4.9 SR 02-20-2024Request for Action
To
Item Number
Mayor and City Council
4.9
Agenda Section
Meeting Date
Prepared by
Consent Agenda
February 20, 2024
Brandon Wisner, Engineering Project Manager
Item Description
Reviewed by
Accept Quote for Trott Brook Barn Remodel
Cal Portner, City Administrator
Reviewed by
Action Requested
Approve, by motion, quote from Dahlheimer Construction, Inc. for $55,496.00 for exterior replacement of the
Trott Brook Barn.
Background/Discussion
Since the original opening of the barn in approximately 1999, the exterior components have passed their useful life
(roof shingles, siding, doors and windows). Staff received one quote from Dahlheimer Construction and another
from Baas Construction, Inc. in the amount of $58,500. Staff recommends Dahlheimer Construction as the lowest
bidder.
Financial Impact
$55,496.00 from Government Building Reserve Fund
Mission/Policy/Goal
Opportunity to live, work, and play
Attachments
■ Dahlheimer Construction, Inc. Quote
■ Short Contract
■ Baas Construction, Inc. Quote
The Elk River Vision
A welcoming community with revolutionary and spirited resourcefulness, exceptional
service, and community engagement that encourages and inspires pi ospei l_ y.
M
TUREJ
Updated: Januag 2023
Dahlheimer Construction Inc.
21309 150th St
Elk River, MN 55330 US
763-442-7699
dcinc77@yahoo.com
ADDRESS
MSPM Brandon Wisner
City of Elk River
DATE ACTIVITY
Estimate 1136
DESCRIPTION
40
DARL-140AAER:
CONSTRUCTION
INC.
DATETOTAL
0 $55,496.00
QTY RATE AMOUNT
Estimate Tor
U.UU
Windows,Siding,Shingles
replacement @
18300 Trott Brook NW,Elk
River,MN.
Construction
Windows, Doors,Siding,Roofing
1
27,900.00
27,900.00
Materials -
Construction
R/R Siding Labor-
1
10,500.00
10,500.00
Construction
R/R Roofing Labor-
1
4,350.00
4,350.00
Construction
R/R Window & Door Labor-
1
4,375.00
4,375.00
Construction
Debris Removel-
1
2,500.00
2,500.00
Construction
Contractor Fee-
1
5,871.00
5,871.00
TOTAL
Accepted By Accepted Date
$55,496.00
THANK YOU.
AGREEMENT
CITY OF ELK RIVER,
SHERBURNE COUNTY, MINNESOTA
Trott Brook Barn Exterior Replacement
AGREEMENT made this 20 day of February, 2024, between the CITY OF Elk River, a
Minnesota municipal corporation ("City"), and Dahlheimer Construction, Inc., a corporation
organized and existing under the laws of the State of Minnesota ("Contractor").
IN CONSIDERATION OF THE MUTUAL UNDERTAKINGS HEREIN
CONTAINED, THE PARTIES AGREE AS FOLLOWS:
1. CONTRACT DOCUMENTS. The following documents shall be referred to as the
"Contract Documents", all of which shall be taken together as a whole as the contract between the
parties as if they were set verbatim and in full herein:
A. This Agreement
B. Project Description:
Replace roof shingles, siding, (2) exterior doors and all windows.
C. Quote dated February 4, 2024.
In the event of conflict among the provisions of the Contract Documents, the order in which they are
listed above shall control in resolving any such conflicts with Contract Document "A" having the first
priority and Contract Document "C" having the last priority.
2. OBLIGATIONS OF THE CONTRACTOR. The Contractor shall provide the
goods, services, and perform the work in accordance with the Contract Documents and in compliance
with federal, state and local laws.
3. CONTRACT PRICE. Owner shall pay Contractor for completion of the Work,
in accordance with the Contractor's quote.
4. ASSIGNMENT. Neither party may assign, sublet, or transfer any interest or
obligation in this Contract without the prior written consent of the other party, and then only upon
such terms and conditions as both parties may agree to and set forth in writing.
5. TIME OF PERFORMANCE. The Contractor shall complete its obligations on or
before May 25, 2024.
1
221667vi
6. PAYMENT. When the obligations of the Contractor have been fulfilled, inspected,
and accepted, the City will pay the Contractor. Such payment shall be made not later than thirty (30)
days after completion, certification thereof, and invoicing by the Contractor.
7. PROMPT PAYMENT TO SUBCONTRACTORS. Pursuant to Minnesota Statute
§ 471.425, Subd. 4a, the Contractor must pay any subcontractor within ten (10) days of the
Contractor's receipt of payment from the City for undisputed services provided by the subcontractor.
The Contractor must pay interest of one and one-half percent (11/2 %) per month or any part of a month
to subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum
monthly interest penalty payment for an unpaid balance of $100.00 or more is $10.00. For an unpaid
balance of less than $100.00, the Contractor shall pay the actual penalty due to the subcontractor. A
subcontractor who prevails in a civil action to collect interest penalties from the Contractor shall be
awarded its costs and disbursements, including attorney's fees, incurred in bringing the action.
8. WORKER'S COMPENSATION. Pursuant to Minnesota Statute § 176.182
Contractor must provide acceptable evidence of compliance with the state Workers' Compensation
insurance requirements for all its employees and, in case any work is subcontracted, Contractor will
require the subcontractor to provide Workers' Compensation insurance or acceptable evidence of
compliance in accordance with the statutory requirements of the State of Minnesota.
9. COMMERCIAL GENERAL LIABILITY. Contractor shall obtain the following
minimum insurance coverage by a single policy or a combination of policies (including umbrella
policies) and maintain it at all times throughout the life of the Contract, with the City endorsed as an
additional insured:
Bodily Injury: $2,000,000 each occurrence
$2,000,000 aggregate, products and
completed operations
Property Damage: $2,000,000 each occurrence
$2,000,000 aggregate
The Additional Insured coverage must be primary and non-contributory. Products and Completed
Operations Insurance shall be maintained for a minimum period of three (3) years after final payment
and Contractor shall continue to provide evidence of such coverage to City on an annual basis during
the aforementioned period; or if any reason Contractor's work ceases before final payment, for a
minimum period of three (3) years from the date Contractor ceases work. Coverages must be
equivalent to that provided by ISO Forms CG 20 10 04 13 and CG 20 37 04 13.
Property Damage Liability Insurance shall include coverage for the following hazards:
X (Explosion)
C (Collapse)
U (Underground)
2
22i667vi
For any contract involving the repair, maintenance or construction of property that involves the
provision of equipment, supplies or materials to the City for projects greater than $100,000, the
Contractor shall obtain and maintain Builder's Risk insurance in an amount not less than the project
or contract cost.
Contractual Liability (identifying the contract):
Bodily Injury: $2,000,000 each occurrence
Property Damage: $2,000,000 each occurrence
$2,000,000 aggregate
Personal Injury, with Employment Exclusion deleted:
$2,000,000 aggregate
Business Automobile Liability (owned, non -owned, hired):
Bodily Injury & Property Damage: $2,000,000 each occurrence
$2,000,000 each accident
or
$2,000,000 Combined single limit
The Contractor shall submit a Certificate of Insurance to the City showing proof of the above -required
insurance prior to doing any work.
The City retains the right to revise the insurance requirements depending on the size and risk of the
proj ect.
10. PERMITS AND LICENSES; RIGHTS -OF -WAY AND EASEMENTS. The
Contractor shall procure all permits and licenses, pay all charges and fees therefore, and give all
notices necessary and incidental to the construction and completion of the Project. The City will
obtain all necessary rights -of -way and easements. The Contractor shall not be entitled to any
additional compensation for any construction delay resulting from the City's not timely obtaining
rights -of -way or easements.
11. DATA PRACTICES/RECORDS.
A. All data created, collected, received, maintained, or disseminated for any
purpose in the course of this Contract is governed by the Minnesota Government Data Practices Act,
Minn. Stat. Ch. 13, any other applicable state statute, or any state rules adopted to implement the act,
as well as federal regulations on data privacy.
B. All books, records, documents, and accounting procedures and practices of the
Contractor and its subcontractors, if any, relative to this Contract are subject to examination by the
City.
3
221667vi
12. WARRANTY. The Contractor shall be held responsible for any and all defects in
workmanship, materials, and equipment which may develop in any part of the contracted service, and
upon proper notification by the City shall immediately replace, without cost to the City, any such
faulty part or parts and damage done by reason of the same.
13. DEFENSE OBLIGATION. To the fullest extent permitted by law, the Contractor
shall indemnify, defend, and hold harmless the City and its officials, employees and agents, against
claims, damages, losses and expenses, including reasonable attorneys' fees, arising out of or resulting
from performance of the Contractor's work, provided that such claim, damage, loss or expense is
attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible
property, other than the work itself, but only to the extent caused by the negligent or wrongful acts or
omissions of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or
anyone for whose acts they may be liable.
14. WAIVER. In the particular event that either party shall at any time or times waive
any breach of this Contract by the other, such waiver shall not constitute a waiver of any other or any
succeeding breach of this Contract by either party, whether of the same or any other covenant,
condition, or obligation.
15. GOVERNING LAW. The laws of the State of Minnesota govern the interpretation
of this Contract.
16. SEVERABILITY. If any provision, term, or condition of this Contract is found to
be or become unenforceable or invalid, it shall not affect the remaining provisions, terms, and
conditions of this Contract, unless such invalid or unenforceable provision, term, or condition renders
this Contract impossible to perform. Such remaining terms and conditions of the Contract shall
continue in full force and effect and shall continue to operate as the parties' entire contract.
17. ENTIRE AGREEMENT. This Contract represents the entire agreement of the
parties and is a final, complete, and all-inclusive statement of the terms thereof, and supersedes and
terminates any prior agreement(s), understandings, or written or verbal representations made between
the parties with respect thereto.
CITY: CONTRACTOR:
CITY OF ELK RIVER
Mayor
Its
City Clerk
[print name]
[title]
4
221667vl
• NEW
DAI
CONSTRUCTION, INC.
HOMES • ADDITIONS • REMODELING • COMMERCIAL •
February 9, 2024
City of Elk River:
Trott Brook Farms Park
18300 Trott Brook Pkwy,
Elk River, MN 55330
The following quote is based on the discussion had between the city representative
and Baas Construction. This quote should represent the majority of answers to your
questions.
1. Permit by City of Elk River.
2. Tear off two layers of shingles. Install new white drip edge. Install 25 square of
new black asphalt shingles. Brand to be chosen by owner. Options are
Certainteed Landmark or Timberline GAF. If there are gaps in the roof boards
bigger than V2" and the roof does not have sheathing on it, the warranty for the
shingles will be void. If we need to install sheathing on the roof to keep the
shingle warranty the price would be $25 per sheet to install and the cost of
sheathing. The price of installing new roof sheathing is not included in this
price.
$149800.00.
3. Replace side and back service doors. Double doors on front to stay.
$59500.00.
4. Replace 12 windows with grids. Non operable. Window trim on inside to stay
and be re used. Price does not include stripping and re staining of interior
window trim. Extending the jambs to the new windows is included if necessary.
$99000.00.
i
11834 97th Street — Milaca, Minnesota 56353 — (320) 369-4338
"QUALITY WORKMANSHIP"
5. Remove steel siding on building and walls around garbage containers. Install
housewrap. Install 275 3/8x8-16' Textured Expert pre finished LP Lap siding.
We are assuming the wall sheathing to be in good shape with the studs to be 16"
on center,
$29,200.00.
6. All garbage is to be removed.
For the above described construction, your investment will be:
.8 00 00
choseIfyou / hire Baas I / / / complete
would like to be responsiblefor this project in its entirety.
Any person or company supplying labor or materials for this
improvement to your property may file a lien against your
property if that person or company is not paid for the
contributions.
Under Minnesota law, you have the right to pay persons who
supplied labor or materials for this improvement directly and
deduct this amount from us until 120 days after completion of
the improvement unless we give you a lien waiver signed by
persons who supplied any labor or material for the
improvement and who gave timely notice. INT.
2
Payment
We request that we receive $5,000.00 down payment and to collect the balance after
work is completed.
Changes
Deviations from the plans and proposal shall require a written change order signed
by both parties prior to beginning the additional work. Changes will be billed for
material, labor at $60.00 per man hour, plus a 15 percent profit and overhead fee.
Conditions
Please be aware that our proposal consists of those items listed in writing as
discussed with the city. If you choose to proceed with the work, please be sure all
items you wish to have included are listed, in writing, in this proposal.
Sincerely,
3�PA4--
Brent Baas,
Baas Construction, Inc.
Note: This proposal may be withdrawn by us if not accepted within 30 days.
All aireements contingent upon strikes, accidents, weather or delays beyond
our control.
Acceptance of Proposal:
The above price, specifications and conditions are satisfactory and
are hereby accepted. You are authorized to do the work as specified.
Date of Acceptance:
Signature: