmental + Planning Page � of i
� � u- 7f17 f1Rx -�9�f,Rf,
�.t i.:.i:i.�,., � .";i.`'ftp"•Il�� �''�� �,��3 — �.? ,�.�����
The proposed roadways are being developed matching the City of Elk River's standard local roadway section where the roadway's
width allows for two-way traffic flow and parking on one-side of the street. The proposed roadways were evaluated by their total
length and excluded parking at intersections and driveway locations. Conservatively, the roadway side with more homes fronting
the roadway was used for this analysis. Additional discussion on the calculations provided are within the Pa�kin� Analysis portion
of this report.
Occupancy
Due to the development being in the design phases, occupancy was based on historical population and household data. At
approximately 3 persons per household, the development is estimated to house around 1,600 people. The historic population
data is shown in Table 10
k `�=;:ali'-'.=��-"-�;
Since 1990, the average persons per household in Elk River has not exceeded 3. Elk River is a commuter community, with 83%
ofthe residents being employed outsidethe city. Currently, there are 8,780 housing units, 72% ofwhich are single-family detached
homes, 15% are multi-family, and 12% are single-family attached homes. The vacancy rate in Elk River is just under 4%, which
shows the need for housing within the city. The proposed development will bring needed single and multi-family home options to
the community.
�1.t"a��l w.={"`:
It is expected visitors will come to the development. Street parking paired with driveway parking will likely be used for these events.
While the majority of parking spaces in the development are unit parking, the development provides 526 street parking spaces
total across the north and the south. Of the 526 street spaces, 490 will be available at any time to visitors or the public, while the
remaining 36 are on private drives in the south, and therefore reserved for residents and their visitors. Note that event parking
for visitors is a short-term and temporary event.
`�` Architecture + Engineering + Environmental + Planning Page 4 of i
Table 1: Elk River Population/Household Data.
'��-��:,:;s �'�'�.i=;i�9i���:; �6V1i�?`u' - ^�1�=�,�iG�"�u
�osTr� ������nf - c�� �ivc�, �r�
Multi-Modal Transportation
There are both bus routes and trains available for residents to access multiple surrounding cities within the City of Elk River.
��.��•��C�', i ������_
The MetroTransit system provides connectivity from Big Lake, MN through Elk River, MN to Target Field Station in Minneapolis
through the commuter rail line, Northstar. The Northstar line connects to the METRO Blue and Green Lines at Target Station. There
are four trains that stop at Elk River every weekday; two (2) in the morning headed southbound to Target Field Station and two (2)
in the evening headed northbound to Big Lake Station. A map of the Northstar commuter rail route is shown in A�pe�ud°ox C.
The Elk River Station provides over 750 parking stalls with the availability for overnight parking. The trains themselves have
onboard bicycle storage, making them more accessible for those commuters without cars. Tickets for the commuter rail are $4.25
from Elk River to downtown Minneapolis for a single-use one way fare. The Transit Assistance Program (TAP) fare is $2.25 for the
same route. The TAP is available to all eligible low-income customers.
ri�. �„^,� ,..;�r.. � r3 {�.�rid����
Tri-CAP bus routes are available from Elk River to St. Cloud, as well as other stops in the area. Fares range from $1.25 to $3.75
for a one way ticket within Sherburne County. The bus is available from 6:00 AM to 6:00 PM Monday-Friday within Elk River. Tri-
CAP has a Dial-A-Ride service, which provides curb-to-curb transit service within the service area. Within Sherburne County, the
bus service has service to:
• Big Lake
• Elk River
• St. Cloud
• Monticello
• Princeton
These destinations along with the Dial-A-Ride service make surrounding cities accessible to Elk River residents by bus.
`�` Architecture + Engineering + Environmental + Planning Page � of i
�� ��:� s � �'�.f=;�e4�'e�:�u����u` - �����;16__u�
FO�T�R PF�OPEFiTY - ELK RIV[R, MN
PARKING ANALYSIS
This section will explain the assumptions used to determine the amount of parking provided within the proposed residential
development. Parking is provided in this development by the combination of on-street and home unit parking. From the
assumptions listed below, the total parking available within the proposed development are a combination of the two (2) sections.
In addition, the analysis was broken up as mentioned, north and south.
lx� 1 r= _�, o i"sr'.r�.u�3:;
Parking is not permitted within 30-feet of an intersection, in front of resident driveways, or on the HOA maintained roadways. An
Exhibit has been provided within Ap�end°ox Q that illustrates no parking locations. It should be noted that the driveways of the
concept are not shown within this exhibit. Note that these lengths are not included within the on-street parking counts.
The public roadways are being developed in accordance of the City of Elk River's minimum roadway width of 32-feet. This roadway
width allows for the flow of 2-way traffic with on-street parking on one side of the roadway. For this analysis the side of the roadway
where more homes fronting the roadway was utilized as this would result in very parking spots. In general, the on-street parking
was calculated with the following equation:
On Street Parking Avaiable = Total Roadway Length —/ntersection No Parking —(No. o f Driveways * Driveway Width)
Note that no on-street parking was accounted for on the HOA maintained roadways and the proposed on-street parking stalls were
added within private roadways.
Within the proposed development the lots denoted within Ap�e�ud°ox A as 60- or 65-foot-wide lots are products of the developer
that have a minimum of a 3-stall garage. The 55, 45, CMA townhomes, and Liberty townhomes all have a minimum of 2-stall
garage. As formerly mentioned, these products do have the opportunity to be constructed with a 4 or 3-stall garage option. As this
is up o the home buyer, the more conversate number is used for this analysis.
The 60-, 60-, 55-, 45-foot-wide lots have a minimum driveway depth of 25-ft and a width of 20-ft. The CMAs have a minimum
driveway depth of 30-ft and a width of 15-ft. The Liberty townhomes have a minimum of depth of 18-ft and 20-ft wide. All units
have driveway parking for 2 additional vehicles, respectively.
Ci`JLkt��L f�LV�LOF�i�clVo i�i�Ri�i�;G
• •• •
1550 1135
�d;:'' �a��<$t�:
423 67
��,.�a�s ��rh;;�z
Priv�ie 5ireee 0 36
��rkinp
Due to Elk River being a commuter community, it was assumed that each person in the
household has a car, despitethere being adequate public transportation forthose commuting.
Conservatively, 3 persons per household was assumed for every unit within the development,
per Table �L. It is assumed that households would host get-togethers for a multitude of
occasions throughout the year. These two factors were used to determine the parking need in
the development.
There are 1,973 parking spots for the 323 units in the northern section of the development,
which equates to 6 parking spaces to every 1 unit at any given time. In the south, there are
1,238 parking spaces for 216 units, which allows for just under 6 parking spaces for every
Table 2 overall deveiopment parking. unit at any given time. The breakdown of how many stalls are available on any given street can
be found in A�pendix E.
`�` Architecture + Engineering + Environmental + Planning Page 6 of i
��-����.� �,a����� ��ru�v - ui�ar-�r
FOSTER PROPERTY - ELK RIVER, MN
CONCLUSIONS
Elk River offers a unique experience for its community, having a smaller sized city with access to Minneapolis and ultimately the
greater Twin Cities area. The proposed housing development will bring an additional 539 lots to the community, as well as a
walkable trail system in the center of the community. With an estimated 3 persons per household, this development could house
approximately 1,600 people.
Overall, there will be 3,211 parking spaces provided through street parking, unit parking spaces, as well as private road spaces.
This allows for approximately 2 parking spaces for every person within the community. It is determined that this is a feasible
number of parking spaces for the development and will allow for additional visitor spaces for special occasions, such as garage
sales, birthday parties, etc. Based on average household size it can be concluded that there is sufficient parking.
`�` Architecture + Engineering + Environmental + Planning Page � of i
� Architecture + Engineering+ Environmental + Planning AppendixA
�� — �� y � s �,: � �,J �_r 1—L ' y' �
� � ' �I—I��T �� � ���� '
c < � � C ��-�I 1J ll I ��`^:-a• � � � .. �a \y�� � � , ��� \
fi � � 1717r1I�I�f�I�I�C1� � —�;.�� �
� �; �� UU�UUIJLJLJLJ❑LJLJLJLJLJ❑ C (f �U
� 'a s R , 'r �� � LJLJCJLJLJLJLJLJL]I�IJIJUUU `" G� ��J �
�nnnnnnnnnnnnnnnnnn C ° �O C
' r� �. nnnnnnon C� nnnnn �, G u0 �C
�r�� - � ° � � � v�� uuuuuuuuuuW .-nn���<`
`� ��� , � uuuuuu❑ � � �U
'��: � i � r �� � �� � �� �� ����0!> " �G onnnnnnnc��` ' uu �
s��`� ' � C� nnnnnn C J �i G vuvU U
,; ��� � � � � j C «k�?'� �OU����� ���nnn
'�t� � � � � G,��� C �<� � ��°. v�� nnnn�
�� �,�R� � �G � C U❑ -.. . � ��On �
�� , � � � � �� u � � � " n� '� .
,�, r .. � `4: ' � C � n �` �. J � 0���,������ . . - J
�._ f� � � c � nn nn ' �J� � , J
fi � � s> . �JJ c� � ` vUUUIJ�Jv� ��O'� \ % � �vJ
�' '`� .. * .II II � c uuu� ��� " % �� �� C' J� �d..
�� � �� c � ... ��nClrl�l - � �J
r � C `3 + J �
• ���. "�t' �,K `� +'�� � � C �..w`, s@� � , 'F. � �%�� � �i��i
�i:, �4i4�. �L. A�< �^ � � C . k�- ���,,' ; � ,� , (�� JUUU�J � �9 e � ; ��i
� ��', � c n_ ' Y��, # �II �� � �a �:
+� .r n�i� C � �- �
1 r y�. . . ��.zo,��� � C .� r ._„ � �
� � r � � r / '� G � �� ��n��nn� m��
�R � � �
+ � � �, �� - , � F..
v►,: i� t� C�, �7��GGC _ , $ �' � � �
;�;� � �'- , � ,- �`
A�.% ���, � ��� �' -, � C � _ �
_ �ta�� �a� O
� ���� _ -
�� � �`
.�
� � � _...
�� �G �
� ❑
� % ,JJJ �` C� l
C���
� --
• � � ° � �q' �J� �� � C '
. �
,�: ��L, � �„' _ n . � � � �
"T �f � �n rl ��
'�4 / A T^ . ' i.l�� �oo �_
�� ���l� y � a .�. � a8//� �"
.� !' t �� r• <;»`- ;'��5• � ll -
, � �'
,
�"t Y � �r � l y„�.r � 7 � * � �� ,, � ,: � ,�, ,�,
���%� � ` �°�'�: . � ��" '�.. '."� a �. a - - �U� 1s1t
�'
�-. r � � ✓ -f .
- '�� �.;' . '�--
CONCEPTUALLAYOUT
�a
`` '
. .. M,.�.�f
Easn��PzoPERr �� �;�
i
£:
���..,� o .00 �
� FOSTER PROPERTY DEVELOPMENT
Archltecture + Engineenng+ Emironmental + Planning E�K aivEa, mwvEso,a-eoeznoiii ISGlnc.com
�sc aR�Ecr rvo. zz-zessa
� - -'4�
*,�"'
•� :
� Architecture + Engineering + Environmental + Planning Appendix B
�,: � -
t : _> $ � � � ,,,� , ,,, '�r' -a _
�L � L e �" � � .5�, �� �' _ ,� e � �1 £ f � � Y _: �'d , . � .
T �': �f� k p � �,
� � c,� , �y`tY % �- A ,c
�C � .� �' t f:.�,r �' " � .. .
�. � �e��.� �� �.� � � ; f zr � t r' i F:4 '�' '..c�-...... , .
� .�, 4 ���., � �s,3 �`� 1.r� : ��� r+��' � ' S� �.:n� t..� � , . . _.
r� 4 s ptl` t ( �
� �} : � t � � .� N, ♦
�.�i ���<tr.�,�yl��f' ., . � q� � �' s�''S � '�.�� � � . �{ ��- '. � . - � i.
�.� 'i;�..S}�s;•�,F�� � '�1+'h ..�; �� �'sy�}�' ^A .. � � � .. . +.`� �y�
J7j � �� �'i: �'�..,�� ', - 5��^i"�',��' �,,.�-ey� � � �k .' � � . -. ' . • .''ti , � /.
'' v,.�,` L� •` �� .�i• ':'�+�` � f. �aCA` * `�£' '� �.t� .,.� k� Y;�� 7���• R S ..�. . . .
�'R `�C f �' ..Cr �;���Q �� t ,✓'�`
'�p� 's�.. - 1' iF � A ;�<!� S:c x t. "� �` 1. +tf r�yyy; x � ��f ,�. .. o
'� ' j � _� .. �it :� _, � �' ��•.• � �. aaCY . �� . � . � ' ;�
t � � �� L � �s *Yo � rc���c ` � t ,�
� ` 'rnr ..:Y
�. ;-�[ � ,,'�'' r��, '4�,�' � � y�, � , ��r _ ' ' , "'�, ;
i R�'`, � S }` J[ A` ..._ `�.,M'(4� � �� T �• .. �� ��� .i�� � �
-�;7 � i� � `�' . j�� �� T � k�� 44 t , ;i�r , , . ` '. _K, a `'�' � ,.1
�1_. �� ,.y.:r . � , x r ��,� ; ,. � ; _. _ > ; R��; � �
y •' �[, � �' hr R' 1 . . .. C , � ✓'.,��* ?
j� ��� .r ,.T• ? -« �. �t=^
�"M�. t 't ��,4 H ^...� � .
° s ,g� � �'� � � * . Q , �� a
�. �� ��:. r��i._ � �,1�`+wr � . � � �.. T �
r �ir+ .�!'y� `'�"�R� t"' _j'' �.�+'+ 4 � :�_, n ^ ' S ` .
•t �%�` .�1.'+dly��'��1� �• ��� r �.��_ �K'� � � i`..�: �� t �.r +'1 . . � . .. 'S . . . a� r� t'S. q:
. � � S �` �.. ` � � -c'-"e'�,} "S. h„�''`�,4'ti, �'4„
- �� � . . �•� ��a �t - ) � .. �. ;�^�- .��....., . . Z _" .
_ t� � • � 'f . - �i �.�e• ,� i ' ~+� �yr . . .
�t, r y�s�- f' ��S sd . � :
;� r+,.k�, ` � � •: r � y`
.i �` ��t . �'r ` . i
1 i � i .-�' .. � ��, �` `.lr� bt . . s ' ' - '{w
/ t�1'F.��'��!'.. � g� -�--- ` , . �}�� r4 .j . . � .
�► „ � � � : � t �, ��,�.� � ° � ' � ,
.� . ` N ��.,a . , . � � � . . �. f 'F"r _ � �,�, �.� ; '
Y, 1" � J�
�'�"�`� �'f 4 r "�� � ,.� � . . � ),I � ' t.
�� ','i' f � -�" �"r •�r s �t �,�'' ''�''�f. i
�+, * . /�� � � 1�;. ... . k , . . � _ . 1 {�+� "l�+ � ' . �.�E� q'+
� �r(�r i �'�.� , � . �`� =Z.� :� �i', � �':< ���. j �.� �l �� �
f �� If I 4,� Y�,` Y'��.� '`'� �+'s+'' � i�` '� � `4 s �.
va , . .. -. �
,s'` 1.�1 �� .*a •'�' � R r� ` r � � s: _ ,� , f.� �� � . t�
( ' � • � o r � � � ' �.: - .� ay -r"`�` y.. `�"r - i' . '� .
�' � ' � � :5�. � a�1Ji'� ,Y e 1 ' 's . ',�: 4 !-"-. �.e:';�ta, �ir ; �r. t + .
_` f ' , r� � q . . �.. .t�. � �"" . i�� �:: �'i• .��? e
i�`—.r 4 � I '0 .1 .� •Ob � � � � .��� tA� ~��"'h. + F � �, t' ^ � � �� :
�A �` • �'�u;�S�
='�i���''r�'�.....- � . _ �r ��. � �:� _ '., . �t.�. �_�"s.� ,�
OVERALL SITE LOCATION ,�.�,.�.,� ° •°° ,N`
� nrchitecture+enBineering+emimmnental+Plann��ng FOSTER PROPERTY DEVELOPMENT ISGlnacom
iv.Rr,a�, M
�sc ae�ecr No. zzaeesa
� Architecture + Engineering + Environmental + Planning Appendix C
. �
Rig Lake
- : �>.:�,�e
� `
��
.r
� �y'
���4 �IV£1'
im
AlveMvilla � . �
�3PIlSE�I
� �;e��a�
a _,� .
Raw�ta�nen 14dlir�n�apo�is
,. '}' .
;�
,.
'�„�--.-.-.��-----�--..., _
�
�
� Ngrtltstar itakipn
�- �OfthSt�F{.IfSEI`w�mmi,rt��ra',
� METR4 $lue �ine 4�Rr�
� A��t12C} �r�en Lina � R-i
� Park 8e Ride
(� Con�i�cting Rnutas
�7 1 7 �
mr�vs
O
Anoka �ovn �apid$!
a
(�} � F�iuer��le
��
+ +�;
��
�4�. iM^^)
r�'�
r. •
. " 7�rg�
�.
, _�,,
E��,
iu �
bi: _
8!3
757
N
�fl��}Ejj 1]
�,�i
��,1
� Architecture + Engineering + Environmental + Planning Appendix D
.. ��-�-
II���
i�V��l!�
c
� \
-s��- __ _ _ \� � �' ��:,� ,� ���A
� ����`�,_ �`��� �� �- i—^'�
� U �� ��V ��
LJLJLJLJLJLJ �� ./�� % �-���
i ii ; �� �
c
— � � I �`�i� �, / � ,.������
��, . ��� IJ �.. �� n� 3
i�� �;�n� `w'////
�\\\� - �/
��
���
�� ��� � �w� �
� � � _ � , ' � �/_�
� �
-- " `�t/ �
�� � �� � � � ,, � � � � ���� � , —
� 1 � �_„M
\ ��yG �� ��.� _ M ROADDD
�/ / _-- � � �f�'�\C
�� .�
> �� �
� �� � .
3 M �
/ � � � � �N� ) ` W ( < L9 '
w��l
—WEr � � I = � ��I ROAD HH
�o(� � / \\ � '�,_/ �� i+m� � � \i O
�t/ /I �L—�.� l
t�/�//�� v �� —�� � 18 C�Y✓ — ..: ROADII
"' � Y✓f � ��� .
- ��.r��r/�JK / 1 Yo'3 \ � rvm , � � ROADJJ
_ -����;����Y� ``� § , - �' �� ��� I��
, r � —WEf .\ �'9— g�
� � � � �� � ! � ��
�� � � � vm � ro_ �II� � ^ _ _
/4 /
� —r� -
� I
I �� r
T� � s �; �% �� � � �,
� d ��
�
� �� �� �
� L L � o�
I � J __
� \ � —/
o ,
, � ,
a- ,�w_, �
�, a „ w__— � � — �
� � � � =w-- — �, �� �,
�, �
�-- „� — w�� —���_� �
� >, — _ � �, ,
��' i ,h = �--�;_ �,, � �� .�
—� — � '� I I
� �,
NO PARKING ZONES
� nrcnitecmre+engineering+envimnmental+alann��ng FOSTER PROPERTY DEVELOPNIENT
�: i�ER. inrvEsara-- iioiia
isc aa�ECT rvo. zz-zes�a
� j�� I
I"III
,n��.,� o .00 �
ISGlnacom
� Architecture + Engineering + Environmental + Planning Appendix E
� . � ���::.a.� :
Centerline Length (FT) 3351.1 Centerline Length (FT) 2256.1
Intersection Setbacks (FT) 409.2 Intersection Setbacks (FT) 496.8
DrivewayWidths(FT)* i 760 DrivewayWidths(FT)* 620
Total Road Available (FT) 2181.9 Total Road Available (FT) 11393
StreetSpacesAvailable 109 StreetSpacesAvailable 56
UnitSpacesAvailable** 325 UnitSpacesAvailable** 290
Total ParkingSpaces 434 Total ParkingSpaces 346
*Assumed street parking onlyon west side of Road A. *Assumed street parking onlyon north side of Road 8.
**This is assuming 381ots on the westside ofthe streetand **This is assuming 311ots on the north side of the streetand
27ontheeast.Assumed5spacesperhome,threegarage,2 27onthesouth.Assumed5spacesperhome,threegarage,2
driveway. driveway.
Centerline Length (FT) 1224.7 Centerline Length (FT) 1193.6
Intersection Setbacks (FT) 378.5 Intersection Setbacks (FT)
Driveway Widths (FT)* 180 Driveway Widths (FT)*
Total Road Available (FT) 666.2 Total Road Available (FT)
StreetSpacesAvailable 33 StreetSpacesAvailable
252.3
300
641.3
32
UnitSpacesAvailable** 75 UnitSpacesAvailable** 140
Total ParkingSpaces 108 Total ParkingSpaces 172
*Assumed street parking onlyon west side of Road C. *Assumed street parking onlyon south side of Road D.
**This is assuming 91ots on the westside ofthe street and 6 **This is assuming 131ots on the north side of the streetand
on the east. Assumed 5 spaces per home, three garage, 2 15 on the south. Assumed 5 spaces per home, three ga rage, 2
driveway. driveway.
: �
Centerline Length (FT) 3167.2 Centerline Length (FT) 700
Intersection Setbacks (FT) 14713 Intersection Setbacks (FT) 633
Driveway Widths (FT)* 460 Driveway Widths (FT)* 220
Total Road Available (FT) 1235.9 Total Road Available (FT) 416.7
StreetSpacesAvailable 61 StreetSpacesAvailable 20
UnitSpacesAvailable** 210 UnitSpacesAvailable** 105
Total ParkingSpaces 271 Total ParkingSpaces 125
*Assumed street parking onlyon east side of Road E. *Assumed street parking only on south side of Road F.
**This is assuming 191ots on the west side ofthe streetand **This is assuming 111ots on the south side ofthe street
23ontheeast.Assumed5spacesperhome,threegarage,2 and2ltotal.Assumed5spacesperhome,threegarage,2
driveway. driveway.
Centerline Length (FT) 446.4
Intersection Setbacks (FT) 61.2
Driveway Widths (FT)* 140
Total Road Available (FT) 245.2
Street Spaces Available 12
Unit Spaces Available** 60
Total ParkingSpaces 72
*Assumed street parking only on west side of Road 6.
**This is assumi ng 7 lots on the west side of the street a nd
12 tota I. Assumed 5 spaces per home, three garage, 2
driveway.
Centerline Length (FT)
Intersection Setbacks(FT)
Driveway Widths (FT)*
Total Road Available (FT)
Street Spaces Available
Unit Spaces Available** 210
Total ParkingSpaces 273
*Assumed street parking onlyon south side of Road H.
**This is assuming 21 lots on the north side of the street and
21 on the south. Assumed 5 spaces per home, three ga rage, 2
driveway.
1927
244.1
420
1262.9
63
r -a •
Centerline Length (FT) 822.4 Centerline Length (FT) 595.3
Intersection Setbacks (FT) 307.7 Intersection Setbacks (FT) 61
Driveway Widths (FT)* 100 Driveway Widths (FT)* 180
Total Road Available (FT) 414.7 Total Road Available (FT) 354.3
StreetSpacesAvailable 20 StreetSpacesAvailable 17
UnitSpacesAvailable** 50 UnitSpacesAvailable** 85
Total ParkingSpaces 70 Total ParkingSpaces 102
*Assumed street parking onlyon east side of Road I. *Assumed street parking onlyon south side of Road 1.
**This is assuming S lots on the westside ofthe street and 5 **This is assuming 91ots on the south side ofthe streetand
on the east. Assumed 5 spaces per home, three garage, 2 17 total. Assumed 5 spaces per home, three garage, 2
driveway. driveway.
•... ,.�..
Centerline Length (FT) 1840J Centerline Length (FT) 10923
Intersection Setbacks (FT) 697.2 Intersection Setbacks (FT) 453.4
Driveway Widths (FT)* 660 Driveway Widths (FT)* 260
Total Road Available (FT) 483.5 Total Road Available (FT) 378.9
StreetSpacesAvailable 24 StreetSpacesAvailable 18
UnitSpacesAvailable** 225 UnitSpacesAvailable** 290
Total ParkingSpaces 249 Total ParkingSpaces 308
*Assumed street parking only on north side of Road K. *Assumed street parking only on west side of Road L.
**This is assuming 331ots on the north side ofthe streetand **This is assuming 131ots on the westside ofthe street and
45total.Assumed5spacesperhome,threegarage,2 Oontheeast.Assumed4spacesperhome,twogarage,2
driveway. driveway.
Centerline Length (FT) 901.8 Centerline Length (FT) 398.2
Intersection Setbacks (FT) 248.1 Intersection Setbacks (FT) 124
Driveway Widths (FT)* 340 Driveway Widths (FT)* 60
Total Road Available (FT) 313.7 Total Road Available (FT) 214.2
StreetSpacesAvailable 15 StreetSpacesAvailable 10
UnitSpacesAvailable** 150 UnitSpacesAvailable** 30
Total ParkingSpaces 165 Total ParkingSpaces 40
*Assumed street parking onlyon south side of Road M. *Assumed street parking onlyon east side of Road N.
**This is assuming 171ots on the south side ofthe street **This is assuming 31ots on the eastside ofthe streetand 6
and35total.Assumed5spacesper55'lot,threegarage,2 total.Assumed5spacesperhome,threegarage,2driveway.
driveway.Assumed 4spaces per45' lot,two garage,2
`..., � � � ..
Centerline Length (FT) 368.2 Centerline Length (FT) 368.5
Intersection Setbacks (FT) 368.2 Intersection Setbacks (FT) 368.5
Driveway Widths (FT)* 0 Driveway Widths (FT)* 0
Total Road Available (FT) 0 Total Road Available (FT) 0
StreetSpacesAvailable 8 StreetSpacesAvailable 4
UnitSpacesAvailable** 64 UnitSpacesAvailable** 48
Total ParkingSpaces 72 Total ParkingSpaces 52
*Assumedstreetparkingonlyindesignatedparkingareas. *Assumedstreetparkingonlyindesignatedparkingareas.
**This is assuming 61ots on the north side ofthe street and **This is assuming 121ots on the eastside ofthe streetand
10onthesouth.Assumed4spacesperhome,twogarage,2 Oonthewest.Assumed4spacesperhome,twogarage,2
driveway. driveway.
Y
Centerline Length (FT) 618.2 Centerline Length (FT) 198.4
Intersection Setbacks (FT) 618.2 Intersection Setbacks (FT) 198.4
Driveway Widths (FT)* 0 Driveway Widths (FT)* 0
Total Road Available (FT) 0 Total Road Available (FT) 0
StreetSpacesAvailable 6 StreetSpacesAvailable 0
UnitSpacesAvailable** 80 UnitSpacesAvailable** 40
Total ParkingSpaces 86 Total ParkingSpaces 40
*Assumedstreetparkingonlyindesignatedparkingareas. *Assumedstreetparkingonlyindesignatedparkingareas.
**This is assuming 121ots on the north side of the street and **This is assuming 6 spaces on the north side of the street
18onthesouth.Assumed4spacesperhome,twogarage,2 and4onthesouth.Assumed4spacesperhome,twogarage,
driveway. 2 driveway.
Centerline Length (FT) 473.6 Centerline Length (FT) 183
Intersection Setbacks (FT) 473.6 Intersection Setbacks (FT) 183
Driveway Widths (FT)* 0 Driveway Widths (FT)* 0
Total Road Available (FT) 0 Total Road Available (FT) 0
StreetSpacesAvailable 4 StreetSpacesAvailable 0
UnitSpacesAvailable** 72 UnitSpacesAvailable** 32
Total ParkingSpaces 76 Total ParkingSpaces 32
*Assumedstreetparkingonlyindesignatedparkingareas. *Assumedstreetparkingonlyindesignatedparkingareas.
**This is assuming Sspaces on the westside of the street **This is assuming 41ots on the south side ofthe streetand
andl0ontheeast.Assumed4spacesperhome,twogarage, 4onthenorth.Assumed4spacesperhome,twogarage,2
2 driveway. driveway.
� _. ���...
ad GG
Centerline Length (FT) 647.1 Centerline Length (FT) • 183
Intersection Setbacks (FT) 647.1 Intersection Setbacks (FT)
Driveway Widths (FT)* 0 Driveway Widths (FT)*
Total Road Available (FT) 0 Total Road Available (FT)
StreetSpacesAvailable 6 StreetSpacesAvailable
183
0
UnitSpacesAvailable** 40 UnitSpacesAvailable** 32
Total ParkingSpaces 46 Total ParkingSpaces 32
*Assumedstreetparkingonlyindesignatedparkingareas. *Assumedstreetparkingonlyindesignatedparkingareas.
**This is assuming 91ots on the south side ofthe streetand **This is assuming 41ots on the south side ofthe streetand
17total.Assumed5spacesperhome,threegarage,2 4onthenorth.Assumed4spacesperhome,twogarage,2
driveway. driveway.
. .: � _ .. . . .
Centerline Length (FT) 194.8 Centerline Length (FT) 129.7
Intersection Setbacks (FT) 194.8 Intersection Setbacks (FT) 129.7
Driveway Widths (FT)* 0 Driveway Widths (FT)* 0
Total Road Available (FT) 0 Total Road Available (FT) 0
StreetSpacesAvailable 4 StreetSpacesAvailable 4
UnitSpacesAvailable** 24 UnitSpacesAvailable** 8
Total ParkingSpaces 28 Total ParkingSpaces 12
*Assumedstreetparkingonlyindesignatedparkingareas. *Assumedstreetparkingonlyindesignatedparkingareas.
**This is assuming 21ots on the south side ofthe streetand **This is assuming 21ots on the north side ofthe streetand
4onthenorth.Assumed4spacesperhome,twogarage,2 Oonthesouth.Assumed4spacesperhome,twogarage,2
driveway. driveway.