Loading...
06-28-2023 PRMIN - Special MeetingSpecial Meeting Elk River Parks and Recreation Commission Held at the Elk River City Hall Wednesday, June 28, 2023 Members Present: Chair David Williams, Commissioners Dave Anderson, Mike Brown, Ryan Holmgren, Greg Loidolt, Mike Niziolek, and Mark Rathbun Members Absent: None Council Liaison: Councilmember Mike Beyer (absent) Staff Present: Parks and Recreation Manager Michael Hecker, Assistant City Administrator Joe Stremcha, Senior Administrative Assistant Dawn Larson 1. Call Meeting to Order Pursuant to due call and notice thereof, the meeting of the Elk River Parks and Recreation Commission was called to order at 6:06 p.m. by Chair Williams. 2. Bradford Park Development Park Dedication-Continued Mr. Hecker presented the staff report. Also attending were Joe Jablonski Director of Land Development with Lennar and Whitney Behny Civil Engineer with ISB. Chair Williams asked the commissioners if there was anything new to bring up related to the three motions presented in Mr. Hecker’s report. Commissioner Anderson shared concerns about the amount of flat usable space. He referenced page 47 on the grading plan, Outlot H. He wanted confirmation from the representatives from Lennar that the green area on the map is a total of 6 acres. After walking the land Commissioner Anderson believes that a good portion of the area to the left of the north-south trail in orange is unusable due to steep slopes. Miss Behny clarified that Commissioner Anderson was referencing backlots 180-184. She also explained the standard slope requirements are 4 to 1. Commissioner Anderson said he does not consider that slope measurement as being flat usable space. Miss Behny explained that part of the lines on the grading plan also include a tree preservation line that was requested to be included. Commissioner Anderson is concerned that if the green area on the map is sloped it is limited in usage compared to if it was completely flat. He is concerned that the park is split up into three little chunks around water areas vs one large programmable space near the largest body of water. Commissioner Anderson referenced the part of the trail as it goes northeast toward the water feature on map 48 and 46. He said that because the land does connect us to the water feature it is valuable but otherwise not usable. He believes the sides of the water are very steep and not sustainable for human traffic due to being a gravel pit. Parks and Recreation Commission Minutes Page 2 June 28, 2023 Commissioner Anderson asked Miss Behny how much shoulder there is on the south side of the gravel pit in case of erosion. She said there is 5 feet on either side of the trail, 20 feet total width from the water. Commissioner Anderson asked the staff from Lennar for more detail on the type of restoration they are responsible for around the gravel pit since it is currently very steep. Miss Behny explained that the bank on the north side of the water will be cut down. During construction, the trail sides will be stabilized. They are not planning to increase the water totals of the mining ponds. There are water control structures between each water feature. The grading plans show the details. Miss Behny explained how the water level of the gravel pit would be maintained to stay at a similar level to what it is today in more detail. Commissioner Niziolek said he has a suggestion to save a quarter million dollars. He said he suggested removing the trail between J and K all the way to the road. He also recommended removing the trail that runs between roads along the south side of the smaller retention pond in the middle of the development. He recommended putting the money into the park dedication fund instead of this land for park dedication. Commissioner Loidolt said he thought that the city had requested the trail between the retention ponds. Mr. Stremcha reiterated that parks maintenance requested the trail between J and K for maintenance access. Chair Williams said that he has thought about this a lot, and he knows where a lot of these recommendations are coming from. Moved by Commissioner Williams and seconded by Commissioner Loidolt to accept staff recommendations for a regional trail within the development (shown in blue) from Cleveland Avenue to the current Trott Brook housing development and pay for the trail segment using existing park dedication fund. Motion carried 6-1. Commissioner Niziolek opposed.. Moved by Commissioner Williams and seconded by Commissioner Brown to accept staff recommendations for a 10-foot trail connecting the sidewalk along the south side of Road G with the trail around the pond-running between basins J and K at Lennar’s expense. Motion carried 6-1. Commissioner Niziolek opposed. Moved by Commissioner Anderson and seconded by Commissioner Niziolek to accept staff recommendations with the general trail layout of the trails depicted on the attached Bradford Park exhibit, subject to the recommended changes noted including the exclusion of the zig zag trail that goes along basin H. Motion failed 4-3. Commissioners Loidolt, Brown, Holmgren, Williams opposed. Moved by Commissioner Brown and second by Commissioner Holmgren to accept staff recommendations the general trail layout of the trails depicted on the attached Bradford Park exhibit, and subject to the recommended changes noted. Motion carried 5-2. Commissioner Niziolek and Commissioner Anderson opposed. Parks and Recreation Commission Minutes Page 3 June 28, 2023 3. Motion to Adjourn Moved by Commissioner Loidolt and seconded by Commissioner Holmgren to adjourn the special meeting of the Parks and Recreation Commission. Motion carried 7-0. The meeting adjourned at 6:49 p.m. Minutes prepared by Dawn Larson. ___________________ David Williams, Chair ___________________ Tina Allard, City Clerk