Loading...
4.2.a PCSR 05-23-2023 Request for Action To Item Number Planning Commission 4.2a Agenda Section Meeting Date Prepared by Public Hearings May 23, 2023 Chris Leeseberg, Senior Planner Item Description Reviewed by st Waste Management – Elk River Landfill, 11711 221 Zack Carlton, Community Development Director Ave. NW / 22460 US Hwy. 169 Reviewed by Ordinance Amending Section 30-1834. SWF solid Suzanne Fischer, Environment Services/Special Projects waste facility overlay district, Case No. OA 23-02 Director Action Requested Recommend, by motion, approval of the ordinance amendment as drafted. Background/Discussion The Elk River Landfill (ERL) submitted an application for a Conditional Use Permit (CUP), case number CU 23- 09, to amend their CUP to incorporate approximately 20 additional acres of property, immediately to the south of the currently permitted landfill footprint. The additional land provides no additional capacity for Municipal Solid Waste (landfill expansion) but will be used for improved/required stormwater management. Currently, no portion of a solid waste facility, including any portion of a solid waste facility, easements, water or air rights, stormwater management facilities, and all buffer areas or buffer zones can occur outside of the Solid Waste Facility (SWF) overlay district. For the CUP to be processed, ERL is proposing an ordinance amendment to Section 30-1834(e) to allow for stormwater management features for the landfill to be located outside of the SWF overlay district. The amendment has been drafted to allow only stormwater facilities serving approved SWF facilities to be located outside of the SWF overlay district if on a Zoning Lot (adjacent lot under common ownership). A Zoning Lot means a parcel of land occupied or used or intended for occupancy or use for a purpose identified in article VI of this chapter and identified as such for the purposes of zero lot line development. The parcel shall abut a public street and shall be of sufficient size to satisfy and meet all dimensional regulations required by article VI of this chapter. The designated zoning lot may encompass more than one lot of record and shall serve as a unified development site for purposes of application of standards. Financial Impact None Attachments  Proposed Ordinance  Applicant’s Narrative The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: January 2023 Created: 2023-03-07 12:38:54 [EST] (Supp. No. 57) Page 1 of 1 Sec. 30-1834. SWF solid waste facility overlay district. (e) Solid waste facilities restricted to SWF—Solid waste facilities overlay district. No solid waste facility, including any portion of a solid waste facility, any easements, water or air rights, all stormwater management facilities and all buffer areas or buffer zones required, needed or useful for the establishment and/or operation of the solid waste facility, with the exception of facilities necessary for monitoring the offsite impacts of the facility on ground and surface water, shall be located or operated in the city except in those areas of the city located within the SWF—Solid waste facilities overlay zoning district. Stormwater facilities serving approved SWF facilities can be located outside of the SWF overlay district if on a Zoning Lot (directly abutting the property of the approved use). (Code 1982, § 900.12(18); Ord. No. 10-02, § 2, 3-15-2010) CU 23-09 Narrative The additional 20-acres of property has been purchased by ERL from Tiller Corporation, now part of Martin Marietta (Tiller). The property is currently used by Tiller for its gravel mining operation, as they retained mineral rights on the property per the terms of the purchase. As has been the practice at the existing Landfill, development of Landfill related components (in this case the proposed stormwater management infrastructure) will follow behind Tiller's mining operations. Tiller has an approved CUP from the City for their mining activity (including the 20-acre subject property). The additional property will allow for ERL to construct one large stormwater basin to replace the currently permitted design which included two sedimentation basins and would have required a lift station to manage stormwater from the Landfill. The modifications will allow for gravity drainage for stormwater management (eliminating the lift station) and reduce the amount of controlled fill placement required for perimeter berm construction. For the previous design, stormwater discharge from the site was under the exterior roadway, then under the City of Elk River trail, and ultimately to an upstream wetland on property owned by ERL. The modified design allows for discharge directly west of the proposed pond to an existing low area, on property also owned by the Landfill, east of the trail (eliminating the need for the City trail crossing). The proposed sedimentation pond includes settling basins at the east and west ends. A safety bench has been incorporated into the design and perimeter access for cleaning / maintenance activities has been considered. The proposed pond has been designed to provide flexibility depending on mining activities in the area. The bottom elevation of the pond will be at maximum an elevation of 964; the actual elevation may be 964 or lower depending on mining activities. The design presented herein represents the minimum storage capacity that would be provided and storm events that would be managed. Actual conditions following mining activities may provide for management of larger storm events by increasing the available storage capacity. See the attached "Conditional Use Permit Application" for additional details Application to the City of Elk River Elk River Landfill CUP and Ordinance Amendment for Stormwater Management Improvements April 2023 Prepared for: Elk River Landfill, Inc. Prepared by: Stantec Consulting Services Inc. One Carlson Parkway, Suite 100 Plymouth, MN 55447 PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Table of Contents i Table of Contents 1.0 INTRODUCTION .......................................................................................................... 1.1 1.1 DESCRIPTION OF PROJECT...................................................................................... 1.1 1.1.1 Landfill Development and Closure Construction .......................................... 1.2 1.1.2 Landfill End Use .......................................................................................... 1.2 2.0 APPLICATION REQUIREMENTS ................................................................................ 2.1 2.1 INTRODUCTION .......................................................................................................... 2.1 2.2 CONDITIONAL USE PERMIT REQUIREMENTS ......................................................... 2.1 2.3 APPLICATION FEE ...................................................................................................... 2.2 3.0 CONDITIONAL USE PERMIT ...................................................................................... 3.1 3.1 EXISTING CONDITIONS AND DEVELOPMENT PLAN ............................................... 3.1 3.2 LEGAL DESCRIPTION OF THE SUBJECT PROPERTY ............................................. 3.1 3.3 PROJECT NARRATIVE ............................................................................................... 3.1 3.4 SITE, UTILITY, GRADING / DRAINAGE PLAN ............................................................ 3.2 3.5 LANDSCAPING PLAN ................................................................................................. 3.2 3.6 DRAINAGE CALCULATIONS ...................................................................................... 3.2 3.7 BUILDING ELEVATIONS / FLOOR PLANS.................................................................. 3.2 3.8 WETLAND DELINEATION / WETLAND MITIGATION ................................................. 3.2 3.9 EAW/EIS REQUIREMENTS ......................................................................................... 3.3 3.10 CONDITIONAL USE PERMIT STANDARDS OF ISSUANCE ....................................... 3.3 FIGURES Figure 1 – Site Map Figure 2 – Site Development Plan Figure 3 – Grading and Drainage Plan LIST OF ATTACHMENTS Attachment 1 – Legal Description Attachment 2 – Landscaping Plan Attachment 3 – Existing Conditions Attachment 4 – Drainage Calculations PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Introduction 1.1 1.0 INTRODUCTION Elk River Landfill, Inc. (ERL), a wholly owned subsidiary of Waste Management of Minnesota, Inc., owns and operates a mixed municipal solid waste (MSW) landfill (Landfill) under Minnesota Solid Waste Permit Number SW-74. The Landfill is located along U.S. TH 169 in the NW ¼ of Section 3, T33N, R26W, and the SW ¼ of Section 34, T34N, R26W, Sherburne County, Minnesota (see Figure 1). Besides the construction and demolition debris (C&D) landfill immediately and adjacent to the north of the Landfill, the remainder of the existing property owned by ERL provides a buffer surrounding the Landfill. The Landfill is permitted to accept MSW, C&D, yard waste for composting, industrial waste in accordance with a MPCA-approved Industrial Solid Waste Management Plan, and processing facility rejects. ERL maintains a Solid Waste Facility (SWF) license and conditional use permits in accordance with City of Elk River (the City or City) requirements. ERL and the City entered into an agreement on May 25, 2011 for the expansion of the facility into an area referred to as the southern development area (SDA). Based on the agreement, a Land Use Application was submitted to the City of Elk River dated June 27, 2011. Subsequently, the application and an amended Conditional Use Permit (CUP) was approved by the Elk River City Council on September 19, 2011. The SWF license references the amended CUP, and the two documents authorize construction and operation of the currently permitted facility. ERL is proposing to revise the CUP to incorporate approximately 20 additional acres of property, immediately to the south of the currently permitted landfill footprint. The additional 20 acres provides no additional MSW capacity, but instead will be used for improved stormwater management. Concurrent to the proposed CUP revision, ERL is proposing an ordinance amendment to Elk River Code, Chapter 30. Land Development Regulations, Article VI. Zoning, Division 10, Sec. 30 -1834.(e) to allow for stormwater management features for the landfill to be located outside of the SWF solid waste facility overlay district boundary. A request for minor modification to the Landfill’s MPCA Solid Waste permit (SW-74) will also be submitted to reflect the changes to the site grading and stormwater management features. 1.1 DESCRIPTION OF PROJECT The additional 20-acres of property has been purchased by ERL from Tiller Corporation, now part of Martin Marietta (Tiller). The property is currently used by Tiller for its gravel mining operation, as they retained mineral rights on the property per the terms of the purchase. As has been the practice at the existing Landfill, development of Landfill related components (in this case the proposed stormwater management infrastructure) will follow behind Tiller's mining operations. Tiller has an approved CUP from the City for their mining activity (including the 20-acre subject property). The additional property will allow for ERL to construct one large stormwater basin to replace the currently permitted design which included two sedimentation basins and would have required a lift station to manage stormwater from the Landfill. The modifications will allow for gravity drainage for stormwater PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Introduction 1.2 management (eliminating the lift station) and reduce the amount of controlled fill placement required for perimeter berm construction. For the previous design, stormwater discharge from the site was under the exterior roadway, then under the City of Elk River trail, and ultimately to an upstream wetland on property owned by ERL. The modified design allows for discharge directly west of the proposed pond to an existing low area, on property also owned by the Landfill, east of the trail (eliminating the need for the City trail crossing). The proposed sedimentation pond includes settling basins at the east and west ends. A safety bench has been incorporated into the design and perimeter access for cleaning / maintenance activities has been considered. The proposed pond has been designed to provide flexibility depending on mining activities in the area. The bottom elevation of the pond will be at maximum an elevation of 964; the actual elevation may be 964 or lower depending on mining activities. The design presented herein represents the minimum storage capacity that would be provided and storm events that would be managed. Actual conditions following mining activities may provide for management of larger storm events by increasing the available storage capacity. 1.1.1 Landfill Development and Closure Construction Modifications to the stormwater management system features have allowed for a reduction in the width of the perimeter berm on the south termination of the MSW disposal area. Changes to the perimeter grading plan result in a reduction in fill materials required to complete construction / landfill development. Consistent with the previous design, stormwater generated from the southern portion of the Landfill will still be controlled and routed by drainage terraces, downslope structures, perimeter ditching, a nd related stormwater management infrastructure. Stormwater will be routed through these features to the proposed large stormwater basin. The modifications to the stormwater management system components on the Landfill will be incorporated during phased closure construction. The modifications to the Landfill discussed above will primarily be on the existing property permitted and approved for Landfill activities and will be addressed in a subsequent minor permit modification application to the MPCA. 1.1.2 Landfill End Use The current end use plan for the Landfill will not change and provides for open green space. Long term, the open space planned for the site would be compatible with any adjacent future use. The end use determined for the site will be consistent with the terms of previous agreements. PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Application Requirements 2.1 2.0 APPLICATION REQUIREMENTS 2.1 INTRODUCTION The current Landfill footprint is located within a SWF – solid waste facility overlay district, but the 20-acres of property to the south is not. The additional property is zoned “Agricultural Conservation” and in a Mineral Excavation Overlay District. Although the proposed modifications are for stormwater management improvements, and do not allow for additional waste disposal capacity (the permitted waste limit will remain unchanged), Elk River Code, Chapter 30. Land Development Regulations, Article VI. Zoning, Division 10, Sec. 30-1834.(e) currently restricts solid waste facilities, including all stormwater management facilities, to the SWF – solid waste facilities overlay district. The language in the following portion of the ordinance is proposed to be amended to allow for stormwater management facilities related to the SWF to be located outside of the SWF zoned area. Sec. 30-1834.(e). No solid waste facility, including any portion of a solid waste facility, any easements, water or air rights, all stormwater management facilities and all buffer areas or buffer zones required, needed or useful for the establishment and/or operation of the solid waste facility, with the exception of facilities necessary for monitoring the offsite impacts of the facility on ground and surface water, shall be located or operated in the city except in those areas of the city located within the SWF—Solid waste facilities overlay zoning district. In addition to the ordinance change request, this application is submitted to obtain a sanitary landfill CUP to incorporate the additional area into the property but manage the land under the current zoning designation without expanding the SWF. 2.2 CONDITIONAL USE PERMIT REQUIREMENTS The Elk River Code, Chapter 30. Land Development R egulations, Article VI. Zoning, Division 2. Administration and Enforcement, Subdivision III. Conditional Use Permits, governs the conditional use permit application requirements: Sec. 30-651. Application. (b) An application for a conditional use permit shall be filed with the director of planning on a form prescribed by the city. The application shall be accompanied by such plans and information as may be required by the city, including, without limitation: (1) A site plan drawn at scale showing all abutting lots, existing buildings, existing uses, utilities, curb cuts, and locations of trees having a diameter of six inches or more. PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Application Requirements 2.2 (2) A proposed development plan showing proposed ingress and egress to the property and proposed structures, yards, off-street parking and loading areas and where appropriate, plans for utilities, screening, buffering, landscape, lighting, signs and open space, and a development schedule. In addition to the information required by Code, the Conditional Use Permit application form requires the submission of the following information: • Application Fee • Full legal description of the subject property (in an editable word format) • A typewritten narrative explaining the request in detail • Site, Utility, Grading/Drainage Plan • Landscape Plan completed by registered landscape architect • Drainage Calculations • Building Elevations (not applicable) • Floor Plans (not applicable) • Wetland Delineation / Mitigation Plan (not applicable) • EAW/EIS Requirements • All other information as determined by City Staff 2.3 APPLICATION FEE The application fees are provided based on the fees itemized on each Application Form. The escrow is used to pay for City's consultants to review the land use applications. If the escrow is used, then the applicant will be billed for all additional services: Application Type Fee Escrow Total Conditional Use Permit $275 $1,000 $1,275 Ordinance Amendment $275 $1,000 $1,275 Grand Total $2,550 PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Conditional Use Permit 3.1 3.0 CONDITIONAL USE PERMIT 3.1 EXISTING CONDITIONS AND DEVELOPMENT PLAN Per City Code, a site plan showing existing conditions is included in Attachment 3. The proposed development plan for the subject property is included as Figure 3. Development of the stormwater management pond within the subject property will take place as mining activities progress; the exact schedule is dependent on mining operations and soils obtained for Landfill operations and construction. 3.2 LEGAL DESCRIPTION OF THE SUBJECT PROPERTY See Attachment 1. 3.3 PROJECT NARRATIVE A description of the project is provided in Section 1.1. The Conditional Use Permit application form requests additional information for a project narrative. The descriptions are itemized in italics below, followed by ERL’s responses. Hours of operation No change is proposed to the current hours of operation. Number of employees The proposed changes will not impact the number of employees required at the landfill. Number of parking stalls (existing and additional) The Landfill employees park their vehicles at the sites' office building located on the north side of the existing Landfill. There are 20 parking stalls located at the office building site as well as ample room for parking in the yard area to the north of the building. No additional parking stalls are proposed as part of the stormwater management system improvements. Is there proposed screening of the site? The proposed Landscape/Screening plan is included in Attachment 2. The plan has been revised from the previously approved screening plan to accommodate the additional land area and grading modifications. Note that trees shown in the Landscape/Screening plan would be installed after waste filling activities in the adjacent landfill area have ceased and final cover construction is complete on the south side of the landfill. Proposed building materials PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Conditional Use Permit 3.2 No buildings/structure s are proposed as part of the stormwater management system improvements. Signage (how many, proposed sizes, locations, type) No new entrances are proposed for the Landfill an d, therefore, new signage will not be required. Outdoor storage (what, how much, proposed screening) No outdoor storage is proposed on the additional property. 3.4 SITE, UTILITY, GRADING / DRAINAGE PLAN The grading and drainage plan for the 20-acre south pond area, including perimeter grading modifications to the southern portion of the Landfill within the previously permitted property boundary, is included as Figure 3. 3.5 LANDSCAPING PLAN The Landscaping/Screening plan for the 20-acre south pond area, including perimeter grading modifications to the southern portion of the Landfill within the previously permitted property boundary, is included in Attachment 2. The plan has been prepared by a registered landscape architect and incorporates a variety of tree types for screening purposes . As previously noted, the plantings shown will be established after final cover is in-place on the adjacent Landfill area. 3.6 DRAINAGE CALCULATIONS Drainage calculations are provided in Attachment 4. The final bottom elevation of the modified / expanded stormwater pond will be dependent on mining activities within the footprint. Based on the maximum bottom elevation of 964 as shown on the grading / drainage plan, the expanded pon d will manage the required 25-year, 24-hour storm event as well as larger storm events (with minimal discharge). Discharge from larger events will be retained on ERL property. 3.7 BUILDING ELEVATIONS / FLOOR PLANS Not applicable. 3.8 WETLAND DELINEATION / WETLAND MITIGATION Not applicable. There are no wetlands on the subject property; the property has been and will continue to be mined for sand and gravel resources. PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Conditional Use Permit 3.3 3.9 EAW/EIS REQUIREMENTS The subject property was previously evaluated as part of a larger expanded Landfill footprint that required a mandatory Environmental Impact Statement (EIS) under the requirements of Minn. R. 4410.4400, subp. 13(E). The Draft and Final EIS for the expansion were previously provided to the City. The EIS was completed in 2005 and approved by the Minnesota Pollution Control Agency (MPCA) in 2006. The EIS findings concluded that environmental impacts would likely be minimal, or that adequate mitigation plans were in place to address potential impacts. The proposed stormwater management system improvements do not include any additional waste disposal areas, leachate management system infrastructure, gas system infrastructure, or other related Landfill components that could potentially impact groundwater, wetlands, or air quality, as evaluated in the EIS. 3.10 CONDITIONAL USE PERMIT STANDARDS OF ISSUANCE The Elk River Code, Chapter 30. Land Development Regulations, Article VI. Zoning, Division 2. Administration and Enforcement, Subdivision III. Conditional Use Permits, governs the issuance of conditional use permits and establishes the following required findings: Sec. 30-654. Standards for issuance. (a) Required findings. The planning commission shall recommend a conditional use permit and the council shall order the issuance of such a permit only if it finds that such use at the proposed location: (1) Will not endanger, injure, or detrimentally affect the use and enjoyment of other property in the immediate vicinity or the public health, safety, morals, comfort, convenience or general welfare of the neighborhood or the city. (2) Will be consistent with the comprehensive plan. (3) Will not impede the normal and orderly development and improvement of surrounding vacant property. (4) Will be served adequately by and will not adversely affect essential public facilities and services including streets, police and fire protection, drainage, refuse disposal water and sewer systems, parks and schools; and will not, in particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. (5) Will not involve uses, activities, processes, materials, equipment, and conditions of operation that will be detrimental to any persons or property because of excessive traffic, noise, smoke, fumes, glare, odors, dust, or vibrations. (6) Will not result in the destruction, loss, or damage of a natural scenic or historic feature of major importance. (7) Will fully comply with all other requirements of this Code , including any PERMIT APPLICATION TO THE CITY OF ELK RIVER APRIL 2023 Conditional Use Permit 3.4 applicable requirements and standards for the issuance of a license o r permit to establish and operate the proposed use in the city. ERL has in place an approved sanitary landfill CUP and SWF license. The Landfill will continue to operate as it has in the past, in accordance with City's requirements. The proposed additional land acquired for stormwater management is consistent with the approved CUP for the existing Landfill. Current standards will continue to be met. The stormwater management improvements allow for additional ponding area and open green space. Use at the proposed location meets the requirements itemized above, as presented in this Conditional Use Permit Application document. CONDITIONAL USE PERMIT APPLICATION TO THE CITY OF ELK RIVER ATTACHMENT 1 Legal Description LEGAL DESCRIPTION That part of the Southwest Quarter of Section 3, Township 33, Range 26, Sherburne County, Minnesota, lying south of the South line of the North 525.00 feet thereof, and lying west of U.S. Highway No. 169; and that part of the Northeast Quarter of the Southeast Quarter of Section 4, Township 33, Range 26, said county, lying south of the South line of the North 525.00 feet thereof, and lying east of the former Great Northern Railroad, all lying south of the following described line: Beginning at the intersection of said South line of the North 525.00 feet with the West right of way line of said U.S. Highway No. 169; thence South 07 degrees 30 minutes 44 seconds East, assuming said South line of the North 525.00 feet of said Southwest Quarter bears South 89 degrees 47 minutes 13 seconds East, a distance of 633.89 feet; thence North 90 degrees 00 minutes 00 seconds West, a distance of 2394.80 feet to intersect the easterly right of way line of said former Great Northern Railroad. And lying north of the following described line: Beginning at the intersection of said South line of the North 525.00 feet with the West right of way line of said U.S. Highway No. 169; thence South 07 degrees 30 minutes 44 seconds East, assuming said South line of the North 525.00 feet of said Southwest Quarter bears South 89 degrees 47 minutes 13 seconds East, a distance of 992.14 feet; thence North 90 degrees 00 minutes 00 seconds West, a distance of 2531.33 feet to intersect the easterly right of way line of said former Great Northern Railroad. CONDITIONAL USE PERMIT APPLICATION TO THE CITY OF ELK RIVER ATTACHMENT 2 Landscaping Plan CONDITIONAL USE PERMIT APPLICATION TO THE CITY OF ELK RIVER ATTACHMENT 3 Existing Conditions E 582500E 582000E 581500E 581000E 580500E 580000E 579500N 250500N 250000N 249500N 249000N 248500N 248000N 247500N 247000N 246500N 246000E 582000E 581500E 581000E 580500E 580000E 579500N 247500N 248000N 248500N 249500N 250000N 250500N 249000N 245500N 247000N 246500CB CBCB CBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CB CBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CB CBCBCBCBCBCBCB CB C B C B C B C B C B C B C B C B CB C B CBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CB CB CBCBCBCBCBCBCBCBCBCBCBCBCBCBCBCB CBCB CBCBCBCBCBCBCBCBCBCBCBCBCBCB CB CBCBCBCBW.L.969.7W.L.973.9W.L.981.6WATER LEVEL962.2OBSCUREDOBSCUREDOBSCUREDOBSCUREDOBSCURED249012.87580001.44980.68 1018.39249180.74582716.18978.551045.54LANDFILL SCALE (ACTIVE) CELL 6N 6S CELL 10N CELL 10S CELL (ACTIVE) DC-5A P 311C ENTRANCE ROAD HIGHWAY 169 NW ACCESS ROAD SITE ENTRANCE ACCESS ROAD 316 OWA WELL NEST DEMO DEBRIS CELL D2 CELL 1 CELL 5 CELL 4 CELL 7 CELL 3 CELL 9 CELL 2 CELL 11 CELL 12 CELL 13 CELL 17CELL 14 CELL 15 (ACTIVE CELL) DEMO DEBRIS CELL DC3 DEMO DEBRIS CELL D1 CELL 16 (ACTIVE CELL) CELL 18 DC-4A CELL) (ACTIVE CLOSURE EXISTING LIMIT OF CLOSURE EXISTING LIMIT OF BUILDING OFFICE/MAINTENANCE EXISTING LANDFILL PLANT GAS TO ENERGY EXISTING LANDFILL EXISTING RECYCLING BUILDING STORAGE TANK (TK-4) ABOVEGROUND LEACHATE EXISTING 225,000 GAL (ACTIVE CELL)N0 200 400 SCALE IN FEET LEGEND TREE LINE EXISTING ROAD EXISTING CONTOUR PROPERTY LINE BUILDING MONITORING WELL WASTE/CELL BOUNDARY CLOSED AREA CB CB 800 EAST CELL 19 WEST CELL 19 CELL) (ACTIVE CELL) (ACTIVE CLOSURE BOUNDARY CELL) (ACTIVE ORIGINAL SHEET - ANSI D Permit-Seal Drawing No.Client/ProjectSheet of Project Number: Revision the drawing - any errors or omissions shall be reported to Stantec without delay.The Contractor shall verify and be responsible for all dimensions. DO NOT scale or use for any purpose other than that authorized by Stantec is forbidden.The Copyrights to all designs and drawings are the property of Stantec. Reproduction ByIssuedAppd.YY.M M.DD1 1 1 PRINT NAME SIGNATURE DATE LICENSE # I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Chkd.Dwn.Dsgn.YY.MM.DD File Name: JWT ELK RIVER LANDFILLSherburne County, MinnesotaCMaple Plain, Minnesota, 553571800 Pioneer Creek Center3. 2. 1. NOTES: CELL) (ACTIVE PHASE 1 CELL 20 PHASE 2 CELL 20 Tepfer, Jeffrey By: Existing Conditions0 BARR ENGINEERING. MONITORING WELL AND GAS PROBE LOCATIONS PROVIDED BY VERTICAL DATUM = NGVD 1929 LANDFILL, DECEMBER 7, 2022. APRIL 11, 2015 , AND SURVEY PROVIDED BY ELK RIVER MAPPING PERFORMED BY WILLIAMS AERIAL & MAPPING, INC.U:\27705870\drafting/existing conditions/05870e_sp_2023_01.dgn227705870 23.04.19 02870e_sp_2023_01EXISTING CONDITIONS CONDITIONAL USE PERMIT APPLICATION TO THE CITY OF ELK RIVER ATTACHMENT 4 Drainage Calculations Memo To: Elk River Landfill From: Megan Ambuehl, PE Ethan Ketelsen, PE File: South Stormwater Pond Date: April 21, 2023 Reference: South Stormwater Pond Re-Design; City of Elk River Application Modifications to the stormwater management system for the southern portion of the MSW disposal area have been made to accommodate gravity drainage for stormwater management. The previous design included two sedimentation basins and would have required a lift station to manage stormwater from the landfill; discharge was under the exterior roadway, then under the City of Elk River trail, and ultimately to an upstream wetland on property owned by Waste Management. Consistent with the previous design, stormwa ter generated from the southern portion of the landfill will still be controlled and routed by drainage terraces, downslope structures, perimeter ditching, and related stormwater management infrastructure. Stormwater will be routed through these features to one large stormwater basin as shown on the attached subwatershed map. The proposed larger stormwater basin will allow for on-site control of stormwater, eliminating the trail crossing. The discharge point will be directly west of the proposed pond to an existing low area, on property owned by by the Landfill, east of the trail. HydroCAD stormwater modeling, using the SCS Curve Number method, was used to calculate run-off hydrographs for the final landfill configuration which assumes all landfill areas are closed with the final capping system. To determine surface water run-off for this analysis, the landfill area draining to the southern pond was divided into subwatersheds depending on the contributing drainage areas. Subwatershed areas are shown on the attached figure. Model inputs were consistent with the previously completed modeling for the site. Run-off curve numbers of 77, 80, and 98 were used for the landfill top, sides and ponded water in the sedimentation basin, respectively. Perimeter areas were assigned curve numbers of 55 (woods), 69 (fair grass cover), and 81 (developed urban industrial area) depending on existing or expected condition at the time of final closure of the current MSW disposal area. Time of concentration was computed within the HydroCAD model based on the characteristics of each subwatershed (i.e. hydraulic distance and slope). Peak flows from the subwatersheds were calculated for the 25-year and 100-yr 24-hr storm events based on NOAA Atlas 14 precipitation frequency estimates for the site. • 25-year, 24-hr = 5.19 inches • 100-year, 24-hr = 6.86 inches Runoff-calculations were used to size the various components of the surface water management system routing drainage to the south stormwater basin. Landfill development is in progress and currently Cell 20 Phase 3 is planned to be constructed in 2023. The drainage area contributing runoff to the pond will depend on waste filling activities and final cover construction; with the ultimate drainage area realized at the time of final closure of the currently permitted MSW disposal area. Prior modeling completed for the site included open channel flow within the landfill footprint. The re-design project modeling has incorporated a piping network. MPCA solid waste rules require management of the 25-year, 24-hr storm as the minimum design storm event. For the purposes of the southern pond re -design project, piping has been sized based on the 100-year, 24-hr storm event. Actual materials used for downslope structure or other infrastructure construction may vary; open channel flow or piping networks may be utilized for drainage. At minimum, the 25-year 24-hour storm event will be considered during construction level design/implementation. April 21, 2023 Elk River Landfill Page 2 of 2 Reference: South Stormwater Pond u:\227705870\technical\south_stormwater_pond\cup\attachment 4 - drainage calculations\stormwater write-up.docx The southern stormwater basin was designed to provide flexibility depending on mining activities in the area. The maximum bottom elevation of the pond will be at an elevation of 964; the actual elevation may be 964 or lower. Modeling assumed a bottom elevation of 964 with two deeper settling basins at the east and west ends of the pond, as shown on the drainage map. A safety bench has been incorporated into the pond design and perimeter access for cleaning / maintenance activities has been considered. A 5:1 slope on the north side of the pond was implemented to visually change the slope and allow for additional landscaping. Based on site soils, it is anticipated that infiltration will take place within the pond footprint. However, to be conservative, no infiltration was assumed in the stormwater model. The stormwater basin includes an outlet culvert at an elevation of 967.5’. Since it is anticipated that infiltration will occur (onsite soils are HSG A/B soils) the outlet culvert will serve as an overflow mechanism, rather than a typical pond outlet structure. As another conservative design measure, the model assumes that run-off from a 25-year, 24-hr storm event is in the pond at the start of the modeled storm (~2.0 feet of water within the pond). If stormwater does discharge through the outlet culvert, stormwater would flow through the pipe to an existing wooded, low-lying area directly west of the pond footprint. The overflow elevation of this low-lying area is 969.5; the area was included in the modeling to confirm that discharge will remain on Landfill property for the design storm events. Incorporating the shallowest anticipated pond grades into the model, results indicate that the 25-yr and 100-yr storm events will be managed with no off-site discharge. The 100-yr event includes nominal discharge to the low-lying area onsite. Excavation below the grades shown would result in more ponding capacity and the capability to manage even more extreme storm events with no discharge from the Landfill property. A summary of the pond performance for the modeled storm events is included below: Storm Event 25-yr 100-yr Pond Peak Water Elev. 967.88 968.66 Pond Discharge (cfs) 0.00 0.34 Low Area Peak 968.58 969.34 Low Area Discharge (cfs) 0.00 0.00 Stantec Consulting Services Inc. Attachment: Subwatershed Map 1020 1030 1050 1070 1080 109011001110111811183%x1119.51110112011101040 1060 1100 1110 105010601070108010901100102010301040105010601070CBMH1020 1030 3:1970 980 990 1000 1010 964 964 970 970960960980990960960964 964 CB CB CB CB CB CB CB CB CB CB 9709809905:15: 1 1040 EXISTING 18" RCP EXISTING MANHOLE EXISTING 30" RCP EXISTING CATCH BASIN TOP ELEV 969.5 PROPOSED 15' WIDE BERM BENCH @ 967.5 PROPOSED 10' WIDE SETTLING BASIN PROPOSED SETTLING BASIN PROPOSED EXISTING CONTOURS LEGEND TREE LINE EXISTING ROAD PROPERTY LINE BUILDING 800 0 100 200 SCALE IN FEET N SOUTH SEDIMENTATION POND CATCH BASIN MANHOLE PROPOSED MANHOLE CATCH BASIN PROPOSED OR LOWER) ELEVATION 964 (ELEVATION TO BE 964 BASED ON MINING ACTIVITIES; MAXIMUM POND BOTTOM ELEVATION MAY VARY NOTE: ROAD @ 10% WIDE ACCESS PROPOSED 15' DOWNSLOPE PIPE PROPOSED 36" CPEP DOWNSLOPE PIPE PROPOSED 36" CPEP W. INV. 966.7 E. INV. 967.5 OVERFLOW PIPE. PROPOSED 36" MIN. RIPRAP PROPOSED Permit-Seal Drawing No.Client/ProjectSheet of Project Number: Revision ByIssuedAppd.YY.M M.DD 1 0 JWT 1 PRINT NAME SIGNATURE DATE LICENSE # I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 5 2023.04.11 227705870ByRevisionAppd.YY.M M.DDChkd.Dwn.Dsgn.YY.MM.DD File Name:jeffrey tepferELK RIVER LANDFILLSHERBURNE COUNTY, MINNESOTAGrading PlanDECEMBER 2022. SURVEY PROVIDED BY ELK RIVER LANDFILL MAPPING, INC. APRIL 11, 2015, WITH DRONE MAPPING PERFORMED BY WILLIAMS AERIAL & NOTE:U:/227705870/drafting/2023 south pond CUP.dgn2023 south pond CUP (TYP.) PROPOSED BENCH STRUCTURE WEST DOWNSLOPE DISSIPATOR PROPOSED ENERGY STRUCTURE PROPOSED DOWNSLOPE DOWNSLOPE STRUCTURE PROPOSED ENERGY DISSIPATOR PROPOSED STRUCTURE EAST DOWNSLOPE BASIN (TYP.) PROPOSED CATCH (TYP.) PROPOSED BENCH 800 PROPOSED CONTOURS PROPERTY BOUNDARY PREVIOUS LANDFILL PROPERTY BOUNDARY EXTENDED LANDFILL ORDINANCE AND CUP AMENDMENT APPLICATIONSW-35 385,374 sf SW-36 56,415 sf SW-37 95,530 sf SW-38 114,445 sf SW-41 66,039 sf SW-44B 108,550 sf Ditch- 39 DT-44B DT- 35 DT- 36DT- 37 Dit ch 38 DT-41 WD S- 1 WD S- 2WD S- 3WD S- 4 WD S- 5 West Road Cross ing West slope grading changes to accommodate 2022 closure construction are shown; however, the original drainage areas have still been considered in the stormwater modeling (the model is conservative). SW-39 155,329 sf SW-45B 59,711 sf SW-42 68,296 sf SW-43 101,721 sf Direct Pond 909,842 sf DT-45A DT-44A DT-42 DT-43 Ditch 45-B East Road Crossing SW-34 410,994 sf SW-46 113,368 sf D T - 4 6 SW-47 109,948 sfD T - 4 7 SW-48 83,249 sfD T - 4 8 DT -3 4 SW-45 A 92,463 SF (SW extends off page) SW-44A 161,59 8 SF (SW extends off page) Note: square foot areas shown have been reflected in the HydroCAD model as acres (input to the tenth of an acre) Direct Low Area 127,525 sf East 12.3acres(SW extends offpage) CONDITIONAL USE PERMIT APPLICATION TO THE CITY OF ELK RIVER FIGURES Figure 1 – Site Map Figure 2 – Site Development Plan Figure 3 – Grading and Drainage Plan Existing Scale Existing Leachate Storage Existing Recycling Building Existing Office/ Maintenance Building Existing Landfill Gas to Energy Plant Construction and Demolition Debris Landfill Stormwater Management Area MSW Landfill Existing Site Entrance/Exit Existing Site Exit Existing Parking Area Existing Yard £¤169 £¤169 221st Ave NW 221st St 225th St NWQuinn St NW223rd Ave NW 225th St NW 1 75-103-2400 30-033-4400 30-034-2200 75-104-1105 30-523-0115 75-672-0004 75-103-3200 30-033-1300 30-033-410030-033-4200 75-109-1100 30-523-0105 30-523-0110 30-033-1100 75-103-2100 75-104-1400 75-109-1201 75-103-1300 75-110-2200 75-103-4200 75-104-1102 75-103-420175-104-4200 75-103-1101 30-033-2400 75-104-1101 30-034-2201 30-033-3400 75-110-2102 75-104-4300 75-109-1200 75-104-2100 75-128-000175-672-0003 30-501-0225 75-104-4405 75-104-4306 75-104-4100 75-103-2105 75-672-0080 75-110-2100 75-104-4105 75-104-420530-034-420030-034-4400 30-034-3400 75-110-110575-104-4410 30-034-3300 75-104-4400 30-034-1301 75-103-330075-104-421030-501-0220 75-110-220275-104-430575-128-000030-034-130075-103-310030-033-440575-104-421530-034- 3 4 0 1 30-033-1200 30-034-310030-523-012030-034-210030-033-2100 75-104-4307 30-523-012530-523-013075-672-09 3 0 75-672-0715 75-672-0575 75-672-0710 75-672-0925 75-672-0705 75-103-3205 75-672-0585 30-531-0205 75-672-0570 75-672-0920 75-672-0565 75-672-0580 75-672-0935 75-672-0560 75-672-0605 75-672-0590 75-672-0610 75-672-0805 75-672-0555 75-672-0595 75-104-4301 75-672-0005 75-672-0006 75-672-0007 75-672-0060 75-672-0910 75-672-0050 600 0 600300 Feet ³ Legend Previous Elk River Landfill Boundary Extended Landfill Property Boundary Approximate Property Boundaries Figure 1 - Site Plan - Entire Property Path: V:\2277\active\227701797\gis\Pro\CUP\CUP.aprx Aerial Photograph (Source: 2023 Stantec & 2022 Sherburne Co) Existing Scale Existing Leachate Storage Recycling Building Existing Office/ Maintenance Building Existing Landfill Gas to Energy Plant Active Construction and Demolition Debris Landfill Active Area Site Entrance/Exit Site Exit Parking Area £¤169 £¤169 221st Ave NW 221st St 225th St NWQuinn St NW223rd Ave NW 225th St NW Stormwater Management Area DC-9A (Future) DC-8A (Future) DC-7A (Future) DC-6A (Future) DC-5A (Active) DC-4A (Active) Demo Debris Cell D1 Demo Debris Cell D2 Cell 9 Cell 7 Cell 1 Cell 2 Cell 3 Cell 4 Cell 5 Cell 6N Cell 6S Cell 11 Cell 10N Cell 10S Cell 12 Cell 13 Cell 14 Cell 15 (Active) Cell 16 (Active) Cell 17 (Active) Cell 18 (Active) Cell 19 West (Active) Cell 19 East (Active) Cell 20 Phase 1 (Active)Cell 20 Phase 3 (Future)Cell 20 Phase 2 (Active) 600 0 600300 Feet ³Aerial Photograph (Source: 2023 Stantec & 2022 Sherburne Co) Legend Previous Elk River Landfill Boundary Extended Landfill Property Boundary Any future buildings/structures to be located in this area Existing Closed Area Cell Boundaries Active Area Figure 2 - Site Development Plan - Entire Site Path: V:\2277\active\227701797\gis\Pro\CUP\CUP.aprx 1020 1030 1050 1070 1080 109011001110111811183%x1119.51110112011101040 1060 1100 1110 105010601070108010901100102010301040105010601070CBMH1020 1030 3:1970 980 990 1000 1010 964 964 970 970960960980990960960964 964 CB CB CB CB CB CB CB CB CB CB 9709809905:15: 1 1040 EXISTING 18" RCP EXISTING MANHOLE EXISTING 30" RCP EXISTING CATCH BASIN TOP ELEV 969.5 PROPOSED 15' WIDE BERM BENCH @ 967.5 PROPOSED 10' WIDE SETTLING BASIN PROPOSED SETTLING BASIN PROPOSED EXISTING CONTOURS LEGEND TREE LINE EXISTING ROAD PROPERTY LINE BUILDING 800 0 100 200 SCALE IN FEET N SOUTH SEDIMENTATION POND CATCH BASIN MANHOLE PROPOSED MANHOLE CATCH BASIN PROPOSED OR LOWER) ELEVATION 964 (ELEVATION TO BE 964 BASED ON MINING ACTIVITIES; MAXIMUM POND BOTTOM ELEVATION MAY VARY NOTE: ROAD @ 10% WIDE ACCESS PROPOSED 15' DOWNSLOPE PIPE PROPOSED 36" CPEP DOWNSLOPE PIPE PROPOSED 36" CPEP W. INV. 966.7 E. INV. 967.5 OVERFLOW PIPE. PROPOSED 36" MIN. RIPRAP PROPOSED Permit-Seal Drawing No.Client/ProjectSheet of Project Number: Revision ByIssuedAppd.YY.M M.DD 1 0 JWT 1 PRINT NAME SIGNATURE DATE LICENSE # I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 5 2023.04.11 227705870ByRevisionAppd.YY.M M.DDChkd.Dwn.Dsgn.YY.MM.DD File Name:jeffrey tepferELK RIVER LANDFILLSHERBURNE COUNTY, MINNESOTAGrading PlanDECEMBER 2022. SURVEY PROVIDED BY ELK RIVER LANDFILL MAPPING, INC. APRIL 11, 2015, WITH DRONE MAPPING PERFORMED BY WILLIAMS AERIAL & NOTE:U:/227705870/drafting/2023 south pond CUP.dgn2023 south pond CUP (TYP.) PROPOSED BENCH STRUCTURE WEST DOWNSLOPE DISSIPATOR PROPOSED ENERGY STRUCTURE PROPOSED DOWNSLOPE DOWNSLOPE STRUCTURE PROPOSED ENERGY DISSIPATOR PROPOSED STRUCTURE EAST DOWNSLOPE BASIN (TYP.) PROPOSED CATCH (TYP.) PROPOSED BENCH 800 PROPOSED CONTOURS PROPERTY BOUNDARY PREVIOUS LANDFILL PROPERTY BOUNDARY EXTENDED LANDFILL ORDINANCE AND CUP AMENDMENT APPLICATION23 232323 PRINT NAME SIGNATURE DATE LICENSE #23/04/21 48669 MEGAN AMBUEHL 123