Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
4.2 SR 01-02-2024
Request for Action To Item Number Mayor and City Council 4.2 Agenda Section Meeting Date Prepared by Consent Agenda January 2, 2024 Brandon Wisner, Engineering Project Manager Item Description Reviewed by Accept Bid for Rolling Hills Stormwater Pond Cal Portner, City Administrator Reviewed by Dredging Action Requested Accept, by motion, the bid from Valdes Lawn Care and Snow Removal, LLC for $48,870.00 for dredging six stormwater basins within the Rolling Hills Addition development. Background/Discussion The Rolling Hills Development stormwater basins were identified as needing maintenance due to sediment accumulation and some clogging due to density of vegetation growth. City staff monitor and inspect city maintained stormwater basins for function. Dredging costs of these basins will be covered by the Stormwater Utility Fund. Financial Impact $48,870.00 from the Stormwater Utility Fund. Mission/Policy/Goal Meet changing needs - Agile Attachments ■ Bid Tabulation Spreadsheet ■ Affidavit of Publication ■ Agreement The Elk River Vision A welcoming community with revolutionary and spirited resourcefulness, exceptional service, and community engagement that encourages and inspires pi ospei l_ y. M TUREJ Updated: Januag 2023 I AFFIDAVIT OF PUBLICATION STATE OF MINNESOTA ) ss COUNTY OF SHERBURNE Rhonda Herberg being duly sworn on an oath, states or affirms that he/she is the Publisher's Designated Agent of the newspa- per(s) known as: Star News with the known office of issue being located in the county of: SHERBURNE with additional circulation in the counties of: WRIGHT and has full knowledge of the facts stated below: (A) The newspaper has complied with all of the requirements constituting qualifica- tion as a qualified newspaper as provided by Minn. Stat. §331A.02. (B) This Public Notice was printed and pub- lished in said newspaper(s) once each week, for 2 successive week(s); the first insertion being on 12/16/2023 and the last insertion being on 12/23/2023. MORTGAGE FORECLOSURE NOTICES Pursuant to Minnesota Stat. §580,033 relating to the publication of mortgage foreclosure notices: The newspaper complies with the conditions described in §580.033, subd. 1, clause (1) or (2). If the newspaper's known office of issue is located in a county adjoining the county where the mortgaged premises or some part of the mortgaged premises described in the notice are located, a substantial portion of the newspaper's circulation is in the latter county. By: Agent Subscribed and sworn to or affirmed - me on 12/23/2023 by Rhonda Herberg. �� .. _... d' Notary Public ��'=°-�r t !<lMBERLY A HANSOM "°";� State of�innesota � � �� �� My anus ig31 202J3res Rate Information: (1) Lowest classified rate paid by commercial users for comparable space: $999.99 per column inch Ad ID 1360969 Specifications fo r Rolling Hills Pond Dredging City of Elk River, Minnesota December 2023 CERTIFICATION PAGE Plans and Specifications for Rolling Hills Pond Dredging City of Elk River, Minnesota December 2023 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Justin Femrite, P.E. Reg. No.44658 City of Elk River 13065 Orono Parkway Elk River, MN 55330 Phone: 763.635.1051 Fax: 763.635.1090 Date TABLE OF CONTENTS ADVERTISEMENTFORBIDS ........................................................................................................................ 00100-1 INFORMATION FORBIDDERS....................................................................................................................00200-1 BIDFORM..............................................................................................................................................................00400-1 BIDBOND.............................................................................................................................................................00430-1 NOTICEOF AWARD.........................................................................................................................................00510-1 AGREEMENT....................................................................................................................................................... 00520-1 NOTICETO PROCEED....................................................................................................................................00550-1 PERFORMANCEBOND...................................................................................................................................00610-1 PAYMENTBOND...............................................................................................................................................00615-1 CONTRACTCHANGE ORDER.....................................................................................................................00671-1 INTERNAL REVENUE FORM IC-134.......................................................................................................... 00672-1 CERTIFICATE OF SUBSTANTIAL COMPLETION...............................................................................00673-1 CONTRACTOR'S AFFIDAVIT........................................................................................................................ 00674-1 GENERALCONDITIONS................................................................................................................................00700-1 SUPPLEMENT TO GENERAI, CONDITIONS.......................................................................................... 00800-1 TECHNICAL SPECIFICATIONS Division S....... PLAN DRAWINGS ......................................................................... S-1 SECTION 00100 Advertisement for Bids City of Elk River 13065 Orono Parkway Elk River, MN 55330 Rolling Hills Pond Dredging Ell< River, Minnesota Separate BIDS for the construction of Rolling Hills Pond Dredging will be received electronically through QuestCDN until 1:00 p.m. local time, on Thursday, December 28, 2023, at which time the bids will be opened and read aloud virtually. The bid opening can only be viewed remotely through the following link: https://shorturi.at/eIMX2 The city will not accept telephone, facsimile, or email bids under any circumstances. The Work for the said improvements, as required by the Contract Documents, is generally described as follows: • Pond dredging of six municipal stormwater ponds in the Rolling Hills development in Elk River, MN. Bidding Information can be downloaded at https://www.elkrivermn.gov/bids.aspx OR at www.questcdn.com under Login using QuestCDN #8877407 for a non-refundable charge of $42. Contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading this digital project information and vBid Online Bid Submittal. To submit a vBid online bid (which is required for this project) you must download the project bid document file from QuestCDN which will add you to the plan holders list and gain you access to vBid Online Bidding. Each bid must be accompanied by a bid bond payable to the City of Elk River for 5% of the total amount of the bid. The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of forty-five (45) days. The city has designated an alternative method for the solicitation of bids and requests for proposals. The designated alternative method is the City of Elk River website at: www.elkrivermn.gov. Click on Bid Posting. Justin Femrite City Engineer End of Section Advertisement for Bids 00100- 1 Rolling Hills Pond Dredging Ell< River, Minnesota SECTION 00200 Instructions to Bidders BIDS will be received by City of Elk River (herein called the OWNER), electronically, on QuestCDN.com until 1:00 p.m. local time, on Thursday, December 28, 2023, and then virtually opened and read aloud. The BID opening can only be viewed remotely. All BIDS must be made on the required BID form. All blank spaces for BID prices must be filled in and the BID form must be fully completed and executed when submitted. Only one copy of the BID form is required. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponed thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof. Should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID Schedule by examination of the site and a review of the drawings and specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done. The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned and rights -of -way acquired or to be acquired. The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT. Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR, or relieve them from fulfilling any of the conditions of the contract. Each BID must be accompanied by a BID bond payable to the OWNER for five percent of the total amount of the BID. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS. When the Agreement is executed, the bonds of the two remaining unsuccessful BIDDERS will be returned. The BID BOND of the successful BIDDER will be retained until the payment BOND and performance BOND have been executed and approved, after which it will be returned. A certified check may be used in lieu of a BID BOND. A performance BOND and a payment BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Instructions to Bidders 00200 - 1 Rolling Hills Pond Dredging Ell< River, Minnesota Attorneys -in -fact who signs BID BONDS or payment BONDS and performance BONDS must file with each BOND a certified and effective dated copy of their power of attorney. The party to whom the contract is awarded will be required to execute the Agreement and obtain the performance BOND and payment BOND within ten (10) calendar days from the date when NOTICE OF AWARD is delivered to the BIDDER. The NOTICE OF AWARD shall be accomplished by the necessary Agreement and BOND forms. In case of failure of the BIDDER to execute the Agreement, the OWNER may at their option consider the BIDDER in default, in which case the BID BOND accompanying the proposal shall become the property of the OWNER. The OWNERS within ten (10) days of receipt of acceptable performance BOND, payment BOND, and Agreement signed by the party to whom the Agreement was awarded shall sign the Agreement and return to such party an executed duplicate of the Agreement. Should the OWNER not execute the Agreement within such period, the BIDDER may by WRITTEN NOTICE withdraw their signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the OWNER. The NOTICE TO PROCEED shall be issued within ten (10) days of the execution of the Agreement by the OWNER. Should there be reasons why the NOTICE TO PROCEED cannot be issued within such period, the time may be extended by mutual agreement between the OWNER and CONTRACTOR. If the NOTICE TO PROCEED has not been issued within the ten (10) day period or within the period mutually agreed upon, the CONTRACTOR may terminate the Agreement without further liability on the part of either party. The OWNER may make such investigation as they deem necessary to determine the ability of the BIDDER to perform the WORK, and the BIDDER shall furnish to the OWNER all such information and data for this purpose as the OWNER may request. The OWNER reserves the right to reject any BID if the evidence submitted by, or investigation of, such BIDDER fails to satisfy the OWNER that such BIDDER is properly qualified to carry out the obligations of the Agreement and to complete the WORK contemplated therein. A conditional or qualified BID will not be accepted. The award will be made to the lowest responsible BIDDER. The Owner reserves the right to reduce the quantities of the project after the BID and before AWARD of the contract to meet budget. Such adjustments will be made by reducing the quantities at the BID prices. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the contract throughout. Any BIDDER or subcontractor to a BIDDER that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. �16C.285, subd. 3, or fails to verify that it meets those criteria, is not a responsible contractor and is not eligible to be awarded a contract for the PROJECT or to perform work on the PROJECT. Instructions to Bidders 00200 - 2 Rolling Hills Pond Dredging Ell< River, Minnesota Responding BIDDERS shall submit to the OWNER, on the form attached, a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. �16C.285, subd. 3, at the time that it responds to this solicitation document. Each BIDDER shall submit to the OWNER, upon request, copies of the signed verifications of compliance from all of the bidder's subcontractors. A false statement under oath verifying compliance with any of the minimum criteria shall make the BIDDER or subcontractor that makes the false statement ineligible to be awarded a contract and may result in termination of a contract awarded to a BIDDER or subcontractor that submits a false statement. Each BIDDER is responsible for inspecting the site and for reading and being thoroughly familiar with the CONTRACT DOCUMENTS. The failure or omission of the BIDDER to do any of the foregoing shall in no way relieve any BIDDER from any obligation in respect to the BID. The low BIDDER shall supply the names and addresses of major material SUPPLIERS and SUBCONTRACTORS when requested to do so by the OWNER. End of Section Instructions to Bidders 00200 - 3 Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00400 Bid Form Contract Identification: ROLLING HILLS POND DREDGING City of Elk River This Bid Is Submitted To: City of Elk River, 13065 Orono Parkway, Elk River, MN 55330 The proposal of Valdes Lawncare & Snow Removal LLC (hereinafter called BIDDER), organized and existing under the laws of the State of Minnesota doing business as Contractor *, to the City of Elk River (hereinafter called 'OWNER'). In compliance with your Advertisement for Bids, BIDDER hereby proposes to perform all WORK for the construction of Rolling Hills Pond Dredging in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below. By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as their own organization, that this BID has been arrived at independently without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the contract special provisions. BIDDER further agrees to pay as liquidated damages, the sum of $600 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions. BIDDER acknowledges receipt of the following ADDENDUM: Addendum No. Addendum Date N/A 12/28/2023 Name of person representing BIDDER who inspected site of proposed work: Name: Cody Junk Date of Inspection: * Insert "a corporation," "a partnership," or "an individual" as applicable. 12/20/2023 Bid Form 00400 - 3 Rolling Hills Pond Dredging Elk River, Minnesota USE ELECTRONIC BID WORKSHEET TO SUBMIT BIDS Respectively Submitted: Cody Junk Signature Project Manager Tide Apon Request License Number (Seal — If bid is by a Corporation) N/A Attest Valdes Lawncare & Snow Removal LLC. Company 9591 60th st N, Lake Elmo, MN 55042 Address 12/28/2023 Date 651-428-1560 Phone/Fax N/A Fax Bid Form 00400 - 3 Rolling Hills Pond Dredging Ell< River, Minnesota Bidder's Verification of Compliance The undersigned, being first duly sworn, as Bidder on the Project, represents and swears as follows: Now, and at all times during the duration of the Project, the undersigned complies with each of the minimum criteria in Minn. Stat. � 16C.285, subd. 3, the Responsible Contractor statute. The undersigned understands that a failure to meet or verify compliance with the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. 16C.285, subd. 3 renders a bidder ineligible to be awarded a construction contract for the Project or to perform work on the Project. Upon request, the undersigned will submit copies of the signed verifications of compliance from all subcontractors. The undersigned understands that a false statement under oath verifying compliance with any of the minimum criteria shall make the undersigned or its subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a the undersigned or its subcontractor that submits a false statement. Bidder: Valdes Lawncare & Snow Removal LLC. Bv: Cody Junk Its: Project Manager End of Section Bid Form 00400 - 3 SECTION 00430 Bid Bond Bidder (Name and Address): Surety (Name and Address of Principal Place of Business): Owner (Name and Address): City of Elk River 13065 Orono Parkway Elk River, MN 55330 Bid Bid Due Date: Thursday, December 28, 2023 Project: Rolling Hills Pond Dredging Bond Bond Number: Date: Penal Sum: (Words) (Figures) Rolling Hills Pond Dredging Elk River, Minnesota KNOW ALL MEN BY THESE PRESENTS, which we, the undersigned, as Principal, as Surety, are hereby held and firmly bound unto City of Elk River as OWNER in the penal sum of for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Signed, this day of 2023. The Condition of the above obligation is such that whereas the Principal has submitted to the City of Elk River a certain BID, attached hereto and hereby made a part to enter into a contract in writing, for the Rolling Hills Pond Dredging. BID BOND 00430 - 1 Rolling Hills Pond Dredging Elk River, Minnesota NOW THEREFORE, a) If said BID shall be rejected, or b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BID) and shall furnish a BOND for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said BID, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such BID; and said Surety does hereby waive notice of any such extension. IN WITNESS WHEREOF, the Principal and the Surety have hereto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. Principal Surety M. Note: Date of Bond must not be prior to date of Contract. If Contractor is partnership, all partners should execute Bond. Important: Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. BID BOND 00430 - 2 Rolling Hills Pond Dredging Elk River, Minnesota End of Section BID BOND 00430 - 3 Delivery Instructions: [ ] COURIER [ PATE BONDING INC. 1276 So, Robert St. • West St. Paul, MN 55118 • Phone: (651) 457-6842 - Fax: (651) 457-7531 • Web Site: www.patebonding.com Valdes Lawn Care and Snow Removal, LLC 9591 60th Street North Lake Elmo, MN 55042 Bid Bond Results Form PROJECT OWNER: City Of Elk River BID DATE., December 28th 2023 PROJECT NAME. Quest # 8877407 - Rolling Hills Pond Dredging APPROX. BID AMOUNT. * $49,000.00 * If your bid increases by 10% or more from this estimate, please contact our office for approval prior to the bid letting. BOND NUMBER: FB0003517 Full File Updates for Final Bond PLEASE LIST THE FIRST THREE BIDDERS IF KNOWN Contractor's Name Low $ 2nd $ 3rd $ Your Bid If Not Listed Above $ Comments Amount Date: PLEASE RETURN THIS FORM TO PATE BONDING, INC. Your assistance in providing us with all of your bid results is appreciated PBI-Fed ] EMAIL [ ] FAX [ ] MAIL [ ] OVERNIGHT [ ] PICKUP [ ] OTHER Bid Security Bid Bond Check ❑ ❑ ❑ ❑ M Please review your bond to ensure it is s yits ordered and that it is in the proper form which includes the correct names, bond amounts and dates before you submit it. By affixing your signature, exe utand providing this bond to the obligee you are verifying, and we will justifiably assume, the bond has been issued correctly with the best interests and require of all parties being considered. Contact us immediately if any correction is required. To: Valdes Lawn Care and Snow Removal, LLC Date: December 27th, 2023 Re: Bid Bond Request for: City Of Elk River Letting Date December 28th, 2023 Pate Bonding, Inc. has issued the bid bond(s) for the above -mentioned project(s). Please be advised that if you are awarded the contract and are required to provide performance and payment bonds, the Surety will require the following terms: Full File Updates for Final Bond Prior to the bid letting, please be sure to contact your agent or our office at 651- 457-6842 with any questions about these terms or if you should need copies of the Collateral Guidelines, the Surety's sample ILOC form or an Escrow Overview. DATE BONGING INC. 1276 So, Rc)[xrt St. * 4tN St. Paul, MN 55118 • Ph m- (651) 457.6342 + Fax: (651) 457-7531 a kV6 Site: �ti�n�u�ltel�ancling.com Memo Maintenance Bond Rates Please review your project specs/contract documents carefully. If the specs/contract documents require the bond to cover a warranty period longer than one (1) year, the surety will charge additional premium for any warranty period over one (1) year. Please be sure to contact Pate Bonding or your agent with any questions regarding additional premium or maintenance rates. Main Phone: (651)457-6842 Email: Bonds@patebonding.com www.patebonding.com AIA T — 2010 ii �►J DocumentA31 Bond No, FB0003517 Bid Bond CONTRACTOR: Name, legal status and address Valdes Lawn Care Removal, LLC and now SURETY: 9591 60th Street North (Name, legal status and principal place of This document has important legal business) consequences. Consultation with Lake Elmo, MN 55042 GRANITE RE, INC. an attorney is encouraged with respect to its completion or 14001 Quailbrook Drive modification. Any singular reference to OWNER: Oklahoma City, OK 73134 Contractor, Surety, Owner or (Name, legal status and address) other party shall be considered plural City Of Elk River where applicable. Bond Amount: Five Percent of the Bid Amount ( 5% of Bid Amount) PROJECT: Quest # 8877407 - Rolling Hills Pond Dredging (Name, location or address, and Project number, if any) The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (I) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 27th day of December 2023 aldes Lawn Care and Snow Removal, LLC (Witness) r A 'v v ~ -PA-�o (Witness) (Principal) (Seal) (Title) GRANITE RE, IN (Surety) (Seal;. (T1tle)A rney-in-Fact Troy Staples CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An origin <rst>ates that changes will not be obscured. Init AIA Document A330'"— 2010. Copyright 01963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This .AIA- Document is protected by U.S. C'opyright l.avr and Internat:ional'rreaties. Unauthorized reproduction or distribution of this AIA'' i)ocum6-hr, or anv portion of it, may result in severe civil and criminal penalties, and will uc prosecuted to the maximum extent possible under the.tarr. / Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e avail The American Institute of Architects' legal counsel, copyright@aia.org. 051110 ACKNOWLEDGMENT OF PRINCIPAL (Individual) State of ) County of ) On this day of f in the year before me personally come(s) , to me known and known to me to be the person(s) who (is) (are) described in and executed the foregoing instrument and acknowledge(s) to me that he/she executed the same. Notary Public ACKNOWLEDGMENT OF PRINCIPAL (Partnership) State of County of On this day of in the year before me personally come(s) a member of the co -partnership of to me known and known to me to be the person who is described in and executed the foregoing instrument and acknowledges to me that he/she executed the same as for the act and deed of the said co -partnership. Notary Public ACKNOWLEDGMENT OF PRINCIPAL (Corporation) State of ) County of ) On this day of in the year before me personally come(s) , to me known, who, being duly swom, deposes and says that he/she is the of the the corporation described in and which executed the foregoing instrument; that he/she knows the seal of the said corporation; the seal affixed to the said instrument is such corporate seal; that it was so affixed by the order of the Board of Directors of said corporation, and that he/she signed his/her name thereto by like order. Notary Public ACKNOWLEDGMENT OF SURETY State of Minnesota ) County of Dakota ) On this 27th day of December, in the year 2023, before me personally come(s) Troy Staples, Attorney(s)-in-Fact of GRANITE RE, INC. with whom I am personally acquainted, and who, being by me duly swom, says that he/she is (are) the Attomey(s)-in-Fact of GRANITE RE INC. company described in and which executed the within instrument; that he/she know(s) the corporate seal of such company; and that seal affixed to the within instrument is such corporate seal and that it was affixed by order of the Board of Directors of said company, and that he/she signed said instrument as Attorney(s)-in-Fact of the said company by like order. l l7 �� �Top4r� , g AAA TONI L. FERRILL Notary Public NOTARY PUBLIC - MINNESOTA a y My Commission Expires Jan 31, 2027 ..cyv GRANITE RE, INC. GENERAL POWER OF ATTORNEY Know all Men by these Presents: That GRANITE RE, INC., a corporation organized and existing under the laws of the State of MINNESOTA and having its principal office at the City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint: WANDA FRANZ; TOM LAHL; TOM KEMP: LISA M. FRANCOUR; JENNIFER BOYLES; ZACHARY PATE; TROY STAPLES; NICHOLAS HOCHBAN its true and lawful Attorney-in-Fact(s) for the following purposes, to wit: To sign its name as surety to, and to execute, seal and acknowledge, any and all bonds, and to respectively do and perform any and all acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, Its Board of Directors, hereby ratifies and confirms all and whatsoever the said: WANDA FRANZ; TOM LAHL;TOM KEMP: LISA M. FRANCOUR; JENNIFER BOYLES; ZACHARY PATE; TROY STAPLES; NICHOLAS HOCHBAN may lawfully do In the premises by virtue of these presents. In Witness Whereof, the said GRANITE RE, INC. has caused this instrument to be sealed with its corporate seal, duly attested by the signatures of its President and Assistant Secretary, this 31st day of July, 2023. s a L Kenneth D. Whittincdon, President STATE OF OKLAHOMA } i } SS: COUNTY OF OKLAHOMA ) Kyle/P. McDonald, Assistant Secretary On this 315t day of July, 2023, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company and Kyle P. McDonald, Assistant Secretary of said Company, with both of whom 1 am personally acquainted, who being by me severally duly sworn, said, that they, the said Kenneth D. Whittington and Kyle P. McDonald were respectively the President and the Assistant Secretary of GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of said corporation, and that they signed their name thereto by like order as President and Assistant Secretary, respectively, of the Company. My Commission Expires; April 21, 2027Notary Public Commission #: 11003620 H+ GRANITE RE, INC. Certificate THE UNDERSIGNED, being the duly elected and acting Assistant Secretary of Granite Re, Inc., a`Minnesota Corporation, HEREBY CERTIFIES that the following resolution is a true and correct excerpt from the July 15, 1987, minutes of the meeting of the Board of Directors of Granite Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect. "RESOLVED, that the President, any Vice President, the Assistant Secretary, and any Assistant Vice President shall each have authority to appoint individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the Company in the course of its business. On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced; provided, however, that the seal shall not be necessary to the i+t}Cut V4jQf any such instrument or undertaking." IN WITNESS WHEREOF, the undersigned has subscr�* s`�tf t? Grttsi `6 d the corporate seal of the Corporation this 27th day of December 2023, z7` _' `'�=`•.�} Ky1�McDonald, Assistant Secretary GR0800-1 c= IX Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00510 Notice of Award [Certified Mail — Return Receipt Requested] Date: To: Contract: Rolling Hills Pond Dredging OWNER's Contract No. You are notified that your Bid dated December 28, 2023, for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for the Rolling Hills Pond Dredging. The Contract Price of your Contract is Three copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within 15 days of the date you receive this Notice of Award. 1. Deliver to the OWNER three fully executed counterparts of the Contract Documents. 2. Deliver with the executed Contract Documents the Contract Security (Bonds) as specified in the Instructions to Bidders and General Conditions (paragraph 22) and Supplemental Conditions (paragraph SC-22). 3. (List other conditions precedent). Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award and to declare your Bid security forfeited. Within ten days after you comply with the above conditions, OWNER will return to you one fully executed counterpart of the Contract Documents. Notice of Award 00510 - 1 Rolling Hills Pond Dredging Elk River, Minnesota City of Elk River (OWNER) City Administrator End of Section Notice of Award 00510 - 2 Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00520 Agreement THIS AGREEMENT, made this day of , 2023, by and between the City of Elk River (hereinafter called OWNER) and (hereinafter called CONTRACTOR). WITNESSETH: That for and in consideration of the payment and agreements hereinafter mentioned: 1. The CONTRACTOR will commence and complete the construction of the Rolling Hills Pond DredgingProject. 2. The CONTRACTOR will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the construction and completion of the PROJECT described herein. 3. The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within 10 calendar days after the date of the NOTICE TO PROCEED and will complete as specified in the CONTRACT DOCUMENTS. 4. The CONTRACTOR agrees to perform all of the WORK described in the CONTRACT DOCUMENTS and comply with the terms therein for the sum of 5. The Term "CONTRACT DOCUMENTS" means and includes the following: (A) Advertisement for BIDS (B) Information for BIDDERS (C) BID FORM (D) BID BOND (E) Agreement (F) General Conditions (G) Performance BOND (H) Payment BOND (I) NOTICE OF AWARD U) NOTICE TO PROCEED Agreement 00520 - 1 Rolling Hills Pond Dredging Elk River, Minnesota (K) CHANGE ORDER M PLANS (l) ADDENDA: Addendum No. Addendum Date 6. The OWNER will pay to the CONTRACTOR in the manner and at such times set forth in the General Conditions such amounts as required by the CONTRACT DOCUMENTS. 7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in triplicate, each of which shall be deemed an original on the date first above written. 8. This contract may be terminated by the OWNER at any time upon discovery by the OWNER that the prime contractor or subcontractor has submitted a false statement under oath verifying compliance with any of the minimum criteria set forth in Minn. Stat. � 16C.285, subd. 3 Agreement 00520 - 2 (SEAL) Attest: Name (Please Type) Title (SEAL) Attest: Name (Please Type) Title OWNER City of Elk River i City Clerk CONTRACTOR By: Name (Please Type) Address: Telephone: End of Section Rolling Hills Pond Dredging Elk River, Minnesota Agreement 00520 - 3 SECTION 00550 Notice to Proceed To: Date: Rolling Hills Pond Dredging Elk River, Minnesota Contract: Rolling Hills Pond Dredging Owner's Contract No. You are notified that the Contract Times under the above contract will commence to run on , 2023. By that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 3 of the Agreement, the dates of Substantial Completion are and the date of readiness for final payment is Before BIDDER may start any Work at the Site, they must comply with paragraph 21 of the General Conditions, which require you to deliver to the Owner, with copies to Engineer, Certificates of Insurance, which each is required to purchase and maintain in accordance with the Contract Documents. City of Elk River (OWNER) City Administrator ACCEPTANCE OF NOTICE Receipt of the above NOTICE TO PROCEED is hereby acknowledged by: Title , this the day of 12023. End of Section Notice to Proceed 00550 - 1 Rolling Hills Pond Dredging Ell< River, Minnesota SECTION 00610 Performance Bond Bond No. KNOW ALL PERSONS BY THESE PRESENTS; That a (corporation, a partnership, or an individual), hereafter called Contractor, and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto City of Elk River 13065 Orono Parkway, Elk River, MN 55330 hereinafter called Owner, in the aggregate penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is based upon a certain contract by and between Contractor and Owner dated the day of , 2023, a copy of which is hereto attached and made a part hereof, for the construction of Rolling Hills Pond Dredging, generally described as follows: Dredging of six municipal ponds in the Rolling Hills development of Elk River. NOW THEREFORE, if Contractor well, truly and faithfully performs its duties, all the undertakings, covenants, terms, conditions, and agreements of said contract during the original terms thereof, and any extensions thereof which may be granted by Owner, with or without notice to Surety, and during the Two (2) year(s) guarantee and maintenance period, and if it satisfies all claims and demands incurred under such contract, and fully indemnifies and saves harmless the Owner from all costs and damages which Owner may suffer by reason of its failure to do so, and it Performance Bond 00610 - 2 Rolling Hills Pond Dredging Ell< River, Minnesota reimburses and repays Owner all outlay and expense which Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to Work to be performed thereunder or the Contract Documents accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the Work or to the Contract Documents. PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Contract not increasing the contract price more than 20 percent, so as to bind the Contractor and Surety to the full and faithful performance of the Contract as so amended. The term "Amendment," wherever used in this Bond, and whether referring to this Bond, the Contract, or the Loan Documents shall include any alteration, addition, extension, or modification of any character whatsoever. PROVIDED, FURTHER, that no final settlement between Owner and Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. Performance Bond 00610 - 3 Rolling Hills Pond Dredging Elk River, Minnesota IN WITNESS WHEREOF, this instrument is executed in three counterparts, each one of which shall be deemed an original, this day of 12023. SURETY: IN ATTEST: [SEAL] Attorney -in -Fact (Address) (Surety) CONTRACTOR AS PRINCIPAL: (Address) ATTEST: (Contractor as Principal) [SEAL] (Witness as to Surety) (Witness as to Contractor as Principal) (Address) (Address) NOTE: Date of BOND must not be prior to date of Contract. If Contractor is partnership, all partners should execute BOND. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. End of Section Performance Bond 00610 - 4 Rolling Hills Pond Dredging Ell< River, Minnesota SECTION 00615 Payment Bond Bond No. KNOW ALL PERSONS BY THESE PRESENTS; That a (corporation, a partnership, or an individual), hereafter called Contractor, and (Name of Surety) (Address of Surety) hereinafter called Surety, are held and firmly bound unto City of Elk River 13065 Orono Parkway, Elk River, MN 55330 hereinafter called Owner, and unto all persons, firms and corporations who or which may furnish labor or materials, as defined in Minnesota Statute 574, to perform as described under the contract and to their successors and assigns in the total aggregate penal sum of in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is based upon a certain contract by and between Contractor and Owner dated the day of , 2023, a copy of which is hereto attached and made a part hereof, for the construction of Rolling Hills Pond Dredging, generally described as follows: Improve various sections of bituminous by means of mill and overlay and/or full depth reclamation. NOW, THEREFORE, if the Contractor promptly makes payment to all persons, firms, Subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such contract and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. Payment Bond 00615 - 1 Rolling Hills Pond Dredging Elk River, Minnesota PROVIDED, that beneficiaries or claimants hereunder shall be limited to the subcontractors, and persons, firms and corporations having a direct contract with the principal or its subcontractors. PROVIDED, FURTHER, that the said Surety for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the Work to be performed thereunder or the Contract Documents accompanying the same shall in any way affect its obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the Work or to the Contract Documents. PROVIDED, FURTHER, that no suit or action shall be commenced hereunder by any claimant: (a) Unless the claimant, other than one having a direct contract with the Contractor, shall have given written notice to any two of the following: the Contractor, the Owner, or the Surety above named within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed to the Contractor, Owner, or Surety, at any place where an office is regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that such service need not be made by a public officer. (b) After the expiration of two (2) years following the date of which Contractor ceased work on said Contract, it being understood, however, that if any limitation embodied in the Bond is prohibited by any law controlling the construction hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. PROVIDED, FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and immediately, without formal and separate amendments hereto, upon amendment to the Contract not increasing the contract price more than 20 percent, so as to bind the Contractor and Surety to the full and faithful performance of the Contract as so amended. The term "Amendment", wherever used in this Bond, and whether referring to this Bond, the Contract or the Loan Documents shall include any alteration, addition, extension, or modification of any character whatsoever. PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. Payment Bond 00615 - 2 Rolling Hills Pond Dredging Elk River, Minnesota IN WITNESS WHEREOF, this instrument is executed in two or more counterparts, each one of which shall be deemed an original, this day of 52023. SURETY: By Attorney -in -Fact (Address) ATTEST: (Surety) [SEAL] (Witness as to Surety) (Address) LM CONTRACTOR AS PRINCIPAL: (Address) ATTEST: (Contractor as Principal) [SEAL] (Witness as to Contractor as Principal) (Address) NOTE: Date of BOND must not be prior to date of Contract. If Contractor is partnership, all partners should execute BOND. IMPORTANT: Surety companies executing Bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located. End of Section Payment Bond 00615 - 3 Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00671 Change Order Instruction on reverse side No. PROJECT: Rolling Hills Pond Dredging DATE OF ISSUANCE: OWNER: City of Elk River 13065 Orono Parkway Elk River, MN 55330 CONTRACTOR: CONTRACT FOR: Rolling Hills Pond Dredging You are directed to make the following changes in the Contract Documents. Description: Purpose of Change Order: Attachments (List documents supporting change): CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time Substantial Completion: Final Completion: Previous Change Orders No. to No. Net change from previous Change Orders $ Days Contract Price prior to this Change Order Contract Time prior to this Change Order Substantial Completion: $ Final Completion: Net Increase (Decrease) of this Change Order Net Increase (Decrease) of this Change Order days for Substantial Completion $ .00 days for Final Completion Contract Price with all approved Change Orders Contract Time with all approved Change Orders Substantial Completion: $ Final Completion: RECOMMENDED: APPROVED: APPROVED: By By By City Engineer City of Elk River EJCDC No. 1910-8-B (1996 Edition Change Order 00671 - 1 Change Order Instructions A. General Information Rolling Hills Pond Dredging Ell< River, Minnesota This document was developed to provide a uniform format for handling contract changes that affect Contract Price or Contract Time. Changes that have been initiated by a Work Directive Change must be incorporated into a subsequent Change Order if they Affect Price of Time. Changes that affect Contract Price or Contract Time should be promptly covered by a Change Order. The practice of accumulating change order items to reduce the administrative burden may lead to unnecessary disputes. For supplemental instructions and minor changes not involving a Change in the Contract Price or Contract Time, a Field Order may be used. B. Completing the Change Order Form Engineer initiates the form, including a description of the changes involved and attachments based upon documents and proposals submitted by Contractor, or requests from Owner, or Both. Once Engineer has completed and signed the form, all copies should be sent to Contractor for approval. After approval by Contractor, all copies should be sent to Owner for approval. Engineer should make distribution of executed copies after approval by Owner. If a change only applies to price or to the time, cross out the part of the tabulation that does not apply. Change Order 00671 - 2 Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00672 Withholding Affidavit for Contractors (FORM IC-134) The following Withholding Affidavit for Contractors form (IC-134), or the most current edition thereof, must be competed for each subcontractor and submitted to the Engineer before final payment can be made. Withholding Affidavit for Contractors 00672- 1 Rolling Hills Pond Dredging Elk River, Minnesota SECTION 00673 Certificate of Substantial Completion DATE OF ISSUANCE OWNER City of Elk River CONTRACTOR Contract: Rolling Hills Pond Dredging This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof - To the City of Elk River (OWNER) And To (CONTRACTOR) The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on Date of Substantial Completion A tentative list of items to be completed or corrected is attached hereto. This list may not be all- inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR no later than 00673 - 1 Rolling Hills Pond Dredging Elk River, Minnesota The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER: CONTRACTOR: The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by OWNER on 2023 Date By: , 2023 (Authorized Signature) CON7Rf1CTOB accepts this Certificate of Substantial Completion on 2023 LN Date CONTRACTOR (Authorized Signature) OWNER accepts this Certificate of Substantial Completion on Date City of Elk River OWNER (Authorized Signature) End of Section 00673 - 2 SECTION 00674 Contractor's Affidavit State of Minnesota The County of The City of Rolling Hills Pond Dredging Elk River, Minnesota Date: of has furnished all labor and material entering into the Rolling Hills Pond Dredging project for the City of Elk River (Owner). , of states further that Contractor has full knowledge of all obligations for such labor and materials which have entered into and become part of that certain project known and designated above, and Contractor further disposes and says that all debts and other obligations for such labor and materials have been fully and completely paid for in good and lawful money of the United States of American and that there are no suits for damages against them proceeding, prospective or otherwise, in consequence of their operations on the above said project. The said will hold the Owners, the City of Elk River, blameless of any and all Mechanic's Liens that may be hereafter entered or filed for record, so as to constitute charge against said premises for work or labor done or materials furnished by them. IN WITNESS WHEREOF, Contractor has heretofore put their hand and seal. SEAL Contractor's Authorized Agent I, , Notary Public in and for the above named County and State do hereby certify that personally known to me to be the affiant in the foregoing affidavit, personally appeared before me this day, and, having been duly sworn, deposes and say that the facts set forth in the above affidavit are true and correct. WITNESS my hand and seal this day of , 2023. my commission expires End of Section 00674 - 1 SECTION 00700 General Conditions 1. Definitions 2. Additional Instructions and Detail Drawings 3. Schedules, Reports, and Records 4. Drawings and Specifications 5. Shop Drawings 6. Materials, Services and Facilities 7. Inspection and Testing 8. Substitutions 9. Patents 10. Surveys, Permits, Regulations 11. Protection of Work, Property, Persons 12. Supervision by Contractor 13. Changes in the Work 14. Changes in Contract Price 15. Time for Completion and Liquidated Damages 16. Correction of Work 1. Definitions Rolling Hills Pond Dredging Ell< River, Minnesota 17. Subsurface Conditions 18. Suspension of Work, Termination, and Delay 19. Payments to Contractor 20. Acceptance of Final Payment as Release 21. Insurance 22. Contract Security 23. Assignments 24. Indemnification 25. Separate Contracts 26. Subcontracting 27. Engineer's Authority 28. Land and Rights -Of -Way 29. Guarantee 30. Arbitration 31. Taxes 1.1 Wherever used in the Contract Documents, the following terms shall have the meanings indicated, and shall be applicable to both the singular and plural thereof- 1.2 Addenda - Written or graphic instruments issued prior to the execution of the Agreement which modify and interpret the Contract Documents, Drawings, and Specifications, by additions, deletions, clarifications, or corrections. 1.3 Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the prices for the work to be performed. 1.4 Bidder - Any person, firm or corporation submitting a Bid for the work. 1.5 Bonds - Bid, Performance and Payment Bonds and other instruments of surety, furnished by the Contractor and the Contractor's surety in accordance with the Contract Documents. 1.6 Change Order - A written order to the Contractor authorizing an addition, deletion, or revision in the work within the general scope of the Contract Documents, or authorizing an adjustment in the contract price or contract time. General Conditions 00700 - 1 Rolling Hills Pond Dredging Ell< River, Minnesota 1.7 Contract Documents - The Contract, including Advertisement for Bids, Information for Bidders, Bid, Bid Bond, Agreement, Payment Bond, Performance Bond, Notice of Award, Notice to Proceed, Change Order, Drawings, Specifications, and Addenda. 1.8 Contract Price - The total monies payable to the Contractor under the terms and conditions of the Contract Documents. 1.9 Contract Time - The number of calendar days stated in the Contract Documents for the completion of the work. 1.10 Contractor - The person, firm, or corporation with whom the Owner has executed the Agreement. 1.11 Drawings - The parts of the Contract Documents which show the characteristics and scope of the work to be performed and which have been prepared or approved by the Engineer. May also be designated as "PLANS". 1.12 Engineer —(Section Omitted) 1.13 Field Order -A written order effecting a change in the work not involving an adjustment in the contract price or an extension of the contract time, issued by the Engineer to the Contractor during construction. 1.14 Notice of Award - The written notice of the acceptance of the Bid from the Owner to the successful Bidder. 1.15 Notice to Proceed - Written communication issued by the Owner to the Contractor authorizing him/her to proceed with the work and establishing the date for commencement of the work. 1.16 Owner -A public or quasi -public body or authority, corporation, association, partnership, or an individual for whom the work is to be performed. 1.17 Project - The undertaking to be performed as provided in the Contract Documents. 1.18 Resident Project Representative -The authorized representative of the Owner who is assigned to the project site or any part thereof. 1.19 Shop Drawings - All drawings, diagrams, illustration, brochures, schedules, and other data which are prepared by the Contractor, a subcontractor, manufacturer, supplier or distributor, which illustrate how specific portions of the work shall be fabricated or installed. 1.20 Specifications - A part of the Contract Documents consisting of written descriptions of a technical nature of materials, equipment, construction systems, standards, and workmanship. General Conditions 00700 - 2 Rolling Hills Pond Dredging Ell< River, Minnesota 1.21 Subcontractor - An individual, firm, or corporation having a direct contract with Contractor or with any other subcontractor for the performance of a part of the work at the site. 1.22 Substantial Completion - That date certified by the Engineer when the construction of the Project or a specified part thereof is sufficiently completed, in accordance with the Contract Documents, so that the Project or specified part can be utilized for the purposes for which it is intended. 1.23 Supplemental General Conditions - Modifications and/or additions to the General Conditions or such requirements that may be imposed by applicable state laws. 1.24 Supplier - Any person or organization who supplies materials or equipment for the work, including the fabricated special design, but who does not perform labor at the site. 1.25 Work - All labor necessary to produce the construction required by the Contract Documents, and all materials and equipment incorporated or to be incorporated in the Project. 1.26 Written Notice - Any notice to any party of the Agreement relative to any part of this Agreement in writing and considered delivered and the service thereof completed, when posted by certified or registered mail to the said party at their last given address, or delivered in person to said party or their authorized representative on the work. 2. Additional Instructions and Detail Drawings 2.1 The Contractor may be furnished additional instructions and detail drawings, by the Engineer, as necessary to carry out the work required by the Contract Documents. 2.2 The additional drawings and instructions thus supplied will become a part of the Contract Documents. The Contractor shall carry out the work in accordance with the additional detail drawings and instructions. 3. Schedules, Reports and Records 3.1 The Contractor shall submit to the Owner such schedule of quantities and costs, progress schedules, payrolls, reports, estimates, records and other data where applicable, as are required by the Contract Documents for the work to be performed. 3.2 Prior to the first partial payment estimate, the Contractor shall submit construction progress schedules showing the order in which the Contractor proposes to carry on the work, including dates at which the various parts of the work will be started, estimated date of completion of each part, and, as applicable: 3.2.1 The dates at which special detail drawings will be required; and General Conditions 00700 - 3 Rolling Hills Pond Dredging Ell< River, Minnesota 3.2.2 Respective dates for submission of shop drawings, the beginning of manufacture, the testing and the installation of materials, supplies, and equipment. 3.3 The Contractor shall also submit a schedule of payments that the Contractor anticipates will be earned during the course of the work. 4. Drawings and Specifications 4.1 The intent of the drawings and specifications is that the Contractor shall furnish all labor, materials, tools, equipment, and transportation necessary for the proper execution of the work in accordance with the Contract Documents and all incidental work necessary to complete the Project in an acceptable manner, ready for use, occupancy or operation by the Owner. 4.2 In case of conflict between the drawings and specifications, the specifications shall govern. Figure dimensions on drawings shall govern over general drawings. 4.3 Any discrepancies found between the drawings and specifications and site conditions or any inconsistencies or ambiguities in the drawings or specifications shall be immediately reported to the Engineer, in writing, who shall promptly correct such inconsistencies or ambiguities in writing. Work done by the Contractor after discovery of such discrepancies, inconsistencies or ambiguities shall be done at the Contractor's risk. 5. Shop Drawings 5.1 The Contractor shall provide shop drawings as may be necessary for the prosecution of the work as required by the Contract Documents. The Engineer shall promptly review all shop drawings. The Engineer's approval of any shop drawing shall not release the Contractor from responsibility for deviations from the Contract Documents. The approval of any shop drawing which substantially deviates from the Contract Documents shall be evidenced by a Change Order. 5.2 When submitted for the Engineer's review, shop drawings shall bear the Contractor's certification that he has reviewed, checked and approved the shop drawings, and that they are in conformance with the requirements of the Contract Documents. 5.3 Portions of the work requiring a shop drawing or sample submission shall not begin until the shop drawing or submission has been approved by the Engineer. A copy of each approved shop drawing and each approved sample shall be kept in good order by the Contractor at the site and shall be available to the Engineer. A copy of the approved shop drawings shall be provided to the Owner. 6. Materials, Services, and Facilities 6.1 It is understood that, except as otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, water, light, power, transportation, supervision, temporary construction of any nature, and all other services and facilities General Conditions 00700 - 4 Rolling Hills Pond Dredging Ell< River, Minnesota of any nature whatsoever necessary to execute, complete, and deliver the work within the specified time. 6.2 Materials and equipment shall be so stored as to insure the preservation of their quality and fitness for the work. Stored materials and equipment to be incorporated in the work shall be located so as to facilitate prompt inspection. 6.3 Manufactured articles, materials, and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned as directed by the manufacturer. 6.4 Materials, supplies, and equipment shall be in accordance with samples submitted by the Contractor and approved by the Engineer. 6.5 Materials, supplies, or equipment to be incorporated into the work shall not be purchased by the Contractor or subcontractor subject to a chattel mortgage or under a conditional sale contract or other agreement by which an interest is retained by the seller. 7. Inspection and Testing 7.1 All materials and equipment used in the construction of the Project shall be subject to adequate inspection and testing in accordance with generally accepted standards, as required and defined in the Contract Documents. 7.2 The Owner shall provide all inspection and testing services not required by the Contract Documents. 7.3 The Contractor shall provide at the Contractor's expense, the testing and inspection services required by the Contract Documents. 7.4 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any work to specifically be inspected, tested, or approved by someone other than the Contractor, the Contractor will give the Engineer timely notice of readiness. The Contractor will then furnish the Engineer the required certificates, testing, or approval. 7.5 Inspections, tests, or approvals by the Engineer or others shall not relieve the Contractor from the obligations to perform the work in accordance with the requirements of the Contract Documents. 7.6 The Owner, Engineer and the Engineer's representatives will at all times have access to the work. In addition, authorized representatives and agents of any participating federal or state agency shall be permitted to inspect all work, materials, payrolls, records of personnel, invoices of materials, and other relevant data and records. The Contractor will provide proper facilities for such access and observation of the work and also for any inspection or testing thereof. General Conditions 00700 - 5 Rolling Hills Pond Dredging Ell< River, Minnesota 7.7 If any work is covered contrary to the written instructions of the Engineer, it must, if requested by the Engineer, be uncovered for the Engineer's observation and replaced at the Contractor's expense. 7.8 If the Engineer considers it necessary or advisable that covered work be inspected or tested by others, the Contractor, at the Engineer's request, will uncover, expose or otherwise make available for observation, inspection or testing as the Engineer may require, that portion of the work in question, furnishing all necessary labor, materials, tools, and equipment. If it is found that such work is defective, the Contractor will bear all expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction; if, however, such work is not found to be defective, the Contractor will be allowed an increase in the contract price or an extension of the contract time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction and an appropriate Change Order shall be issued. 8. Substitutions 8.1 Whenever a material, article, or piece of equipment is identified on the drawings or specifications by reference to brand name or catalogue numbers, it shall be understood that this is referenced for the purpose of defining the performance or other salient requirements and that other products of equal capacities, quality and functions shall be considered. The Contractor may recommend the substitution of a material, article, or piece of equipment of equal substance and function for those referred to in the Contract Documents by reference to brand name or catalogue number, and if, in the opinion of the Engineer and Owner, such material, article, or piece of equipment is of equal substance and function to the specified, the Engineer may approve its substitution and use by the Contractor. Any cost differential shall be deductible from the contract price and the Contract Documents shall be appropriately modified by Change Order. The Contractor warrants that if substitutes are approved, no major changes in the function or general design of the project will result. Incidental changes or extra component parts required to accommodate the substitute will be made by the Contractor without a change in the contract price or contract time. 9. Patents 9.1 The Contractor shall pay all applicable royalties and license fees, and shall defend all suits or claims for infringement of any patent rights and save the Owner harmless from loss on account thereof, except that the Owner shall be responsible for such loss unless the Contractor promptly gives such information to the Engineer. 10. Surveys, Permits, Regulations 10.1 The Owner shall furnish all boundary surveys and establish all base lines for locating the principal component parts of the work together with a suitable number of bench marks adjacent to the work as shown in the Contract Documents. General Conditions 00700 - 6 Rolling Hills Pond Dredging Ell< River, Minnesota 10.2 The Contractor shall carefully preserve bench marks, reference points and stakes, and, in case of willful or careless destruction, shall be charged with the resulting expense and shall be responsible for any mistake that may be caused by their unnecessary loss or disturbance. 10.3 Permits and licenses of a temporary nature necessary for the prosecution of the work shall be secured and paid for by the Contractor unless otherwise stated in the Supplemental General Conditions. Permits, licenses, and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the Owner, unless otherwise specified. The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the Contract Documents are at variance therewith, the Contractor shall promptly notify the Engineer in writing, and any necessary changes shall be adjusted as provided in Section 13, Changes In The Work. 11. Protection of Work, Property, and Persons 11.1 The Contractor will be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work. The Contractor will take all necessary precautions for the safety of and will provide the necessary protection to prevent damage, injury or loss to all employees on the work and other persons who may be affected thereby, all the work and all materials or equipment to be incorporated therein, whether in storage on or off the site, and other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation, or replacement in the course of construction. 11.2 The Contractor will comply with all applicable laws, ordinances, rules, regulations and orders of any public body having jurisdiction. The Contractor will erect and maintain, as required by the conditions and progress of the work, all necessary safeguards for safety and protection. The Contractor will notify owners of adjacent utilities when prosecution of the work may affect them. The Contractor will remedy all damage, injury or loss to any property caused, directly or indirectly, in whole or part, by the Contractor, any subcontractor or anyone directly or indirectly employed by any of them or anyone of whose acts any of them be liable, except damage or loss attributable to the fault of the Contract Documents or to the acts or omissions of the Owner, of the Engineer, or anyone employed by either of them or anyone for whose acts either of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of the Contractor. 11.3 In emergencies affecting the safety of persons or the work or property at the site or adjacent thereto, the Contractor, without special instructions or authorization from the Engineer or Owner, shall act to prevent threatened damage, injury or loss. The Contractor will give the Engineer prompt written notice of any significant changes in the work or deviations from the Contract Documents caused thereby, and a Change Order shall thereupon be issued covering the changes and deviations involved. 11.4 In order to protect the lives and health of its employees under the Contract, the Contractor shall comply with all pertinent provisions of the "Manual of Accident Prevention in Construction" issued General Conditions 00700 - 7 Rolling Hills Pond Dredging Ell< River, Minnesota by the Associated General Contractors of America, Inc., and shall maintain an accurate record of all cases of death, occupational disease, and injury requiring medical attention or causing loss of time from work, arising out of and in the course of employment of work under the Contract. 11.5 The Contractor alone shall be responsible for the safety, efficiency, and adequacy of its plant, appliances, and methods, and for any damage which may result from their failure of their improper construction, maintenance, or operation. 12. Supervision by Contractor 12.1 The Contractor shall supervise and direct the work. He will be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor will employ and maintain on the work a qualified supervisor or superintendent who shall have been designated in writing by the Contractor as the Contractor's representative at the site. The supervisor shall have full authority to act on behalf of the Contractor and all communications given to the supervisor shall be as binding as if given to the Contractor. The supervisor shall be present on the site at all times as required to perform adequate supervision and coordination of the work. 13. Changes in the Work 13.1 The Owner may at any time, as the need arises, order changes within the scope of the work without invalidating the Agreement. If such changes increase or decrease the amount due under the Contract Documents, or the time required for performance of the work, an equitable adjustment shall be authorized by Change Order. 13.2 The Engineer, also, may at any time, by issuing a Field Order, make changes in the details of the work. The Contractor shall proceed with the performance of any changes in the work so ordered by the Engineer unless the Contractor believes that such field order entitles the Contractor to a change in contract price or time, or both, in which event the Contractor shall give the Engineer written notice thereof within seven (7) days after the receipt of the ordered change. Thereafter, the Contractor shall document the basis for the change in contract price or time within thirty (30) days. The Contractor shall not execute such changes pending the receipt of an executed Change Order or further instruction from the Owner. 14. Changes in Contract Price 14.1 The contract price may be changed only by a Change Order. The value of any work covered by a Change Order or of any claim for increase or decrease in the contract price shall be determined by one or more of the following methods in the order of precedence listed below: a) Unit prices previously approved b) An agreed lump sum 14.2 The contract Change Order will include extra work, work for which quantities have been altered from those shown in the bidding schedule, as well as decreases or increases in the quantities of installed General Conditions 00700 - 8 Rolling Hills Pond Dredging Ell< River, Minnesota units which are different than those shown in the bidding schedule because of final measurements. All changes should be recorded on a Change Order as they occur so that they may be included in the partial payment estimate. 15. Time for Completion and Liquidated Damages 15.1 The date of beginning and the time for completion of the work are essential conditions of the Contract Documents, and the work embraced shall be commenced on the date specified in the Notice to Proceed. 15.2 The Contractor will proceed with the work at such rate of progress to insure full completion within the contract time. It is expressly understood and agreed, by and between the Contractor and the Owner, that the contract time for the completion of the work described herein is a reasonable time, taking into consideration the average climatic and economic conditions and other factors prevailing in the locality of the work. 15.3 If the Contractor shall fail to complete the work within the contract time, or extension of time granted by the Owner, then the Contractor will pay to the Owner the amount for liquidated damages as specified in the Bid for each calendar day that the Contractor shall be in default after the time stipulated in the Contract Documents. 15.4 The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following, and the Contractor has promptly given written notice of such delay to the Owner or Engineer. 15.4.1 To any preference, priority or allocation order duly issued by the Owner. 15.4.2 To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to acts of God, or of the public enemy, acts of the Owner, acts of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather. 15.4.3 To any delays of subcontractors occasioned by any of the causes specified in paragraphs 15.4.1 and 15.4.2 of this article. 16. Correction of Work 16.1 The Contractor shall promptly remove from the premises all work rejected by the Engineer for failure to comply with the Contract Documents whether incorporated in the construction or not, and the Contractor shall promptly replace and re -execute the work in accordance with the Contract Documents and without expense to the Owner and shall bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement. General Conditions 00700 - 9 Rolling Hills Pond Dredging Ell< River, Minnesota 16.2 All removal and replacement work shall be done at the Contractor's expense. If the Contractor does not take action to remove such rejected work within ten (10) days after receipt of written notice, the Owner may remove such work and store the materials at the expense of the Contractor. 17. Subsurface Conditions 17.1 The Contractor shall promptly, and before such conditions are disturbed except in the event of an emergency, notify the Owner by written notice o£ 17.1.1 Subsurface or latent physical conditions at the site differing materially from those indicated in the Contract Documents, or 17.1.2 Unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. 17.2 The Owner shall promptly investigate the conditions, and if it is found that such conditions do so materially differ and cause an increase or decrease in the cost of, or in the time required for, performance of the work, an equitable adjustment shall be made and the Contract Documents shall be modified by a Change Order. Any claim of the Contractor for adjustment hereunder shall not be allowed unless the required written notice has been given; provided that the Owner may, if the Owner determines the facts to justify; consider and adjust any such claims asserted before the date of final payment. 18. Suspension of Work, Termination, and Delay 18.1 The Owner may suspend the work or any portion thereof for a period of not more than ninety (90) days or such further time as agreed upon by the Contractor, by written notice to the Contractor and the Engineer which shall fix the date on which work shall be resumed. The Contractor will resume that work on the date so fixed. The Contractor will be allowed an increase in the contract price or an extension of the contract time, or both, directly attributable to any suspension. 18.2 If the Contractor is adjudged bankrupt or insolvent, or makes a general assignment for the benefit of its creditors, or if a trustee or receiver is appointed for the Contractor or for any of its property, or if Contractor files a petition to take advantage of any debtor's act, or to reorganize under the bankruptcy or applicable laws, or repeatedly fails to supply sufficient skilled workers or suitable materials or equipment, or repeatedly fails to make prompt payments to subcontractors or for labor, materials or equipment, or disregards laws, ordinances, rules, regulations or orders of any public body having jurisdiction of the work, or disregards the authority of the Engineer, or otherwise violates any provision of the Contract Documents, then the Owner may, without prejudice to any other right or remedy and after giving the Contractor and its surety a minimum of ten (10) days from delivery of a written notice, terminate the services of the Contractor and take possession of the project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor, and finish the work by whatever method the Owner may deem expedient. In such case, the Contractor General Conditions 00700 - 10 Rolling Hills Pond Dredging Ell< River, Minnesota shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price exceeds the direct and indirect costs of completing the project, including compensation for additional professional services, such excess shall be paid to the Contractor. If such costs exceed such unpaid balance, the Contractor will pay the difference to the Owner. Such costs incurred by the Owner will be determined by the Engineer and incorporated in a Change Order. 18.3 Where the Contractor's services have been so terminated by the Owner, said termination shall not affect any right of the Owner against the Contractor then existing or which may thereafter accrue. Any retention or payment of monies by the Owner due the Contractor will not release the Contractor from compliance with the Contract Documents. 18.4 After ten (10) days from delivery of a written notice to the Contractor and the Engineer, the Owner may, without cause and without prejudice to any other right or remedy, elect to abandon the project and terminate the Contract. In such case, the Contractor shall be paid for all work executed and any expense sustained plus reasonable profit. 18.5 If, through no act or fault of the Contractor, the work is suspended for a period of more than ninety (90) days by the Owner, or under an order of court or other public authority, or the Engineer fails to act on any request for payment within thirty (30) days after it is submitted, or the Owner fails to pay the Contractor substantially the sum approved by the Engineer or awarded by arbitrators within thirty (30) days of its approval and presentation, then the Contractor may, after (10) days from delivery of a written notice to the Owner and the Engineer terminate the Contract and recover from the Owner payment for all work executed and all expenses sustained. In addition and in lieu of terminating the Contract, if the Engineer has failed to act on a request for payment or if the Owner has failed to make any payment as aforesaid, the Contractor may upon ten (10) days written notice to the Owner and the Engineer stop the work until paid all amounts then due, in which event and upon resumption of the work, Change Orders shall be issued for adjusting the contract price or extending the contract time or both to compensate for the costs and delays attributable to the stoppage of the work. 18.6 If the performance of all or any portion of the work is suspended, delayed, or interrupted as a result of a failure of the Owner or Engineer to act within the time specified in the Contract Documents, or if no time is specified, within a reasonable time, an adjustment in the contract price or an extension of the contract time, or both, shall be made by Change Orders to compensate the Contractor for the costs and delays necessarily caused by the failure of the Owner or Engineer. 19. Payment to Contractor 19.1 At least ten (10) days before each progress payment falls due (but not more often than once a month), the Contractor will submit to the Engineer a partial payment estimate filled out and signed by the Contractor covering the work performed during the period covered by the partial payment estimate and supported by such data as the Engineer may reasonably require. If payment is requested on the basis of materials and equipment not incorporated in the work but delivered and suitably stored at or near the site, the partial payment estimate shall also be accompanied by such supporting data, satisfactory to the Owner, as will establish the Owner's title to the material and equipment and protect General Conditions 00700 - 11 Rolling Hills Pond Dredging Ell< River, Minnesota the Owner's interest therein, including applicable insurance. The Engineer will, within ten (10) days after receipt of each partial payment estimate, either indicate in writing approval of payment, and present the partial payment estimate to the Owner, or return the partial payment estimate to the Contractor indicating in writing the reasons for refusing to approve payment. In the latter case, the Contractor may make the necessary corrections and resubmit the partial payment estimate. The Owner will, within ten (10) days of presentation of an approved partial payment estimate, pay the Contractor a progress payment on the basis of the approved partial payment estimate less the retainage. The retainage shall be an amount equal to 5% of said estimate. At any time when the progress of the work is not satisfactory, additional amounts may be retained. Upon substantial completion of the work, any amount retained may be paid to the Contractor. When the work has been substantially completed except for work which cannot be completed because of weather conditions, lack of materials, or other reasons which in the judgment of the Owner are valid reasons for non -completion, the Owner may make additional payments, retaining at all times an amount sufficient to cover the estimated cost of the work still to be completed. 19.1.1 The Engineer may disapprove or, on account of subsequently discovered evidence, nullify the whole or part of the approved partial payment estimate to such extent as may be necessary to protect the Owner from loss, on account of - (a) Defective work not remedied. (b) Claims filed or reasonable evidence indicating probable filing of claims. (c) Failure of Contractor to make payment properly to subcontracts or for material or labor. (d) A reasonable doubt that the work can be completed for the balance then unpaid. (e) Damage to another Contractor. (� Performance of work in violation of the terms of the Contract Documents. 19.1.2 Where work on unit price items is substantially complete but lack clean-up and/or corrections ordered by the Engineer, amounts shall be deducted from unit prices in partial payment estimates to amply cover such clean-up and corrections. 19.1.3 When the grounds for withholding or reducing partial payment defined in 19.1.1 and 19.1.2 are corrected, payment shall be made for the amounts withheld because of them. 19.2 The request for payment may also include an allowance for the cost of such major materials and equipment which are suitably stored either at or near the site. 19.3 Prior to substantial completion, the Owner, with the approval of the Engineer and with the concurrence of the Contractor, may use any completed or substantially completed portions of the work. Such use shall not constitute an acceptance of such portions of the work. 19.4 The Owner shall have the right to enter the premises for the purpose of doing work not covered by the Contract Documents. This provision shall not be construed as relieving the Contractor of the General Conditions 00700 - 12 Rolling Hills Pond Dredging Ell< River, Minnesota sole responsibility for the care and protection of the work, or the restoration of any damaged work except such as may be caused by agents or employees of the Owner. 19.5 Upon completion and acceptance of the work, the Engineer shall issue a certificate attached to the final payment request that the work has been accepted under the conditions of the Contract Documents. The entire balance found to be due the Contractor, including the retained percentages, but except such sums as may be lawfully retained by the Owner, shall be paid to the Contractor within thirty (30) days of completion and acceptance of the work. 19.6 The Contractor will indemnify and save the Owner or the Owner's agents harmless from all claims growing out of the lawful demand of subcontractors, laborers, workers, mechanics, material, men, and furnishers or machinery and parts thereof, equipment, tools and all supplies incurred in the furtherance of the performance of the work. The Contractor shall, at the Owner's request, furnish satisfactory evidence that all obligations of the nature designated above have been paid, discharged or waived. If the Contractor fails to do so the Owner may, after having notified the Contractor, either pay unpaid bills or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to pay any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged whereupon payment to the Contractor shall be resumed in accordance with the terms of the Contract Documents, but in no event shall the provisions of this sentence be construed to impose any obligations upon the Owner to either the Contractor, the Contractor's surety, or any third party. In paying any unpaid bills of the Contractor, any payment so made by the Owner shall be considered as a payment made under the Contract Documents by the Owner to the Contractor and the owner shall not be liable to the Contractor for any such payments made in good faith. 19.7 If the Owner fails to make payment thirty (30) days after approval by the Engineer, in addition to other remedies available to the Contractor, there shall be added to each such payment interest at the maximum legal rate commencing on the first day after said payment is due and continuing until the payment is received by the Contractor. 20. Acceptance of Final Payment as Release 20.1 The acceptance by the Contractor of final payment shall be and shall operate as a release to the Owner of all claims and all liability to the Contractor other than claims in stated amounts as may be specifically excepted by the Contractor for all things done or furnished in connection with this work and for every act and neglect of the Owner and others relating to or arising out of this work. Any payment, however, final or otherwise, shall not release the Contractor or its sureties from any obligations under the Contract Documents or the Performance and Payment Bonds. 21. Insurance 21.1 The Contractor shall purchase and maintain such insurance as will protect it from claims set forth below which may arise out of, or result from, the Contractor's execution of the work, whether General Conditions 00700 - 13 Rolling Hills Pond Dredging Ell< River, Minnesota such execution be by the Contractor, any subcontractor, or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 21.1 Claims under Workers' Compensation, disability benefit, and other similar employee benefit acts; 21.1.2 Claims for damages because of bodily injury, occupational sickness or disease, or death of employees; 21.1.3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than employees; 21.1.4 Claims for damages insured by usual personal injury liability coverage which are sustained (1) by any person as a result of an offense directly or indirectly related to the employment of such person by the Contractor, or (2) by any other person; and 21.1.5 Claims for damages because of injury to or destruction of tangible property, including loss of use resulting therefrom. 21.2 Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to commencement of work. These Certificates shall contain a provision that coverage afforded under the policies will not be cancelled, materially changed, or not renewed unless at least thirty (30) days prior written notice has been given to the Owner. All insurance certificates shall list the Owner as an additional named insured and the project name. 21.2.1 The Certificates of Insurance shall specifically provide that the contractual liability as set forth in Section 24, INDEMNIFICATION, has been insured and that coverage is included for collapse and underground hazards and completed operations. In the event that conditions are encountered during the progress of the work which requires blasting, no such blasting shall be undertaken until coverage for blasting has been obtained and certificates issued therefor. 21.3 The Contractor shall procure and maintain, at the Contractor's own expense, during the contract time, Liability Insurance as hereinafter specified: 21.3.1 Contractor's General Public Liability and Property Damage Insurance including vehicle coverage issued to the Contractor and protecting the Contractor from all claims for personal injury, including death, and all claims for destruction of or damage to property, arising out of or in connection with any operations under the Contract Documents, whether such operations be by the Contractor or by any subcontractor employed by the Contractor or anyone directly or indirectly employed by the Contractor or by a subcontractor employed by the Contractor. Insurance shall be written with a limit of liability of not less than $600,000 for all damages arising out of bodily injury, including death, at any time resulting therefrom, sustained by any one person in any one accident, and a limit of liability of not less than $600,000 aggregate for any such damages sustained by two or more persons in any one accident. Insurance shall be written with a limit of liability of not less than $200,000 for all General Conditions 00700 - 14 Rolling Hills Pond Dredging Ell< River, Minnesota property damage sustained by any one person in any one accident; and a limit of liability of not less than $200,000 aggregate for any such damage sustained by two or more persons in any one accident. 21.3.2 The Contractor shall acquire and maintain, if applicable, Fire and Extended Coverage Insurance upon the project to the full insurable value thereof for the benefit of the Owner, the Contractor, and subcontractors as their interest may appear. This provision shall in no way release the Contractor or Contractor's surety from obligations under the Contract Documents to fully complete the project. 21.4 The Contractor shall procure and maintain, at the Contractor's own expense, during the contract time, in accordance with the provisions of the laws of the state in which the work is performed, Workers' Compensation Insurance, including occupational disease provisions, for all of the Contractor's employees at the site of the project and in case any work is sublet, the Contractor shall require such subcontractor similarly to provide Workers' Compensation Insurance, including occupational disease provisions for all of the latter's employees unless such employees are covered by the protection afforded by the Contractor. In case any class of employees engaged in hazardous work under this contract at the site of the project is not protected under Workers' Compensation statute, the Contractor shall provide, and shall cause each subcontractor to provide, adequate and suitable insurance for the protection of its employees not otherwise protected. 21.5 The Contractor shall secure, if applicable, "All Risk" type Builder's Risk Insurance for work to be performed. Unless specifically authorized by the Owner, the amount of such insurance shall not be less than the contract price totaled in the Bid. The policy shall cover not less than the losses due to fire, explosion, hail, lightning, vandalism, malicious mischief, wind, collapse, riot, aircraft, and smoke during the contract time, and until the work is accepted by the Owner. The policy shall name as the insured the Contractor, and the Owner. 21.6 Owner's Protective Liability and Property Damage Insurance: The Contractor shall take out and maintain Owner's Protective Liability and Property Damage Insurance in the name of the Owner and the Engineer insuring against bodily injury, including accidental death, and property damage liability in the limits set forth above under "Public Liability Insurance" for which they may become legally obligated to pay as damages sustained by any persons, caused by accident and arising out of operations performed for the named insured by independent contractors and general supervision thereof. 22. Contract Security 22.1 The Contractor shall within ten (10) days after the receipt of the Notice of Award, furnish the Owner with a Performance Bond and a Payment Bond in penal sums equal to the amount of the contract price, conditional upon the performance by the Contractor of all undertakings, covenants, terms, conditions and agreements of the Contract Documents, and upon the prompt payment by the Contractor to all persons supplying labor and materials in the prosecution of the work provided by the Contract Documents. Such bonds shall be executed by the Contractor and a corporate bonding company licensed to transact such business in the state in which the work is to be performed and named on the current list of "Surety Companies Acceptable on Federal Bonds" as published in the General Conditions 00700 - 15 Rolling Hills Pond Dredging Elk River, Minnesota Treasury Department Circular Number 570. The expense of these Bonds shall be borne by the Contractor. If at any time a surety on any such Bond is declared a bankrupt or loses its right to do business in the state in which the work is to be performed or is removed from the list of Surety Companies accepted on Federal Bonds, Contractor shall within ten (10) days after notice from the Owner to do so, substitute an acceptable Bond (or Bonds) in such form and sum and signed by such other sureties as may be satisfactory to the Owner. The premiums on such Bond shall be paid by the Contractor. No further payment shall be deemed due nor shall be made until the new surety or sureties shall have furnished an acceptable Bond to the Owner. 23. Assignments 23.1 Neither the Contractor nor the Owner shall sell, transfer, assign, or otherwise dispose of the Contract or any portion thereof, or of any right, title, or interest therein, or any obligation thereunder, without the written consent of the other party. 24. Indemnification 24.1 The Contractor will indemnify and hold harmless the Owner and the Engineer and their agents and employees from and against all claims, damages, losses and expenses, including attorney's fees arising out of or resulting from the performance of the work, provided that any such claims, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting therefrom; and is caused in whole or in part by any negligent or willful act or omission of the Contractor, and subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. 24.2 In any and all claims against the Owner or the Engineer, or any of their agents or employees of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under Workers' Compensation acts, disability benefit acts, or other employee benefit acts. 24.3 The obligation of the Contractor under this paragraph shall not extend to the liability of the Engineer, its agents or employees arising out of the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifications. 25. Separate Contracts 25.1 The Owner reserves the right to let other contracts in connection with this project. The Contractor shall afford other Contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate the work with theirs. If the proper execution or results of any part of the Contractor's work depends upon the work of any other Contractor, the Contractor shall inspect and promptly report to the Engineer any defects in such work that render it unsuitable for such proper execution and results. General Conditions 00700 - 16 Rolling Hills Pond Dredging Ell< River, Minnesota 25.2 The Owner may perform additional work related to the project or the Owner may let other contracts containing provisions similar to these. The Contractor will afford the other Contractors who are parties to such Contracts (or the Owner, if the Owner is performing the additional work) reasonable opportunity for the introduction and storage of materials and equipment and the execution of work, and shall properly connect and coordinate the work with theirs. 25.3 If the performance of additional work by other Contractors or the Owner is not noted in the Contract Documents prior to the execution of the Contract, written notice thereof shall be given to the Contractor prior to starting any such additional work. If the Contractor believes that the performance of such additional work by the Owner or others involves it in additional expense or entitles it to an extension of the contract time, the Contractor may make a claim thereof as provided in Sections 14 and 15. 26. Subcontracting 26.1 The Contractor may utilize the services of specialty subcontracts on those parts of the work which, under normal contracting practices, are performed by specialty subcontractors. 26.2 The Contractor shall not award work to subcontractor(s), in excess of fifty (50%) percent of the contract price, without prior written approval of the Owner. 26.3 The Contractor shall be fully responsible to the Owner for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as the Contractor is for the acts and omissions of persons directly employed by it. 26.4 The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the Contract Documents insofar as applicable to the work of subcontractors and give the Contractor the same power as regards terminating any subcontract that the Owner may exercise over the Contractor under any provision of the Contract Documents. 26.5 Nothing contained in this Contract shall create any contractual relation between any subcontractor and the Owner. 27. Engineer's Authority 27.1 The Engineer shall act as the Owner's representative during the construction period, shall decide questions which may arise as to quality and acceptability of materials furnished and work performed, and shall interpret the intent of the Contract Documents in a fair and unbiased manner. The Engineer will make visits to the site and determine if the work is proceeding in accordance with the Contract Documents. General Conditions 00700 - 17 Rolling Hills Pond Dredging Ell< River, Minnesota 27.2 The Contractor will be held strictly to the intent of the Contract Documents in regard to the quality of materials, workmanship, and execution of the work. Inspections may be at the factory or fabrication plant of the source of material supply. 27.3 The Engineer will not be responsible for the construction means, controls, techniques, sequences, procedures, or construction safety. 27.4 The Engineer shall promptly make decisions relative to interpretations of the Contract Documents. 28. Land and Rights -Of -Way 28.1 Prior to issuance of Notice to Proceed, the Owner shall obtain all land and rights -of -way necessary for carrying out and for the completion of the work to be performed pursuant to the Contract Documents, unless otherwise mutually agreed. 28.2 The Owner shall provide to the Contractor information which delineates and describes the lands owned and rights -of -way acquired. 28.3 The Contractor shall provide at its own expense and without liability to the Owner any additional land and access thereto that the Contractor may desire for temporary construction facilities, or for storage of materials. 29. Guarantee 29.1 The Contractor shall guarantee all materials and equipment furnished and work performed for a period of two (2) years from the date of substantial completion. The Contractor warrants and guarantees for a period of two (2) years from the date of substantial completion of the system that the completed system is free from all defects due to faulty materials or workmanship and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of the damage of other parts of the system resulting from such defects. The Owner will give notice of observed defects with reasonable promptness. In the event that the Contractor should fail to make such repairs, adjustments, or other work that may be made necessary by such defects, the Owner may do so and charge the Contractor the cost thereby incurred. The Performance Bond shall remain in full force and effect through the guarantee period. 30. Arbitration 30.1 All claims, disputes and other matters in question arising out of, or relating to, the contract documents or the breach thereof, except for claims which have been waived by the making and acceptance of final payment as provided by Section 20, may be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association provided that the Owner and the Contractor mutually agree by separate instrument to arbitrate such claims, disputes and matters in question. This agreement to arbitrate shall be specifically enforceable under General Conditions 00700 - 18 Rolling Hills Pond Dredging Elk River, Minnesota the prevailing arbitration law. The award rendered by the arbitrators shall be final, and judgment may be entered upon it in any court having jurisdiction thereof. 30.2 Notice of the demand for arbitration shall be filed in writing with the Owner party to the Contract Documents and with the American Arbitration Association and a copy shall be filed with the Engineer. Demand for arbitration shall in no event be made on any claim, dispute, or other matter in question which would be barred by the applicable statue of limitations. 30.3 The Contractor will carry on the work and maintain the progress schedule during any arbitration proceedings, unless otherwise mutually agreed in writing. 31. Taxes 31.1 The Contractor will pay all sales, consumer, use and other similar taxes required by the laws of the place where the work is performed. General Conditions 00700 - 19 SECTION 00800 Supplement to General Conditions General Rolling Hills Pond Dredging Elk River, Minnesota These supplementary General Conditions make additions, deletions, or revisions to the General Conditions as indicated herein. All provisions, which are not so amended or supplemental, remain in full force and effect. Terms used in these Supplementary General Conditions which are defined in the General Conditions have the meanings assigned to them in the General Conditions. 1. Definitions Add the following definitions to Article 1: Conflict: A case where an item of Work is shown or specified differently in two or more places in the Contract Documents. An item of Work shown in one portion of the Contract Documents but not in another is not a conflict. Engineer: Justin Femrite P.E., Elk River City Engineer Address: 13065 Orono Parkway Elk River, MN 55330-2846 Phone: 763.635.1051 Email: jfemrite@E1kRiverMN.gov Furnish: To deliver to the job site or other specified location any item, equipment or material or labor. Holidays: Legal holidays designated by the State or specifically identified as follows: For general scheduling information, in the City of Elk River, Minnesota, holidays occur on the first of January, commonly known as New Year's Day; the third Monday of February, known as President's Day; the last Monday in May, known as Memorial Day; the Fourth Day of @y, known as Independence Day; the first Monday in September, known as Labor Day; the eleventh day of November, known as Veteran's Day; the fourth Thursday of November, known as Thanksgiving Day; the Friday after Thanksgiving; Christmas Eve at noon and the twenty-fifth day of December, known as Christmas Day. When an official holiday falls on a Sunday, the following Monday shall be designated as a substitute holiday, and observed as an official holiday. When an official holiday falls on a Saturday, the preceding Friday shall be designated as a substitute holiday, and observed as an official holiday. Inspect: The act of observing, checking, or verifying that materials provided or Work furnished under this Contract comply with the general intent of the project Contract documents. Supplementary General Conditions 00800-1 Rolling Hills Pond Dredging Elk River, Minnesota Install: Placing, erecting, or constructing complete in place any item, equipment, or material. Provide: Furnish and install, complete in place. Punch List: List of incomplete items of Work and of items of Work which are not in conformance with the Contract. The list will be prepared by the Engineer's representative when the Contractor (1) notifies the Engineer's representative in writing that the Work has been completed in accordance with the contract and (2) requests in writing that the Owner accept the Work. Shall: Refers to actions by either the Contractor or the Owner and means that Contractor or Owner has entered into a covenant with the other party to do or perform the action. Submittals: The information that is specified for submission to the Engineer in accordance with Division 1 of the Project Manual. 2. Additional Instructions and Detail Drawings Replace Section 2.1 with the following: 2.1 The Owner shall furnish to the Contractor six copies of the Contract Documents. Additional quantities of the Contract Documents will be furnished at reproduction cost. 10. Surveys, Permits, Regulations Add the following section to Article 10: 10.4 The Contractor shall obtain all necessary federal, state, and local permits required for any dewatering and stormwater discharges necessary during construction. The Contractor shall also provide all monitoring and test reporting relating to the discharges. 12. Supervision by Contractor Add the following section to Article 12: 12.2 Contractor shall maintain a qualified and responsible person available 24 hours per day, seven days per week to respond to emergencies which may occur after hours. Contractor shall provide to Engineer the phone number and/or paging service of this individual. 15. Time for Completion and Liquidated Damages Replace Section 15.3 with the following: 15.3 Owner and the Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the time specified in the Contract Documents, plus any extensions of time Supplementary General Conditions 00800-2 Rolling Hills Pond Dredging Elk River, Minnesota granted by the Owner. They also recognize the delays, expense, and difficulties involved in proving in a legal preceding the actual loss suffered by the Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, the Owner and the Contractor agree that as liquidated damages for delay (but not as a penalty) the Contractor shall pay the Owner TWO HUNDRED DOLLARS ($200.00) for each day that expires after the completion time specified in Division S as may be adjusted by executed Contract Documents. 19. Payment to Contractor Delete section 19.7 from Article 19. Add the following sections to Article 19: 19.1.4 The Owner shall retain from each monthly payment 5% of the amount which is determined to be due according to the recommendation of the Engineer. The retainage shall constitute a fund for the payment of claims for materials furnished and labor performed on the project and will be held by the Owner. Replace Section 19.5 with the following: 19.5 State law provides that the final estimate will be made within 90 days after completion of all work required under this contract. If, however, the total value of the Contract exceeds $2,000,000, the 90-day requirement will not apply and the time allowed for making such final estimate shall be 180 days after the work under this Contract has been, in all things, completed to the satisfaction of the Engineer. Add the following sections to Article 19: 19.8 Payment shall be made to subcontractors within ten (10) day of the CONTRACTOR's receipt of payment from the OWNER for all undisputed services provided by the subcontractor. Contractor shall pay subcontractor interest, at a rate of 1.5% per month, for any undisputed amounts not paid within the above mentioned timeframe. 21. Insurance The limits of liability for the insurance required by Section 21 of the General Conditions shall provide coverage for not less than the following amounts or greater where required by Law and Regulations: A. Workers' Compensation 1. State: Statutory 2. Applicable Federal Statutory Supplementary General Conditions 00800-3 Rolling Hills Pond Dredging Elk River, Minnesota 3. Employer's Liability $500,000 Each Occurrence 4. Contractor agrees to waive all rights of subrogation against the Owner, the Engineer, and their Subconsultants, employees, officer and directors, for Work performed under Contract. 5. Minimum insurance requirements are listed below: Contractor's Liability Insurance: Workers' Compensation: Statutory Requirements Employer's Liability: Each accident $1,000,000 Each disease $1,000,000 General Liability: Bodily injury per occurrence/aggregate limit $1,000,000 Property damage per occurrence/aggregate limit $1,000,000 Automobile: Bodily injury per occurrence/aggregate limit $1,000,000 Property damage per occurrence/aggregate limit $1,000,000 Minimum total Umbrella Coverage $3,000,000 B. Comprehensive General Liability: 1. Combined Single Unit $1,000,000 Each Occurrence $1,000,000 Annual Aggregate a. Products/Completed Operations $500,000 Each Occurrence 500 000 Annual Aggregate b. Personal injury $1,000,000 Each Occurrence $1,000,000 Annual Aggregate or 2. Bodily injury $1,000,000 Each Occurrence 2 000 000 Annual Aggregate Property damage $1,000,000 Each Occurrence 2 000 000 Annual Aggregate 3. If policies are written on a claims -made basis, certificate should so specify and policies continue in force for 1 year after completion of project. The retro date of the coverage must also be listed. Supplementary General Conditions 00800-4 Rolling Hills Pond Dredging Elk River, Minnesota 4. Policies shall include premises/operations, products, completed operations, independent contractors, owners and contractors protective, explosion, collapse, underground hazard, broad form contractual, personal injury with employment exclusion deleted, and broad form property damage. 5. The Contractor's Comprehensive General Liability Insurance policy shall be endorsed to add the Owner as additional insured. The Contractual Liability insurance shall be written so as to cover the Indemnification Clause. C. Comprehensive Automobile Liability (including owned, hired, and non -owned vehicles): 1. Bodily injury $1,000,000 Each Person 1 000 000 Each Occurrence 2. Property damage: $1,000,000 Each Occurrence or combined single limit of $2,000,000 All policies shall provide for 30 days' written notice prior to any cancellation or non -renewal of insurance policies required under Contract. "Will endeavor" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the Company, its agents, or representatives" wording will be deleted from certificates. 22. Contract Security Add the following section to Article 22: 22.2 Bonds The Contractor shall furnish a satisfactory Performance Bond in the amount of 100 percent of the Contract Price and a satisfactory Payment Bond in the amount of 100 percent of the Contract Price as security for the faithful performance and payment of all the Contractor obligations under the Contract Documents. 26. Subcontracting Replace Section 26.2 with the following: 26.2 The Contractor shall perform not less than 50 percent of the Work with its own forces (i.e., without subcontracting). The 50 percent requirement shall be understood to refer to the Work, the value of which totals not less than 50 percent of the Contract Price. Supplementary General Conditions 00800-5 Rolling Hills Pond Dredging Elk River, Minnesota 31. Taxes Add the following section to Article 31: 31.2 The tax codes of the State of Minnesota require the Contractor to pay Sales or Use Tax on material used in the construction. All Contractors shall prepare and require their Subcontractors to prepare, sign and acknowledge before a Notary Public, Department of Revenue Forms listing their respective expenditures for all materials that become an integral part of the completed project; the purchase price, the amount of Sales or Use Tax paid, the names of the material suppliers, and all other information required to complete said forms. All Contractors shall file with the Owner executed copies of these forms covering all material incorporated by them or their Subcontractors. Receipt of said executed forms by the Owner shall be a prerequisite to final payment of retained percentages of contract price to the Contractor. End of Section Supplementary General Conditions 00800-6 Rolling Hills Pond Dredging Ell< River, Minnesota Division S S-1 PROJECT DESCRIPTION This project aims to provide pond dredging of six ponds in the Rolling Hills development in Elk River. S-2 Personnel 5-2.1 Owner The Owner of the projects, entitled Rolling Hills Pond Dredging, is the City of Elk River. Correspondence should be addressed to: Mr. Justin Femrite, P.E. City of Elk River 13065 Orono Parkway Elk River, MN 55330 Phone: 763.635.1051 Email: jfemrite@E1kRiverMN.gov S-3 Project Schedule Construction of the Rolling Hills Pond Dredging will be as follows: • Shall be completed before February 16, 2024. Once work has begun on the contract, it shall progress continuously and be completed within one month of the start date. Within ten (10) days of executing the Contract, and in any case by the time of the preconstruction conference, the Contractor shall submit a schedule for commencement and completion of the work. This schedule shall include an anticipated partial pay estimate schedule and shall be reviewed by the Owner and the Engineer. The project schedule shall be updated by the Contractor upon request of the Engineer. S-4 Guarantee The Contractor shall guarantee all materials and equipment furnished and work performed for a period of two (2) years from the date of substantial completion. The Contractor warrants and guarantees for a period of two (2) years from the date of substantial completion of the system, that the completed system is free from all defects due to faulty materials or workmanship, and the Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs, adjustments, or other work that may be necessary by such defects. If the Contractor should fail to make such repairs, adjustments, or other work that may be necessary by such defects, the Owner may do so and charge the Contractor the cost thereby incurred. The Performance Bond shall remain in fully force and effect through the guarantee period. Division S S-1 Rolling Hills Pond Dredging Ell< River, Minnesota S-5 Scope of Work The specifications, together with the plans, describe in detail the work to be completed on the project. The Contractor shall be responsible for all work and its proper completion except as explicitly noted. All work shall be completed in accordance with the pertinent federal, state, and local codes and ordinances. In addition to the construction, the Contractor shall protect, maintain, repair, and restore all subsurface and overhead structures directly or indirectly disturbed, damaged, or affected by his operation. The work under this project consists of excavation activities at six municipal stormwater ponds in Elk River, Minnesota. These municipal stormwater ponds are referenced as Rolling Hills Pond Dredging. Rolling Hills Pond Dredging encompasses an area of approximately 10,200 Square Feet at a depth of 2 feet, see site plan for reference. The Rolling Hills ponds have reached the limit of treatment effectiveness and requires maintenance. The sediment testing consisted of 12 composite samples at six different locations. The full assessment of sediment testing is attached as Rolling Hills Sediment Testing. B-1 is considered above Tier 1 SRV and would be classified as "regulated fill." Regulated fill is considered solid waste by the MPCA and required proper disposal. The five other basins are considered Tier 1 and is classified as "unregulated fill," which should follow the MPCA's Best Management Practices for Offsite Use of Unregulated Fill (MPCA BMP Guidance). According to their guidance, the MPCA recommends avoiding placing unregulated fill at schools, playgrounds, daycares, residential properties, in gardens where food will be produced, and near lakes, rivers or streams. The MPCA indicates that unregulated fill is best suited for use at industrial or commercial properties. If the Minnesota Pollution Control Agency SRV standards change during the timeline of the project that affects these standards, the city will retain the option to reconsider with the contractor and MPCA on an appropriate solution. The contractor will furnish all labor, equipment and materials to perform the requested excavation in accordance with the approved permit conditions. Contractor shall properly dewater the pond prior to excavation and may have to continue dewatering if groundwater is encountered during the project. The dredged sediment material must also be adequately dewatered prior to being hauled off site. The excavation shall include providing access for equipment from the banks of the pond, repairing the bank as can be accomplished during winter conditions, and excavating the pond until the native bottom is reached. The contractor shall be responsible for determining the best methods and equipment to use with a goal of maximizing the area of excavation. The contractor shall also be responsible for providing trucking of spoils to a suitable location selected by the contractor and allows for proper disposal. The contractor shall be responsible for compliance with all project permit conditions including, but not limited to, meeting all environmental standards. Division S S-2 Rolling Hills Pond Dredging Ell< River, Minnesota Other Terms and Conditions 1. All excavated pond material shall become the property of the contractor. 2. Quantities identified in the bid schedule are estimates. City representatives will work with contractor to approve final excavation depths. Final payment will be based on actual material removed. Contractor is responsible for all basin and excavated material dewatering, if needed. Material shall be sufficiently dewatered prior to hauling to avoid leaking from the haul trucks onto public streets. All leaked or tracked material along any haul route shall be immediately cleaned up by the contractor. 4. All work shall comply with applicable State and Federal regulations and requirements. The contractor shall be responsible for compliance with all project permit conditions including, but not limited to, meeting all environmental standards. 5. All work shall be completed without damage to the adjacent property, roadway surfaces, or trail surfaces. Any disturbed turf or improved surface shall be restored to the acceptability of the City Engineer and may require, up to, full depth, full width, repaving of the traffic lane through the damaged area. All disturbed turf areas shall be restored with vegetation to pre-existing conditions. All costs required to re-establish vegetation shall be include in the bid. Temporary restoration shall include a hydro mulch or erosion control blanket to all exposed soil areas unless noted otherwise. Minimum measures for final restoration shall include the furnishing and installation of 4" of topsoil, appropriate seed mixture, fertilizer and erosion control blanket unless noted otherwise. Maintenance including but not limited to watering, erosion repair, and re -seeding shall be required until the area has reached 70% vegetative cover. 7. The City will retain 5% of payments until final acceptance of the project. 8. Contractor must provide evidence of being bonded, licensed and insured. 9. The City Council reserves the right to reject any or all bids or any alternates or to hold bids for forty-five (45) days; or accept any bid which, in the opinion of the City Council, serves the best interest of the City; and to waive any minor irregularities. 10. All excavation and temporary seeding and mulching work must be completed on or by February 16, 2024. Final turf restoration shall be completed by May 17, 2024, if necessary, as determined by the assigned city representative. 11. The successful bidder will be required to enter the attached contract should the City Council approve their bid. Division S S-3 Rolling Hills Pond Dredging Ell< River, Minnesota 12. If applicable, DNR dewatering/appropriations permit, and NPDES construction stormwater permit will be secured by the City of Elk River for the project and inspections will be the responsibility of the contractor. Conditions of the newest NPDES General Permit must be followed. S-6 Codes and Standards Reference to codes and standards established by federal, state, and local agencies, or the professional and trade societies and associations shall be to the latest edition at the time of contract award. When conflicting information is given, the most restrictive shall apply. Any questions of intent will be determined by the Engineer upon written request by the Contractor. S-7 "Or Equal" Cause Whenever a required material or article is shown on the Plans or in the Specifications by using the name of a product or of a particular manufacturer, it is to be understood that other products or materials which will adequately perform the required function may be considered equal and satisfactory in the Engineer's opinion. A comparable product shall not be purchased or installed without the Engineer's approval. A "Contract Change Order" shall be used if the Contract is to be modified. S-8 Additional Costs Incurred If the Contractor feels that additional compensation should be paid due to an event or condition that was unknown or unforeseen at the time the contract was awarded, the Contractor shall notify the Engineer in writing of the event or conditions prior to taking any action. Any additional compensation must be agreed upon by all parties involved including, but not limited to, the Contractor, City, and Engineer. Any additional compensation made shall be made through the use of a change order S-9 Public Safety The Contractor shall take the necessary precautions to protect the public and employees from injury by hazardous circumstances by providing barricades, warning signs, flashers, and other safety aids. The costs associated with all such items shall be considered incidental to the project. S-10 Project Storage Area The City will provide material storage at the City Garage, 19000 Proctor Road. The Contractor may choose to locate his own storage area and acquire permission from the appropriate parties to store equipment and materials. The Contractor shall be responsible for restoring the storage area back to its original condition. Division S S-4 Rolling Hills Pond Dredging Ell< River, Minnesota S-11 Traffic Control All traffic control devices (construction signs, barricades and barricade weights, flaggers, warning lights, cones, drums, trailers, pavement markings, flagmen, etc.) shall conform and be installed in accordance to the "Minnesota Manual on Uniform Traffic Control Devices" (MIVIUTCD) and Part VI, "Field Manual for Temporary Traffic Control Zone Layouts", the "Guide to Establishing Speed Limits in Highway Work Zones", the Minnesota Flagging Handbook, the provisions of Mn/DOT 1404 and 1710, the Minnesota Standard Signs Manuals Parts I and II, the Traffic Engineering Manual, the Traffic Control Layouts/Typical Traffic Control Layouts in the Plans, and these Special Provisions. At the time of initial set up and at the time of major stage changes,100 percent of each type of device shall be classified as acceptable. The acceptable devices shall be determined by using the guidelines set in the Temporary Traffic Control Zone Layout Field Manual. During the duration of the project, the acceptable devices may decrease to 75 percent with 25 percent of the devices marginal. Furnishing, installing, maintaining, relocating, and subsequently removing traffic control devices as required will be considered incidental to the project. S-12 Inspection Of Work The City of Elk River will provide Observation of the work. City, County, or State agencies having jurisdiction as deemed necessary by those authorities, may make additional observation of the work. S-13 Mobilization Mobilization is considered incidental and should be considered in the bids of individual items. End of Section Division S S-5 AMERICAN ENGINEERING TESTING Report of Environmental Sampling Rolling Hills Development Elk River, Minnesota AET Project No. P-0025977 Date: October 10, 2023 Prepared for: City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 American Engineering Testing 550 Cleveland Avenue North St. Paul, MN 55114-1804 teamAET.com • 800.972.6364 October 10, 2023 AMERICAN ENGINEERING TESTING City of Elk River 13065 Orono Parkway Elk River, Minnesota 55330 ATT: Brandon Wisner, MSPM RE: Report of Environmental Sampling Rolling Hills Development City of Elk River, Minnesota AET Project No. P-0025977 Dear Mr. Wisner, American Engineering Testing, Inc. (AET) has prepared this report for the assessment of contaminant levels in sediment from six stormwater ponds in the Rolling Hills Development (near 226t" Ln NW) of Elk River. These services were performed in general accordance with the City's authorization dated September 7, 2023. We appreciate the opportunity to assist you with this project. If you have questions regarding the information in this report, or if we can be of additional service, please call me. Sincerely, American Engineering Testing, Inc. eif Johnson Geologist Phone: (612) 523-1277 Email: Ijohnson@teamaet.com 550 Cleveland Avenue North I Saint Paul, MN 55114 Phone (651) 659-9001 I (800) 972-6364 I Fax (651) 659-1379 I teamAET.com I AA/EEO This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 CERTIFICATION Prepared for: Brandon Wisner 13065 Orono Parkway Elk River, Minnesota 55330 Report Authored By: L Johnson Geologist Copyright 2023 American Engineering Testing, Inc. All Rights Reserved Prepared by: American Engineering Testing, Inc. 550 Cleveland Avenue North St. Paul, Minnesota 55114 (615) 659-9001/www.teamaet.com Report Reviewed By: ic" C. H sse, PE Principal Engineer AM E R ICAN €NGINEENlN❑ TE5TIN9 Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project. Page i Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 AIM IN SCAN €HGINEEHlNG TESTING TABLE OF CONTENTS Page CERTIFICATION...................................................................................................................... i TABLE OF CONTENTS........................................................................................................... ii 1.0 INTRODUCTION............................................................................................................... 1 2.0 SCOPE OF SERVICES..................................................................................................... 1 3.0 SEDIMENT SAMPLING AND TESTING............................................................................ 1 3.1 Sediment Collection................................................................................................................1 3.2 Classification Methods............................................................................................................2 3.3 Laboratory Analysis................................................................................................................2 3.4 Reference Standards..............................................................................................................2 4.0 RESULTS.......................................................................................................................... 2 4.1 Sample Locations...................................................................................................................2 4.2 Sediment Description..............................................................................................................3 4.3 Analytical Results....................................................................................................................3 5.0 DISCUSSION/CONCLUSIONS......................................................................................... 3 6.0 RECOMMENDATIONS.....................................................................................................4 7.0 STANDARD OF CARE...................................................................................................... 4 TABLE Table 1 — Summary of Soil Analytical Results FIGURE Figure 1 — Sample Location Map APPENDICES A. General Environmental Sampling Methods B. Laboratory Analytical Report C. Soil Screening Logs D. MPCA Best Management Practices Guidance for the Off -Site Reuse of Unregulated Fill Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 AIM IN SCAN €HGINEEHlNG TESTING 1.0 INTRODUCTION The city of Elk River plans to dredge sediment deposits from six stormwater ponds in the Rolling Hills Development, located near 226th Lane NW. Brandon Wisner, Engineering Project Manager, requested engineering assistance to complete this project. On September 8, 2023, the Client authorized American Engineering Testing, Inc. (AET) to provide environmental services for characterizing sediments in the stormwater pond so that the dredged sediments may be managed properly upon removal. Figure 1 shows the location of the stormwater pond sampling locations in the Rolling Hills Development (Site). The Site is a residential area, approximately 30 acres in size. The stormwater ponds are spread out through the development, with each pond less than 1 acre in size. Most of the ponds are overgrown with wetland vegetation and little standing water. 2.0 SCOPE OF SERVICES AET performed a sediment assessment in general accordance with the May 2017 Minnesota Pollution Control Agency (MPCA) document Managing Stormwater Sediment Best Management Practices Guidance, wstrm4-16 (May 2017 Stormwater Sediment Guidance). The scope of services completed by AET consisted of: • Collecting two samples from each pond, for a total of twelve (12) sediment samples. Samples were collected to depths of 2.0 feet below the pond bottom, or native soil. The borings were advanced at the inlet and outlet of each stormwater pond. Each sample location was logged in one -foot intervals noting sediment types and other characteristics (i.e. staining, odors). • Collecting a sediment sample from each of the borings for laboratory analysis of arsenic, copper, polynuclear aromatic hydrocarbons (PAH), and carcinogenic polynuclear aromatic hydrocarbons (cPAHs). • Preparing this report presenting the testing results and recommendations for managing sediment/soil dredged from the stormwater pond and the expansion area. 3.0 SEDIMENT SAMPLING AND TESTING 3.1 Sediment Collection AET collected a total of twelve (12) samples, two from each of six stormwater ponds (Figure 1). The City of Elk River provided a Rolling Hills Development plan sheet which showed the pond locations. Samples were collected from borings advanced 0 to 2 feet into the pond sediment. In general, all the encountered pond sediment was silty or clayey sand with varying amounts of organic material. Appendix A provides a general description of sampling methods used during this project. Page 1 of 4 Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 eAM E R IC.4N no1neersana resrino- 3.2 Classification Methods Sediment samples obtained in the field were visually/manually classified in general accordance with the Unified Soil Classification System (USCS) described in ASTM: D 2488. Soil screening notes are included in Appendix C. 3.3 Laboratory Analysis AET submitted one sediment sample from each of the two hand augers advanced in the stormwater pond area to Pace Analytical for laboratory analysis of the following parameters: • arsenic • copper '31 cPAHs Appendix B includes the laboratory analytical report. 3.4 Reference Standards In this report, we compare the analytical results to the baseline environmental regulatory standards in use by the MPCA. The reference standards are included in the results tables for comparison with assessment results. The following reference standards apply to potential contaminant exposures in soils: MPCA Tier 1 Residential Soil Reference Values (SRVs): Compound -specific values for long- term soil exposure in unrestricted -use settings (i.e., residential) above which an unacceptable risk to human health is predicted to exist. Soils below Tier 1 SRVs are suitable for reuse in residential settings. • MPCA Tier 2 Industrial SRVs: Compound -specific values for long-term soil exposure in industrial -use settings above which an unacceptable risk to human health is predicted to exist. Soils below Tier 2 SRVs are suitable for reuse in industrial settings. • MPCA Tier 1 Screening Soil Leaching Values (SLVs): Compound -specific values in unsaturated soils above which an unacceptable risk of leaching to groundwater and/or receptors is predicted to exist. 4.0 RESULTS 4.1 Sample Locations Sample locations were selected at the inlet and outlet of each pond. AET scouted these locations and was able to access all locations for sampling. Page 2 of 4 Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 AIM IN SCAN €HGINEEHlNG TESTING 4.2 Sediment Description The sediments encountered at all locations were mostly silty sand or clayey sand with organic material. Sediments encountered at B-3a and B-3b were more saturated than the other sites. 4.3 Analytical Results AET submitted one sample from each boring location (12 total) for laboratory analysis. Laboratory analytical results are shown in the attached Table 1 and compared to regulatory criteria published by the MPCA. The laboratory reports are included as Appendix B. 4.3.1 PAHs Various PAHs were detected in each sample. Most individual parameters were not detected above their respective Tier 1 Residential/Recreational SRVs or Tier 1 SLVs. However, the BaP equivalent was calculated for each sample based on the PAHs detected. The calculated BaP equivalent was above the Tier 1 Residential/Recreational SRV and Tier 1 SLV in B-1A. 4.3.2 Metals Arsenic and copper were detected at varying concentrations in the sediment samples analyzed. None of the concentrations detected exceed their respective Tier 1 Residential/Recreational SRV or Tier 1 SLV. 5.0 DISCUSSION/CONCLUSIONS The calculated BaP equivalent for one sample (B-1A) was above the Tier 1 Residential/Recreational SRV and Tier 1 SLV. Arsenic and copper were detected in each of the samples collected at concentrations below their respective Tier 1 Residential/Recreational SRVs and Tier 1 SLVs. Both metals occur naturally in the environment and the measured concentrations of arsenic and copper appear to be consistent with typical background concentrations. Based on the laboratory analysis of sediment samples, most of the excavated sediment from the ponds would be classified as "unregulated fill" and re -use of this material should follow MPCA's Best Management Practices for Offsite Use of Unregulated Fill (MPCA BMP Guidance). According to their guidance, the MPCA recommends avoiding placing unregulated fill at schools, playgrounds, daycares, residential properties, in gardens where food will be produced, and near lakes, rivers or streams. The MPCA indicates that unregulated fill is best suited for use at industrial or commercial properties. The MPCA BMP Guidance is attached (Appendix D). Excavated sediments from areas near B-1A would be classified as "regulated fill". Regulated fill is considered solid waste by the MPCA and requires proper disposal. Page 3 of 4 Rolling Hills Development Environmental Sampling Report Elk River, Minnesota October 10, 2023 AET Report No. P-0025977 AIM IN SCAN €HGINEEHlNG TESTING 6.0 RECOMMENDATIONS During excavation, the water level should be kept below any outlets of the stormwater management area for the duration of the sediment excavating activity, or the discharge must be protected or controlled in such a manner as to prevent turbid water and/or dredged sediment from being released to a water resource. We recommend the water in the stormwater management area be drained as much as possible. The MPCA May 2017 Stormwater Sediment Manual recommends that best management practices (BMPs) for erosion and sediment control should be employed at the site as well as the location where sediment is temporarily stockpiled. The MPCA also recommends that records of all dredge projects (e.g., reports, permits, plans, waste manifests, etc.) be maintained by the owner and operator of the stormwater management facilities. 7.0 STANDARD OF CARE The data derived through this sampling program have been used to develop our opinions about subsurface conditions. However, because no sampling program can reveal totally what is in the subsurface, conditions between samples, and at other times, may differ from conditions described in this report. The sampling we conducted identified soil conditions only at those points where we took samples. Depending on the sampling methods and sampling frequency, every soil type may not be observed, and some materials or layers which are present in the ground may not be documented. AET has endeavored to perform services for this project in a manner consistent with the level of skill and care ordinarily exercised by other members of the profession currently practicing in this area, under similar budgetary and time constraints. No additional warranty, express or implied, is made. This report is based on our current understanding of the project. If conditions differing from our original understanding or findings are identified, AET should be consulted to determine if there are material impacts on our conclusions or recommendations. Page 4 of 4 Tables AET Project No. P-0025977 raa. � AM ERICAN °" ""'"''"° °""'�"' Figures AET Project No. P-0025977 n_. '�� _ •� _._ . rl .. rid !S��„, Site Area of m F I i f/ USGS The National Map: 4.—.. ii. j. National Boundaries Dataset, 3DEP Elevation Program, Geographic Names 6=3[J 1 aX,'�226th �Avp. N�W g C B-1 b Y r 1-.. Legend - f C Stormwater Pond Sampling Locations Map References: Figure 1 Aerial: Sherburne County, 2021 Sample Locations N ARolling Hills Development AMERICAN 0 200 400 Elk River, MN ENGINEERING TESTING Feet Date: 10/06/2023 AET Project No. P-0025977 Appendix A General Environmental Sampling Methods AET Project No. P-0025977 AET Project No. P-0025977 Page A 1 of 1 ENVIRONMENTAL SAMPLING METHODS — GENERAL: EXCAVATIONS/TEST PITS, HAND AUGERS, SURFICIAL SOILS, STOCKPILES Site Safety Issues Safety is of paramount importance on construction, demolition, or other high -traffic sites with potentially unstable ground. Frequent visual and verbal contact is maintained with operators of heavy equipment in the sampling vicinity. Care is taken not to enter depressions or scale mounds that would constitute confined spaces, where engulfment, immersion, or falls are possible, or where harmful vapors may collect. Most observations and soil collection are performed from a stable and level ground surface with the help of heavy equipment operated by an excavation contractor. Contamination Reduction Sampling devices (except heavy equipment in most cases) are cleaned between sampling points to minimize cross contamination. The cleaning procedure may consist of an alconox detergent -water wash using a brush, followed by a tap water rinse. Certain types of projects may entail more or less stringent decontamination procedures. Soil Collection Most soil samples from excavations or test pits are collected directly from heavy equipment (e.g., excavation bucket, loader, or bulldozer), giving preference to soils that have not touched the equipment. A hand auger is used to complete shallow soil borings in locations of limited vehicle access. Hand auger borings are advanced manually, typically in 6" to 12" depth intervals. Soils are collected directly from the hollow auger barrel. A spade shovel is used to collect surficial soils (i.e., up to 6" depth). In many cases, soil samples can be collected by hand without added equipment. Impacted soils or buried debris may be present in the ground that are not observed due to the spacing and depths of sampling points. Best judgment determinations, based on known site conditions and past experience in similar situations, do not guarantee identification or removal of all impacts. Soil Classification As the samples are obtained in the field, they are visually and manually classified by the field staff. Representative portions of the samples may be returned to the laboratory for further examination and for verification of the field classification. Soil classifications, visual/odor observations, and information on any groundwater encountered are reported on the Soil Screening Data Sheet or other field notes. Soil Sample Vapor Screening Soil samples collected directly or from equipment are screened with a photoionization detector (PID) for the presence of organic vapors with ionization potentials less than the lamp voltage. The PID is calibrated for direct reading in parts -per -million -volume (PPMv) of a benzene equivalent. Soil samples are collected and screened according to the bag-headspace field screening procedure, which consists of placing freshly collected soil into a polyethylene Whirl -Pak or freezer "baggie" (i.e., bag), sealing the bag to contain an air pocket (i.e., headspace), and allowing 10 to 20 minutes for vapors to disperse from the soil to the headspace. The highest reading upon inserting the PID probe into the bag headspace — typically attained within two to five seconds of probe insertion — is recorded on the Soil Screening Data Sheet or other field notes. Excessive moisture, temperature extremes, ambient vapors, or other unusual field circumstances can affect screening results. Other Field Screening For certain sites, field screening may be conducted for additional parameters in accordance with AET's Field Screening Methods Supplemental information sheet. Soil Sampling for Chemical Analysis Soil samples obtained for chemical analysis are collected directly or from the sampling device into laboratory - prepared containers with appropriate preservatives, according to laboratory protocols. The samples are delivered to the analytical laboratory within prescribed holding times, accompanied by proper chain -of -custody forms. Page 1 of 1 (02/2013) AMERICAN ENGINEERING TESTING, INC. Not all methods summarized on this information sheet are conducted at all sites. Special conditions may also occur which require modifications to these methods. Any descriptions of field methods within the report text take precedence. Appendix B Laboratory Analytical Report AET Project No. P-0025977 AE ject No. P-0025977 acre Page B 1 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 October 05, 2023 Leif Johnson American Engineering Testing, Inc. 550 Clleveland Ave. N Saint Paul, MN 55114 RE: Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Dear Leif Johnson: Enclosed are the analytical results for sample(s) received by the laboratory on September 22, 2023. The results relate only to the samples included in this report. Results reported herein conform to the applicable TNI/NELAC Standards and the laboratory's Quality Manual, where applicable, unless otherwise noted in the body of the report. The test results provided in this final report were generated by each of the following laboratories within the Pace Network: • Pace Analytical Services - Minneapolis If you have any questions concerning this report, please feel free to contact me. Sincerely, Kongmeng Vang kongmeng.vang@pacelabs.com 612-607-6382 Project Manager Enclosures 2��R ACC�E4�Fi7 REPORT OF LABORATORY ANALYSIS TN I #I n> This report shall not be reproduced, except in full, ( without the written consent of Pace Analytical Services, LLC. 9'0 - - pQ Page 1 of 41 AE ject No. P-0025977 ace Page B 2 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Pace Analytical Services, LLC - Minneapolis MN 1700 Elm Street SE, Minneapolis, MN 55414 A21-A Certification #: 2926.01 Alabama Certification #: 40770 Alaska Contaminated Sites Certification #: 17-009 Alaska DW Certification #: MN00064 Arizona Certification #: AZ0014 Arkansas DW Certification #: MN00064 Arkansas WW Certification #: 88-0680 California Certification #: 2929 Colorado Certification #: MN00064 Connecticut Certification #: PH-0256 EPA Region 8 Tribal Water Systems+Wyoming DW Certification #: via MN 027-053-137 Florida Certification #: E87605 Georgia Certification #: 959 GMP+ Certification #: GMP050884 Hawaii Certification #: MN00064 Idaho Certification #: MN00064 Illinois Certification #: 200011 Indiana Certification #: C-MN-01 Iowa Certification #: 368 Kansas Certification #: E-10167 Kentucky DW Certification #: 90062 Kentucky WW Certification #: 90062 Louisiana DEQ Certification #: AI-03086 Louisiana DW Certification #: MN00064 Maine Certification #: MN00064 Maryland Certification #: 322 Michigan Certification #: 9909 Minnesota Certification #: 027-053-137 Minnesota Dept ofAg Approval: via MN 027-053-137 Minnesota Petrofund Registration #: 1240 CERTIFICATIONS Mississippi Certification #: MN00064 Missouri Certification #: 10100 Montana Certification #: CERT0092 Nebraska Certification #: NE-OS-18-06 Nevada Certification #: MN00064 New Hampshire Certification #: 2081 New Jersey Certification #: MN002 New York Certification #: 11647 North Carolina DW Certification #: 27700 North Carolina WW Certification #: 530 North Dakota Certification (A2LA) #: R-036 North Dakota Certification (MN) #: R-036 Ohio DW Certification #: 41244 Ohio VAP Certification (1700) #: CL101 Oklahoma Certification #: 9507 Oregon Primary Certification #: MN300001 Oregon Secondary Certification #: MN200001 Pennsylvania Certification #: 68-00563 Puerto Rico Certification #: MN00064 South Carolina Certification #:74003001 Tennessee Certification #: TN02818 Texas Certification #: T104704192 Utah Certification #: MN00064 Vermont Certification #: VT-027053137 Virginia Certification #: 460163 Washington Certification #: C486 West Virginia DEP Certification #: 382 West Virginia DW Certification #: 9952 C Wisconsin Certification #: 999407970 Wyoming UST Certification #: via A21LA 2926.01 USDA Permit #: P330-19-00208 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 2 of 41 AE ject No. P-0025977 acre Page B 3 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 SAMPLE SUMMARY Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Lab ID Sample ID Matrix Date Collected Date Received 10669893001 B1-A Solid 09/21/2309:15 09/22/23 11:31 10669893002 1131-113 Solid 09/21/2309:30 09/22/23 11:31 10669893003 1132-A Solid 09/21 /23 09:45 09/22/23 11:31 10669893004 1132-113 Solid 09/21 /23 10:00 09/22/23 11:31 10669893005 1133-A Solid 09/21 /23 10:30 09/22/23 11:31 10669893006 1133-113 Solid 09/21 /23 10:45 09/22/23 11:31 10669893007 1134-A Solid 09/21 /23 11:00 09/22/23 11:31 10669893008 1134-113 Solid 09/21 /23 11:15 09/22/23 11:31 10669893009 1135-A Solid 09/21 /23 11:30 09/22/23 11:31 10669893010 1135-113 Solid 09/21 /23 11:45 09/22/23 11:31 10669893011 1136-A Solid 09/21 /23 12:00 09/22/23 11:31 10669893012 1136-113 Solid 09/21 /23 12:15 09/22/23 11:31 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 3 of 41 AE ject No. P-0025977 acre Page B 4 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 SAMPLE ANALYTE COUNT Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Lab ID Sample ID Method Analysts Analytes Reported 10669893001 131-A EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893002 131-13 EPA6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893003 132-A EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893004 132-13 EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893005 133-A EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893006 133-13 EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893007 134-A EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893008 134-13 EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893009 135-A EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 10669893010 135-13 EPA 6010D DM 2 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 4 of 41 AE ject No. P-0025977 acre Page B 5 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Lab ID Sample ID 10669893011 136-A 10669893012 136-13 PASI-M = Pace Analytical Services - Minneapolis SAMPLE ANALYTE COUNT Method Analysts Analytes Reported ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 EPA 6010D DM 2 ASTM D2974 JDL 1 EPA 8270E by SIM JLR 19 EPA 8270E by SIM KJ3 40 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 5 of 41 AE ject No. P-0025977 acre Page B 6 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 131-A Lab ID: 10669893001 Collected: 09/21/23 09:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 2.1 mg/kg 1.2 1 09/27/2312:55 10/02/2313:40 7440-38-2 Copper 15.6 mg/kg 0.62 1 09/27/2312:55 10/02/2313:40 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 20.0 % 0.10 1 10/03/23 15:46 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene 29.2 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 83-32-9 Acenaphthylene 15.1 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 208-96-8 Anthracene ND ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 120-12-7 Benzo(a)anthracene 652 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 56-55-3 Benzo(a)pyrene 795 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 50-32-8 Benzo(b)fluoranthene 969 ug/kg 61.3 5 09/27/23 08:35 09/29/23 15:36 205-99-2 Benzo(g,h,i)perylene 854 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 191-24-2 Benzo(k)fluoranthene 442 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 207-08-9 Chrysene 875 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 218-01-9 Dibenz(a,h)anthracene 201 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 53-70-3 Fluoranthene 1460 ug/kg 61.3 5 09/27/23 08:35 09/29/23 15:36 206-44-0 Fluorene 41.0 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 86-73-7 Indeno(1,2,3-cd)pyrene 973 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 193-39-5 Naphthalene ND ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 91-20-3 Phenanthrene 892 ug/kg 12.3 1 09/27/23 08:35 09/28/23 23:55 85-01-8 Pyrene 1310 ug/kg 61.3 5 09/27/23 08:35 09/29/23 15:36 129-00-0 Total BaP Eq. MN 2006sh. ND=O 1220 ug/kg 61.3 5 09/27/23 08:35 09/29/23 15:36 Surrogates 2-Fluorobiphenyl (S) 78 %. 54-125 1 09/27/23 08:35 09/28/23 23:55 321-60-8 p-Terphenyl-d14 (S) 84 %. 60-125 1 09/27/23 08:35 09/28/23 23:55 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene 75.1 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 83-32-9 Acenaphthylene 18.3 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 208-96-8 Anthracene 134 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 120-12-7 Benzo(a)anthracene 946 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 56-55-3 Benzo(a)pyrene 1210 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 50-32-8 Benzo(e)pyrene 1090 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 192-97-2 Benzo(g,h,i)perylene 1150 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 191-24-2 Benzofluoranthenes (Total) 2530 ug/kg 37.5 1 09/28/23 18:14 10/02/23 14:58 Carbazole 193 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 86-74-8 2-Chloronaphthalene ND ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 91-58-7 Chrysene 163 ug/kg 62.5 5 09/28/2318:14 10/03/2316:31 218-01-9 Dibenz(a,h)acridine 61.1 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 226-36-8 Dibenz(a,h)anthracene 220 ug/kg 12.5 1 09/28/2318:14 10/02/2314:58 53-70-3 REPORT OF LABORATORY ANALYSIS N2 M1 M1 M1,R1 M1,R1 M1,R1 M1,R1 M1,N2 M1 M1. R1 M1 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 6 of 41 AE ject No. P-0025977 acre Page B 7 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 131-A Lab ID: 10669893001 Collected: 09/21/23 09:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 224-42-0 Dibenzo(a,e)pyrene 450 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 192-65-4 M1 Dibenzo(a,h)pyrene 219 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 189-64-0 M1 Dibenzo(a,i)pyrene 64.0 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 189-55-9 Dibenzo(a,l)pyrene 31.2 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 191-30-0 7H-Dibenzo(c,g)carbazole 35.2 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 194-59-2 Dibenzofuran 25.0 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 57-97-6 Fluoranthene 3050 ug/kg 62.5 5 09/28/23 18:14 10/03/2316:31 206-44-0 M1,R1 Fluorene 87.9 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 86-73-7 M1 Indeno(1,2,3-cd)pyrene 943 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 193-39-5 M1,R1 3-Methylcholanthrene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 56-49-5 5-Methylchrysene 171 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 3697-24-3 M1 1-Methylnaphthalene 13.5 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 90-12-0 2-Methylnaphthalene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 91-57-6 Naphthalene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 91-20-3 M1 5-Nitroacenaphthene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 602-87-9 6-Nitrochrysene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 7496-02-8 M1 2-Nitrofluorene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 607-57-8 N2 1-Nitropyrene 119 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 5522-43-0 M1,N2 4-Nitropyrene ND ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 57835-92-4 N2 Perylene 301 ug/kg 12.5 1 09/28/23 18:14 10/02/23 14:58 198-55-0 M1 Phenanthrene 1660 ug/kg 62.5 5 09/28/23 18:14 10/03/2316:31 85-01-8 M1,R1 Pyrene 2750 ug/kg 62.5 5 09/28/23 18:14 10/03/2316:31 129-00-0 M1,R1 Total BaP Eq. MN 2006 ND=O 5590 ug/kg 62.5 5 09/28/23 18:14 10/03/23 16:31 N2 Surrogates 2-Fluorobiphenyl (S) 82 %. 35-125 1 09/28/23 18:14 10/02/23 14:58 321-60-8 p-Terphenyl-d14 (S) 84 %. 66-125 1 09/28/23 18:14 10/02/23 14:58 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 7 of 41 AE ject No. P-0025977 acre Page B 8 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 131-13 Lab ID: 10669893002 Collected: 09/21/23 09:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 1.4 mg/kg 1.2 1 09/27/2312:55 10/02/2313:42 7440-38-2 Copper 13.1 mg/kg 0.58 1 09/27/2312:55 10/02/2313:42 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 17.1 % 0.10 1 10/03/23 15:46 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 83-32-9 Acenaphthylene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 208-96-8 Anthracene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 120-12-7 Benzo(a)anthracene 13.4 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 56-55-3 Benzo(a)pyrene 21.7 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 50-32-8 Benzo(b)fluoranthene 42.1 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 205-99-2 Benzo(g,h,i)perylene 22.2 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 191-24-2 Benzo(k)fluoranthene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 207-08-9 Chrysene 24.0 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 218-01-9 Dibenz(a,h)anthracene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 53-70-3 Fluoranthene 46.2 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 206-44-0 Fluorene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 86-73-7 Indeno(1,2,3-cd)pyrene 28.1 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 193-39-5 Naphthalene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 91-20-3 Phenanthrene 13.8 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 85-01-8 Pyrene 29.9 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 129-00-0 Total BaP Eq. MN 2006sh. ND=O 30.3 ug/kg 12.0 1 09/27/23 08:35 09/29/23 00:15 Surrogates 2-Fluorobiphenyl (S) 64 %. 54-125 1 09/27/23 08:35 09/29/23 00:15 321-60-8 p-Terphenyl-d14 (S) 60 %. 60-125 1 09/27/23 08:35 09/29/23 00:15 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 83-32-9 Acenaphthylene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 208-96-8 Anthracene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 120-12-7 Benzo(a)anthracene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 56-55-3 Benzo(a)pyrene 13.9 ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 50-32-8 Benzo(e)pyrene 13.6 ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 192-97-2 Benzo(g,h,i)perylene 14.7 ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 191-24-2 Benzofluoranthenes (Total) ND ug/kg 35.8 1 09/28/23 18:14 10/02/23 16:32 Carbazole ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 86-74-8 2-Chloronaphthalene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 91-58-7 Chrysene 19.0 ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 218-01-9 Dibenz(a,h)acridine ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 226-36-8 Dibenz(a,h)anthracene ND ug/kg 11.9 1 09/28/2318:14 10/02/2316:32 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 8 of 41 AE ject No. P-0025977 acre Page B 9 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 131-13 Lab ID: 10669893002 Collected: 09/21/23 09:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 224-42-0 Dibenzo(a,e)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 194-59-2 Dibenzofuran ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 57-97-6 Fluoranthene 29.5 ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 206-44-0 Fluorene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 86-73-7 Indeno(1,2,3-cd)pyrene 13.5 ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 193-39-5 3-Methylcholanthrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 56-49-5 5-Methylchrysene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 3697-24-3 1-Methylnaphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 90-12-0 2-Methylnaphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 91-57-6 Naphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 91-20-3 5-Nitroacenaphthene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 602-87-9 6-Nitrochrysene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 7496-02-8 2-Nitrofluorene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 607-57-8 N2 1-Nitropyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 5522-43-0 N2 4-Nitropyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 57835-92-4 N2 Perylene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 198-55-0 Phenanthrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 85-01-8 Pyrene 26.4 ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 129-00-0 Total BaP Eq. MN 2006 ND=O 15.4 ug/kg 11.9 1 09/28/23 18:14 10/02/23 16:32 N2 Surrogates 2-Fluorobiphenyl (S) 63 %. 35-125 1 09/28/23 18:14 10/02/23 16:32 321-60-8 p-Terphenyl-d14 (S) 83 %. 66-125 1 09/28/23 18:14 10/02/23 16:32 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 9 of 41 AE ject No. P-0025977 acre Page B 10 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 132-A Lab ID: 10669893003 Collected: 09/21/23 09:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 3.0 mg/kg 1.8 1 09/27/2312:55 10/02/2313:43 7440-38-2 Copper 30.3 mg/kg 0.89 1 09/27/2312:55 10/02/2313:43 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 44.8 % 0.10 1 10/03/23 15:46 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 83-32-9 Acenaphthylene ND ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 208-96-8 Anthracene ND ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 120-12-7 Benzo(a)anthracene 119 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 56-55-3 Benzo(a)pyrene 185 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 50-32-8 Benzo(b)fluoranthene 347 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 205-99-2 Benzo(g,h,i)perylene 186 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 191-24-2 Benzo(k)fluoranthene 104 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 207-08-9 Chrysene 198 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 218-01-9 Dibenz(a,h)anthracene 37.1 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 53-70-3 Fluoranthene 413 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 206-44-0 Fluorene ND ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 86-73-7 Indeno(1,2,3-cd)pyrene 231 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 193-39-5 Naphthalene ND ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 91-20-3 Phenanthrene 134 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 85-01-8 Pyrene 275 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 129-00-0 Total BaP Eq. MN 2006sh. ND=O 287 ug/kg 18.0 1 09/27/23 08:35 09/29/23 00:34 Surrogates 2-Fluorobiphenyl (S) 69 %. 54-125 1 09/27/23 08:35 09/29/23 00:34 321-60-8 p-Terphenyl-d14 (S) 71 %. 60-125 1 09/27/23 08:35 09/29/23 00:34 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 83-32-9 Acenaphthylene 18.6 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 208-96-8 Anthracene 18.5 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 120-12-7 Benzo(a)anthracene 147 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 56-55-3 Benzo(a)pyrene 257 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 50-32-8 Benzo(e)pyrene 261 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 192-97-2 Benzo(g,h,i)perylene 257 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 191-24-2 Benzofluoranthenes (Total) 606 ug/kg 52.3 1 09/28/23 18:14 10/02/23 17:04 Carbazole 39.6 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 86-74-8 2-Chloronaphthalene ND ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 91-58-7 Chrysene 353 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 218-01-9 Dibenz(a,h)acridine ND ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 226-36-8 Dibenz(a,h)anthracene 43.1 ug/kg 17.4 1 09/28/2318:14 10/02/2317:04 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 10 of 41 AE ject No. P-0025977 acre Page B 11 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 132-A Lab ID: 10669893003 Collected: 09/21/23 09:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 224-42-0 Dibenzo(a,e)pyrene 104 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 192-65-4 Dibenzo(a,h)pyrene 50.2 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 194-59-2 Dibenzofuran 26.7 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 57-97-6 Fluoranthene 534 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 206-44-0 Fluorene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 86-73-7 Indeno(1,2,3-cd)pyrene 226 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 193-39-5 3-Methylcholanthrene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 56-49-5 5-Methylchrysene 40.6 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 3697-24-3 1-Methylnaphthalene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 90-12-0 2-Methylnaphthalene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 91-57-6 Naphthalene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 91-20-3 5-Nitroacenaphthene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 602-87-9 6-Nitrochrysene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 7496-02-8 2-Nitrofluorene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 607-57-8 N2 1-Nitropyrene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 5522-43-0 N2 4-Nitropyrene ND ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 57835-92-4 N2 Perylene 63.5 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 198-55-0 Phenanthrene 163 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 85-01-8 Pyrene 495 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 129-00-0 Total BaP Eq. MN 2006 ND=O 1030 ug/kg 17.4 1 09/28/23 18:14 10/02/23 17:04 N2 Surrogates 2-Fluorobiphenyl (S) 77 %. 35-125 1 09/28/23 18:14 10/02/23 17:04 321-60-8 p-Terphenyl-d14 (S) 80 %. 66-125 1 09/28/23 18:14 10/02/23 17:04 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 11 of 41 AE ject No. P-0025977 acre Page B 12 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 132-13 Lab ID: 10669893004 Collected: 09/21/23 10:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 1.5 mg/kg 1.3 1 09/27/2312:55 10/02/2313:45 7440-38-2 Copper 14.0 mg/kg 0.64 1 09/27/2312:55 10/02/2313:45 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 23.8 % 0.10 1 10/03/23 15:47 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 83-32-9 Acenaphthylene ND ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 208-96-8 Anthracene ND ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 120-12-7 Benzo(a)anthracene 22.3 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 56-55-3 Benzo(a)pyrene 35.1 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 50-32-8 Benzo(b)fluoranthene 73.2 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 205-99-2 Benzo(g,h,i)perylene 40.9 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 191-24-2 Benzo(k)fluoranthene 21.0 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 207-08-9 Chrysene 40.9 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 218-01-9 Dibenz(a,h)anthracene ND ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 53-70-3 Fluoranthene 80.0 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 206-44-0 Fluorene 16.7 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 86-73-7 Indeno(1,2,3-cd)pyrene 47.2 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 193-39-5 Naphthalene ND ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 91-20-3 Phenanthrene 25.7 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 85-01-8 Pyrene 53.2 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 129-00-0 Total BaP Eq. MN 2006sh. ND=O 51.9 ug/kg 13.1 1 09/27/23 08:35 09/29/23 00:53 Surrogates 2-Fluorobiphenyl (S) 78 %. 54-125 1 09/27/23 08:35 09/29/23 00:53 321-60-8 p-Terphenyl-d14 (S) 76 %. 60-125 1 09/27/23 08:35 09/29/23 00:53 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 83-32-9 Acenaphthylene ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 208-96-8 Anthracene ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 120-12-7 Benzo(a)anthracene 16.3 ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 56-55-3 Benzo(a)pyrene 26.8 ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 50-32-8 Benzo(e)pyrene 29.1 ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 192-97-2 Benzo(g,h,i)perylene 30.1 ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 191-24-2 Benzofluoranthenes (Total) 66.3 ug/kg 38.7 1 09/28/23 18:14 10/02/23 17:35 Carbazole ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 86-74-8 2-Chloronaphthalene ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 91-58-7 Chrysene 38.0 ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 218-01-9 Dibenz(a,h)acridine ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 226-36-8 Dibenz(a,h)anthracene ND ug/kg 12.9 1 09/28/2318:14 10/02/2317:35 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 12 of 41 AE ject No. P-0025977 acre Page B 13 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 132-13 Lab ID: 10669893004 Collected: 09/21/23 10:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 224-42-0 Dibenzo(a,e)pyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 194-59-2 Dibenzofuran ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 57-97-6 Fluoranthene 56.0 ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 206-44-0 Fluorene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 86-73-7 Indeno(1,2,3-cd)pyrene 25.3 ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 193-39-5 3-Methylcholanthrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 56-49-5 5-Methylchrysene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 3697-24-3 1-Methylnaphthalene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 90-12-0 2-Methylnaphthalene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 91-57-6 Naphthalene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 91-20-3 5-Nitroacenaphthene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 602-87-9 6-Nitrochrysene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 7496-02-8 2-Nitrofluorene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 607-57-8 N2 1-Nitropyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 5522-43-0 N2 4-Nitropyrene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 57835-92-4 N2 Perylene ND ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 198-55-0 Phenanthrene 17.6 ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 85-01-8 Pyrene 51.5 ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 129-00-0 Total BaP Eq. MN 2006 ND=O 38.0 ug/kg 12.9 1 09/28/23 18:14 10/02/23 17:35 N2 Surrogates 2-Fluorobiphenyl (S) 70 %. 35-125 1 09/28/23 18:14 10/02/23 17:35 321-60-8 p-Terphenyl-d14 (S) 85 %. 66-125 1 09/28/23 18:14 10/02/23 17:35 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 13 of 41 AE ject No. P-0025977 acre Page B 14 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 133-A Lab ID: 10669893005 Collected: 09/21/23 10:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 1.4 mg/kg 1.1 1 09/27/2312:55 10/02/2313:47 7440-38-2 Copper 12.5 mg/kg 0.56 1 09/27/2312:55 10/02/2313:47 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 16.2 % 0.10 1 10/03/23 15:47 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 83-32-9 Acenaphthylene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 208-96-8 Anthracene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 120-12-7 Benzo(a)anthracene 13.6 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 56-55-3 Benzo(a)pyrene 17.2 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 50-32-8 Benzo(b)fluoranthene 35.1 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 205-99-2 Benzo(g,h,i)perylene 20.2 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 191-24-2 Benzo(k)fluoranthene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 207-08-9 Chrysene 20.4 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 218-01-9 Dibenz(a,h)anthracene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 53-70-3 Fluoranthene 41.6 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 206-44-0 Fluorene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 86-73-7 Indeno(1,2,3-cd)pyrene 23.8 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 193-39-5 Naphthalene ND ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 91-20-3 Phenanthrene 14.9 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 85-01-8 Pyrene 28.7 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 129-00-0 Total BaP Eq. MN 2006sh. ND=O 24.7 ug/kg 11.8 1 09/27/23 08:35 09/29/23 01:13 Surrogates 2-Fluorobiphenyl (S) 75 %. 54-125 1 09/27/23 08:35 09/29/23 01:13 321-60-8 p-Terphenyl-d14 (S) 75 %. 60-125 1 09/27/23 08:35 09/29/23 01:13 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 83-32-9 Acenaphthylene ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 208-96-8 Anthracene ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 120-12-7 Benzo(a)anthracene 32.7 ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 56-55-3 Benzo(a)pyrene 55.2 ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 50-32-8 Benzo(e)pyrene 61.3 ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 192-97-2 Benzo(g,h,i)perylene 63.9 ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 191-24-2 Benzofluoranthenes (Total) 132 ug/kg 34.8 1 09/28/23 18:14 10/02/23 18:07 Carbazole ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 86-74-8 2-Chloronaphthalene ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 91-58-7 Chrysene 76.3 ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 218-01-9 Dibenz(a,h)acridine ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 226-36-8 Dibenz(a,h)anthracene ND ug/kg 11.6 1 09/28/2318:14 10/02/2318:07 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 14 of 41 AE ject No. P-0025977 acre Page B 15 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 133-A Lab ID: 10669893005 Collected: 09/21/23 10:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 224-42-0 Dibenzo(a,e)pyrene 22.8 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 194-59-2 Dibenzofuran ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 57-97-6 Fluoranthene 107 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 206-44-0 Fluorene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 86-73-7 Indeno(1,2,3-cd)pyrene 51.1 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 193-39-5 3-Methylcholanthrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 56-49-5 5-Methylchrysene 13.1 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 3697-24-3 1-Methylnaphthalene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 90-12-0 2-Methylnaphthalene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 91-57-6 Naphthalene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 91-20-3 5-Nitroacenaphthene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 602-87-9 6-Nitrochrysene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 7496-02-8 2-Nitrofluorene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 607-57-8 N2 1-Nitropyrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 5522-43-0 N2 4-Nitropyrene ND ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 57835-92-4 N2 Perylene 18.0 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 198-55-0 Phenanthrene 39.4 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 85-01-8 Pyrene 104 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 129-00-0 Total BaP Eq. MN 2006 ND=O 113 ug/kg 11.6 1 09/28/23 18:14 10/02/23 18:07 N2 Surrogates 2-Fluorobiphenyl (S) 77 %. 35-125 1 09/28/23 18:14 10/02/23 18:07 321-60-8 p-Terphenyl-d14 (S) 85 %. 66-125 1 09/28/23 18:14 10/02/23 18:07 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 15 of 41 AE ject No. P-0025977 acre Page B 16 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 133-13 Lab ID: 10669893006 Collected: 09/21/23 10:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 2.9 mg/kg 1.4 1 09/27/2312:55 10/02/2313:48 7440-38-2 Copper 16.4 mg/kg 0.71 1 09/27/2312:55 10/02/2313:48 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 32.5 % 0.10 1 10/03/23 15:47 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 83-32-9 Acenaphthylene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 208-96-8 Anthracene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 120-12-7 Benzo(a)anthracene 28.9 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 56-55-3 Benzo(a)pyrene 31.8 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 50-32-8 Benzo(b)fluoranthene 78.9 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 205-99-2 Benzo(g,h,i)perylene 48.8 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 191-24-2 Benzo(k)fluoranthene 21.5 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 207-08-9 Chrysene 59.3 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 218-01-9 Dibenz(a,h)anthracene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 53-70-3 Fluoranthene 98.1 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 206-44-0 Fluorene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 86-73-7 Indeno(1,2,3-cd)pyrene 48.6 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 193-39-5 Naphthalene ND ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 91-20-3 Phenanthrene 46.8 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 85-01-8 Pyrene 64.8 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 129-00-0 Total BaP Eq. MN 2006sh. ND=O 50.2 ug/kg 14.5 1 09/27/23 08:35 09/29/23 01:32 Surrogates 2-Fluorobiphenyl (S) 72 %. 54-125 1 09/27/23 08:35 09/29/23 01:32 321-60-8 p-Terphenyl-d14 (S) 78 %. 60-125 1 09/27/23 08:35 09/29/23 01:32 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 83-32-9 Acenaphthylene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 208-96-8 Anthracene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 120-12-7 Benzo(a)anthracene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 56-55-3 Benzo(a)pyrene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 50-32-8 Benzo(e)pyrene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 192-97-2 Benzo(g,h,i)perylene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 191-24-2 Benzofluoranthenes (Total) ND ug/kg 44.1 1 09/28/23 18:14 10/02/23 18:38 Carbazole ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 86-74-8 2-Chloronaphthalene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 91-58-7 Chrysene 20.3 ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 218-01-9 Dibenz(a,h)acridine ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 226-36-8 Dibenz(a,h)anthracene ND ug/kg 14.7 1 09/28/2318:14 10/02/2318:38 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 16 of 41 AE ject No. P-0025977 acre Page B 17 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 133-13 Lab ID: 10669893006 Collected: 09/21/23 10:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 224-42-0 Dibenzo(a,e)pyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 194-59-2 Dibenzofuran ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 57-97-6 Fluoranthene 29.8 ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 206-44-0 Fluorene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 86-73-7 Indeno(1,2,3-cd)pyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 193-39-5 3-Methylcholanthrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 56-49-5 5-Methylchrysene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 3697-24-3 1-Methylnaphthalene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 90-12-0 2-Methylnaphthalene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 91-57-6 Naphthalene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 91-20-3 5-Nitroacenaphthene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 602-87-9 6-Nitrochrysene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 7496-02-8 2-Nitrofluorene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 607-57-8 N2 1-Nitropyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 5522-43-0 N2 4-Nitropyrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 57835-92-4 N2 Perylene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 198-55-0 Phenanthrene ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 85-01-8 Pyrene 26.3 ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 129-00-0 Total BaP Eq. MN 2006 ND=O ND ug/kg 14.7 1 09/28/23 18:14 10/02/23 18:38 N2 Surrogates 2-Fluorobiphenyl (S) 68 %. 35-125 1 09/28/23 18:14 10/02/23 18:38 321-60-8 p-Terphenyl-d14 (S) 85 %. 66-125 1 09/28/23 18:14 10/02/23 18:38 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 17 of 41 AE ject No. P-0025977 acre Page B 18 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 134-A Lab ID: 10669893007 Collected: 09/21/23 11:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 1.8 mg/kg 1.3 1 09/27/2312:55 10/02/2313:50 7440-38-2 Copper 13.5 mg/kg 0.63 1 09/27/2312:55 10/02/2313:50 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 25.8 % 0.10 1 10/03/23 15:47 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 83-32-9 Acenaphthylene ND ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 208-96-8 Anthracene ND ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 120-12-7 Benzo(a)anthracene 110 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 56-55-3 Benzo(a)pyrene 217 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 50-32-8 Benzo(b)fluoranthene 579 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 205-99-2 Benzo(g,h,i)perylene 335 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 191-24-2 Benzo(k)fluoranthene 167 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 207-08-9 Chrysene 240 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 218-01-9 Dibenz(a,h)anthracene 79.1 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 53-70-3 Fluoranthene 308 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 206-44-0 Fluorene ND ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 86-73-7 Indeno(1,2,3-cd)pyrene 432 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 193-39-5 Naphthalene ND ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 91-20-3 Phenanthrene 57.2 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 85-01-8 Pyrene 197 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 129-00-0 Total BaP Eq. MN 2006sh. ND=O 392 ug/kg 13.4 1 09/27/23 08:35 09/29/23 01:52 Surrogates 2-Fluorobiphenyl (S) 81 %. 54-125 1 09/27/23 08:35 09/29/23 01:52 321-60-8 p-Terphenyl-d14 (S) 83 %. 60-125 1 09/27/23 08:35 09/29/23 01:52 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 83-32-9 Acenaphthylene ND ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 208-96-8 Anthracene ND ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 120-12-7 Benzo(a)anthracene 60.6 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 56-55-3 Benzo(a)pyrene 151 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 50-32-8 Benzo(e)pyrene 207 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 192-97-2 Benzo(g,h,i)perylene 203 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 191-24-2 Benzofluoranthenes (Total) 456 ug/kg 39.1 1 09/28/23 18:14 10/02/23 19:09 Carbazole 23.2 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 86-74-8 2-Chloronaphthalene ND ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 91-58-7 Chrysene 192 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 218-01-9 Dibenz(a,h)acridine 13.6 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 226-36-8 Dibenz(a,h)anthracene 36.8 ug/kg 13.0 1 09/28/2318:14 10/02/2319:09 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 18 of 41 AE ject No. P-0025977 acre Page B 19 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 134-A Lab ID: 10669893007 Collected: 09/21/23 11:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 224-42-0 Dibenzo(a,e)pyrene 93.2 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 192-65-4 Dibenzo(a,h)pyrene 43.9 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 194-59-2 Dibenzofuran ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 57-97-6 Fluoranthene 203 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 206-44-0 Fluorene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 86-73-7 Indeno(1,2,3-cd)pyrene 185 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 193-39-5 3-Methylcholanthrene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 56-49-5 5-Methylchrysene 17.2 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 3697-24-3 1-Methylnaphthalene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 90-12-0 2-Methylnaphthalene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 91-57-6 Naphthalene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 91-20-3 5-Nitroacenaphthene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 602-87-9 6-Nitrochrysene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 7496-02-8 2-Nitrofluorene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 607-57-8 N2 1-Nitropyrene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 5522-43-0 N2 4-Nitropyrene ND ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 57835-92-4 N2 Perylene 36.2 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 198-55-0 Phenanthrene 40.7 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 85-01-8 Pyrene 172 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 129-00-0 Total BaP Eq. MN 2006 ND=O 794 ug/kg 13.0 1 09/28/23 18:14 10/02/23 19:09 N2 Surrogates 2-Fluorobiphenyl (S) 79 %. 35-125 1 09/28/23 18:14 10/02/23 19:09 321-60-8 p-Terphenyl-d14 (S) 85 %. 66-125 1 09/28/23 18:14 10/02/23 19:09 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 19 of 41 AE ject No. P-0025977 acre Page B 20 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 134-13 Lab ID: 10669893008 Collected: 09/21/23 11:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 4.3 mg/kg 1.5 1 09/27/2312:55 10/02/2313:52 7440-38-2 Copper 26.2 mg/kg 0.75 1 09/27/2312:55 10/02/2313:52 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 37.0 % 0.10 1 10/03/23 15:47 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 83-32-9 Acenaphthylene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 208-96-8 Anthracene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 120-12-7 Benzo(a)anthracene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 56-55-3 Benzo(a)pyrene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 50-32-8 Benzo(b)fluoranthene 45.9 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 205-99-2 Benzo(g,h,i)perylene 22.2 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 191-24-2 Benzo(k)fluoranthene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 207-08-9 Chrysene 23.9 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 218-01-9 Dibenz(a,h)anthracene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 53-70-3 Fluoranthene 27.5 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 206-44-0 Fluorene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 86-73-7 Indeno(1,2,3-cd)pyrene 28.0 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 193-39-5 Naphthalene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 91-20-3 Phenanthrene ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 85-01-8 Pyrene 18.4 ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 129-00-0 Total BaP Eq. MN 2006sh. ND=O ND ug/kg 15.6 1 09/27/23 08:35 09/29/23 02:11 Surrogates 2-Fluorobiphenyl (S) 74 %. 54-125 1 09/27/23 08:35 09/29/23 02:11 321-60-8 p-Terphenyl-d14 (S) 75 %. 60-125 1 09/27/23 08:35 09/29/23 02:11 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 83-32-9 Acenaphthylene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 208-96-8 Anthracene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 120-12-7 Benzo(a)anthracene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 56-55-3 Benzo(a)pyrene 17.9 ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 50-32-8 Benzo(e)pyrene 27.0 ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 192-97-2 Benzo(g,h,i)perylene 26.6 ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 191-24-2 Benzofluoranthenes (Total) 62.2 ug/kg 46.7 1 09/28/23 18:14 10/02/23 19:40 Carbazole ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 86-74-8 2-Chloronaphthalene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 91-58-7 Chrysene 35.6 ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 218-01-9 Dibenz(a,h)acridine ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 226-36-8 Dibenz(a,h)anthracene ND ug/kg 15.6 1 09/28/2318:14 10/02/2319:40 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 20 of 41 AE ject No. P-0025977 acre Page B 21 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 134-13 Lab ID: 10669893008 Collected: 09/21/23 11:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 224-42-0 Dibenzo(a,e)pyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 194-59-2 Dibenzofuran 41.6 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 57-97-6 Fluoranthene 37.5 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 206-44-0 Fluorene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 86-73-7 Indeno(1,2,3-cd)pyrene 21.8 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 193-39-5 3-Methylcholanthrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 56-49-5 5-Methylchrysene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 3697-24-3 1-Methylnaphthalene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 90-12-0 2-Methylnaphthalene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 91-57-6 Naphthalene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 91-20-3 5-Nitroacenaphthene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 602-87-9 6-Nitrochrysene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 7496-02-8 2-Nitrofluorene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 607-57-8 N2 1-Nitropyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 5522-43-0 N2 4-Nitropyrene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 57835-92-4 N2 Perylene ND ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 198-55-0 Phenanthrene 16.5 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 85-01-8 Pyrene 34.8 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 129-00-0 Total BaP Eq. MN 2006 ND=O 26.7 ug/kg 15.6 1 09/28/23 18:14 10/02/23 19:40 N2 Surrogates 2-Fluorobiphenyl (S) 72 %. 35-125 1 09/28/23 18:14 10/02/23 19:40 321-60-8 p-Terphenyl-d14 (S) 77 %. 66-125 1 09/28/23 18:14 10/02/23 19:40 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 21 of 41 AE ject No. P-0025977 acre Page B 22 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 135-A Lab ID: 10669893009 Collected: 09/21/23 11:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 2.1 mg/kg 1.1 1 09/27/2312:55 10/02/2313:53 7440-38-2 Copper 10.7 mg/kg 0.56 1 09/27/2312:55 10/02/2313:53 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 16.6 % 0.10 1 10/03/23 15:48 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 83-32-9 Acenaphthylene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 208-96-8 Anthracene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 120-12-7 Benzo(a)anthracene 85.9 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 56-55-3 Benzo(a)pyrene 110 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 50-32-8 Benzo(b)fluoranthene 196 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 205-99-2 Benzo(g,h,i)perylene 115 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 191-24-2 Benzo(k)fluoranthene 56.7 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 207-08-9 Chrysene 113 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 218-01-9 Dibenz(a,h)anthracene 31.2 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 53-70-3 Fluoranthene 217 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 206-44-0 Fluorene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 86-73-7 Indeno(1,2,3-cd)pyrene 136 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 193-39-5 Naphthalene ND ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 91-20-3 Phenanthrene 61.8 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 85-01-8 Pyrene 147 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 129-00-0 Total BaP Eq. MN 2006sh. ND=O 176 ug/kg 12.0 1 09/27/23 08:35 09/29/23 02:31 Surrogates 2-Fluorobiphenyl (S) 79 %. 54-125 1 09/27/23 08:35 09/29/23 02:31 321-60-8 p-Terphenyl-d14 (S) 84 %. 60-125 1 09/27/23 08:35 09/29/23 02:31 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 83-32-9 Acenaphthylene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 208-96-8 Anthracene 15.6 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 120-12-7 Benzo(a)anthracene 69.1 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 56-55-3 Benzo(a)pyrene 92.2 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 50-32-8 Benzo(e)pyrene 82.6 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 192-97-2 Benzo(g,h,i)perylene 84.6 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 191-24-2 Benzofluoranthenes (Total) 190 ug/kg 35.6 1 09/28/23 18:14 10/02/23 20:11 Carbazole 20.1 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 86-74-8 2-Chloronaphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 91-58-7 Chrysene 121 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 218-01-9 Dibenz(a,h)acridine ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 226-36-8 Dibenz(a,h)anthracene 15.2 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 22 of 41 AE ject No. P-0025977 acre Page B 23 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 135-A Lab ID: 10669893009 Collected: 09/21/23 11:30 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 224-42-0 Dibenzo(a,e)pyrene 34.5 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 192-65-4 Dibenzo(a,h)pyrene 15.9 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 194-59-2 Dibenzofuran ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 57-97-6 Fluoranthene 245 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 206-44-0 Fluorene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 86-73-7 Indeno(1,2,3-cd)pyrene 71.1 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 193-39-5 3-Methylcholanthrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 56-49-5 5-Methylchrysene 13.4 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 3697-24-3 1-Methylnaphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 90-12-0 2-Methylnaphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 91-57-6 Naphthalene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 91-20-3 5-Nitroacenaphthene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 602-87-9 6-Nitrochrysene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 7496-02-8 2-Nitrofluorene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 607-57-8 N2 1-Nitropyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 5522-43-0 N2 4-Nitropyrene ND ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 57835-92-4 N2 Perylene 22.8 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 198-55-0 Phenanthrene 130 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 85-01-8 Pyrene 206 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 129-00-0 Total BaP Eq. MN 2006 ND=O 342 ug/kg 11.9 1 09/28/23 18:14 10/02/23 20:11 N2 Surrogates 2-Fluorobiphenyl (S) 78 %. 35-125 1 09/28/23 18:14 10/02/23 20:11 321-60-8 p-Terphenyl-d14 (S) 87 %. 66-125 1 09/28/23 18:14 10/02/23 20:11 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 23 of 41 AE ject No. P-0025977 acre Page B 24 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 135-13 Lab ID: 10669893010 Collected: 09/21/23 11:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 5.4 mg/kg 1.6 1 09/27/2312:55 10/02/2313:55 7440-38-2 Copper 23.4 mg/kg 0.80 1 09/27/2312:55 10/02/2313:55 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 41.5 % 0.10 1 10/03/23 15:48 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 83-32-9 Acenaphthylene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 208-96-8 Anthracene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 120-12-7 Benzo(a)anthracene 32.6 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 56-55-3 Benzo(a)pyrene 53.7 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 50-32-8 Benzo(b)fluoranthene 127 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 205-99-2 Benzo(g,h,i)perylene 69.5 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 191-24-2 Benzo(k)fluoranthene 36.8 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 207-08-9 Chrysene 80.7 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 218-01-9 Dibenz(a,h)anthracene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 53-70-3 Fluoranthene 147 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 206-44-0 Fluorene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 86-73-7 Indeno(1,2,3-cd)pyrene 81.3 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 193-39-5 Naphthalene ND ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 91-20-3 Phenanthrene 58.7 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 85-01-8 Pyrene 98.7 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 129-00-0 Total BaP Eq. MN 2006sh. ND=O 82.2 ug/kg 16.5 1 09/27/23 08:35 09/29/23 02:50 Surrogates 2-Fluorobiphenyl (S) 75 %. 54-125 1 09/27/23 08:35 09/29/23 02:50 321-60-8 p-Terphenyl-d14 (S) 79 %. 60-125 1 09/27/23 08:35 09/29/23 02:50 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 83-32-9 Acenaphthylene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 208-96-8 Anthracene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 120-12-7 Benzo(a)anthracene 18.3 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 56-55-3 Benzo(a)pyrene 35.8 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 50-32-8 Benzo(e)pyrene 44.3 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 192-97-2 Benzo(g,h,i)perylene 42.3 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 191-24-2 Benzofluoranthenes (Total) 103 ug/kg 49.0 1 09/28/23 18:14 10/02/23 20:42 Carbazole ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 86-74-8 2-Chloronaphthalene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 91-58-7 Chrysene 64.8 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 218-01-9 Dibenz(a,h)acridine ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 226-36-8 Dibenz(a,h)anthracene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 24 of 41 AE ject No. P-0025977 acre Page B 25 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 135-13 Lab ID: 10669893010 Collected: 09/21/23 11:45 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 224-42-0 Dibenzo(a,e)pyrene 16.4 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 194-59-2 Dibenzofuran 140 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 57-97-6 Fluoranthene 95.0 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 206-44-0 Fluorene 17.5 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 86-73-7 Indeno(1,2,3-cd)pyrene 36.6 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 193-39-5 3-Methylcholanthrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 56-49-5 5-Methylchrysene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 3697-24-3 1-Methylnaphthalene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 90-12-0 2-Methylnaphthalene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 91-57-6 Naphthalene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 91-20-3 5-Nitroacenaphthene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 602-87-9 6-Nitrochrysene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 7496-02-8 2-Nitrofluorene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 607-57-8 N2 1-Nitropyrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 5522-43-0 N2 4-Nitropyrene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 57835-92-4 N2 Perylene ND ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 198-55-0 Phenanthrene 37.3 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 85-01-8 Pyrene 83.6 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 129-00-0 Total BaP Eq. MN 2006 ND=O 68.7 ug/kg 16.3 1 09/28/23 18:14 10/02/23 20:42 N2 Surrogates 2-Fluorobiphenyl (S) 69 %. 35-125 1 09/28/23 18:14 10/02/23 20:42 321-60-8 p-Terphenyl-d14 (S) 74 %. 66-125 1 09/28/23 18:14 10/02/23 20:42 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 25 of 41 AE ject No. P-0025977 acre Page B 26 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 136-A Lab ID: 10669893011 Collected: 09/21/23 12:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 3.1 mg/kg 1.1 1 09/27/2312:55 10/02/2314:00 7440-38-2 Copper 17.2 mg/kg 0.55 1 09/27/2312:55 10/02/2314:00 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 16.4 % 0.10 1 10/03/23 15:48 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 83-32-9 Acenaphthylene 20.6 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 208-96-8 Anthracene 32.6 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 120-12-7 Benzo(a)anthracene 110 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 56-55-3 Benzo(a)pyrene 174 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 50-32-8 Benzo(b)fluoranthene 296 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 205-99-2 Benzo(g,h,i)perylene 247 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 191-24-2 Benzo(k)fluoranthene 96.8 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 207-08-9 Chrysene 166 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 218-01-9 Dibenz(a,h)anthracene 53.6 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 53-70-3 Fluoranthene 291 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 206-44-0 Fluorene ND ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 86-73-7 Indeno(1,2,3-cd)pyrene 276 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 193-39-5 Naphthalene ND ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 91-20-3 Phenanthrene 81.0 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 85-01-8 Pyrene 190 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 129-00-0 Total BaP Eq. MN 2006sh. ND=O 284 ug/kg 11.9 1 09/27/23 08:35 09/29/23 03:10 Surrogates 2-Fluorobiphenyl (S) 81 %. 54-125 1 09/27/23 08:35 09/29/23 03:10 321-60-8 p-Terphenyl-d14 (S) 87 %. 60-125 1 09/27/23 08:35 09/29/23 03:10 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 83-32-9 Acenaphthylene 19.5 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 208-96-8 Anthracene 18.0 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 120-12-7 Benzo(a)anthracene 105 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 56-55-3 Benzo(a)pyrene 152 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 50-32-8 Benzo(e)pyrene 173 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 192-97-2 Benzo(g,h,i)perylene 183 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 191-24-2 Benzofluoranthenes (Total) 349 ug/kg 35.5 1 09/28/23 18:14 10/02/23 21:13 Carbazole 18.9 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 86-74-8 2-Chloronaphthalene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 91-58-7 Chrysene 186 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 218-01-9 Dibenz(a,h)acridine 13.3 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 226-36-8 Dibenz(a,h)anthracene 38.2 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 26 of 41 AE ject No. P-0025977 acre Page B 27 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 136-A Lab ID: 10669893011 Collected: 09/21/23 12:00 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 224-42-0 Dibenzo(a,e)pyrene 71.6 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 192-65-4 Dibenzo(a,h)pyrene 36.4 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 194-59-2 Dibenzofuran ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 57-97-6 Fluoranthene 286 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 206-44-0 Fluorene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 86-73-7 Indeno(1,2,3-cd)pyrene 145 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 193-39-5 3-Methylcholanthrene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 56-49-5 5-Methylchrysene 29.1 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 3697-24-3 1-Methylnaphthalene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 90-12-0 2-Methylnaphthalene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 91-57-6 Naphthalene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 91-20-3 5-Nitroacenaphthene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 602-87-9 6-Nitrochrysene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 7496-02-8 2-Nitrofluorene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 607-57-8 N2 1-Nitropyrene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 5522-43-0 N2 4-Nitropyrene ND ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 57835-92-4 N2 Perylene 43.9 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 198-55-0 Phenanthrene 89.6 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 85-01-8 Pyrene 252 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 129-00-0 Total BaP Eq. MN 2006 ND=O 701 ug/kg 11.8 1 09/28/23 18:14 10/02/23 21:13 N2 Surrogates 2-Fluorobiphenyl (S) 77 %. 35-125 1 09/28/23 18:14 10/02/23 21:13 321-60-8 p-Terphenyl-d14 (S) 79 %. 66-125 1 09/28/23 18:14 10/02/23 21:13 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 27 of 41 AE ject No. P-0025977 acre Page B 28 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 136-13 Lab ID: 10669893012 Collected: 09/21/23 12:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 6010D MET ICP Analytical Method: EPA 6010D Preparation Method: EPA 3050B Pace Analytical Services - Minneapolis Arsenic 4.1 mg/kg 1.2 1 09/27/2312:55 10/02/2314:02 7440-38-2 Copper 17.4 mg/kg 0.59 1 09/27/2312:55 10/02/2314:02 7440-50-8 Dry Weight 1 %M byASTM D2974 Analytical Method: ASTM D2974 Pace Analytical Services - Minneapolis Percent Moisture 19.4 % 0.10 1 10/03/23 15:48 8270E MSSV PAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 83-32-9 Acenaphthylene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 208-96-8 Anthracene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 120-12-7 Benzo(a)anthracene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 56-55-3 Benzo(a)pyrene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 50-32-8 Benzo(b)fluoranthene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 205-99-2 Benzo(g,h,i)perylene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 191-24-2 Benzo(k)fluoranthene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 207-08-9 Chrysene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 218-01-9 Dibenz(a,h)anthracene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 53-70-3 Fluoranthene 13.8 ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 206-44-0 Fluorene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 86-73-7 Indeno(1,2,3-cd)pyrene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 193-39-5 Naphthalene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 91-20-3 Phenanthrene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 85-01-8 Pyrene ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 129-00-0 Total BaP Eq. MN 2006sh. ND=O ND ug/kg 12.4 1 09/27/23 08:35 09/29/23 03:29 Surrogates 2-Fluorobiphenyl (S) 73 %. 54-125 1 09/27/23 08:35 09/29/23 03:29 321-60-8 p-Terphenyl-d14 (S) 80 %. 60-125 1 09/27/23 08:35 09/29/23 03:29 1718-51-0 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Acenaphthene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 83-32-9 Acenaphthylene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 208-96-8 Anthracene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 120-12-7 Benzo(a)anthracene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 56-55-3 Benzo(a)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 50-32-8 Benzo(e)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 192-97-2 Benzo(g,h,i)perylene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 191-24-2 Benzofluoranthenes (Total) ND ug/kg 37.2 1 09/28/23 18:14 10/02/23 21:43 Carbazole ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 86-74-8 2-Chloronaphthalene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 91-58-7 Chrysene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 218-01-9 Dibenz(a,h)acridine ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 226-36-8 Dibenz(a,h)anthracene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 53-70-3 REPORT OF LABORATORY ANALYSIS N2 10161 This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 28 of 41 AE ject No. P-0025977 acre Page B 29 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 ANALYTICAL RESULTS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Sample: 136-13 Lab ID: 10669893012 Collected: 09/21/23 12:15 Received: 09/22/23 11:31 Matrix: Solid Results reported on a "dry weight" basis and are adjusted for percent moisture, sample size and any dilutions. Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 8270E MSSV CPAH by SIM Analytical Method: EPA 8270E by SIM Preparation Method: EPA 3546 Pace Analytical Services - Minneapolis Dibenz(a,j)acridine ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 224-42-0 Dibenzo(a,e)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 192-65-4 Dibenzo(a,h)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 189-64-0 Dibenzo(a,i)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 189-55-9 Dibenzo(a,l)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 191-30-0 7H-Dibenzo(c,g)carbazole ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 194-59-2 Dibenzofuran ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 132-64-9 7,12-Dimethylbenz(a)anth race ne ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 57-97-6 Fluoranthene 14.4 ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 206-44-0 Fluorene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 86-73-7 Indeno(1,2,3-cd)pyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 193-39-5 3-Methylcholanthrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 56-49-5 5-Methylchrysene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 3697-24-3 1-Methylnaphthalene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 90-12-0 2-Methylnaphthalene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 91-57-6 Naphthalene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 91-20-3 5-Nitroacenaphthene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 602-87-9 6-Nitrochrysene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 7496-02-8 2-Nitrofluorene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 607-57-8 N2 1-Nitropyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 5522-43-0 N2 4-Nitropyrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 57835-92-4 N2 Perylene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 198-55-0 Phenanthrene ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 85-01-8 Pyrene 12.9 ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 129-00-0 Total BaP Eq. MN 2006 ND=O ND ug/kg 12.4 1 09/28/23 18:14 10/02/23 21:43 N2 Surrogates 2-Fluorobiphenyl (S) 67 %. 35-125 1 09/28/23 18:14 10/02/23 21:43 321-60-8 p-Terphenyl-d14 (S) 82 %. 66-125 1 09/28/23 18:14 10/02/23 21:43 1718-51-0 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 29 of 41 AE ject No. P-0025977 acre Page B 30 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 QC Batch: 908358 Analysis Method: EPA 601 OD QC Batch Method: EPA 3050B Analysis Description: 601 OD Solids Laboratory: Pace Analytical Services - Minneapolis Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 METHOD BLANK: 4782195 Matrix: Solid Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Arsenic mg/kg ND 0.93 10/02/2313:12 Copper mg/kg ND 0.47 10/02/2313:12 LABORATORY CONTROL SAMPLE: 4782197 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Arsenic mg/kg 47.4 45.9 97 80-120 Copper mg/kg 47.4 47.4 100 80-120 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 4732200 4782202 MS MSD 10669779001 Spike Spike MS MSD MS MSD % Rec Max Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD RPD Qual Arsenic mg/kg 2.3 53 51.9 46.6 45.3 84 83 75-125 3 20 Copper mg/kg 16.8 53 51.9 65.8 64.9 93 93 75-125 1 20 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 30 of 41 AE ject No. P-0025977 acre Page B 31 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 QC Batch: 909389 Analysis Method: ASTM D2974 QC Batch Method: ASTM D2974 Analysis Description: Dry Weight / %M by ASTM D2974 Laboratory: Pace Analytical Services - Minneapolis Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 SAMPLE DUPLICATE: 4787769 10669893001 Dup Max Parameter Units Result Result RPD RPD Qualifiers Percent Moisture % 20.0 19.8 1 30 N2 SAMPLE DUPLICATE: 4787770 10669893011 Dup Max Parameter Units Result Result RPD RPD Qualifiers Percent Moisture % 16.4 16.2 1 30 N2 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 31 of 41 AE ject No. P-0025977 acre Page B 32 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 QC Batch: 908357 Analysis Method: EPA 8270E by SIM QC Batch Method: EPA 3546 Analysis Description: 8270E Solid PAH by SIM MSSV Laboratory: Pace Analytical Services - Minneapolis Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 METHOD BLANK: 4782196 Matrix: Solid Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Acenaphthene ug/kg ND 10.0 09/28/23 20:01 Acenaphthylene ug/kg ND 10.0 09/28/23 20:01 Anthracene ug/kg ND 10.0 09/28/23 20:01 Benzo(a)anthracene ug/kg ND 10.0 09/28/23 20:01 Benzo(a)pyrene ug/kg ND 10.0 09/28/23 20:01 Benzo(b)fluoranthene ug/kg ND 10.0 09/28/23 20:01 Benzo(g,h,i)perylene ug/kg ND 10.0 09/28/23 20:01 Benzo(k)fluoranthene ug/kg ND 10.0 09/28/23 20:01 Chrysene ug/kg ND 10.0 09/28/23 20:01 Dibenz(a,h)anthracene ug/kg ND 10.0 09/28/23 20:01 Fluoranthene ug/kg ND 10.0 09/28/23 20:01 Fluorene ug/kg ND 10.0 09/28/23 20:01 Indeno(1,2,3-cd)pyrene ug/kg ND 10.0 09/28/23 20:01 Naphthalene ug/kg ND 10.0 09/28/23 20:01 Phenanthrene ug/kg ND 10.0 09/28/23 20:01 Pyrene ug/kg ND 10.0 09/28/23 20:01 2-Fluorobiphenyl (S) %. 80 54-125 09/28/23 20:01 p-Terphenyl-d14 (S) %. 100 60-125 09/28/23 20:01 LABORATORY CONTROL SAMPLE: Parameter 4782198 Units Spike Conc. LCS Result LCS % Rec % Rec Limits Qualifiers Acenaphthene ug/kg 100 76.8 77 56-125 Acenaphthylene ug/kg 100 77.5 78 54-125 Anthracene ug/kg 100 78.7 79 59-125 Benzo(a)anthracene ug/kg 100 78.4 78 55-125 Benzo(a)pyrene ug/kg 100 73.1 73 69-125 Benzo(b)fluoranthene ug/kg 100 80.8 81 54-125 Benzo(g,h,i)perylene ug/kg 100 83.6 84 63-125 Benzo(k)fluoranthene ug/kg 100 89.2 89 65-125 Chrysene ug/kg 100 89.7 90 62-125 Dibenz(a,h)anthracene ug/kg 100 85.4 85 64-125 Fluoranthene ug/kg 100 82.9 83 69-125 Fluorene ug/kg 100 79.0 79 61-125 Indeno(1,2,3-cd)pyrene ug/kg 100 77.8 78 54-125 Naphthalene ug/kg 100 76.7 77 49-125 Phenanthrene ug/kg 100 80.2 80 60-125 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 32 of 41 AE ject No. P-0025977 acre Page B 33 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 LABORATORY CONTROL SAMPLE: 4732198 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Pyrene ug/kg 100 91.5 92 69-125 2-Fluorobiphenyl (S) %. 77 54-125 p-Terphenyl-d14 (S) %. 93 60-125 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 4782199 MS 10669983002 Spike Parameter Units Result Conc. MSD Spike Conc. 4782201 MS Result MSD Result MS % Rec MSD % Rec % Rec Limits RPD Max RPD Qual Acenaphthene ug/kg ND 105 107 85.4 95.6 81 89 51-125 11 30 Acenaphthylene ug/kg 0.049 105 107 134 174 81 117 50-125 26 30 mg/kg Anthracene ug/kg 0.071 105 107 137 207 63 127 39-136 40 30 R1 mg/kg Benzo(a)anthracene ug/kg 0.18 105 107 254 404 68 207 30-131 46 30 M1,R1 mg/kg Benzo(a)pyrene ug/kg 0.24 105 107 312 498 72 244 30-150 46 30 M1,R1 mg/kg Benzo(b)fluoranthene ug/kg 0.26 105 107 351 592 90 313 30-150 51 30 M1,R1 mg/kg Benzo(g,h,i)perylene ug/kg 0.17 105 107 271 390 96 205 30-146 36 30 M1,R1 mg/kg Benzo(k)fluoranthene ug/kg 0.14 105 107 209 318 63 164 41-130 42 30 M1,R1 mg/kg Chrysene ug/kg 0.20 105 107 260 400 55 185 30-135 42 30 M1,R1 mg/kg Dibenz(a,h)anthracene ug/kg 0.024 105 107 103 171 75 137 50-129 50 30 M1,R1 mg/kg Fluoranthene ug/kg 0.36 105 107 400 773 41 389 30-150 64 30 M1,R1 mg/kg Fluorene ug/kg 0.016 105 107 94.9 115 75 92 56-125 19 30 mg/kg Indeno(1,2,3-cd)pyrene ug/kg 0.16 105 107 252 429 88 251 30-148 52 30 M1,R1 mg/kg Naphthalene ug/kg 0.025 105 107 100 117 71 86 30-125 15 30 mg/kg Phenanthrene ug/kg 0.16 105 107 196 406 39 235 30-143 70 30 M1,R1 mg/kg Pyrene ug/kg 0.31 105 107 342 599 30 271 30-150 55 30 M1,R1 mg/kg 2-Fluorobiphenyl (S) %. 75 80 54-125 p-Terphenyl-d14 (S) %. 76 83 60-125 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 33 of 41 AE ject No. P-0025977 acre Page B 34 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 QC Batch: 908751 Analysis Method: EPA 8270E by SIM QC Batch Method: EPA 3546 Analysis Description: 8270E CPAH Solid Laboratory: Pace Analytical Services - Minneapolis Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 METHOD BLANK: 4784133 Matrix: Solid Associated Lab Samples: 10669893001,10669893002,10669893003,10669893004,10669893005,10669893006,10669893007, 10669893008,10669893009,10669893010,10669893011,10669893012 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers 1-Methylnaphthalene ug/kg ND 10.0 10/02/23 13:56 1-Nitropyrene ug/kg ND 10.0 10/02/23 13:56 2-Chloronaphthalene ug/kg ND 10.0 10/02/23 13:56 2-Methylnaphthalene ug/kg ND 10.0 10/02/23 13:56 2-Nitrofluorene ug/kg ND 10.0 10/02/23 13:56 3-Methylcholanthrene ug/kg ND 10.0 10/02/23 13:56 4-Nitropyrene ug/kg ND 10.0 10/02/23 13:56 5-Methylchrysene ug/kg ND 10.0 10/02/23 13:56 5-Nitroacenaphthene ug/kg ND 10.0 10/02/23 13:56 6-Nitrochrysene ug/kg ND 10.0 10/02/23 13:56 7,12-Dimethylbenz(a)anthracene ug/kg ND 10.0 10/02/23 13:56 7H-Dibenzo(c,g)carbazole ug/kg ND 10.0 10/02/23 13:56 Acenaphthene ug/kg ND 10.0 10/02/23 13:56 Acenaphthylene ug/kg ND 10.0 10/02/23 13:56 Anthracene ug/kg ND 10.0 10/02/23 13:56 Benzo(a)anthracene ug/kg ND 10.0 10/02/23 13:56 Benzo(a)pyrene ug/kg ND 10.0 10/02/23 13:56 Benzo(e)pyrene ug/kg ND 10.0 10/02/23 13:56 Benzo(g,h,i)perylene ug/kg ND 10.0 10/02/23 13:56 Benzofluoranthenes (Total) ug/kg ND 30.0 10/02/23 13:56 Carbazole ug/kg ND 10.0 10/02/23 13:56 Chrysene ug/kg ND 10.0 10/02/23 13:56 Dibenz(a,h)acrid ine ug/kg ND 10.0 10/02/23 13:56 Dibenz(a,h)anthracene ug/kg ND 10.0 10/02/23 13:56 Dibenz(a,j)acridine ug/kg ND 10.0 10/02/23 13:56 Dibenzo(a,e)pyrene ug/kg ND 10.0 10/02/23 13:56 Dibenzo(a,h)pyrene ug/kg ND 10.0 10/02/23 13:56 Dibenzo(a,i)pyrene ug/kg ND 10.0 10/02/23 13:56 Dibenzo(a,l)pyrene ug/kg ND 10.0 10/02/23 13:56 Dibenzofuran ug/kg ND 10.0 10/02/23 13:56 Fluoranthene ug/kg ND 10.0 10/02/23 13:56 Fluorene ug/kg ND 10.0 10/02/23 13:56 Indeno(1,2,3-cd)pyrene ug/kg ND 10.0 10/02/23 13:56 Naphthalene ug/kg ND 10.0 10/02/23 13:56 Perylene ug/kg ND 10.0 10/02/23 13:56 Phenanthrene ug/kg ND 10.0 10/02/23 13:56 Pyrene ug/kg ND 10.0 10/02/23 13:56 2-Fluorobiphenyl (S) %. 74 35-125 10/02/23 13:56 p-Terphenyl-d14 (S) %. 102 66-125 10/02/23 13:56 N2 I0fa N2 N2 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 34 of 41 AE ject No. P-0025977 Page B 35 of 41 Pace Analytical Services, LLC 1700 Elm Street acre Minneapolis, MN 55414 �J (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 LABORATORY CONTROL SAMPLE: Parameter 4734134 Units Spike Conc. LCS Result LCS % Rec % Rec Limits Qualifiers 1-Methylnaphthalene ug/kg 300 210 70 43-125 1-Nitropyrene ug/kg 300 223 74 71-125 N2 2-Chloronaphthalene ug/kg 300 216 72 36-125 2-Methylnaphthalene ug/kg 300 206 69 48-125 2-Nitrofluorene ug/kg 300 240 80 74-125 N2 3-Methylcholanthrene ug/kg 300 240 80 30-130 4-Nitropyrene ug/kg 300 228 76 73-125 N2 5-Methylchrysene ug/kg 300 267 89 75-125 5-Nitroacenaphthene ug/kg 300 209 70 70-125 6-Nitrochrysene ug/kg 300 258 86 66-125 7,12-Dimethylbenz(a)anthracene ug/kg 300 328 109 69-128 7H-Dibenzo(c,g)carbazole ug/kg 300 252 84 71-125 Acenaphthene ug/kg 300 213 71 52-125 Acenaphthylene ug/kg 300 203 68 51-125 Anthracene ug/kg 300 234 78 62-125 Benzo(a)anthracene ug/kg 300 257 86 63-125 Benzo(a)pyrene ug/kg 300 266 89 61-125 Benzo(e)pyrene ug/kg 300 286 95 71-125 Benzo(g,h,i)perylene ug/kg 300 285 95 61-125 Benzofluoranthenes (Total) ug/kg 900 877 97 75-125 N2 Carbazole ug/kg 300 246 82 75-125 Chrysene ug/kg 300 285 95 66-125 Dibenz(a,h)acrid ine ug/kg 300 248 83 75-125 Dibenz(a,h)anthracene ug/kg 300 287 96 57-125 Dibenz(a,j)acridine ug/kg 300 195 65 48-125 Dibenzo(a,e)pyrene ug/kg 300 270 90 75-125 Dibenzo(a,h)pyrene ug/kg 300 286 95 72-125 Dibenzo(a,i)pyrene ug/kg 300 267 89 52-125 Dibenzo(a,l)pyrene ug/kg 300 262 87 30-133 Dibenzofuran ug/kg 300 214 71 51-125 Fluoranthene ug/kg 300 255 85 67-125 Fluorene ug/kg 300 210 70 62-125 Indeno(1,2,3-cd)pyrene ug/kg 300 282 94 58-125 Naphthalene ug/kg 300 203 68 48-125 Perylene ug/kg 300 286 95 72-125 Phenanthrene ug/kg 300 227 76 61-125 Pyrene ug/kg 300 287 96 67-125 2-Fluorobiphenyl (S) %. 73 35-125 p-Terphenyl-d14 (S) %. 95 66-125 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 4784170 4784171 MS MSD 10669893001 Spike Spike MS MSD MS MSD % Rec Max Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD RPD Qual 1-Methylnaphthalene ug/kg 13.5 365 370 296 287 78 74 70-130 3 30 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 35 of 41 AE ject No. P-0025977 acre Page B 36 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 4734170 MS 10669893001 Spike Parameter Units Result Conc. MSD Spike Conc. 4784171 MS Result MSD Result MS % Rec MSD % Rec % Rec Limits RPD Max RPD Qual 1-Nitropyrene ug/kg 119 365 370 311 285 53 45 70-130 9 30 M1,N2 2-Chloronaphthalene ug/kg ND 365 370 302 297 83 80 70-130 2 30 2-Methylnaphthalene ug/kg ND 365 370 285 274 78 74 70-130 4 30 2-Nitrofluorene ug/kg ND 365 370 455 422 125 114 70-130 8 30 N2 3-Methylcholanthrene ug/kg ND 365 370 334 338 92 91 70-130 1 30 4-Nitropyrene ug/kg ND 365 370 329 304 90 82 70-130 8 30 N2 5-Methylchrysene ug/kg 171 365 370 368 342 54 46 70-130 8 30 M1 5-Nitroacenaphthene ug/kg ND 365 370 382 380 105 103 70-130 1 30 6-Nitrochrysene ug/kg ND 365 370 249 239 68 65 70-130 4 30 M1 7,12- ug/kg ND 365 370 455 402 125 109 70-130 12 30 Dimethylbenz(a)anthracene 7H-Dibenzo(c,g)carbazole ug/kg 35.2 365 370 314 313 76 75 70-130 0 30 Acenaphthene ug/kg 75.1 365 370 331 309 70 63 70-130 7 30 M1 Acenaphthylene ug/kg 18.3 365 370 313 311 81 79 70-130 1 30 Anthracene ug/kg 134 365 370 400 334 73 54 70-130 18 30 M1 Benzo(a)anthracene ug/kg 946 365 370 859 563 -24 -104 70-130 42 30 M1,R1 Benzo(a)pyrene ug/kg 1210 365 370 998 682 -57 -142 70-130 38 30 M1,R1 Benzo(e)pyrene ug/kg 1090 365 370 895 638 -53 -122 70-130 34 30 M1,R1 Benzo(g,h,i)perylene ug/kg 1150 365 370 912 656 -66 -134 70-130 33 30 M1,R1 Benzofluoranthenes(Total) ug/kg 2530 1090 1110 2340 1750 -17 -71 70-130 29 30 M1,N2 Carbazole ug/kg 193 365 370 431 366 65 47 70-130 16 30 M1 Chrysene ug/kg 163 365 370 1170 783 277 168 70-130 40 30 M1,R1 Dibenz(a,h)acridine ug/kg 61.1 365 370 349 341 79 76 70-130 2 30 Dibenz(a,h)anthracene ug/kg 220 365 370 423 361 56 38 70-130 16 30 M1 Dibenz(a,j)acridine ug/kg ND 365 370 310 329 85 89 70-130 6 30 Dibenzo(a,e)pyrene ug/kg 450 365 370 549 441 27 -2 70-130 22 30 M1 Dibenzo(a,h)pyrene ug/kg 219 365 370 433 379 59 43 70-130 13 30 M1 Dibenzo(a,i)pyrene ug/kg 64.0 365 370 385 348 88 77 70-130 10 30 Dibenzo(a,l)pyrene ug/kg 31.2 365 370 333 310 83 75 70-130 7 30 Dibenzofuran ug/kg 25.0 365 370 308 302 78 75 70-130 2 30 Fluoranthene ug/kg 3050 365 370 2010 1150 -284 -512 70-130 54 30 M1,R1 Fluorene ug/kg 87.9 365 370 340 313 69 61 70-130 8 30 M1 Indeno(1,2,3-cd)pyrene ug/kg 943 365 370 837 611 -29 -90 70-130 31 30 M1,R1 Naphthalene ug/kg ND 365 370 257 241 70 65 70-130 6 30 M1 Perylene ug/kg 301 365 370 483 410 50 29 70-130 17 30 M1 Phenanthrene ug/kg 1660 365 370 1080 584 -159 -291 70-130 60 30 M1,R1 Pyrene ug/kg 2750 365 370 1850 1080 -247 -452 70-130 53 30 M1,R1 2-Fluorobiphenyl (S) %. 83 80 35-125 p-Terphenyl-d14 (S) %. 88 88 66-125 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 36 of 41 AE ject No. P-0025977 acre Page B 37 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALIFIERS Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 DEFINITIONS DF - Dilution Factor, if reported, represents the factor applied to the reported data due to dilution of the sample aliquot. ND - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL-Adjusted Method Detection Limit. PQL - Practical Quantitation Limit. RL - Reporting Limit - The lowest concentration value that meets project requirements for quantitative data with known precision and bias for a specific analyte in a specific matrix. S - Surrogate 1,2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270. The result for each analyte is a combined concentration. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates the compound was analyzed for, but not detected. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Reported results are not rounded until the final step prior to reporting. Therefore, calculated parameters that are typically reported as "Total" may vary slightly from the sum of the reported component parameters. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI - The NELAC Institute. WORKORDER QUALIFIERS WO:10669893 Ill The samples were received outside of required temperature range. Analysis was completed upon client approval. ANALYTE QUALIFIERS M1 Matrix spike recovery exceeded QC limits. Batch accepted based on laboratory control sample (LCS) recovery. N2 The lab does not hold NELAC/TNI accreditation for this parameter but other accreditations/certifications may apply. A complete list of accreditations/certifications is available upon request. R1 RPD value was outside control limits. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 37 of 41 AE ject No. P-0025977 acre Page B 38 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Analytical Lab ID Sample ID QC Batch Method QC Batch Analytical Method Batch 10669893001 B1-A EPA 3050B 908358 EPA 6010D 908747 10669893002 131-13 EPA 3050B 908358 EPA 6010D 908747 10669893003 132-A EPA 3050B 908358 EPA 6010D 908747 10669893004 132-13 EPA 3050B 908358 EPA 6010D 908747 10669893005 133-A EPA 3050B 908358 EPA 6010D 908747 10669893006 133-13 EPA 3050B 908358 EPA 6010D 908747 10669893007 134-A EPA 3050B 908358 EPA 6010D 908747 10669893008 134-13 EPA 3050B 908358 EPA 6010D 908747 10669893009 135-A EPA 3050B 908358 EPA 6010D 908747 10669893010 135-13 EPA 3050B 908358 EPA 6010D 908747 10669893011 136-A EPA 3050B 908358 EPA 6010D 908747 10669893012 136-13 EPA 3050B 908358 EPA 6010D 908747 10669893001 B1-A ASTM D2974 909389 10669893002 131-13 ASTM D2974 909389 10669893003 132-A ASTM D2974 909389 10669893004 132-13 ASTM D2974 909389 10669893005 133-A ASTM D2974 909389 10669893006 133-13 ASTM D2974 909389 10669893007 134-A ASTM D2974 909389 10669893008 134-13 ASTM D2974 909389 10669893009 135-A ASTM D2974 909389 10669893010 135-13 ASTM D2974 909389 10669893011 136-A ASTM D2974 909389 10669893012 136-13 ASTM D2974 909389 10669893001 B1-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893002 131-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893003 132-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893004 132-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893005 133-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893006 133-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893007 134-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893008 134-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893009 135-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893010 135-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893011 136-A EPA 3546 908357 EPA 8270E by SIM 908718 10669893012 136-13 EPA 3546 908357 EPA 8270E by SIM 908718 10669893001 B1-A EPA 3546 908751 EPA 8270E by SIM 909308 10669893002 131-13 EPA 3546 908751 EPA 8270E by SIM 909308 10669893003 132-A EPA 3546 908751 EPA 8270E by SIM 909308 10669893004 132-13 EPA 3546 908751 EPA 8270E by SIM 909308 10669893005 133-A EPA 3546 908751 EPA 8270E by SIM 909308 10669893006 133-13 EPA 3546 908751 EPA 8270E by SIM 909308 10669893007 134-A EPA 3546 908751 EPA 8270E by SIM 909308 10669893008 134-13 EPA 3546 908751 EPA 8270E by SIM 909308 10669893009 135-A EPA 3546 908751 EPA 8270E by SIM 909308 10669893010 135-13 EPA 3546 908751 EPA 8270E by SIM 909308 10669893011 136-A EPA 3546 908751 EPA 8270E by SIM 909308 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 10/05/2023 02:34 PM without the written consent of Pace Analytical Services, LLC. Page 38 of 41 AE ject No. P-0025977 acre Page B 39 of 41 Pace Analytical Services, LLC 1700 Elm Street Minneapolis, MN 55414 (612)607-1700 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: P-0025977 Rolling Hills Pond Pace Project No.: 10669893 Analytical Lab ID Sample ID QC Batch Method QC Batch Analytical Method Batch 10669893012 136-13 EPA 3546 908751 EPA 8270E by SIM 909308 Date: 10/05/2023 02:34 PM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 39 of 41 AET Project No. P-0025977 Page B 40 of 41 Cn to LL O ®a w w w O FOR z .�- X 42 r -- N 'o Lo 60) � z 50) O M ' r- N � LO Cu U� �co U)-; V)Lo U) LOU) (0 CD Ell �Iz Z 1 W 14 Y J � w � � 36 Q3v W ati 0 z O L V CO w H a �'.to� w Q e xxxx x' F J � x NIA G3b31113 (1-131J m -- o w j EONH --- O J �% Q bOSZH > w w lOH °) w a HOOK —. I l 03AJDS3bdNn S 1 SH3NIb'1NOO JO ON � � w o ❑ w 2 � "A Q a -lq S Q- O 0 < O a LLj :y ►- F- O W z m U z 0 z O u Z vUi w 0 0 Ca r U¢ U¢ O ► Ca cD Cr.) o o z (1) .— z0C ..-- �co� c� cn ���(Z4 0 ~ 0O w U w J w cow J w Z (;Q II a.LIJa a Uof w w w w O Iw- of �_ �1 V) C- H age 40 of 41 w Q a Q ¢ U) U) U) 0 AET Project No. P-0025977 Page B 41 of 41 DC#_Title: ENV-FRM-MIN4-0150 v13_Sample Condition Upon Receipt (SCUR) Effective Date: 4/14/2023 Sample Condition Client Name: Project #: Upon Receipt 9 Si Courier: ❑ FedEx ❑ UPS ❑ USPS Client ❑ Pace ❑ SpeeDee ❑ Commercial ❑ See Exceptions Tracking Number: ENV-FRM-MIN4-0142 Custody Seal on Cooler/Box Present? ❑ Yes ,6 No Seals Intact? ❑ Yes 2 No Packing Material: �ZBubble Wrap Z Bubble Bags ❑ None ❑ Other Thermometer: ❑ T1 (0461) ❑ T2 (0436) ❑ T3 (0459) ❑ T4 (0402) ❑ T5 (0178) 0 T6 (0235) P'T7 (0042) ❑ T8 (01,75) ❑ T9(0727) ❑ 01339252/1710 WO#:10669893 PM: KV Due Date: 10/06/23 CLIENT: AET Biological Tissue Frozen? ❑ Yes ❑ No � ' "/A Temp Blank? KYes ❑ No Type of Iceorwet ❑ Blue ❑ Dry ❑ None ❑ Melted Did Samples Originate in West Virginia? ❑ Yes ONO Were All Container Temps Taken? ❑ Yes ❑ No 2N/A Temp should be above freezing to 6 °C Cooler temp Read w/Temp Blank: :2• L' °C Average Corrected Temp —1 Correction Factor: �C• tL Cooler Temp Corrected w/temp blank: 1_—°C (no temp blank only): 'C ❑ See Exceptions ENV-FRM-MIN4-0142 ❑ 1 Container USDA Regulated Soil: (❑ N/A, water sample/other: Date/Initials of Person Examining Contents: Did samples originate in a quarantine zone within the United States: AL, AR, AZ CA, FL, Did samples originate from a foreign source (internationally, GA, ID, LA, MS, NC, NM, NY, OK, OR, SC, TN, TX, or VA (check maps)? ❑ Yes KNo including Hawaii and Puerto Rico)? ❑ Yes.+© No If Yes to either question. fill out a Regulated Soil Checklist (ENV-FRM-MIN4-0154) and include with SCUR/COC oaoerwork. Location (Check one): LJDuluth Minneapolis Virginia COMMENTS Chain of Custody Present and Filled Out? es H No 1. Chain of Custody Relinquished? Yes LJ No 2. Sampler Name and/or Signature on COC? Yes No N/A 3. Samples Arrived within Hold Time? Yes No 4. If fecal: <8 hrs U >8 hr, <24 No Short Hold Time Analysis (<72 hr)? LJ Yes o 5. LJ Fecal Coliform HPC Total Coliform/E.coli ❑ BOD/cBOD ❑ Hex Chrom❑ T"Urhidity ❑ Nitrate ❑ Nitrite ❑ Orthophos ❑ Other Rush Turn Around Time Requested? LJ Yes No 6. Sufficient Sample Volume? es LJ No 7. Correct Containers Used? es LJ No 0 N/A 8. -Pace Containers Used? Wes ❑ No Containers Intact? es No 9. Field Filtered Volume Received for Dissolved Tests? Yes No N/A 10. Is sediment visible in the dissolved container? Yes UNo Is sufficient information available to reconcile the samples to the es LJ No 11. If no, write ID/Date/Time of container below: COC? ❑ See Exceptions Matrix: ❑ Water Soil ❑ Oil ❑ Other ENV-FRM-MIN4-0142 All containers needing acid/base preservation have beenLJ Yes LJ No N/A 12. Sample # checked? All containers needing preservation are found to be in ❑ Yes ❑ No ?5N/A ❑ NaOH ❑ HNO3 compliance with EPA recommendation? ❑ H2SO4 ❑ Zinc Acetate (HNO3, H2SO4, <2pH, NaOH >9 Sulfide, NaOH>10 Cyanide) Exceptions: VOA, Coliform, TOC/DOC Oil and Grease, DRO/8015 ❑ Yes ❑ No TJ"N/A Positive for Residual ❑ Yes ❑ See Exceptions (water) and Dioxins/PFAS Chlorine? ❑ No ENV-FRM-MIN4-0142 ('If adding preservative to a container, it must be added to pH Paper Lot # Residual Chlorine 0-6 Roll 0-6 Strip 0-14 Strip associated field and equipment blanks --verify with PM first.) Headspace in Methyl Mercury Container? U Yes No N/A 13. Extra labels present on soil VOA or WIDRO containers? LJ Yes LJ No N/A 14. LJ See Exceptions Headspace in VOA Vials (greater than 6mm)? ❑ Yes ❑ No ❑ N/A ENV-FRM-MIN4-0142 3 Trip Blanks Present? LJ Yes I No /A Trip Blank Custody Seals Present? ❑ Yes ❑ No N/A 115. Pace Trip Blank Lot # (if purchased): CLIENT NOTIFICATION/RESOLUTION Person Contacted: _ Comments/Resolution: i Project Manager Review: NOTE: Whenever there is a discrepancy affecting temp, incorrect containers). Qualtrax ID: 52742 Field Data Required? U Yes (_) NO Date/Time: "/ r /�_'.r__ Date: 9/26/23 North Carolina compliance samples, a copy of this form will be sent to the North Carolina DEHNR Certification Office (Le., t f o incorrect preservaY ie, Qyte{ Labeled By: Lin (J�j P e 1 Pace® Analytical Services, LLC Page 1 of 1 Appendix C Soil Screening Logs AET Project No. P-0025977 AET Project No. P-0025977 Page C 1 of 2 AMERICAN ENGIN€ERING TESTING AET Project #: P-0025977 PROJECT: Rolling Hills Stormwater Pond Sampling LOCATION: Elk River, MN Instrument Type: (circle) PID FID OTHER: N/A Instrument ID#: N/A SOIL SCREENING DATA SHEET DATE: 9/21 /2023 WEATHER: Sunny, 75°F TECHNICIAN: BT/RF ID DEPTH (feet) GEOL. DESCRIPTION PPM OTHER B#1a 0-2 Fill Fill, mainly poorly graded sand and N/A x:-93.51208 silty sand, trace organics, dark -brown y: 45.38032 B#1 b 0-2 FA/Fill Clayey sand, some roots, slightly N/A x:-93.51222 organic, gray (SC) y: 45.38020 B#2a 0-2 SD Silty sand, organic, roots present, N/A x:-93.51397 gray (ML) y: 45.37940 B#2b 0-2 FA Clayey sand, gray (SC) N/A x:-93.51435 y: 45.37944 B#3a 0-2 FA/Fill Clayey sand, some roots, gray (SC) N/A x:-93.51651 y: 45.38056 B#3b 0-2 FA Silt w/ sand, slightly organic, roots, N/A x:-93.51656 gray (ML) y: 45.38064 B#4a 0-2 FA/Fill Clayey sand, gray (SC) N/A x:-93.51572 y: 45.38092 NOTES: Using a 4" electric auger Reviewed By: LAJ Date: 10/9/2023 Page 1 of 2 REV 051011 AET Project No. P-0025977 Page C 2 of 2 AMERICAN ENGINEERING TESTING AET Project #: P-0025977 PROJECT: Rolling Hills Stormwater Pond Sampling LOCATION: Elk River, MN Instrument Type: (circle) PID FID OTHER: N/A Instrument ID#: N/A SOIL SCREENING DATA SHEET DATE: 9/21 /2023 WEATHER: Sunny, 75°F TECHNICIAN: BT/RF ID DEPTH (feet) GEOL. DESCRIPTION PPM OTHER B#4b 0-2 FA Lean clay, gray w/ brown mottles, N/A x:-93.51576 (CL) turning to sand @ 2' y: 45.38084 B#5a 0-2 FA Clayey sand, trace of gravel, very N/A x:-93.51432 moist, brown w/ gray mottles (SC) y: 45.38159 B#5b 0-2 FA Clayey sand, slightly organinc, roots, N/A x:-93.51425 gray (SC) y: 45.38146 2-3 Till Clay sand, trace of gravel, brown w/ N/A x:-93.51425 gray mottles (SC) y: 45.38146 B#6a 0-2 SD Silt w/ sand, slightly organic, pieces of N/A x:-93.51530 roots, dark -brown (ML) y: 45.38230 B#6b 0-2 FA Sandy lean clay, brown w/ gray N/A x:-93.51537 mottles (CL) y: 45.38229 NOTES: Using a 4" electric auger 1114+ 11111 Reviewed By: LAJ Date: 10/9/2023 Page 2 of 2 REV 051011 Appendix D MPCA Guidance for Unregulated Fill AET Project No. P-0025977 AET Project No. P-0025977 Page D 1 of 3 Minnesota Pollution Control Agency LWWw.pca.state.rnn.us Best Management Practices for the Off -Site Reuse of Unregulated Fill Remediation Division This document defines unregulated fill and provides guidance from the Minnesota Pollution Control Agency (MPCA) Remediation Division regarding Best Management Practices for its off -site reuse. Off -site reuse of excess soil as fill or aggregate is a common practice at many development and road construction projects. If no known or potential sources of contamination are identified during environmental due diligence and subsequent field observations, then sampling of excess soil for laboratory analysis is not necessary. However, when excess soil originates from a site with known or potential sources of contamination, characterization of the soil is warranted prior to off -site reuse in order to ensure the protection of public health and the environment. If contamination is detected in the soil, the unregulated fill criteria and best management practices described herein provide a framework for making good decisions about the off -site reuse of the soil. If the soil does not meet the criteria for unregulated fill, the soil should be managed or disposed of in accordance with applicable regulations. Definition of unregulated fill Unregulated fill, for the purpose of this guidance, is defined as excess soil in which a release of contaminants has been identified at concentrations less than the MPCA's most conservative risk -based values (see complete criteria on the next page). Thus, the identified contaminants in the fill are present at concentrations that are not of regulatory concern to the MPCA. Unregulated fill is not a solid waste.* Exclusions 1. Some excess soil and other material generated at a redevelopment site is regulated as either solid or hazardous waste and must be managed according to applicable solid or hazardous waste laws, including: • Soil that is characteristically hazardous or contaminated due to a release of a listed hazardous waste, as defined in Minn. R. ch. 7045. Such soil must be managed in accordance with the requirements of the MPCA's Resource Conservation and Recovery Act (RCRA) program. • Waste material such as salvaged bituminous, crushed concrete, bricks, fly ash, etc. proposed to be reused as fill. The beneficial reuse of solid wastes is governed by Minn. R. 7035.2860. Information regarding the beneficial reuse of solid wastes can be found on the MPCA's website at htti3://www.i3ca.state.mn.us/waste/sw-utiIization.htm1. 2. The management and reuse of dredged material may be regulated by permit or subject to other regulations. Information about the management of dredged materials can be found on the MPCA's website at htti3://www.i3ca.state.mn.us/water/dredgedmaterials.htmi. *If sent to a permitted landfill for disposal, unregulated fill may be subject to a solid waste tax. Minnesota Pollution Control Agency 651-296-6300 I 800-657-3864 I TTY 651-282-5332 or 800-657-3864 February 2012 1 c-reml-01 Available in alternative formats AET Project No. P-0025977 Page D 2 of 3 Criteria for unregulated fill Unregulated fill is excess soil that meets all of the following field screening and contaminant concentration criteria: • free from solid waste, debris, asbestos -containing material, visual staining, and chemical odor • organic vapors less than 10 parts per million, as measured by a photoionization detector (PID) • for petroleum -impacted soil, less than 100 mg/kg diesel range organics (DRO)/gasoline range organics (GRO) • for contaminants detected in soil, less than the MPCA's Residential Soil Reference Values (SRVs) and Tier 1 Soil Leaching Values (SLVs)* *Naturally -occurring concentrations of some metals, such as arsenic, selenium, or copper, sometimes exceed the SRV or SLV. Such soils are not considered impacted in the absence of a contaminant source or other field or laboratory indications of contamination. A list of current SRVs can be found in the MPCA's Risk -Based Guidance for the Soil -Human Health Pathway. A list of current SLVs can be found in the Risk -Based Guidance for Evaluating the Soil Leaching Pathway. Both documents can be found at http://www.pca.state.mn.us/cleanup/riskbasedoc.html. For contaminants detected in soil that do not have established SRVs or SLVs, additional evaluation may be needed to determine whether the soil can be considered unregulated fill. Some detections of DRO in soil may stem from the presence of natural organic material or non - petroleum contaminants in the soil, such as coal tars or other material containing polynuclear aromatic hydrocarbons (PAHs). Evaluation of DRO data should take into consideration the history of the property, including the known or likely presence of a petroleum source, the presence (or lack thereof) of other contaminants in the soil sample, and the type of soil. If positive DRO results are related to non - petroleum contaminants, risk -based criteria for the non -petroleum contaminants should be applied. If necessary, laboratory analytical methods are available to help determine if the DRO is from natural organic material in the soil. Placement of unregulated fill To avoid potential problems or public concern stemming from the placement of unregulated fill in sensitive settings, the MPCA recommends the following Best Management Practices: • Avoid placing unregulated fill at schools, playgrounds, daycares, and residential properties. Unregulated fill is most suitable for use at industrial or commercial properties. • Avoid placing unregulated fill in gardens where food for human/animal ingestion will be grown. • Observe a minimum ten -foot separation distance between unregulated fill and the water table. • Avoid placing unregulated fill where contaminants may be transported by run-off to lakes, rivers, wetlands, or streams. Sampling decisions Decisions of whether to sample soil for contamination prior to off -site reuse should be based on the history of the source area, the nature of the source material, the extent to which the soil has been previously characterized, and other factors that are part of a due diligence assessment of the environmental condition of the source property. If the soil originates from a site where known or potential sources of contamination are present, samples of the soil should be collected for field screening and laboratory analyses. Examples of sites where environmental due diligence may reveal known or potential sources of contamination include sites where contamination was previously identified as a result of regulatory action or voluntary Page 2 of 3 1 c-rem1-01 AET Project No. P-0025977 Page D 3 of 3 investigation, previously developed sites (commercial, industrial, recreational, or residential), agricultural properties, or land that may have been subject to dumping, spills, or historic filling activities. If no known or potential sources of contamination are identified during environmental due diligence and subsequent field observations, then sampling of excess soil for laboratory analyses is not necessary. Sample type and frequency When soil sampling is appropriate, the frequency and type of samples should be based on the potential sources of contamination, the depth, volume, and heterogeneity of the source material, and the availability of existing data. At a minimum, analytical parameters should include volatile organic compounds, PAHs, RCRA metals, DRO, and GRO. Other contaminants of concern should be included as appropriate, based on the history of the source location. Analytical data should be age -appropriate and representative of the source material. Some soils even lightly impacted by heavy metals have the potential to leach at concentrations at or above the Toxicity Characteristic Leaching Procedure (TCLP) regulatory limit. As a rule -of -thumb, a TCLP analysis for RCRA metals should be conducted if the soil concentration of a metal is 20 times or greater the TCLP regulatory criteria. A typical frequency for the field screening of potentially contaminated soil using a PID is one measurement for every ten cubic yards of soil. For analytical samples, the stockpile sampling guidance presented in Section 7.3 of the MPCA's Site Characterization and Sampling Document can be used as a frame of reference for the appropriate sampling frequency based on soil volume: http://www.pca.state.mn.us/cleanup/pubs/sitechar.pdf. Soil sampling guidelines for the Petroleum Remediation Program are presented in guidance Document 4-04: http://www.i)ca.state.mn.us/publications/c-i3rp4-04.i3df. Flexibility in the number of samples may be warranted, depending on the site -specific circumstances. Sound professional judgment, taking into account all of the factors discussed above, should be used when developing a sampling plan to determine whether excess soil meets the criteria for unregulated fill. Implementation All parties are encouraged to use the best management practices described herein in order to make good decisions about the off -site reuse of unregulated fill. It is the responsibility of the property owners and other parties engaged in development and construction activities to make sure that their activities include appropriate environmental due diligence and that excess soil and other materials generated by these activities are managed in an environmentally responsible manner. Note that some local units of government, including Dakota County, may have local ordinances which restrict the off -site reuse of unregulated fill within their boundaries. Parties seeking to import unregulated fill should check with local regulators to determine if such ordinances are in effect in their project area. Nothing in this guidance excuses anyone from compliance with any law, rule, or other legal obligation (including any environmental covenant) that applies to any development or construction activity, including the generation, management, transport, and reuse of excess soil. For more information Questions about the information presented above can be directed to the MPCA at 651-296-6300 or 1-800-657-3864. Page 3 of 3 1 c-rem1-01