11.3 SR 11-06-2023Request for Action
To Item Number
Ma ror and Cinr Council 11.3
Agenda Section Meeting Date Prepared by
Work Session November 6, 2023 Lori Stich, Finance Manager
Item Description Reviewed by
2024-2028 Capital Improvement Plan Cal Pormer, Cit�r Administrator
Reviewed by
Action Requested
Review the 2024-2028 Capital Improvement Plan
Background/Discussion
Cit�T staff have identified specific capital projects together with estimated project costs and funding sources to be
completed in the next five yTears. Projects listed for 2024 `vill be reviewed along `vith cash flow estimates of the
associated pYoject fund. Projects are Yeviewed annually and updated with the CIP.
Capital Reserve Fund
The purchase and replacement of IT hard`vare/soft�vare has been funded byT excess General Fund fund balance.
The curYent balance designated for the Yeplacement of IT technology is about $521,000. In addition, the fund
Yeceives inteYest income and cable franchise fees to be used for miscellaneous capital outlay items. The
undesignated balance of the fund is about $909,000.
Development Fund
Used foY costs associated with new development projects. The Downtown Small Area Plan is the onlyr project
included for 2024.
Equipment Replacement Fund
Established to provide funding for the planned replacement of vehicles and mobile equipment, the majority of
funding is provided through annual General Fund department charges and Local Government rlid (LGA). LGA
comes from the state GeneYal Fund collected thYough sales income taxes and can be subject to state unallotment.
Department chaYges aYe based on the amoYtization of their Yespective equipment and updated annually. The Fleet
Committee evaluates the replacement of vehicles and equipment based on the criteria of age, miles/hours,
maintenance costs, and usage t�Tpe. The 2024-2028 vehicle/equipment purchase requests `vere reviewed and
recommended b�T the Fleet Committee.
Government Building Fund
Used for municipal building construction/maintenance, landscaping, and remodeling. The facilities maintenance
supervisor and department directors identifyT needed building improvements which are updated annuallyT. The
landfill expansion fee and interest earnings are the primar�T funding sources. The landfill expansion fee is
scheduled to expire in 2030 but is expected to end as earlyr as 2027-2028 based on landfill capacit�r. The fund has
covered debt service payTments for the public `vorks building since 2012 and `vill also cover the 2024 debt service.
The Elk River Vision
A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional
se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty.
row�REo ar
�I'1 ����
Up�iited.• August 2020
Park Dedication Fund
Cash balance has decYeased fYom last yreaY to a cuYYent balance of about $1,524,000 as of 10/30/2023. PYojects
planned for 2024 include play-ground replacement/addition at Lion John Weicht Park (split `vith Park
Improvement Fund) and trail development.
Park Improvement Fund
Funds the Yeplacement and maintenance of paYk amenities with an annual $250,000 transfeY fYom the Liquor
Fund. The projects identified b�J the Parks & Recreation Commission for 2024 include playground replacement at
Trott Brook Park and Lion John Weicht Park (split with Park Dedication Fund).
Pavement Management Fund/MSA
A franchise fee on gas and electric utilities is the primaryT ongoing revenue source to provide long-term funding
for the pavement management program. Municipal State Aid (MSA) is also utilized to fund portions of various
street impYovement pYojects. The maintenance poYtion (25%) of MSA offsets the cost of the sealcoating and
smaller overlayT preventative maintenance projects. MnDOT's transportation funding allotment for 2024 will be
about $1,736,000.
Trunk Utility Fund
This fund consists of special assessment revenue from se`ver and `vater improvement projects. The funds `vill be
used on trunk se`ver improvement projects in lieu of having to issue bonds on future syTstem expansion /
improvements. The 169 Bedefine pYoject is included for 2024.
Funding To Be Determined
Capital items or projects pending revie`v that do not have an associated funding source identified.
Other Funds
Projects listed for 2024 that are associated with budgeted funds such as LibraryT, FTCenter, Liquor, Sewer, and
Stormwater have been reviewed during budget work sessions or alreadyT approved b�T Council.
Financial Impact
N/A
Mission/Policy/Goal
Identif�T funding to develop a sustainable and prosperous communityT.
Attachments
■ 2024-2028 Capital Improvement Plan
N:APublic Bodies\�lgenda Packets\11-06-2023\Final\x113 si CIP.docs
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026
Ca ital Reserve - TT
2025 Technology Upgrades TC-25 92,400
2026 Technology Upgrades TG26 70,000
2027 Technology Upgrades TG27
2028 Technology Upgrades TC-28
Capital Reserve - IT Total 92,400 70,000
Capital Reserve - Undesignated
Financial Software TFN-01 200,000
Capital Reserve - Undesignated Total 200,000
Cit Develo ment Fund
Downtown Small Area Plan Plan-24 100,000
Comprehensive Update of Zoning Ordinance Plan-25 50,000
City Development Fund Total 100,000 50,000
Equipment Replacement Fund
Facilities Maintenance -Vehicles BM-01
Building Safeiy - Vehicles BZ-01
2027 2028 Total
92, 400
7Q 000
57,000 57, 000
48,000 48,000
57,000 48,000 267,400
20Q 000
200,000
90,000
40,000
Fire - Vehicles FD-01 65,000 60,000
Fire - Trucks FD-02 95,000 100,000
Police - Patrol Squads PD-01 350,000 217,500 0 145,000 75,000
Police - Unmarked Squads PD-02 167,500 107,500 110,000 100,000
Police - CSO Vehicles PD-03 55,000 52,500
Parks - Pickup Trucks PK-01 0 203,000 125,000 0
Parks - Mobile Equipment PK-02 320,000 15,000 279,000 58,000 25,000
Streets - Pickup Trucks ST-01 320,000 90,000 125,000 75,000
Streets - Dump Trucks ST-02 315,000
Streets - Mobile Equipment ST-03 0 214,000 260,000 544,000 365,000
Equipment Replacement Fund Total 1,140,000 1,387,000 884,000 1,112,000 64Q000
ERMU
2025 Technology Upgrades TC-25 15,600
2026 Technology Upgrades TC-26 5,000
2027 Technology Upgrades TG27
2028 Technology Upgrades TC-28
ERMU Total
3,000
15,600 5,000 3,000
12,000
12,000
10Q 000
5Q 000
150,000
9Q 000
4Q 000
125, 000
195,000
787,500
485,000
107,500
328,000
697,000
61Q000
315,000
1, 383, 000
5,163, 000
15, 600
5, 000
3, 000
12, 000
35,600
2023-2027 CAPITAL MPROVEMENT PLAN
Source Project #
Federal Grant
Trail Development-Mega Loop PF-64
Federal Grant Total
Government Buildin s
Fire Station #2 FS-02
Fire Station #3 FS-03
Government Buildings Total
Library Reviewed with budget
Library LB-03
Library Total
Li uor Fund Reviewed with budget
LiquorStores LS-01
Liquor Fund Total
Municipal State Aid
Hwy 169 Frontage/Backage Road Improvements II-01
Couniy Projects - Cost Share II-20
Trail Development-Mega Loop PF-64
Municipal State Aid Total
Park Dedication
Couniy Projects - Cost Share II-20
AED's PDF 24-2
Hillside Park Parking Lot PDF 25-1
Highway 10 Mississippi River Trail PDF25-2
Oak Knoll Athletic Complex PDF 28-1
Plants and Things Recreation Complex PDF 28-2
Trail Development-Mega Loop PF-64
Playground - Lions Park PIF 23-2
Park Dedication Total
Park Improvement
Playground - Lions Park PIF 23-2
Park Improvement - Miscellaneous PIF 23-27
Playgrounds - Country Crossing/Trott Brook PIF 24-1
Basketball Court - Kliever Lake Fields PIF 24-2
Basketball Courts - Deerfeld/Ridgewood PIF 25-1
Nature Play - Woodland Trails PIF 25-2
Parks & Recreation Master Plan PIF 25-3
Playground/Basketball Court - Riverplace PIF 26-1
Lions Park Shelters PIF 26-2
Playgrounds - Fresno/Mississippi Oaks PIF 27-1
Rivers Edge Park Fountain PIF 27-2
2023-2027 CAPITAL IMPROVEMENT PLAN
2024 2025 2026 2027 2028 Total
830,000
830,000
130,000
22,000
152,000
60,000
60,000
180,000
180,000
750,000
1,720,000
450,000
450,000 2,470,000
18,000
250,000
250,000
200,000
370,000
310,000
698,000 700,000
100,000
16,250
125,000
16,250
50,000
30,000
100,000
120,000
120,000
450,000
350,000
800,000
16,250 10,000
125,000
50,000
75,000
185,000
300,000
190,000
75,000
83Q 000
830,000
13Q 000
22, 000
152,000
18Q 000
180,000
18Q 000
180,000
75Q 000
1, 72Q 000
45Q 000
2,920,000
25Q 000
18, 000
25Q 000
20Q 000
45Q 000
35Q 000
37Q 000
31Q000
2,198, 000
10Q 000
58, 750
25Q 000
5Q 000
8Q 000
75, 000
10Q 000
185,000
30Q 000
19Q 000
75, 000
Source Project #
Park Improvement Total
Pavement Management
Hwy 169 Frontage/Backage Road Improvements II-01
169 Redefine II-03
Couniy Projects - Cost Share II-20
Pavement Management - Streets PM-01
Pavement Management - Parking Lots/Trails PM-02
Pavement Management Total
Sewer Fund Reviewed with budget
Wastewater - Vehicle WW-06
Wastewater - Equipment WW-12
Wastewater - Lift Station Improvements WW-19
Wastewater - Urban Services Expansion WW-23
Wastewater - Centrifuge Installation WW-24
Grit Classifer Replacement WW-30
Head of Plant Splitter Structure WW-31
UV Building Modification WW-32
CR 44 Sewer Replacement WW-33
Sewer Fund Total
State Aid
Infrastructure Improvements-Misc. II-40
State Aid Total
Storm Water Reviewed with budget
Pavement Management - Streets PM-01
Stormwater Projects STW-1
Storm Water Total
Trunk Utilit Fund
169 Redefine II-03
Wastewater - Urban Services Expansion WW-23
Trunk Utility Fund Total
Yet To Be Determined
Fire - Engines/Ladders FD-03
Fire - Burn Building FD-07
Fire Equipment FD-25
Knox Box Key Secure System Update FD-26
Business Center Drive Extension II-35
Yet To Be Determined Total
2024 2025 2026 2027 2028 Total
241,250 196,250 501,250 450,000 75,000 1,463,750
750,000 75Q 000
1,507,000 1, 507, 000
750,000 75Q 000
300,000 3,600,000 300,000 3,000,000 300,000 7,50Q000
550,000 350,000 200,000 350,000 1,45Q000
2,357,000 5,450,000 500,000 3,350,000 300,000 11,957,000
65,000 325,000 39Q 000
200,000 20Q 000
55,000 55,000 55,000 55,000 55,000 275,000
11,850,000 11, 85Q 000
6,000,000 6, OOQ 000
150,000 15Q 000
1,500,000 1, 50Q 000
1,800,000 1, 80Q 000
20,000 250,000 27Q000
75,000 720,000 1,555,000 8,180,000 11,905,000 22,435,000
100,000 10Q 000
100,000 100,000
100,000
300,000 250,000 200,000
300,000 350,000 200,000
10Q 000
75Q 000
850,000
1,000,000 1, OOQ 000
16,850,000 16, 85Q 000
1,000,000 16,850,000 17,850,000
2,000,000 1,300,000
1,000,000
109,000
55,000
700,000
2,000,000 2,109,000 1,055,000
3, 30Q 000
1, OOQ 000
109,000
55, 000
70Q 000
5,164, 000
2023-2027 CAPITAL MPROVEMENT PLAN
Source Project # 2024 2025 2026 2027 2028 Total
GRAND TOTAL
2023-2027 CAPITAL IMPROVEMENT PLAN
9,491,250 13,932,250 4,770,250 13,272,000 30,630,000 72,095,750
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026
Ca ital Reserve - TT
2025 Technology Upgrades TC-25 92,400
2026 Technology Upgrades TG26 70,000
2027 Technology Upgrades TG27
2028 Technology Upgrades TC-28
Capital Reserve - IT Total 92,400 70,000
GRAND TOTAL
2027 2028 Total
92,400
7Q 000
57,000 57,000
48,000 48,000
57,000 48,000 267,400
92,400 70,000 57,000 48,000 267,400
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Technology/Software Improvements
Expenditures 2024 2025 2026 2027 2028
Enter rise backu s stem 42,000 25,000
Securit camera s stem re lacement 30,000
Microsoft server u rade 30,000
Email archiver, S am, ATP 36,000
DSX U rades 50,000
Sim livit server node - increase stora e ca acit 60,000
Meraki Switch Upgrades 30,000
o a xpen i ures - , , , ,
Funding Sources:
Ca ital Reserve Fund - 92,400 70,000 57,000 48,000
Government Buildin Reserve
ERMU (cost share) - 15,600 5,000 3,000 12,000
Total - 108,000 75,000 60,000 60,000
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026 2027 2028 Total
Cit Develo ment Fund
Downtown Small Area Plan Plan-24 100,000 10Q000
Comprehensive Update of Zoning Ordinance Plan-25 50,000 50,000
City Development Fund Total 100,000 50,000 150,000
GRAND TOTAL 100,000 50,000 150,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
rro�e�t# Plan-24
ProjectName �OWritOWri Srilall E�Yea Plari
Department Planning
Contact Planning Manager
Type Study
Useful Life Unassigned
Category City-Wide Development
l�escription I
The project will include hiring a consultant to complete a small area plan for the extended downtown area. The plan is expected to include design
ietails, redevelopment opportunities, land use guidance, and a traffic analysis.
Justification I
Che last small area plan for downtown was completed in 2012 and was largely a reaction to the possible transition of Highway 10 through
lowntown to a freeway. The long-term transportation plans have changed and the transformation of Highway 169 to a freeway will be complete in
!024. This project, along with other land use and zoning changes, has the potential to reshape how the downtown area is used and experienced.
iiring a consultant to help guide these changes will put the city on strong footing moving forward.
Expenditures 2024 2025 2026 2027 2028 Total
Study 100,000 100,000
TOt�l 100,000 100,000
Funding Sources 2024 2025 2026 2027 2028 Total
City Development Fund 100,000 100,000
'j'p�j 100,000 100,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
rro�e�t# Plan-25
rro�e�tName Comprehensive Update of Zoning Ordinance
l�escription I
3ire a consultant to assist city staff with a comprehensive re-write of the city's zoning ordinance.
Department Planning
Contact Planning Manager
Type Study
Useful Life Unassigned
Category City-Wide Development
Justification I
Che city has not undertaken this task for 20+ years and the regular updates to the ordinance have created inconsistencies and references to sections
hat no longer exist. Staff have also discussed an update to our residential and commercial zones, which will impact nearly the entire ordinance.
Expenditures 2024 2025 2026 2027 2028 Total
Study 50,000 50,000
TOt�l 50,000 50,000
Funding Sources 2024 2025 2026 2027 2028 Total
City Development Fund 50,000 50,000
'j'p�j 50,000 50,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026 2027 2028 Total
E ui ment Re lacement Fund
Facilities Maintenance - Vehicles BM-01 90,000
Building Safeiy - Vehicles BZ-01 40,000
Fire - Vehicles FD-01 65,000 60,000
Fire - Trucks FD-02 95,000 100,000
Police - Patrol Squads PD-01 350,000 217,500 0 145,000 75,000
Police - Unmarked Squads PD-02 167,500 107,500 110,000 100,000
Police - CSO Vehicles PD-03 55,000 52,500
Parks - Pickup Trucks PK-01 0 203,000 125,000 0
Parks - Mobile Equipment PK-02 320,000 15,000 279,000 58,000 25,000
Streets - Pickup Trucks ST-01 320,000 90,000 125,000 75,000
Streets - Dump Trucks ST-02 315,000
Streets - Mobile Equipment ST-03 0 214,000 260,000 544,000 365,000
Equipment Replacement Fund Total 1,140,000 1,387,000 884,000 1,112,000 64Q000
GRAND TOTAL
9Q 000
4Q 000
125,000
195, 000
787, 500
485, 000
107,500
328,000
697, 000
61 Q 000
315, 000
1, 383, 000
5,163,000
1,140,000 1,387,000 884,000 1,112,000 640,000 5,163,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Equipment Replacement Fund
Beginning Cash Balance
Revenues:
Revenues from charges
Local Government Aid
Interest earnings
Transfer (ARPA)
Other revenues (sale of assets/misc)
Total Revenues
Expenditures:
Capital Equipment -
Police
Fire
Parks
Streets
Facilities Maintenance
Building Safety
Total Expenditures
Revenues over/(under) Expenditures
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
$1,417,963 $1,468,363 $1,275,863 $1,644,863 $1,854,863
471,000 509,000 550,000 594,000 642,000
590,900 606,000 621,000 637,000 653,000
28,500 29,500 32,000 41,000 46,500
50,000 - - - -
50,000 50,000 50,000 50,000 50,000
1,190,400 1,194,500 1,253,000 1, 322,000 1, 391,500
405,000 385,000 160,000 255,000 175,000
95,000 165,000 60,000 - -
320,000 218,000 404,000 58,000 25,000
320,000 619,000 260,000 669,000 440,000
- - - 90,000 -
- - - 40,000 -
1,140,000 1,387,000 884,000 1,112,000 640,000
50,400 (192,500) 369,000 210,000 751,500
Ending Cash Balance $1,468,363 $1,275,863 $1,644,863 $1,854,863 $2,606,363
2024 Equipment Purchases
No. Unit # Old Description Department New Vehicle Description Est. Cost
1 411 2004 Ford F350 Grass #3 Fire Ford F350 $95,000
2 700 2014 Cat 257D Skid Steer Parks Skid Steer $110,000
3 722 2017 Toro Z-Master Zero Turn Mower Parks Mower $20,000
4 723 2017 Toro Groundsmaster 5910 Parks Mower $125,000
5 728 2015 John Deere Zero Turn Mower Parks Mower $20,000
6 730 2015 Kromer Field Commander B100 Parks Mower $45,000
7 602 2020 Ford Interceptor Hybrid Police Ford Utility Hybrid $70,000
8 606 2020 Ford Interceptor Hybrid Police Ford Utility Hybrid $70,000
9 608 2020 Ford Interceptor Hybrid Police Ford Utility Hybrid $70,000
10 612 2014 Ford Police Interceptor Utility Police - CSO Ford Utility $55,000
11 615 2019 Ford Interceptor Hybrid Police Ford Utility Hybrid $70,000
12 617 2021 Ford Interceptor Hybrid Police Ford Utility Hybrid $70,000
13 241 2010 Ford F550 Streets Pickup Truck $200,000
14 244 2011 Dodge 1-Ton 550 Streets Pickup Truck $120,000
TOTAL $1,140,000
Moved from 2023
Department / Year Description (Mfr/Model) 2024-2028 Equipment Replacement
Unit #
2024 2025 2026 2027 2028
BLDG MAINT $0 $0 $0 $90,000 $0
370 2012 Ford F350 Utility Pickup $90,000
FABS $0 $0 $0 $40,000 $0
511 2015 GMC Sierra 1500 $40,000
FIRE $95,000 $165,000 $60,000 $0 $0
401 2015 Chevrolet Tahoe (Fire Chief) $65,000
406 2004 Polaris 4-Wheeler $60,000
411 2004 Ford F350 Grass #3 $95,000
412 2006 Ford F350 Grass #4 $100,000
PARKS $320,000 $218,000 $404,000 $58,000 $25,000
700 2014 Cat 257D Skid Steer w/Tracks $110,000
701 1988 Snow Scoot - Yellow (Hillside) $12,000
702 1988 Snow Scoot - Red (Hillside) $12,000
714 2012 Bombardier Ski-Doo Skandic $15,000
715 2014 Ski-Doo Skandic 600 SWT $15,000
718 2003 Suzuki 4x4 ATV $20,000
719 2003 Suzuki 4x4 ATV $20,000
721 2020 Toro Z-Master Zero Turn Mower $23,000
722 2017 Toro Z-Master Zero Turn Mower $20,000
723 2017 Toro Groundsmaster 5910 Wide Area $125,000
725 2018 Toro Groundsmaster 4010 Wide Area $110,000
726 2014 John Deere 1565 Front-Mnt Mower $25,000
728 2015 John Deere Zero Turn Mower $20,000
730 2015 Kromer Field Commander B100 $45,000
731 2009 Chev Silverado 2500HD $65,000
735 2018 John Deere 835i UTV $35,000
738 2012 John Deere Tractor 4720 $90,000
743 2011 GMC 2500 HD $55,000
745 2012 GMC Sierra Pickup 3500 $70,000
746 2011 Ford F550 $70,000
752 2008 Ford F250 Pickup $68,000
POLICE $405,000 $385,000 $160,000 $255,000 $175,000
601 2023 Ford Police Interceptor Utility $72,500
602 2020 Ford Interceptor Hybrid $70,000
603 2016 Ford Taurus Interceptor Sedan - Unmarked $72,500
604 2021 Ford Interceptor Utility $72,500
605 2016 Ford Taurus Interceptor Sedan - Unmarked $50,000
606 2020 Ford Interceptor Hybrid $70,000
607 2015 Ford Interceptor Utility - Unmarked $52,500
608 2020 Ford Interceptor Hybrid $70,000
610 2023 Chevrolet Tahoe - Unmarked $56,000
612 2014 Ford Police Interceptor Utility - CSO $55,000
613 2021 Ford Police Interceptor Utility $72,500
614 2017 Ford Police Interceptor Utility - CSO $52,500
615 2019 Ford Interceptor Hybrid $70,000
616 2015 Ford Interceptor Utility - Unmarked $50,000
617 2021 Ford Interceptor Hybrid $70,000
618 2018 Ford Interceptor Utility - Unmarked $55,000
619 2023 Ford Police Interceptor Utility - Unmarked $54,000
623 2023 Ford Interceptor Utility $72,500
624 2014 Ford Police Interceptor Utility - Unmarked $50,000
626 2020 Ford Interceptor Hybrid $72,500
627 2015 Chevrolet Equinox - Unmarked $45,000
628 2023 Ford Interceptor Utility - Marked $75,000
Department / Year Description (Mfr/Model) 2024-2028 Equipment Replacement
Unit #
2024 2025 2026 2027 2028
STREETS $320,000 $619,000 $260,000 $669,000 $440,000
79 2000 Vermeer Brush Chipper $90,000
80 2012 JD Tractor $140,000
82 2010 Bobcat Skid Loader S300 $75,000
88 2011 Falcon Asphalt Patcher (Patch Trailer) $95,000
89 2001 Komatsu Forklift $125,000
90 2011 Schwarce Patch Trailer (Velocity Trailer) $100,000
91 2015 CAT Skid Steer $100,000
93 2010 Ingersol Rand Air Compressor $25,000
94 2010 Crafco Pavement Cutter (Router $14,000
96 2012 CAT Mini Excavator $115,000
99 2012 Crafco Pavement Cutter (Router $14,000
117 2018 Ford Interceptor Utility - Marked $75,000
123 2010 Ford Pickup F250 $55,000
241 2010 Ford F550 $200,000
242 2010 Ford F550 $90,000
243 2011 International Dump Truck 7600 SFA 6x4 $315,000
244 2011 Dodge 1 Ton 5500 $120,000
245 2014 Ford F450 $70,000
309 2012 Elgin Pelican Sweeper $240,000
312 2012 Cat Loader 924H $250,000
Equipment Replacement Fund Total $1,140,000 $1,387,000 $884,000 $1,112,000 $640,000
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 � 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026 2027 2028 Total
Government Buildings
Fire Station #2 FS-02 130,000 130,000
Fire Station #3 FS-03 22,000 22,000
Government Buildings Total 152,000 152,000
GRAND TOTAL 152,000
152,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Government Building
Cash Balance - Beginning
Revenues:
Landfill expansion fee
Interest earnings
Total Revenues
Expenditures:
Fire Station #2 - Admin offices remodel
Fire Station #3 - door fobs
Debt Service -
2020B PW Building Bonds (Call 2/1/2029)'
Total Expenditures
Revenues over/(under) Expenditures
Cash Balance - Ending
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
$4,039,086 $5,849,766 $7,574,446 $9,549,112 $11,594,645
2,125,000 2,150,000 2,175,000 2,200,000 -
81,000 117,000 189,361 238,728 289,866
2,206,000 2,267,000 2,364,361 2,438,728 289,866
395,320
395,320
1,810,680
$5,849,766
130,000
22,000
390,320
542,320
1,724,680
$7,574,446
389,695
389,695
1,974,666
$9,549,112
393,195 392,595
393,195 392,595
2,045,533 (102,729)
$11,594,645 $11,491,916
" Debt service transition to tax levy
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # �',�-OZ
rro�e�tName Fire Station #2
l�escription
Zemodel of administration offices
Department Fire Stations
Contact Fire Chief
Type Building
Useful Life 20 years
Category Buildings
Justification I
Che remodel of the administration offices at Fire Station 2 was specified in the remodel project at station 2, but was not completed due to lack of
unds available.
Expenditures 2024 2025 2026 2027 2028 Total
Design/Construction 130,000 130,000
TOt�l 130,000 130,000
Funding Sources 2024 2025 2026 2027 2028 Total
Government Buildings 130,000 130,000
'j'p�j 130,000 130,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # F',�-03
rro�e�tName Fire Station #3
l�escription
�oor fobs
Department Fire Stations
Contact Fire Chief
Type Building
Useful Life 50 years
Category Buildings
Justification I
Chere are 6 doors at station 3 that need fobs added to improve access and functuionality. Four of these were designed for fobs as part of the
�uilding project and conduit/hardware is in place for the fobs to be installed.
Expenditures 2024 2025 2026 2027 2028 Total
Buildings 22,000 22,000
TOt�l 22,000 22,000
Funding Sources 2024 2025 2026 2027 2028 Total
Government Buildings 22,000 22,000
'j'p�j 22,000 22,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026
Park Dedication
Couniy Projects - Cost Share II-20 250,000
AED's PDF 24-2 18,000
Hillside Park Parking Lot PDF 25-1 250,000
Highway 10 Mississippi RiverTrail PDF25-2 200,000
Oak Knoll Athletic Complex PDF 28-1
Plants and Things Recreation Complex PDF 28-2
Trail Development-Mega Loop PF-64 370,000
Playground - Lions Park PIF 23-2 310,000
Park Dedication Total 698,000 700,000
Park Improvement
Playground - Lions Park PIF 23-2 100,000
Park Improvement - Miscellaneous PIF 23-27 16,250 16,250 16,250
Playgrounds - Country Crossing/Trott Brook PIF 24-1 125,000
Basketball Court - Kliever Lake Fields PIF 24-2 50,000
Basketball Courts - Deerfield/Ridgewood PIF 25-1 30,000
Nature Play - Woodland Trails PIF 25-2
Parks & Recreation Master Plan PIF 25-3 100,000
Playground/Basketball Court - Riverplace PIF 26-1 185,000
Lions Park Shelters PIF 26-2 300,000
2027 2028 Total
10,000
125,000
50,000
Playgrounds - Fresno/Mississippi Oaks PIF 27-1 190,000
Rivers Edge Park Fountain PIF 27-2 75,000
Park Improvement Total 241,250 196,250 501,250 45Q000
GRAND TOTAL
450,000
350,000
800,000
75,000
75,000
25Q 000
18, 000
25Q 000
20Q 000
45Q 000
35Q 000
37Q 000
31 Q 000
2,198,000
10Q 000
58, 750
25Q 000
5Q 000
8Q 000
75, 000
10Q 000
185, 000
30Q 000
19Q 000
75, 000
1,463,750
939,250 896,250 501,250 450,000 875,000 3,661,750
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Park Dedication Fund
Cash Balance - Beginning
Revenues:
Park dedication
Sale of property - Pinewood CD
Interest
Total Revenues
Expenditures:
Playground - Lions Park
AED's (2)
County Projects - Cost share
Hillside Parking Lot
Highway 10 Trail
Oak Knoll Athletic Complex
Plants & Things Recreational Comlex
Trail Development
Total Expenditures
Revenues over/(under) Expenditures
Cash Balance - Ending
2024 2025
Estimate Estimate
$1,561,098 $1,069,378
2026
Estimate
$566,658
2027
Estimate
$755,438
2028
Estimate
$947,218
150,000 150,000 150,000 150,000 150,000
28,780 28,780 28,780 28,780 28,780
27,500 18,500 10,000 13,000 16,500
206,280 197,280 188,780 191,780 195,280
310,000 - - - -
18,000 - - - -
- 250,000 - - -
- 250,000 - - -
- 200,000 - - -
- - - - 450,000
- - - - 350,000
370,000 - - - -
698,000 700,000 - - 800,000
(491,720) (502,720) 188,780 191,780 (604,720)
$1,069,378 $566,658 $755,438 $947,218 $342,498
City of Elk River
Park Improvement Fund
Cash Balance - Beginning
Revenues:
Interest Income
Lacrosse - Oak Knoll Lights
Sponsorships
Transfer In-Liquor Fund
Donations
Total Revenues
Expenditures:
Parks and Recreation master plan
WHHCA Friends of the Mississippi partnership
Country Crossing playground
Deerfield basketball court
Lions Park playground
Ridgewood basketball court
Riverplace - playground/basketball court
Trott Brook playground
Kliever Lake Fields - basketball court
Woodland Trails nature play area
Misc. projects
Lions Park Shelters replacements (3)
Fresno Park Playground
Mississippi Oaks Playground
Rivers Edge Park fountain
Total Expenditures
Revenues over/(under) Expenditures
Cash Balance - Ending
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
$119,365 $177,815 $277,265 $66,015 ($97,985)
2,000 2,500 5,000 1,000 -
4,450 4,450 - - -
43,250 38,750 35,000 35,000 35,000
250,000 250,000 250,000 250,000 250,000
299,700 295,700 290,000 286,000 285,000
- 100,000 -
6,250 6,250 6,250 - -
- - - 125,000 -
- - - 50,000 -
100,000 - - - -
- 30,000 - - -
- - 185,000 - -
125,000 - - - -
- 50,000 - - -
- - - - 75,000
10,000 10,000 10,000 10,000 -
- - 300,000 - -
- - - 100,000 -
- - - 90,000 -
- - - 75,000 -
241,250 196,250 501,250 450,000 75,000
58,450 99,450 (211,250) (164,000) 210,000
$177,815 $277,265 $66,015 ($97,985) $112,015
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # PDF 24-2
ProjectName AE��S
l�escription
�ED's for 2 parks
Justification
'ut AED's in parks for public safety.
Department Park Dedication
Contact Park & Rec. Director
Type Equipment
Useful Life 5 years
Category Equipment
Expenditures 2024 2025 2026 2027 2028 Total
Equipment 18,000 18,000
TOt�l 18,000 18,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Dedication 18,000 18,000
'j'p�j 18,000 18,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project# PDF 25-1
rro�e�tName Hillside Park Parking Lot
l�escription
a paved parking lot at Hillside Park including curb and gutter.
Department Park Dedication
Contact Park & Rec. Director
Type Infrastructure
Useful Life 15 years
Category Park Improvements
Justification I
� paved parking lot at Hillside Park is recommended in the Hillside Park Master Plan approved by city council November 2016.
Expenditures 2024 2025 2026 2027 2028 Total
Parking Lot 250,000 250,000
TOt�l 250,000 250,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Dedication 250,000 250,000
'j'p�j 250,000 250,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # PDF 25-2
rro�e�tNan►e Highway 10 Mississippi River Trail
l�escription
�ighway 10 Mississippi River Trail
Justification I
Che trail is recommended in the Trails Master Plan
Department Park Dedication
Contact Park & Rec. Director
Type Improvement
Useful Life 20 years
Category TrailImprovements
Expenditures 2024 2025 2026 2027 2028 Total
Trails 200,000 200,000
TOt�l 200,000 200,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Dedication 200,000 200,000
'j'p�j 200,000 200,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project# PDF 28-1
rro�e�tName Oak Knoll Athletic Complex
l�escription
Ylakes improvements to the Oak Knoll Athletic Complex.
Justification
Department Park Dedication
Contact Park & Rec. Director
Type Improvement
Useful Life 20 years
Category Park Improvements
improvements made to the Oak Knoll Complex are based on the recommendations in the Athletic Facilities Master Plan.
Expenditures 2024 2025 2026 2027 2028 Total
Improvements 450,000 450,000
TOt�l 450,000 450,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Dedication 450,000 450,000
'j'p�j 450,000 450,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # PDF 28-2
rro�e�tName Plants and Things Recreation Complex
l�escription
Ylake improvements to the Plants and Things Recreation Complex.
Justification
Department Park Dedication
Contact Park & Rec. Director
Type Improvement
Useful Life 15 years
Category Park Improvements
improvements made to the Plants and Things Recreation Complex are based on the recommendations in the Athletic Facilities Master Plan.
Expenditures 2024 2025 2026 2027 2028 Total
Improvements 350,000 350,000
TOt�l 350,000 350,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Dedication 350,000 350,000
'j'p�j 350,000 350,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # PIF 23-2
rro�e�tName Playground - Lions Park
l�escription I
Jpdate playground at Lion John Weicht Park
Justification
maintenance/repairs of our park system.
Department Park Improvement
Contact Park & Rec. Director
Type Equipment
Useful Life 15 years
Category Playground Equipment
Expenditures 2024 2025 2026 2027 2028 Total
Equipment 410,000 410,000
TOt�l 410,000 410,000
Funding Sources
Park Dedication
Park Improvement
2024
310,000
100,000
'j'p�j 410,000
2025 2026 2027 2028
Total
310,000
100,000
410,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # PIF 25-3
rro�e�tName Parks & Recreation Master Plan
Department Park Improvement
Contact Park & Rec. Director
Type Study
Useful Life Unassigned
Category Park Improvements
l�escription I
� Parks and Recreation Master Plan will provide direction for the city council, the parks and recreation commission and city staff to guide them in
he big picture decision making that will impact the parks and recreation system. The key components are the community engagement and a
;tatistically-valid community survey. It should also include relevant influencing trends, program analysis, level of service analysis, financial
inalysis, action plan and initiatives, task execution and priority actions.
Justification I
Che Comprehensive Plan adopted October 2021 recommends the city update the Parks and Recreation Master Plan. The Parks Master Plan was
�dopted in 2015 and many projects identified in the plan such as the improvements to Orono Park are completed. The city should update the plan
o identify new parks and recreation needs in the community as it grows.
Expenditures 2024 2025 2026 2027 2028 Total
Study 100,000 100,000
TOt�l 100,000 100,000
Funding Sources 2024 2025 2026 2027 2028 Total
Park Improvement 100,000 100,000
'j'p�j 100,000 100,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026
Munici al State Aid
Hwy 169 Frontage/Backage Road Improvements II-01 750,000
Couniy Projects - Cost Share II-20 1,720,000
Trail Development-Mega Loop PF-64 450,000
Municipal State Aid Total 450,000 2,470,000
Pavement Management
2027 2028 Total
75Q 000
1, 720, 000
45Q 000
2,920,000
Hwy 169 Frontage/Backage Road Improvements II-01 750,000 750,000
169 Redefne II-03 1,507,000 1,507,000
Couniy Projects - Cost Share II-20 750,000 75Q000
PavementManagement-Streets PM-01 300,000 3,600,000 300,000 3,000,000 300,000 7,50Q000
Pavement Management - Parking Lots/Trails PM-02 550,000 350,000 200,000 350,000 1,45Q000
Pavement Management Total 2,357,000 5,450,000 50Q000 3,35Q000 30Q000 11,957,000
Trunk Utility Fund
169 Redefne II-03 1,000,000
Wastewater - Urban Services Expansion WW-23
Trunk Utility Fund Total 1,000,000
GRAND TOTAL
1, 000, 000
16,850,000 16, 850, 000
16,850,000 17, 850, 000
3,807,000 7,920,000 500,000 3,350,000 17,150,000 32,727,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Pavement Management Fund
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
Cash Balance - Beginning $4,678,881 $4,441,381 $1,126,381 $2,714,881 $1,506,381
Revenues:
Charges for Services -
Franchise Fee
Other Revenue -
I nte rest
MSA - Street Maintenance
Total Revenues
Expenditures:
Street Projects
Hwy 169 Project
County Projects - cost share
SealcoaUOverlay program
Parking Lots
Trails
Total Expenditures
Revenues less Expenditures
Cash Balance - Ending
1,581,000 1,597,000 1,613,000 1,629,000 1,645,000
93,500 89,000 22,500 54,500 30,000
445,000 449,000 453,000 458,000 463,000
2,119,500 2,135,000 2,088,500 2,141,500 2,138,000
100,000 3,400,000 100,000 2,800,000 100,000
1,507,000 750,000 - - -
- 750,000 - - -
200,000 200,000 200,000 200,000 200,000
350,000 350,000 - 350,000 -
200,000 - 200,000 - -
2,357,000 5,450,000 500,000 3,350,000 300,000
(237,500) (3,315,000) 1,588,500 (1,208,500) 1,838,000
$4,441,381 $1,126,381 $2,714,881 $1,506,381 $3,344,381
Municipal State Aid - Construction Balance
Beginning balance
New Allotment (average)
Allocations:
County Projects - Local cost share
Trail Development
Hwy 169 Frontage/Backage Roads
Total Allocations
2024 2025 2026 2027 2028
$ 3,365,482 $ 4,651,482 $ 3,952,482 $ 5,758,482 $ 7,600,482
1,736,000 1,771,000 1,806,000 1,842,000 1,879,000
- (1,720,000) - - -
(450,000) - - - -
- (750,000) - - -
(450,000) (2,470,000) - - -
Ending Balance $4,651,482 $3,952,482 $5,758,482 $7,600,482 $9,479,482
City of Elk River
Trunk Utility Fund
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
Cash Balance - Beginning $2,835,910 $1,976,210 $2,106,510 $2,197,310 $2,288,110
Revenues:
Special Assessments 90,800 90,800 90,800 90,800 90,800
Interest 49,500 39,500 - - -
Total Revenues 140,300 130,300 90,800 90,800 90,800
Expenditures:
Hwy 169 utility modifications 1,000,000 - - - -
NE & NW urban services expansion - - - - 16,850,000
Total Expenditures 1,000,000 - - - 16,850,000
Revenues over/(under) Expenditures (859,700) 130,300 90,800 90,800 (16,759,200)
Cash Balance - Ending $1,976,210 $2,106,510 $2,197,310 $2,288,110 ($14,471,090)
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project # 2024 2025 2026
Munici al State Aid
Hwy 169 Frontage/Backage Road Improvements II-01 750,000
Couniy Projects - Cost Share II-20 1,720,000
Trail Development-Mega Loop PF-64 450,000
Municipal State Aid Total 450,000 2,470,000
Pavement Management
2027 2028 Total
75Q 000
1, 720, 000
45Q 000
2,920,000
Hwy 169 Frontage/Backage Road Improvements II-01 750,000 750,000
169 Redefne II-03 1,507,000 1,507,000
Couniy Projects - Cost Share II-20 750,000 75Q000
PavementManagement-Streets PM-01 300,000 3,600,000 300,000 3,000,000 300,000 7,50Q000
Pavement Management - Parking Lots/Trails PM-02 550,000 350,000 200,000 350,000 1,45Q000
Pavement Management Total 2,357,000 5,450,000 50Q000 3,35Q000 30Q000 11,957,000
Trunk Utility Fund
169 Redefne II-03 1,000,000
Wastewater - Urban Services Expansion WW-23
Trunk Utility Fund Total 1,000,000
GRAND TOTAL
1, 000, 000
16,850,000 16, 850, 000
16,850,000 17, 850, 000
3,807,000 7,920,000 500,000 3,350,000 17,150,000 32,727,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River
Pavement Management Fund
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
Cash Balance - Beginning $4,678,881 $4,441,381 $1,126,381 $2,714,881 $1,506,381
Revenues:
Charges for Services -
Franchise Fee
Other Revenue -
I nte rest
MSA - Street Maintenance
Total Revenues
Expenditures:
Street Projects
Hwy 169 Project
County Projects - cost share
SealcoaUOverlay program
Parking Lots
Trails
Total Expenditures
Revenues less Expenditures
Cash Balance - Ending
1,581,000 1,597,000 1,613,000 1,629,000 1,645,000
93,500 89,000 22,500 54,500 30,000
445,000 449,000 453,000 458,000 463,000
2,119,500 2,135,000 2,088,500 2,141,500 2,138,000
100,000 3,400,000 100,000 2,800,000 100,000
1,507,000 750,000 - - -
- 750,000 - - -
200,000 200,000 200,000 200,000 200,000
350,000 350,000 - 350,000 -
200,000 - 200,000 - -
2,357,000 5,450,000 500,000 3,350,000 300,000
(237,500) (3,315,000) 1,588,500 (1,208,500) 1,838,000
$4,441,381 $1,126,381 $2,714,881 $1,506,381 $3,344,381
Municipal State Aid - Construction Balance
Beginning balance
New Allotment (average)
Allocations:
County Projects - Local cost share
Trail Development
Hwy 169 Frontage/Backage Roads
Total Allocations
2024 2025 2026 2027 2028
$ 3,365,482 $ 4,651,482 $ 3,952,482 $ 5,758,482 $ 7,600,482
1,736,000 1,771,000 1,806,000 1,842,000 1,879,000
- (1,720,000) - - -
(450,000) - - - -
- (750,000) - - -
(450,000) (2,470,000) - - -
Ending Balance $4,651,482 $3,952,482 $5,758,482 $7,600,482 $9,479,482
City of Elk River
Trunk Utility Fund
2024 2025 2026 2027 2028
Estimate Estimate Estimate Estimate Estimate
Cash Balance - Beginning $2,835,910 $1,976,210 $2,106,510 $2,197,310 $2,288,110
Revenues:
Special Assessments 90,800 90,800 90,800 90,800 90,800
Interest 49,500 39,500 - - -
Total Revenues 140,300 130,300 90,800 90,800 90,800
Expenditures:
Hwy 169 utility modifications 1,000,000 - - - -
NE & NW urban services expansion - - - - 16,850,000
Total Expenditures 1,000,000 - - - 16,850,000
Revenues over/(under) Expenditures (859,700) 130,300 90,800 90,800 (16,759,200)
Cash Balance - Ending $1,976,210 $2,106,510 $2,197,310 $2,288,110 ($14,471,090)
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
'roject # PM-01
�ro�e�tName Pavement Management - Streets
Department Infrastructure Improvements
Contact Public Works Director
Type Improvement
Useful Life 25 years
Category Street Construction
l�escription I
?reventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects.
�treet improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed
;very other year.
Justification I
ndividual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street
�egment. These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are
mplemented, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements.
Expenditures 2024 2025 2026 2027 2028 Total
Design 100,000 100,000 100,000 300,000
Construction 3,500,000 3,000,000 6,500,000
Maintenance 200,000 200,000 200,000 200,000 800,000
TOtal 300,000 3,700,000 300,000 3,000,000 300,000 7,600,000
Funding Sources 2024
Pavement Management 300,000
Storm Water
Total 300,000
2025
3,600,000
100,000
3,700,000
2026 2027
300,000 3,000,000
300,000 3,000,000
2028
300,000
300,000
Total
7,500,000
100,000
7,600,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan 2024 rhru 202�
Department Infrastructure Improvements
City of Elk River, Minnesota Contact Public Works Director
Project # PM-OZ
ero�e�tName Pavement Management - Parking Lots/Trails
l�escription
�verlay and sealcoat public parking lots and trails as needed
Type Maintenance
Useful Life 15 years
Category Street Maintenance
Justification I
'rojects will be prioritized based on condition and available funding after all street maintenance project needs are met.
Expenditures 2024 2025 2026 2027 2028 Total
Parking Lot 350,000 350,000 350,000 1,050,000
Trails 200,000 200,000 400,000
TOtal 550,000 350,000 200,000 350,000 1,450,000
Funding Sources
Pavement Management
2024
550,000
'j'p�j 550,000
2025
350,000
350,000
2026
200,000
200,000
2027
350,000
350,000
2028
Total
1,450,000
1,450,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # jj-01
rro�e�t Name Hwy 169 Frontage/Backage Road Improvements
Department Infrastructure Improvements
Contact Public Works Director
Type Infrastructure
Useful Life 25 years
Category Street Construction
l�escription I
�esign and implement improvements to the frontage and backage road system east and west of the Hwy 169 Redefine project
Justification
>vements to the local road connections to Hwy 169 to assure the successful completion of connecting commercial uses on the east side of
169 from Main Street to Dodge Avenue.
Expenditures 2024 2025 2026 2027 2028 Total
Construction 1,500,000 1,500,000
TOt�l 1,500,000 1,500,000
Funding Sources 2024
Municipal State Aid
Pavement Management
`TOi�t
2025
750,000
750,000
1,500,000
2026 2027 2028
Total
750,000
750,000
1,500,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # II-03
rro�e�t Name 169 Redefine
Department Infrastructure Improvements
Contact Public Works Director
Type Infrastructure
Useful Life 25 years
Category Street & Utility Construction
l�escription I
�ocal cost share for MNDOT project to reconstruct TH 169 through Elk River, including sewer modifications.
Justification I
iafety and mobility improvement to the TH 169 corridor and provide better local connection across the highway. Visual quality enhanced railings,
�treet lights, plantings, colors and textures of the final elements of the TH 169 project.
Expenditures 2024 2025 2026 2027 2028 Total
I m prove m ents 2,507,000 2,507,000
TOt�l 2,507,000 2,507,000
Funding Sources
Pavement Management
Trunk Utility Fund
2024
1,507,000
1,000,000
'j'p�j 2,507,000
2025 2026 2027 2028
Total
1,507,000
1,000,000
2,507,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # jj-20
rro�e�tName County Projects - Cost Share
l�escription
�ity share of county projects include:
1) CR 33 Realignment and future trail preparation ($2,200,000 less $480,000 county turnback)
2) CR 44 Reconstruction ($750,000) and Trail ($250,000)
Justification I
;ity participation in projects initiated by Sherburne County.
Department Infrastructure Improvements
Contact Public Works Director
Type Infrastructure
Useful Life 25 years
Category Street Construction
Expenditures 2024 2025 2026 2027 2028 Total
Improvements 2,745,000 2,745,000
TOt�l 2,745,000 2,745,000
Funding Sources 2024 2025 2026 2027 2028 Total
Municipal State Aid 1,720,000 1,720,000
Park Dedication 250,000 250,000
Pavement Management 750,000 750,000
TOtal 2,720,000 2,720,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # II-40
rro�e�tNarr►e Infrastructure Improvements-Misc.
l�escription
� lashing yellow left turn arrow
Department Infrastructure Improvements
Contact Public Works Director
Type Infrastructure
Useful Life 15 years
Category Street & Utility Construction
Justification I
;itizen reported concerns that are negatively impacting their daily trips. MnDOT may share in some of the project costs.
Expenditures 2024 2025 2026 2027 2028 Total
Improvements 100,000 100,000
TOt�l 100,000 100,000
Funding Sources 2024 2025 2026 2027 2028 Total
State Aid 100,000 100,000
'j'p�j 100,000 100,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project# PF'-(4
rro�e�tName Trail Development-Mega Loop
l�escription
Trail extensions and ADA improvements on the following road segments:
1) Cleveland St NW (CR 40) - CR 12 to south of Twin Lakes Pkwy
2) Mississippi Rd NW (CR 30) - Troy StNW to Naples StNW
3) Mississippi Rd NW (CR 30) - Denver St NW to Orono Rd NW
4) Twin Lakes Rd NW - Twin Lakes Pkwy to Cleveland Rd NW
Department Park Improvement
Contact Public Works Director
Type Improvement
Useful Life 20 years
Category TrailImprovements
Justification I
Crail exptensions and ADA improvements allow for increased options of multi-modal transportation and create a safer path for users to bike, walk,
�nd roll. These extensions fill in gaps in the current city trail system along the county road system.
Expenditures 2024 2025 2026 2027 2028 Total
Trails 1,650,000 1,650,000
TOt�l 1,650,000 1,650,000
Funding Sources 2024 2025 2026 2027 2028 Total
Federal Grant 830,000 830,000
Municipal State Aid 450,000 450,000
Park Dedication 370,000 370,000
TOtal 1,650,000 1,650,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project# ww-i9
rro�e�tName Wastewater - Lift Station Improvements
l�escription I
?024-2028 - Aro flash safety lift station panels
Department Sewer Department
Contact Chief Wastewater Operator
Type Equipment
Useful Life 15 years
Category Equipment
Justification I
!024-2028 - The lift station panels are starting to age and with newer tecnologies the aro flash safety panels make it safer for the wastewater
�perators. Plan to replace 1 panel per year.
Expenditures 2024 2025 2026 2027 2028 Total
Equipment 55,000 55,000 55,000 55,000 55,000 275,000
TOt�l 55,000 55,000 55,000 55,000 55,000 275,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 55,000 55,000 55,000 55,000 55,000 275,000
'j'p�j 55,000 55,000 55,000 55,000 55,000 275,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # ww-23
rro�e�tName Wastewater - Urban Services Expansion
l�escription I
Trunk system upgrades and expansion including regional lift stations, forcemains, and gravity sewer.
Justification
Department Sewer Department
Contact Public Works Director
Type Infrastructure
Useful Life Unassigned
Category Plant Expansion
improvements to support future development in the expanded urban service area (NE & NW areas of the city).
Expenditures 2024 2025 2026 2027 2028 Total
I m prove m ents 11,850,000 11,850,000
Utilities 16,850,000 16,850,000
TOtal 28,700,000 28,700,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 11,850,000 11,850,000
Trunk Utility Fund 16,850,000 16,850,000
TOtal 28,700,000 28,700,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # ww-24
rro�e�tName Wastewater - Centrifuge Installation
l�escription I
2eplace undersized screw presses with centrifuges
Department Sewer Department
Contact Chief Wastewater Operator
Type Improvement
Useful Life 25 years
Category Utilities
Justification I
�riginal screw presses were undersized and are expected to be beyond capacity need of the wastewater treatment plant 30 years earlier than
Expenditures 2024 2025 2026 2027 2028 Total
I m prove m ents 6,000,000 6,000,000
TOt�l 6,000,000 6,000,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 6,000,000 6,000,000
'j'p�j 6,000,000 6,000,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # ww-30
rro�e�tName Grit Classifier Replacement
l�escription
Zeplace 21 year old grit classifier
Department Sewer Department
Contact Public Works Director
Type Equipment
Useful Life 20 years
Category Sewer Maintenance
Justification I
� mandatory piece of equipment that has reached its expected life span (20 years) due to the abrasiveness of the material it handles.
Expenditures 2024 2025 2026 2027 2028 Total
Equipment 150,000 150,000
TOt�l 150,000 150,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 150,000 150,000
'j'p�j 150,000 150,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # ww-31
rro�e�tName Head of Plant Splitter Structure
Department Sewer Department
Contact Public Works Director
Type Improvement
Useful Life 20 years
Category Utilities
l�escription I
nstallation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions.
Justification I
,urrently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The
�ddition of the splitter structure will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive
�dditional connections in the future (if NW or NW service area expansions ever are considered).
Expenditures 2024 2025 2026 2027 2028 Total
Construction/Maintenance 1,500,000 1,500,000
TOt�l 1,500,000 1,500,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 1,500,000 1,500,000
'j'p�j 1,500,000 1,500,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # ww-32
rro�e�t Name UV Building Modification
l�escription I
3uild out remaining UV building capacity by adding bulbs in second channel.
Department Sewer Department
Contact
Type Unassigned
Useful Life
Category Unassigned
Justification I
�s our flow is increasing the need for additional disinfection capacity grows. Our building is set up for the needed expansion and we estimate
ieeding to have some of this capacity on-line by 2028.
Expenditures 2024 2025 2026 2027 2028 Total
Construction/Maintenance 1,800,000 1,800,000
TOt�l 1,800,000 1,800,000
Funding Sources 2024 2025 2026 2027 2028 Total
Sewer Fund 1,800,000 1,800,000
'j'p�j 1,800,000 1,800,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan 2024 rhru 202�
Department Sewer Department
City of Elk River, Minnesota Contact Public Works Director
Project # ww-33
ero�e�tName CR 44 Sewer Replacement
l�escription
Zeplace existing clay pipe as part of the CR 44 reconstruction project
Type Infrastructure
Useful Life 20 years
Category Sewer Maintenance
Justification I
Che clay pipe has reached its expected service life. Replacement is recommended at the time the roadway surface is being reconstructed.
Expenditures 2024 2025 2026 2027 2028 Total
Design 20,000 20,000
Construction/Maintenance 250,000 250,000
Total 20,000 250,000 270,000
Funding Sources
SewerFund
2024
20,000
'j'p�j 20,000
2025
250,000
250,000
2026 2027 2028
Total
270,000
270,000
2023-2027 CAPITAL IMPROVEMENT PLAN
City of Elk River, Minnesota
Capital Imp�ovement Plan
2024 thru 2028
PROJECTS BY FUNDING SOURCE
Source Project #
Yet To Be Determined
Fire - Engines/Ladders FD-03
Fire - Burn Building FD-07
Fire Equipment FD-25
Knox Box Key Secure System Update FD-26
Business Center Drive Extension II-35
Yet To Be Determined Total
2024 2025 2026 2027 2028 Total
2,000,000 1,300,000
1,000,000
109,000
55,000
700,000
2,000,000 2,109,000 1,055,000
GRAND TOTAL
2,000,000 2,109,000 1,055,000
3, 300, 000
1, 000, 000
109, 000
55, 000
70Q 000
5,164,000
5,164,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # F'�-03
rro�e�tNarr►e Fire - Engines/Ladders
l�escription
?024 - #419 - 1990 Pierce Ladder
?025 - #416 - 2005 Pierce Engine 2
Justification
on annual condition assessment. The fire engines/ladders are the primary front-line response units.
Department Fire
Contact Fire Chief
Type Vehicle
Useful Life 20 years
Category Vehicles
Expenditures 2024 2025 2026 2027 2028 Total
Veh icles 2,000,000 1,300,000 3,300,000
TOt�l 2,000,000 1,300,000 3,300,000
Funding Sources 2024 2025 2026 2027 2028 Total
Yet To Be Determined 2,000,000 1,300,000 3,300,000
'j'p�j 2,000,000 1,300,000 3,300,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # �'�-0�]
rro�e�tNarr►e Fire - Burn Building
l�escription
�ire burn building for training
Department Fire
Contact Fire Chief
Type Building
Useful Life 25 years
Category Buildings
Justification I
�or the continued required training for firefighters to have live fire training. Acquiring residential structures are no longer a long-term solution and
he lack of live fire training is making the job of firefighting unsafe.
Expenditures 2024 2025 2026 2027 2028 Total
Buildings 1,000,000 1,000,000
TOt�l 1,000,000 1,000,000
Funding Sources 2024 2025 2026 2027 2028 Total
Yet To Be Determined 1,000,000 1,000,000
'j'p�j 1,000,000 1,000,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # F'�-ZS
rro�e�tNarr►e Fire Equipment
Department Fire
Contact Fire Chief
Type Equipment
Useful Life 10 years
Category Equipment
l�escription I
�xtrication tools (Jaws of Life) - update two sets on front line apparatus. The purchase would include a spreader, cutter, and ram device along with
lecessary batteries, chargers, and modification to apparatus to propertly secure them. ($64,000)
wall maze system for training area in station 3. ($45,000)
Justification I
1Ve have two sets of extrication tools that are 10+ years old on front line fire engines. In 2021 the department evaluated battery operated tools and
�urchased one set for the rescue truck. These tools have been highly successful and proved their value in allowing quick deployment and reduced
system was not included in station 3 construction due to lack of funds.
Expenditures 2024 2025 2026 2027 2028 Total
Equipment 109,000 109,000
TOt�l 109,000 109,000
Funding Sources 2024 2025 2026 2027 2028 Total
Yet To Be Determined 109,000 109,000
'j'p�j 109,000 109,000
2023-2027 CAPITAL IMPROVEMENT PLAN
Capital Improvement Plan
City of Elk River, Minnesota
2024 thru 202�
Project # �'�-2(
rro�e�tName Knox Box Key Secure System Update
Department Fire
Contact Fire Chief
Type Maintenance
Useful Life Unassigned
Category Unassigned
l�escription I
The Knox system is a key box system that allows police, fire, and EMS access to buildings in our communities during an emergency without
iaving to damage a door to gain entry. This saves valuable time and property. We currently have 363 Knox boxes around our communities. The
zpgrade to the newest key secure system would also enble us to manage the key system from a cloud-based program remotely, versus having to
ztilize older technology and physically plugging into the units. There are currently 32 key secure units in service across the Elk River Fire, Police
ind Ambulance fleet.
Justification
rrent system is outdated, relying on older technology for maintaining and tracking users and keys. This has led to situations causing delays for
ice, fire, and EMS to be able to access buildings in a timely manner in an emergency. This will improve reliability, maintenance, and security of
se units.
Expenditures 2024 2025 2026 2027 2028 Total
Maintenance 55,000 55,000
TOt�l 55,000 55,000
Funding Sources 2024 2025 2026 2027 2028 Total
Yet To Be Determined 55,000 55,000
'j'p�j 55,000 55,000
2023-2027 CAPITAL IMPROVEMENT PLAN