Loading...
5.04a ERMUSR 11-14-2023Elk River Municipal Utilities Proposed 2024 Utilities Fee Schedule Fee Description ELECTRIC 2023 Proposed 2024 Proposed Increase New Residential Electric Connection - Developer - Lot with ERMU water service $ 975.00 $ 975.00 New Residential Electric Connection - Developer - Lot without ERMU water service $ 1,075.00 $ 1,475.00 New Electric Connection $ 875.00 $ 875.00 New Wire Footages over 200' (per foot) $ 4.00 $ 5.00 New Service Frost Trenching (per foot) $ 5.00 $ 6.00 New Commercial & Industrial Electric Connection 50% 50% Service Upgrades or Additions for Existing Customers 100% 100% Minimum Temporary Electric Service Fee - Existing Transformer $ 220.00 $ 220.00 Minimum Temporary Electric Service Fee - Without Existing Transformer $ 850.00 $ 850.00 Grid Access Fee - new New Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture $ 2,700.00 $ 2,700.00 Street Light - 23' Decorative Pole with Cobra Fixture $ 1,800.00 $ 1,800.00 Street Light - 14' Decorative Pole with Cobra Fixture $ 4,100.00 $ 4,100.00 Street Light - 14' Decorative Pole with Acorn Fixture $ 5,300.00 $ 5,300.00 Security Light - Wood Pole with Fixture $ 975.00 $ 975.00 Security Light - Existing Pole $ 350.00 $ 350.00 Pole Attachment Fee (per pole) Chris K to update agreement to include late fees $ 15.00 $ 15.00 Meter Installation Fee (per individually metered apartment unit) $ 22.00 $ 22.00 WATER Water Access Charge = Water Connection Charge + Water Availability Charge $ 3,990.00 $ 3,990.00 Water Connection Charge (Per Plumbing Unit) - Builder $ 3,600.00 $ 3,600.00 Water Availability Charge (Per Plumbing Unit) - Developer $ 390.00 $ 390.00 Abandoned Water Service (minimum) $ 6,000.00 $ 6,000.00 Backflow Preventer Device Non -Compliance (per month) $100.00 $ 100.00 Deposit for 5/8" Hydrant Meter $ 150.00 $ 150.00 Deposit for 2 1/2" Hydrant Meter $ 1,000.00 $ 1,000.00 Hydrant Water Sales - Rental (per week) $ 50.00 $ 50.00 Hydrant Water Sales - Units (per 1000 gallons) $ 4.00 $ 4.00 Hydrant Wrench $ 40.00 $ 40.00 Private Hydrant Maintenance Program Monthly Fee $ 5.00 $ 5.00 ADMINISTRATIVE Administrative Fee for Continued Submission of Checks After No -Check Notice Given $ 20.00 $ 20.00 Administrative Fee for Continued Submission of Payment After Account Closed - new $ 20.00 New Billable Cost of Materials Markup 15% 15% Billable Labor Markup 55% 55% Billable Vehicle / Equipment (per employee per hour) $ 45.00 $ 45.00 Commercial Application Fee $ 20.00 $ 20.00 Electric Service Disconnect/Trip Fee - Meter Technician $ 50.00 $ 50.00 Electric Service Disconnect/Trip Fee - Line Crew $ 150.00 $ 150.00 Water Service Disconnect/Trip Fee - Water Operator $ 100.00 $ 100.00 Manual Meter Reading Fee (per month) $ 10.00 $ 50.00 Additional Manual Meter Reading Fee (per month) -new $ 10.00 New Meter Tampering Fee $ 250.00 $ 250.00 Meter Testing Fee $ 50.00 $ 50.00 NSF Fee $ 30.00 $ 30.00 Penalty Amount 10% 10% Photocopies(per page) $ 0.25 $ 0.25 Red Tag Handling Fee $ 20.00 $ 20.00 93