Loading...
6.0 PRSR 10-17-23 Memorandum To: Parks and Recreation Commission From: Michael Hecker, Parks and Recreation Manager Date: October 17, 2023 Subject: Parks and Recreation Manager’s Report This report is a monthly highlight of department activities related to recent collaborations, strategic planning, staff changes/developments, and park operations. Athletic Facilities Tour Three team members (Warren Ellingworth, Joe Stremcha and Michael Hecker) visited various athletic facilities to get ideas on the latest designs, services, and amenities. Facilities visited include the following: Schwan’s Regional Amateur Sports Complex in Marshall, The Irish Yard in Milroy, Riverside Park Ballfield in Springfield, Johnson Ballpark in New Ulm, Caswell Complex in North Mankato and Gleason Fields in Maple Grove. We appreciated the four turf fields at Gleason, but we were not as excited about their design layout. They seemed too spread out. We prefer the pinwheel type layout with a central service building in the middle that overlooks the fields. Marshall had the best example of this, with an elevated central plaza (concessions, restrooms, shelter, and playground) that overlooks their four athletic fields. Marshall was also creative in using stone/pavers for their seating. Highlights from our tours that staff want to consider and pass along to the Athletic Fields Planning Committee and HKGi include the following: • Seating areas/concourse overlooking the fields (built up) no bleachers. • Separate seating areas at all fields ADA accessible • Sport decking for the premier fields • Large dugouts with storage areas and decking (Gleason had the best example) • Archway/plaza at the entranceway Plants and Things Recreation Complex Shed The shed at the Plants and Things Recreation Complex is nearly complete. It is a total of 350 sq. ft. complete with interior and exterior lighting and separate entrances. One half of the shed will be shared with baseball and softball. Baseball has notified staff they would like to store new grooming equipment. Item: 6 Skate Park The skate park lighting controls and nearby irrigation controls were vandalized three times over the past few weeks. Therefore, the lights will continue to be off for the foreseeable future. Parks maintenance is working on moving all the electrical control boxes (skate park and irrigation) to one secure location. Hillside Park Mountain Bike Trail Improvements MORC was able to obtain funding for rehab and maintenance work on the trails in the SE quadrant of the park. The contractor is Trailsource LLC which is the same company that built the trails in the west side of the park in 2018. MORC only requested $1,000 from the city to cover mobilization costs. The work will take a few days and should be completed by the time this report is received. Camp Cozy Natural Resource Management Plan (NRMP) The public meeting for the Camp Cozy NRMP is scheduled Wednesday, November 8 at 5:00 p.m. at City Hall, right before the Parks Commission meeting. The Friends of the Mississippi River (FMR) are funding and completing the plan with a Sherburne County SHIP grant. They will also facilitate the public meeting. The goal is to help the city improve the ecology of the natural spaces without adding a burden to staff. FMR will continue to stay committed as a management partner once the plan is complete (just like WHHCA). Minnesota Recreation and Park Association (MRPA) Annual Conference Three staff attended the MRPA annual conference last week at the Plymouth Community Center. The theme of this year’s conference was Trailblazing Beyond the Beaten Path focusing on the trailblazing experiences parks and recreation provide in our communities. A few of the key staff takeaways from the four-day conference include the following: • Trailblazing = Creative thinking • Using social pinpoints for feedback and tracking of our parks and playgrounds • Create a large impact with a small footprint nature center • Park programming improvements, equity in access, sustainability, and efficiency. • An emphasis to update our current parks and recreation system wide plan (2015) with a focused approach to the needs and priorities of our community. • Automating recreation tasks with Artificial Intelligence (AI) Bradford Development Lennar/Foster property Bradford Park Final Plat for Phase One is moving forward. This area does not include any park infrastructure or amenities as outlined in the Preliminary Plat. It is proceeding through the planning commission and future phases will warrant future action by the commission. I recommend the commission appoint 2 commissioners to work with staff on a subcommittee to solicit feedback and review of Plat details prior to consideration by the Commission. This is a similar process to our Athletic Facilities Master Plan review. Eagle Scout Project – York/Zumbro Trail Tristan (Eagle Scout) has cleared out the brush and the trail is clearly defined. More than thirty loads of brush were hauled away as part of the effort. The next steps include stump grinding, boundary signage and a snow fence installation to clearly define the residential boundary in one of the open clearings. Tristan will be gone over MEA and plans to plant grass seed and mulch at the end of the month. This has been a great collaborative effort and staff are excited to see Tristan’s efforts come through to fruition over these next few weeks.