Loading...
6.1g ERMUSR 06-13-2023Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: June 13, 2023 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In May, the locators processed 656 locate tickets. These consisted of 555 normal tickets, 4 emergency tickets, 62 updated tickets, 15 cancellations, 18 meets, 1 non -excavation, and 1 correction. This resulted in a 55.1% increase in tickets from the previous month and is a 1.7% increase from the prior May. • Electrical technicians completed 270 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • On May 26, staff ran generators #1, #2 & #3. About 45 minutes into the run on generator #3, a fuse blew on one of the raw -water pumps causing the temperature to rise quickly. Staff took the generator offline quickly and shut down the engine. Staff will be getting estimates to rewind the motor vs. replacement. • Testing of SCADA operation for the new Station #14, Bank #4 feeder has been completed. A fiber communication conduit was installed through the substation yard to the control house in preparation for our next fiber connection to a substation. Also, staff added crushed rock to the Station #14 substation entrance. • We met with TKDA on May 22 to discuss development of our Advanced Metering Infrastructure (AMI) installation RFP and their consulting services for inspection of the installation contractor's work. The AMI kick-off meeting was held on May 31 with Core & Main and Sensus representatives in attendance. Discussion topics covered all aspects of the project and I found it reassuring that National Information Solutions Cooperative & Sensus have worked together on numerous other projects. We have started to receive the AMI network radio equipment and have done a preliminary walkthrough at each of the water towers to make sure there won't be any last-minute surprises. I anticipate the AMI radio network will be operational by the end of June. We are optimistic that the initial deployment meters will arrive late August or early September so that we can start testing the system. Page IofI