4.10 SR 10-16-2023 Request for Action To Item Number Mayor and City Council 4.10 Agenda Section Meeting Date Prepared by Consent Agenda October 16, 2023 Seth Calvin, IT Manager Item Description Reviewed by Accept Bid for East Fiber Loop Extension Cal Portner, City Administrator Reviewed by Action Requested Approve, by motion, the low bid from TD & I Cable Maintenance and authorize the execution of a contract with $605,587.25 for the construction of the east fiber extension project. We accept the alternates A1 - the Johnson Tower lateral = $42,465.00, A2 - the Auburn Tower lateral = $26040.00, A3 – connection to wells 7,8,9 = $79,444.00, A4 – Trott Brook Park lateral = $5,250.00, A5 – Hillside Park lateral = $11,872.00. We are rejecting the alternate A6 – deduct to 96 strands as it is not cost-beneficial. Background/Discussion The City of Elk River, Elk River Municipal Utilities, and the School District 728 are in partnership to create a fiber loop extension to help connect to resources on the east side of Hwy 169. Financial Impact rds rd, The city will pay 2/3of the cost at $403,724.83 of the base bid. ERMU will pay for the other 1/3 and the school district will buy from us the strands that they need. The school district thinks they will need 6 strands at $25,232.80. Mission/Policy/Goal Responsible for every dollar – good stewards Attachments  Bid Tabulation  Public Bid Notice  Contract The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires prosperity. Updated: January 2023 City of Elk River Fiber Extension (#8667862)100% Owner: Elk River MN, City of Solicitor: Elk River MN, City of 10/02/2023 02:30 PM CDT$25,232.80 $4,205.47 Engineer EstimateTD & I Cable MaintenanceCastrejon IncorporatedComLink Solutions LLCMichels Power, Inc.MasTec North America Inc Section TitleLine ItemItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtensionUnit PriceExtension 1$0.00$605,587.25$641,874.38$717,493.29$973,179.83$2,182,793.02 Alternate$0.00$154,673.36$160,703.53$300,853.17$359,124.83$902,991.16 A11JOHNSON TOWER LATERALLS1$42,465.00$42,465.00$44,073.52$44,073.52$70,653.23$70,653.23$102,223.76$102,223.76$219,107.15$219,107.15 A22AUBURN TOWER LATERALLS1$26,040.00$26,040.00$62,764.03$62,764.03$47,490.73$47,490.73$66,375.98$66,375.98$165,184.92$165,184.92 A33WELLS 7,8,9LS1$79,444.00$79,444.00$6,156.27$6,156.27$121,238.39$121,238.39$178,972.09$178,972.09$398,622.79$398,622.79 A44TROTT BROOK KPARK LATERALLS1$5,250.00$5,250.00$10,617.31$10,617.31$11,595.00$11,595.00$0.00$0.00$53,108.15$53,108.15 A55HILLSIDE PARK LATERALLS1$11,872.00$11,872.00$10,617.31$10,617.31$14,749.90$14,749.90$11,553.00$11,553.00$66,968.15$66,968.15 A6696 STRAND DEDUCTLS1($10,397.64)($10,397.64)$26,475.09$26,475.09$35,125.92$35,125.92$0.00$0.00$0.00$0.00 Base Bid Total:$0.00$605,587.25$641,874.38$717,493.29$973,179.83$2,182,793.02 Specifications for East Fiber Extension City of Elk River, Minnesota October 2023 CERTIFICATION PAGE Plans and Specifications for East Fiber Extension City of Elk River, Minnesota October 2023 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Justin Femrite, P.E.Date Reg. No.44658 City of Elk River 13065 Orono Parkway Elk River, MN 55330 Phone: 763.635.1051 Fax: 763.635.1090 TABLE OF CONTENTS ADVERTISEMENT FOR BIDS ........................................................................................................................ 00100-1 INFORMATION FOR BIDDERS .................................................................................................................... 00200-1 BID FORM .............................................................................................................................................................. 00400-1 BID BOND ............................................................................................................................................................. 00430-1 NOTICE OF AWARD ......................................................................................................................................... 00510-1 AGREEMENT ....................................................................................................................................................... 00520-1 NOTICE TO PROCEED .................................................................................................................................... 00550-1 PERFORMANCE BOND ................................................................................................................................... 00610-1 PAYMENT BOND ............................................................................................................................................... 00615-1 CONTRACT CHANGE ORDER ..................................................................................................................... 00671-1 INTERNAL REVENUE FORM IC-134 .......................................................................................................... 00672-1 CERTIFICATE OF SUBSTANTIAL COMPLETION ............................................................................... 00673-1 CONTRACTOR'S AFFIDAVIT ........................................................................................................................ 00674-1 GENERAL CONDITIONS ................................................................................................................................ 00700-1 SUPPLEMENT TO GENERAL CONDITIONS .......................................................................................... 00800-1 TECHNICAL SPECIFICATIONS Division S .......................................................................................................................................................................... S-1 PLAN DRAWINGS East Fiber Loop Google Earth File East Fiber Extension Elk River, Minnesota SECTION 00100 Advertisement for Bids City of Elk River 13065 Orono Parkway Elk River, MN 55330 Separate sealed BIDS for the construction of East Fiber Extension will be received at the office of the City of Elk River, 10635 Orono Parkway, Elk River, MN 55330 until 2:30 p.m.local time, on Monday, September25, 2023,and then at said office publicly opened and publically read. The city will not accept telephone, facsimile, or email bids under any circumstances. The Work for the said improvements, as required by the Contract Documents, is generally described as follows: Design/Build East Fiber Extension. Approximately 22,870 Feet of New Underground Fiber with 3 Conduits Approximately 1,873 Feet of Fiber in Existing Conduit Approximately 12,596 Feet of Aerial Fiber All Fiber to be Single Mode The Bidding Documents including proposal forms, specifications, plans, etc., may be examined at the following locations: City of Elk River, 13065 Orono Parkway, Elk River, 55330 Electronic Bidding Documents may be purchased from the office of the City Clerk, 13065 Orono Parkway, Elk River, MN 55330. The cost for the documents is $25.00. Cash and checks made payable to the City of Elk River are accepted. Include official email address with delivery of check for distribution of electronic plans. Each bid must be accompanied by a bid bond payable to the City of Elk River for 5%of the total amount of the bid. The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of forty-five (45) days. The city has designated an alternative method for the solicitation of bids and requests for proposals. The designated alternative method is the City of Elk River website at: www.elkrivermn.gov. Click on Bid Posting. Justin Femrite CityEngineer End of Section Advertisement for Bids 00100- 1 East Fiber Extension Elk River, Minnesota SECTION 00200 Instructions to Bidders BIDS will be received by City of Elk River(herein called the OWNER), at City Hall, 13065 Orono Parkway, Elk River, MN 55330 until 2:30p.m. localtime, on Monday, September 25, 2023,and then at said office publicly opened and read aloud. Each BID must be submitted in a sealed envelope, addressed to the City Clerk’s Office at City Hall, 13065 Orono Parkway, Elk River, MN 55330. Each sealed envelope containing a BID must be plainly marked on the outside as BID for EastFiber Extension and, the envelope should bear on the outside the name of the BIDDER, their address, license number if applicable, and the name of the project for which the BID is submitted. If forwarded by mail, the sealed envelope containing the BID must be enclosed in another envelope addressed to the OWNER at the same address. All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in, in ink or typewritten, and the BID form must be fully completed and executed when submitted. Only one copy of the BID form is required. No faxed bids will be accepted. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BID S or authorized postponed thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID Schedule by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning thequantities of WORK or of the nature of the WORK to be done. The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned and rights-of-way acquired or to be acquired. The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT. Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR, or relieve them from fulfilling any of the conditions of the contract. Each BID must be accompanied by a BID bond payable to the OWNER for five percent of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS. When the Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The BID Instructions to Bidders 00200 - 1 East Fiber Extension Elk River, Minnesota BOND of the successful BIDDER will be retained until the payment BOND and performance BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND. A performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Attorneys-in-fact who signs BID BONDS or payment BONDS and performance BOND S must file with each BOND a certified and effective dated copy of their power of attorney. The party to whom the contract is awarded will be required to execute the Agreement and obtain the performance BOND and payment BOND within ten (10) calendar days from the date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accomplished by the necessary Agreement and BOND forms. In case of failure of the BIDDER to execute the Agreement, the OWNER may at their option consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the OWNER. The OWNERS within ten (10) days of receipt of acceptable performance BOND, payment BOND, and Agreement signed by the party to whom the Agreement was awarded shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may by WRITTEN NOTICE withdraw their signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the OWNER. The NOTICE TO PROCEED shall be issued within ten (10) days of the execution of the Agreement by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period, the time may be extended by mutual agreement between the OWNER and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten (10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement without further liability on the part of either party. The OWNER may make such investigation as they deem necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein. A conditional or qualified BID will not be accepted. The award will be made to the lowest responsible BIDDER. The Owner reserves the right to reduce the quantities of the project after the BID and before AWARD of the contract to meet budget. Such adjustments will be made by reducing the quantities at the BID prices. Instructions to Bidders 00200 - 2 East Fiber Extension Elk River, Minnesota All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the contract throughout. Any BIDDER or subcontractor to a BIDDER that does not meet the minimum criteria established for a “responsible contractor” as defined in Minn. Stat. §16C.285, subd. 3, or fails to verify that it meets those criteria, is not a responsible contractor and is not eligible to be awarded a contract for the PROJECT or to perform work on the PROJECT. Responding BIDDERS shall submit to the OWNER, on the form attached, a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. §16C.285, subd. 3, at the time that it responds to this solicitation document. Each BIDDER shall submit to the OWNER, upon request, copies of the signed verifications of compliance from all of the bidder’s subcontractors. A false statement under oath verifying compliance with any of the minimum criteria shall make the BIDDER or subcontractor that makes the false statement ineligible to be awarded a contract and may result in termination of a contract awarded to a BIDDER or subcontractor that submits a false statement. Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of the BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to the BID. The low BIDDER shall supply the names and addresses of major material SUPPLIERS and SUBCONTRACTORS when requested to do so by the OWNER. End of Section Instructions to Bidders 00200 - 3 East Fiber Extension Elk River, Minnesota SECTION 00400 Bid Form Contract Identification: EAST FIBER EXTENSION City of Elk River This Bid Is Submitted To: City of Elk River, 13065 Orono Parkway, Elk River, MN 55330 The proposal of TD & I Cable Maintenance ____________ (hereinafter called BIDDER), organized and existing under the laws of the State of Minnesota doing business as TD & I Cable Maintenance , to the City of Elk River(hereinafter called 'OWNER'). In compliance with your Advertisement for Bids, BIDDER hereby proposes to perform all WORK for the construction of EAST FIBER EXTENSION in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below. By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as their own organization, that this BID has been arrived at independently without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the contract special provisions. BIDDER further agrees to pay as liquidated damages, the sum of $600 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions. BIDDER acknowledges receipt of the following ADDENDUM: Addendum No. Addendum Date 1 9/29/2023 Name of person representing BIDDER who inspected site of proposed work: Name: _______________________________ Date of Inspection: _________________ * Insert "a corporation,” "a partnership,” or "an individual" as applicable. Bid Form 00400 - 3 East Fiber Extension Elk River, Minnesota Respectively Submitted: ____________________________________ Signature Company Title Address License Number (Seal – If bid is by a Corporation) Date Attest Phone/Fax Fax Bid Form 00400 - 3 East Fiber Extension Elk River, Minnesota Bidder’s Verification of Compliance The undersigned, being first duly sworn, as Bidder on the Project, represents and swears as follows: Now, and at all times during the duration of the Project, the undersigned complies with each of the minimum criteria in Minn. Stat. § 16C.285, subd. 3, the Responsible Contractor statute. The undersigned understands that a failure to meet or verify compliance with the minimum criteria established for a “responsible contractor” as defined in Minn. Stat. § 16C.285, subd. 3 renders a bidder ineligible to be awarded a construction contract for the Project or to perform work on the Project. Upon request, the undersigned will submit copies of the signed verifications of compliance from all subcontractors. The undersigned understands that a false statement under oath verifying compliance with any of the minimum criteria shall make the undersigned or its subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a the undersigned or its subcontractor that submits a false statement. Bidder: TD & I Cable Maintenance By: Its: End of Section Bid Form 00400 - 3 East Fiber Extension Elk River, Minnesota SECTION 00430 Bid Bond Bidder (Name and Address): _ TD & I Cable Maintenance _____ _748 Exchange Dr._______________ _Hudson, WI 54016______________ Surety (Name and Address of Principal Place of Business): Owner (Name and Address): City of Elk River 13065 Orono Parkway Elk River, MN 55330 Bid Bid Due Date: Monday, September 25, 2023 Project: East Fiber Extension Bond Bond Number: Date: Penal Sum: (Words) (Figures) KNOW ALL MEN BY THESE PRESENTS, which we, the undersigned, as Principal, as Surety, are hereby held and firmly bound unto City of Elk River as OWNER in the penal sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this day of , 2023. The Condition of the above obligation is such that whereas the Principal has submitted to the City of Elk River a certain BID, attached hereto and hereby made a part to enter into a contract in writing, for the East Fiber Extension Project. NOW THEREFORE, BID BOND 00430 -1 East Fiber Extension Elk River, Minnesota a)If said BID shall be rejected, or b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have hereto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. (L.S.) Principal Surety By: Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute Bond. Important: Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. End of Section BID BOND 00430 -2 East Fiber Extension Elk River, Minnesota SECTION 00510 Notice of Award \[Certified Mail – Return Receipt Requested\] Date: To: Contract: East Fiber Extension OWNER’s Contract No. You are notified that your Bid dated September 25, 2023, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for the East Fiber Extension Project. The Contract Price of your Contract is __ $770,658.25 Three copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within 15 days of the date you receive this Notice of Award. 1. Deliver to the OWNER three fully executed counterparts of the Contract Documents. 2.Deliver with the executed Contract Documents the Contract Security (Bonds) as specified in the Instructions to Bidders and General Conditions (paragraph 22) and Supplemental Conditions (paragraph SC-22). 3. (List other conditions precedent). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award and to declare your Bid security forfeited. Within ten days after you comply with the above conditions, OWNER will return to you one fully executed counterpart of the Contract Documents. Notice of Award 00510 - 1 East Fiber Extension Elk River, Minnesota City of Elk River (OWNER) By: Mayor End of Section Notice of Award 00510 - 2 East Fiber Extension Elk River, Minnesota SECTION 00520 Agreement THIS AGREEMENT, made this _____day of ___________, 2023, by and between the City of Elk River(hereinafter called OWNER) and TD & I Cable Maintenance(hereinafter called CONTRACTOR). WITNESSETH: That for and in consideration of the payment and agreements hereinafter mentioned: 1. The CONTRACTOR will commence and complete the construction of the East Fiber Extension Project. 2. The CONTRACTOR will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the PROJECT described herein. 3. The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete as specified in the CONTRACT DOCUMENTS. 4. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for the sum of __$770,658.25_________________. 5. The Term "CONTRACT DOCUMENTS" means and includes the following: (A) Advertisement for BIDS (B) Information for BIDDERS (C) BID FORM (D) BID BOND (E) Agreement (F) General Conditions (G) Performance BOND (H) Payment BOND (I) NOTICE OF AWARD Agreement 00520 - 1 East Fiber Extension Elk River, Minnesota (J) NOTICE TO PROCEED (K)CHANGE ORDER (M) PLANS (N) ADDENDA: Addendum No. Addendum Date 1 _ 9/29/2023___ 6. The OWNER will pay to the CONTRACTOR in the manner and at such times set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in triplicate, each of which shall be deemed an original on the date first above written. 8. This contract may be terminated by the OWNER at any time upon discovery by the OWNER that the prime contractor or subcontractor has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minn. Stat. § 16C.285, subd. 3. Agreement 00520 - 2 East Fiber Extension Elk River, Minnesota OWNER City of Elk River By: City Clerk (SEAL) Attest: Name (Please Type) Title CONTRACTOR By: ______________________________________ Name (Please Type) Address: ________________ ________________ Telephone: ___________________________ (SEAL) Attest: Name (Please Type) Title End of Section Agreement 00520 - 3 East Fiber Extension Elk River, Minnesota SECTION 00550 Notice to Proceed Date: __ ____ To: Contract: East Fiber Extenstion Owner’s Contract No. You are notified that the Contract Times under the above contract will commence to run on October 18, 2023. By that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 3 of the Agreement, the dates of Substantial Completion are October 1, 2024 , and the date of readiness for final payment isNovember 19, 2024 . Before BIDDER may start any Work at the Site, they must comply with paragraph 21 of the General Conditions, which require you to deliver to the Owner, with copies to Engineer, Certificates of Insurance, which each is required to purchase and maintain in accordance with the Contract Documents. City of Elk River (OWNER) By: Mayor ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PROCEED is hereby acknowledged by: , this the day of , 2023. By Title End of Section Notice to Proceed 00550 - 1 East Fiber Extension Elk River, Minnesota SECTION 00610 Performance Bond Bond No. ___________________ KNOW ALL PERSONS BY THESE PRESENTS; That ____________________________________ a (corporation, a partnership, or an individual), hereafter called Contractor, and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto City of Elk River 13065 Orono Parkway, Elk River, MN 55330 hereinafter called Owner, in the aggregate penal sum of _______________________________________in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is based upon a certain contract by and between Contractor and Owner dated the ______day of _______, 2023, a copy of which is hereto attached and made a part hereof, for the construction of East Fiber Extension, generally described as follows: Construct various sections of bituminous and concrete trails in accordance with the plans and specifications. NOW THEREFORE, if Contractor well, truly and faithfully performs its duties, all the undertakings, covenants, terms, conditions, and agreements of said contract during the original terms thereof, and any extensions thereof which may be granted by Owner, with or without notice to Surety, and during the Two (2) year(s) guarantee and maintenance period, and if it satisfies all claims and demands incurred under such contract, and fully indemnifies and saves harmless the Owner from all costs and damages which Owner may suffer by reason of its failure to do so, and it Performance Bond 00610 - 2 East Fiber Extension Elk River, Minnesota reimburses and repays Owner all outlay and expense which Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to Work to be performed thereunder or the Contract Documents accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the Work or to the Contract Documents. PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Contract not increasing the contract price more than 20 percent, so as to bind the Contractor and Surety to the full and faithful performance of the Contract as so amended. The term “Amendment,” wherever used in this Bond, and whether referring to this Bond, the Contract, or the Loan Documents shall include any alteration, addition, extension, or modification of any character whatsoever. PROVIDED, FURTHER, that no final settlement between Owner and Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. Performance Bond 00610 - 3 East Fiber Extension Elk River, Minnesota IN WITNESS WHEREOF, this instrument is executed in three counterparts, each one of which shall be deemed an original, this day of , 2023. SURETY: CONTRACTOR AS PRINCIPAL: By By Attorney-in-Fact (Address) (Address) ATTEST: ATTEST: (Surety) (Contractor as Principal) \[SEAL\] \[SEAL\] (Witness as to Surety) (Witness as to Contractor as Principal) (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If Contractor is partnership, all partners should execute BOND. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. End of Section Performance Bond 00610 - 4 East Fiber Extension Elk River, Minnesota SECTION 00615 Payment Bond Bond No. ___________ KNOW ALL PERSONS BY THESE PRESENTS; That ________________________________ a (corporation, a partnership, or an individual), hereafter called Contractor, and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto City of Elk River 13065 Orono Parkway, Elk River, MN 55330 hereinafter called Owner, and unto all persons, firms and corporations who or which may furnish labor or materials, as defined in Minnesota Statute 574, to perform as described under the contract and to their successors and assigns in the total aggregate penal sum of _____________________________________ in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmlyby these presents. THE CONDITION OF THIS OBLIGATION is based upon a certain contract by and between Contractor and Owner dated the _____ day of _____, 2023, a copy of which is hereto attached and made a part hereof, for the construction of East Fiber Extension Project, generally described as follows: Construct various sections of bituminous and concrete trails in accordance with the plans and specifications. NOW, THEREFORE, if the Contractor promptly makes payment to all persons, firms, Subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such contract and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. Payment Bond 00615 - 1 East Fiber Extension Elk River, Minnesota PROVIDED, that beneficiaries or claimants hereunder shall be limited to the subcontractors, and persons, firms and corporations having a direct contract with the principal or its subcontractors. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the Work to be performed thereunder or the Contract Documents accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the Work or to the Contract Documents. PROVIDED, FURTHER, that no suit or action shall be commenced hereunder by any claimant: (a) Unless the claimant, other than one having a direct contract with the Contractor, shall have given written notice to any two of the following: the Contractor, the Owner, or the Surety above named within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to the Contractor, Owner, or Surety, at any place where an office is regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer. (b) After the expiration of two (2) years following the date of which Contractor ceased work on said Contract, it being understood, however, that if any limitation embodied in the Bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Contract not increasing the contract price more than 20 percent, so as to bind the Contractor and Surety to the full and faithful performance of the Contract as so amended. The term "Amendment”, wherever used in this Bond, and whether referring to this Bond, the Contract or the Loan Documents shall include any alteration, addition, extension, or modificationof any character whatsoever. PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. Payment Bond 00615 - 2 East Fiber Extension Elk River, Minnesota IN WITNESS WHEREOF, this instrument is executed in two or more counterparts, each one of which shall be deemed an original, this day of , 2023. SURETY: CONTRACTOR AS PRINCIPAL: By By Attorney-in-Fact (Address) (Address) ATTEST: ATTEST: (Surety) (Contractor as Principal) \[SEAL\] \[SEAL\] (Witness as to Surety) (Witness as to Contractor as Principal) (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If Contractor is partnership, all partners should execute BOND. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. End of Section Payment Bond 00615 - 3 East Fiber Extension Elk River, Minnesota SECTION 00671 Change Order (Instruction on reverse side) No. PROJECT: East Fiber Extension DATE OF ISSUANCE: ______________ OWNER: City of Elk River 13065 Orono Parkway Elk River, MN 55330 CONTRACTOR: _______ _______ _______ CONTRACT FOR: East Fiber Extension You are directed to make the following changes in the Contract Documents. Description: Purpose of Change Order: Attachments (List documents supporting change): CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $_________ Substantial Completion: _________________ Final Completion: Previous Change Orders No. ___ to No. ___ Net change from previous Change Orders $ Days Contract Price prior to this Change OrderContract Time prior to this Change Order Substantial Completion: $Final Completion: Net Increase (Decrease) of this Change OrderNet Increase (Decrease) of this Change Order ____ days for Substantial Completion $ .00 ____ days for Final Completion Contract Price with all approved Change OrdersContract Time with all approved Change Orders Substantial Completion: __________________ $ Final Completion: _______________________ RECOMMENDED: APPROVED: APPROVED: By _____________________ By _____________________ By _______________________ City Engineer City of Elk River EJCDC No. 1910-8-B (1996 Edition) Change Order 00671 - 1 East Fiber Extension Elk River, Minnesota Change Order Instructions A.General Information This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they Affect Price of Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a Change in the Contract Price or Contract Time, a Field Order may be used. B. Completing the Change Order Form Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or Both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to the time, cross out the part of the tabulation that does not apply. Change Order 00671 - 2 East Fiber Extension Elk River, Minnesota SECTION 00672 Withholding Affidavit for Contractors (FORM IC-134) The following Withholding Affidavit for Contractors form (IC-134), or the most current edition thereof, must be competed for each subcontractor and submitted to the Engineer before final payment can be made. Withholding Affidavit for Contractors 00672- 1 East Fiber Extension Elk River, Minnesota SECTION 00673 Certificate of Substantial Completion DATE OF ISSUANCE ______________________ OWNER City of Elk River CONTRACTOR TD & I Cable Maintenance Contract: East Fiber Extension This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To the City of Elk River (OWNER) And To (CONTRACTOR) The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on _________________________________ Date of Substantial Completion A tentative list of items to be completed or corrected is attached hereto. This list may not be all- inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR no later than ________________________. 00673 - 1 East Fiber Extension Elk River, Minnesota The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER: CONTRACTOR: The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by OWNER on _______________________, 2023 Date By: ____________________________, 2023 (Authorized Signature) CONTRACTOR accepts this Certificate of Substantial Completion on _____________, Date ____________________________ CONTRACTOR By: __________________________________________ (Authorized Signature) OWNER accepts this Certificate of Substantial Completion on _______________________ Date City of Elk River OWNER By: _______________________________________ (Authorized Signature) End of Section 00673 - 2 East Fiber Extension Elk River, Minnesota SECTION 00674 Contractor's Affidavit State of Minnesota Date:___________ The County of _________________ The City of __________________ , of _______________________, has furnished all labor and material entering into the East Fiber Extension project for the City of Elk River (Owner). , of _______________________, states further that Contractor has full knowledge of all obligations for such labor and materials which have entered into and become part of that certain project known and designated above, and Contractor further disposes and says that all debts and other obligations for such labor and materials have been fully and completely paid for in good and lawful money of the United States of American and that there are no suits for damages against them proceeding, prospective or otherwise, in consequence of their operations on the above said project. The said will hold the Owners, the City of Elk River, blameless of any and all Mechanic's Liens that may be hereafter entered or filed for record, so as to constitute charge against said premises for work or labor done or materials furnished by them. IN WITNESS WHEREOF, Contractor has heretofore put their hand and seal. SEAL Contractor's Authorized Agent I, , Notary Public in and for the above named County and State do hereby certify that personally known to me to be the affiant in the foregoing affidavit, personally appeared before me this day, and, having been duly sworn, deposes and say that the facts set forth in the above affidavit are true and correct. WITNESS my hand and seal this day of , 2023. my commission expires End of Section 00674 - 1 East Fiber Extension Elk River, Minnesota SECTION 00700 General Conditions 1. Definitions 16. Correction of Work 2. Additional Instructions and Detail 17. Subsurface Conditions Drawings 18. Suspension of Work, Termination, and 3. Schedules, Reports, and RecordsDelay 4. Drawings and Specifications19. Payments to Contractor 5. Shop Drawings 20. Acceptance of Final Payment as Release 6. Materials, Services and Facilities 21. Insurance 7. Inspection and Testing 22. Contract Security 8. Substitutions 23. Assignments 9. Patents24. Indemnification 10. Surveys, Permits, Regulations 25. Separate Contracts 11. Protection of Work, Property, Persons26. Subcontracting 12. Supervision by Contractor 27. Engineer's Authority 13. Changes in the Work28. Land and Rights-Of-Way 14. Changes in Contract Price 29. Guarantee 15. Time for Completion and Liquidated 30. Arbitration Damages 31. Taxes 1. Definitions 1.1 Wherever used in the Contract Documents, the following terms shall have the meanings indicated, and shall be applicable to both the singular and plural thereof: 1.2 Addenda- Written or graphic instruments issued prior to the execution of the Agreement which modify and interpret the Contract Documents, Drawings, and Specifications, by additions, deletions, clarifications, or corrections. 1.3 Bid -The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the work to be performed. 1.4 Bidder- Any person, firm or corporation submitting a Bid for the work. 1.5 Bonds - Bid, Performance and Payment Bonds and other instruments of surety, furnished by the Contractor and the Contractor's surety in accordance with the Contract Documents. 1.6 Change Order - A written order to the Contractor authorizing an addition, deletion, or revision in the work within the general scope of the Contract Documents, or authorizing an adjustment in the contract price or contract time. 00700 -1 General Conditions East Fiber Extension Elk River, Minnesota 1.7 Contract Documents -The Contract, including Advertisement for Bids, Information for Bidders, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond, Notice of Award, Notice to Proceed, Change Order, Drawings, Specifications, and Addenda. 1.8 Contract Price -The total monies payable to the Contractor under the terms and conditions of the Contract Documents. 1.9 Contract Time - The number of calendar days stated in the Contract Documents for the completion of the work. 1.10 Contractor-The person, firm, or corporation with whom the Owner has executed the Agreement. 1.11 Drawings-The parts of the Contract Documents which show the characteristics and scope of the work to be performed and which have been prepared or approved by the Engineer. May also be designated as "PLANS". 1.12 Engineer –(Section Omitted) 1.13 Field Order -A written order effecting a change in the work not involving an adjustment in the contract price or an extension of the contract time, issued by the Engineer to the Contractor during construction. 1.14 Notice of Award - The written notice of the acceptance of the Bid from the Owner to the successful Bidder. 1.15 Notice to Proceed - Written communication issued by the Owner to the Contractor authorizing him/her to proceed with the work and establishing the date for commencement of the work. 1.16 Owner-A public or quasi-public body or authority, corporation, association, partnership, or an individual for whom the work is to be performed. 1.17 Project - The undertaking to be performed as provided in the Contract Documents. 1.18 Resident Project Representative -The authorized representative of the Owner who is assigned to the project site or any part thereof. 1.19 Shop Drawings - All drawings, diagrams, illustration, brochures, schedules, and other data which are prepared by the Contractor, a subcontractor, manufacturer, supplier or distributor, which illustrate how specific portions of the work shall be fabricated or installed. 1.20 Specifications - A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards, and workmanship. 00700 -2 General Conditions East Fiber Extension Elk River, Minnesota 1.21 Subcontractor-An individual, firm, or corporation having a direct contract with Contractor or with any other subcontractor for the performance of a part of the work at the site. 1.22 Substantial Completion - That date certified by the Engineer when the construction of the Project or a specified part thereof is sufficiently completed, in accordance with the Contract Documents, so that the Project or specified part can be utilized for the purposes for which it is intended. 1.23 Supplemental General Conditions - Modifications and/or additions to the General Conditions or such requirements that may be imposed by applicable state laws. 1.24 Supplier - Any person or organization who supplies materials or equipment for the work, including the fabricated special design, but who does not perform labor at the site. 1.25 Work - All labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in the Project. 1.26 Written Notice -Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at their last given address, or delivered in person to said party or their authorized representative on the work. 2. Additional Instructions and Detail Drawings 2.1 The Contractor may be furnished additional instructions and detail drawings, by the Engineer, as necessary to carry out the work required by the Contract Documents. 2.2 The additional drawings and instructions thus supplied will become a part of the Contract Documents. The Contractor shall carry out the work in accordance with the additional detail drawings and instructions. 3. Schedules, Reports and Records 3.1 The Contractor shall submit to the Owner such schedule of quantities and costs, progress schedules, payrolls, reports, estimates, records and other data where applicable, as are required by the Contract Documents for the work to be performed. 3.2 Prior to the first partial payment estimate, the Contractor shall submit construction progress schedules showing the order in which the Contractor proposes to carry on the work, including dates at which the various parts of the work will be started, estimated date of completion of each part, and, as applicable: 3.2.1 The dates at which special detail drawings will be required; and 00700 -3 General Conditions East Fiber Extension Elk River, Minnesota 3.2.2 Respectivedates for submission of shop drawings, the beginning of manufacture, the testing and the installation of materials, supplies, and equipment. 3.3 The Contractor shall also submit a schedule of payments that the Contractor anticipates will be earned during the course of the work. 4. Drawings and Specifications 4.1 The intent of the drawings and specifications is that the Contractor shall furnish all labor, materials, tools, equipment, and transportation necessary for the proper execution of the work in accordance with the Contract Documents and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy or operation by the Owner. 4.2 In case of conflict between the drawings and specifications, the specifications shall govern. Figure dimensions on drawings shall govern over general drawings. 4.3 Any discrepancies found between the drawings and specifications and site conditions or any inconsistencies or ambiguities in the drawings or specifications shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk. 5. Shop Drawings 5.1 The Contractor shall provide shop drawings as may be necessary for the prosecution of the work as required by the Contract Documents. The Engineer shall promptly review all shop drawings. The Engineer's approval of any shop drawing shall not release the Contractor from responsibility for deviations from the Contract Documents. The approval of any shop drawing which substantially deviates from the Contract Documents shall be evidenced by a Change Order. 5.2 When submitted for the Engineer's review, shop drawings shall bear the Contractor's certification that he has reviewed, checked and approved the shop drawings, and that they are in conformance with the requirements of the Contract Documents. 5.3 Portions of the work requiring a shop drawing or sample submission shall not begin until the shop drawing or submission has been approved by the Engineer. A copy of each approved shop drawing and each approved sample shall be kept in good order by the Contractor at the site and shall be available to the Engineer. A copy of the approved shop drawings shall be provided to the Owner. 6. Materials, Services, and Facilities 6.1 It is understood that, except as otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, 00700 -4 General Conditions East Fiber Extension Elk River, Minnesota transportation, supervision, temporary construction of any nature, and all other services and facilities of any nature whatsoever necessary to execute, complete, and deliver the work within the specified time. 6.2 Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the work. Stored materials and equipment to be incorporated in the work shall be located so as to facilitate prompt inspection. 6.3 Manufactured articles, materials, and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer. 6.4 Materials, supplies, and equipment shall be in accordance with samples submitted by the Contractor and approved by the Engineer. 6.5 Materials, supplies, or equipment to be incorporated into the work shall not be purchased by the Contractor or subcontractor subject to a chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. 7. Inspection and Testing 7.1 All materials and equipment used in the construction of the Project shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the Contract Documents. 7.2 The Owner shall provide all inspection and testing services not required by the Contract Documents. 7.3 The Contractor shall provide at the Contractor's expense, the testing and inspection services required by the Contract Documents. 7.4 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any work to specifically be inspected, tested, or approved by someone other than the Contractor, the Contractor will give the Engineer timely notice of readiness. The Contractor will then furnish the Engineer the required certificates, testing, or approval. 7.5 Inspections, tests, or approvals by the Engineer or others shall not relieve the Contractor fromthe obligations to perform the work in accordance with the requirements of the Contract Documents. 7.6 The Owner, Engineer and the Engineer's representatives will at all times have access to the work. In addition, authorized representatives and agents of any participating federal or state agency shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials, and other relevant data and records. The Contractor will provide proper facilities for such access and observation of the work and also for any inspection or testing thereof. 00700 -5 General Conditions East Fiber Extension Elk River, Minnesota 7.7 If any work is covered contrary to the written instructions of the Engineer, it must, if requested by the Engineer, be uncovered for the Engineer's observation and replaced at theContractor's expense. 7.8 If the Engineer considers it necessary or advisable that covered work be inspected or tested by others, the Contractor, at the Engineer's request, will uncover, expose or otherwise make available for observation, inspection or testing as the Engineer may require, that portion of the work in question, furnishing all necessary labor, materials, tools, and equipment. If it is found that such work is defective, the Contractor will bear all expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction; if, however, such work is not found to be defective, the Contractor will be allowed an increase in the contract price or an extension of the contract time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and an appropriate Change Order shall be issued. 8. Substitutions 8.1 Whenever a material, article, or piece of equipment is identified on the drawings or specifications by reference to brand name or catalogue numbers, it shall be understood that this is referenced for the purpose of defining the performance or other salient requirements and that other products of equal capacities, quality and functions shall be considered. The Contractor may recommend the substitution of a material, article, or piece of equipment of equal substance and function for those referred to in the Contract Documents by reference to brand name or catalogue number, and if, in the opinion of the Engineer and Owner, such material, article, or piece of equipment is of equal substance and function to the specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential shall be deductible from the contract price and the Contract Documents shall be appropriately modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the contract price or contract time. 9.Patents 9.1 The Contractor shall pay all applicable royalties and license fees, and shall defend all suits or claims for infringement of any patent rights and save the Owner harmless from loss on account thereof, except that the Owner shall be responsible for such loss unless the Contractor promptly gives such information to the Engineer. 10. Surveys, Permits, Regulations 10.1 The Owner shall furnish all boundary surveys and establish all base lines for locating the principal component parts of the work together with a suitable number of bench marks adjacent to the work as shown in the Contract Documents. 00700 -6 General Conditions East Fiber Extension Elk River, Minnesota 10.2 The Contractor shall carefully preserve bench marks, reference points and stakes, and, in case of willful or careless destruction, shall be charged with the resulting expenseand shall be responsible for any mistake that may be caused by their unnecessary loss or disturbance. 10.3 Permits and licenses of a temporary nature necessary for the prosecution of the work shall be secured and paid for by the Contractor unless otherwise stated in the Supplemental General Conditions. Permits, licenses, and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Owner, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the Contract Documents are at variance therewith, the Contractor shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in Section 13, Changes In The Work. 11. Protection of Work, Property, and Persons 11.1 The Contractor will be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work. The Contractor will take all necessary precautions for the safety of and will provide the necessary protection to prevent damage, injury or loss to all employees on the work and other persons who may be affected thereby, all the work and all materials or equipment to be incorporated therein, whether in storage on or off the site, and other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation, or replacement in the course of construction. 11.2 The Contractor will comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction. The Contractor will erect and maintain, as required by the conditions and progress of the work, all necessary safeguards for safety and protection. The Contractor will notify owners of adjacent utilities when prosecution of the work may affect them. The Contractor will remedy all damage, injury or loss to any property caused, directly or indirectly, in whole or part, by the Contractor, any subcontractor or anyone directly or indirectly employed by any of them or anyone of whose acts any of them be liable, except damage orloss attributable to the fault of the Contract Documents or to the acts or omissions of the Owner, of the Engineer, or anyone employed by either of them or anyone for whose acts either of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of the Contractor. 11.3 In emergencies affecting the safety of persons or the work or property at the site or adjacent thereto, the Contractor, without special instructions or authorization from the Engineer or Owner, shall act to prevent threatened damage, injury or loss. The Contractor will give the Engineer prompt written notice of any significant changes in the work or deviations from the Contract Documents caused thereby, and a Change Order shall thereupon be issued covering the changes and deviations involved. 11.4 In order to protect the lives and health of its employees under the Contract, the Contractor shall comply with all pertinent provisions of the "Manual of Accident Prevention in Construction" issued by the Associated General Contractors of America, Inc., and shall maintain an accurate record of all cases 00700 -7 General Conditions East Fiber Extension Elk River, Minnesota of death, occupational disease, and injury requiring medical attention or causing loss of time from work, arising out of and in the course of employment of work under the Contract. 11.5 The Contractor alone shall be responsible for the safety, efficiency, and adequacy of its plant, appliances, and methods, and for any damage which may result from their failure of their improper construction,maintenance, or operation. 12. Supervision by Contractor 12.1 TheContractor shall supervise and direct the work. He will be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor will employ and maintain on the work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor as the Contractor's representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be as binding as if given to the Contractor. The supervisor shall be present on the site at all times as required to perform adequate supervision and coordination of the work. 13. Changes in the Work 13.1 The Owner may at any time, as the need arises, order changes within the scope of the work without invalidating the Agreement. If such changes increase or decrease the amount due under the Contract Documents, or the time required for performance of the work, an equitable adjustment shall be authorized by Change Order. 13.2 The Engineer, also, may at any time, by issuing a Field Order, make changes in the details of the work. The Contractor shall proceed with the performance of any changes in the work so ordered by the Engineer unless the Contractor believes that such field order entitles the Contractor to a change in contract price or time, or both, in which event the Contractor shall give the Engineer written notice thereof within seven (7) days after the receipt of the ordered change. Thereafter, the Contractor shall document the basis for the change in contract price or time within thirty (30) days. The Contractor shall not execute such changes pending the receipt of an executed Change Order or further instruction from the Owner. 14.Changes inContract Price 14.1 The contract price may be changed only by a Change Order. The value of any work covered by a Change Order or of any claim for increase or decrease in the contract price shall be determined by one or more of the following methods in the order of precedence listed below: a) Unit prices previously approved b) An agreed lump sum 14.2 The contract Change Order will include extra work, work for which quantities have been altered from those shown in the bidding schedule, as well as decreases or increases in the quantities of installed units which are different than those shown in the bidding schedule because of final measurements. All 00700 -8 General Conditions East Fiber Extension Elk River, Minnesota changes should be recorded on a Change Order as they occur so that they may be included in the partial payment estimate. 15. Time for Completion and Liquidated Damages 15.1 The date of beginning and the time for completion of the work are essential conditions of the Contract Documents, and the work embraced shall be commenced on the date specified in the Notice to Proceed. 15.2 The Contractor will proceed with the work at such rate of progress to insure full completion within the contract time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the contract time for the completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work. 15.3 If the Contractor shall fail to complete the work within the contract time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages as specified in the Bid for each calendar day that the Contractor shall be in default after the time stipulated in the Contract Documents. 15.4 The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following, and the Contractor has promptly given written notice of such delay to the Owner or Engineer. 15.4.1 To any preference, priority or allocation order duly issued by the Owner. 15.4.2 Tounforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, or of the public enemy, acts of the Owner, acts of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. 15.4.3 To any delays of subcontractors occasioned by any of the causes specified in paragraphs 15.4.1 and 15.4.2 of this article. 16. Correction of Work 16.1 The Contractor shall promptly remove from the premises all work rejected by the Engineer for failure to comply with the Contract Documents whether incorporated in the construction or not, and the Contractor shall promptly replace and re-execute the work in accordance with the Contract Documents and without expense to the Owner and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement. 00700 -9 General Conditions East Fiber Extension Elk River, Minnesota 16.2 All removal and replacement work shall be done at the Contractor's expense. If the Contractor does not take action to remove such rejected work within ten (10) days after receipt of written notice, the Owner may remove such work and store the materials at the expense of the Contractor. 17.Subsurface Conditions 17.1 The Contractor shall promptly, and before such conditions are disturbed except in the event of an emergency, notify the Owner by written notice of: 17.1.1 Subsurface or latent physical conditionsat the site differing materially from those indicated in the Contract Documents, or 17.1.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. 17.2 The Owner shall promptly investigate the conditions, and if it is found that such conditions do so materially differ and cause an increase or decrease in the cost of, or in the time required for, performance of the work, an equitable adjustment shall be made and the Contract Documents shall be modified by a Change Order. Any claim of the Contractor for adjustment hereunder shall not be allowed unless the required written notice has been given; provided that the Owner may, if the Owner determines the facts to justify; consider and adjust any such claims asserted before the date of final payment. 18. Suspension of Work, Termination, and Delay 18.1 The Owner may suspend the work or any portion thereof for a period of not more than ninety (90) days or such further time as agreed upon by the Contractor, by written notice to the Contractor and the Engineer which shall fix the date on which work shall be resumed. The Contractor will resume that work on the date so fixed. The Contractor will be allowed an increase in the contract price or an extension of the contract time, or both, directly attributable to any suspension. 18.2 If the Contractor is adjudged bankrupt or insolvent, or makes a general assignment for the benefit of its creditors, or if a trustee or receiver is appointed for the Contractor or for any of its property, or if Contractor files a petition to take advantage of any debtor's act, or to reorganize under the bankruptcy or applicable laws, or repeatedly fails to supply sufficient skilled workers or suitable materials or equipment, or repeatedly fails to make prompt payments to subcontractors or for labor, materials or equipment, or disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction of the work, or disregards the authority of the Engineer, or otherwise violates any provision of the Contract Documents, then the Owner may, without prejudice to any other right or remedy and after giving the Contractor and its surety a minimum of ten (10) days from delivery of a written notice, terminate the services of the Contractor and take possession of the project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor, and finish the work by whatever method the Owner may deem expedient. In such case, the Contractor shall not 00700 - 10 General Conditions East Fiber Extension Elk River, Minnesota be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price exceeds the direct and indirect costs of completing the project, including compensation for additional professional services, such excess shall be paid to the Contractor. If such costs exceed such unpaid balance, the Contractor will pay the difference to the Owner.Such costs incurred by the Owner will be determined by the Engineer and incorporated in a Change Order. 18.3 Where the Contractor's services have been so terminated by the Owner, said termination shall not affect any right of the Owner against the Contractor then existing or which may thereafter accrue. Any retention or payment of monies by the Owner due the Contractor will not release the Contractor from compliance with the Contract Documents. 18.4 After ten (10) days from delivery of a written notice to the Contractor and the Engineer, the Owner may, without cause and without prejudice to any other right or remedy, elect to abandon the project and terminate the Contract. In such case, the Contractor shall be paid for all work executed and any expense sustained plus reasonable profit. 18.5 If, through no act or fault of the Contractor, the work is suspended for a period of more than ninety (90) days by the Owner, or under an order of court or other public authority, or the Engineer fails to act on any request for payment within thirty (30) days after it is submitted, or the Owner fails to pay the Contractor substantially the sum approved by the Engineer or awarded by arbitrators within thirty (30) days of its approval and presentation, then the Contractor may, after (10) days from delivery of a written notice to the Owner and the Engineer terminate the Contract and recover from the Owner payment for all work executed and all expenses sustained. In addition and in lieu of terminating the Contract, if the Engineer has failed to act on a request for payment or if the Owner has failed to make any payment as aforesaid, the Contractor may upon ten (10) days written notice to the Owner and the Engineer stop the work until paid all amounts then due, in which event and upon resumption of the work, Change Orders shall be issued for adjusting the contract price or extending the contract time or both to compensate for the costs and delays attributable to the stoppage of the work. 18.6 If the performance of all or any portion of the work is suspended, delayed, or interrupted as a result of a failure of the Owner or Engineer to act within the time specified in the Contract Documents, or if no time is specified, within a reasonable time, an adjustment in the contract price or an extension of the contract time, or both, shall be made by Change Orders to compensate the Contractor for the costs and delays necessarily caused by the failure of the Owner or Engineer. 19. Payment to Contractor 19.1 At least ten (10) days before each progress payment falls due (but not more often than once a month), the Contractor will submit to the Engineer a partial payment estimate filled out and signed by the Contractor covering the work performed during the period covered by the partial payment estimate and supported by such data as the Engineer may reasonably require. If payment is requested on the basis of materials and equipment not incorporated in the work but delivered and suitably stored at or near the site, the partial payment estimate shall also be accompanied by such supporting data, satisfactory to the Owner, as will establish the Owner's title to the material and equipment and protect 00700 - 11 General Conditions East Fiber Extension Elk River, Minnesota the Owner's interest therein, including applicable insurance. The Engineer will, within ten (10) days after receipt of each partial payment estimate, either indicate in writing approval of payment, and present the partial payment estimate to the Owner, or return the partial payment estimate to the Contractor indicating in writing the reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the partial payment estimate. The Owner will, within ten (10) days of presentation of an approved partial payment estimate, pay the Contractor a progress payment on the basis of the approved partial payment estimate less the retainage. The retainage shall be an amount equal to 5% of said estimate. At any time when the progress of the work is not satisfactory, additional amounts may be retained. Upon substantial completion of the work, any amount retained may be paid to the Contractor. When the work has been substantially completed except for work which cannot be completed because of weather conditions, lack of materials, or other reasons which in the judgment of the Owner are valid reasons for non-completion, the Owner may make additional payments, retaining at all times an amount sufficient to cover the estimated cost of the work still to be completed. 19.1.1 The Engineer may disapprove or, on account of subsequently discovered evidence, nullify the whole or part of the approved partial payment estimate to such extent as may be necessary to protect the Owner from loss, on account of: (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating probable filing of claims. (c) Failure of Contractor to make payment properly to subcontracts or for material or labor. (d) A reasonable doubt that the work can be completed for the balance then unpaid. (e) Damage to another Contractor. (f) Performance of work in violation of the terms of the Contract Documents. 19.1.2 Where work on unit price items is substantially complete but lack clean-up and/or corrections ordered by the Engineer, amounts shall be deducted from unit prices in partial payment estimates to amply cover such clean-up and corrections. 19.1.3 When the grounds for withholding or reducing partial payment defined in 19.1.1 and 19.1.2 are corrected, payment shall be made for the amounts withheld because of them. 19.2 The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site. 19.3 Prior to substantial completion, the Owner, with the approval of the Engineer and with the concurrence of the Contractor, may use any completed or substantially completed portions of the work. Such use shall not constitute an acceptance of such portions of the work. 19.4 The Owner shall have the right to enter the premises for the purpose of doing work not covered by the Contract Documents. This provision shall not be construed as relieving the Contractor of the sole responsibility for the care and protection of the work, or the restoration of any damaged work except such as may be caused by agents or employees of the Owner. 00700 - 12 General Conditions East Fiber Extension Elk River, Minnesota 19.5 Upon completion and acceptance of the work, the Engineer shall issue a certificate attached to the final payment request that the work has been accepted under the conditions of the Contract Documents. The entire balance found to be due the Contractor, including the retained percentages, but except such sums as may be lawfully retained by the Owner, shall be paid to the Contractor within thirty (30) days of completion and acceptance of the work. 19.6 The Contractor will indemnify and save the Owner or the Owner's agents harmless from all claims growing out of the lawful demand of subcontractors, laborers, workers, mechanics, material, men, and furnishers or machinery and parts thereof, equipment, tools and all supplies incurred in the furtherance of the performance of the work. The Contractor shall, at the Owner's request, furnish satisfactory evidence that all obligations of the nature designated above have been paid, discharged or waived. If the Contractor fails to do so the Owner may, after having notified the Contractor, either pay unpaid bills or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the Contractor shall be resumed in accordance with the terms of the Contract Documents, but in no event shall the provisions of this sentence be construed to impose any obligations upon the Owner to either the Contractor, the Contractor's surety, or any third party. In paying any unpaid bills of the Contractor, any payment so made by the Owner shall be considered as a payment made under the Contract Documents by the Owner to the Contractor and the owner shall not be liable to the Contractor for any such payments made in good faith. 19.7 If the Owner fails to make payment thirty (30) days after approval by the Engineer, in addition to other remedies available to the Contractor, there shall be added to each such payment interest at the maximum legal rate commencing on the first day after said payment is due and continuing until the payment is received by the Contractor. 20.Acceptance of Final Payment as Release 20.1 The acceptance by the Contractor of final payment shall be and shall operate as a release to the Owner of all claims and all liability to the Contractor other than claims in stated amounts as may be specifically excepted by the Contractor for all things done or furnished in connection with this work and for every act and neglect of the Owner and others relating to or arising out of this work. Any payment, however, final or otherwise, shall not release the Contractor or its sureties from any obligations under the Contract Documents or the Performance and Payment Bonds. 21. Insurance 21.1 The Contractor shall purchase and maintain such insurance as will protect it from claims set forth below whichmay arise out of, or result from, the Contractor's execution of the work, whether such execution be by the Contractor, any subcontractor, or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 21.1 Claims under Workers’ Compensation, disability benefit, and other similar employee benefit acts; 00700 - 13 General Conditions East Fiber Extension Elk River, Minnesota 21.1.2 Claims for damages because of bodily injury, occupational sickness or disease, or death of employees; 21.1.3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than employees; 21.1.4 Claims for damages insured by usual personal injury liability coverage which are sustained (1) by any person as a result of an offense directly or indirectly related to the employment of such person by the Contractor, or (2) by any other person; and 21.1.5 Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 21.2 Certificates of Insurance acceptable tothe Owner shall be filed with the Owner prior to commencement of work. These Certificates shall contain a provision that coverage afforded under the policies will not be cancelled, materially changed, or not renewed unless at least thirty (30) days prior written notice has been given to the Owner. All insurance certificates shall list the Owner as an additional named insured and the project name. 21.2.1 The Certificates of Insurance shall specifically provide that the contractual liability as set forth in Section 24, INDEMNIFICATION, has been insured and that coverage is included for collapse and underground hazards and completed operations. In the event that conditions are encountered during the progress of the work which requires blasting, no such blasting shall be undertaken until coverage for blasting has been obtained and certificates issued therefor. 21.3 The Contractor shall procure and maintain, at the Contractor's own expense, during the contract time, Liability Insurance as hereinafter specified: 21.3.1 Contractor's General Public Liability and Property Damage Insurance including vehicle coverage issued to the Contractor and protecting the Contractor from all claims for personal injury, including death, and all claims for destruction of or damage to property, arising out of or in connection with any operations under the Contract Documents, whether such operations be by the Contractor or by any subcontractor employed by the Contractor or anyone directly or indirectly employed by the Contractor or by a subcontractor employed by the Contractor. Insurance shall be written with a limit of liability of not less than $600,000 for all damages arising out of bodily injury, including death, at any time resulting therefrom, sustained by any one person in any one accident, and a limit of liability of not less than $600,000 aggregate for any such damages sustained by two or more persons in any one accident. Insurance shall be written with a limit of liability of not less than $200,000 for all property damage sustained by any one person in any one accident; and a limit of liability of not less than $200,000 aggregate for any such damage sustained by two or more persons in any one accident. 21.3.2 The Contractor shall acquire and maintain, if applicable, Fire and Extended Coverage Insurance upon the project to the full insurable value thereof for the benefit of the Owner, the Contractor, and 00700 - 14 General Conditions East Fiber Extension Elk River, Minnesota subcontractors as their interest may appear. This provision shall in no way release the Contractor or Contractor's surety from obligations under the Contract Documents to fully complete the project. 21.4 The Contractor shall procure and maintain, at the Contractor's own expense, during the contract time, in accordance with the provisions of the laws of the statein which the work is performed, Workers’Compensation Insurance, including occupational disease provisions, for all of the Contractor's employees at the site of the project and in case any work is sublet, the Contractor shall require such subcontractor similarly to provide Workers’ Compensation Insurance, including occupational disease provisions for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. In case any class of employees engaged in hazardous work under this contract at the site of the project is not protected under Workers’ Compensation statute, the Contractor shall provide, and shall cause each subcontractor to provide, adequate and suitable insurance for the protection of its employees not otherwise protected. 21.5 The Contractor shall secure, if applicable, "All Risk" type Builder's Risk Insurance for work to be performed. Unless specifically authorized by the Owner, the amount of such insurance shall not be less than the contract price totaled in the Bid. The policy shall cover not less than the losses due to fire, explosion, hail, lightning, vandalism, malicious mischief, wind, collapse, riot, aircraft, and smoke during the contract time, and until the work is accepted by the Owner. The policy shall name as the insured the Contractor, and the Owner. 21.6 Owner's Protective Liability and Property Damage Insurance: The Contractor shall take out and maintain Owner's Protective Liability and Property Damage Insurance in the name of the Owner and the Engineerinsuring against bodily injury, including accidental death, and property damage liability in the limits set forth above under "Public Liability Insurance" for which they may become legally obligated to pay as damages sustained by any persons, caused by accident and arising out of operations performed for the named insured by independent contractors and general supervision thereof. 22.Contract Security 22.1 The Contractor shall within ten (10) days after the receipt of the Notice of Award, furnish the Owner with a Performance Bond and a Payment Bond in penal sums equal to the amount of the contract price, conditional upon the performance by the Contractor of all undertakings, covenants, terms, conditions and agreements of the Contract Documents, and upon the prompt payment by the Contractor to all persons supplying labor and materials in the prosecution of the work provided by the Contract Documents. Such bonds shall be executed by the Contractor and a corporate bonding company licensed to transact such business in the state in which the work is to be performed and named on the current list of "Surety Companies Acceptable on Federal Bonds" as published in the Treasury Department Circular Number 570. The expense of these Bonds shall be borne by the Contractor. If at any time a surety on any such Bond is declared a bankrupt or loses its right to do business in the state in which the work is to be performed or is removed from the list of Surety Companies accepted on Federal Bonds, Contractor shall within ten (10) days after notice from the Owner to do so, substitute an acceptable Bond (or Bonds) in such form and sum and signed by such other sureties as may be satisfactory to the Owner. The premiums on such Bond shall be paid by the Contractor. No further 00700 - 15 General Conditions East Fiber Extension Elk River, Minnesota payment shall be deemed due nor shall be made until the new surety or sureties shall have furnished an acceptable Bond to the Owner. 23.Assignments 23.1 Neither the Contractor nor the Owner shall sell, transfer, assign, or otherwise dispose of the Contract or any portion thereof, or of any right, title, or interest therein, or any obligation thereunder, without the written consent of the other party. 24. Indemnification 24.1 The Contractor will indemnify and hold harmless the Owner and the Engineer and their agents and employees from and against all claims, damages, lossesand expenses, including attorney's fees arising out of or resulting from the performance of the work, provided that any such claims, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom; and is caused in whole or in part by any negligent or willful act or omission of the Contractor, and subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. 24.2 In any and all claims against the Owner or the Engineer, or any of their agents or employees of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under Workers’ Compensation acts, disability benefit acts, or other employee benefit acts. 24.3 The obligation of the Contractor under this paragraph shall not extend to the liability of the Engineer, its agents or employees arising out of the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifications. 25. Separate Contracts 25.1 The Owner reserves the right to let other contracts in connection with this project. The Contractor shall afford other Contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate the work with theirs. If the proper execution or results of any part of the Contractor's work depends upon the work of any other Contractor, the Contractor shall inspect and promptly report to the Engineer any defects in such work that render it unsuitable for such proper execution and results. 25.2 The Owner may perform additional work related to the project or the Owner may let other contracts containing provisions similar to these. The Contractor will afford the other Contractors who are parties to such Contracts (or the Owner, if the Owner is performing the additional work) reasonable opportunity for the introduction and storage of materials and equipment and the execution of work, and shall properly connect and coordinate the work with theirs. 00700 - 16 General Conditions East Fiber Extension Elk River, Minnesota 25.3 If the performance of additional work by other Contractors or the Owner is not noted in the Contract Documents prior to the execution of the Contract, written notice thereof shall be given to the Contractor prior to starting any such additional work. If the Contractor believes that the performance of such additional work by the Owner or others involves it in additional expense or entitles it to an extension of the contract time, the Contractor may make a claim thereof as provided in Sections 14 and 15. 26.Subcontracting 26.1 The Contractor may utilize the services of specialty subcontracts on those parts of the work which, under normal contracting practices, are performed by specialty subcontractors. 26.2 The Contractor shall not award work to subcontractor(s), in excess of fifty (50%) percent of the contract price, without prior written approval of the Owner. 26.3 The Contractor shall be fully responsible to the Owner for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as the Contractor is for the acts and omissions of persons directly employed by it. 26.4 The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the Contract Documents insofar as applicable to the work of subcontractors and give the Contractor the same power as regards terminating any subcontract that the Owner may exercise over the Contractor under any provision of the Contract Documents. 26.5 Nothing contained in this Contract shall create any contractual relation between any subcontractor and the Owner. 27.Engineer's Authority 27.1 The Engineer shall act as the Owner's representative during the construction period, shall decide questions which may arise as to quality and acceptability of materials furnished and work performed, and shall interpret the intent of the ContractDocuments in a fair and unbiased manner. The Engineer will make visits to the site and determine if the work is proceeding in accordance with the Contract Documents. 27.2 The Contractor will be held strictly to the intent of the Contract Documents in regard to the quality of materials, workmanship, and execution of the work. Inspections may be at the factory or fabrication plant of the source of material supply. 27.3 The Engineer will not be responsible for the construction means, controls, techniques, sequences, procedures, or construction safety. 00700 - 17 General Conditions East Fiber Extension Elk River, Minnesota 27.4The Engineer shall promptly make decisions relative to interpretations of the Contract Documents. 28. Land and Rights-Of-Way 28.1 Prior to issuance of Notice to Proceed, the Owner shall obtain all land and rights-of-way necessary for carrying out and for the completion of the work to be performed pursuant to the Contract Documents, unless otherwise mutually agreed. 28.2 The Owner shall provide to the Contractor information which delineates and describes the lands owned and rights-of-way acquired. 28.3 The Contractor shall provide at its own expense and without liability to the Owner any additional land and access thereto that the Contractor may desire for temporary construction facilities, or for storage of materials. 29. Guarantee 29.1 The Contractor shall guarantee all materials and equipment furnished and work performed for a period of two (2) years from the date of substantial completion. The Contractor warrants and guarantees for a period of two (2) yearsfrom the date of substantial completion of the system that the completed system is free from all defects due to faulty materials or workmanship and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of the damage of other parts of the system resulting from such defects. The Owner will give notice of observed defects with reasonable promptness. In the event that the Contractor should fail to make such repairs, adjustments, or other work that may be made necessary by such defects, the Owner may do so and charge the Contractor the cost thereby incurred. The Performance Bond shall remain in full force and effect through the guarantee period. 30. Arbitration 30.1 All claims, disputes and other matters in question arising out of, or relating to, the contract documents or the breach thereof, except for claims which have been waived by the making and acceptance of final payment as provided by Section 20, may be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association provided that the Owner and the Contractor mutually agree by separate instrument to arbitrate such claims, disputes and matters in question. This agreement to arbitrate shall be specifically enforceable under the prevailing arbitration law. The award rendered by the arbitrators shall be final, and judgment may be entered upon it in any court having jurisdiction thereof. 30.2 Notice of the demand for arbitration shall be filed in writing with the Owner party to the Contract Documents and with the American Arbitration Association and a copy shall be filed with the Engineer. Demand for arbitration shall in no event be made on any claim, dispute, or other matter in question which would be barred by the applicable statue of limitations. 00700 - 18 General Conditions East Fiber Extension Elk River, Minnesota 30.3 The Contractor will carry on the work and maintain the progress schedule during any arbitration proceedings, unless otherwise mutually agreed in writing. 31.Taxes 31.1 The Contractor will pay all sales, consumer, use and other similar taxes required by the laws of the place where the work is performed. 00700 - 19 General Conditions East Fiber Extension Elk River, Minnesota SECTION 00800 Supplement to General Conditions General These supplementary General Conditions make additions, deletions, or revisions to the General Conditions as indicated herein. All provisions, which are not so amended or supplemental, remain in full force and effect. Terms used in these Supplementary General Conditions which are defined in the General Conditions have the meanings assigned to them in the General Conditions. 1. Definitions Add the following definitions to Article 1: Conflict: A case where an item of Work is shown or specified differently in two or more places in the Contract Documents. An item of Work shown in one portion of the Contract Documents but not in another is not a conflict. Engineer: Justin Femrite P.E., Elk River City Engineer Address: 13065 Orono Parkway Elk River, MN 55330-2846 Phone: 763.635.1051 Email: jfemrite@ElkRiverMN.gov Furnish: To deliver to the job site or other specified location any item, equipment or material or labor. Holidays: Legal holidays designated by the State or specifically identified as follows: For general scheduling information, in the City of Elk River, Minnesota, holidays occur on the first of January, commonly known as New Year’s Day; the third Monday of February, known as President’s Day; the last Monday in May, known as Memorial Day; the Fourth Day of July, known as Independence Day; the first Monday in September, known as Labor Day; the eleventh day of November, known as Veteran’s Day; the fourth Thursday of November, known as Thanksgiving Day; the Friday after Thanksgiving; Christmas Eve at noon and the twenty-fifth day of December, known as Christmas Day. When an official holiday falls on a Sunday, the following Monday shall be designated as a substitute holiday, and observed as an official holiday. When an official holiday falls on a Saturday, the preceding Friday shall be designated as a substitute holiday, and observed as an official holiday. Supplementary General Conditions 00800-1 East Fiber Extension Elk River, Minnesota Inspect: The act of observing, checking, or verifying that materials provided or Work furnished under this Contract comply with the general intent of the project Contract documents. Install: Placing, erecting, or constructing complete in place any item, equipment, or material. Provide: Furnish and install, complete in place. Punch List: List of incomplete items of Work and of items of Work which are not in conformance with the Contract. The list will be prepared by the Engineer’s representative when the Contractor (1) notifies the Engineer’s representative in writing that the Work has been completed in accordance with the contract and (2) requests in writing that the Owner accept the Work. Shall: Refers to actions by either the Contractor or the Owner and means that Contractor or Owner has entered into a covenant with the other party to do or perform the action. Submittals: The information that is specified for submission to the Engineer in accordance with Division 1 of the Project Manual. 2. Additional Instructions and Detail Drawings Replace Section 2.1 with the following: 2.1 The Owner shall furnish to the Contractor six copies of the Contract Documents. Additional quantities of the Contract Documents will be furnished at reproduction cost. 10. Surveys, Permits, Regulations Add the following section to Article 10: 10.4 The Contractor shall obtain all necessary federal, state, and local permits required for any dewatering and stormwater discharges necessary during construction. The Contractor shall also provide all monitoring and test reporting relating to the discharges. 12. Supervision by Contractor Add the following section to Article 12: 12.2 Contractor shall maintain a qualified and responsible person available 24 hours per day, seven days per week to respond to emergencies which may occur after hours. Contractor shall provide to Engineer the phone number and/or paging service of this individual. 15. Time for Completion and Liquidated Damages Replace Section 15.3 with the following: Supplementary General Conditions 00800-2 East Fiber Extension Elk River, Minnesota 15.3 Owner and the Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the time specified in the Contract Documents, plus any extensions of time granted by the Owner. They also recognize the delays, expense, and difficulties involved in proving in a legal preceding the actual loss suffered by the Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, the Owner and the Contractor agree that as liquidated damages for delay (but not as a penalty) the Contractor shall pay the Owner TWO HUNDRED DOLLARS ($200.00) for each day that expires after the completion time specified in Division S as may be adjusted by executed Contract Documents. 19. Payment to Contractor Delete section 19.7 from Article 19. Add the following sections to Article 19: 19.1.4 The Owner shall retain from each monthly payment 5% of the amount which is determined to be due according to the recommendation of the Engineer. The retainage shall constitute a fund for the payment of claims for materials furnished and labor performed on the project and will be held by the Owner. Replace Section 19.5 with the following: 19.5 State law provides that the final estimate will be made within 90 days after completion of all work required under this contract. If, however, the total value of the Contract exceeds $2,000,000, the 90-day requirement will not apply and the time allowed for making such final estimate shall be 180 days after the work under this Contract has been, in all things, completed to the satisfaction of the Engineer. Add the following sections to Article 19: 19.8 Paymentshall be made to subcontractors within ten (10) day of the CONTRACTOR’s receipt of payment from the OWNERfor all undisputed services provided by the subcontractor. Contractor shall pay subcontractor interest, at a rate of 1.5% per month, for any undisputed amounts not paid within the above mentioned timeframe. 21. Insurance The limits of liability for the insurance required by Section 21 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Law and Regulations: Supplementary General Conditions 00800-3 East Fiber Extension Elk River, Minnesota A.Workers’ Compensation 1. State: Statutory 2. Applicable Federal Statutory 3. Employer’s Liability $500,000Each Occurrence 4. Contractor agrees to waive all rights of subrogation against the Owner, the Engineer, and their Subconsultants, employees, officer and directors, for Work performed under Contract. 5. Minimum insurance requirements are listed below: Contractor’s Liability Insurance: Workers’ Compensation: Statutory Requirements Employer’s Liability: Each accident $1,000,000 Each disease$1,000,000 General Liability: Bodily injury per occurrence/aggregate limit $1,000,000 Property damage per occurrence/aggregate limit $1,000,000 Automobile: Bodily injury per occurrence/aggregate limit $1,000,000 Property damage per occurrence/aggregate limit $1,000,000 Minimum total Umbrella Coverage$3,000,000 B. Comprehensive General Liability: 1. Combined Single Unit $1,000,000 Each Occurrence $1,000,000 Annual Aggregate a. Products/Completed Operations $500,000Each Occurrence $500,000Annual Aggregate b. Personal injury $1,000,000 Each Occurrence $1,000,000 Annual Aggregate or 2. Bodily injury $1,000,000 Each Occurrence $2,000,000 Annual Aggregate Property damage $1,000,000 Each Occurrence Supplementary General Conditions 00800-4 East Fiber Extension Elk River, Minnesota $2,000,000 Annual Aggregate 3. If policies are written on a claims-made basis, certificate should so specify and policies continue in force for 1 year after completion of project. The retro date of the coverage must also be listed. 4. Policies shall include premises/operations, products, completed operations, independent contractors, owners and contractors protective, explosion, collapse, underground hazard, broad form contractual, personal injury with employment exclusion deleted, and broad form property damage. 5. The Contractor’s Comprehensive General Liability Insurance policy shall be endorsed to add the Owner as additional insured. The Contractual Liability insurance shall be written so as to cover the Indemnification Clause. C. Comprehensive Automobile Liability (including owned, hired, and non-owned vehicles): 1. Bodily injury $1,000,000 Each Person $1,000,000 Each Occurrence 2. Property damage: $1,000,000 Each Occurrence or combined single limit of $2,000,000 All policies shall provide for 30 days’ written notice prior to any cancellation or non-renewal of insurance policies required under Contract. “Will endeavor” and “but failure to mail such notice shall impose no obligation or liability of any kind upon the Company, its agents, or representatives” wording will be deleted from certificates. 22. Contract Security Add the following section to Article 22: 22.2 Bonds The Contractor shall furnish a satisfactory Performance Bond in the amount of 100 percent of the Contract Price and a satisfactory Payment Bond in the amount of 100 percent of the Contract Price as security for the faithful performance and payment of all the Contractor obligations under the Contract Documents. 26. Subcontracting Replace Section 26.2 with the following: Supplementary General Conditions 00800-5 East Fiber Extension Elk River, Minnesota 26.2 The Contractor shall perform not less than 50 percent of the Work with its own forces (i.e., without subcontracting). The 50 percent requirement shall be understood to refer to the Work, the value of which totals not less than 50 percent of the Contract Price. 31. Taxes Add the following section to Article 31: 31.2 The tax codes of the State of Minnesota require the Contractor to pay Sales or Use Tax on material used in the construction. All Contractors shall prepare and require their Subcontractors to prepare, sign and acknowledge before a Notary Public, Department of Revenue Forms listing their respective expenditures for all materials that become an integral part of the completed project; the purchase price, the amount of Sales or Use Tax paid, the names of the material suppliers, and all other information required to complete said forms. All Contractors shall file with the Owner executed copies of these forms covering all material incorporated by them or their Subcontractors. Receipt of said executed forms by the Owner shall be a prerequisite to final payment of retained percentages of contract price to the Contractor. End of Section Supplementary General Conditions 00800-6 East Fiber Extension Elk River, Minnesota Division S S-1PROJECT DESCRIPTION This project aims to provide city fiber infrastructure to the east side of Highway 169 for current and future facilities. S-2 Personnel S-2.1 Owner The Owner of the projects, entitled East Fiber Extension, is the City of Elk River. Correspondence should be addressed to: Mr. Justin Femrite, P.E. City of Elk River 13065 Orono Parkway Elk River, MN 55330 Phone: 763.635.1051 Email: jfemrite@ElkRiverMN.gov S-3 Project Schedule Construction of the East Fiber Extensionwill be as follows: Shall be completed before October 1, 2024. Once work has begun on the contract, it shall progress continuously and be completed within one month of the start date. Within ten (10) days of executing the Contract, and in any case by the time of the preconstruction conference, the Contractor shall submit a schedule for commencement and completion of the work. This schedule shall include an anticipated partial pay estimate schedule and shall be reviewed by the Owner and the Engineer. The project schedule shall be updated by the Contractor upon request of the Engineer. S-4 Guarantee The Contractor shall guarantee all materials and equipment furnished and work performed for a period of two (2) years from the date of substantial completion. The Contractor warrants and guarantees for a period of two(2) yearsfrom the date of substantial completion of the system, that the completed system is free from all defects due to faulty materials or workmanship, and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs, adjustments, or other work that may be necessary by such defects. In the event that the Contractor should fail to make such repairs, adjustments, or other work that may be necessary by such defects, the Owner may do so and charge the Contractor the cost thereby Division S S-1 East Fiber Extension Elk River, Minnesota incurred. The Performance Bond shall remain in fully force and effect through the guarantee period. S-5 Scope of Work The specifications, together with the plans, describe in detail the work to be completed on the project. The Contractor shall be responsible for all work and its proper completion except as explicitly noted. All work shall be completed in accordance with the pertinent federal, state, and local codes and ordinances. In addition to the construction, the Contractor shall protect, maintain, repair, and restore all subsurface and overhead structures directly or indirectly disturbed, damaged, or affected by his operation. S-6 Codes and Standards Reference to codes and standards established by federal, state, and local agencies, or the professional and trade societies and associations shall be to the latest edition at the time of contract award. When conflicting information is given, the most restrictive shall apply. Any questions of intent will be determined by the Engineer upon written request by the Contractor. S-7 “Or Equal” Cause Whenever a required material or article is shown on the Plans or in the Specifications by using the name of a product or of a particular manufacturer, it is to be understood that other products or materials which will adequately perform the required function may be considered equal and satisfactory in the Engineer’s opinion. A comparable product shall not be purchased or installed without the Engineer’s approval. A “Contract Change Order” shall be used if the Contract is to be modified. S-8 Additional Costs Incurred If the Contractor feels that additional compensation should be paid due to an event or condition that was unknown or unforeseen at the time the contract was awarded, the Contractor shall notify the Engineer in writing of the event or conditions prior to taking any action. Any additional compensation must be agreed upon by all parties involved including, but not limited to, the Contractor, City, and Engineer. Any additional compensation made shall be made through the use of a change order S-9 Public Safety The Contractor shall take the necessary precautions to protect the public and employees from injury by hazardous circumstances by providing barricades, warning signs, flashers, and other safety aids. The costs associated with all such items shall be considered incidental to the project. Division S S-2 East Fiber Extension Elk River, Minnesota S-10 Project Storage Area The City will provide material storage at the City Garage, 19000 Proctor Road. The Contractor may choose to locate his own storage area and acquire permission from the appropriate parties to store equipment and materials. The Contractor shall be responsible for restoring the storage area back to its original condition. S-11 Traffic Control All traffic control devices (construction signs, barricades and barricade weights, flaggers, warning lights, cones, drums, trailers, pavement markings, flagmen, etc.) shall conform and be installed in accordance to the "Minnesota Manual on Uniform Traffic Control Devices" (MMUTCD) and Part VI, "Field Manual for Temporary Traffic Control Zone Layouts", the "Guide to Establishing Speed Limits in Highway Work Zones", the Minnesota Flagging Handbook, the provisions of Mn/DOT 1404 and 1710, the Minnesota Standard Signs Manuals Parts I and II, the Traffic Engineering Manual, the Traffic Control Layouts/Typical Traffic Control Layouts in the Plans, and these Special Provisions. At the time of initial set up and at the time of major stage changes, 100 percent of each type of device shall be classified as acceptable. The acceptable devices shall be determined by using the guidelines set in the Temporary Traffic Control Zone Layout Field Manual. During the duration of the project, the acceptable devices may decrease to 75 percent with 25 percent of the devices marginal. Furnishing, installing, maintaining, relocating, and subsequently removing traffic control devices as required will be considered incidental to the project. S-12 Inspection Of Work The City of Elk River will provide Observation of the work. City, County, or State agencies having jurisdiction as deemed necessary by those authorities, may make additional observation of the work. S-13 Mobilization Mobilization is considered incidental and should be considered in the bids of individual items. End of Section Division S S-3