Loading...
4.5 SR 12-04-2023Request for Action To Item Number Mayor and Council 4.5 Agenda Section Meeting Date TDecember Prepared by Consent 4, 2023 Lori Stich, Finance Manager Item Description Reviewed by 2024-2028 Capital Improvement Plan Cal Portner, City Administrator Reviewed by Action Requested Adopt, by motion, the 2024-2028 Capital Improvement Plan (CIP). Background/Discussion City staff and the Council have reviewed the proposed 2024-2028 CIP leading up to its adoption. During Work Session, we reviewed the specific projects, costs, funding sources, and 5-year cash flow projections. The CIP is a strategic planning document that is re-evaluated annually and upon each review projects may be deleted, added, or delayed, reflecting community needs and financing. Approval of the CIP does not authorize spending or the initiation of a planned project. The City Council is accepting and acknowledging the planning document with the provision that capital improvement planning is subject to the dynamics of the community and other unanticipated needs. Projects presented in the CIP will be brought to the Council for approval per the Financial Management Policy. A few highlights of the CIP for 2024 include: ■ 2024 Street Improvement Project ■ Trail development — trail extensions and ADA improvements ■ Rolling Hills stormwater improvements ■ Lions Park playground ■ Equipment replacement includes a fire vehicle, police squads, and park & street maintenance equipment. Financial Impact Projects and funding sources are identified in the 2024-2028 CIP. Mission/Policy/Goal Develop a sustainable and prosperous community that reflects the culture of its citizens. Attachments ■ 2024-2028 Capital Improvement Plan A IR River City of Elk River, MN CAPITAL IMPROVEMENT PLAN 2024-2028 l TABLE OF CONTENTS INTRODUCTION: CityOfficials.............................................................................................. 1 Capital Improvement Plan Overview............................................................... 2 CAPITAL IMPROVEMENT PLAN: Capital Improvement Financing...................................................................... 4 Capital Improvement Plan Summary............................................................... 6 Categories of Expenditures...................................................................... 6 Timing of Projects and Expenditures.......................................................... 7 FundingSources.................................................................................... 8 Impact on Operating Budget............................................................................. 9 Projectsby Year........................................................................................ 10 Projects by Funding Source......................................................................... 13 PROJECT DETAILS: BM-01 Facilities Maintenance — Vehicle............................................................18 BZ-01 Building Safety — Vehicle.......................................................................19 FD-01 Fire — Vehicles.......................................................................................20 FD-02 Fire — Trucks..........................................................................................21 FD-03 Fire — Ladder/Engine.............................................................................22 FD-07 Fire — Training Burn Building.................................................................23 FD-25 Fire Equipment......................................................................................24 FD-26 Knox Box Key Secure System Update..................................................25 FS-02 Fire Station #2.......................................................................................26 FS-03 Fire Station #3.......................................................................................27 II-01 Hwy 169 Frontage/Backage Road Improvements.................................28 II-03 169 Redefine.........................................................................................29 II-20 County Projects — Cost Share................................................................30 II-35 Business Center Drive Extension..........................................................31 II-40 Infrastructure Improvements — Misc.......................................................32 LB-03 Library — Roof/Flooring..........................................................................33 LS-01 Liquor - Northbound —Monument Sign/Westbound-Roof........................34 PD-01 Police — Patrol Squads...........................................................................35 PD-02 Police — Unmarked Squads...................................................................36 PD-03 Police — CSO Vehicles...........................................................................37 PDF 24-2 AED's.....................................................................................................38 PDF 25-1 Hillside Park — Parking Lot.....................................................................39 PDF 25-2 Highway 10 Mississippi River Trail........................................................40 PDF 28-1 Oak Knoll Athletic Complex...................................................................41 PDF 28-2 Plants and Things Athletic Complex......................................................42 PF-64 Trail Development..................................................................................43 PIF 23-2 Playground — Lions Park........................................................................44 PIF 23-27 Park Improvements — Miscellaneous.....................................................45 PIF 24-1 Playground — Country Crossing/Trott Brook..........................................46 PIF 24-2 Basketball Court — Kliever Lake Fields..................................................47 PIF 25-1 Basketball Courts — Deerfield/Ridgewood..............................................48 PIF 25-2 Nature Play — Woodland Trails..............................................................49 PIF 25-3 Parks & Recreation Master Plan............................................................50 PIF 26-1 Playground/Basketball Court - Riverplace............................................51 PIF 26-2 Lions Park Shelters (3).............................................................. 52 PIF 27-1 Playgrounds — Fresno/Mississippi Oaks ........................................ 53 PIF 27-2 Rivers Edge Park — Fountain.................................................................54 PK-01 Parks — Pickup Trucks...........................................................................55 PK-02 Parks — Mobile Equipment......................................................... 56 Plan-24 Downtown Small Area Plan...................................................................57 Plan-25 Comprehensive Update of Zoning Ordinance........................................58 PM-01 Pavement Management — Streets.........................................................59 PM-02 Pavement Management - Parking Lots/Trails........................................60 ST-01 Streets — Pickup Trucks.........................................................................61 ST-02 Streets — Dump Trucks..........................................................................62 ST-03 Streets — Mobile Equipment...................................................................63 STW-1 Stormwater Projects..................................................................64 TC-25 2025 Technology Upgrades........................................................65 TC-26 2026 Technology Upgrades....................................................... 66 TC-27 2027 Technology Upgrades....................................................... 67 TC-28 2028 Technology Upgrades....................................................... 68 TFN-01 Financial Software....................................................................69 WW-06 Wastewater — Vehicle................................................................ 70 WW-12 Wastewater — Equipment........................................................... 71 WW-19 Wastewater —Lift Station Improvements ........................................ 72 WW-23 Wastewater — Urban Services Expansion ...................................... 73 WW-24 Wastewater — Centrifuge Installation ............................................ 74 WW-30 Wastewater — Grit Classifier Replacement .................................... 75 WW-31 Wastewater — Head of Plant Splitter Structure ............................... 76 WW-32 Wastewater — UV Building Modification ........................................ 77 WW-33 Wastewater — CR 44 Sewer Replacement .................................... 78 CITY OF ELK RIVER, MINNESOTA CITY OFFICIALS CITY COUNCIL John Dietz Cory Grupa Mike Beyer Jennifer Wagner Matthew Westgaard CITY MANAGEMENT STAFF Mayor Council member Council member Council member Council member Term Expires December 31, 2026 2026 2024 2026 2024 Calvin Portner City Administrator Joe Stremcha Business Services Director/Asst. City Administrator Ron Nierenhausen Police Chief Mark Dickinson Fire Chief Justin Femrite Public Works Director/Chief Engineer Zachary Carlton Community Development Director Suzanne Fischer Environmental Services/Special Projects Director CAPITAL IMPROVEMENT PLAN 2024 - 2028 The City of Elk River's Capital Improvement Plan (CIP) for the years 2024-2028 has been prepared as a strategic planning tool for the City Council to identify proposed capital improvement projects that address community priorities over the next five years. The CIP outlines projected capital expenditures based on the city's long-range plans, goals, and policies. In addition to identifying the specific capital projects, the CIP also outlines how these projects are anticipated to be financed. The primary objective of preparing a CIP is to develop a comprehensive program that allows the Council to align capital investments with specified projects based on the community's needs, while taking into consideration the best use of the limited resources available to provide efficient and effective delivery of services. The CIP will also provide a planning foundation for future needs assessments to ensure the City is appropriately responding to the critical infrastructure needs necessary for sustainable future growth. This document will provide the Council with the information to begin the process for planning improvements that meet the City's physical infrastructure needs. Consequently, the CIP serves as a flexible guide to properly identify the critical components of the City's infrastructure, yet maintain flexibility in determining project timeframes, project scope and possible funding sources. The CIP continues the emphasis of managing the City's limited resources by prudently planning for known and/or anticipated future capital expenditures. Capital improvements to streets, parks, buildings, equipment, software, and vehicles are included in the CIP. This plan is designed to show details of each specific capital improvement together with the estimated project costs, the need for the improvement, the sources of revenue to pay for the improvement, as well as the timing and location for each improvement. Specific information is shown on each project within this document. With the adoption of the attached plan, and the projects contained herein, Council and staff have carefully considered for each project and the overall plan: • The condition of the city's existing infrastructure, including the projected need for repair or replacement • The likely demand for the improvement • The estimated cost of the improvement • The available resources • The level of overlapping debt • The relative benefits and costs of alternative uses of the funds • Operating costs of the proposed improvements • Alternatives for providing services most efficiently through shared facilities with other cities or local governments. City staff estimates the amount of funding that is needed for projects to be completed in the next five years. This uniqueness of the type of project generally is associated with a funding source. Cash flow estimates are done frequently to review cash reserve levels associated with the project funds. Projects listed in the first year are included in the budget and upon each annual update of the CIP some projects will be deleted, added, or even delayed reflecting community needs and financial ability to fund the project. Approval of the CIP by Council does not authorize spending or initiation of a given project nor allocate funding for any of the projects. The City Council simply supports and accepts this document with the provision that capital improvement planning is subject to the dynamics of community growth and political leadership and acknowledges that other unanticipated needs may take precedence over planned projects Capital Improvement Financing Implementing capital improvements requires the utilization of sound, economical financing methods. The City of Elk River has several financing mechanisms available, ranging from cash reserves to special-purpose funds to borrowing through the issuance of municipal bonds. Several funding sources may be used for a project. The following funding sources are identified as potential financing mechanisms for the projects in the CIP.. Internal Sources: Capital Reserve — this fund was established to help build reserves for the purchase of the city's information technology hardware and software. Development Fund — this fund accounts for activities related to economic development within the city. Equipment Replacement Fund — this fund was established to account for the purchases of the city's vehicles and mobile equipment. Funding is provided through departmental charges based on the amortization of their respective equipment. FTCenter —this fund accounts for the operation and maintenance of the multipurpose facility which is funded by user fees. Government Buildings Reserve — this fund was established to provide funding for the replacement and/or rehabilitation of city facilities. The major source of revenue is from landfill expansion fees. Liquor Fund — this fund accounts for the operations and maintenance of the city's two off -sale municipal liquor stores. A portion of the profits provide funding for park improvement projects. Park Dedication — this fund accounts for park dedication fees from developers and funds expenditures for park land acquisitions and park capital improvements. Park Improvement — this fund was established to account for the replacement and maintenance of park equipment and for the beautification of city parks. It is financed by an annual transfer from the Liquor Fund. Pavement Management — this fund accounts for franchise taxes collected on gas and electric bills which the city uses to fund street projects. Sewer Fund — this fund accounts for customer sewer service charges that are used to finance the sewer system expenses and infrastructure improvements. Special Assessments — the costs of the improvements are levied against those properties that benefit from a particular improvement to finance such improvements. Storm Water — this fund accounts for customer stormwater service charges that are used to finance the stormwater system expenses. Trunk Utility — this fund is used on trunk water and sewer improvement projects for which assessments were collected. These funds would be used in lieu of having to issue bonds on future system expansion/improvements. External Sources: ERMU — a portion of project costs that are paid by Elk River Municipal Utilities. Federal Grants — grants received from federal agencies approved by the City Council. MN Dot — a portion of public works improvement costs on state -aid roads are paid by the Minnesota Department of Transportation. Municipal State Aid — money received from the state for street construction projects. State aid allotments for street construction are based on population and fiscal need. Capital Improvement Plan Summary Categories of Expenditures Streets and utilities construction are the largest expenditure categories in the CIP. The proposed 2024 Street Improvement project and the Hwy 169 improvements make up the largest share of streets expenditures. With the anticipated completion of the Hwy 169 improvements in 2024, that is expected to spur the urban services expansion of utilities in the northeast and northwest areas of the city. The equipment category includes public works equipment, squad cars, fire apparatus, and city vehicles. Park improvements include playground equipment and trail improvements. Summary of CIP Projects by Category Category 2024 2025 2026 2027 2028 Total Buildings $ - $ 392,000 $ 1,000,000 $ 120,000 $ - $ 1,512,000 Equipment 3,213,000 3,061,000 939,000 1,437,000 640,000 9,290,000 Parks 2,201,250 646,250 501,250 450,000 875,000 4,673,750 Streets 3,557,000 8,995,000 500,000 3,350,000 300,000 16,702,000 Technology 200,000 108,000 75,000 60,000 60,000 503,000 Utilities 320,000 755,000 1,755,000 7,855,000 28,755,000 39,440,000 TOTAL $ 9,491,250 $ 13,957,250 $ 4,770,250 $ 13,272,000 $ 30,630,000 $ 72,120,750 2024-2028 PROJECTS BY CATEGORY $7251209750 Equipment Buildings $9,2905000 $1,512,000 Parks $4,673,750 Utilities $39,440,000 Streets $16,702,000 Technology $503,000 Timing of Projects and Expenditures The total amount of capital expenditures included in the CIP is $72,120,750. The projects and equipment in the CIP have been staged appropriately to align with affordability and available funding sources. Each project has a financing plan, and a review of funding sources is important in the context of total expenditures. Through long-term financial planning, the city strives to minimize impact on local property taxes. All projects and expenditures are subject to approval and annual appropriation by the City Council, as well as city purchasing and capital expenditure policies. Summary of CIP Expenditures by Year 12024-2028 CIP EXPENDITURES BY YEAR 2024 $9,491,250 2025 $13,957,250 2026 $4,770,250 2027 $13,272,000 2028 $30,630,000 is Funding Sources A variety of funding sources will be utilized to fund the projects and expenditures. Utility funds will provide financing for 57% of the project expenditures. Street improvement projects will be financed from street funds (17%), along with intergovernmental revenues from the state, and federal grants which will add 5% of funding sources. A variety of capital project funds contain money that has been set aside for capital expenditures for facility improvements and the purchase of public works equipment, squad cars, fire apparatus, and technology equipment. Summary of CIP Funding Sources 12024 - 2028 CIP FUNDING SOURCES Yet To Be Determined Capital 7% Reserve 1% Utility Funds 57% Equipment Govt Fund Development Fund Building 7% 0% 0 /° Grants MnDOT/State Aid 4 /° Park Funds 5% Street Funds 17% )ther Sources 1% 8 Impact on Operating Budget Identifying potential costs associated with implementation of the proposed capital improvement projects is a critical aspect of long-term financial planning. Many of the projects included in the Capital Improvement Plan will have little or no impact on the operating budget. Generally, equipment replacement items will have a positive impact on future operating budgets due to lower maintenance costs. Street improvement projects will result in substantial savings in maintenance costs. The park improvement projects represent identified maintenance or replacement of existing assets and should have little impact on the operating budget. 9 City of Elk River, Minnesota Capital Improvement Plan PROJECTS BY YEAR Project Name Department Project # Project Cost 2024 Financial Software Finance TFN-01 200,000 Fire - Trucks Fire FD-02 95,000 Fire - Engines/Ladders Fire FD-03 2,000,000 169 Redefine Infrastructure Improvements II-03 2,507,000 Infrastructure Improvements-Misc. Infrastructure Improvements II-40 100,000 Pavement Management - Streets Infrastructure Improvements PM-01 300,000 Pavement Management - Parking Lots/Trails Infrastructure Improvements PM-02 550,000 AED's Park Dedication PDF 24-2 18,000 Trail Development -Mega Loop Park Improvement PF-64 1,650,000 Playground - Lions Park Park Improvement PIF 23-2 410,000 Park Improvement- Miscellaneous Park Improvement PIF23-27 16,250 Playgrounds - Country Crossing/Trott Brook Park Improvement PIF 24-1 125,000 Parks - Mobile Equipment Park Maintenance PK-02 320,000 Downtown Small Area Plan Planning Plan-24 100,000 Police - Patrol Squads Police PD-01 350,000 Police - CSO Vehicles Police PD-03 55,000 Wastewater - Lift Station Improvements Sewer Department WW-19 55,000 CR 44 Sewer Replacement Sewer Department WW-33 20,000 Stormwater Projects Storm Water STW-1 300,000 Streets - Pickup Trucks Streets ST-01 320,000 Total for2024 9,491,250 2025 Fire - Vehicles Fire FD-01 65,000 Fire - Trucks Fire FD-02 100,000 Fire - Engines/Ladders Fire FD-03 1,300,000 Fire Equipment Fire FD-25 109,000 Fire Station #2 Fire Stations FS-02 130,000 Fire Station #3 Fire Stations FS-03 22,000 Hwy 169 Frontage/Backage Road Improvements Infrastructure Improvements II-01 1,500,000 County Projects - Cost Share Infrastructure Improvements II-20 2,745,000 Business Center Drive Extension Infrastructure Improvements II-35 700,000 Pavement Management - Streets Infrastructure Improvements PM-01 3,700,000 Pavement Management - Parking Lots/Trails Infrastructure Improvements PM-02 350,000 Library Library LB-03 60,000 Liquor Stores Liquor Fund LS-01 180,000 Hillside Park Parking Lot Park Dedication PDF 25-1 250,000 Highway 10 Mississippi River Trail Park Dedication PDF 25-2 200,000 Park Improvement- Miscellaneous Park Improvement PIF23-27 16,250 Basketball Court - Kliever Lake Fields Park Improvement PIF 24-2 50,000 Basketball Courts - Deerfield/Ridgewood Park Improvement PIF 25-1 30,000 Parks & Recreation Master Plan Park Improvement PIF25-3 100,000 Parks - Pickup Trucks Park Maintenance PK-01 203,000 Parks - Mobile Equipment Park Maintenance PK-02 15,000 2024-2028 CAPITAL IMPROVEMENT PLAN 10 Project Name Department Project # Project Cost Comprehensive Update of Zoning Ordinance Planning Plan-25 50,000 Police - Patrol Squads Police PD-01 217,500 Police - Unmarked Squads Police PD-02 167,500 Wastewater - Vehicle Sewer Department WW-06 65,000 Wastewater - Equipment Sewer Department WW-12 200,000 Wastewater - Lift Station Improvements Sewer Department WW-19 55,000 Grit Classifier Replacement Sewer Department WW-30 150,000 CR 44 Sewer Replacement Sewer Department WW-33 250,000 Stormwater Projects Storm Water STW-1 250,000 Streets - Pickup Trucks Streets ST-01 90,000 Streets - Dump Trucks Streets ST-02 315,000 Streets - Mobile Equipment Streets ST-03 214,000 2025 Technology Upgrades Technology/Communications TC-25 108,000 Total for 2025 13,957,250 2026 Fire - Vehicles Fire FD-01 60,000 Fire - Burn Building Fire FD-07 1,000,000 Knox Box Key Secure System Update Fire FD-26 55,000 Pavement Management - Streets Infrastructure Improvements PM-01 300,000 Pavement Management - Parking Lots/Trails Infrastructure Improvements PM-02 200,000 Park Improvement- Miscellaneous Park Improvement PIF23-27 16,250 Playground/Basketball Court - Riverplace Park Improvement PIF 26-1 185,000 Lions Park Shelters Park Improvement PIF26-2 300,000 Parks - Pickup Trucks Park Maintenance PK-01 125,000 Parks - Mobile Equipment Park Maintenance PK-02 279,000 Police - Unmarked Squads Police PD-02 107,500 Police - CSO Vehicles Police PD-03 52,500 Wastewater - Lift Station Improvements Sewer Department WW-19 55,000 Head of Plant Splitter Structure Sewer Department WW-31 1,500,000 Stormwater Projects Storm Water STW-1 200,000 Streets - Mobile Equipment Streets ST-03 260,000 2026 Technology Upgrades Technology/Communications TC-26 75,000 Total for 2026 4,770,250 2027 Building Safety - Vehicles Building Safety BZ-01 40,000 Facilities Maintenance - Vehicles Facilities Maintenance BM-01 90,000 Pavement Management - Streets Infrastructure Improvements PM-01 3,000,000 Pavement Management - Parking Lots/Trails Infrastructure Improvements PM-02 350,000 Library Library LB-03 120,000 Park Improvement- Miscellaneous Park Improvement PIF23-27 10,000 Playgrounds - Country Crossing/Trott Brook Park Improvement PIF 24-1 125,000 Basketball Courts - Deerfield/Ridgewood Park Improvement PIF 25-1 50,000 Playgrounds - Fresno/Mississippi Oaks Park Improvement PIF 27-1 190,000 Rivers Edge Park Fountain Park Improvement PIF27-2 75,000 Parks - Mobile Equipment Park Maintenance PK-02 58,000 Police - Patrol Squads Police PD-01 145,000 Police - Unmarked Squads Police PD-02 110,000 Wastewater - Vehicle Sewer Department WW-06 325,000 Wastewater - Lift Station Improvements Sewer Department WW-19 55,000 Wastewater - Centrifuge Installation Sewer Department WW-24 6,000,000 UV Building Modification Sewer Department WW-32 1,800,000 Streets - Pickup Trucks Streets ST-01 125,000 Streets - Mobile Equipment Streets ST-03 544,000 2024-2028 CAPITAL IMPROVEMENT PLAN 11 Project Name Department Project # Project Cost 2027 Technology Upgrades Technology/Communications TC-27 60,000 Total for 2027 13,272,000 2028 Pavement Management - Streets Infrastructure Improvements PM-01 300,000 Oak Knoll Athletic Complex Park Dedication PDF 28-1 450,000 Plants and Things Recreation Complex Park Dedication PDF 28-2 350,000 Nature Play - Woodland Trails Park Improvement PIF 25-2 75,000 Parks - Mobile Equipment Park Maintenance PK-02 25,000 Police - Patrol Squads Police PD-01 75,000 Police - Unmarked Squads Police PD-02 100,000 Wastewater - Lift Station Improvements Sewer Department WW-19 55,000 Wastewater - Urban Services Expansion Sewer Department WW-23 28,700,000 Streets - Pickup Trucks Streets ST-01 75,000 Streets - Mobile Equipment Streets ST-03 365,000 2028 Technology Upgrades Technology/Communications TC-28 60,000 Total for 2028 30,630,000 GRAND TOTAL 72,120,750 2024-2028 CAPITAL IMPROVEMENT PLAN im City of Elk River, Minnesota Capital Improvement Plan 2024 ffim 2028 PROJECTS BY FUNDING SOURCE Source Project # 2024 2025 2026 2027 2028 Total Capital Reserve - IT 2025 Technology Upgrades TC-25 92,400 92,400 2026 Technology Upgrades TC-26 70,000 70,000 2027 Technology Upgrades TC-27 57,000 57,000 2028 Technology Upgrades TC-28 48,000 48,000 Capital Reserve - IT Total 92,400 70,000 57,000 48,000 267,400 Capital Reserve - Undesignated Financial Software TFN-01 200,000 200,000 Capital Reserve - Undesignated Total 200,000 200,000 �City Development Fund Downtown Small Area Plan Plan-24 100,000 100,000 Comprehensive Update of Zoning Ordinance Plan-25 50,000 50,000 City Development Fund Total 100,000 50,000 150,000 Equipment Replacement Fund Facilities Maintenance -Vehicles BM-01 90,000 90,000 Building Safety - Vehicles BZ-01 40,000 40,000 Fire -Vehicles FD-01 65,000 60,000 125,000 Fire - Trucks FD-02 95,000 100,000 195,000 Police - Patrol Squads PD-01 350,000 217,500 0 145,000 75,000 787,500 Police - Unmarked Squads PD-02 167,500 107,500 110,000 100,000 485,000 Police - CSO Vehicles PD-03 55,000 52,500 107,500 Parks - Pickup Trucks PK-01 0 203,000 125,000 0 328,000 Parks - Mobile Equipment PK-02 320,000 15,000 279,000 58,000 25,000 697,000 Streets - Pickup Trucks ST-01 320,000 90,000 125,000 75,000 610,000 Streets - Dump Trucks ST-02 315,000 315,000 Streets - Mobile Equipment ST-03 0 214,000 260,000 544,000 365,000 1,383,000 Equipment Replacement Fund Total 1,140,000 1,387,000 884,000 1,112,000 640,000 5,163,000 ERMU 2025 Technology Upgrades TC-25 15,600 15,600 2026 Technology Upgrades TC-26 5,000 5,000 2027 Technology Upgrades TC-27 3,000 3,000 2028 Technology Upgrades TC-28 12,000 12,000 ERMU Total 15,600 5,000 3,000 12,000 35,600 2024-2028 CAPITAL IMPROVEMENT PLAN 13 Source Project # 2024 2025 2026 2027 2028 Total Federal Grant Trail Development -Mega Loop PF-64 830,000 830,000 Federal Grant Total 830,000 830,000 Government Buildings Fire Station #2 FS-02 130,000 130,000 Fire Station #3 FS-03 22,000 22,000 Government Buildings Total 152,000 152,000 Library Library LB-03 60,000 120,000 180,000 Library Total 60,000 120,000 180,000 Li uor Fund Liquor Stores LS-01 180,000 180,000 Liquor Fund Total 180,000 180,000 Municipal State Aid Hwy 169 Frontage/Backage Road Improvements II-01 750,000 750,000 County Projects - Cost Share II-20 1,720,000 1,720,000 Trail Development -Mega Loop PF-64 450,000 450,000 Municipal State Aid Total 450,000 2,470,000 2,920,000 Park Dedication County Projects - Cost Share II-20 275,000 275,000 AED's PDF 24-2 18,000 18,000 Hillside Park Parking Lot PDF25-1 250,000 250,000 Highway 10 Mississippi River Trail PDF25-2 200,000 200,000 Oak Knoll Athletic Complex PDF28-1 450,000 450,000 Plants and Things Recreation Complex PDF28-2 350,000 350,000 Trail Development -Mega Loop PF-64 370,000 370,000 Playground - Lions Park PIF 23-2 310,000 310,000 Park Dedication Total 698,000 725,000 800,000 2,223,000 Park Improvement Playground - Lions Park PIF 23-2 100,000 100,000 Park Improvement - Miscellaneous PIF 23-27 16,250 16,250 16,250 10,000 58,750 Playgrounds - Country Crossing/Trott Brook PIF 24-1 125,000 125,000 250,000 Basketball Court - Kliever Lake Fields PIF 24-2 50,000 50,000 Basketball Courts - Deerfield/Ridgewood PIF 25-1 30,000 50,000 80,000 Nature Play - Woodland Trails PIF 25-2 75,000 75,000 Parks & Recreation Master Plan PIF 25-3 100,000 100,000 Playground/Basketball Court - Riverplace PIF 26-1 185,000 185,000 Lions Park Shelters PIF 26-2 300,000 300,000 Playgrounds - Fresno/Mississippi Oaks PIF 27-1 190,000 190,000 Rivers Edge Park Fountain PIF 27-2 75,000 75,000 2024-2028 CAPITAL IMPROVEMENT PLAN 14 Source Project # 2024 2025 2026 2027 2028 Total Park Improvement Total 241,250 196,250 501,250 450,000 75,000 1,463,750 Pavement Management Hwy 169 Frontage/Backage Road Improvements II-01 750,000 750,000 169 Redefine 11-03 1,507,000 1,507,000 County Projects - Cost Share II-20 750,000 750,000 Pavement Management - Streets PM-01 300,000 3,600,000 300,000 3,000,000 300,000 7,500,000 Pavement Management - Parking Lots/Trails PM-02 550,000 350,000 200,000 350,000 11450,000 Pavement Management Total 2,357,000 5,450,000 500,000 3,350,000 300,000 11,957,000 Sewer Fund Wastewater - Vehicle WW-06 65,000 325,000 390,000 Wastewater - Equipment WW-12 200,000 200,000 Wastewater - Lift Station Improvements WW-19 55,000 55,000 55,000 55,000 55,000 275,000 Wastewater - Urban Services Expansion WW-23 11,850,000 11,850,000 Wastewater - Centrifuge Installation WW-24 6,000,000 6,000,000 Grit Classifier Replacement WW-30 150,000 150,000 Head of Plant Splitter Structure WW-31 1,500,000 1,500,000 UV Building Modification WW-32 1,800,000 1,800,000 CR 44 Sewer Replacement WW-33 20,000 250,000 270,000 Sewer Fund Total 75,000 720,000 1,555,000 8,180,000 11,905,000 22,435,000 (State Aid Infrastructure Improvements-Misc. II-40 100,000 100,000 State Aid Total 100,000 100,000 Storm Water Pavement Management - Streets PM-01 100,000 100,000 Stormwater Projects STW-1 300,000 250,000 200,000 750,000 Storm Water Total 300,000 350,000 200,000 850,000 Trunk Utility Fund 169 Redefine 11-03 1,000,000 1,000,000 Wastewater - Urban Services Expansion WW-23 16,850,000 16,850,000 Trunk Utility Fund Total 1,000,000 16,850,000 17,850,000 Yet To Be Determined Fire - Engines/Ladders FD-03 2,000,000 1,300,000 3,300,000 Fire - Burn Building FD-07 1,000,000 1,000,000 Fire Equipment FD-25 109,000 109,000 Knox Box Key Secure System Update FD-26 55,000 55,000 Business Center Drive Extension 8-35 700,000 700,000 Yet To Be Determined Total 2,000,000 2,109,000 1,055,000 5,164,000 2024-2028 CAPITAL IMPROVEMENT PLAN 15 Source Project # 2024 2025 2026 2027 2028 Total GRAND TOTAL 9,491,250 13,957,250 4,770,250 13,272,000 30,630,000 72,120,750 2024-2028 CAPITAL IMPROVEMENT PLAN IV PROJECT DETAILS iWA Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # BM-01 Project Name Facilities Maintenance- Vehicles Description 2027 - #370 - 2012 Ford F350 Utility Justification 3ased on annual condition assessment. Expenditures Department Facilities Maintenance Contact Facilities Maintenance Supt. Type Vehicle Useful Life 10 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 90,000 90,000 Total 90,000 90,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 90,000 90,000 Tom 90,000 90,000 2024-2028 CAPITAL IMPROVEMENT PLAN 18 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # BZ-01 Project Name Building Safety - Vehicles Description I Zeplace #511 - 2015 GMC Sierra 1500 Justification 3ased on annual condition assessment. Expenditures Department Building Safety Contact Building Offical Type Vehicle Useful Life 10 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 40,000 40,000 Total 40,000 40,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 40,000 40,000 Total 40,000 40,000 2024-2028 CAPITAL IMPROVEMENT PLAN 19 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-01 Project Name Fire - Vehicles Description I 2025 - Replace #401 - 2015 Chevrolet Tahoe 2026 - Replace #406 - 2004 Polaris 4-wheeler Justification 3ased on annual condition assessment. Expenditures Department Fire Contact Fire Chief Type Vehicle Useful Life 10 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 65,000 60,000 125,000 Total 65,000 60,000 125,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 65,000 60,000 125,000 Total 65,000 60,000 125,000 2024-2028 CAPITAL IMPROVEMENT PLAN 20 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-02 Project Name Fire -Trucks Description 2024 - #411 - 2004 Ford F350 Grass 3 2025 - #412 - 2006 Ford F350 Grass 4 Justification 3ased on annual condition assessment. Expenditures Department Fire Contact Fire Chief Type Vehicle Useful Life 15 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 95,000 100,000 195,000 Total 95,000 100,000 195,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 95,000 100,000 195,000 Tom 95,000 100,000 195,000 2024-2028 CAPITAL IMPROVEMENT PLAN 21 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-03 Project Name Fire- Engines/Ladders Description 2024 - #419 - 1990 Pierce Ladder 2025 - #416 - 2005 Pierce Engine 2 Justification 3ased on annual condition assessment. The fire engines/ladders are the primary front-line response units. Department Fire Contact Fire Chief Type Vehicle Useful Life 20 years Category Vehicles Expenditures 2024 2025 2026 2027 2028 Total Vehicles 2,000,000 1,300,000 3,300,000 Total Funding Sources 2,000,000 2024 1,300,000 2025 2026 3,300,000 2027 2028 Total Yet To Be Determined 2,000,000 1,300,000 3,300,000 Tom 2,000,000 1,300,000 3,300,000 2024-2028 CAPITAL IMPROVEMENT PLAN M Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-07 Project Name Fire- Burn Building Description sire burn building for training Department Fire Contact Fire Chief Type Building Useful Life 25 years Category Buildings Justification nor the continued required training for firefighters to have live fire training. Acquiring residential structures are no longer a long-term solution and he lack of live fire training is making the job of firefighting unsafe. Expenditures 2024 2025 2026 2027 2028 Total Buildings 1,000,000 1,000,000 Total Funding Sources 2024 1,000,000 2025 2026 2027 1,000,000 2028 Total Yet To Be Determined 1,000,000 1,000,000 Tom 1,000,000 1,000,000 2024-2028 CAPITAL IMPROVEMENT PLAN 23 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-25 Project Name Fire Equipment Department Fire Contact Fire Chief Type Equipment Useful Life 10 years Category Equipment Description I extrication tools (Jaws of Life) - update two sets on front line apparatus. The purchase would include a spreader, cutter, and ram device along with iecessary batteries, chargers, and modification to apparatus to propertly secure them. ($64,000) Y4oveable wall maze system for training area in station 3. ($45,000) Justification ]Ve have two sets of extrication tools that are 10+ years old on front line fire engines. In 2021 the department evaluated battery operated tools and purchased one set for the rescue truck. These tools have been highly successful and proved their value in allowing quick deployment and reduced maintenance. Maze system was not included in station 3 construction due to lack of funds. Expenditures 2024 2025 2026 2027 2028 Total Equipment 109,000 109,000 Total Funding Sources 2024 109,000 2025 2026 109,000 2027 2028 Total Yet To Be Determined 109,000 109,000 Total 109,000 109,000 2024-2028 CAPITAL IMPROVEMENT PLAN 24 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # FD-26 Project Name Knox Box Key Secure System Update Description Department Fire Contact Fire Chief Type Maintenance Useful Life Unassigned Category Unassigned fhe Knox system is a key box system that allows police, fire, and EMS access to buildings in our communities during an emergency without laving to damage a door to gain entry. This saves valuable time and property. We currently have 363 Knox boxes around our communities. The zpgrade to the newest key secure system would also enble us to manage the key system from a cloud -based program remotely, versus having to Ailize older technology and physically plugging into the units. There are currently 32 key secure units in service across the Elk River Fire, Police ind Ambulance fleet. Justification ,urrent system is outdated, relying on older technology for maintaining and tracking users and keys. This has led to situations causing delays for )olice, fire, and EMS to be able to access buildings in a timely manner in an emergency. This will improve reliability, maintenance, and security of hese units. Expenditures 2024 2025 2026 2027 2028 Total Maintenance 55,000 55,000 Total Funding Sources 2024 55,000 2025 2026 2027 55,000 2028 Total Yet To Be Determined 55,000 55,000 Total 55,000 55,000 2024-2028 CAPITAL IMPROVEMENT PLAN f' i Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project FS-02 Project Name Fire Station #2 Description Zemodel of administration offices Department Fire Stations Contact Fire Chief Type Building Useful Life 20 years Category Buildings Justification Che remodel of the administration offices at Fire Station 2 was specified in the remodel project at station 2, but was not completed due to lack of unds available. Expenditures 2024 2025 2026 2027 2028 Total Design/Construction 130,000 130,000 Total 130,000 130,000 Funding Sources 2024 2025 2026 2027 2028 Total Government Buildings 130,000 130,000 Tom 130,000 130,000 2024-2028 CAPITAL IMPROVEMENT PLAN O Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project FS-03 Project Name Fire Station #3 Description Door fobs Department Fire Stations Contact Fire Chief Type Building Useful Life 50 years Category Buildings Justification Chere are 6 doors at station 3 that need fobs added to improve access and functuionality. Four of these were designed for fobs as part of the )uilding project and conduit/hardware is in place for the fobs to be installed. Expenditures 2024 2025 2026 2027 2028 Total Buildings 22,000 22,000 Total 22,000 22,000 Funding Sources 2024 2025 2026 2027 2028 Total Government Buildings 22,000 22,000 Tom 22,000 22,000 2024-2028 CAPITAL IMPROVEMENT PLAN 27 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # 11-01 Project Name Hwy 169 Frontage/Backage Road Improvements Department Infrastructure Improvements Contact Public Works Director Type Infrastructure Useful Life 25 years Category Street Construction Description I design and implement improvements to the frontage and backage road system east and west of the Hwy 169 Redefine project Justification mprovements to the local road connections to Hwy 169 to assure the successful completion of connecting commercial uses on the east side of 3wy 169 from Main Street to Dodge Avenue. Expenditures 2024 2025 2026 2027 2028 Total Construction 1,500,000 1,500,000 Total Funding Sources 2024 1,500,000 2025 2026 1,500,000 2027 2028 Total Municipal State Aid Pavement Management 750,000 750,000 750,000 750,000 Tom 1,500,000 1,500,000 2024-2028 CAPITAL IMPROVEMENT PLAN 28 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # II-03 Project Name 169 Redefine Department Infrastructure Improvements Contact Public Works Director Type Infrastructure Useful Life 25 years Category Street & Utility Construction Description I -ocal cost share for MNDOT project to reconstruct TH 169 through Elk River, including sewer modifications. Justification iafety and mobility improvement to the TH 169 corridor and provide better local connection across the highway. Visual quality enhanced railings, treet lights, plantings, colors and textures of the final elements of the TH 169 project. Expenditures 2024 2025 2026 2027 2028 Total Improvements 2,507,000 2,507,000 Total Funding Sources 2,507,000 2024 2025 2,507,000 2026 2027 2028 Total Pavement Management Trunk Utility Fund 1,507,000 1,000,000 1,507,000 1,000,000 Tom 2,507,000 2,507,000 2024-2028 CAPITAL IMPROVEMENT PLAN 29 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # II-20 Project Name County Projects -Cost Share Description City share of county projects include: 1) CR 33 Realignment and future trail preparation ($2,200,000 less $480,000 county turnback) 2) CR 44 Reconstruction ($750,000) and Trail ($250,000) Justification ,ity participation in projects initiated by Sherburne County. Department Infrastructure Improvements Contact Public Works Director Type Infrastructure Useful Life 25 years Category Street Construction Expenditures 2024 2025 2026 2027 2028 Total Improvements 2,745,000 2,745,000 Total 2,745,000 2,745,000 Funding Sources 2024 2025 2026 2027 2028 Total Municipal State Aid 1,720,000 1,720,000 Park Dedication 275,000 275,000 Pavement Management 750,000 750,000 Total 2,745,000 2,745,000 2024-2028 CAPITAL IMPROVEMENT PLAN 30 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # II-35 Project Name Business Center Drive Extension Description extend Business Center Drive from Waco Street west to Big Lake Township Department Infrastructure Improvements Contact Planning Manager Type Infrastructure Useful Life 25 years Category Street Construction Justification Che project will complete a long planned connection of a frontage road system from Waco Street to Big Lake Township to better serve ransportation needs in the area. The project will further complete a water system loop and add sewer service to an unserved developable parcel. Expenditures 2024 2025 2026 2027 2028 Total Design/Construction 700,000 700,000 Total Funding Sources 2024 700,000 2025 2026 700,000 2027 2028 Total Yet To Be Determined 700,000 700,000 Tom 700,000 700,000 2024-2028 CAPITAL IMPROVEMENT PLAN 31 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # II-40 Project Name Infrastructure Improvements-Misc. Description lashing yellow left turn arrow Department Infrastructure Improvements Contact Public Works Director Type Infrastructure Useful Life 15 years Category Street & Utility Construction Justification ,itizen reported concerns that are negatively impacting their daily trips. MnDOT may share in some of the project costs. Expenditures 2024 2025 2026 2027 2028 Total Improvements 100,000 100,000 Funding Sources Total 100,000 2024 2025 100,000 2026 2027 2028 Total State Aid 100,000 100,000 Tom 100,000 100,000 2024-2028 CAPITAL IMPROVEMENT PLAN M Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project L$-03 Project Name Library Description mprovements to the library. 2025 - Flooring 2027 - Roof replacement Justification 3eautification and maintenance of the library building and grounds. Department Library Contact Park & Rec. Director Type Equipment Useful Life Unassigned Category Building Maintenance Expenditures 2024 2025 2026 2027 2028 Total Buildings 120,000 120,000 Building Maintenance 60,000 60,000 Total 60,000 120,000 180,000 Funding Sources 2024 2025 2026 2027 2028 Total Library 60,000 120,000 180,000 Tom 60,000 120,000 180,000 2024-2028 CAPITAL IMPROVEMENT PLAN 33 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project LS-01 Project Name Liquor Stores Description 2025 - Northbound monument sign Westbound roof replacement Department Liquor Fund Contact Liquor Operations Manager Type Improvement Useful Life 20 years Category Buildings Justification New monument sign for Northbound Liquor, with an updated logo, will need to be installed due to visibility related to the reconstruction of TH 169. Replace existing rock ballast rubber membrane roof at Westbound with a screwed down non -rock ballast rubber membrane roof adding insulation, & necessary. (Existing roof at end of life expectancy.) Expenditures 2024 2025 2026 2027 2028 Total Buildings Improvements 100,000 80,000 100,000 80,000 Total Funding Sources 2024 180,000 2025 2026 180,000 2027 2028 Total Liquor Fund 180,000 180,000 Tom 180,000 180,000 2024-2028 CAPITAL IMPROVEMENT PLAN 34 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PD-01 Project Name Police - Patrol Squads Description 1 2024 - #602 - 2020 Ford Utility Hybrid #606 - 2020 Ford Utility Hybrid #608 - 2020 Ford Utility Hybrid #615 - 2019 Ford Utility Hybrid #617 - 2021 Ford Utility Hybrid 2025 - #604 - 2021 Ford Utility Hybrid #613 - 2021 Ford Utility Hybrid #626 - 2020 Ford Utility Hybrid 2027 - #601 - 2023 Ford Utility Hybrid #613 - 2021 Ford Utility Hybrid 2028 - #628 - 2023 Ford Utility Hybrid Justification 3ased on annual condition assessment. Expenditures Department Police Contact Police Captain Type Vehicle Useful Life 5 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 350,000 217,500 145,000 75,000 787,500 Tom 350,000 217,500 145,000 75,000 787,500 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 350,000 217,500 0 145,000 75,000 787,500 Total 350,000 217,500 0 145,000 75,000 787,500 2024-2028 CAPITAL IMPROVEMENT PLAN Kli Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PD-02 Project Name Police- Unmarked Squads Description 2025 - #603 - 2016 Ford Taurus #616 - 2015 Ford Utility #627 - 2015 Chevrolet Equinox 2026 - #607 - 2015 Ford Utility #618 - 2018 Ford Utility 2027 - #610 - 2015 Ford Utility #619 - 2023 Ford Utility 2028 - #605 - 2016 Ford Taurus #624 - 2014 Ford Utility Justification 3ased on annual condition assessment. Department Police Contact Police Captain Type Vehicle Useful Life 7 years Category Vehicles Expenditures 2024 2025 2026 2027 2028 Total Vehicles 167,500 107,500 110,000 100,000 485,000 Tom 167,500 107,500 110,000 100,000 485,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 167,500 107,500 110,000 100,000 485,000 Tom 167,500 107,500 110,000 100,000 485,000 2024-2028 CAPITAL IMPROVEMENT PLAN lGI Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PD-03 Project Name Police - CSO Vehicles Description 2024 - #612 - 2014 Ford Utility 2026 - #614 - 2017 Ford Utility Justification 3ased on annual condition assessment. Expenditures Department Police Contact Police Captain Type Vehicle Useful Life 6 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 55,000 52,500 107,500 Total 55,000 52,500 107,500 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 55,000 52,500 107,500 Tom 55,000 52,500 107,500 2024-2028 CAPITAL IMPROVEMENT PLAN 37 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PDF 24-2 Project Name AED's Description kED's for 2 parks Justification 'ut AED's in parks for public safety. Department Park Dedication Contact Park & Rec. Director Type Equipment Useful Life 5 years Category Equipment Expenditures 2024 2025 2026 2027 2028 Total Equipment 18,000 18,000 Funding Sources Total 18,000 2024 2025 18,000 2026 2027 2028 Total Park Dedication 18,000 18,000 Tom 18,000 18,000 2024-2028 CAPITAL IMPROVEMENT PLAN 38 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PDF 25-1 Project Name Hillside Park Parking Lot Description 2onstruct a paved parking lot at Hillside Park including curb and gutter. Department Park Dedication Contact Park & Rec. Director Type Infrastructure Useful Life 15 years Category Park Improvements Justification � paved parking lot at Hillside Park is recommended in the Hillside Park Master Plan approved by city council November 2016. Expenditures 2024 2025 2026 2027 2028 Total Parking Lot 250,000 250,000 Total Funding Sources 2024 250,000 2025 2026 250,000 2027 2028 Total Park Dedication 250,000 250,000 Tom 250,000 250,000 2024-2028 CAPITAL IMPROVEMENT PLAN 39 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PDF 25-2 Project Name Highway 10 Mississippi River Trail Description 3ighway 10 Mississippi River Trail Justification Che trail is recommended in the Trails Master Plan Department Park Dedication Contact Park & Rec. Director Type Improvement Useful Life 20 years Category Trail Improvements Expenditures 2024 2025 2026 2027 2028 Total Trails 200,000 200,000 Total Funding Sources 2024 200,000 2025 2026 200,000 2027 2028 Total Park Dedication 200,000 200,000 Tom 200,000 200,000 2024-2028 CAPITAL IMPROVEMENT PLAN 40 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PDF 28-1 Project Name Oak Knoll Athletic Complex Description Y4akes improvements to the Oak Knoll Athletic Complex. Department Park Dedication Contact Park & Rec. Director Type Improvement Useful Life 20 years Category Park Improvements Justification Che improvements made to the Oak Knoll Complex are based on the recommendations in the Athletic Facilities Master Plan. Expenditures 2024 2025 2026 2027 2028 Total Improvements 450,000 450,000 Total Funding Sources 2024 450,000 2025 2026 2027 2028 450,000 Total Park Dedication 450,000 450,000 Tom 450,000 450,000 2024-2028 CAPITAL IMPROVEMENT PLAN 41 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PDF 28-2 Project Name Plants and Things Recreation Complex Description Y4ake improvements to the Plants and Things Recreation Complex. Department Park Dedication Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements Justification Che improvements made to the Plants and Things Recreation Complex are based on the recommendations in the Athletic Facilities Master Plan. Expenditures 2024 2025 2026 2027 2028 Total Improvements 350,000 350,000 Total Funding Sources 2024 350,000 2025 2026 2027 2028 350,000 Total Park Dedication 350,000 350,000 Tom 350,000 350,000 2024-2028 CAPITAL IMPROVEMENT PLAN ►y, Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PF-64 Project Name Trail Development -Mega Loop Description Trail extensions and ADA improvements on the following road segments: 1) Cleveland St NW (CR 40) - CR 12 to south of Twin Lakes Pkwy 2) Mississippi Rd NW (CR 30) - Troy St NW to Naples St NW 3) Mississippi Rd NW (CR 30) - Denver St NW to Orono Rd NW 4) Twin Lakes Rd NW - Twin Lakes Pkwy to Cleveland Rd NW Department Park Improvement Contact Public Works Director Type Improvement Useful Life 20 years Category Trail Improvements Justification Frail exptensions and ADA improvements allow for increased options of multi -modal transportation and create a safer path for users to bike, walk, end roll. These extensions fill in gaps in the current city trail system along the county road system. Expenditures 2024 2025 2026 2027 2028 Total Trails 1,650,000 1,650,000 Funding Sources Total 1,650,000 2024 2025 1,650,000 2026 2027 2028 Total Federal Grant Municipal State Aid Park Dedication 830,000 450,000 370,000 830,000 450,000 370,000 Total 1,650,000 1,650,000 2024-2028 CAPITAL IMPROVEMENT PLAN 43 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 23-2 Project Name Playground- Lions Park Description I Jpdate playground at Lion John Weicht Park Justification annual maintenance/repairs of our park system. Department Park Improvement Contact Park & Rec. Director Type Equipment Useful Life 15 years Category Playground Equipment Expenditures 2024 2025 2026 2027 2028 Total Equipment 410,000 410,000 Funding Sources Total 410,000 2024 2025 410,000 2026 2027 2028 Total Park Dedication Park Improvement 310,000 100,000 310,000 100,000 Tom 410,000 410,000 2024-2028 CAPITAL IMPROVEMENT PLAN 44 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PIF 23-27 Project Name Park Improvement - Miscellaneous Description JVHHCA - Friends of the Mississippi partnership - $6,250 Miscellaneous park projects - $10,000 Justification carious park improvement expenditurees Department Park Improvement Contact Park & Rec. Director Type Unassigned Useful Life Unassigned Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Other 16,250 16,250 16,250 10,000 58,750 Total 16,250 16,250 16,250 10,000 58,750 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 16,250 16,250 16,250 10,000 58,750 Tom 16,250 16,250 16,250 10,000 58,750 2024-2028 CAPITAL IMPROVEMENT PLAN i�,r Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 24-1 Project Name Playgrounds -Country Crossing/Trott Brook Description Zeplace playgrounds at Country Crossing and Trott Brook parks 2024 - Trott Brook 2027 - Country Crossing Justification annual maintenance/repairs of our park system. Department Park Improvement Contact Park & Rec. Director Type Equipment Useful Life 15 years Category Playground Equipment Expenditures 2024 2025 2026 2027 2028 Total Equipment 125,000 125,000 250,000 Total 125,000 125,000 250,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 125,000 125,000 250,000 Tom 125,000 125,000 250,000 2024-2028 CAPITAL IMPROVEMENT PLAN W Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 24-2 Project Name Basketball Court - Kliever Lake Fields Description I Zeplace basketball court at Kliever Lake Fields Justification annual maintenance/repairs of our park system. Expenditures Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements 2024 2025 2026 2027 2028 Total Improvements 50,000 50,000 Total 50,000 50,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 50,000 50,000 Tom 50,000 50,000 2024-2028 CAPITAL IMPROVEMENT PLAN 47 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 25-1 Project Name Basketball Courts - Deerfield/Ridgewood Description I Zeplace basketball courts at Deerfield ($50,000) and Ridgewood ($30,000) parks Justification annual maintenance/repairs of our park system. Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Improvements 30,000 50,000 80,000 Total 30,000 50,000 80,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 30,000 50,000 80,000 Tom 30,000 50,000 80,000 2024-2028 CAPITAL IMPROVEMENT PLAN 48 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 25-2 Project Name Nature Play -Woodland Trails Description 2onstruct nature play area at Woodland Trails Regional Park Justification annual maintenance/repairs of our park system. Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Improvements 75,000 75,000 Total 75,000 75,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 75,000 75,000 Tom 75,000 75,000 2024-2028 CAPITAL IMPROVEMENT PLAN 49 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 25-3 Project Name Parks & Recreation Master Plan Description Department Park Improvement Contact Park & Rec. Director Type Study Useful Life Unassigned Category Park Improvements k Parks and Recreation Master Plan will provide direction for the city council, the parks and recreation commission and city staff to guide them in he big picture decision making that will impact the parks and recreation system. The key components are the community engagement and a statistically -valid community survey. It should also include relevant influencing trends, program analysis, level of service analysis, financial malysis, action plan and initiatives, task execution and priority actions. Justification Che Comprehensive Plan adopted October 2021 recommends the city update the Parks and Recreation Master Plan. The Parks Master Plan was adopted in 2015 and many projects identified in the plan such as the improvements to Orono Park are completed. The city should update the plan o identify new parks and recreation needs in the community as it grows. Expenditures 2024 2025 2026 2027 2028 Total Study 100,000 100,000 Total 100,000 100,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 100,000 100,000 Tom 100,000 100,000 2024-2028 CAPITAL IMPROVEMENT PLAN 50 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 26-1 Project Name Playground/Basketball Court- Riverplace Description Zeplacement of playground equipment and basketball court Justification annual maintenance/repairs of our park system. Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Equipment Improvements 125,000 60,000 125,000 60,000 Total Funding Sources 2024 185,000 2025 2026 2027 185,000 2028 Total Park Improvement 185,000 185,000 Tom 185,000 185,000 2024-2028 CAPITAL IMPROVEMENT PLAN 51 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PIF 26-2 Project Name Lions Park Shelters Description I Zeplace park shelters (3) at Lion John Weicht Park Justification annual replacement/improvement of our park system. Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 20 years Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Improvements 300,000 300,000 Total 300,000 300,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 300,000 300,000 Tom 300,000 300,000 2024-2028 CAPITAL IMPROVEMENT PLAN 6% Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PIT 27-1 Project Name Playgrounds - Fresno/Mississippi Oaks Description I Zeplace playgrounds at Fresno ($100,000) and Mississippi Oaks ($90,000) parks Justification annual replacement/improvement of our park system. Department Park Improvement Contact Park & Rec. Director Type Equipment Useful Life 15 years Category Playground Equipment Expenditures 2024 2025 2026 2027 2028 Total Equipment 190,000 190,000 Total 190,000 190,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 190,000 190,000 Tom 190,000 190,000 2024-2028 CAPITAL IMPROVEMENT PLAN 53 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project PIF 27-2 Project Name Rivers Edge Park Fountain Description Zeplace fountain at Rivers Edge Park Justification annual replacement/improvement of our park system. Department Park Improvement Contact Park & Rec. Director Type Improvement Useful Life 15 years Category Park Improvements Expenditures 2024 2025 2026 2027 2028 Total Improvements 75,000 75,000 Total 75,000 75,000 Funding Sources 2024 2025 2026 2027 2028 Total Park Improvement 75,000 75,000 Tom 75,000 75,000 2024-2028 CAPITAL IMPROVEMENT PLAN 54 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PK-01 Project Name marks - Pickup Trucks Description 2025 - #752 - 2008 Ford F250 #731 - 2009 Chev 2500 #745 - 2012 GMC 3500 2026 - #746 - 2011 Ford F550 #743 - 2011 GMC 2500 Justification 3ased on annual condition assessment. Expenditures Department Park Maintenance Contact Street/Park Supt. Type Vehicle Useful Life 10 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 203,000 125,000 328,000 Total 203,000 125,000 328,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 0 203,000 125,000 0 328,000 Total 0 203,000 125,000 0 328,000 2024-2028 CAPITAL IMPROVEMENT PLAN 61i Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota 'roject # PK-02 'roject Name Parks -Mobile Equipment Description Department Park Maintenance Contact Street/Park Supt. Type Equipment Useful Life 10 years Category Equipment 2024 - #700 - 2014 Skid Steer #722 - 2017 Toro Z-Master Mower #723 - 2017 Toro Groundsmaster 5910 #728 - 2015 JD Zero Turn Mower #730 - 2015 Kromer Field Commander 2025 - #714 - 2012 Ski-Doo Skandic 2026 - #701 - 1988 Snow Scoot #702 - 1988 Snow Scoot #715 - 2014 Ski-Doo Skandic #718 - 2003 Suzuki ATV #719 - 2003 Suzuki ATV #725 - Toro Groundmaster 4010 #738 - 2012 John Deere Tractor 2027 - #721 - Toro Z-Master #735 - John Deere Gator 2028 - #726 - John Deere 1565 Justification Based on annual condition assessment Expenditures 2024 2025 2026 2027 2028 Total Equipment 320,000 15,000 279,000 58,000 25,000 697,000 Total 320,000 15,000 279,000 58,000 25,000 697,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 320,000 15,000 279,000 58,000 25,000 697,000 Total 320,000 15,000 279,000 58,000 25,000 697,000 2024-2028 CAPITAL IMPROVEMENT PLAN 6V Capital Improvement Plan 2024 thru 2028 City of Elk Diver, Minnesota Project Plan-24 Project Name Downtown Small Area Plan Department Planning Contact Planning Manager Type Study Useful Life Unassigned Category City -Wide Development Description fhe project will include hiring a consultant to complete a small area plan for the extended downtown area. The plan is expected to include design letails, redevelopment opportunities, land use guidance, and a traffic analysis. Justification Che last small area plan for downtown was completed in 2012 and was largely a reaction to the possible transition of Highway 10 through lowntown to a freeway. The long-term transportation plans have changed and the transformation of Highway 169 to a freeway will be complete in !024. This project, along with other land use and zoning changes, has the potential to reshape how the downtown area is used and experienced. airing a consultant to help guide these changes will put the city on strong footing moving forward. Expenditures 2024 2025 2026 2027 2028 Total Study 100,000 100,000 Total 100,000 100,000 Funding Sources 2024 2025 2026 2027 2028 Total City Development Fund 100,000 100,000 Tom 100,000 100,000 2024-2028 CAPITAL IMPROVEMENT PLAN 57 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project Plan-25 Project Name Comprehensive Update of Zoning Ordinance Description I Sire a consultant to assist city staff with a comprehensive re -write of the city's zoning ordinance. Department Planning Contact Planning Manager Type Study Useful Life Unassigned Category City -Wide Development Justification Che city has not undertaken this task for 20+ years and the regular updates to the ordinance have created inconsistencies and references to sections hat no longer exist. Staff have also discussed an update to our residential and commercial zones, which will impact nearly the entire ordinance. Expenditures 2024 2025 2026 2027 2028 Total Study 50,000 50,000 Total 50,000 50,000 Funding Sources 2024 2025 2026 2027 2028 Total City Development Fund 50,000 50,000 Tom 50,000 50,000 2024-2028 CAPITAL IMPROVEMENT PLAN 58 Capital Improvement Plan 2024 thru 2028 City of Elk Diver, Minnesota Project # PM-01 Project Name Pavement Management -Streets Department Infrastructure Improvements Contact Public Works Director Type Improvement Useful Life 25 years Category Street Construction Description I ?reventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects. itreet improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed ;very other year. Justification ndividual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street egment. These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are mplemented, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. Expenditures 2024 2025 2026 2027 2028 Total Design 100,000 100,000 100,000 300,000 Construction 3,500,000 3,000,000 6,500,000 Maintenance 200,000 200,000 200,000 200,000 800,000 Total 300,000 3,700,000 300,000 3,000,000 300,000 7,600,000 Funding Sources 2024 2025 2026 2027 2028 Total Pavement Management 300,000 3,600,000 300,000 3,000,000 300,000 7,500,000 Storm Water 100,000 100,000 Total 300,000 3,700,000 300,000 3,000,000 300,000 7,600,000 2024-2028 CAPITAL IMPROVEMENT PLAN 59 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # PM-02 Project Name Pavement Management -Parking Lots/Trails Description Overlay and sealcoat public parking lots and trails as needed Department Infrastructure Improvements Contact Public Works Director Type Maintenance Useful Life 15 years Category Street Maintenance Justification 'rojects will be prioritized based on condition and available funding after all street maintenance project needs are met. Expenditures 2024 2025 2026 2027 2028 Total Parking Lot 350,000 350,000 350,000 1,050,000 Trails 200,000 200,000 400,000 Total 550,000 350,000 200,000 350,000 1,450,000 Funding Sources 2024 2025 2026 2027 2028 Total Pavement Management 550,000 350,000 200,000 350,000 1,450,000 Tom 550,000 350,000 200,000 350,000 1,450,000 2024-2028 CAPITAL IMPROVEMENT PLAN 60 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project ST-01 Project Name Streets - Pickup Trucks Description 2024 - #244 - 2011 Dodge 5500 #241 - 2010 Ford F550 2025 - #242 - 2010 Ford F550 2027 - #123 - 2010 Ford F250 #245 - 2014 Ford F450 2028 - #117 - 2018 Ford Utility Justification 3ased on annual condition assessment. Expenditures Department Streets Contact Street/Park Supt. Type Vehicle Useful Life 10 years Category Vehicles 2024 2025 2026 2027 2028 Total Vehicles 320,000 90,000 125,000 75,000 610,000 Total 320,000 90,000 125,000 75,000 610,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 320,000 90,000 125,000 75,000 610,000 Tom 320,000 90,000 125,000 75,000 610,000 2024-2028 CAPITAL IMPROVEMENT PLAN 61 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project ST-02 Project Name Streets - Dump Trucks Description 2025 - #243 - 2011 International 7600 Dump Truck Justification 3ased on annual condition assessment. Department Streets Contact Street/Park Supt. Type Vehicle Useful Life 15 years Category Heavy Equipment Expenditures 2024 2025 2026 2027 2028 Total Vehicles 315,000 315,000 Total 315,000 315,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment Replacement Fund 315,000 315,000 Total 315,000 315,000 2024-2028 CAPITAL IMPROVEMENT PLAN 62 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota 'roject4 ST-03 'roject Name Streets - Mobile Equipment Description 2025 - #90 - 2011 Patch Trailer #91 - 2015 Skid Steer #94 - 2010 Pavement Cutter 2026 - #79 - 2000 Brush Chipper #82 - 2010 Skid Loader #88 - 2011 Asphalt Patch Trailer 2027 - #80 - 2012 JD Tractor #89 - 2001 Forklift #93 - 2010 Air Compressor #99 - 2012 Pavement Cutter #309 - 2012 Elgin Sweeper 2028 - #96 - 2012 Cat Mini Excavator #312 - 2012 Cat Loader 924H Justification 3ased on annual condition assessment. Department Streets Contact Street/Park Supt. Type Equipment Useful Life 15 years Category Heavy Equipment Expenditures 2024 2025 2026 2027 2028 Total Equipment 214,000 260,000 544,000 365,000 1,383,000 Total Funding Sources 2024 214,000 2025 260,000 2026 544,000 2027 365,000 2028 1,383,000 Total Equipment Replacement Fund 0 214,000 260,000 544,000 365,000 1,383,000 Total 0 214,000 260,000 544,000 365,000 1,383,000 2024-2028 CAPITAL IMPROVEMENT PLAN 63 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project STw-1 Project Name Stormwater Projects Department Storm Water Contact Storm Water Coordinator Type Maintenance Useful Life 25 years Category Utilities Description 3i-annual pond cleaning, stormwater repairs, BMW inventory. 2024 - Rollings Hills - 6 basins 2025 - Elk Park Center basin and Zane Street basin 2026 - Basin 197 (by McDonald's) Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.) Justification These projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water system is functioning as designed and achieving the water quality standards of our NPDES permit. The smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 300,000 250,000 200,000 750,000 Total Funding Sources 300,000 2024 250,000 2025 200,000 2026 2027 750,000 2028 Total Storm Water 300,000 250,000 200,000 750,000 Tom 300,000 250,000 200,000 750,000 2024-2028 CAPITAL IMPROVEMENT PLAN 64 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project TC-25 Project Name 2025 Technology Upgrades Description Technology upgrades include: 02,000 - Enterprise backup hardware/software 00,000 - Microsoft server upgrade 06,000 - Email archiver, spam, ATP Justification annual replacement and upgrade of technology hardware and software. Department Technology/Communications Contact IT Manager Type Technology Useful Life Category Technology Expenditures 2024 2025 2026 2027 2028 Total Software/Hardware 108,000 108,000 Total Funding Sources 2024 108,000 2025 2026 108,000 2027 2028 Total Capital Reserve - IT ERMU 92,400 15,600 92,400 15,600 Tom 108,000 108,000 2024-2028 CAPITAL IMPROVEMENT PLAN 65 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project TC-26 Project Name 2026 Technology Upgrades Description Technology upgrades include: 00,000 - DSX upgrade Q5,000 - Enterprise backup system Justification annual replacement and upgrade of technology hardware and software. Department Technology/Communications Contact IT Manager Type Technology Useful Life Category Technology Expenditures 2024 2025 2026 2027 2028 Total Software/Hardware 75,000 75,000 Total Funding Sources 2024 75,000 2025 2026 2027 75,000 2028 Total Capital Reserve - IT ERMU 70,000 5,000 70,000 5,000 Tom 75,000 75,000 2024-2028 CAPITAL IMPROVEMENT PLAN 66 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project TC-27 Project Name 2027 Technology Upgrades Description Technology upgrades include: 00,000 - Security camera server 00,000 - Meraki switch upgrades Justification annual replacement and upgrade of technology hardware and software. Department Technology/Communications Contact IT Manager Type Technology Useful Life Category Technology Expenditures 2024 2025 2026 2027 2028 Total Software/Hardware 60,000 60,000 Total Funding Sources 2024 60,000 2025 2026 2027 2028 60,000 Total Capital Reserve - IT ERMU 57,000 3,000 57,000 3,000 Tom 60,000 60,000 2024-2028 CAPITAL IMPROVEMENT PLAN 67 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project TC-28 Project Name 2028 Technology Upgrades Description Technology upgrades include: 660,000 Simplivity server node - increase storage capacity. Justification annual replacement and upgrade of technology hardware and software. Department Technology/Communications Contact IT Manager Type Technology Useful Life Category Technology Expenditures 2024 2025 2026 2027 2028 Total Software/Hardware 60,000 60,000 Total Funding Sources 2024 60,000 2025 2026 2027 2028 60,000 Total Capital Reserve - IT ERMU 48,000 12,000 48,000 12,000 Tom 60,000 60,000 2024-2028 CAPITAL IMPROVEMENT PLAN 68 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project 4 TFN-01 Project Name Financial Software Department Finance Contact Finance Director Type Technology Useful Life 10 years Category Software Description I Jpdate financial software to improve technology efficiences, structured workflows, and integration flexibility with other applications. Justification Che current financial software is approaching 15 years old and is in need of updating to take advantage of newer technology enhancements and workflows to improve efficiencies in the financial management of the city. Expenditures 2024 2025 2026 2027 2028 Total Software/Hardware 200,000 200,000 Total 200,000 200,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Reserve - 200,000 200,000 Undesignated Tom 200,000 200,000 2024-2028 CAPITAL IMPROVEMENT PLAN 69 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project WW-06 Project Name Wastewater - Vehicle Description 2025- Pickup Truck 2027 - Jet Truck ($400,000 less trade-in/auction value of $75,000) Department Sewer Department Contact Chief Wastewater Operator Type Vehicle Useful Life 10 years Category Vehicles Justification W additional pickup is needed due to current staffing. Che jet truck is one of our most vital rolling assets in the wastewater division. Replacement will allow for the existing truck to be auctioned at 12 ears old. Expenditures 2024 2025 2026 2027 2028 Total Vehicles 65,000 325,000 390,000 Total Funding Sources 2024 65,000 2025 2026 325,000 2027 2028 390,000 Total Sewer Fund 65,000 325,000 390,000 Total 65,000 325,000 390,000 2024-2028 CAPITAL IMPROVEMENT PLAN 70 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # WW-12 Project Name Wastewater - Equipment Description 1 2026 - Sewer camera trailer replacement Department Sewer Department Contact Chief Wastewater Operator Type Equipment Useful Life 25 years Category Equipment Justification !026 - The sewer camera trailer, which is used frequently to televise sewer mains for preventative maintenance, was purchased in 2010 and is tarting to show signs of wear. Expenditures 2024 2025 2026 2027 2028 Total Equipment 200,000 200,000 Total Funding Sources 2024 200,000 2025 2026 200,000 2027 2028 Total Sewer Fund 200,000 200,000 Tom 200,000 200,000 2024-2028 CAPITAL IMPROVEMENT PLAN 71 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # WW-19 Project Name Wastewater- Lift Station Improvements Description 1 2024-2028 - Are flash safety lift station panels Department Sewer Department Contact Chief Wastewater Operator Type Equipment Useful Life 15 years Category Equipment Justification !024-2028 - The lift station panels are starting to age and with newer tecnologies the are flash safety panels make it safer for the wastewater )perators. Plan to replace 1 panel per year. Expenditures 2024 2025 2026 2027 2028 Total Equipment 55,000 55,000 55,000 55,000 55,000 275,000 Funding Sources Total 55,000 2024 55,000 2025 55,000 2026 55,000 2027 55,000 2028 275,000 Total Sewer Fund 55,000 55,000 55,000 55,000 55,000 275,000 Tom 55,000 55,000 55,000 55,000 55,000 275,000 2024-2028 CAPITAL IMPROVEMENT PLAN M Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # WW-23 Project Name Wastewater - Urban Services Expansion Description Trunk system upgrades and expansion including regional lift stations, forcemains, and gravity sewer. Department Sewer Department Contact Public Works Director Type Infrastructure Useful Life Unassigned Category Plant Expansion Justification ,ontinued improvements to support future development in the expanded urban service area (NE & NW areas of the city). Expenditures 2024 2025 2026 2027 2028 Total Improvements 11,850,000 11,850,000 Utilities 16,850,000 16,850,000 Total 28,700,000 28,700,000 Funding Sources 2024 2025 2026 2027 2028 Total Sewer Fund 11,850,000 11,850,000 Trunk Utility Fund 16,850,000 16,850,000 Total 28,700,000 28,700,000 2024-2028 CAPITAL IMPROVEMENT PLAN 73 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project # WW-24 Project Name Wastewater -Centrifuge Installation Description I 2eplace undersized screw presses with centrifuges Department Sewer Department Contact Chief Wastewater Operator Type Improvement Useful Life 25 years Category Utilities Justification )riginal screw presses were undersized and are expected to be beyond capacity need of the wastewater treatment plant 30 years earlier than Expenditures 2024 2025 2026 2027 2028 Total Improvements 6,000,000 6,000,000 Total Funding Sources 2024 6,000,000 2025 2026 2027 2028 6,000,000 Total Sewer Fund 6,000,000 6,000,000 Tom 6,000,000 6,000,000 2024-2028 CAPITAL IMPROVEMENT PLAN 74 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project WW-30 Project Name Grit Classifier Replacement Description Zeplace 21 year old grit classifier Department Sewer Department Contact Public Works Director Type Equipment Useful Life 20 years Category Sewer Maintenance Justification y mandatory piece of equipment that has reached its expected life span (20 years) due to the abrasiveness of the material it handles. Expenditures 2024 2025 2026 2027 2028 Total Equipment 150,000 150,000 Total Funding Sources 2024 150,000 2025 2026 150,000 2027 2028 Total Sewer Fund 150,000 150,000 Tom 150,000 150,000 2024-2028 CAPITAL IMPROVEMENT PLAN rV Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project WW-31 Project Name Head of Plant Splitter Structure Department Sewer Department Contact Public Works Director Type Improvement Useful Life 20 years Category Utilities Description nstallation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions. Justification ,urrently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The addition of the splitter structure will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive additional connections in the future (if NW or NW service area expansions ever are considered). Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 1,500,000 1,500,000 Total Funding Sources 2024 1,500,000 2025 2026 2027 1,500,000 2028 Total Sewer Fund 1,500,000 1,500,000 Tom 1,500,000 1,500,000 2024-2028 CAPITAL IMPROVEMENT PLAN Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project WW-32 Project Name UV Building Modification Description I 3uild out remaining UV building capacity by adding bulbs in second channel. Department Sewer Department Contact Type Unassigned Useful Life Category Unassigned Justification �s our flow is increasing the need for additional disinfection capacity grows. Our building is set up for the needed expansion and we estimate seeding to have some of this capacity on-line by 2028. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 1,800,000 1,800,000 Total Funding Sources 2024 1,800,000 2025 2026 2027 2028 1,800,000 Total Sewer Fund 1,800,000 1,800,000 Total 1,800,000 1,800,000 2024-2028 CAPITAL IMPROVEMENT PLAN 77 Capital Improvement Plan 2024 rhru 2028 City of Elk Diver, Minnesota Project WW-33 Project Name CR 44 Sewer Replacement Description Zeplace existing clay pipe as part of the CR 44 reconstruction project Department Sewer Department Contact Public Works Director Type Infrastructure Useful Life 20 years Category Sewer Maintenance Justification Che clay pipe has reached its expected service life. Replacement is recommended at the time the roadway surface is being reconstructed. Expenditures 2024 2025 2026 2027 2028 Total Design 20,000 20,000 Construction/Maintenance 250,000 250,000 Total 20,000 250,000 270,000 Funding Sources 2024 2025 2026 2027 2028 Total Sewer Fund 20,000 250,000 270,000 Tom 20,000 250,000 270,000 2024-2028 CAPITAL IMPROVEMENT PLAN 78