Loading...
4.3 SR 04-03-2023�, Elk s �- River Request for Action To Item Number Ma Tor and CinT Council 4.3 Agenda Section Meeting Date Prepared by Consent Agenda April 3, 2023 Matt Stevens, Wastewater Treatment FacilityT Chief O eYator Item Description Reviewed by Bids: SanitaryT Se`ver Cure in Place Pipe Installation Brandon Wisner, En ineerin Pro�ect Mana er Reviewed by Cal Pormer, Ci T Administrator Action Requested Approve, byT motion, bid from Visu-Sewer, Inc. for Cure in Place Pipe (CIPP) installation in the School Vie`v development in the amount of $44,454.50. Background/Discussion This neighborhood is slated foY a full reconstruct as part of the 2023 Street Improvement PYoject. The cityr seweY system is original to the 1970 development This CIPP installation pYolongs the asset foY aYeas that we didn't have CIPP lined in 2014. Staff obtained two bids and recommends the low bid from Visu-Sewer, Inc. Financial Impact $44,454.50 from the WastewateY budget. Mission/Policy/Goal Responsible for everyT dollar — good ste�vards Attachments ■ Visu-Sewer, Inc. proposal ■ HyTdro-Klean, LLC proposal The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. row�REo ar �I'1 ���� Update�l• January 2023 � � � To: Matt Stevens Ciry of Elk River 248 Railroad Drive Elk River, MN 55330 (763) 635-1170 Date: 2/13/2023 Visu-Sewer Inspect. Maintain. Rehabilitate. Proposal From: Todd Stelmacher Visu-Sewer, Inc 19587 Tamarack St NW Oak Grove, MN 55011 763-252-0004 Project: Sanitary Sewer CIPP Installation Visu-Sewer is pleased to provide the following quotation for CIPP installation: Install 1,3271inear feet of 8" National Liner @$33.50 per linear foot $ 44,454.50 The above listed price is based on a video inspection dated 1/26/2023 and assumes the current pipe condition is suitable for CIPP installation utilizing air pressure for the inversion and hot air/ steam for curing. Pricing includes: - Labor, material, and equipment - Mobiliaation and residential traffic control - One (1) pass jet cleaning and televising of sewers prior to installation - Bypass pumping of existing flow - Installation ofNational Liner per manufacturer's instructions, ASTM F1216 - Reinstatement of active service connections - Televising of sewers after installation NOTE: Due to volatiliry in material pricing and availabiliry this proposal is valid for 30 days from the date of origination. If a signed proposal has not been received within 30 days price(s) may be adjusted upon mutual agreement, or the proposal may be withdrawn by either parry. The City of Elk River will need to provide: drivable equipment access to all manholes, water from nearby hydrants (without charge), a dump site for captured debris, and traffic control beyond cones and signs. If needed, grouting of active leaks, removal of obstructions (e.g., roots, deposits, and protruding taps), and heavy cleaning will be quoted separately. If it is determined that current pipe conditions are not suitable for an air inversion and hot air/ steam cure, pricing may be adjusted to reflect alternate installation methods. Mobiliaation and/ or time on site will be billed at a T&M rate of $375.00 per hour for pipe sections not suitable for CIPP installation. Thank you for the opportunity to quote on this project. Please do not hesitate to call if you have any questions. All material guaranteed to be as specified. All work to be completed in a substaulial workmanlike matmer accordiug to standard practices or specificatiot�s submitted. Any alteration or de�-iation from above specifications un-olving exh�a costs will be executed only upon ��•ritten orders and �m�ill become an exh�a charee over and above the estimate. All agreements contiugent upon sh-ikes, accidents or delays beyond om- controL Owner to cany fu-e, tornado and other uecessary it�stu-ance. If a collapse of the original pipe results dtsing die lining process. V isu-Sewer will not be held liable for costs associated wiTh excavation, repairs or restoration. Our workers are fixlly covered by Worlaveu's Compensation Instu-ance. Tlus proposal may be wididrav,�i if not accepted witlun 30 days of issue. Teims - Net30 daye. Acceptance of Proposal The above prices / conditions are satisfactory and are hereby accepted. Visu-Sewer is authorized to do the work as specified. Date: Signature: www.visu-sewer.com WISCONSIN - ILLINOIS - MINNESOTA - IOWA - MISSOURI - VIRGINIA - OHIO ����� •_ ����� Hydro-Klean, LLC 333 NW 49th Place Des Moines, IA, 50313 Phone: 515-283-0500 City of Elk River, MN 248 Railroad Drive Elk River MN 55330 United States of America Quote Nbr.: Order Date: Valid Until: Sales Person: Customer ID: Payment Terms: City of Elk River, MN 248 Railroad Drive Elk River MN 55330 United States of America Q007201 03/21 /2023 06/19/2023 Michele McGreal 100363 Net 30 Days .- Projected probable project cost to perform the following tasks on a unit cost basis: Variations in the work scope will require execution of a change order. Location of Work: Elk River, MN. Project Name: Elk River CIPP 2023. Job Description: Install CIPP as identified on provided map. Footages are estimated, actual lengths will be invoiced. Owner to provide clear access to exposed manholes, water, dumpsite, major traffic control, any permits and equipment retrieval if necessary. Obstruction removal and infiltration grouting or preliner, if required, will be considered extra. Pipe conditions are constantly changing and may need additional attention prior to lining. Prices do not include Prevailing Wage. '� � • 1 Mobilization 1.0000 EACH 5,940.0000 5,940.00 2 8" Prep 1,323.0000 FOOT 10.9000 14,420.70 3 Protruding Taps or Mineral Deposits, If Any 1.0000 EACH 250.0000 250.00 4 8" CIPP Lining 1,323.0000 FOOT 31.2000 41,277.60 5 Reinstates 1.0000 EACH 75.0000 75.00 *NOTE: Quote does not include any applicable taxes Prepared By: Michele McGreal Accepted By: Approved By: Wade Anderson Date: PO#: *Quote Total: 61,963.30