6.01h ERMUSR 11-14-2023��i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Dave Ninow —Water Superintendent MEETING DATE: AGENDA ITEM NUMBER: November 14, 2023 6.01h SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Delivered 8 new water meters, installed a Smart Point module, and took curb stop ties. • Completed 15 BACTI/Total Chlorine Residual Samples o All confirmed negative for Coliform Bacteria. o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH • Completed 22 routine fluoride samples o All samples met MDH standards o Submitted MDH Fluoride Report • The water department completed the annual inspection of the Lake Orono Damon October 4. The dam seems to be in satisfactory condition. • The Minnesota Department of Health (MDH) has notified us that we have passed the next threshold for bacteriological monitoring. Now that our water system serves more than 17,201 people our sampling rate will be increased from 15 to 20 bacteriological samples per month starting in 2024. • Water department staff worked with City staff and the contractor installing the Rolling Hills neighborhood sewer force main to find a difficult to locate sixteen -inch water main pipe stub in the roundabout at County Road 40 and County Road 13. After much time and effort, we were able to locate the pipe and the contractor was able to directionally drill the force main past the water main pipe without incident. • The drop pipe, check valve, pump, and motor have been removed from Well 4 for routine maintenance and inspection. • AT&T has expressed interest in leasing space on the Freeport Street Water Tower for telecommunication equipment. Currently Verizon Wireless and T-Mobile (formerly Sprint) lease space on our towers but this would be the first for AT&T. We are working on drafting a tower attachment lease agreement for this potential site build. • The replacement of the water main pipe in the School View neighborhood has been completed as well as the nine water services that homeowners elected to have replaced with the project by paying through assessment. Page 1 of 2 147 We have drained the Auburn Street Water Tower for the winter. Throughout previous winters the tower was subject to ice buildup on top of the water, which is extremely damaging to the structure and paint. This will be the last time we will need to drain the tower for winter as we have identified in the 2024 budget to have a submersible tank mixer installed to keep the water moving, preventing freezing and improving water quality. ATTACHMENTS: • October 2023 Pumping by Well Page 2 of 2 Um