Loading...
5.1. HPSR 09-21-2023 The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: January 2023 Request for Action To Heritage Preservation Commission Item Number 5.1 Agenda Section General Business Meeting Date September 21, 2023 Prepared by Brandon Wisner, Engineering Project Manager Item Description W.H. Houlton Conservation Area (WHHCA) - Elk River Shoreline/Bluff Erosion Reviewed by Reviewed by Action Requested Information, provide direction on next steps. Background/Discussion The city included a line item in the Stormwater Management fund to stabilize the bluff in the WHHCA adjacent to the bridge and dam the last two years. Staff identified this eroded area shortly after the city received the conservation area from the state in 2014. A phase I archaeological study was completed two years ago, and the U.S. Army Corps of Engineers recently notified the city that a phase II is required prior to any work being done to stabilize this area due to potential significant archaeological deposits (timber and flour mill). Staff is working with a consultant to identify grant opportunities through the Minnesota Historical Society to cove an archaeological phase II study. At this time, the Heritage Partnership Program grant seems to be the best fit https://www.mnhs.org/preservation/partnership. The state indicated to apply through our local HPC. Financial Impact N/A currently. Mission/Policy/Goal  Meet changing needs - Agile Attachments  USACE Letter – August 4, 2023  Construction Plan Sheets  Aerial Image of Existing Site DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS 332 MINNESOTA STREET ST. PAUL, MN 55101 REPLY TO ATTENTION OF REGULATORY DIVISION Regulatory File No. 2023-00474-ARC Brandon Wisner City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 Dear Mr. Wisner: The St. Paul District, U.S. Army Corps of Engineers (Corps) is evaluating your application for Section 404 Clean Water Act Department of the Army (DA) permit to discharge fill material into waters of the United States (WoUS) in conjunction with your proposal to stabilize the bank of the Elk River just below the Orono Lake Dam (Project) and adjacent to the Elk River First Sawmill Site (21SH0051). The Project is in Section 33, Township 33 North, Range 26 West, Sherburne County, Minnesota. The Corps has a statutory responsibility to consider effects of this federal action on historic properties (e.g., buildings, structures, archaeological sites, objects) pursuant Section 106 of the National Historic Preservation Act of 1966 (Public Law 89-665), as amended. Site 21SH0051 occurs within the Corps’ permit area and was identified in 2005 (Rothaus 2005) and revisited in 2022 (Blondo Consulting 2022). Blondo Consulting did not complete the inventory and evaluation effort. We have determined you must conduct a Phase II archaeological investigation (Phase II evaluation) within the Corps’ permit area consistent with procedures outlined in the OSA’s “Manual for Archaeological Projects in Minnesota.” You must ensure the Phase II evaluation is completed by a qualified archaeologist who meets the Secretary of the Interior’s professional qualification standards (36 CFR Part 61, Appendix A). This Phase II evaluation should include sufficient information to inform your eligibility recommendation on this site. The Corps’ permit area for this Project is comprised of those areas in the Elk River where you propose to place fill material below the ordinary high water mark, as well as areas including riverbank excavation and upland areas used for construction access and staging. Figure 1 shows the permit area in blue outline as we currently understand it based on information provided by you to our Project Manager Andy Chambers on May 23, 2023. If you work to minimize impact areas to the extent practicable, this will reduce your Phase II evaluation area, e.g., staging equipment in the nearby parking lot, using a narrow equipment travel lane for access, or minimizing amount of riverbank you excavate in association with stabilization. Conversely, should you propose additional upland workspaces, your Phase II evaluation must include those areas. August 4, 2023 Regulatory File No. 2023-00474-ARC Page 2 of 2 Depending on the outcome of the survey, we will consult with the State Historic Preservation Office and potentially other consulting parties. Please be advised if significant archaeological deposits are identified that lead to a determination that site 21SH0051, or any other previously unidentified site, is eligible for inclusion on the NRHP, you will need to assess opportunities to avoid and minimize effects to the site. We understand the purpose of your project is to protect the Elk River Sawmill Site from further erosion, and we are available to meet on-site with you to further discuss Phase II requirements. Should your project result in unavoidable adverse effects to any historic properties, we will work with you and other consulting parties to resolve the adverse effects. We must conclude the Section 106 process before making a final decision on your Section 404 CWA application. Once you complete the archaeological survey, please submit a PDF copy of the report. If you have any questions, please contact me at (651) 290-5725 or Michael.J.Madson@usace.army.mil. For any project-related questions, contact Andrew Chambers at (218) 788-6407 or andrew.r.chambers@usace.army.mil. In any correspondence or inquiries, please refer to the Regulatory file number shown above. Sincerely, Michael Madson Archaeologist Enclosure: Figure 1, permit area Electronic copy furnished: Brandon Wisner, Engineering Project Manager, bwisner@elkrivermn.gov USACE Permit Area (in blue ouline, based on Applicant email on 5/23/2023) 2023-00474-ARC: Figure 1 13'1' H Scale: 1" = 10', V Scale 1" = 5' (VE 2:1) TYPICAL SECTION1