Request for Action
To Item Number
Ma Tor and CinT Council 4.5
Agenda Section Meeting Date Prepared by
Consent A enda Au ust 7, 2023 Brandon Wisner, En ineerin Pro�ect Mana eY
Item Description Reviewed by
Garage Building Quote: Youth Athletic Complex Tim Sevcik, Street and Park Superintendent
(YAC) oe Stremcha, Assistant Ci r Administrator
Reviewed by
Cal Pormer, Ci T Administrator
Action Requested
Approve, byT motion, bid from Dahlheimer Construction Inc. for the construction of a 32'x24' garage in the
amount of $66,451.
Background/Discussion
This spring, staff posted a request for bids on QuestCDN for the construction of a storage garage at Yr�C.
No bids weYe Yeceived through that posting. The request foY bids was then sent to three local companies via email
and one quote was Yeceived byr the deadline from Dahlheimer Construction Inc.
Since the quote was originally received, the building was slightly enlarged from 30'x20' to 32'x24' to better utilize
the site location. Construction is to be substantially completed by December 1, 2023.
Financial Impact
$66,451 from the Park Dedication Fund
Mission/Policy/Goal
OpportunityT to live, `vork, and p1ayT
Attachments
■ Quote from Dahlheimer Constructionm Inc.
■ Short Contract
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty.
row�REo er
�I'1 ����
Update�l• January 2023
Dahlheimer Construction Inc.
21309 150th St NW
Elk River, MN 55330 US
763-442-7699
dcinc77@yahoo.com
ADDRESS
City of Elk River
DATE ACTIVITY
DESCRIPTIQN
�����������
CONSTRUCTION
INC.
�� TOTAL
� • � : � $66,451.00
(REVISED 4) Proposal for 32x24
storage garage for the YAC fields
C:onstruction Materials (lumber, siding, roofing,
service door)
C:onstruction Framing labor
C:onstruction Electrical (bring power to building
from road)
C:onstruction Dirt work, concrete, with an apron in
front and block (materials included)
C:onstruction Contractor fee
C:onstruction Two 9x8 steel garage doors (no
openers)
C:onstruction Waste disposal
C:onstruction Roofing Labor
C:onstruction Siding/soffit & facia labor.
C:onstruction Plans
Been in buisness since 2004, for more information on
Dahlheimer Construction Inc go to dcinclandandhome.com
Insurance will be sent upon acceptance.
Estimate 1122
TOTAL
QTY RATE
1 14,600.00
1 8,428.00
1 7,200.00
1 18,860.00
1 5,563.00
1 4,500.00
1 850.00
1 2,100.00
1 3,500.00
1 850.00
AM OlJ NT
14,600.00
8,428.00
7,200.00
18,860.00
5,563.00
4,500.00
850.00
2,100.00
3,500.00
850.00
$66,451.00
THAN K YOU.
-Nate Dahlheimer
Accepted By Accepted Date
AGREEMENT
CITY OF ELK RIVER _ _
SHERBURNE C4UNTY, MINNESOTA
YOUTH ATHI.,ETIC COMPLEX GARAGE
QIJEST ID # 8444162
AGREEMENT made this day of , 20 , between the
CTTY OF Elk River, a Minnesota municipal corporation ("City"), and
Dahlheimer Gonstruction Inc., a corporation organized and e�sting under the laws of the State of
Minnesota ("Contractor").
IN CONSIDERATION OF THE MUTUAL UNDERTAKINGS HEREIN
CONTAINED, THE PARTIES AGREE AS FOLLOWS:
1. CONTRACT DOCUMENTS. The following documents sha11 be referred to as the
"Contract Documents", a11 of whic� sha11 be taken together as a whole as the contract between the
parties as if they were set verbatim and in full herein:
A. This Ageement
B. Proj ect Description; Specifications, or Proposal dated 5-1 &2023
C. Quote dated 6-8-2023
D. Certificate and Insurance Policy
In the event of conflict among the provisions of the Contract Documents, the order in which they are
listed above sha11 control in resolving any such conflicts with Contract Document "A" having the first
priority and Contract Dociunent "C" having the last priority.
2. OBLIGATIONS OF THE CONTRACTOR. The Contractor sha11 provid,e the
goods, services, and perform the work in accordance with the Contract Documents and in compliance
with federal, state and local laws. This contract may be terminated by the City at any time upon
discovery by the City that the Contractor or any of its subcontractors has submitted a false statement
under oath verifying compliance with any of the minimum criteria set forth in Minn. Stat. § 16C.285,
Subdivision 3, the Responsible Contractor statute.
3. UBLIGATIONS OF THE CITY. The City sha11 pay the Contractor the sum of
$ G6,451 inclusive of sales tax.
4. ASSIGNMENT. Neither party may assign, sublet, or transfer any interest or
obligation in this Contract without the prior written consent of the other party, and then only upon
such terms and conditions as both parties may agree to and set forth in writing.
221668v1
Properiy Damage: $2,000,000 each occurrence
$2,000;000 aggregate
The Additional Insured coverage must be primary and non-contributory. Products and Completed
Operations Insurance sha11 be maintained for a minimum period of three (3} years after final payment
and Contractor sha11 continue to provide evidence of such coverage to City on an annual basis during
the aforementioned period; or if any reason Contractor's work cea.ses before final payment, for a
minimum period of three (3) years from the date Contractor ceases work. Coverages must be
equivalent to that provided by ISO Forms CG 2010 04 13 and CG 20 37 04 13.
Property Damage Liability Inswance shall include coverage for the foliowing hazards:
X (Explosion)
C (Collapse)
LT (Underground)
For any contract involving the repair, maintenance or construction of property that involves the
provision of equipment, supplies or materials to the City for projects greater than $100,000, the
Contractor shall obtain and maintain Builder's Risk insurance in an amount not less tha.n the project
or contract cost.
Contractual Liability (identifying the contract):
Bodily Injury:
Property Damage:
$2,000,000 ea.ch occurrence
$2,000,000 each occurrence
$2,000,000 aggegate
Personal Injury, with Employment Exclusion deleted:
$2,000,000 aggregate
Business Automobile Liability (owned, non-owned, hired}:
Bodily Injury &
Property Damage:
�.
$2,000,000 each occurrence
$2,000,000 each accident
OR
$2,000,000 Combined single limit
The Contractor shall submit a Certif cate of Insurance to the City showing proof of the above-required
insurance prior to doing any work.
The City retains the right to revise the insurance requirements depending on the size and risk of the
proj ect.
3
221668v1
17. ENTIRE AGREEMENT. This Contract represents the entire agreement of the
parties and is a final, complete, and all-inclusive sta.tement of the terms thereof, and supersedes and
terminates any prior agreement(s}, understandings, or written or verbal representations made between
the parties with respect thereto.
CITY:
CITY OF ELIi RIVER
:
I�
221668v1
CONTRACTOR:
Dahlheimer Constuction Inc.
— - - By: � - - ,.,r_�- — �
. Mayor �a-(�aN�1`�e� 1n I I�r � nn Q l IP�tnameJ
ItS ��� � (tide]
, City Clerk
S