Loading...
6.01i ERMUSR 11-14-2023•�i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Chris Kerzman — Engineering Manager MEETING DATE: AGENDA ITEM NUMBER: November 14, 2023 6.01i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • The City of Elk River has awarded the contract for the expansion of the fiber loop to the northeast area of Elk River, the low bidder was below the project estimate. This is planned to be a joint project between City of Elk River, ISD 728, and ERMU. We are expecting the majority of the work to be done in 2024. • We are expecting review drawings for the Otsego substation transformer in January of 2024. This is currently scheduled for delivery in May of 2026. • We are beginning the planning and design of the future East substation, which will be needed to support development in the southeast portion of our service territory. • We continue to assist with Advanced Metering Infrastructure system planning and setup as the first meters are installed. Page 1 of 1 150