Loading...
6.01g ERMUSR 11-14-2023��i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: November 14, 2023 6.01g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In October, the locators processed 464 locate tickets. These consisted of 364 normal tickets, 2 emergency tickets, 59 updated tickets, 23 cancellations, 13 meets, 2 non - excavation and 1 boundary survey. This resulted in a 14.4% decrease in tickets from the previous month and is a 7.9% increase from the prior October. • Electrical technicians completed 197 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters have been starting to get installed in new services and where we may have had an existing meter failure. We are working with our consultant, Rick Schmidt, on evaluating the AMI Endpoint Installation proposals that were opened on November 6. We are still anticipating a start date of March 2024 for mass deployment of meters. • For the month of October, staff did not run generators. Engine #4 is still waiting on plugs that are on backorder. • Staff completed the scheduled recloser tank replacements for Feeder 95 and also replaced Feeder 96 and 93 reclosers after testing was performed due to issues that were found. Load tap changer and relay testing and maintenance at our Station 14 substation was completed. We are still working on getting fiber communications completed to this substation before freeze-up this year. • Our yearly oil samples of substation equipment, line regulators, and oil filled switchgear have been completed. Test results came back with only Station 14, Bank #3's transformer showing an elevated amount of ethylene gas which we will need to monitor closely. This will help us identify any issues before they become a problem. Page 1 of 1 146