4.5 SR 08-21-2023�,
Elk s �-
River
Request for Action
To Item Number
Ma Tor and CinT Council 4.5
Agenda Section Meeting Date Prepared by
Consent A enda Au ust 21, 2023 ustin Femrite P.E., Public WoYks DirectoY
Item Description Reviewed by
Snow and Ice Control Policy Update Cal Pormer, Ci r Administrator
Reviewed by
Action Requested
Approve, byT motion, updated Snow & Ice Control PolicyT.
Background/Discussion
Proposed changes to the Sno`v & Ice Control PolicyT `vere revie`ved at work session on August 7, 2023.
The most impactful changes surround mailbox reimbursement and language detailing private improvements in the
right of `vay. Through additional discussions at the `vork session, no modifications have been made relating to
levels of service section or the sidewalk plowing routes.
Provisions, similar to a policyT ERIVIU for their field managers, that compensates (through additiona140-hours of
vacation time) our exempt public works managers, who are accountable to monitor weather, receive calls, diagnose
issues, Yespond to location and/oY direct the response of personnel to complete snow control tasks on behalf of the
cityT at night, on `veekends and holidayT `vill be brought forward `vith the next round of personal policy updates.
Financial Impact
Policy changes result in negligible increases in mailbox replacement costs which �vill be carried in the annual Street
operating budget.
Mission/Policy/Goal
Meet changing needs - Agile
Attachments
■ Snow and Ice Control PolicyT
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty.
rowEREo ar
�I'1 ����
Update�l• January 2023
Snow & Ice Control Policy
Forward
The purpose of sno`v/ice control is to provide for the safetyT and mobilityT of the public during periods of
heav�T sno�vfall, accumulation and ic�T conditions. Planned levels of service and existing capabilities of the
cityr must be carefullyr corYelated with opeYational costs and expected benefits. It is the Yesponsibilityr of the
Public Works Department to provide a level of snow and ice control consistent `vith the City of Elk River's
approved level of service and corresponding funding.
This policy provides for the planned and orderl�T control of snow/ice on cit�T-maintained streets, alleyTs,
`valks, parking lots and some trails during periods of inclement `veather. Operations are performed and
coordinated byT Streets and Parks personnel, with assistance from other divisions as needed. A planned,
coordinated appYoach is essential to ensure effective and efficient Yesponse to snow and ice
conditions. Unplanned, reactive responses to localized conditions conflict with and inhibit an effective
approach to citywide snow/ice events.
This policyT is also a summaryT of procedures and policies of the cityT as theyT relate to snow and ice control
operations.
Snow control is hazaYdous, tiring, and stressful, often not fullyr understood byr the public. Operations are
performed frequentlyT at night and often require cre`vs to `vork arduous hours, on `veekends, and holidayTs.
Introduction
The entire communityT has a role in keeping Elk River safe for winter traveL The cityT assumes the
responsibilityT for control of sno`v and ice on cityT-maintained streets, alleyTs, `valks, parking lots and trails,
while propertyT owners are responsible for private streets, parking lots, alleys, and sidewalks abutring their
propertyT. Reasonable ice and snow control is necessaryT to ensure all transportation pathwayTs function as
well as possible under even the most extreme weather conditions for routine travel and emergencyT services.
The cityT will provide such control in as safe and cost-effective manner as practical, keeping in mind safetyT,
budget, personnel, and environmental concerns. The cit�T `vill use a combination of cityT employTees,
equipment, and may also utilize private contractoYs if needed.
This policy will be enforced equallyT throughout the CityT of Elk River.
Poi��y
Decision to Begin Operations
The Street and Park Superintendent oY designee(s) will decide when to begin snow and/or ice control
operations. The criteria foY that decision will include:
■ Reasonable thYeat of inclement weatheY pYedicted to occur within 24 hours.
■ Storm conditions that warrant pre-treatment with salt or brine solution.
■ Snow accumulation or as road conditions warrant (drifting, icing, etc.).
■ Time of sno`vfall.
■ Forecasted temperatures post snow event.
Use of Salt and Sand
The cit�- mayT use salt, salt brine, sand, or a mixture thereof �vhen there is hazardous ice or other conditions
that warrant their use. Application `vill follo`v the same priorities followed for snow and ice control set forth
in the "Snow and Ice Control Priorities" section. The cityr is concerned about the effect of such chemicals
on the environment and `vill limit their use for that reason. Application of sand/salt �vill be limited on lo`ver
volume streets. The Street and Park Superintendent oY designee(s) shall deteYmine when conditions waYrant
the application of sand and/or salt, and what mixture is appropriate for the conditions.
Snow Removal
Sno`v removal operations shall be performed on streets, alley s, `valks, parking lots and trails maintained byT
the cit�r. Snow removal priorit�r and scheduling shall be based on needs and conditions and shall be
determined by the Street and Park Superintendent or designee(s).
Method of Snow Removal
Snow will be plowed in a manner minimizing traffic obstructions. The center of the roadwayT will be plo�ved
first The dischaYge shall go onto the boulevaYd aYea of the street and mitumize oY reduce snow stack upon
`valktivayTs, where practical.
Weather Conditions/Suspension of Operations
Sno`v and ice control operations will be conducted on1�T when `veather conditions do not endanger the
safetyT of cit�T emplo�Tees and equipment. Factors that may dela�T sno`v and ice control operations include
severe cold, significant `vinds, limited visibilit�T, or damaged equipment.
GenerallyT, operations shall continue until all roads are passable. Widening and clean-up operations mayT
continue immediately or on the following regularlyT scheduled `vorkdayT depending upon conditions and
circumstances. The safety of the plow operatoYs and the public is essential. TheYefoYe, snow opeYations mayr
be suspended temporarily to allow peYsonnel adequate time for rest There may be instances when this is not
possible depending on storm conditions and other circumstances. Operations mayT also be suspended during
periods of limited visibilityT. AnyT decision to suspend operations shall be made byT the Street and Park
Superintendent or designee(s) and shall be based on the conditions of the storm. The cityT will still provide
access for emergency fire, police, medical and utility services during a major sno`v or ice storm.
Snow and Ice Control Priorities
CityT streets are classified by street function, traffic volume, and importance to the welfare of the communityT.
Streets aYe prioritized to clear majoY travel routes first, allowing full access for public safetyr vehicles.
■ PriorityT 1- Main Arterials. High-volume streets that must be clear to provide access for emergencyT,
fire, police, and medical services.
■ Priorityr 2- Secondary Arterials. r1ll otheY streets that connect majoY sections of the cityr.
■ PriorityT 3- Residential Streets. Third priorityT streets are lower volume residential streets.
■ PriorityT 4 - Cul-de-sacs. (PriorinT 4)
■ PriorityT 5— Alle,� The lo`vest priorityT. Plowed after arterials and residential streets are cleared.
Downtown snow removal (including parking lots) commences between 2:00 a.m. and 6:00 a.m. depending
on the severity of the event. Do�untown businesses are responsible for removing snow from the front of
their establishments within 24 hours after the snowfall.
Sidewalks, Trails, Ciry Operated Facilities, and Outdoor Ice Rinks
The Cit�T Council designates side�ualks and trails that are plo�ued b�T the cityT. Clearing of non-designated cit�T
side`valks is the responsibilit�T of the propertyT owner.
CityT side`valks, trails, city operated facilities and cityT outdoor ice rinks are classified based on traffic, use and
the importance to the welfare of the communityT. These facilities are prioritized to clear school routes and
public facilities first This allows for safetyr to the public and employees of cityr opeYated facilities as well as
to pedestrians in high traffic corridors.
■ PriorityT 1- School Routes and Downtown Sidewalks. Sidewalks and trails to school campuses and
downtown businesses shall be cleared to provide safe pedestrian access.
■ PriorittT 2— Cit�T-o�erated Facilities. Prioritized based on traffic volume and scheduled operations.
Order of precedence: Public SafetyT Campuses, CityT Hall, Public Works FacilityT, libraryT, liquor stores,
and Yental facilities.
■ PriorityT 3- Trails, Side`valks, Park Parking Lots. Non-school routes designated for snow removal
and parking lots supporting park facilities.
■ PriorityT 4- Ice Rinks. The lowest priority- and will be cleared of snow and resurfaced once all other
sno`v removal operations are complete, generally on dayT two following a snowfall.
Driveways
It is unlawful to deposit snow on public roadwayTs per Minnesota HighwayT Traffic Regulations:
State Statute 160.2795 Sul�d (5): Misdelneanoys: It sball l�e unlaaa ful to ol�st�z�ct any pul�lic street oT� high�a�ay o�• to deposit
any sno�a� o�• ice tbe�eon; and, 169.42 Sul�d �9�: Litte�zng. No pe�:son shall thTo2��, deposit, place, oT� dulnp upon any stTeet o�•
highaa�ay any sno2a�, ice, etc.
Residents and contracted snotiv Yemoval companies observed doing such activities aYe subject to a citation
according to the statute.
Minimal Levels of Service
The following are the minimum levels of service which can be anticipated. The cit�J will attempt to achieve
better results where possible.
Streets
■ Sno`v removal and/or sanding operations shall begin `vhen sno`v accumulation or icing occurs on
Priority 1 and Priority 2 streets and shall continue periodically throughout the duration of the
snowfall. The intention is to keep these routes open to traffic during a storm; howeveY, it may not be
possible to keep them snow or ice free.
■ All priority-1 and priorit�r 2 streets shall be open to traffic (t�vo lanes) within 24 hours after the
sno�vfall subsides.
■ All remaining public streets shall be open to traffic (one lane) within 36 hours after the snowfall
subsides.
■ All public alleyTs and cul-de-sacs shall be opened and made passable within 48 hours after the
sno`vfall subsides.
Sidewalks, Trails, Ciry Operated Facilities, and Outdoor Ice Rinks
■ Sno`v removal and/or sanding operations shall begin `vhen sno�v accumulation or icing occurs on
PriorityT 1 and Priorit�T 2 sidewalks, trails, and cit�T-operated facilities; and shall continue periodically
throughout the duration of the sno�vfall. The intention is to keep these facilities open to pedestrian
and vehicular traffic during a storm; ho�vever, it ma�T not be possible to keep them sno�v or ice free.
■ All PriorityT 1 and Priorit�T 2 side�valks, trails, and cityT-operated facilities shall be open to traffic
�vithin 24 hours after the sno`vfall subsides.
■ All PriorityT 3 sidewalks and trails shall be open to pedestrian traffic within 48 hours after the
sno`vfall subsides.
■ All Priorit�r 4 outdoor ice rinks shall be cleared of snow and resurfaced as manpo`ver and equipment
are available, generally- within 48 hours after snowfall subsides. Priority- for outdoor ice rinks shall be
the Handke Pit, Spectrum Rink, then designated neighborhood ice rinks.
Should a subsequent snowfall occur `vithin the minimum times of service listed, that snowfall shall
become the snowfall refeYYed to in this policy.
Items in the Public Right of Way
Mailboxes
The cityT does not assume liabilityT for mailbox damage caused on1yT byT sno`v windro`vs. The cit�T will assume
liabilityT for mailbox damage if the Street and Park Superintendent or their designee determines that a plow
unit made direct contact.
Residents must inform the city of mailbox damage within 48 hours after the completion of the snow event.
Staff shall investigate each complaint and determine if the mailbox was hit byT cit�r equipment. If so, the cit�r
will install a temporar�T mailbox until the propert�T o`vner installs a permanent replacement or 4-months has
passed (`vhichever comes first).
The cit�T will reimburse up to $150 to replace the mailbox; purchase and installation of the mailbox is the
responsibilittT of the property o`vner. Cluster mailboxes mayT be reimbursed at a rate of $150 per mailbox up
to a maximum of $500, whichever is the lesser amount. Mailbox structures in the public right-of-`vayT shall
be constructed of break-awayT materials and be installed according to the U.S. Postal Service construction
standards �vhich can be found at htt�s://�vww.us�s.com/manage/mailboxes.htm
Trash Containers
Trash and rec�Tcling containers shall be placed behind the curb to ensure the�T are clear of passing
sno�uplo�vs and resulting `vindrows. Do not place trash and rec�Tcling containers in the street as this prevents
plo`v trucks from clearing public right-of-�va�T curb to curb and mayT result in road hazards to motorists. The
cit�T is not responsible for tipped over or damaged trash or rec�Tcling containers.
Sod Damage
Sod damaged byT cityT equipment will be repaired the following spring either byT cityT crews using black dirt
and seed; or byT the propertyT owner if theyT elect to do the repair using commercial sod. The cityT will provide
the propernT owner with the sod required to cover the damaged area. The propertyT owner is responsible for
installation and maintenance of the sod to ensure establishment. Requests for sod damage repair must be
Yeceived byr the cityr byr l�1ay 1 s` or no more than 30-days after the last plowable snow event of the season,
`vhichever comes first.
Landscaping, Irrigation Systems and Fences
The cit�T is not liable for damage to privatel�r installed landscaping, irrigation syTstems or fencing (visible or
buried) within the public right-of-wa�T. Permanent features such as boulders, retaining walls, rock or wood
mulch, edging, lighting, vegetation, fences, etc. placed ��ithin the public right-of-`vayT mayT be damaged during
snow plo`ving operations including hauling of sno`v from boulevards. Landscaping within the public right-
of-way may be a hazard to motorists experiencing a lane departure event. Additionally, landscaping within
the right-of-wayT is a hazard to cityT staff and equipment when pushing back or hauling snow from
boulevaYds as these items ma�r become buried under the snow making them difficult to identifyr.
Conditions Which May Impact Policy Goals
Vehicles disabled in deep snow.
Weather so severe as to cause crews to be called in from the street, i.e., whiteout conditions.
■ Equipment rendered inadequate by the depths of the snow or drifts, refueling, refilling material
spreaders, installing ne`v plo�v cutting edges, and routine maintenance.
■ IllegallyT parked, parked, or stalled vehicles that restrict or prevent access, those streets, `valks and
pathwayTs will be assigned to lower priorityT, as available.
■ Unforeseen emergencies.
■ Equipment breakdown.
Snow Plowing Procedures
The Public Works Department shall maintain a snow and ice control procedures manual.
Snow and Ice Control Policy
Policy History
Adopted byT: On (date) Item #