Loading...
4.18 SR 11-20-2023�, Elk s �- River Request for Action To Item Number Ma Tor and CinT Council 4.18 Agenda Section Meeting Date Prepared by Consent A enda NovembeY 20, 2023 Brandon Wisner, En ineerin Pro�ect Mana eY Item Description Reviewed by Quote for Orono Park Beach Stabilization Cal Pormer, Ci r Administrator Improvements Reviewed by Action Requested Approve, byT motion, quote from Brenteson Companies Inc. for $39,818.99 for stabilization improvements at Orono Park. Background/Discussion Follo`ving the completion of the improvements at Orono Park two yTears ago, an area beach sand washes onto the ADA trail during rain events. This proposed `vork `vill alleviate this occurrence. T�vo quotes `vere received. Financial Impact $39,818.99 Mission/Policy/Goal Meet changing needs - Agile Attachments • Quotes The Elk River Vision A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. rowEREo ar �I'1 ���� Update�l• January 2023 Brenteson Companies, Inc. 5/31/23 DOCUMENT 00 41 00 QUOTE FORM BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLOWING UNIT PRICES AND/OR LUMP SUMS, WHICH INCLUDE SALES TAX AND OTHER APPLICABLE TAXES i4ND FEES. THE CITY RESERVES THE RIGHT TO ADD OR ELIMINATE PARTIAL OR ENTIRE QUANTITIES OF INDIVIDUAL BID ITEMS. ORONO PARK BEACH STABILIZATION IMPROVEMENTS Item Unit Price Amount No. Description Unit Est. Qty In Dollars In Dollars 1 Mobilization LS 1 1120.00 Furnish and install 12" compacted 2 depth topsoil borrow — complete. CY 58 90 80 5.266.40 Furnish and install infiltration pipe including 24" dia. Perforated HDPE 3 pipe, fabric, 2" minus river rock LF 75 bedding, and compacted backfill material as shown on the plans and details - com lete. 83.85 6,288.75 4 Furnish and install manhole with 24" EA 1 sump - complete. 6 772.50 5 Furnish and install 6" thick concrete SF 84 avin - com lete. 31.76 2 7. 4 6 Furnish and install 6" x 18" concrete LF 41 curb - com lete. 88.25 7 Furnish and install sod - complete. SY 145 40.45 Furnish and install irrigation zone 8 within sodded area, included LS 1 connection to existin s stem. 8 220.00 Quote Total 39,818.99 Quote Form 00 4100-1 �r DOCUMENT 00 4100 �V ��✓ �c� l� �^i� ✓'�i c.�- � r� QUOTE FORM ._J BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRAGT DOCUM�M'S FOR TNE FOLL�WING UIVi'f' PRICES AND/OR LUMP SUMS, WHICH INCLUDE SALFS TAX AND OTNER APPLICABLE TAXES AND FEES. THE CITI' RESERVES THE RiGHT 70 Abb OR ELIMINA7� PARTL4L OR EMfIRE QUAN'1TiTFS OF INDNIpUAL BID ITEMS. �RONO PARK BEACH STABILIZATION IMPROVEMENTS Item Descripfion Uni# Est Qty Unit Price Amount No. In Dollars In Dotlars 1 Mabilizatian LS 1 �,�50�•� � �.5�. °O Furnish and install 12" compacied ' g�gob. ao 2 dep#h topsoil �orrow - complete. CY 58 �g�, po � Furnish and instal! infiltration pipe including 24" dia. PerForated HD�E 3 pip�, fabric, 2" minus river rock �F 7� ���� ,�o � �S ��So, oa bedding, and compacted backfill material as shown on the plans and de#ails - com lete. � �Furnish and install manhole wi#h 24" sump - complete. EA � ���,���. 00 � q.�so, c�a Furnish and instal! 6" thick concrete 5 paving - camplete. S� 84 � 3y�', 5� �3.oL�.oa 6 Furnish and install 6L x 18" concrete LF 41 curb - com iete. I� laD. na � 2y Vo , ao 7 Furnish and instail sod - complete. . SY 145 ���x.�d ��. �`�� •° p Fumish and install irrigation zone 8 within sodded area, included , LS 1 �, � goo.m�o S� 3, Sop�o� connection to existin s stem. ' �� �. . , .. -_ ,��-�.-�� � ;: .: - -, _ _ � . ,���- ��� � �><�: � _ - ,�, � �t .�y.r �. ..�.. ,� . , , .... =.vr�; �. � r_ _, ,_.. _ >. , . . . . .. � .. z _ Quote7otal�0u+f�c ��X �'[\��c1 SQ�a,+A.�tV�� ��.VW�r �t'v�tn a�vt� ��iia.�'lZ,nd Z.�a.ro t¢,.,�,�..5 Quote Fo�m 00 4100-1