Request for Action
To Item Number
Ma Tor and CinT Council 4.8
Agenda Section Meeting Date Prepared by
Consent A enda Au ust 7, 2023 Brandon Wisner, En ineerin Pro�ect Mana eY
Item Description Reviewed by
Change Order: Morton Avenue Storm Se`ver Cal Pormer, Ci r Administrator
Reviewed by
Action Requested
Approve, by motion, a North Valley Inc. change oYdeY to install 271 feet of 18-inch stoYm pipe and associated
work south of Main Street on Morton Avenue in the amount of $67,229.95
Background/Discussion
As paYt of the 2023 Street Improvement Project, 250 feet of 12-inch stoYm pipe south of Main Street was
removed because it was undersized. Based on the record drawings, the storm pipe after this `vas supposed to
transition to an 18-inch storm pipe, but during construction it was found to on1yT be a 12-inch storm pipe.
For the newly upgYaded storm system to function properlyr, 271 feet of the e�sting 12-inch storm pipe has to be
removed in order to prevent one of the storm structures from backing up.
Financial Impact
Paid for by the Stormwater Utilit�T Fund.
Mission/Policy/Goal
Meet changing needs, agile
Attachments
■ Change Order
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty.
rowEREo ar
�I'1 ����
Update�l• January 2023
Change Order No. 2
Date of Issuance: August 2, 2023
Owner: City of Elk River
Contractor: North Valley, Inc.
Engineer: Bolton & Menk, Inc.
Project: 2023 Street Improvements Project
The Contract is modified as follows upon execution of this Change Order:
The existing storm sewer pipe in Morton Avenue south of the connection point of the proposed storm sewer
improvements was found to be 12-inch diameter. The record drawings in this location show this pipe as an 18-inch pipe.
The Morton Avenue Drainage Study completed in September 2022 determined the recommended improvement based
on the 18-inch pipe size. Updating the model to the smaller pipe size found that the storm water would surge out of the
new manhole on high rain events. To correct this surge, the 12-inch pipe needs to be replaced with the 18-inch pipe that
was originally believed to be in place.
The following pay items will be added to the contract:
Item No Description
CO-2.1 Remove 12" Storm Pipe
CO-2.2 18" RCP Storm Pipe
CO-2.3 Connect to Ex MH
CO-2.4 Bituminous Street Patch
CO-2.5 Remove & Replace Curb & Gutter
CO-2.6 Mobilization
CO-2.7 Traffic Control
CO-2.8 Grated Casting Lid
CO-2.9 Clear & Grub Tree
CO-2.10 R-3501-TB Casting Assembly
Quantity
271 LF
271 LF
2 EA
400 SY
20 LF
1 LS
1 LS
1 EA
4 EA
2 EA
Effective Date: August 7, 2023
Owner's Contract No.:
Contractor's Project No.:
Engineer's Project No.: OR1.128082
Contract Name:
Unit Price
$23.00
$96.00
$4,025.00
$31.33
$35.13
$9,125.00
$450.00
$397.35
$675.00
$512.00
Item Value
$6,233.00
$26,016.00
$8,050.00
$12,532.00
$702.60
$9,125.00
$450.00
$397.35
$2,700.00
$1,024.00
CHANGE IN CONTRACT PRICE
Original Contract Price:
$ 5,433,358.71
CHANGE IN CONTRACT TIMES
Original Contract Times:
Substantial Completion: _November 3, 2023
Ready for Final Payment: December 15, 2023
Increase from previously approved Change Order No. 1:
$ 8,483.45
Contract Price prior to this Change Order:
$ 5,441,842.16
Increase of this Change Order:
��
.
[Increase] [Decrease] from previously approved Change
Orders No. to No.
Substantial Completion:
Ready for Final Payment:
Contract Times prior to this Change Order:
Substantial Completion:
Ready for Final Payment:
Contract Price incorporating this Change Order
$—
By:
Title:
Date:
RECOMMENDED:
Engineer (if required)
Contract Times with all approved Change Orders:
Substantial Completion: November 3, 2023
Readv for Final Pavment: December 15, 2023
ACCEPTED:
By:
Owner (Authorized Signature)
Title:
Date:
[Increase] [Decrease] of this Change Order:
Substantial Completion:
Ready for Final Payment:
ACCEPTED:
By:
Contractor (Authorized Signature)
Title:
Date: