4.8 SR 08-07-2023�, Elk s �- River Request for Action To Item Number Ma Tor and CinT Council 4.8 Agenda Section Meeting Date Prepared by Consent A enda Au ust 7, 2023 Brandon Wisner, En ineerin Pro�ect Mana eY Item Description Reviewed by Change Order: Morton Avenue Storm Se`ver Cal Pormer, Ci r Administrator Reviewed by Action Requested Approve, by motion, a North Valley Inc. change oYdeY to install 271 feet of 18-inch stoYm pipe and associated work south of Main Street on Morton Avenue in the amount of $67,229.95 Background/Discussion As paYt of the 2023 Street Improvement Project, 250 feet of 12-inch stoYm pipe south of Main Street was removed because it was undersized. Based on the record drawings, the storm pipe after this `vas supposed to transition to an 18-inch storm pipe, but during construction it was found to on1yT be a 12-inch storm pipe. For the newly upgYaded storm system to function properlyr, 271 feet of the e�sting 12-inch storm pipe has to be removed in order to prevent one of the storm structures from backing up. Financial Impact Paid for by the Stormwater Utilit�T Fund. Mission/Policy/Goal Meet changing needs, agile Attachments ■ Change Order The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. rowEREo ar �I'1 ���� Update�l• January 2023 Change Order No. 2 Date of Issuance: August 2, 2023 Owner: City of Elk River Contractor: North Valley, Inc. Engineer: Bolton & Menk, Inc. Project: 2023 Street Improvements Project The Contract is modified as follows upon execution of this Change Order: The existing storm sewer pipe in Morton Avenue south of the connection point of the proposed storm sewer improvements was found to be 12-inch diameter. The record drawings in this location show this pipe as an 18-inch pipe. The Morton Avenue Drainage Study completed in September 2022 determined the recommended improvement based on the 18-inch pipe size. Updating the model to the smaller pipe size found that the storm water would surge out of the new manhole on high rain events. To correct this surge, the 12-inch pipe needs to be replaced with the 18-inch pipe that was originally believed to be in place. The following pay items will be added to the contract: Item No Description CO-2.1 Remove 12" Storm Pipe CO-2.2 18" RCP Storm Pipe CO-2.3 Connect to Ex MH CO-2.4 Bituminous Street Patch CO-2.5 Remove & Replace Curb & Gutter CO-2.6 Mobilization CO-2.7 Traffic Control CO-2.8 Grated Casting Lid CO-2.9 Clear & Grub Tree CO-2.10 R-3501-TB Casting Assembly Quantity 271 LF 271 LF 2 EA 400 SY 20 LF 1 LS 1 LS 1 EA 4 EA 2 EA Effective Date: August 7, 2023 Owner's Contract No.: Contractor's Project No.: Engineer's Project No.: OR1.128082 Contract Name: Unit Price $23.00 $96.00 $4,025.00 $31.33 $35.13 $9,125.00 $450.00 $397.35 $675.00 $512.00 Item Value $6,233.00 $26,016.00 $8,050.00 $12,532.00 $702.60 $9,125.00 $450.00 $397.35 $2,700.00 $1,024.00 CHANGE IN CONTRACT PRICE Original Contract Price: $ 5,433,358.71 CHANGE IN CONTRACT TIMES Original Contract Times: Substantial Completion: _November 3, 2023 Ready for Final Payment: December 15, 2023 Increase from previously approved Change Order No. 1: $ 8,483.45 Contract Price prior to this Change Order: $ 5,441,842.16 Increase of this Change Order: �� . [Increase] [Decrease] from previously approved Change Orders No. to No. Substantial Completion: Ready for Final Payment: Contract Times prior to this Change Order: Substantial Completion: Ready for Final Payment: Contract Price incorporating this Change Order $— By: Title: Date: RECOMMENDED: Engineer (if required) Contract Times with all approved Change Orders: Substantial Completion: November 3, 2023 Readv for Final Pavment: December 15, 2023 ACCEPTED: By: Owner (Authorized Signature) Title: Date: [Increase] [Decrease] of this Change Order: Substantial Completion: Ready for Final Payment: ACCEPTED: By: Contractor (Authorized Signature) Title: Date: