6.1h ERMUSR 09-12-2023Well #4, 22.321, 15% Well #3, 20.354, 14% Well #2, 12.867, 9% 100 Well #5, 20.897, 15% (Well #, Gallons Pumped, Percentage of Pumping) Well #9, 21.321, 15% August 2023 Monthly Pumping By Well Well #6, 17.042, 12% Values Are Displayed in Millions of Gallons Well #8, 18.577, 13% Well #7, 9.669, 7% August 15, 2023RE: Dave Ninow,Water Superintendent Elk River Municipal Utilities 13069 Orono Pkwy NW Elk River,MN :00 p.m., Friday,August4, 2023,threebids were received for the above-referenced project. The base bids ranged from a high of $158,450.00to a low of $97,620.00. The low bid received was submitted by the amount of $97,620.00. Contractor Base Bid 9ƌĻǝğƷźƚƓ /ƚğƷźƓŭƭυВАͲЏЋЉ͵ЉЉ {ƌğĭƉ tğźƓƷźƓŭυЊЋЍͲЎЉЉ͵ЉЉ /ƌğƭƭźĭ tƩƚƷĻĭƷźǝĻυЊЎБͲЍЎЉ͵ЉЉ This contractor has worked in Elk Riveron projects of various sizes. SEH engineers can conclude that Elevation Coatingshas the experience and ability to complete a project of this size. Accordingly,we recommend the project be awarded to in thereasonableamount of $97,620.00. Brad Sipe NACE CIP 3 #67044 Protective Coatings Manager/Project Manager dmk X:\\AE\\E\\ELKMU\\171929\\6-bid-const\\recommendation letter.docx Engineers|Architects|Planners|Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 651.490.2000|800.325.2055|888.908.8166 fax|sehinc.com SEH is 100% employee-owned|Affirmative ActionEqual Opportunity Employer 101