Loading...
7.6 SR 06-20-2023�� e��� ar � Elk -�-� �iver Request for Action To Item Number Ma�Tor and CinT Council 7.6 Agenda Section Meeting Date Prepared by Public Hearings June 20, 2023 Brandon Wisner, Engineering Project Manager Item Description Reviewed by National Pollutant Discharge Elimination (NPDES) Cal Pormer, Cit�T Administrator SyTstem Annual Report Reviewed by Action Requested 1. Open public hearing to take comments on the city Stormwater Program. 2. No other action required. Background/Discussion The Cit�T of Elk River is regulated as a municipal separate storm sewer system (MS4) under the National Pollutant Discharge Elimination SyTstem (NPDES) byT the iVlinnesota Pollution Control Agenc�T (MPCA). The new peYmit was Yeissued in October 2021 and runs on a five-yrear cyrcle. The permit prescribes goals in the follo`ving categories: Public Education and Outreach; Public Participation and Involvement; Illicit Discharge Detection and Elimination; Construction Site Runoff Control; and Pollution Prevention and Good Housekeeping. The cityT is required to hold an annual public hearing to receive feedback on the stormwater program. The follo`ving goals were met byT the cityT in 2022: ■ Staff has continued to make progress planning for future projects related to nutrient reduction goals for Lake Orono as required by the state and meeting above listed minimum control measures. ■ Continue to investigate potential sources of illicit discharges. ■ Maintain, repair and upgrade old infrastructure in the stormwater system with street upgrades (e.g. Morton Avenue). Financial Impact There aYe no financial impacts associated with the action Yequested. Attachments ■ None The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith revolutionary and s�i�zted resourcefulness, exceptional p o w E A E u e Y seTvice, and coln�nunity engagelnent that encourages and ins�i�•es pro��e�zty ����p� fE