Loading...
6.1. SR 12-05-2005 Item 6.1. MEMORANDUM TO: Mayor and City Council FROM: Joan Schmidt, City Clerk DATE: December 5, 2005 SUBJECT: Public Hearing to adopt 2006 Fee Schedule REQUEST Council is requested to conduct a public hearing and adopt the 2006 fee schedule. BACKGROUND Attached is the proposed 2006 fee schedule for Council review. Fees for services are reviewed by staff and Council on an annual basis to ensure that fees charged cover the services that are provided by the city. In the attached fee schedule, the proposed changes are highlighted in red. The current fee amount to be changed is illustrated with a strikethrough. With the recent change in State Law, the cities can now only charge $.25 for copies. State law requires any fees dealing with land use to be enacted through ordinance with a public hearing. ATTACHMENTS · Proposed 2006 Master Fee Schedule, Exhibit A, B, C, and D · Memo from Bill Maertz regarding Park Dedication Fees · Ordinance adopting 2006 Fee Schedule · Summary of ordinance for publication ACTION REQUESTED Motion to adopt the attached ordinance setting the 2006 Fee Schedule. Motion to adopt the attached summary publication of the ordinance setting the 2006 Fee Schedule. S: \ Council\Joan \FeeSched06.DOC TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Bill Maertz, Parks and Recreation Director November 30, 2005 Recommendation for Park Dedication Fees ACTION FOR CONSIDERATION Recommendation on park dedication fees BACKGROUND Elk River current park dedication fees: Residential $2,800/ dwelling unit Commercial $6,000/ acre Industrial $2,000/ acre 2005 neighboring communities park dedication fees: Subject to increase for 2006. Otsego Residential Commercial Industrial Ramsey Residential Commercial Industrial Big Lake Residential Commercial Industrial Rogers Residential Commercial Industrial $2932/dwelling unit $7,000/ acre $3,500/ acre $ 2,200/ dwelling unit $ 4,356/acre $ 4,356/acre $3,500/dwelling unit (scheduled for increase to $4,000 in 2006) NA NA $2,000/ dwelling unit $6,000/ acre $4,000/acre A substantial portion of the park improvement budget consists of products or services that are rising in price faster than the cost of living. · The cost of paving trails, sports courts, and parking areas is closely related to the cost of fuel. · Playgrounds, benches, and fencing for backstops are subject to rising steel costs. . Prices for land acquisition are increasing rapidly. In order to maintain purchasing power at 2005 levels, staff recommends an increase of 5% on park dedication fees for 2006. PARK COMISSION RECOMMENDATION At the November 9, 2005 Park commission meeting, the Commission voted 7-0 to recommend a 5% increase in park dedication fees ACTION REOUESTED Increase park dedication fees by 5%. Residential $2,940/ dwelling unit Commercial $6,300/ acre Industrial $2,100/ acre (Proposed) 2006 MASTER FEE SCHEDULE Exhibit A ACCIDENT REPORT (STATE MOTOR VEHICLE) $a $.25 per oaae ANIMAL IMPOUND FEES 151 Time in one vear $30 2nd Time in one vear $50 3rd Time in one year $100 ANIMAL LICENSES Cat $5/2 vears DOQ $10/2 vears Duplicate Cat or Doq License $2 each Residential Kennel $50/vear Commercial Kennel $75/vear ASSESSMENT SEARCH CERTIFICATION $20/each AUDIOIVISUAL Dubbinq Police Audio Taoes $25/taoe Dubbinq Audio Tapes $5/tape Dubbinq Police Video T aoes $35/taoe Dubbinq Video Tapes $20/tape Video Operator $50 hour BACKGROUND (Jetter of aood conduct) $5 BUILDING PERMIT Industrial, Commercial, Multifamily State permit fee, 1997 UBC Table 1 A, plus 65% Residential, Single-family, and additions plan check fee (valuation based on current State of MN buildinq valuation datal State Residential Contractor License $5/permit Search Miscellaneous Building Permits City permit fee schedule Exhibit C plus State Surcharae Heatinq, Ventilation and Air Conditioninq Citv permit fee schedule Exhibit B-1 .5% Plumbinq Permit Citv oermit fee Schedule D - 1 .5% Page 2 BURNING PERMITS Residential Special BurninQ Permit $10 each Residential Special Burning Permit - Daytime Hours $25 each COPIES Microfilm to hard copy ct 1 ~~~h $.25 per paQe Driver's License (non-city residents) ~ $.25 CD/DVD reproduction $13 Photocopies $.25 per page up to 100 pages; over 100 paqes plus staff time CUPS - ELK RIVER Plastic $4 DOCUMENTS Audit or BudQet $0 Comprehensive Plan $50 City Code $135 Available through Municipal Code Corporation Housinq Maintenance Ordinance $5 each Meeting Packets $5/packet Land Development Requlations $35 FALSE ALARMS Fire First 3 alarms - no charge - $150 for the 4th alarm, $50 for each successive alarm thereafter Other (Security) First four alarms - no charge - $50 for 5th alarm and each successive alarm thereafter FERTILIZER LICENSE Commercial Applicator License $45 FINGER PRINTS $10 FIREWORKS DISPLAY - PYROTECHNICS $25 FIREWORKS SALES PERMIT $100 Renewal $100 FLAG - (Citvl $40 GARBAGE HAULER LICENSE $60 15t truck plus $15 each additional truck GRADING PERMIT $50 plus city consultant fees if required to process application IMPOUNDED VEHICLES -- AT CITY GARAGE $10/Day Page 3 OR POLICE DEPARTMENT LABOR RATE - Research. Com outer Services Etc. $15/hr (15 minutes minimum) LION'S PARK CENTER Per Policy & Aoolication for Facility Use LIQUOR LICENSE Club $300/vear Intoxicatinq On-Sale $5,000 Intoxicating Sunday On-Sale $200/vear Investiqation Fee Corporation $400 Sinqle $200 3.2% Beer Off-Sale $75/vear 3.2% Beer On-Sale $225/vear Set Up $75/vear Wine $700 Temporary Non-Intoxicating $30/day T emporarv Intoxicatinq $40/day Premises Extension Permit (on-sale) $100 LOCKOUT FEES $20 MAPS Aerial Photos $6/sheet Aerial T opoqraphy Maps $55/per acre Large Base, Zoning, or Land Use Map $3 each Medium Base or Zoninq Map $2 each Medium Base Ward Map $2 each Copies of Maps from COpy Machine $2 each MASSAGE ESTABLISHMENT Initial Fee (Includes Investigation Fee) Single $200 Corporation $300 Partnership $300 Renewal Fee $150 MASSAGE THERAPIST Initial Fee (Includes Investigation Fee) $150 Renewal Fee $100 MECHANICAL AMUSEMENT $15/per establishment plus: Mechanical Rides $15/ride Pin Ball Games $15/machine Pool Tables (Coin Operated) $15/table Video Games $15/qame Page 4 MINERAL EXTRACTION $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not activelv mined PARK DEDICATION FEE Residential $~/dwellinq unit $2,940 Commercial $(r,OOG/acre $6,300 Industrial $~/acre $2,100 PARK FACILITY USE FEE Shelter, Bandshell, Fields, and Hockey Rinks Residents $20 Non-residents $40 Field with a Shelter $0 PARK AND ALL RECREATIONAL FACILITIES Per Policy & Application for Use PARKING FINES Overtime Parkinq $10 Prohibited/Improper Parking $20 No Parkinq 2 a.m. to 6 a.m. $20 Winter Parking Ordinance $15 Other $20 Fire Lane/Hydrant $20 Handicap Parkinq Onlv $200 PARKING STICKERS Commuter Parkinq $12/space (2 stickers/space) Duplicate (for lost stickers) $l/sticker PAWN SHOPS $12,000/year Investiqation Fee $1,500 PHOTOGRAPHS 35 mm photos up to 12 exposures $10 35 mm photos UP to 24 exposures $15 Digital black and white $10 Diqital color $15 PINS Plastic - Elk River $.35 each Metal - Elk River $2 each POSTAGE Prevailing Rate RENTAL DWELLING LICENSE $15/dwelling unit Page 5 SANITARY SEWER USER FEES Aoril 1. 2006 April 1. 2007 Charqe per 1 ,000 qallons $ 3.48 $ 3.58 Minimum charae $ 8.06 $8.30 Aoartment Unit Charqe $13.85 $14.27 House Unit Flat Charae $18.20 $18.75 SEPTIC INSTALLATION AND REPAIR $100 SEWER AVAilABILITY CHARGE (SAC) (Plant replacement interceptor) $2,750 per unit for 2005; $3,500 for 2006 SEWER AND WATER HOOK-UP PERMIT $45 plus ($2,000 bond in favor of the citvl SIGN PERMITS Uo to 100 sauare feet $60 101-300 square feet $120 Over 300 sauare feet $200 Temoorarv $30 Temoorarv. Deoosit $100 SOLID WASTE FACILITY LICENSE $2,000 plus cost of reviewing license. Amount of annual cost incurred by the city for monitoring and inspecting the facility plus the license. STREET DISRUPTION $100 plus ($5,000 letter of credit in favor of the city) SURFACE WATER MANAGEMENT IMPACT $~/residentiallot (rural) $84.65 FEE (3% annual increasel (Resolution 94-110) $~/residentiallot (urban) $169.32 $9UAG/acre (multifamily, commercial, and industrial) $1015.99 TOBACCO LICENSE $150/vear TRANSIENT MERCHANT LICENSE $100/vear TROTT BROOK FARM BARN Per Policy & Application for Facility Use UTILITY HOOK-UP PERMIT Year-Ionq city-wide permit $1,000 One-time hook-up permit $45 WATER ACCESS CHARGE (WAC) $300 (Contact Municioal Utilities - 441-20201 WATER CONNECTION CHARGE ctl ,A <::1"\ $1,700 (Contact Municipal Utilities - 441-2020) Page 6 ZONING/PLANNING APPLICATIONS Administrative Subdivisions/Simple Plats $300 plus Park Dedication if applicable (Escrow for Consultina Servicesl $500 Conditional and Interim Use Permit Commercial/Industrial $500 (Escrow for ConsultinQ Services) $1000 Residential $300 (Escrow for Consultina Services) $200 Amendments and renewals requiring Same as fees for initial applications public hearinas (Escrow for Consultina Servicesl $300 Easement Vacation $250 (Escrow for ConsultinQ Services) $300 General Zoning Requests $100 Land Use Plan Amendment $400 Nonconformim:J Sian Alteration $110 Ordinance Amendment $400 Preliminarv Plats $1 ,000 + $5/lot for each lot over 50 (Escrow for Consultina Services) $1,000 Plats. Final $200 Permitted Home Occupations $15 Planned Unit Development (PUD) Charge for necessary planning applications required for the PUD, Le. CUP. RezoninQ, etc. Reauests for Parcel Information Property Identification Number or $15 per parcel Legal Description Zonina Desianation or Flood Zone $25 per parcel Lot Dimension $40 per parcel Zoning Letter $50 per request Subdivision Exemptions $100 Site Plan Review $300 (Escrow for Consultina Services) $1.000 Page 7 I Variance Zone Change ~200 400 Page 8 EXHIBIT B CITY OF ELK RIVER MECHANICAL PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, gas piping, or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than fifteen dollars ($15.00). PERMIT FEE FOR HEATING. VENTILATION AND AIR CONDITIONING APPLIANCE ITEMS. CONNECTIONS OR APPENDAGES For any permit for the installation, alteration or repair ofthe above-referenced items, the fee shall be one and one-half percent (1.5%) ofthe valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. Page 9 EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $45.00 plus state surcharge Fire Places and Wood Stoves $45.00 plus state surcharge Garages. Outbuildings. and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-roof Residential- $45.00 plus state surcharge. Commercial/lndustrial- $.50 per square foot for valuation for permit fee plus state surcharge. Swimminl! Pools $45.00 plus state surcharge 3 Season and Screen Porches $40.00 x square footage = valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures Moving structures in - $150.00 (Note: in addition, a building permit is required for foundation, garage, and remodeling of structures moved in). Page 10 Moving Outbuildines In $45.00 (Note: in addition, a building permit is required for foundation and remodeling of structures moved in). Moving Outbuildings Out and Demolition - $45.00 Moving Houses Out and Demolition - $150.00 Window Installation - $45.00 Residing - $45.00 Page 11 EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fixture, or device, shall require the payment by the applicant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Fifteen Dollars ($15.00). PERMIT FEE FOR PLUMBING For any permit for plumbing, the fee shall be one and one-half percent (1.5%) ofthe valuation of the work. Page 12 ORDINANCE 05- CITY OF ELK RIVER AN ORDINANCE OF THE CITY OF ELK RIVER ADOPTING THE 2006 FEE SCHEDULE The City Council of the City of Elk River does hereby ordain as follows: Section 1. Pursuant to Minnesota Law, and the Elk River City Code, a fee schedule for City services and licensing is hereby adopted. 2006 Master Fee Schedule. (a) The Code of the City of Elk River establishes that certain fees beset from time to time by the Elk River City Council. (b) City staff has reviewed the current Master Fee Schedule for the City of Elk River and is hereby recommending that the 2006 Master Fee Schedule, hereto attached as Exhibit A, B, C, and D be adopted. (c) Upon consideration and review of the Elk River City Council, the 2006 Master Fee Schedule, hereto attached as Exhibit A, B, C, and D is hereby adopted and becomes effective January 1,2006. Section 2. This ordinance shall be published on December 14, 2005 and shall become effective beginning January 1,2006. Passed and adopted by the City Council of the City of Elk River this 5th day of December 2005. Stephanie A. Klinzing, Mayor ATTEST: Joan M. Schmidt, City Clerk Page 1 The City Council of the City of Elk River has determined that Ordinance 05-_ should be published in summary form. SUMMARY OF ORDINANCE #05 -_ AN ORDINANCE OF THE CITY OF ELK RIVER ADOPTING THE 2006 FEE SCHEDULE The City of Elk River does ordain: On December 5, 2005, the Elk River City Council adopted Ordinance OS-_ adopting the 2006 fee schedule. This Master Fee Schedule, referred to as Exhibit A, B, C, and D, has some slight increases. To be increased: park dedication fees, surface water management impact fees, and sanitary sewer user fees. Charges to be reduced: photocopies in general. A printed copy of the full text of the Ordinance and Master Fee Schedule, referred to as Exhibit A, B, C, and D in Ordinance 05-_, is available for public inspection at the office of the Elk River City Clerk, 13065 Orono Parkway, during regular business hours - 8:00 a.m. to 4:30 p.m., Monday through Friday. This summary of Ordinance 05-_ has been approved by the City Council, by at least four-fifths vote, on December 5, 2005. Ordinance 05-_ shall become effective January 1, 2006. Stephanie Klinzing, Mayor ATTEST: Joan Schmidt, City Clerk (published in Official Newspaper 12-14-05)