Loading...
4.5 SR 08-07-2023�, Elk s �- River Request for Action To Item Number Ma Tor and CinT Council 4.5 Agenda Section Meeting Date Prepared by Consent A enda Au ust 7, 2023 Brandon Wisner, En ineerin Pro�ect Mana eY Item Description Reviewed by Garage Building Quote: Youth Athletic Complex Tim Sevcik, Street and Park Superintendent (YAC) oe Stremcha, Assistant Ci r Administrator Reviewed by Cal Pormer, Ci T Administrator Action Requested Approve, byT motion, bid from Dahlheimer Construction Inc. for the construction of a 32'x24' garage in the amount of $66,451. Background/Discussion This spring, staff posted a request for bids on QuestCDN for the construction of a storage garage at Yr�C. No bids weYe Yeceived through that posting. The request foY bids was then sent to three local companies via email and one quote was Yeceived byr the deadline from Dahlheimer Construction Inc. Since the quote was originally received, the building was slightly enlarged from 30'x20' to 32'x24' to better utilize the site location. Construction is to be substantially completed by December 1, 2023. Financial Impact $66,451 from the Park Dedication Fund Mission/Policy/Goal OpportunityT to live, `vork, and p1ayT Attachments ■ Quote from Dahlheimer Constructionm Inc. ■ Short Contract The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. row�REo er �I'1 ���� Update�l• January 2023 Dahlheimer Construction Inc. 21309 150th St NW Elk River, MN 55330 US 763-442-7699 dcinc77@yahoo.com ADDRESS City of Elk River DATE ACTIVITY DESCRIPTIQN ����������� CONSTRUCTION INC. �� TOTAL � • � : � $66,451.00 (REVISED 4) Proposal for 32x24 storage garage for the YAC fields C:onstruction Materials (lumber, siding, roofing, service door) C:onstruction Framing labor C:onstruction Electrical (bring power to building from road) C:onstruction Dirt work, concrete, with an apron in front and block (materials included) C:onstruction Contractor fee C:onstruction Two 9x8 steel garage doors (no openers) C:onstruction Waste disposal C:onstruction Roofing Labor C:onstruction Siding/soffit & facia labor. C:onstruction Plans Been in buisness since 2004, for more information on Dahlheimer Construction Inc go to dcinclandandhome.com Insurance will be sent upon acceptance. Estimate 1122 TOTAL QTY RATE 1 14,600.00 1 8,428.00 1 7,200.00 1 18,860.00 1 5,563.00 1 4,500.00 1 850.00 1 2,100.00 1 3,500.00 1 850.00 AM OlJ NT 14,600.00 8,428.00 7,200.00 18,860.00 5,563.00 4,500.00 850.00 2,100.00 3,500.00 850.00 $66,451.00 THAN K YOU. -Nate Dahlheimer Accepted By Accepted Date AGREEMENT CITY OF ELK RIVER _ _ SHERBURNE C4UNTY, MINNESOTA YOUTH ATHI.,ETIC COMPLEX GARAGE QIJEST ID # 8444162 AGREEMENT made this day of , 20 , between the CTTY OF Elk River, a Minnesota municipal corporation ("City"), and Dahlheimer Gonstruction Inc., a corporation organized and e�sting under the laws of the State of Minnesota ("Contractor"). IN CONSIDERATION OF THE MUTUAL UNDERTAKINGS HEREIN CONTAINED, THE PARTIES AGREE AS FOLLOWS: 1. CONTRACT DOCUMENTS. The following documents sha11 be referred to as the "Contract Documents", a11 of whic� sha11 be taken together as a whole as the contract between the parties as if they were set verbatim and in full herein: A. This Ageement B. Proj ect Description; Specifications, or Proposal dated 5-1 &2023 C. Quote dated 6-8-2023 D. Certificate and Insurance Policy In the event of conflict among the provisions of the Contract Documents, the order in which they are listed above sha11 control in resolving any such conflicts with Contract Document "A" having the first priority and Contract Dociunent "C" having the last priority. 2. OBLIGATIONS OF THE CONTRACTOR. The Contractor sha11 provid,e the goods, services, and perform the work in accordance with the Contract Documents and in compliance with federal, state and local laws. This contract may be terminated by the City at any time upon discovery by the City that the Contractor or any of its subcontractors has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minn. Stat. § 16C.285, Subdivision 3, the Responsible Contractor statute. 3. UBLIGATIONS OF THE CITY. The City sha11 pay the Contractor the sum of $ G6,451 inclusive of sales tax. 4. ASSIGNMENT. Neither party may assign, sublet, or transfer any interest or obligation in this Contract without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. 221668v1 Properiy Damage: $2,000,000 each occurrence $2,000;000 aggregate The Additional Insured coverage must be primary and non-contributory. Products and Completed Operations Insurance sha11 be maintained for a minimum period of three (3} years after final payment and Contractor sha11 continue to provide evidence of such coverage to City on an annual basis during the aforementioned period; or if any reason Contractor's work cea.ses before final payment, for a minimum period of three (3) years from the date Contractor ceases work. Coverages must be equivalent to that provided by ISO Forms CG 2010 04 13 and CG 20 37 04 13. Property Damage Liability Inswance shall include coverage for the foliowing hazards: X (Explosion) C (Collapse) LT (Underground) For any contract involving the repair, maintenance or construction of property that involves the provision of equipment, supplies or materials to the City for projects greater than $100,000, the Contractor shall obtain and maintain Builder's Risk insurance in an amount not less tha.n the project or contract cost. Contractual Liability (identifying the contract): Bodily Injury: Property Damage: $2,000,000 ea.ch occurrence $2,000,000 each occurrence $2,000,000 aggegate Personal Injury, with Employment Exclusion deleted: $2,000,000 aggregate Business Automobile Liability (owned, non-owned, hired}: Bodily Injury & Property Damage: �. $2,000,000 each occurrence $2,000,000 each accident OR $2,000,000 Combined single limit The Contractor shall submit a Certif cate of Insurance to the City showing proof of the above-required insurance prior to doing any work. The City retains the right to revise the insurance requirements depending on the size and risk of the proj ect. 3 221668v1 17. ENTIRE AGREEMENT. This Contract represents the entire agreement of the parties and is a final, complete, and all-inclusive sta.tement of the terms thereof, and supersedes and terminates any prior agreement(s}, understandings, or written or verbal representations made between the parties with respect thereto. CITY: CITY OF ELIi RIVER : I� 221668v1 CONTRACTOR: Dahlheimer Constuction Inc. — - - By: � - - ,.,r_�- — � . Mayor �a-(�aN�1`�e� 1n I I�r � nn Q l IP�tnameJ ItS ��� � (tide] , City Clerk S