6.1g ERMUSR 03-12-2024��i Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: March 12, 2024 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In February, the locators processed 110 locate tickets. These consisted of 91 normal tickets, 3 emergency tickets, 8 updated tickets, 3 cancellations, 3 meets, 1 correction, and 1 boundary survey. This resulted in an 18.3% increase in tickets from the previous month and is a 34.1% increase from the prior February. • Electrical technicians completed 535 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out our Automated Meter Reading (AMR) to AMI meters around the system. • The contract for meter installations has been reviewed by our legal team and fully executed (attached). This was approved pending legal review at the February meeting. We held our kick-off meeting on March 11 and are working through the initial setup processes before we move into the mass meter deployment. • Integrating National Information Solutions Cooperative with AMI continues to progress as expected. We have resolved most of the identified issues and are currently utilizing Meter Data Management for all AMI meter reads. We will continue to read AMR meters via drive -by method until we have fully deployed all the AMI meters. • For the month of February, staff did not run generators. • One of my staff members will be out due to a medical procedure for approximately six weeks. • The substation apparatus technician has been working on preparing the physical design package for East substation so that we can send this out for engineering review within the next few months. ATTACHMENTS: • Allegiant Utility Services AMI Endpoint Installation Agreement - Executed Page 1 of 1 196 AMI (ADVANCED METERING INFRASTRUCTURE) ENDPOINT INSTALLATION AGREEMENT A THIS A INSTA LATION AGREEMENT (the "Agreement") is made and entered into this -day of r 2024, by and between ELK RIVER MUNICIPALITIES UTILITIES, a Minnesota municipal utility (designated herein as "Utility") and ALLEGIANT UTILITY SERVICES, LLC, a Delaware limited liability company (designated herein as "Contractor"). Utility and Contractor are sometimes hereinafter collectively referred to as the "Parties," and "Party" shall mean either of them. WHEREAS, Utility desires Contractor to perform electric meter and water Endpoint installation services and meter technician services as set forth in this Agreement; and WHEREAS, Contractor is a professional metering installation company, and desires and agrees to perform the meter installation services as set forth in this Agreement. NOW, THEREFORE, in consideration of the mutual promises set forth herein, the Parties hereby agree as follows: 1.1 Scope Of Work: Except as otherwise expressly provided herein, the Contractor shall furnish at Contractor's sole expense all materials, supplies, equipment, machinery, tools, labor, transportation and other means required to complete the work described in Exhibit A (the "Statement Of Work (SOW)") and Attachment I Requirements Response and shall complete the Work in strict accordance with the terms, conditions and specifications herein and any specifications, Utility will provide GIS (Geographic Information Systems) output with premise -based Latitude and Longitude coordinates of meter premise locations. The Utility shall also provide customer data for Endpoints to be exchanged. If any conflict among the documents, their terms and conditions shall prevail in the following order: 1.1.1 Attachment I Requirements Response 1.1.2 Attachment II Pricing Response 1.1.3 Statement Of Work (Exhibit A) 1.1.4 Change Orders as provided after contracting 1.1.5 Certificate of Insurance 1.1.6 Certificate of naming Elk River Municipal Utilities as additional insured 1.1.7 Performance Bond 1.1.8 Workers' Compensation Certificate 1.1.9 Attachment III Black -Out Schedule 197 1.2 Utility Customer Relations: The Contractor realizes the importance of the relationship between Utility and its customers. The Contractor will make every effort to be courteous to the Utility's customers as well as respectful to the fact that all meter exchanges are being conducted on a customer's property. The Contractor will refer all questions concerning the meters to the Utility. The Contractor will also have identifying markings on their vehicles indicating they are a contractor for the Utility. 1.3 Prices and Payment for Work: Contractor will submit an invoice of all completed work at completion of each metered location once per month in accordance with Attachment II. Payment shall be made by Utility within thirty (30) days of the date of receipt of Contractor's invoice, subject to Utility's right of inspection and approval. Any payment may be withheld in whole or in part by Utility for cause based on a customer's complaint or the report or recommendations of a Utility designated inspector or approved official. If disapproved, Contractor shall have up to thirty (30) days to correct or remedy any defect or mistake, pursuant to the terms of this Agreement. Upon satisfactory performance after any disapproval, as shall be determined by Utility at its discretion, Utility shall remit payment, including any withheld amount to Contractor within thirty (30) days. 1.4 Confidentiality: "Confidential Information" means any information furnished by Utility or its representatives in connection with this Agreement regarding Utility's property, employees, finances, operations, customers, and/or financial affairs that is non-public, confidential, or proprietary in nature, whether furnished before or after the date of this Agreement and regardless of the manner in which it is furnished. Confidential Information expressly includes, but is not limited to, the names of Utility's customers, contact information of Utility's customers and any Utility customer account information. Except as may be required by law, Contractor agrees that it will not disclose, publish, or disseminate any Confidential Information to any person or entity other than its employees or agents who have a need to know to further the purpose of this Agreement and who are subject to legally binding obligations of confidentiality no less restrictive than Contractor's obligation under this Agreement. 1.5 Independent Contractor Relationship: The Contractor is an independent Contractor and is not an employee, servant, agent, partner or in a joint venture with the Utility. The Contractor shall determine how it accomplishes the Work in accordance with this Agreement. The Utility shall not control the details of the Work performed by the Contractor. The Utility is not responsible for withholding, and shall not withhold, FICA or taxes of any kind from payments which it may owe the Contractor. Neither the contractor or its employees shall be entitled to receive any benefit which employees of the Utility are entitled to receive, and shall not be entitled to unemployment compensation, medical insurance, life insurance, paid vacations, paid holidays, pensions, profit sharing, or social security on account of their work for the Utility. 1.6 Business of Contractor and Compliance with Laws: The Contractor is engaged in the business of meter installation and meter testing and holds or maintains any licenses necessary required by the federal, state, and local governments to perform this business. The Contractor HM shall always take all reasonable precautions for the safety of its employees, Utility's customers, and employees, and of the public, and shall comply with all applicable provisions of Federal, State, and Municipal laws and regulations. When applicable law requires that services be performed by licensed professionals, the Contractor shall provide those services through qualified, licensed professionals. All professional engineering or design services or certifications to be provided by the Contractor, including all drawings, calculations, specifications, certifications, shop drawings and other deliverables, shall contain the signature and seal of the licensed professional preparing them. Contractor understands licensed Professional Engineer (PE) engineering needs will be limited for this engagement. Utility and its consultants shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such licensed professionals. 1.7 Compliance with the Law: This contract is governed by the laws of the state of Minnesota. The venue and jurisdiction for any court action regarding this contract shall be in Sherburne County, MN. The Contractor shall perform all obligations under this contract in strict compliance with all federal, state, municipal laws, rules, statutes, ordinances, and regulations, especially sections of the Occupational Safety and Health protection for workers, applicable to the performance of the Contractor under this contract. 1.8 Reimbursement of Expenses: The Utility shall not be liable to the Contractor for any expenses paid or incurred by Contractor unless otherwise agreed in writing. 1.9 Employees of Contractor: The Contractor shall be solely responsible for paying its employees. The Contractor shall be solely responsible for the paying of any and all taxes, FICA, workers' compensation, unemployment compensation, medical insurance, life insurance, paid vacations, paid holidays, pension, profit sharing, and other benefits for the Contractor and its employees, servants, and agents. Contractor understands that Contractor is responsible to pay, according to law, Contractor's income tax. 1.10 Utility is not responsible for Workers' Compensation: No workers' compensation insurance shall be obtained by Utility concerning Contractor or employees of Contractor. 1.11 Insurance: ALLEGIANT UTILITY SERVICES, LLC shall provide and maintain the minimum insurance coverage listed below. Coverage will be provided with forms and insurers acceptable to Utility, until all obligations under this Agreement are satisfied. 1. Workers' Compensation insurance to cover obligations imposed by Federal and State statutes having jurisdiction of its employees engaged in the performance of the Work, and Employers' Liability insurance with limits of not less than ONE MILLION DOLLARS ($1,000,000). Comprehensive General Liability insurance with a minimum combined single limit of not less than ONE MILLION DOLLARS ($1,000,000) per occurrence and a 199 general aggregate of not less than TWO MILLION DOLLARS ($2,000,000). The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (with coverage for contractual and employee claims), blanket contractual liability (including coverage for liabilities assumed under this Agreement), and products and completed operations. Comprehensive Automobile Liability insurance with a combined single limit for bodily injury and property damage of not less than ONE MILLION DOLLARS ($1,000,000) per occurrence covering ALLEGIANT UTILITY SERVICES, LLC.'s owned, hired, or non -owned vehicles. 4. General Liability Excess Endorsement (with coverage at least as broad as the underlying coverage) with minimum limits of not less than TEN MILLION DOLLARS ($10,000,000) per occurrence, including a "drop down" provision should an aggregate limit be exhausted. Utility shall be included on the public liability and property damage insurance and on the comprehensive general business liability insurance as an additional named insured with a waiver of subrogation. Contractor shall furnish a Certificate of Insurance and a copy of the endorsement of additional insured to Utility showing the above obligations and requirements are provided for by a qualified insurance carrier and showing Utility as an additional named insured with a waiver of subrogation on such insurance. Contractor shall maintain such coverages in full force and effect at all times during the continuance of this Agreement and shall provide notice to Utility of any change in insurance, including cancellation, at least thirty (30) days prior to the effective date of such change or cancellation. Utility shall have the right, but no obligation, at any time to review the original of any policy held by the Contractor to ascertain coverage and amounts. 1.12 Assumption Of RISK and Indemnification: The Contractor shall perform the work at its own risk and assumes all responsibility for the condition of their vehicles and supplies used on job sites. The Contractor shall indemnify, defend and hold harmless Utility and its directors, officers, agents, and employees (collectively the "Indemnitees") from any claim, demand, loss, liability, and/or damage, of whatsoever nature or kind, including those brought by employees or agents of Contractor or subcontractors, if any, arising in any way out of or as a result of any act or omission of the Contractor negligence, willful misconduct, or breach of law of the Contractor, its agents, employees, Subcontractors, and suppliers, in connection with the performance of the Contractor's work pursuant to this Agreement, by Contractor, its employees, agents, or subcontractors, and Contractor agrees to defend the Utility and the Indemnitees, and to pay all costs including attorneys' fees and expenses incurred by the Utility in defending such claims. In the event of joint or concurrent negligence of Contractor and the Indemnitees Contractor's indemnification obligation hereunder shall be limited to its allocable share of such negligence attributed to it. 200 1.13 No Authority to Bind Utility: Contractor has no authority to enter into contracts or agreements on behalf of Utility. This Agreement does not create a partnership between the Parties. 1.14 Term of this Agreement and Termination: This Agreement is effective as of the date signed by both Parties and shall continue in effect until completion of the project. 1.15 Time is of the Essence. Time is of the essence of this Agreement. 1.16 Termination with Cause: In the event of a breach by the Contractor of any of the provisions of the Agreement or if the Contractor does not progress on the agreed upon schedule or has a lack of attention to the project, incompetence or carelessness in the performance of any or part of this Agreement, or in the event that Contractor conducts work or performs this Agreement in a manner that, in the sole opinion of Utility, endangers the public; the Utility's customers; their equipment, property, or surrounding properties, then Utility may terminate the Agreement after giving written notice to Contractor, and such default is not cured within 10-days of Contractor receipt of such notice. Upon termination, Contractor shall immediately return to Utility, its meters, and any other property of Utility. 1.17 Termination for Convenience: Utility reserves the right, at any time, to terminate this Contract, or any portion of the work, for its sole convenience. Any such termination shall be effective by delivery of a written notice of termination to Contractor specifying the extent to which the Contract and related work have been terminated with an effective date of no less than 30 days from receipt of the termination notice. 1.18 Non -Assignment of Contract: Contractor shall not assign this Agreement or any part thereof, or enter any contract with any person, firm, corporation, or entity for the performance of the Contractor's obligations thereunder, or any part thereof, without the prior, written approval of Utility in, which approval will not be unreasonably withheld, conditioned, or delayed. 1.19 Non -Waiver: The failure of either Party to exercise its rights under this Agreement shall not be deemed to be a waiver of such rights or a waiver of any subsequent breach. 1.20 Entire Agreement: This is the entire Agreement of the Parties including the exhibits and additional documents attached hereto, and supersedes all prior oral and/or written understandings or agreements with respect to the subject matter hereof. 1.21 Severability: If any part of this Agreement shall be held unenforceable, the rest of this Agreement will nevertheless remain in full force and effect. 1.22 Amendments: This Agreement may be supplemented, amended, or revised only in writing signed by both Parties. 201 1.23 Warranty: The installation services shall have a 12-month warranty on all craftsmanship based on installation date. 1.24 Incorporation of Additional Documents: This contract incorporates, herein by reference, the terms, and conditions of the following documents. If there is a conflict among the documents, their terms and conditions shall prevail as described in section 1.1 Scope of Work. 1.24a Attachment I Requirements Response Mandatory Minimum Requirements Item # Mandatory Minimum Requirements Comply Yes or No Prime Bidders must have demonstrated and completed three successful EnclPoint Installation Projects with municipal utilities that have both electric 1 and water service. Yes The Onsite project manager of the Prime contractor must have completed three successful End Point installation projects with a combination of three 2 electric utilities, three water utilities or three combo electric & water utilities. Yes Bidders must provide a bid for all services defined in the RFP. Prime Bidders are welcome to obtain subcontractors to best fill gaps in their overall solution 3 Iso long as conditions in 4-6 are followed. Yes The site project manager must be an employee of the prime contractor 4 leading the work for both electric and water. Yes 5 A single software solution must be used for both electric and water End Points. Yes If using Subcontractors as part of your proposed staffing plan, Bidders must indicate what assigned staff are employees or subcontractors of the prime 6 contractor. Yes For any exceptions or assumptions, Suppliers should state them in the Exception to Requirements tab Fully Comply Supplier Elk River Municipal Utilities (Purchaser) - and Not Supplier Comments and Req.G Requirements/Specifications for Endpoint Installation Services Comment Proposed in Comply Clarifications Required Base Bid Vendors please insert a T' in either the Fully Comply or Not Comply. Please insert Ifstating Fully comply, comments will be comments and clarifications in Column F. Please don't add rows into this file. ignored and wadors must comply with the stated requirement as written with no quality and Risk Control 1 qualityand Process Certifications: Upon request,the Suppliershould providealistmofficial quality and/or process x standards with which the Supplier complies (i.e. ISO 9000 family). x z Safety: The Supplier should have implemented a detailed and documented Safety Management Program. Please provide yes any available written materials that describes your safety program if you have materials readily available. You can provide this with a separate attachment to your proposal. Please see detail response in RFP Bid x Installation Software: The Supplier should have a secure software -based Work Management System integrating 3 handheld field tools with Purchaser's NISC Customer Information System and Meter Data Management System. The Yes current vendors are NISC CIS, FlexNet (Sensus), and Esri GIS. This software is used to manage the smart meter exchange installation process. Please see detail response in RFP Bid 202 Daily Dashboard: Supplier should have a daily dash board that provides updates each day consisting of thefollowing: a) X existing meter locations installed project to date b) meters installed current day, c) rolling schedule of future installs 4 planned to be installed over the next 30 days. If the Supplier prior customers have found additional data to be viewed via Yes the dashboard to be valuable, please suggest additional information to be presented. Master Service Agreement: Vendors should include their standard Master Services Agreement that would include 6 warranties, insurance requirements, statement of work attachments and other standard contractual language they are proposing in this potential agreement. Quality Processes: Upon request, the Supplier should provide its quality process for endpoint deployment services. X Please attach these process descriptions within your proposal. This primarily involves capturing the last legacy read 7 correctly, serial numbers, form factors, water meter size, dates, etc. for the exchanged legacy to AMI Endpoints. Yes Please see detail response in RFP Bid Warranty. Supplier shall warrant its work for 12 months following completion of installation and acceptance of all work. X 8 Supplier is requested to acknowledge its compliance with this requirement. Yes Please see detail response in RFP Bid Pricing References and or Commerms: Electric meter Quantities All references to pricing or costs must only be defined in Attachment II Pricing. Any comments or footnotes to pricing In X this Attachment I, will be ignored. The quantity of electric meters by form factor for the Supplier to install is as follows: 3 Meter Type Qum6ry 3.I F09m$3 11 89 3.2 rom 2SE 46 9 3.3 Fam 3.4 !IS -163Iaudlcd by ERMS: [ostltll for New Electric Meters/Modules for 12,270 InstaUsiddon Supplier to Install All references to pricing or costs must only be defined in Attachment II Pricing. Any comments or footnotes to pricing In this Attachment I, will be ignored. The quantity of water meters/modules and module onlyfm the Supplier to install is as 10 follows: Quantities of water meters and modules in scope X 6 FaMly Meter Mrter Star Q".taY 10 NEW Water Meters, 5 Encoders & Registers mad Quantity AMI JVHUs 5.1 Short iPerl 3/4" 4,5,6 5.2 iPerl 1" 338 5.3 Cordooel 1 1/2" 93 5.4 Cordood 2" - 5.5 Cordooel 3" 23 5.6 Cordonel 4" 9 Cordovel 6" 1 1 5.7 5.8 Cordovel 8" - Insta3 for New Meters, 5,010 Encoders, Registers and MIUs mind Instau TYPe 61 �l?.Sns 6R' Sly 62 aryw EBanw lmbuanc 6.) Illavy MyRS E.sar 6.1 Sae 1 12' 11 6.1 a'*- m to 1 arI[rr MeeR T &Sam 61 I lieneyFYrR- Background Checks: The Supplier may be accountable to complete a general background check on all employees to X 11 out individuals with criminal backgrounds, sex offenders and other categories as proposed by the Supplier for both prime and any subcontractor employees. Clothing: Endpoint installation crew should wear clothing and drive vehicles that clearly indicate the installation X 12company's name. 13 OSHATmined:lnstalters should be trained on OSHA safety practices and on the appropriate meter types (the meter type X selected is a TBD at this time). Installer's ID's: All meter installation crews should carry proper identification, vehicles should have identifying car X magnets, carry I.D., and identify themselves to all Purchaser's customers before any installations are made. Car magnets 14 to be provided by Supplier with Purchaser design approval. Ethical Behavior: The Supplier will not collect any monies from Purchaser's customers and shall not accept any payment X 15 for services or energy furnished by Purchaser to its customers or any other person. Safety & Environment Personal Protection Equipment: The Supplier should supply and require electric meter installers to use certified tested X low voltage gloves, glove protectors, safety glasses, hard hat and other appropriate clothing at a minimum and should supply additional Personal Protection Equipment if required by applicable laws, codes and regulations. The Supplier should supply and require water meter installers to use gloves, safety glasses, temporary jumpers for installations 16 without jumpers around the water meter at a minimum and should supply additional Personal Protective Equipment if required by applicable laws, codes and regulations. Please describe all aspects of clothing and safety equipment for the Supplier's installation staff. Safety Procedures: The Supplier will receive a copy of Purchaser's Safety Manual and should follow the procedures X outlined in the Safety Manual. Failure to comply may be considered performance default by the Supplier. Supplier should 17 notify Purchaser in writing if it believes there are any conflicts between the Safety Manual and applicable laws, codes and regulations. Arc Flash for Electric EndPoirm Installation: All personnel working on behalf of the Supplier should be dressed in X appropriate PPE category clothing, when working on energized equipment, which corresponds to the Owners Arc -Flash 18 Hazard Assessment latest report on file. Purchaser currently requires flame resistant clothing be worn with a minimum c rating of 8 calories per square centimeter. 277/480 volt equipment must be decnergized before being worked on. 19 Unsafe conditions should be reported by Supplier immediately to the Utility for resolution. X 203 20 Safety incidents maybe recorded per OSHA standards. X 21 Environmental Laws: The Supplier should perform all work in accordance with State and Federal Environmental Laws. X 22 Reporting Issues: The Supplier should report any unforeseen environmental issues immediately to the Purchaser. X Inventory Management Asset Tracking: The Supplier should provide an electronic inventory system to track all meter and module assets down X to the employee level to and from the field as well as to and from the AMI Solution contractor(s). Integration with 23 Utilities systems may be required and assets should be updated daily. Yes We inventory tracking down to each technician sing or WOM's solution Peak Workflow Tracking Chain -cif -Custody: The Supplier may utilize bills -of -ladings to track and account for material transfers between X their warehouses and other users (employees, subcontractors, the Purchaser or other third parties). The Supplier may 24 assume all liability for any inventory loss not documented with a chain -of -custody bill -of -lading transfer. Please confirm agreement to this requirement and describe your inventory managements solution. Daily Inventory Reporting: Supplier should provide Purchaser a daily inventory report of all meters and modules supplied X 25 materials in their possession. Yes We inventory tracking down to eachtechnician sing or WOM's solution Peak Workflow Periodic Inventory Reconciliation: On a periodic basis, Supplier and Purchaser should reconcile the meters issued to X Supplier vs. smart meters not otherwise installed or returned to Purchaser by Supplier up to that point in time. Supplier 26 should acknowledge this requirement. Work Order Management and Handhelds: IT and Security Supplier to Provide Work Order Management Process: Supplier should provide its own Work Order Management X (WOM) system to implement all aspects of work performed under this RFP. Supplier should develop a Work Order Management process and workflows that cover all activities in this RFP. Supplier's processes should include the 27 methodology used to manage and control individual installations from a scheduling, completion and dose out Yes standpoint, including any coordination required with Purchaser. Supplier should provide an overview of its proposed WOMB as part of its response to this RFP. Please see detail response in RFP Bid Purchaser to Use NISC AppSufte for Purchaserto Install Selected End Points: To complete selective meter installations, X Purchaser will be using their NISCAppSuite mobile workforce software to process the following: 1) replacing a failed AMI meter and/or Module with a new AMI meter and or Module, 2) Replacing a water meter that failed, 3) for new construction and adding the initial meter/module to anew premise. For these use cases, there is no assumed need to 28 integrate NISC AppSuite with the Yes Supplier's software but we are asking the Supplier to state what their typical approach is for the utility to complete AMI meter installations with these type of use cases. When Purchaser installs an AMI meter, the Purchaser's NISC CIS will be updated with the appropriate AMI metering asset information. Please see detail response in RFP Bid Change a Scheduled Account from Supplier to Purchaser: The Supplier must have the capability to view via the Supplier's X 29 WMS a scheduled EndPoint installation premise account and change the status for the EndPoint to be installed by the 29 Purchaser versus by the Supplier. Handheld Devices Used by Supplier Staff. Supplier should provide all hand held computers, tablets, smart phones or X other devices required to schedule, implement, program, and activate the smart meter/ module deployments and the cording of information associated with the installation process. These devices should be an integral part of its Work Order Management system and processes. Supplier's system should have the ability to dispatch and push data to individual workers and to monitor progress throughout the day, and the ability to capture pictures, snap GPS LAT/LON 30 and utilize barcode scanners. Supplier's application is expected to validate Supplier collected data against expected Yes values and to either create exceptions if those values are not met, or to prompt the installer to try again. Ideally, once the work order has been completed. Supplier's system should have the ability to upload completed data to the dispatch application wirelessly. Installer Notes in Handheld: The WMS handled system must allow notes entered by installer primarily for premise acce,ss X issues e. a) arrived at premise for scheduled appt at 8:30 am 10/15/23, b) electric meter located behind locked gate and 31 don't have entry, c) large dog in yard near electric meter and concerned for safety. Yes Scripting. Supplier's work order management system should have the capability to load scripts onto handhelds that X direct installers to execute certain activities when at a premise. This capability should be a part of the work order system and be based on the agreed to logical workflows. Supplier should develop and test scripts prior to start of deployment, 32 and update these periodically as conditions change or requirements warrant, without impact to the deployment schedule. The Supplier's scripts should cover all requirements contained in this RFP. Minimizing Errors. the Purchaser seeks to eliminate exceptions caused by installation errors. Supplier should design its X processes to minimize data errors entered by an installer, such as wrong meter number, incorrect meter read, etc., by establishing data checks in its handhelds and work order management system. Supplier should also design its system to 33 provide prompts that assure that the installer is at the correct premise prior to commencing the meter exchange and Yes module installation process. Please describe Suppliers tools and/or processes developed to minimize installation exception errors. Exceptions Caused by Supplier Errors: When the legacy to AMI meter exchange produces exceptions and those X xceptions are determined to be caused by keying errors by the Supplier, the Purchaser will track these errors and report 34 credit request of $10 per error recorded. The tracking of these exception errors will be submitted monthly by the Yes Purchase. Notes in Mobile Device: The Work Order Management system should support the loading of premise specific X 35 information such as meter location, access issues, meter behind gate, etc. Real -Time Dynamic Scheduling: Work Order Management system should have the ability to dispatch and push data to X 35 individual workers, monitor progress throughout the day, and report on this progress i.e. change of appointment time for water meter change rit. Special lnstrucHons by Account: Work Order Management system should have the capability to load special instructions X 36 or codes onto handhelds that direct installers to execute certain activities when at premises. Meter Exchange Black -Out Dates: Supplier must follow the defined black -out dates as listed below: In summary. X 1) Schedule has been adjusted for holiday/closed office days. 2) The Friday BEFORE the read meter task is the first day of the black out. (Starting at the beginning of the business day. 37 3) The meter read date should match what we currently have on the Billing calendar. 4) The Thursday AFTER the billing date is the end date of the blackout. (Starting at the beginning of the business day). 204 Cycle Planning: Upon award, Supplier should provide its detailed process and work flows for meter cycle selection and X cycle requests that it plans to use. As part of the routine execution of its work, the Supplier may be required to provide periodic cycle Requests prior to release of cycle data to Supplier, so that Purchaser can confirm that Supplier's cycle Request meets all Network Deployment and other business requirements of the Purchaser prior to release and approval. Meter replacements may be suspended during billing windows based on the cycle. Purchaser has provided a file listing specific meters to be installed by month and a listing of the current meter cycle that each meter belongs to but we are not providing any cycle planning scripts. A CIS map can be provided with the general location of each meter. Purchaser may request irrigation and seasonal meters to be done during the months of July September 3yae merer eegin xeae e�arx ourrw snn� sim� snuzflz3 : s/sc­ sA /p snu2@3 3 sAs/mci `WcV oz3 snu­ sn2r 23 9nwp23 uv112 3 3 snsno23 w/,-3 wA2/2W3 2 1u/e/2 3n/Wj2W1 3nAs/2.. 38 Yes 3 11/l/M l wA2nW3 uv /­ nap/ 23 wPo2 2/2/2M 3 W/2v. 31/10@3 2 11/9ip23 3u3u-3 3122nM. 3 w3,r 23 rrzol 23 3u3on@3 4 111n1 2 3112x1— ru /n 3 12i1/2o23 Wsizoz3 32u102M 2 12i1/2o23 colPic3 3uocic. We will load all Blackout dates into our WOM's 3 12/1no23 32/1112o23 3?/.12M solution to ensure meters will not be changed out when they are up for billing. Day tuck Ahead: Supplier may be required, on a daily basis, to provide purchaser with a '1-day look ahead" that X contains the key cycles that Supplier intends to deploy meters and modules on. The format of the data should be 39 mutually agreed to. Yes Information Technology Data Security, Synchronization, and Upload. Through automated means, the Supplier should record all appropriate X meter exchange and module installation information and provide the data in a common readable electronic format for 40 batch upload into Purchaser' IT systems no later than end of the business day. 41 Minimum Information Required. The Supplier should list the minimum customer information that Purchaser will need X to supply to perform the work. Batch Completion of AM[ Meer Exchange Installation Service Orders -'To Utility", on no less than a daily basis, X Supplier should process the completion of bulk AMI meter exchanges and send to Purchaser's CIS. The file data 42 requirements, format, transfer methodology and frequency of these requests should be mutually agreed to between Yes Supplier and Purchaser. Note, Attachment IV defines the Integration to Meter Exchange Integration method. Data Elements and Installer Tasks for Electric Change -Outs. The Supplier should capture and transfer the data elements listed below: The Supplier should capture and transfer the data elements listed below: 43 ID of the installer. X 44 Date/time the order is completed. X 45 Read from the removed electric meter. X 46 Read from the new electric meter. The reading from the electric meter being installed is expected to be zero. X 47 Serial number of the electric meter being installed. X 48 Sensus FlexNet ID Number. X 49 Meter number of the electric meter being removed; if applicable. X 50 Follow-up Rags indicafing that Purchaser should investigate situations found at a premise such as X 51 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 52 Premise as found condition (based on list to be provided by Purchaser). X 53 Premise as -left condition (based on list to be provided by Purchaser). X 54 Certification that locks and seals are in place -Y/N. X Global Positioning System (CPS). The Supplier should capture CPS spherical (latitude, longitude, and altitude) X coordinates for each electric meter with an accuracy no worse than plus or minus three (+/- 3) meters. The process 55 description should include specifications for the field device to be used, device settings (e.g., PDOP mask value, etc.), and any differential processing method to be used. Data should be delivered in a format with a spatial reference that can be readily used by Pur haser's' GIS. 56 Digital photograph of the as found meter/meter read. X 57 Digital photograph of the empty electric meter can with meter removed. X 58 Digital photograph of the as -left meter/meter read (Meter Socket). X 59 If repair required, a digital photograph of the electric meter with the meter removed revealing appearance. X 205 60 Meter Attachment Type: Home, pole or meter Fred. X 61 Secondary wire size: U6, #4, 1/0, 2/0, 4/0 or 250 AL or CU. X 62 Meter Clearance: 3 feet in front and 3 feet on the sides.. Yes or No. If <3 feet provide photo. X 63 Meter socket accessibility concern X 64 By Pass Meter Socket: Yes or No. X 65 Meter socket amperage rating X 66 Does meter/stand pipe need attention: Yes or No.... Provide Comments. X 67 Identify any damaged meter sockets that require repair or replacement and/or or minor repairs. X Meter Seal Lid/Ring: Once a meter is replaced, the lid and/or ring will be placed back on the meter base and the x appropriate meter seal will be used to seal the meter. Supplier will follow Purchaser's Meter Seal Policy to determine the 68 appropriate type of seal to utilize for each location. Meter seals will be provided by Purchaser. X Please see addition pricing to capture read in ERT Meters without Readable Displays: A small percentage of existing ERT meters don't have a readable display to pricing table. capture the read of the legacy meter before changing out the meter. For any of these meters, the installer should use the 69 Itron hand -hold device to capture the meter read. Supplier to provide Itron FC300 hand-held device and attach picture o handheld display for meter read. Data Elements for Water Meter Change -Outs. The Supplier should capture and transfer the data elements listed belowl 1 70 ID of the installer X 71 Date/time the order is completed X 72 Read from the removed water meter ERT. X 73 Read from the new water meter. The reading from the water meter being installed is expected to be ten. X 74 Serial number of the water meter being removed X 75 Serial number of the water meter ENT being removed X 76 Serial number of the water meter being installed X 77 Sensus FlexNet ID Number. X 78 Installed Meter Brand, Type and Model. X 79 Installed Meter Size X 80 Is the current meter installed Vertically or horizontally: state direction. All joints should be leak tight. X 81 Does the meter have a pressure reducing valve? Yes or No X 82 Is there an electrical jumper? Yes or No X 83 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. X 84 State the service line pipe material identification by defining the lead/copper/galvanized/pex or other identifies for MDH X requirements. 85 Describe location of the meter in the building. X Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety X 86 issues, potential tamper, premise repairs required, date/time found, Purchaser's party reported to, and other situations found in the field by the Supplier 87 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 88 Premise as -found condition (based on list to be provided by Purchaser). X 89 Premise —left condition (based on list to be provided by Purchaser). X 90 Certification that locks and seals are in place -Y/N. X 91 Digital photograph of the as -found meter/meter read. X 92 Digital photograph of the handheld ERT read for the meter to be removed. X 93 Digital photograph of the "as -left meter/meter read'. X 94 If repair is required, a digital photograph of the water meter with the meter removed revealing appearance (blocked, X buried, other). Defective Plumbing: The Supplier shall promptly notify the Purchase if defective plumbing is found that could prevent a X 95 safe meter change. If the Purchaser concurs, the installation will be deferred until repairs are made and the installer informed of the repair. x Effective Shut -Off: The first valve is defined as the upstream shutoff valve or the valve on the street side of the meter. The second valve is on the downstream side of the meter. The curb stop valve is located in the street right-of-way and shall be operated by Purchaser. The installer shall operate the first valve to obtain the shut-off necessary for meter installation: however, should the first valve be defective, the installer shall freeze the service connection upstream of the first valve to 96 obtain the shutciff. Freezing shall be accomplished with the use of CO2 freeze packs, electrical freeze units, or dry ice. The Yes Freeze shut of services will be conducted at a installer shall freeze the service connection to accomplish shutciffs for accounts with inoperative first valves, at the additional charge as outlined in our pricing table customers first scheduled appointment without having to reschedule. In cases where freezing cannot he employed to obtain the shut-off the meter installer shall inform the Purchaser that meter could not be replaced. The installer shall note any plumbing problems on the installation record form. 206 Supplier Leak Testing: After the installation of the metering system is complete, the installer shall open all valves and X check for leaks. The installer shall verity that the meter register is functioning properly and that the meter and plumbing 97 connections in the vicinity of the meter do not leak. All leaks or defects between and including connection points shall he Yes repaired. Approach: Please describe your proposed approach, at the minimum the installer should turn on the water at the X customers hose bib to ensure water is flowing, the installer should flush out any sediment in the line. Then the installer 98 should check for any leaks on the inlet and outlet side of the meter. Yes Warranty: Any leaks found within 90 days of the installation date must be covered by the Supplier's warranty. Any leaks X between and including the connection points for a normal installation, or for installations that were necessary to freeze from the point frozen to the outlet side of the meter are the responsibility of the Supplier. The Contractor shall repair 99 such leaks and correct all damages which occur during the 90 day period, at the Contractor's expense. Yes Data Elements for Water Modules Retrofits. The Supplier should capture and transfer the data elements listed below: The Supplier should rapture and transfer the data elements listed below: 100 ID of the installer. X 101 Date/time the order is completed. X 102 Read from the removed water ERT. X 103 Read from the water meter register. X 104 Read from the new water meter register. Installer should verify the installed read from the radio matches the display X on the water meter register 105 Confirm serial number of existing water meter. X 106 Sensus FlexNet ID Number for the installed radio. X 107 Verify installed Meter Brand, Type and Model. X 108 Installed Meter Size X 109 Is the current meter installed Vertically or horizontally: state direction. X 110 Does the meter have a pressure reducing valve? Yes or No X ill Is there an electrical jumper? Yes or No X 112 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. X 113 State the service line pipe material identification by defining the lead/copper/galvanized/pex or other identifies for MDH X requirements. 114 Describe location of the meter in the building. X 115 Confirm/document manufacturer of the existing meter body. X Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety X 116 issues, potential tamper, premise repairs required, date/time found, Purchaser's party reported to, and other situations found in the field by the Supplier. 117 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 118 Premise —found condition (based on list to be provided by Purchaser). X 119 Premise asleft condition (based on list to be provided by Purchaser). X 120 Certification that lacks and seals are in place -Installer indicate Y/N. X 121 Digital photograph of the —found existing meter/meter read. X 122 Digital photograph of the handheld ERT read for the removed ERT. X 123 Digital photograph of the asleft installed meter/meter read. X 124 If repair required, a digital photograph to document the repair needed X Data and Information Technology Security 125 Data Privacy: The Supplier should ensure that customer data remains private and upon request shall describe what x controls and processes may be utilized to achieve this requirement. Data Encryption: Purchaser's data and authentication content (passwords) should be secured in transit from end to end, x and at rest. The Supplier should identify what encryption standards they use or support such as but not limited to AES- 256, PKI, FTPS (SSL/TLS), SFTP (SSH) to secure Purchaser's data in transit (between Purchaser's systems and Supplier's 126 systems, and between Supplier's systems) and at rest in their field tools, laptops, servers, as applicable. Supplier should describe the implementation of their data encryption solution(s). 127 Secure Transfer Server. The Supplier should provide Purchaser with a secure CHIP server for transfer of Yes x Please see detail response in RFP Bid Unique User Identification and Authorization (Non -Utility Users) (IA): The Supplier should attest to enforce that their x personnel use unique idenfity user accounts and authentication content for 128 Purchaser's System accesses via local interfaces or network connections (ref. NISF SP 800-531A-8). Process Approval: Upon award, Supplier should provide its processes, and Purchaser may approve Supplier's processes, x for incorporating appropriate security measures including but not limited to data encryption and key management for 129 Supplier's Work Order Management System(WOMs), Inventory Management System(IMS), etc. Supplier should indicate its compliance with this requirement. 207 Authorized Users. The Supplier should ensure that only authorized and authenticated users have access to the customer x 130 data and should describe what controls and processes will be utilized to achieve this requirement. Yes Please see detail response in REP Bid 131 Auditability. All record of access and change of customer data should be auditable. Yes x Please see detail response in RFP Bid 132 Log Unauthorized Use: All unauthorized use and change of customer data should be detected and logged. x Data Ownership: The Purchaser will retain ownership of all customer information. The customer information is only x 133 provided to the Supplier for specific use in support of this Endpoint Deployment Services project. No other use is authorized. End -of Contract Data Purge: The Purchaser requires all customer information to be purged from the Supplier's systems x (including handhelds) in accordance with NISf SP 800-88 media sanifization guidelines for'purging' of data when this 134 information becomes no longer required by the Purchaser. This will be targeted 12 months after the last meter is exchanged and must he requested in writing from the Purchaser's project manager. Handheld Security Requirements Handheld Mobile Device Data Security: The Supplier should have handheld security features that aid in preventing the X data from being extracted if device is lost in the field (i.e. authentication, screen locks, time outs, encryption, poison pill, 135 mote data wipe, etc.). Loss of Handheld: The Supplier should have procedures to inform the Purchaser in the event of a lost or stolen X handheld. Describe the process for identification of the data lost in the handheld device and the process for re -acquiring 136 the lost completion data. Provide metrics on frequency of lost handheld devices during a deployment project. Contact Center Security Core Security Requirements: The data and Information Technology Security requirements should be applicable to the X 137 Suppliers Call Center environment(s). The Supplier is required to acknowledge its compliance with these requirements. Customer Identification: Customer identification procedures should be used in Suppliers Call Center to validate that the X 138 customer is who they say they are (Authentication) in order to prevent social engineering attacks. Scrapping Meters Electric ERT Resale Value: For the Purchaser's Itron ERT meters, please quote a proposed market value that the Supplier X 139 could coordinate for the selling of the electric ERT meters. Approximately 25 percent of the ERT meters are seven years or less n age. Scrapping Process: The Supplier should develop and obtain approval from Purchaser for the process used following X 140 meter/module removal including shipping, storing, processing, and scrapping. 141 Electric Meter Waste Sorting: The Supplier may be required to separate both electric and water meter waste by glass vs. X plastic covers, and/or non -electronic vs. electronic waste. Supplier Accountable to Scrapping: Supplier is accountable for all meter scrapping. The Supplier is fully accountable to X 142 follow all State and Federal environmental laws relating to materials scrapping and disposal. Scheduling of Water Meter and Module Appointments and Unreachable Electric Meter Locations Supplier Best Practice: This bid is asking the Suppliers to propose what they have found to be the most effective X approach for scheduling and customer's availability for appointments primarily for the water meter and module replacements. This recommendation should be defined within the Proposal as Addendum p 1: Appointment Scheduling. The objective is to obtain the highest percent of met appointments and meter exchanges on the initial appointment and the fewest remaining appointments to re -schedule with the on the second attempt and the lowest 143 remaining accounts that require a third attempt. The Purchaser is asking the Supplier to propose their entire awareness and marketing programs with the use of press releases, bill inserts, web site updates, email use, text messages, and other media and means for the most optimal appointment obtainment and cost effectiveness for the Purchaser. Electric Appointments: For locations behind gates without gate keys available from the utility, obstructed electric meter X locations and other "access" issues that an appointment is may be necessary to exchange the electric meter, Supplier 144 shall notify the Utility for mutual resolution. All electric meters are located on the outside of the premise. Maximum of 3 Attempts: For those locations where the Supplier may be required to make contact with the customer X prior to performing the work, the Supplier should make a minimum of three (3) attempts to contact the customer. If after three (3) attempts the Supplier is unable to contact the customer for electric or for water the customer failed to 145 keep a committed appointment, the Supplier should then provide records showing the attempted contacts and proceed to change the meter. Please state otherwise if (3) attempts are not standard practice in your preferred model and/or if it is not included in the base bid. Documentation of Customer Communications: Any communication with the customer or any attempt to communicate X 146 with the customer should be documented by the Supplier. Electric Life Support Accounts: Purchaser may provide a list showing those customers who are registered as having fife X Support Equipment or "Life Support Status" - this is estimated to be approximately 21 premises. The Supplier may be 147 required to provide all call center services needed to make verbal contact with these customers prior to disconnecting power and ensuring that these customers are aware that the power will be interrupted when the work is performed. Scheduling of Water Meter Appointment: Supplier should provide a toll -free number for customer questions regarding X installation scheduling. Purchaser may use its toll -free number for general AMI questions. Numbers to he listed on all 148 customer communications. Supplier to recommend best practices if different. 149 Web Based Water Meter/Module Appointment Scheduling: Proposals must include a means for customers to schedule Yes X installation appointments via web site. Web Based Water Meter/Module Appointment Scheduling Changes: Proposals must include a means for customers to X 150 change their appointment installation appointments via web site. Voice Mail Support. The Supplier should indicate availability of voice message retrieval and, if applicable, describe X 151 latency of message retrieval and response. 152 Supplier should create a FACE document for communications with customers. FAO, document may be approved by X Purchaser. X 153 Adult 18 Years or Older Must be Present at Customers Home: No installer shall enter a residence without the permission of an adult member of the household at least 18 years of age 154 Police Entry Assistance: A limited number of installations may require police assistance for access. The Supplier should X coordinate with Purchaser for any Police entry customer sites. Post Cards for Electric Meter Exchanges: About two weeks prior to the scheduled electric meter exchange, Supplier shall X send post cards the planned change -outs. This means nearly every day a different batch of post cards would be sent 155 (vendors can batch the post cards and send once per weekversus daily if that is desired by Supplier. Yes Please see detail response in RFP Bid Call Center Process Records Availability. The Supplier should make available to Purchaser a record of all communications between the X 156 Supplier and purchasers customers upon request. A copy of all remarks, calls, or logs of communications from the Supplier customer management system is sufficient. Purchaser Monitoring of Customer Calls: Upon request, Supplier should provide the capability for X 157 Purchaser to monitor the Supplier's phone conversations with conversations with Purchaser's customers. Call Center Quality Assurance Call Recording and Retention. There may be situations where a customer will call Purchaser regarding an exchange X between the customer and the Supplier's representative. These situations may require the ability for Purchaser to review the actual conversation between the customer and the Supplier's representative. The Supplier may be required to provide the following system requirements. All calls to the Call Center should: - Be recorded 158 - Be catalogued by date, time, complaint or phone number - Be maintained a minimum of one hundred eighty (I80) days with the option to hold specific calls for a longer period as necessary - Have the ability to be queried by date, time, phone number and agent - Made available in Wave file format Purchaser should retain right to audit call recordings. 159 Average Hold Time Maximum: Supplier should answer 90%of the calls within 60 seconds and 100%within 5 minutes. X Call Wait Time Statistics: Purchaser upon request should be provided call center statistics including the following: - X Total calls - Average Speed of Answer (ASA) 159 - Wait time - Total and average hold time - Abandoned/lost calls 160 Escalation to Purchaser Percentage. Based on the Supplier's experience, indicate how many of these calls are expected X to be escalated to Purchaser for resolution. 160 Supervision. Upon request, the Supplier shall describe how the Supplier will ensure that appropriate supervision is on- Yes X site at all times during hours of operation. Please see detail response in REP Bid Languages Supported. The predominant language in Purchaser's service territory is English. The Supplier is requested to X communicate with customers that speak languages other than English, but it is not required to have multiple US 161 languages but please list how you address conversations with non-English customers? Yes Please see detail response in REP Bid Customer Satisfaction & Call Center 162 Hours of Operations. The Supplier should provide their Customer Call Center hours of operation from a minimum of X 7:00 AM to 7:00 PM CST on all installation days. If availability exists less or more than the Appointment Scheduling For business customers, the Supplier should notify the business of their purpose. If an outage is required, the Supplier may inquire if it is possible for the outage to occur at that time. If not, the Supplier may be required to return to the 163 premise at a scheduled time with the business. Yes X Please see detail response in REP Bid Electric Meter Installation Times: Normal hours for the Supplier to work in the field doing meter installations at customer premises should never be before or after daylight hours typically before 8 AM or after 5 PM Monday to Friday 164 for most instances, unless requested by the customer. The hours can be extended past 5 PM in the summer months �coordinated X when the day light is longer but not before 8 AM, unless requested by the customer. The specific installation time to be monthly between Supplier and Purchaser. Water Meter Working Hours for Customer Appointments: 7:01 am until 7:00 PM Monday -Friday and 1:00 to 5 PM on 165 Saturdays. Special circumstances outside of these hours must have prior authorization from Purchaser. X Worker Requirements. Purchaser reserves the right to request and review any of the items specified in the following section: Human Resources Plan. The Supplier should ensure that their Human Resource plan that addresses the recruiting, staffing and management of internal or contractor personnel to be used to deal with the requirements of this RFP. This 166 plan should include hiring policies, security screening procedures, testing and performance review procedures and other X pertinent procedures. 167 Employee vs Contractor: Supplier must indicate whether each employee involved are direct employees of the prime X contractor or subcontractors. 168 Onsite Project Manager: Must be an employee of the prime contractor. Yes X Please see detail response in REP Bid Qualified Workers. Supplier should employ and assign work only to qualified workers. Qualified workers shall be trained by the Supplier in accordance with an established set of specific qualifications inclusive of experience, training, audit, and 169 related items that are relevant to the nature and type work activities to be performed. X Licensed. Purchaser expects that the Supplier and their subcontractors and agents are properly licensed and qualified (including having all necessary authorizations) to perform the class and type of the services as specified, in addition to 170 being properly insured, equipped, organized, staffed, and financed to handle such services. X Professionalism. The Supplier should perform the services in an orderly and professional manner. Including but not 171 limited to customer experience expectations such as hygiene, respect for property, clean-up workspace, no cussing, no Yes X moking, etc I IPlease see detail response in REP Bid Skilled and Physicalfty: Workers. The Supplier should not employ for the services any personnel or subcontractor unskilled in the work assigned. Also, ability to lift 50 pounds, stoop for long periods of time each day, enter small areas 172 and unique compartmented areas inutility locations, extend extremities to reach meter areas, use of stairs. Also, okay X with working in areas with insects and wildlife. 209 Minimum Qualifications and Licensing. All workers employed or contracted by the Supplier may be required to have X We typically bring in seasoned qualified the minimum competencies necessary to accomplish the specific task or work requirement presented in this document. resource for both Electric and Water The Supplier and their subcontractors, suppliers and agents are to be properly licensed and qualified to perform the installations. class and type ofthe services as specified in this REP, in addition to being properly insured, equipped, organized, staffed 173 and financed to handle such services. The Supplier is to outline how it will meet these minimum competencies and indicate any requested exceptions. Supplier should provide Self -Contained Metering class for EPI Installation Personnel. Local Hires. The Supplier should use local qualified personnel whenever possible. However, this is not a requirement, X 174 especially if highly trained crews from outside of the region are available. Yes We typically don't hire locally, and we prefer to bring in seasoned technicians. Substance Abuse. In order to maintain a safe, healthy and efficient work environment, and to minimize absenteeism X and tardiness, Purchaser requires that the Work Site be a Drug and Alcohol -Free Environment. Prior to commencement of work, Supplier should have a Substance Abuse Program in place. Supplier should provide a copy of their substance 175 abuse program with its submittal to this REP. Purchaser should review the program and if acceptable, approve the program prior to commencement of end point installation. Pre -employment and Random Drug Testing. The Supplier and their agents, employees and X Subcontractors should adhere to DOT drug and alcohol testing policies in place during the term of the Project. All testing 176 should be paid for in full by the Supplier. Supplier should indicate compliance with this requirement. The Purchaser serves the right to review how the Supplier is in compliance with this requirement. Training Program Overview. The Supplier should provide an overview of their employee training programs (technical, X 177 safety and customer contact/communications) for the specific work functions listed in this REP. Yes Please see detail response in REP Bid Supervision. Supplier should ensure appropriate supervision is provided for all field -related work for its employees. X Supplier should provide its expected ratio of 'Field Installation Personnel' to Field Supervisors. Purchaser expects that Supplier will provide more management oversight, e.g. the ratio of field technicians 178 to field supervisors, when the workforce is less experienced such as in the beginning of the project or at the start of yes implementation of a new type of technology or end point. Supplier should indicate compliance with this requirement and the proposed ratio of installers to supervisor? Please see detail response in REP Bid Special Meter Installation Requirements & Project Management Proposed Process: Please create a process map or a set of steps used from meters entering the CIS database to post installation such as: a) from the Purchaser's warehouse and into your Work 179 Management Software, b) meters moved from warehouse to the installer's vehicles, c) from doing the meter exchange, X d) to uploading the meter exchanged data to reporting the work completed and planned into the dashboard tools. Integration Method: Batch Creation of AMI Meter Exchange Installation Service Orders - "From Purchaser". Upfront and then daily during the meter installation period, Purchaser should create bulk AMI meter 180 exchange service orders and send these to the Suppliers work management system via an Yes X automated integration or data transfer. Please indicate your preferred integration method between the Supplier's Work management System, and the Purchasers' NISC CIS. Please see detail response in REP Bid 181 installation results into the Supplier's NISC CIS system, please describe your proposed approach for completing this task? Yes X Please see detail response in REP Bid 182 Data Exchange: Data files to be exchanged with Purchaser should be provided in a format suitable for uploadingto NISC Yes X CIS. Please see detail response in REP Bid 183 Secure FTP Exchange: The software upload of the progress should occur at least daily. X 184 Dashboard: Software should provide web access to Purchaser personnel to monitor the progress of the installation and X run reports. 185 Reporting of Installation Plan and Progress: Supplier should attach sample reports as used to track meter installation X progress. 186 Project Schedule: The Supplier may work with the Utility Staffto develop a detailed project schedule for cycle completion Yes X and scheduling. 187 Project Plan for this Proposal: The Supplier should include a sample Project Plan showing estimated timelines to X complete the various phases of this project. Deployment Project Plan: Provide updates as needed to the project plan during the deployment articulating all Supplier and Purchaser's key tasks and specific time durations from contract execution through the first electric and water meter I88 replacement, ramp -up, mass deployment, and ramp-down/cleanup. Provide sample documents with response. Yes X Please we detail response in REP Bid 189 Project Manager: Supplier should provide complete project management services with at least one project manager X located onsite during the entire installation period. Daily Dashboard Update: Supplier should provide reports no less than daily frequency on the status of the installation. 190 These reports may be in the form of outputs from the Supplier's installation management software. Yes X Please see detail response in REP Bid Weekly Status: The Supplier should provide a status work of meters installed, any identified problems, inventory levels 191 projected, and other defined Project Management items for the Purchaser's PM. X Daily Upload of Meters/Modules Exchanged: The Supplier should submit no less than a nightly database feed of all 192 meters installed from the prior day to Purchaser. This information will provide Purchaser with the reporting capability to X check and verify each customer account is an active account. Please explain how you plan to meet this requirement. Seasonal Cost Differences: If the schedules would allow for the bulk of the meter installations to be conducted April to October, is there a potential for a lower cost per meter to be quoted or are seasonal differences built into your pricing? 193 Note, we are expecting a bout 75% of the meters to be installed over a nine -month March -November period. X Deploying Sequence and Timing 194 Initial Deployment Area (IDA) To gather a good understanding of the system integrations and business process flows, X Supplier must propose a replacement of 125 electric meters and 25 water meters. Ramp -up Productivity Rates: Describe the Suppliers expected Productivity Per Day meter installations for a typical 8 195 hour and 10-hour day during production ramp up. Please describe your proposed ramp -up duration for the Phase 2 Full Yes X Deployment. Please see detail response in REP Bid 196 Steady State Productivity Rates: Describe the Suppliers expected Productivity Per Day for meter installations for a Yes X typical 8 hour and 10-hour day during normal production (after ramp -up). Please we detail response in REP Bid Ramp -down Process: Describe the Suppliers production ramp down process for delivery of the Endpoint Deployment Services and discuss any issues that could negatively or positively impact the installation schedule for the proposed full- 197 service territory implementation with a focus on completing typical hard -to -access and clean-up work associated with Yes X project closeout. Please see detail response in REP Bid Evidence of Meter Tampering 210 In the event meter tampering is evident, the Supplier may contact Purchaser's Operations or designated Purchaser 198 contact and report the violation immediately. The Supplier should also photograph the meter tampering or bypass X situation. 199 In the event meter bypass (diversion) is evident, the Supplier should photograph the issue and contact Purchaser X immediately. Meter/Meter Base/Meter Enclosure Damage In the event the Supplier uncovers existing damage to the meter, meter base, meter enclosure, Supplier should report 200 the type of problem to Purchaser, re -install the old meter if safe to re -install. X 201 In the event the Supplier damages the meter base due to improper insertion of the meter, the Supplier may be X responsible for 100% of the cost of repairs. Bulk Meter Installation Experience Supplier Experience with Similar Sized Utilities as ERMU: Supplier list the deployments of at least four 10,000 to 20,000 X electric AM meter exchange contracts and four water meter exchange contracts with utilities from 3,000 to 10,000 202 water meter exchange engagements that have taken place after January 1, 2020? Yes References: Please list all contracts for meter installation deployments completed from 2020to present. From the list of all deployments, please provide at least three (4) verifiable references (contact names, phone number and emails). 203 Purchaser intends to contact these references. Purchaser reserves the right to request additional references. Yes X Resources and Staffing Levels 204 Supplier Staffing Plan. Indicate by month the forecasted number of installers and supervisors needed during the X deployment for the water and electric endpoints. 205 Resume: Provide the resume for the proposed onsite Supervisor and or Foreman Yes X 206 Project Manager Change Out Request: Purchaser has the right to request a new project manager at the discretion of the Yes X Purchaser. Installer Bio's: Please provide resume or bio of the contractors or employees assigned to the purchaser. In the event X 207 some of the staff have not been selected at this time pleases the minimum level of experience that you will commit to Yes hiring/assigning for this contract. Safety& Environment 208 Please describe Suppliers Safety Assurance program, including all safety training, reporting, auditing, and corrective Yes X actions employed. Environmental Compliance: The Purchaser provides products and services to their customers with consideration to the X impact on the environment. Protecting the environment is one of the Purchaser's core values and Purchaser is committed to delivering products and services in an environmentally sensitive manner. The Purchaser is committed to 209 complying with all applicable international, federal, state, and local environmental laws and requirements. Please explain Yes your approach for complying with this specification? Environmental Audits. The Purchaser reserves the right to have an environmental audit performed by the Supplier or X 210 an independent third party at any time during the course of the project with respect to any work performed during this Yes project. Inventory Management 211 Meter Inventory Level. Describe the Supplier's process for determining the required inventory level to be retained in X warehouse. Inventory Control. Describe the Supplier's experience and proposed inventory control procedures and work flows with X 212 regards to receipt, storage, transfer and installation of the Purchaser's' metering assets. Yes Physical Security 213 Supplier Facilities Security. The Supplier shall properly lock and secure and operate warehousing and/or cross -dock X facilities. 214 Supplier's Physical Security in Warehouse: The Supplier shall secure any use of PC's at the warehouse by locking the PC X on a nightly basis. 215 Warehouse Workspace: Purchaser will supply internet access from our warehouse X Miscellaneous Active Accounts Daily FTP Feed from Purchaser: At the start of the engagement, Purchaser will provide a list of account X 216 information for active customer accounts. This data will be updated each day or weekly if that is preferred. Yes 217 Electric Accounts in DisconnectStatus: Supplier to describe the process for installing AM electric meters where the Yes X meter is in disconnected status. Inspections First 100: Purchaser will provide an inspection of all meters installed for the first 100 electric and water X meters and approve the workmanship before additional meters are installed. Purchaser will complete this task within no 218 ore than two business days, and the inspections may also randomly occur during the time of installation. Yes Inspections for New Installers: Purchaser will provide an inspection of all meters installed for the first 50 meters for X 219 either Phase 1 or Phase 2 when the Supplier adds a new installer to their crew. Yes New Installers Added: The Supplier must notify Purchaser when the Supplier adds new installation staff at any point of X time within this contract. When notifying Purchase of new staff, then the Supplier must also provide evidence that all 220 required background and training approvals have been completed. Inspections After First 500 Meters: A second phase of inspections will be completed by Purchaser after the first 500 X meters and modules are installed. After the inspection, Purchaser will send a written correspondence to the Supplier's Project Manager confirming conformance to the specifications of this RFP or request corrective measures. During this 221 second phase of inspections, the Supplier is welcome to co -visit the inspected meters with a Purchaser representative. 222 Any work on electric meters other than single-phase, 120/240 volt, 320 amps or less should not be performed by X Supplier. Revisit Trips: Customer Premise Field Investigations— Post Installation. After installation, some small percentage of the X installed AMI meters may require an investigation and resolution for multiple reasons including incorrect installation, failed hardware, software mismatches on the systems, poor communications, etc. For these visits, the vendor to quote 223 a per visit cost. The visit should occur within 14 working days from the request by the Purchaser. Supplier may be required to revisit non -performing meters in the deployment area, identify the cause of the problem and when applicable resolve the issue. For budgetary purposes, assume 200 re -visits will be requested. The Supplier may only charge Purchaser for the number of visits completed and should be broken out separately on the monthly invoice. 211 224 Inoperable AM Meters. The Supplier should return any inoperable smart meters to Purchaser on a periodic basis, not to exceed monthly. X X 225 Acceptance of Work. Acceptance of work by Purchaser will be completed on a cycle-bycycle basis. cycle completion should be based on the measure of those meters on the cycle that have been assigned by Purchaser to Supplier for meter installation. Upon completion of a cycle, the Supplier will request acceptance of the cycle by Purchaser. Then Purchaser should then provide approval or rejection of the request based upon predetermined cycle acceptance guidelines. End Assumptions & Exceptions Supplier: Date File Name See Pricing Instructions document. Requirement Number I Assumption/Exception 212 1.24b Attachment II Pricing Response Attachment II.• Pricing (Common Costs) 1 Please do not change the format of this form or insert any new rows and/or columns. 2 Please return the completed pricing schedule in native Excel. Only fill out the areas shaded yellow. 3 For some of the optional services as listed below, please insert the incremental cost. 4 While we ask for pricing for the entire account population of approximately 19,000 of endpoints to be installed, it is a requirement for the Supplier to only invoice the cost of the installation after the actual installation has occurred. Key Assumptions: The deployment will consist of two phases. Phase 1 shall consist of installing roughly 150 new electric meters/modules, 20 1 water meter/modules and 10 water retrofit modules with the existing water meters. Fixed Project Charges 1 Fixed: Set Up Fees for Electric and Water EndPoint Installation Services Quantity Q Unit Cost for Each Extended Cost Optional Vendor Clarification 1.1 Initiation Fee 1 $ - $ - 1.2 Project Management Fee 1 $ 6,800.00 $ 6,800.00 1.3 Meter Installation Software Integration Fee with CIS and GIS 1 $ 8,200.00 $ 8,200.00 1.4 System Integration Fee I $ $ - 1.4 Phase I Mobilization Charge 1 $ 2,500.00 $ 2,500.00 1.5 Phase II Mobilization Fee 1 $ 5,000.00 $ 5,000.00 1.6 Other Start -Up Costs (Vendor to describe) 1 $ - $ - 1.7 Other Start -Up Costs (Vendor to describe) 1 $ $ 1.8 Other Start -Up Costs (Vendor to describe) 1 $ $ - 1.9 Performance Bond (final pricing determined at contracting) 1 $ 18,539.11 $ 18,539.11 Total Fixed Set -Up Fee $ 41,039.11 2 Incremental Fixed Fees Quantity Unit Cost for Each Extended Cost 2.1 Water and Electric Meter Disposal (excluding electric meters of value) $ 0.85 $ - 2.2 Revisit Electric 100 $ 38.1 $ 3,812.00 2.3 Revisit Water 100 $ 13.5 $ 7,345.00 Total Incremental Fixed Fee S 11,157.00 Total One -Time Set -Up Fees $ 52,196.11 Vendor Assumptions We will waive the electric meter portion of the handling fee if EMRU choose the reclamation 1 program. Estimated savings $10400 213 Attachment IL• Pricing (Electric) ' End Point Pricing Incremental Electric Meter InstallationCosts. Supplier Response Instructi1 Please respond in shaded yellow cells to the following questions. 11 NOT EDITII 1 I 1' ROWS BY INSERTINGCOLUMNS 1' ROWS Premises Requiring Electric Meter/Module Installation Base 3 Meter Type Quantity Unit/meter Extended Cost Optional Vendor Clarification Form 2S Install Cost Comments 3.1 $ 17.34 $ 207,889.26 11.989 3.2 Form 2SE $ 17.34 $ 797.64 46 3.3 Form 3S r $ 17.34 $ 4,074.90 3.4 Form 4S -16S Installed by ERMU - $ - $ - Install for New Electric Meters/Modules for Installation Supplier to Install 12,270 $ 212,761.80 Installation Services Priced Incrementally Add -On Services (if any of these are included in your base Premise Incremental 4 quote, then insert $0 in the cost cell) Quantity Add -on Extended Cost Service 4.1 ID of the installer. 12,270 No Charge $ 4.2 Digital Photo of Post -Site Conditions 12,270 No Charge $ - Global Positioning System (GPS) coordinates. (Our Standard GPS 4.3 offering of 3-meter accuracy (min. 6 decimal places).) 12,270 No Charge $ Prior to meter installation, Supplier may be asked to issue an 4.4 informative postcard with the postcard provided and pre -approved 12,270 by Purchaser. $ 0.88 $ 10J97.60 Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety issues, 4.5 potential tamper, premise repairs required, date/time found, 12,270 Purchaser's party reported to, and other situations found in the field by the Supplier. No Charge $ Comments section is to include the correct versus incorrect data 4.6 found and note follow-up Bag details. 12,270 No Charge $ 4.70 Select from a Drop -down List: Premise as -found condition (based 12,270 on list to be provided by Purchaser). No Charge $ Select from a Drop -down List: Premise as -left condition (based on 4.80 list to be provided by Purchaser). 12,270 No Charge $ 4.90 Certification that locks and seals are in place - Y/N. 12,270 No Charge $ Global Positioning System (GPS). The Supplier should capture 4.10 GPS spherical (latitude, longitude, and altitude) coordinates for 12,270 each electric meter with an accuracy no worse than plus or minus three +/- 3 No Charge $ 4.11 Digital photograph of the as -found meter/meter read. 12,270 No Charge $ 4.12 Digital photograph of the empty electric meter can with iiiete 12,270 removed. No Charge $ 4.13 Digital photograph of the as -left meter/meter read (Meter Socket). 12,270 No Charge $ - - If repair required, a digital photograph of the water meter with the 4.14 meter removed revealing appearance (blocked, buried, other). 600 No Charge 4.15 Meter Attachment Type: Home, pole or meter ped. 12,270 No Charge $ 4.16 Secondary wire size: #6, #4, 1/0, 2/0,or 250 AL or CU. 12,270 4/0 No Charge $ 4.17 Meter Clearance: 3 feet in front and A on the sides. Yes or No. 12,270 fee No Charge $ 4.18 Immediately contact Utility with Bypass Meter Socket. NA No Charge $ 100 Amp or 200 Amp Meter Socket: Should be a sticker inside that 4.19 indicates the amps. 12,270 No Charge $ 4.20 Does meter/standpipe need attention: Yes or No.... Provide 12,270 Comments No Charge $ 421 Identify any damaged meter sockets that require repair or 12,270 replacement No Charge $ 214 Meter Seal Lid/Ring: Once a meter is replaced, the lid and/or ring will be placed back on the meter base and the appropriate meter 422 seal will be used to seal the meter. Supplier will follow Purchaser's 12,270 Meter Seal Policy to determine the appropriate type of seal to utilize for each location. Meter seals will be provided by No ERT Meters without Readable Displays: A small percentage of existing ERT meters don't have a readable display to capture the 423 read of the legacy meter before changing out the meter. For any of 600 these meters, the installer should use the Itron hand -hold device to capture the meter read. $ 6.S9 $ 4,134.00 Total Services Priced Incrementally $ 14,931.60 Vendor Assumptions 1 Sub 3 meter GPS is included in the bid package. Sub meter GPS is availabe on 95%of the meters for $2.85 per 2 3 4 5 6 7 8 9 10 11 12 13 Attachment II: Pricing (Water) Instructions: Purchaser has organized water installation pricing with the following: Section 5 = Water Meter/Modules Installation, Section 6: = incremental services that can be priced separately. It is acceptable to bundle all installation costing into Section 5 for the meter/module installation. Section 7 is the installation costs for 1 Retrofit AMI modules with existing meters and Section 8 is a breakdown to incremental price the retrofit services. Again, it is acceptable to bundle all retrofit installation costs in Section 7 for the module retrofits. 2 Please return the completed pricing schedule in native Excel. Only fill out the areas shaded yellow. 3 Please don't add rows or new columns to the Excel spreadsheet. While we ask for pricing for the entire account population of approximately 19,000 of endpoints to be installed, it is a requirement for the Supplier to only 4 invoice the cost of the installation after the actual installation has occurred. ' d Point Installer Pricing IncrementalMeter/Mod 1 AMI Module InstallationCosts. Supplier Response InstructiI Please respond in shaded yellow cells to the following questions. 11 NOT EDIT1 1 1 1' ROWS BY 1 COLUMNS 1' ROWS. Premises Requiring New Water Meter/Modules Base Unit 5 NEW Water Meters, Encoders & Registers and AMR MIUs Quantity Meter Install Cost for Each Extended Cost Optional Vendor Clarification Comments Short iPerl 3/4" Premise 5.1 83.12 $ 377,863.52 4,546 215 5.2 Wed 1" 338 83.12 $ 28,094.56 5.3 Cordonel 11/2" 93 260.12 $ 24,191.16 5.4 Cordonel 2" - $ - 5.5 Cordonel 3" 23 580.12 $ 13,342.76 5.6 Cordonel 4" 9 580.12 $ 5,221.08 5.7 Cordonel 6" 1 1340.00 $ 1,340.00 5.8 Cordonel 8" - $ - ow - Install for New Meters, Encoders, Registers and MIUs and Install 5,010 $ 450,053.08 Premises Requiring Retrofits with Adding AMI to an Existing Meter 6 Existing Meter Type Meter Size 5/8" Quantity 537 Base Unit Install/Retrofit Cost fostforrEacEach Premise Extended Cost Optional Vendor Clarification Comments 6.1 Badger E-Series Ultrasonic 68.12 $ 36,580.44 6.2 Badger E-Series Ultrasonic 3/4" 1 68.12 $ 68.12 6.3 1 Hersey Mag & 5 Badger E- Series P, 6 6812 $ 408.72 6.4 Badger E-Series Ultrasonic 1 1/2" 13 11212 $ 1,457.56 6.5 Badger E-Series Ultrasonic 2" 10 112.12 $ 1,121.20 6.6 1 Badger Mag & 7 Badger E- Series 3" 9 112.12 $ 1,009.08 6.7 1 Hersey Mag & 2 Badger E- Series 4" 4 112.12 $ 448.48 6.8 Badger Mag Meter 6" 1 112.12 $ 112.12 6.9 Badger Mag Meter 8" 1 112.12 $ 112.12 Am" AMI Modules 582 $ 41,317.84 Installation Services Priced Incrementally for Meter/Module Installation 7 Installation Services (if any of these are included in your base quote, then insert $0 in the cost cell) Premise Quantity Incremental Add -on Service Extended Cost Optional Vendor Clarification Comments 7.1 I D of the installer 5,010 No Charge 7.2 Date/time the order is completed 5,010 No Charge 7.3 Read from the removed water meter. 5,010 No Charge 7.4 Read from the new water meter. The reading from the water meter being installed is expected 5,010 No Charge 7.5 Serial number of the water meter being register installed. 5,010 No Charge 7.6 FlexNet ID on SmartPoint Module 5,010 No Charge 7.7 Meter Brand, Type and Model. 5,010 No Charge 7.8 Meter Size 5,010 No Charge 7.9 Is the current meter installed Vertically or horizontally: state direction. All joints should be lea tight. 5,010 No Charge 7.10 Does the meter have a pressure reducing valve? Yes or No 5,010 No Charge 7.11 Is there an electrical jumper? Yes or No 5,010 No Charge 7.12 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. 5,010 No Charge 7.13 State the service line pipe material identification. 5,010 No Charge 7.14 State location of the meter in the building. 5,010 No Charge 7.15 Meter number of the water meter being removed; if applicable. 5,010 No Charge 216 Follow-up flags indicating that Purchaser should investigate situations found at a premise 7.16 such as incorrect data, safety issues, potential tamper, premise repairs required, date/time 5,010 found, Purchaser's parry reported to, and other situations found in the field by the Supplier. No Charge Comments section is to include the correct versus incorrect data found and note follow-up 7.17 flag details. 5,010 No Charge 7.18 Premise as -found condition (based on list to be provided by Purchaser). 5,010 No Charge 7.18 Premise as -left condition (based on list to be provided by Purchaser). 5,010 No Charge 7.19 Certification that locks and seals are in place - Y/N. 5,010 No Charge 7.20 Digital photograph of the as -found meter/meter read. 5,010 No Charge 7.21 Digital photograph of the empty water meter can with meter removed. 5,010 No Charge 7.22 Digital photograph ofthe as -left meter/meter read. 5,010 No Charge 7.23 - If repair required, a digital photograph of the water meter with the meter removed 5,010 No Charge revealing Defective Plumbing: The Supplier shall promptly notify the Purchase if defective plumbing is 7.24 found that could prevent a safe meter change. If the Purchaser concurs, the installation will 5,010 be deferred until repairs are made and the installer informed of the repair. No Charge Effective Shut -Off: The first valve is defined as the upstream shutoff valve or the valve on the street side of the meter. The second valve is on the downstream side of the meter. The curb stop valve is located in the street right-of-way and shall be operated by Purchaser. The installer shall operate the first valve to obtain the shut-off necessary for meter installation: however, should the first valve be defective, the installer shall freeze the service connection upstream of the first valve to obtain the shut-off. Freezing shal I be accomplished with the use 725 of CO2 freeze packs, electrical freeze units, or dry ice. The installer shall freeze the service TBD connection to accomplish shut -offs for accounts with inoperative first valves, at the customer's first scheduled appointment without having to reschedule. I n cases where freezing cannot be employed to obtain the shut-off the meter installer shall inform the Purchaser to close the curb stop valve. Purchaser owns the curb stop and is responsible for repairing buried or broken curb stops. The installer shall note any plumbing problems on the installation record Additional Charge for Freeze shut form. $ 117.12 off only Supplier Leak Testing: After the installation of the metering system is complete, the installer shall open all valves and check for leaks. The installer shall verify that the meter register is functioning properly and that the meter and plumbing connections in the vicinity of the meter 726 do not leak. All leaks or defects shall be repaired. It shall be presumed that any leaks in the 010 vicinity of the water meter reported by the customer to either the Purchaser or the Supplier within 90 calendar days after completion of the installation work at the customers property are the result of the installation work. The Contractor shall repair such leaks and correct all damages which occur during the 90-day period, at the Contractors expense. No Charge Approach: Please describe your proposed approach, at the minimum the installer should turn on the water at the customers hose bib to ensure water is flowing, the installer should 727 flush out any sediment in the line. Then the installer should check for any leaks on the inlet 5,010 and outlet side of the meter. No Charge Warranty: Any leaks found within 90-days of the installation date must be covered by the 7.28 Supplier's warranty. Any leaks from the outlet side of the meter back to the utility 5.010 curbstop/shut-off valve are obviously the responsibility of the installer (or utility No Charge Total Add -on Services Priced Incrementally $ Installation Incremental Services for AMI Module Retrofit with Existing Meter Retrofit Incremental Installation Services (if any of these are included Premise Incremental Optional vendor S in your base quote, then insert $0 in the cost cell) Quantity Add -on Service Extended Cost Clarification Comments 8.1 ID of the installer. 582 No Charge 8.2 Date/time the order is completed. 582 No Charge 8.3 Read from the removed water meter register. 582 No Charge Read from the new water meter register. The reading from the water meter being installed 582 8.4 is expected to be zero. No Charge 8.5 Confi rm serial number of existing water meter. 582 No Charge 8.6 Media Access Control (MAC) or IP address, if present, of the AMI endpoint being installed. 582 No Charge 8.7 Confirm/document manufacturer of the existing meter body. 582 No Charge Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety issues, potential tamper, premise repairs required, date/time 582 found, Purchaser's parry reported to, and other situations found in the field by the Supplier. 8.8 No Charge 217 8.9 Comments section is to include the correct versus incorrect data found and note follow-up flag details. 582 No Charge 8.1 Premise as -found condition (based on list to be provided by Purchaser). 582 No Charge 8.11 Premise as -left condition (based on list to be provided by Purchaser). 582 No Charge 8.12 Certification that locks and seals are in place - Installer indicate Y/N. 582 No Charge 8.13 Digital photograph of the as -found existing meter/meter read. 582 No Charge 8.14 Digital photograph of the empty water meter with meter register removed. 582 No Charge 8.15 Digital photograph of the as -left installed meter/meter read. 582 No Charge 8.16 If repair is required, a digital photograph of the water meter with the meter removed revealing appearance (blocked, buried, other). 582 No Charge Total Add -on Services Priced Incrementally $ Vendor Assumptions 1 If you ERMU elects to have Allegiant dispose of the ERT batteries, we charge $4.85 each and provide an environmental certification. 2 Blanket Permit with a Master Plumber fee is $2500 3 4 5 6 7 8 9 10 11 12 13 Installation Cost Summary Proposed Costs 1 One -Time Set -Up Fees $ 41,039.11 2 Incremental One -Time Set -Up Fees $ 11,157.00 3 Electric Meter Installation Fees $ 212,761.80 4 If proposed and not included in 3 above - Incremental Electric Installation Fees $ 14,931.60 5 Water Meter/Module Installation Fees $ 450,053.08 6 Retrofit Installation Fees $ 41,317.84 7 If proposed and not included in 5 above - Incremental Water Meter/Module Installation Fees $ - 8 If proposed and not included in 6 above, Incremental Retrofit Water Installation Fees $ - Total Proposed Cost Note: Vendors should confirm Summary for their own accuracy. 771,260.43 218 1.23 Warranty: The installation services shall have a 12-month warranty on all craftsmanship based on installation date. 1.24 Incorporation of Additional Documents: This contract incorporates, herein by reference, the terms, and conditions of the following documents. If there is a conflict among the documents, their terms and conditions shall prevail as described in section 1.1 Scope of Work. 1.24a Attachment I Requirements Response Mandatory Minimum Requirements Item # Mandatory Minimum Requirements Comply Yes or No Prime Bidders must have demonstrated and completed three successful EnclPoint Installation Projects with municipal utilities that have both electric 1 and water service. Yes The Onsite project manager of the Prime contractor must have completed three successful End Point installation projects with a combination of three 2 electric utilities, three water utilities or three combo electric & water utilities. Yes Bidders must provide a bid for all services defined in the RFP. Prime Bidders are welcome to obtain subcontractors to best fill gaps in their overall solution 3 Iso long as conditions in 4-6 are followed. Yes The site project manager must be an employee of the prime contractor 4 leading the work for both electric and water. Yes 5 A single software solution must be used for both electric and water End Points. Yes If using Subcontractors as part of your proposed staffing plan, Bidders must indicate what assigned staff are employees or subcontractors of the prime 6 contractor. Yes For ainy excepafions or assuUni[far ons, riuul6wpalliers should state theirn lirathis fxcepafion to IlYraayluuilrenruentrs tab Fully Comply Supplier Elk River Municipal Utilities (Purchaser) - and Not Supplier Comments and Req.k Requirements/Specifications for Endpoint Installation Services Comment Proposed in Comply Clarifications Required Base Bid Vendors please insert a T' in either the Fully Comply or Not Comply. Tease insert p °, Comments and Clarifications In Column F. Tease don't add rows Into this file.0 IIII IIII I l i III I Quality and Risk Control 1 quality and Process Certifications: Upon request, the Supplier should provide alistmofficial quality and/or process x standards with which the Supplier complies (i.e. ISO 9000 family). x z Safety: The Supplier should have implemented a detailed and documented Safety Management Program. Please provide Yes any available written materials that describes your safety program if you have materials readily available. You can provide this with a separate attachment to your proposal. Please see detail response in RFP Bid x Installation Software: The Supplier should have a secure software -based Work Management System integrating 3 handheld field tools with Purchaser's NISC Customer Information System and Meter Data Management System. The Yes current vendors are NISC CIS, FlexNet (Sensus), and Esri CIS. This software is used to manage the smart meter exchange nstallation process. Please see detail response in RFP Bid 202 Daily Dashboard: Supplier should have a daily dashboard that provides updates each day consisting of the following: a) X existing meter locations installed project to date b) meters installed current day, c) to, schedule of future installs 4 planned to be installed over the next 10 days. If the Supplier prior customers have found additional data to be viewed via yes the dashboard to be valuable, please suggest additional information to be presented. Master Service Agreement: Vendors should include their standard Master Services Agreement that would include 6 warranties, insurance requirements, statement of work attachments and other standard contractual language they are proposing in this potential agreement. Quality Processes: Upon request, the Supplier should provide its quality process for endpoint deployment services. X 7 Please attach these process descriptions within your proposal. This primarily involves capturing the last legacy read correctly, serial numbers, form factors, water meter size, dates, etc. for the exchanged legacy to AMI Endpoints. yes Please see detail response in RFP Bid Warranty. Supplier shall warrant its work for 12 months following completion of installation and acceptance of all work. X 8 Supplier is requested to acknowledge its compliance with this requirement. yes Please see detail response in RFP Bid Pricing References and or Comments: Electric meet Quantities All references to pricing or costs must only be defined in Attachment II Pricing. Any comments or footnotes to pricing In X this Attachment I, will be ignored. The quantity of electric meters by form factor for the Supplier to install is as follows: i "Meter "Type Quantity Forltt 25 l l 959 3, t ror,25E 46 3.2 9 3.a ........,p......, .............._ Form 45-169 lustatkod ERNW tMl'GRtWAtZ!M,nt'fNfWJ� roe ip j Sl.1Ard.a r kY All references to pricing or costs must only be defined in Attachment II Pricing. Any comments orfootnotes to pricing In this Attachment I, will be ignored. The quantityof water meters/modules and module only for the Supplier to install is as 10 follows: quantities of water meters and modules in scope X d }�..,tYw10.uR 7FtuPex� AArter!iYu. Quuadty NEW Water Meters, 5 Encoders & Registers and Quantity AMI MIUs 5.1 Short iPed 3/4" 4,546 5.2 iPed r 338 5.3 Cocdovel 1 1/2" 93 5.4 Cocdovel 2" - 5.5 Cocdovel 3" 23 5.6 Cocdovel 4" 9 5.� Cotdovel 6" 1 5.8 Cocdovel 8" - 11ttfd(IT6t ekr Iete�s>;7 1 Regics�sgd..MIs�a'tid AyPm .._. p ti. '-unn�rraa,�� I t Y' � N warou� }41�urppym �-,"wrdinra �„ &�, `'" iC:Grww�mvi C an h tµ n uin�nu Background Checks: The Supplier may be accountable to complete a general background check on all employees to X 11 out individuals with criminal backgrounds, sex offenders and other categories as proposed by the Supplier for both prime and any subcontractor employees. Clothing: EndPoint installation crew should wear clothing and drive vehicles that dearly indicate the installation X 12company's name. 13 OSHA Trained: Installers should be trained on OSHA safety practices and on the appropriate meter types (the meter type X selected is a TBD at this time). Installer's ID's: All meter installation crews should carry proper identification, vehicles should have identifying car X magnets, carry I.D., and identify themselves to all Purchaser's customers before any installations are made. Car magnets 14 to be provided by Supplier with Purchaser design approval. Ethical Behavior: The Supplier will not collect any monies from Purchaser's customers and shall not accept any payment X 15 for services or energy furnished by Purchaser to its customers or any other person. Safety & Environment Personal Protection Equipment: The Supplier should supply and require electric meter installers to use certified tested X low voltage gloves, glove protectors, safety glasses, hard hat and other appropriate clothing at a minimum and should supply additional Personal Protection Equipment if required by applicable laws, codes and regulations. The Supplier should supply and require water meter installers to use gloves, safety glasses, temporary jumpers for installations 16 without jumpers around the water meter at a minimum and should supply additional Personal Protective Equipment if required by applicable laws, codes and regulations. Please describe all aspects of clothing and safety equipment for the Supplier's installation staff. Safety Procedures: The Supplier will receive a copy of Purchaser's Safety Manual and should follow the procedures X outlined in the Safety Manual. Failure to comply may be considered performance default by the Supplier. Supplier should 17 notify Purchaser in writing if it believes there are any conflicts between the Safety Manual and applicable laws, codes and regulations. At Flash for Electric EndPolnt Installation: All personnel working on behalf of the Supplier should be dressed in X appropriate PPE category clothing, when working on energized equipment, which corresponds to the Owner's Arc -Flash 18 Hazard Assessment latest report on file. Purchaser currently requires flame resistant clothing be woo with a minimum c rating of 8 calories per square centimeter. 277/480 volt equipment must be de -energized before being worked on. 19 Unsafe conditions should be reported by Supplier immediately to the Utility for resolution. X 203 20 Safety incidents may be recorded per OSHA standards. X 21 Environmental Laws: The Supplier should perform all work in accordance with State and Federal Environmental Laws. X 22 Reporting Issues: The Supplier should report any unforeseen environmental issues immediately to the Purchaser. X Inventory Management Asset Tracking: The Supplier should provide an electronic inventory system to track all meter and module assets down X to the employee level to and from the field as well as to and from the AMI Solution contractor(s). Integration with 23 Utilities systems may be required and assets should be updated daily. Yes We inventory tracking down to each technician sing or WOM's solution Peak Workflow Tracking Chain -of -Custody: The Supplier may utilize bills-oflacingsto track and account for material transfers between X their warehouses and other users(employees,subcontractors, the Purchaser or other third parties). The Supplier may 24 assume all liability for any inventory loss not documented with a chainofcustody bill-ofladingtransfer. Please confirm agreement to this requirement and describe your inventory managements solution. Daily Inventory Reporting: Supplier should provide Purchaser a daily inventory report of all meters and modules supplied X 25 materials in their possession. Yes We inventory tracking down to each technician sing or WOM's solution Peak Workflow Periodic Inventory Reconciliation: On a periodic basis, Supplier and Purchaser should reconcile the meters issued to X Supplier vs. smart meters not otherwise installed or returned to Purchaser by Supplier up to that point in time. Supplier 26 should acknowledge this requirement. Work Order Management and Handhelds: IT and Security Supplier to Provide Work Order Management Process: Supplier should provide its own Work Order Management X (WOM) system to implement all aspects of work performed under this REP. Supplier should develop a Work Order Management process and work flows that cover all activities in this REP. Supplier's processes should include the 27 methodology used to manage and control individual installations from a scheduling, completion and close out Yes standpoint, including any coordination required with Purchaser. Supplier should provide an overview of its proposed WOMB as part of its response to this REP. Please see detail response in RFP Bid Purchaser to Use NISC AppSuite for Purchaser to Install Selected EndPoInts: To complete selective meter installations, X Purchaser will be using their NISC AppSuite mobile workforce software to process the following: 1) replacing a failed AMI meter and/or Module with a new AM I meter and or Module, 2) Replacing a water meter that failed, 3) for new construction and adding the initial meter/module to a new premise. For these use cases, there is no assumed need to 28 integrate NISC AppSuite with the Yes Supplier's software but we are asking the Supplier to state what their typical approach is for the utility to complete AMI meter installations with these type of use cases. When Purchaser installs an AMI meter, the Purchaser's NISC CIS will be updated with the appropriate AMI metering asset information. Please see detail response in RFP Bid Change a Scheduled Account from Supplier to Purchaser: The Supplier must have the capability to view via the Supplier X 29 WMS a scheduled Endpoint installation premise account and change the status for the EndPoint to be installed by the 29 Pur baser versus by the Supplier. Handheld Devices Used by Supplier Staff. Supplier should provide all hand held computers, tablets, smart phones or X other devices required to schedule, implement, program, and activate the smart meter/ module deployments and the cording of information associated with the installation process. These devices should be an integral part of its Work Order Management system and processes. Supplier's system should have the ability to dispatch and push data to individual workers and to monitor progress throughout the day, and the ability to capture pictures, snap CPS FAT/LON 30 and utilize barcode scanners. Supplier's application is expected to validate Supplier collected data against expected Yes values and to either create exceptions if those values are not met, or to prompt the installer to tryagain. Ideally, once the work order has been completed. Supplier's system should have the ability to upload completed data to the dispatch application wirelessly. Installer Notes in Handheld: The WMS handled system must allow notes entered by installer primarily for premise access X issues e. a) arrived at premise for scheduled appt at 8:30 am 10/15/23, b) electric meter located behind locked gate and 31 don't have entry, c) large dog in yard near electric meter and concerned for safety. Yes Scripting. Supplier's work order management system should have the capability to load scripts onto handhelds that X direct installers to execute certain activities when at a premise. This capability should be a part ofthe work order system and be based on the agreed to logical workflows. Supplier should develop and test scripts prior to start of deployment, 32 and up date these periodically as conditions change or requirements warrant, without impact to the deployment schedule. The Supplier's scripts should cover all requirements contained in this RFP. Minimizing Errors. the Purchaser seeks to eliminate exceptions caused by installation errors. Supplier should design its X processes to minimize data errors entered by an installer, such as wrong meter number, incorrect meter read, etc., by establishing data checks in its handhelds and work order management system. Supplier should also design its system to 33 provide prompts that assure that the installer is at the correct premise prior to commencing the meter exchange and Yes module installation process. Please describe Suppliers tools and/or processes developed to minimize installation exception errors. Exceptions Caused by Supplier Errors: When the legacy to AMI meter exchange produces exceptions and those X exceptions are determined to be caused by keying errors bythe Supplier, the Pur baser will track these errors and report 34 credit request of$10 per error recorded. The tracking of these exception errors will be submitted monthly by the Yes ,Purchase. Notes in Mobile Device: The Work Order Management system should support the loading of premise specific X 35 information such as meter location, access issues, meter behind gate, etc. Real -Time Dynamic Scheduling: Work Order Management system should have the ability to dispatch and push data to X 35 individual workers, monitor progress throughout the day, and report on this progress i.e. change of appointment time for water meter change -out. Special Instructions by Account: Work Order Management system should have the capability to load special instructions X 36 codes onto handhelds that direct installers to execute certain activities when at premises. Meter Exchange Black -Out Dates: Supplier must follow the defined blackout dates as listed below: In summary. X 1) Schedule has been adjusted for holiday/closed office days. 2) The Friday BEFORE the read meter task is the first day of the blackout. (Starting at the beginning of the business day. 37 3) The meter read date should match what we currently have on the Billing calendar. 4) The Thursday AFTER the billing date is the end date of the black out. (Starting at the beginning of the business day). 204 Cycle Planning: Upon award, Supplier should provide its detailed process and work flows for meter cycle selection and X cycle requests that it plans to use. As part of the routine execution of its work, the Supplier may be required to provide periodic cycle Requests prior to release of cycle data to Supplier, so that Purchaser can confirm that Supplier's cycle Request meets Al Network Deployment and other business requirements of the Purchaser prior to release and approval. Meter replacements may be suspended during billing windows based on the cycle. Purchaser has provided a file listing specific meters to be installed by month and a listing of the current meter cycle that each meter belongs to but we are not providing any cycle planning scripts. A CIS map can be provided with the general location of each meter. Purchaser may request irrigation and seasonal meters to be done during the months of July -September Wide 9lark—Merere" dead —..Fad oxn neon Simon 9/.anon e./ne, s/wmn 9au�on a sru/tea sn/mn 9/nnon < snva snb/mn m/mon r snsizm3 av mn mnenon z ro/a/mza ie.00n ae./zon 38 Yes a ro/zs/z , av/ ,/z av/ b/z a ro/mnnn av/ ,ezmn zV+/zmn r rv,/m 'rlr/mn a/.b/ o z rvv/m a/.<non a/neon �r/.00n < ruu�mn �./won .�nnon wvo.,a ws/mn w.<non wo/tea wunon wunon We will load all Blackout dates into our WOM's a w.�r n w>snon wzenon solution to ensure meters will not be changed out when they are up for billing. Day Look Ahead: Supplier maybe required, on a daily basis, to provide purchaser with a "1-day look ahead" that X contains the key cycles that Supplier intends to deploy meters and modules on. The format of the data should be 39 mutually agreed to. yes Information Technology Data Security, Synchronization, and Upload. Through automated means, the Supplier should record Al appropriate X meter exchange and module installation information and provide the data in a common readable electronic format for 40 batch upload into Purchaser' IT systems no later than end of the business day. 41 Minimum Information Required. The Supplier should list the minimum customer information that Purchaser will need X to supply to perform the work. Batch Completion of AMI Meter Exchange Installation Service Orders- "To Utility", on no less than a daily basis, X Supplier should process the completion of bulk AMI meter exchanges and send to Purchaser's CIS. The file data 42 requirements, format, transfer methodology and frequency of these requests should be mutually agreed to between yes Supplier and Purchaser. Note, Attachment IV defines the Integration to Meter Exchange Integration method. Data Elements and Installer Tasks for Electric Change -Outs. The Supplier should capture and transfer the data elements listed below: The Supplier should capture and transfer the data elements listed below: 43 ID of the installer. X 44 1 Date/time the order is completed. X 45 Read from the removed electric meter. X 46 Read from the new electric meter. The reading from the electric meter being installed is expected to be zero. X 47 Serial number of the electric meter being installed. X 48 Sensus FlexNet ID Number. X 49 Meter number of the electric meter being removed; if applicable. X 50 Follow-up flags indicating that Purchaser should investigate situations found at a premise such as X 51 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 52 Premise as -found condition (based on list to be provided by Purchaser). X 53 Premise as -left condition (based on list to be provided by Purchaser). X 54 Certification that locks and seals are in place -V/N. X Global Positioning System (GPS). The Supplier should capture CPS spherical (latitude, longitude, and altitude) X oordinates for each electric meter with an accuracy no worse than plus or minus three (+/- 3) meters. The process 55 description should include specifications for the field device to be used, device settings (e.g., PDOP mask value, etc.), and any differential processing method to be used. Data should be delivered in a format with a spatial reference that can be readily used by Purchaser's' GIS. 56 Digital photograph of the as -found meter/meter read. X 57 Digital photograph of the empty electric meter can with meter removed. X 58 Digital photograph of the as -left meter/meter read (Meter Socket). X 59 If repair required, a digital photograph of the electric meter with the meter removed revealing appearance. X 205 60 Meter Attachment Type: Home, pole or meter ped. X 61 Secondary wire size: #6,#4, 1/0, 2/0, 4/0 or 250 AL or CU. X 62 Meter Clearance: 3 feet in front and 3 feet on the sides.. Yes or No. If <3 feet provide photo. X 63 Meter socket accessibility concern X 64 By Pass Meter Socket: Yes or No. X 65 Meter socket amperage rating X 66 Does meter/stand pipe need attention: Yes or No.... Provide Comments. X 67 Identify any damaged meter sockets that require repair or replacement and/or or minor repairs. X Meter Seal Lid/Ring: Once a meter is replaced, the lid and/or ring will be placed back on the meter base and the X appropriate meter seal will be used to seal the meter. Supplier will follow Purchaser's Meter Seal Policy to determine the 68 appropriate type of seal to utilize for each location. Meter seals will be provided by Purchaser. X Please see addition pricing to capture read in ERT Meters without Readable Displays: A small percentage of existing ERT meters don't have a readable display to pricing table. capture the read of the legacy meter before changing out the meter. For any of these meters, the installer should use the 69 Itron hand -hold device to capture the meter read. Supplier to provide Itron FC300 hand-held device and attach picture of handheld display for meter read. Data Elements for Water Meter Change -Outs. The Supplier should capture and transfer the data elements listed below: 70 ID of the installer X 71 Date/time the order is completed X 72 Read from the removed water meter ERT. X 73 Read from the new water meter. The reading from the water meter being installed is expected to be ten. X 74 Serial number of the water meter being removed X 75 Serial number of the water meter ERT being removed X 76 Serial number of the water meter being installed X 77 Sensors FlexNet ID Number. X 78 Installed Meter Brand, Type and Model. X 79 Installed Meter Size X 8o Is the current meter installed Vertically or horizontally: state direction. All joints should be leak tight. X 81 Does the meter have a pressure reducing Valve? Yes or No X 82 Is there an electrical jumper? Yes or No X 83 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. X 84 State the service line pipe material identification by defining the lead/copper/galvanized/pex or other identifies for MDH X requirements. 85 Describe location of the meter in the building. X Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety X 86 issues, potential tamper, premise repairs required, date/time found, Purchaser's party reported to, and other situations found in the field by the Supplier 87 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 88 Premise as -found condition (based on list to be provided by Purchaser). X 89 Premise as -left condition (based on list to be provided by Purchaser). X 90 Certification that locks and seals are in place -Y/N. X 91 Digital photograph of the as -found meter/meter read. X 92 Digital photograph of the handheld ERT read for the meter to be removed. X 93 Digital photograph of the "as -left meter/meter read". X 94 If repair is required, a digital photograph of the water meter with the meter removed revealing appearance (blocked, X buried, other). Defective Plumbing: The Supplier shall promptly notify the Purchase if defective plumbing is found that could prevent a X 95 safe meter change. If the Purchaser concurs, the installation will be deferred until repairs are made and the installer informed of the repair. X Effective Shut -Off: The first valve is defined as the upstream shutoff valve or the valve on the street side of the meter. The second valve is on the downstream side of the meter. The curb stop valve is located in the street right -of --way and shall be operated by Purchaser. The installer shall operate the first valve to obtain the shut-off necessary for meter installation: however, should the first valve be defective, the installer shall freeze the service connection upstream of the first valve to 96 obtain the shut-off. Freezing shall be accomplished with the use of CO2 freeze packs, electrical freeze units, or dry ice. The Yes Freeze shut of services will be conducted at a installer shall freeze the service connection to accomplish shut -offs for accounts with inoperative first valves, at the additional charge asoutlined in our pricing table customer's first scheduled appointment without having to reschedule. In cases where freezing cannot be employed to obtain the shut-off the meter installer shall inform the Purchaser that meter could not be replaced. The installer shall note any plumbing problems on the installation record form. 206 Supplier leak Testing: After the installation of the metering system is complete, the installer shall open all valves and X check for Teaks. The installer shall verify that the meter register is functioning properly and that the meter and plumbing 97 connections in the vicinity of the meter do not leak All leaks or defects between and including connection points shall be Yes repaired. Approach: Please describe your proposed approach, at the minimum the installer should turn on the water at the X customers hose bib to ensure water is flowing, the installer should flush out any sediment in the line. Then the installer 98 should heck for any leaks on the inlet and outlet side ofthe meter. Yes Warranty: Any leaks found within 90 days of the installation date must be covered by the Supplier's warranty. Any leaks X between and including the connection points for a normal installation, or for installations that were necessary to freeze from the point frozen to the outlet side of the meter are the responsibility of the Supplier. The Contractor shall repair 99 such leaks and correct all damages which occur during the 90 day period, at the Contractor's expense. Yes Data Elements for Water Modules Retrofits. The Supplier should capture and transfer the data elements listed below: The Supplier should capture and transfer the data elements listed below: 10O ID of the installer. X 101 Date/time the order is completed. X 102 Read from the removed water ERT. X 103 Read from the water meter register. X 104 Read from the new water meter register. Installer should verify the installed read from the radio matches the display X on the water meter register 105 Confirm serial number of existing water meter. X 106 Sensors FlexNet ID Number for the installed radio. X 107 Verify installed Meter Brand, Type and Model. X 108 Installed Meter Size X 109 Is the current meter installed Vertically or horizontally: state direction. X 110 Does the meter have a pressure reducing valve? Yes or No X 111 Is there an electrical jumper? Yes or No X 112 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. X 113 State the service line pipe material identification by defining the lead/copper/galvanized/pex or other identifies for MDH X requirements. 114 Describe location of the meter in the building. X 115 Confirm/document manufacturer of the existing meter body. X Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety X 116 issues, potential tamper, premise repairs required, date/time found, Purchaser's party reported to, and other situations found in the field by the Supplier. 117 Comments section is to include the correct versus incorrect data found and note follow-up flag details. X 118 Premise as -found condition (based on list to be provided by Purchaser). X 119 Premise as -left condition (based on list to be provided by Purchaser). X 120 Certification that locks and seals are in place- Installer indicate Y/N. X 121 Digital photograph of the as -found existing meter/meter read. X 122 Digital photograph of the handheld ERT read for the removed ERT. X 123 Digital photograph of the as -left installed meter/meter read. X 124 If repair required, a digital photograph to document the repair needed X Data and Information Technology Security 125 Data Privacy: The Supplier should ensure that customer data remains private and upon request shall describe what x controls and processes may be utilized to achieve this requirement. Data Encryption: Purchaser's data and authentication content (passwords) should be secured in transit from end to end, x and at rest. The Supplier should identify what encryption standards they use or support such as but not limited to AES- 256, PKI, FTPS (SSL/TLS), SFTP (SSH) to secure Purchaser's data in transit (between Purchaser's systems and Supplier's 126 systems, and between Supplier's systems) and at rest in their field tools, laptops, servers, as applicable. Supplier should describe the implementation of their data encryption solution(s). 127 Secure Transfer Server. The Supplier should provide Purchaser with a secure FTP server for transfer of Yes x Please see detail response in RFP Bid Unique User Identification and Authorization (Non -Utility Users) (IA): The Supplier should attest to enforce that their x personnel use unique identity user accounts and authentication content for 128 Purchaser's System accesses via local interfaces or network connections (ref. NIST SP 800-53 IA-8). Process Approval: Upon award, Supplier should provide its processes, and Purchaser may approve Supplier's processes, x for incorporating appropriate security measures including but not limited to data encryption and key management for 129 Supplier's Work Order Management Sys=MOMS), Inventory Management System(IMS), etc. Suppliershould indicate its compliance with this requirement. 207 Authorized Users. The Supplier should ensure that only authorized and authenticated users have access to the customer x 130 data and should describe what controls and processes will be utilized to achieve this requirement. Yes Please see detail response in REP Bid 131 Auditability. All record of access and change of customer data should be auditable. Yes x Please see detail response in REP Bid 132 log Unauthorized Use: All unauthorized use and change of customer data should be detected and logged. x Data Ownership: The Purchaser will retain ownership of all customer information. The customer information is only x 133 provided to the Supplier for specific use in support of this Endpoint Deployment Services project. Nootheruseis authorized. End -of Contract Data Purge: The Purchaser requires all customer information to be purged from the Supplier's systems x (including handhelds) in accordance with NISI SP 800-88 media sanitization guidelines for 'purging'of data when this 134 information becomes no longer required by the Purchaser. This will be targeted 12 months after the last meter is exchanged and must be requested in writing from the Purchaser's project manager. Handheld Security Requirements Handheld Mobile Device Data Security: The Supplier should have handheld security features that aid in preventing the X data from being extracted if device is lost in the field (i.e. authentication, screen locks, time outs, encryption, poison pill, 135 mote data wipe, etc.). Loss of Handheld: The Supplier should have procedures to inform the Purchaser in the event of a lost or stolen X handheld. Describe the process for identification of the data lost in the handheld device and the process for re -acquiring 136 the lost completion data. Provide metrics on frequency of lost handheld devices during a deployment project. Contact Center Security Core Security Requirements: The data and Information Technology Security requirements should be applicable to the X 137 Supplier's Call Center environment(s). The Supplier is required to acknowledge its compliance with these requirements. Customer identification: Customer identification procedures should be used in Supplier's Call Center to validate that the X 138 customer is who they say they are (Authentication) in order to prevent social engineering attacks. Scrapping Meters Electric ERT Resale Value: For the Purchaser's Itron ERT meters, please quote a proposed market value that the Supplier X 139 ould coordinate for the selling of the electric ERT meters. Approximately 25 percent of the ERT meters are seven years or less n age. Scrapping Process: The Supplier should develop and obtain approval from Purchaser for the process used following X 140 meter/module removal including shipping,storing, processing, and scrapping. 141 Electric Meter Waste Sorting: The Supplier may be required to separate both electric and water meter waste by glass vs. X plastic covers, and/or non -electronic vs. electronic waste. Supplier Accountable to Scrapping: Supplier is accountable for all meter scrapping. The Supplier is fully accountable to X 142 follow all State and Federal environmental laws relating to materials scrapping and disposal. Scheduling of Water Meter and Module Appointments and Unreachable Electric Meter Locations Supplier Best Practice: This bid is asking the Suppliers to propose what they have found to be the most effective X approach for scheduling and customer's availability for appointments primarily for the water meter and module replacements. This recommendation should be defined within the Proposal as Addendum C 1: Appointment Scheduling. The objective is to obtain the highest percent of met appointments and meter exchanges on the initial appointment and the fewest remaining appointments to re -schedule with the on the second attempt and the lowest 143 remaining accounts that require a third attempt. The Purchaser is asking the Supplier to propose their entire awareness and marketing programs with the use of press releases, bill inserts, web site updates, email use, text messages, and other media and means for the most optimal appointment obtainment and cost effectiveness for the Purchaser. Electric Appointments: For locations behind gates without gate keys available from the utility, obstructed electric meter X locations and other "access " issues that an appointment 7s may be necessary to exchange the electric meter, Supplier 144 shall notify the Utility for mutual resolution. All electric meters are located on the outside of the premise. Maximum of 3 Attempts: For those locations where the Supplier may be required to make contact with the customer X prior to performing the work, the Supplier should make a minimum of three (3) attempts to contact the customer. If after three (3) attempts the Supplier is unable to contact the customer for electric or for water the customer failed to 145 keep committed appointment, the Supplier should then provide records showing the attempted contacts and proceed to change the meter. Please state otherwise if (3) attempts are not standard practice in your preferred model and/or if it is not included in the base bid. Documentation of Customer Communications: Any communication with the customer or any attempt to communicate X 146 with the customer should be documented by the Supplier. Electric Life Support Accounts: Purchaser may provide a list showing those customers who are registered as having Life X Support Equipment or"Life Support Status' - this is estimated to be approximately 21 premises. The Supplier may be 147 required to provide all call center services needed to make verbal contact with these customers prior to disconnecting power and ensuring that these customers are aware that the power will be interrupted when the work is performed. Scheduling of Water Meter Appointment: Supplier should provide a toll -free number for customer questions regarding X installation scheduling. Purchaser may use its toll -free number for general AMI questions. Numbers to be listed on all 148 customer communications. Supplier to recommend best practices if different. 149 Web Based Water Meter/Module Appointment Scheduling: Proposals must include a means for customers to schedule Yes X installation appointments via web site. Web Based Water Meter/Module Appointment Scheduling Changes: Proposals must include a means for customers to X 150 change their appointment installation appointments via web site. Voice Mail Support. The Supplier should indicate availability of voice message retrieval and, if applicable, describe X 151 latency of message retrieval and response. 152 Supplier should create a FAQ document for communications with customers. FAQ document may be approved by X Purchaser. X 153 Adult 18 years or Older Must be Present at Customers Home: No installer shall enter residence without the permission of an adult member of the household at least 18 years of age 154 Police Entry Assistance: A limited number of installations may require police assistance for access. The Supplier should X coordinate with Purchaser for any Police entry customer sites. • Post Cards for Electric Meter Exchanges: About two weeks prior to the scheduled electric meter exchange, Supplier shall X s send pot cards the planned change -outs. This means nearly every day a different batch of post cards would be sent 155 (vendors can batch the post cards and send once per week versus daily ifthat is desired by Supplier. Yes Please see detail response in RFP Bid Call Center Process Records Availability. The Supplier should make available to Purchaser a record of all communications between the X 156 Supplier and purchaser's customers upon request. A copy of all remarks,calls, or logs of communications from the Supplier customer management system is sufficient. Purchaser Monitoring of Customer Calls: Upon request, Supplier should provide the capability for X 157 Purchaser to monitor the Supplier's phone conversations with conversations with Purchaser's customers. Call Center quality Assurance Call Recording and Retention. There may be situations where a customer will call Purchaser regarding an exchange X between the customer and the Supplier's representative. These situations may require the ability for Purchaser to review the actual conversation between the customer and the Suppliers representative. The Supplier may be required to provide the following system requirements. All calls to the Call Center should: - Be recorded 158 - Be catalogued by date, time, complaintor phone number - Be maintained a minimum of one hundred eighty (180) days with the option to hold specific calls for a longer period as necessary - Have the ability to be queried by date, time, phone number and agent - Made available in Wave file format Purchaser should retain right to audit call recordings. 159 Average Hold Time Maximum: Supplier should answer 90% of the calls within 60 seconds and 100% within 5 minutes. X Call Wait Time Statistics: Purchaser upon request should be provided call center statistics including the following: - X Total calls - Average Speed of Answer (ASA) 159 - Wait time - Total and average hold time - Abandoned/lost calls 160 Escalation to Purchaser Percentage. Based on the Supplier's experience, indicate how many of these calls are expected X to be escalated to Purchaser for resolution. 160 Supervision. Upon request, the Supplier shall describe how the Supplier will ensure that appropriate supervision is on- Yes X site at all times during hours of operation. Please see detail response in RFP Bid Languages Supported. The predominant language in Purchaser's service territory is English. The Supplier is requested to X communicate with customers that speak languages other than English, but it is not required to have multiple US 161 languages but please list how you address conversations with non-English customers' Yes Please see detail response in RFP Bid Customer Satisfaction & Call Center 162 Hours of Operations. The Supplier should provide their Customer Call Center hours of operation from a minimum of X 7:00 AM to 7:00 PM CST on all installation days. If availability exists less or more than the Appointment Scheduling For business customers, the Supplier should notify the business of their purpose. If an outage is required, the Supplier may inquire if it is possible for the outage to occur at that time. If not, the Supplier may be required to return to the 163 premise at a scheduled time with the business. Yes X Please see detail response in RFP Bid Electric Meter Installation Times: Normal hours for the Supplier to work in the field doing meter installations at customer premises should never be before or after daylight hours typically before 8 AM or after 5 PM Monday to Friday 164 for most instances, unless requested by the customer. The hours can be extended past S PM in the summer months X when the day light is longer but not before 8 AM, unless requested by the customer. The specific installation time to be oordinated monthly between Supplier and Purchaser. Water Meter Working Hours for Customer Appointments: 7:00 am until 7.00 PM Monday -Friday and 8:00 to 5 PM on 165 Saturdays. Special circumstances outside of these hours must have prior authorization from Purchaser. X Worker Requirements. Purchaser reserves the right to request and review any of the items specified in the following section: Human Resources Plan. The Supplier should ensure that their Human Resource plan that addresses the recruiting, staffing and management of internal or contractor personnel to be used to deal with the requirements of this RFP. This 166 plan should induce hiring policies, security screening procedures, testing and performance review procedures and other X pertinent procedures. 167 Employee vs Contractor: Supplier must indicate whether each employee involved are direct employees of the prime X contractor or subcontractors. 168 Onsite Project Manager: Must be an employee of the prime contractor. Yes X Please see detail response in RFP Bid Qualified Workers. Supplier should employ and assign worts only to qualified workers. Qualified workers shall be trained by the Supplier in accordance with an established set of specific qualifications inclusive of experience, training, audit, and 169 related items that are relevant to the nature and type work activities to be performed. X Licensed. Purchaser expects that the Supplier and their subcontractors and agents are properly licensed and qualified (including having all necessary authorizations) to perform the class and type of the services as specified, in addition to 170 being properly insured, equipped, organized, staffed, and financed to handle such services. X Professionalism. The Supplier should perform the services in an orderly and professional manner. Including but not 171 limited to customer experience expectations such as hygiene, respect for property, clean-up workspace, no cussing, no yes X mokmg, etc I IPlease see detail response in RFP Bid Skilled and Physicality: Workers. The Supplier should not employ for the services any personnel or subcontractor unskilled in the work assigned. Also, ability to lift 50 pounds, stoop for long periods of time each day, enter small areas 172 and unique compartmented areas in utility locations, extend extremities to reach meter areas, use of stairs. Also, okay X with working in areas with insects and wildlife. 209 Minimum qualifications and Licensing. All workers employed or contracted by the Supplier may be required to have X We typically bring in seasoned qualified the minimum competencies necessary to accomplish the specific task or work requirement presented in this document. resource for both Electric and Water The Supplier and their subcontractors, suppliers and agents are to be properly licensed and qualified to perform the installations. class and type of the services as specified in this RFP, in addition to being properly insured, equipped, organized, staffed 173 and financed to handle such services. The Supplier is to outline how it will meet these minimum competencies and indicate any requested exceptions. Supplier should provide Self -Contained Metering class for EPI Installation Personnel. Local Hires. The Supplier should use local qualified personnel whenever possible. However, this is not a requirement, X 174 especially if highly pained crews from outride of the region are available. yes We typically don't hire locally, and we prefer to bring in seasoned technicians. Substance Abuse. In order to maintain a safe, healthy and efficient work environment, and to minimize absenteeism X and tardiness, Purchaser requires that the Work Site be a Drug and Alcohol -Free Environment. Prior to commencement of work, Supplier should have a Substance Abuse Program in place. Supplier should provide a copy of their substance 175 abuse program with its submittal to this RFP. Purchaser should review the program and if acceptable, approve the program prior to commencement of end point installation. Pre -employment and Random Drug Testing. The Supplier and their agents, employees and X Subcontractors should adhere to DOT drug and alcohol testing policies in place during the term of the Project. All testing 176 shouldbe paid for in full by the Supplier. Suppliershould indicate compliance with this requirement. The Purchaser serves the right to review how the Supplier is in compliance with this requirement. Training Program Overview. The Supplier should provide an overview of their employee training programs(technical, X 177 safety and customer contact/ communications) forthe specific work functions listed in this REP. yes Please see detail response in RFP Bid Supervision. Supplier should ensure appropriate supervision is provided for all field -related work for its employees. X Supplier should provide itsexpected ratio of'Field Installation Personnel' to Field Supervisors. Purchaser expectsthat Supplierwill provide more management oversight, e.g. the ratio offield technicians 178 to field supervisors, when the workforce is less experienced such as in the beginning of the project or at the start of yes implementation of a new type of technology or end point. Suppliershould indicate compliance with this requirement and the proposed ratio of installers to supervisor? Please see detail response in RFP Bid Special Meter Installation Requirements & Project Management Proposed Process: Please create a process map or a set of steps used from meters entering the CIS database to post installation such as: a) from the Purchaser's warehouse and into your Work 179 Management Software, b) meters moved from warehouse to the installer's vehicles, c) from doing the meter exchange, X d) to uploading the meter exchanged data to reporting the work completed and planned into the dashboard tools. Integration Method: Batch Creation of AMI Meter Exchange Installation Service Orders -From Purchaser'. Upfront and then daily during the meter installation period, Purchaser should create bulk AMI meter 180 exchange service orders and send these to the Supplier's work management system via an yes X automated integration or data transfer. Please indicate your preferred integration method between the Supplier's Work management System, and the Purchasers' NISC CIS. Please see detail response in RFP Bid 181 installation results into the Supplier's NISC CIS system, please describe your proposed approach for completingthis task? yes X Please see detail response in RFP Bid 182 Data Exchange: Data files to be exchanged with Purchaser should be provided in a format suitable for uploading to NISC yes X CIS. Please see detail response in RFP Bid 183 Secure FTP Exchange: The software upload of the progress should occur at least daily. X 184 Dashboard: Software should provide web access to Purchaser personnel to monitor the progress of the installation and X run reports. 185 Reporting of Installation Plan and Progress: Supplier should attach sample reports as used to track meter installation X progre 186 Project Schedule: The Supplier may work with the Utility Staff to develop a detailed project schedule for cycle completion yes X and scheduling. 187 Project Plan forthis Proposal: The Supplier should include a sample Project Plan showing estimated timelinesto X omplete the various phases of this project. Deployment Project Plan: Provide updates as needed to the project plan during the deployment articulating all Supplier and Purchaser's key tasks and specifictime durations from contract execution through the first electric and water meter 188 replacement, ramp -up, mass deployment, and ramp-town/clean-up. Provide sample documents with response. yes X Please see detail response in RFP Bid 189 Project Manager: Supplier should provide complete project management services with at least one project manager X located onsite during the entire installation period. Daily Dashboard Update: Supplier should provide reports no less than daily frequency on the status of the installation. 190 These reports may be in the form of outputs from the Supplier's installation management software. yes X Please see detail response in RFP Bid Weekly Status: The Supplier should provide a status work of meters installed, any identified problems, inventory levels 191 projected, and other defined Project Management items for the Purchaser's PM. X Daily Upload of Meters/Modules Exchanged: The Supplier should submit no less than a nightly database feed of all 192 meters installed from the prior day to Purchaser. This information will provide Purchaser with the reporting capability to X check and verify each customer account is an active account. Please explain how you plan to meet this requirement. Seasonal Cost Differences: If the schedules would allow for the bulk of the meter installations to be conducted April to October, is there a potential for a lower cost per meter to be quoted or are seasonal differences built into your pricing? 193 Note, we are expecting about 75% of the meters to be installed over a nine -month March -November period. X Deploying Sequence and Timing 194 Initial Deployment Area (IDA) To gather a good understanding of the system integrations and business process flows, X Supplier must propose a replacement of 125 electric meters and 25 water meters. Ramp -up Productivity Rates: Describe the Supplier's expected Productivity Per Day meter installations for a typical 195 hour and 10 hour day during production ramp up. Please describe your proposed ramp -up duration for the Phase 2 Full yes X Deployment. Please see detail response in RFP Bid 196 Steady State Productivity Rates: Describe the Supplier's expected Productivity Per Day for meter installations for a yes X typical 8 hour and ldhour day during normal production (after ramp -up). Please see detail response in RFP Bid Ramp -down Process: Describe the Supplier's production ramp down process for delivery of the Endpoint Deployment Services and discuss any issues that could negatively or positively impact the installation schedule for the proposed full- 197 service territory implementation with a focus on completing typical hard -to -access and clean-up work associated with yes X project closeout. Please see detail response in RFP Bid Evidence of Meter Tampering 210 In the event meter tampering is evident, the Supplier may contact Purchaser's Operations or designated Purchaser 198 contact and report the violation immediately. The Supplier should also photograph the meter tampering or bypass X situation. 199 In the event meter bypass (diversion) is evident, the Supplier should photograph the issue and contact Purchaser X immediately. Meter/Meter Base/Meter Enclosure Damage In the event the Supplier uncovers existing damage to the meter, meter base, meter enclosure, Supplier should report 200 the type of problem to Purchaser, re -install the old meter if safe to re -install. X 201 In the event the Supplier damages the meter base due to improper insertion of the meter, the Supplier may be X responsible for 100% of the cost of repairs. Bulk Meter Installation Experience Supplier Experience with Similar Sized Utilities as ERMU: Supplier list the deployments of at least four 10,000 to 20,000 X electric AMI meter exchange contracts and four water meter exchange contracts with utilities from 3,000 to 10,000 202 water meter exchange engagements that have taken place after January 1, 2020? Yes References: Please list all contracts for meter installation deployments completed from 2020 to present. From theist of all deployments, please provide at least three (4) verifiable references (contact names, phone number and emails). 203 Purchaser intends to contact these references. Purchaser reserves the right to request additional references. Yes X Resources and Staffing Levels 204 Supplier Staffing Plan. Indicate by month the forecasted number of installers and supervisors needed during the X deployment for the water and electric endpoints. 205 Resume: Provide the resume for the proposed onsite Supervisor and or Foreman Yes X 206 Project Manager Change Out Request: Purchaser has the right to request a new project manager at the discretion of the Yes X Purchaser. Installer Bio's: Please provide resume or bio of the contractors or employees assigned to the purchaser. In the event X 207 e of the staff have not been selected at this time pleases the minimum level of experience that you will commit to Yes hiring/assigning for this contract. Safety& Environment 208 Please describe Suppliers Safety Assurance program, including all safety training, reporting, auditing, and corrective Yes X actions employed. Environmental Compliance: The Purchaser provides products and services to their customers with consideration to the X impact on the environment. Protecting the environment is one of the Purchaser's core values and Purchaser is committed to delivering products and services in an environmentally sensitive manner. The Purchaser is committed to 209 om plying with all applicable international, federal, state, and local environmental laws and requirements. Please explain Yes your approach for complying with this specification? Environmental Audits. The Purchaser reserves the right to have an environmental audit performed by the Supplier or X 210 n independent third party at any time during the course ofthe project with respect to any work performed during this Yes project. Inventory Management 211 Meter Inventory Level. Describe the Supplier's process for determining the required inventory level to be retained in X warehouse Inventory Control. Describe the Supplier's experience and proposed inventory control procedures and work flows with X 212 regards to receipt, storage, transfer and installation of the Purchaser's' metering assets. Yes Physical Security 213 Supplier Facilities Security. The Supplier shall properly lock and secure and operate warehousing and/or cross -lock X facilities. 214 Supplier's Physical Security in Warehouse: The Supplier shall secure any use of PC's at the warehouse by locking the PC X a nightly basis. 215 Warehouse Workspace: Purchaser will supply internet access from our warehouse X Miscellaneous Active Accounts Daily FTP Feed from Purchaser: At the start of the engagement, Purchaser will provide a list of account X 216 information for active customer accounts. This data will be updated each day or weekly if that is preferred. yes 217 Electric Accounts in Disconnect Status: Supplier to describe the process for installing AMI electric meters where the Yes X meter is in disconnected status. Inspections First 100: Purchaser will provide an inspection of all meters installed for the first 100 electric and water X meters and approve the workmanship before additional meters are installed. Purchaser will complete this task within no 218 ore than two business days, and the inspections may also randomly occur during the time of installation. Yes Inspections for New Installers: Purchaser will provide an inspection of all meters installed for the first 50 meters for X 219 either Phase 1 Or Phase 2 when the Supplier adds a new installer to their crew. yes New Installers Added: The Supplier must notify Purchaser when the Supplier adds new installation staff at any point of X time within this contract. When notifying Purchase of new staff, then the Supplier must also provide evidence that all 220 required background and training approvals have been completed. Inspections After First 500 Meters: A second phase of inspections will be completed by Purchaser after the first 500 X meters and modules are installed. After the inspection, Purchaser will send a written correspondence to the Supplier's Project Manager confirming conformance to the specifications of this RFP or request corrective measures. During this 221 second phase of inspections, the Supplier is welcome to co -visit the inspected meters with a Purchaser representative. 222 Any work on electric meters other than single-phase, 1201240 volt, 320 amps or less should not be performed by X Supplier. Revisit Trips: Customer Premise Field Investigations — Post Installation. After installation, some small percentage of the X installed AMI meters may require an investigation and resolution for multiple reasons including incorrect installation, failed hardware, software mismatches on the systems, poor communications, etc. For these visits, the vendor to quote 223 aper visit cost. The visit should occur within 14 working days from the request by the Purchaser. Supplier may be required to revisit non -performing meters in the deployment area, identify the cause of the problem and when applicable resolve the issue For budgetary purposes, assume 200 re -visits will be requested The Supplier may only charge Purchaser for the number of visits completed and should be broken out separately on the monthly invoice. 211 224 Inoperable AMI Meters. The Supplier should return any inoperable smart meters to Purchaser on a periodic basis, not to exceed monthly. X X 225 Acceptance of Work. Acceptance of work by Purchaser will be completed on a cycle -by cycle basis. cycle completion should be based on the measure of those meters on the cycle that have been assigned by Purchaser to Supplier for meter installation. Upon completion of a cycle, the Supplier will request acceptance of the cycle by Purchaser. Then Purchaser should then provide approval or rejection of the request based upon predetermined cycle acceptance guidelines. End Assumptions & Exceptions Supplier: Date File Name See Pricing Instructions document. Requirement Number I Assumption/Exception 212 1.24b Attachment II Pricing Response Attachment Il.• Pricing (Common Costs) 1 Please do not change the format of this form or insert any new rows and/or columns. 2 Please return the completed pricing schedule in native Excel. Only fill out the areas shaded yellow. 3 For some of the optional services as listed below, please insert the incremental cost. 4 While we ask for pricing for the entire account population of approximately 19,000 of endpoints to be installed, it is a requirement for the Supplier to only invoice the cost of the installation after the actual installation has occurred. Key Assumptions: The deployment will consist of two phases. Phase 1 shall consist of installing roughly 150 new electric meters/modules, 20 1 water meter/modules and 10 water retrofit modules with the existing water meters. Faced Project Charges 1 Fixed: Set Up Fees for Electric and Water EndPoint Installation Services Quantity Unit Cost for Each Extended Cost 1.1 Initiation Fee 1 $ - $ - 1.2 Project Management Fee 1 $ 6,800.00 $ 6,800.00 1.3 Meter Installation Software Integration Fee with CIS and GIS 1 $ 8,200.00 $ 8,200.00 1.4 System Integration Fee 1 $ - $ - 1.4 Phase 1 Mobilization Charge 1 $ 2,500.00 $ 2,500.00 1.5 Phase II Mobilization Fee 1 $ 5,000.00 $ 5,000.00 1.6 Other Start -Up Costs (Vendor to describe) 1 $ - $ - 1.7 Other Start -Up Costs (Vendor to describe) 1 $ $ 1.8 Other Start -Up Costs (Vendor to describe) 1 $ $ - 1.9 1 Performance Bond (final pricing determined at 1 $ 1 8,539.11 $ 18,539.11 2 Incremental Fixed Fees Quantity Unit Cost for Each Extended Cost 2.1 Water and Electric Meter Disposal (excluding electric $ 0.85 meters of value) $ - 2.2 Revisit Electric 100 $ 38.1 $ 3,812.00 2.3 Revisit Water 100 $ 73.5 $ 7,345.00 Vendor Assumptions We will waive the electric meter portion of the handling fee if EMRO choose the reclamation 1 program. Estimated savings $10400 213 Attachment IL• Pricing (Electric) Base 3 Meter Type Quantity Unit/meter Extended Cost Optional Vendor Clarification Form 2S Install Cost Comments 3.1 $ 17.34 $ 207,889.26 11,989 3.2 Form 2SE $ 17.34 $ 797.64 46 3.3 Form 3S $ 17.34 $ 4,074.90 235 3.4 Form 4S -16S Installed by ERMU - $ - $ - Installation Services Priced Incrementally Add -On Services (if any of these are included in your base Premise Incremental 4 quote, then insert $0 in the cost cell) Quantity Add -on Extended Cost Service 4.1 ID of the installer. 12,270 No Charge $ 4.2 Digital Photo of Post -Site Conditions 12,270 No Charge $ - Global Positioning System (GPS) coordinates. (Our Standard GPS 4.3 offering of 3-meter accuracy (min. 6 decimal places).) 12,270 No Charge $ Prior to meter installation, Supplier may be asked to issue an 4.4 informative postcard with the postcard provided and pre -approved 12,270 by Purchaser. $ 0.88 $ 10,797.60 Follow -tip flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety issues, 4.5 potential tamper, premise repairs required, date/time found, 12,270 Purchaser's party reported to, and other situations found in the field by the Supplier. No Charge $ Conunents section is to include the correct versus incorrect data 4.6 found and note follow-up flag details. 12,270 No Charge $ 4.70 Select from a Drop -down List: Premise as -found condition (based 12,270 on list to be provided by Purchaser). No Charge $ Select from a Drop -down List: Premise as -left condition (based on 4.80 list to be provided by Purchaser). 12,270 No Charge $ 4.90 Certification that locks and seals are in place - Y/N. 12,270 No Charge $ Global Positioning System (GPS). The Supplier should capture 4.10 GPS spherical (latitude, longitude, and altitude) coordinates for 12,270 each electric meter with an accuracy no worse than plus or minus three +/- 3 No Charge $ 4.11 Digital photograph of the as -found meter/meter read. 12,270 No Charge $ 4.12 Digital photograph of the empty electric meter can with mete 12,270 removed. No Charge $ 4.13 Digital photograph of the as -left meter/meter read (Meter Socket). 12,270 No Charge $ - - If repair required, a digital photograph of the water meter with the 4.14 meter removed revealing appearance (blocked, buried, other). 600 No Charge $ 4.15 Meter Attaclunent Type: Home, pole or meter Ted. 12,270 No Charge $ 4.16 Secondary wire size: #6, #4, 1/0, 2/0,or 250 AL or CU. 12,270 4/0 No Charge $ 4.17 Meter Clearance: 3 feet in fiont and 3t on the sides. Yes or No. 12,270 fee No Charge $ 4.18 Immediately contact Utility with Bypass Meter Socket. NA No Charge $ 100 Amp or 200 Amp Meter Socket: Should be a sticker inside that 4.19 indicates the amps. 12,270 No Charge $ 4.20 Does meter/standpipe need attention: Yes or No.... Provide 12,270 Conunents No Charge $ 4.21 Identify any damaged meter sockets that require repair ou 12,270 replacement No Charge $ 214 Meter Seal Lid/Ring: Once a meter is replaced, the lid and/or ring will be placed back on the meter base and the appropriate meter 4.22 seal will be used to seal the meter. Supplier will follow Purchaser's 12,270 Meter Seal Policy to determine the appropriate type of seal to utilize for each location. Meter seals will be provided by Purchaser. No Charge $ ERT Meters without Readable Displays: A small percentage of existing ERT meters don't have a readable display to capture the 4.23 read of the legacy meter before changing out the meter. For any of 600 these meters, the installer should use the Itron hand -hold device to capture the meter read. $ 6.89 $ 4,134.00 Vendor Assumptions 1 Sub 3 meter GPS is included in the bid package. Sub meter GPS is availabe on 95% of the meters for $2.85 per 2 3 4 5 6 7 8 9 10 11 12 13 Attachment IL• Pricing (Water) IIIIIIIIIIII Premises Requiring New Water Meter/Modules Base Unit 5 NEW Water Meters, Encoders & Registers and AMI MIUs Quantity Meter Install Cost for Each Extended Cost Optional Vendor Clarification Comments Short iPerl 3/4" Premise 5.1 83.12 $ 377,863.52 4,546 215 5.2 iperl 1" 338 83.12 $ 28,094.56 5.3 Cordonel 11/2" 93 260.12 $ 24,191.16 5.4 Cordonel 2" - $ - 5.5 Cordonel 23 580.12 $ 13,342.76 5.6 Cordonel 4" 9 580.12 $ 5,221.08 5.7 Cordonel 6" 1 1340.00 $ 1,340.00 5.8 Cordonel 8" - $ - T�staTTf 'r'15Y w Mifc s, nc ii a rs, R first+ r aud,S4 IYls ari I ta11 ,iM14 $ 45641053,f1& Premises Requiring Retrofits with Adding AMI to an Existing Meter 6 Existing Meter Type Meter Size 5/8" Quantity 537 Base Unit CostforEInstall/RetrofithExtended Cost for Each Premise Cost Optional Vendor Clarification Comments 6.1 Badger E-Series Ultrasonic 68.12 $ 36,580.44 6.2 Badger E-Series Ultrasonic 3/4" 1 68.12 $ 68.12 6.3 1 Hersey Mag & 5 Badger E- Series 1" 6 68.12 $ 408.72 6.4 Badger E-Series Ultrasonic 1 1/2" 13 112.12 $ 1,457.56 6.5 Badger E-Series Ultrasonic 2" 10 112.12 $ 1,121.20 6.6 1 Badger Mag & 7 Badger E- Series 3" 9 112.12 $ 1,009.08 6.7 1 Hersey Mag & 2 Badger E- Series 4" 4 112.12 $ 448.48 6.8 Badger Mag Meter 6" 1 112.12 $ 112.12 6.9 Badger Mag Meter 8" 1 112.12 $ 112.12 AiiI;lVlviluTes`8 $ 41;3.154 Installation Services Priced Incrementally for Meter/Module Installation 7 Installation Services (if any of these are included in your base quote, then insert $0 in the cost cell) Premise Quantity Incremental Add -on Service Extended Cost Optional Vendor Clarification Comments 7.1 ID of the installer 5,010 No Charge 7.2 Date/time the order is completed 5,010 No Charge 7.3 Read from the removed water meter. 5,010 No Charge 7.4 Read from the new water meter. The reading from the water meter being installed is expected 5,010 No Charge 7.5 Serial number of the water meter being register installed. 5,010 No Charge 7.6 FlexNet ID on SmartPoint Module 5,010 No Charge 7.7 Meter Brand, Type and Model. 5,010 No Charge 7.8 Meter Size 5,010 No Charge 7.9 Is the current meter installed Vertically or horizontally: state direction. All joints should be leak tight. 5,010 No Charge 7.10 Does the meter have a pressure reducing valve? Yes or No 5,010 No Charge 7.11 Is there an electrical jumper? Yes or No 5,010 No Charge 7.12 Is there a valve before and after the meter? Yes or No. Define the type of valve in place. 5,010 No Charge 7.13 State the service line pipe material identification. 5,010 No Charge 7.14 State location of the meter in the building. 5,010 No Charge 7.15 Meter number of the water meter being removed; if applicable. 5,010 No Charge 216 Follow-up flags indicating that Purchaser should investigate situations found at a premise 7.16 such as incorrect data, safety issues, potential tamper, premise repairs required, date/time 5,010 found, Purchaser's party reported to, and other situations found in the field by the Supplier. No Charge Comments section is to include the correct versus incorrect data found and note follow-up 7.17 flag details. 5,010 No Charge 7.18 Premise as -found condition (based on list to be provided by Purchaser). 5,010 No Charge 7.18 Premise as -left condition (based on list to be provided by Purchaser). 5,010 No Charge 7.19 Certification that locks and seals are in place -Y/N. 5,010 No Charge 7.20 Digital photograph of the as -found meter/meter read. 5,010 No Charge 7.21 Digital photograph of the empty water meter can with meter removed. 5,010 No Charge 7.22 Digital photograph of the as -left meter/meter read. 5,010 No Charge 7.23 - If repair required, a digital photograph of the water meter with the meter removed 5,010 No Charge revealing Defective Plumbing: The Supplier shall promptly notify the Purchase if defective plumbing is 7.24 found that could prevent a safe meter change. If the Purchaser concurs, the installation will 5,010 be deferred until repairs are made and the installer informed of the repair. No Charge Effective Shut -Off: The first valve is defined as the upstream shutoff valve or the valve on the street side of the meter. The second valve is on the downstream side of the meter. The curb stop valve is located in the street right-of-way and shall be operated by Purchaser. The installer shall operate the first valve to obtain the shut-off necessary for meter installation: however, should the first valve be defective, the installer shall freeze the service connection upstream of the first valve to obtain the shut-off. Freezing shall be accomplished with the use 7.25 of CO2 freeze packs, electrical freeze units, or dry ice. The installer shall freeze the service TBD connection to accomplish shut -offs for accounts with inoperative first valves, at the customer's first scheduled appointment without having to reschedule. In cases where freezing cannot be employed to obtain the shut-off the meter installer shall inform the Purchaser to close the curb stop valve. Purchaser owns the curb stop and is responsible for repairing buried or broken curb stops. The installer shall note any plumbing problems on the installation record Additional Charge for Freeze shut form. $ 117.12 off only Supplier Leak Testing: After the installation of the metering system is complete, the installer shall open all valves and check for leaks. The installer shall verify that the meter register is functioning properly and that the meter and plumbing connections in the vicinity of the meter 7.26 do not leak. All leaks or defects shall be repaired. It shall be presumed that any leaks in the 5,010 vicinity of the water meter reported by the customer to either the Purchaser or the Supplier within 90 calendar days after completion of the installation work at the customer's property are the result of the installation work. The Contractor shall repair such leaks and correct all damages which occur during the 90-day period, at the Contractor's expense. No Charge Approach: Please describe your proposed approach, at the minimum the installer should turn on the water at the customers hose bib to ensure water is flowing, the installer should 727 flush out any sediment in the line. Then the installer should check for any leaks on the inlet 5,010 and outlet side of the meter. No Charge Warranty: Any leaks found within 90-days of the installation date must be covered by the 7.28 Supplier's warranty. Any leaks from the outlet side of the meter back to the utility 5,010 curbstop/shut-off valve are obviously the responsibility of the installer (or utility No Charge �'"tFt�l,A.(�d=4fY`�r•iCe&ii1�(�,�71AC��ItCCICtit�1'�! $'„",,,,, „� - Installation Incremental Services for AMI Module Retrofit with Existing Meter Retrofit Incremental Installation Services (if any of these are included Premise Incremental Optional Vendor S in your base quote, then insert $0 in the cost cell) Quantity Add -on Service Extended Cost Clarification Comments 8.1 ID ofthe installer. 582 No Charge 8.2 Date/time the order is completed. 582 No Charge 8.3 Read from the removed water meter register. 582 No Charge Read from the new water meter register. The reading from the water meter being installed 582 8.4 is expected to be zero. No Charge 8.5 Confirm serial number of existing water meter. 582 No Charge 8.6 Media Access Control (MAC) or IP address, if present, of the AMI endpoint being installed. 582 No Charge 8.7 Confirm/document manufacturer of the existing meter body. 582 No Charge Follow-up flags indicating that Purchaser should investigate situations found at a premise such as incorrect data, safety issues, potential tamper, premise repairs required, date/time 582 found, Purchaser's party reported to, and other situations found in the field by the Supplier. 8.8 No Charge 217 8.9 Comments section is to include the correct versus incorrect data found and note follow-up flag details. 582 No Charge 8.1 Premise as -found condition (based on list to be provided by Purchaser). 582 No Charge 8.11 Premise as -left condition (based on list to be provided by Purchaser). 582 No Charge 8.12 Certification that locks and seals are in place - Installer indicate Y/N. 582 No Charge 8.13 Digital photograph of the as -found existing meter/meter read. 582 No Charge 8.14 Digital photograph of the empty water meter with meter register removed. 582 No Charge 8.15 Digital photograph of the as -left installed meter/meter read. 582 No Charge 8.16 If repair is required, a digital photograph of the water meter with the meter removed revealing appearance (blocked, buried, other). 582 No Charge` 6t,A1 z4C d-4i1' P,,/fYg�0,it,Iu,Ct,'i cfCICi" �,, $ Vendor Assumptions 1 If you ERMU elects to have Allegiant dispose of the ERT batteries, we charge $4.85 each and provide an environmental certification. 2 Blanket Permit with a Master Plumber fee is $2500 3 4 5 6 7 8 9 10 11 12 13 Installation Cost Summary Proposed Costs 1 One -Time Set -Up Fees $ 41,039.11 2 Incremental One -Time Set -Up Fees $ 11,157.00 3 Electric Meter Installation Fees $ 212,761.80 4 If proposed and not included in 3 above - Incremental Electric Installation Fees $ 14,931.60 5 Water Meter/Module Installation Fees $ 450,053.08 6 Retrofit Installation Fees $ 41,317.84 7 If proposed and not included in 5 above - Incremental Water Meter/Module Installation Fees $ - 8 If proposed and not included in 6 above, Incremental Retrofit Water Installation Fees $ - Total Proposed Cost $ 771,260.43 Note: Vendors should confirm Summary for their own accuracy. 218 1.24c Statement of Work.F..xhibit ...A ................... Exhibit A: Statement of Work 1.0 Scope of WorkSummary The Contractor shall make a significant attempt to install 100% of the active meter/modules, other than any pre -agreed upon excluded meters before proceeding to the next metered location installations. During the term of this SOW, Contractor shall be expected to perform Services and manage the deployment process according to the Deployment Schedule. Contractor responsibilities shall include, but not be limited to, scheduling meter replacements, removing meters, installing meters, retrofitting AMI modules with existing water meters, inventory management, operating cross -dock facilities, tracking and reporting on project metrics and field deployment completion data, interface development, data file exchanges, and Work Management. Contractor will work with the Utility to make 3 attempts to exchange a meter before turning it back to the Utility (all three attempts are included in the pricing set forth below). The Utility will provide all new meters, new meter storage, material logistic support and temporary space to house de -installed meters. All National Electric Safety Code, American National Standards Institute (ANSI), and OSHA guidelines will be observed and followed by the Contractor. Any problems found on site by the Contractor's employees will be reported immediately to the Utility. A review of services will be conducted at the end of Phase I installation activities. "AMI" shall mean Advanced Metering Infrastructure. "Black -Out Window" the time defined by Utility when Contractor must not complete meter exchanges. "Certified Installed" shall mean those meters installed that have passed all QA processes with data being delivered to the Utility. "CIS Data" shall mean the data file of work orders provided by Utility to Contractor from its customer information system NISC. "Cycle" shall mean billing cycles that contain Routes. "Deployment Schedule" shall mean the mutually agreed upon schedule developed by Contractor and Utility to support the scope set forth in this Statement of Work. "Handheld" shall mean an electronic device (iPhone) or equivalent running Windows or Android on the latest version available from the manufacturer that is compatible with, and incorporated into, Contractor's software. "Installation Attempt" shall mean physical visits, phone calls, letters, and other means to contact the End -User Customer. 219 "EndPoint" shall mean new AMI meter, new AMI meter and module or a new AMI module to be retrofitted with an existing water meter. "End -User Customers" shall mean utility customers of Elk River Municipal Utilities. "Installation Workshops" shall mean the structured startup Workshops led by Contractor for Utility staff to jointly define the detailed requirements and specifications for this project. "Installers" shall mean the field technicians who install meters for this project. "Life Support" shall designate locations where there is Life Support Equipment or other critical service requiring an appointment to install meters for this project. "Peak Workflow" (Contractor's Work Management software) shall mean the workforce management software product used by Contractor for managing the performance of Services on this project. The utility will be using Peak Workflow for dashboard and program analytics. "Route" shall mean meter reading routes. "RTUs— Return to Utility" shall mean those Contractor work orders that need to be returned to Utility for further investigation or other action as defined in the Installation Workshops. RTUs are deemed complete as it relates to billing and completed work orders. "Services" shall mean labor, material, equipment, tools, vehicles, transportation, storage, and other things and actions necessary to perform and to complete the scope set forth in this Statement of Work. "UTC — Unable to Complete" shall mean those installations that Contractor is not currently able to complete due to issues of access or other reasons to be identified during the Installation Workshops. For avoidance of doubt, UTC items are still the responsibility of Contractor until they are either resolved or change to RTU status. "Utility " shall mean Elk River Municipal Utilities. 3.0 Contractor Services 3.1 Quantity of Endpoint Installation: Installation of meter and modules quantities and schedule listed below in Section 3. 3.2 Customer Appointment Letters: Printing and Distribution of Pre -installation Customer Appointment Letters to all accounts. 3.3 Door Hangers: Printing of post -deployment door hanger to be hung in the field by the installer during deployment. The Utility will draft the verbiage and graphics for the post cards and door hangers and approve the final draft prior to printing by Contractor. 3.4 Scheduling of Appointments: Contractor will use their software to schedule the EndPoint installations. 220 3.5 Integration: of Contractors work management software with Utility's CIS. 3.6 Hiring of Installers: Onsite employee hiring and training of Contractor's staff. 3.7 Data security: Accountability to secure of Utility's data. 3.8 Hosting: Security store Contractor's software. 3.9 Call center: services to schedule water EndPoint installation. For revisits for electric meter installations, appointments would be made by either the Installer or through the Call Center. 3.10 Customer -Facing Appointment Web site: to allow End -User Customers to schedule their appointments and to make changes to scheduled appointments. 3.11 Installation Workshops: Work session between Utility and Contractor to talk through and agree on the planned installation processes, including new installer Onboarding training required. 3.12 Installation Project Management: Contractor is responsible for all hiring, all installation reporting, installation quantity control of workmanship, scheduling, inventory management, coordination with utility staff, and supervision of all staff, including call center and staff not directly assigned to Utility. Facilitate meetings with utility and Installation leads including weekly project management meetings and monthly management team meetings. 3.13 Certified and Unreachable Meters: Document all successful EndPoint change -outs and locations. All document meters/accounts that are determined to be not possible to install where problems exist beyond the Contractor's control. 3.14 Reporting: For both planned EndPoint installation, successfully completed installations and installations where the End -User Customer failed to be available for the scheduled deployment. Some examples of the reporting include: 1) scheduled and planned EndPoint installation, 2) Summary of installation successfully completed (Certified), 3) Inventory report, 4) Escalations with accounts returned to utility for support i.e. meter bypass, bad wiring, bad dog etc. 5) other Escalations due to problems, 6) installations completed daily and running tally for the week, 7) installations completed by installer and number of escalations by installer. 3.15 Installation Work Hours: Electric Meter Installation Times: Normal hours for the Contractor to work in the field doing meter installations at End -User Customer premises should never be before or after daylight hours, typically before 8 AM or after 5 PM Monday to Friday for most instances, unless requested by the End -User Customer. The hours can be extended past 5 PM in the summer months when the daylight is longer but not before 8 AM, unless requested by the End -User Customer. The specific installation time is to be coordinated monthly between Contractor and Utility. Water Meter Working Hours for Customer Appointments: 7:00 am until 7:00 PM Monday -Friday and 8:00 to 5 PM on Saturdays. Special circumstances outside of these 221 hours must have prior authorization from Utility. 3.16 Black -Out Window: Utility will define when Contractor must not complete meter exchanges. During Installation Work sessions, Contractor and Utility shall agree on a route release schedule that ensures routes and billing cycles will be released to the Contractor in a manner such that installations can continue on certain routes / billing cycles while others are in black -out. The black -out dates are listed in Black -Out Schedule (Attachment III). 3.17 Route Completion: Shall mean when 99% of the defined meters assigned to Contractor in the route is completed as each meter will be defined as either 1) Certified, 2) Return to Utility to Install, 3) Pending and waiting new install date/time, 4) escalated to the utility. 3.18 Water Meter Appointments: Failure of an End -User Customer to be available for a scheduled appointment such as not being home and/or allowing access to the premises is defined as a Missed Appointment. 3.19 Revisiting Installed Meter Locations: When Contractor revisits previously installed equipment at Customer's request within 14 days of installation to troubleshoot the installation, the cost of this revisit will be the same cost as the original installation. If the revisit results I Contractor determining that there was an installation issue caused by Contractor, there will be no charge to Utility for the revisit. 3.20: Unable to complete Installation: - Allegiant may come across meter locations that are unable to be completed. Classifications of Meters that are unable to be completed are: Not able to locate, End -User Customer refusal, Obstruction, Locked Gate, No Access, Unsafe Animals, Customer Side Leak, Utility Side Leak, Inoperable curb stop, Direct connect without shut offs. Meter does not match work order. 3.21: Out of Scope: Traffic lights, railroad crossing, meter exchanges in confined spaces and polyphase meters as agreed to by all Parties. 3.22: Integration with NISC: As defined in Attachment I Requirements Response. 4.0 DeploymentSchedule The Contractor must maintain a forward -looking detailed installation schedule based on the Deployment Schedule. The Contractor will deploy approximately 100 electric meters and 20 water EndPoints during Utility's initial deployment period. The Contractor's personnel will be onsite to deploy meters for approximately 1- 2 weeks continuously, during which all meter and EndPoint installations will be performed. Utility shall provide updates on anticipated full deployment start date once a month after initial deployment period. At least 45 days prior to the start of the full deployment, Contractor will confirm the full deployment start date. 222 • Both Parties will mutually agree to the schedule in the table below. • The agreed upon schedule is expected to have a reasonable ramp -up period at the start of the deployment followed with a steady state period anticipated to occur over a continuous 10-month period and ending with a ramp down process. • A Deployment Schedule by EnclPoint will be created as part of the Installation Workshops. Project entails the following: Completion of electric and water EndPoint quantities listed below. If both Contractor and Utility agree, the dates below could be accelerated or extended. Project Sponsors Logistical Kick-off: Month 1 March 2024 Logistics (Within Two weeks from Contracting) Phase I Initial Deployment Area (IDA): Month 1, 2 and 3 March -May 2024 Training and Install Pre -Installation Planning, System 3 —150 meters* Integration, and Installing of IDA meters June 2024 None. *Work Stoppage Between Phase 1 and 30-60 days 2 Phase II Phase II Full Deployment: (Full System Months 4-13 10 July 2024-May 2025 Install all remaining Deployment) electric meters, water modules and water meters TOTALTIME: 15 15 months Planned Deployment Timeline Meters Per Month Month Electric Meters Water Meters & Modules Replacements Water Modules to be Retrofit with Existing Water Meter Months 1-3 (IDA) 100 By Contractor 20 By Contractor 5 Full Deployment Area (the quantities below are estimates and will be finalized during pre -deployment workshops) 4 1210 500 75 5 1210 500 75 223 6 1210 500 75 7 1210 500 75 8 1210 500 75 9 1210 500 75 10 1210 500 75 11 1210 500 51 12 1210 500 0 13 1140 490 0 Total 12,270 5,010 581 5.0 Customer Installation Appointment Scheduling 5.1 Electric Appointments: For locations behind gates without gate keys available from the utility, obstructed electric meter locations and other "access " issues that an appointment may be necessary to exchange the electric meter, Contractor shall notify the Utility for mutual resolution. All electric meters are located on the outside of the premises. 5.2 Maximum of 3 Attempts: For those locations where the Contractor may be required to contact the customer prior to performing the work, the Contractor should make a minimum of three (3) attempts to contact the customer. If after three (3) attempts the Contractor is unable to contact the customer for electric or for water the customer failed to keep a committed appointment, the Contractor should then provide records showing the attempted contacts and proceed to change the meter. Please state otherwise if (3) attempts are not standard practice in Utility's preferred model and/or if it is not included in the base bid. 5.3 Scheduling of Water Meter Appointment: Contractor should provide a toll -free number for customer questions regarding installation scheduling. End -User Customers may use Contractor's toll -free number for general AMI questions. Numbers to be listed on all customer communications. Contractor must also provide a Web Based Water Meter/Module as a means for customers to schedule installation appointments via web site. The Contractor must also include a means for End -User Customers to change their installation appointments via a web site. 224 6.0 Work Order and Data Integration AMI Meter Implementation Allegiant Utility Services proprietary WMS, Peak Workflow"', is purpose-built platform for utility mass deployment and exchange projects in the electric, water, gas, and clean energy markets. Digital data is captured in real-time. As Technician captures data and photos, it is uploaded to Allegiant's cloud instantly, allowing full role -based visibility to everyone on the project including Utility staff, Program Managers, Project managers and affiliate team members. Allegiant's digital platform reduces human error that can occur during large scale projects, ties seamlessly into standard operating procedures and provides a managed workflow. All information captured in the field can be efficiently reviewed and approved with the quality assurance features. Allegiant knows the Technician may not always be connected, so Allegiant's mobile app is smart about managing data allowing Technicians to work even in the remotest areas throughout the day. Allegiant's project team will work with Utility's staff to develop and manage the transfer of data throughout the course of the project. On average, it takes 3-4 weeks to set up all the files and build out Allegiant's work order system for a project. Project start-up and WMS configuration can be condensed to as little as 2 weeks as Allegiant's team has capability execute testing and setup quickly. 6.1 Key Peak Workflow Features Project Management Track and visualize production across services installed vs. not installed Overall status of all work orders Understand all current activities in the field Quality assurance tools Customer Service Searchable data and photos Determine technician locations, view badges Data Management Completion Reports Technician Performance Reports Inventory Control Reports Daily Activity Emails Customized, Managed and Detailed Workflow Enables in -field quality controls Enforce SOP per project Flexible per project requirements Capture data, photos and GPS Data validation on save 225 t Approve meo. .* Wl 14FN1 v�4tt O � — p��.� w sw.ts � not W Rome ro ,:I VVwkkalll M.yv0 fL`l Y�Rep v 14189=12 1 14 , 2941 fmply Socket Photo Q 141wm Itn 1412 v 1419"f 2114129" ": No CANYON GPS lnlorm w Q 14194455121141295 O U., ✓Coplured Q 199937M W2 1 14 I] Q 20004567 l In 14 12 Q 20004997 11n 11412 YON Add photo 3.52 M'"M X 226 6.2 Workflow Status Overview Information flows from the Utility's CIS into Allegiant's Service Delivery and Quality Assurance processes then exchange data is delivered back to the Utility CIS system. All --:.. _a 6.3 Primary Data Transfer File requirements: a. Location File b. Post Meter Change Out Export File C. MMF file d. Blackout Dates e. Damaged Meter f. CNC Meter File g. 3 Strike File From Utility 0 Secure FTP Automated CIS CIS Customer Exceptions Meter Location File ...................... .. k11 It Meter Mfg, File Bledtdul Oatss Fie Period;c Web Porlal 8 Mobile App =; r of II (Idevices ............... .t....�................ M 400 —► Master Database To Utility Secure FTP Automated (Daily) EXpOfi Completed Meter File :............................. CNC Meter Fie Damaged Meter File 3-Strike Meter File Ad Hoc Meter File 227 6.4 Location File Allegiant will work with Elk River, MN to create a CSV file that contains the following data elements to load into Allegiant's "Peak Workflow" program conducting the meter exchanges in the field. Sample: Allegiant Utility Services Template - Existing Meter Location File CSV Preferred File Format Instructions: Update column headers, column positions, and length constraints as appropriate to Utility's CIS. Column Column Header Positio Required from Utility CIS Length n Notes x Account 50 1 Customer account number x Old Meter Number 20 2 Old meter serial number (Primary Key) x Last kWh Reading 10 3 Typical KWH reading x Meter Form 15 4 i.e. 2S, 2S-SD, etc. x Read Notes 100 5 Notes regarding service location, gate codes, etc. x SubArea 50 6 i.e. Substation x Circuit Number 50 7 i.e. Feeder x Billing Cycle 50 8 Code or name of cycle X Route 50 9 Code or name of route x Old Latitude 15 10 Can be 18 if needed for NISC x Old Longitude 15 11 Can be 19 if needed for NISC Account Old Meter Number Last kWh Reading Meter Form Read Notes SubArea Circuit Number Billing Cycle Route Old Latitude Old Longitude 34534534 TS3242353 3425 2S Gate Code:1234 r 02 r 04 r 03 01 44.9453656-93.3358785: 64645456 TS329546 4203 2S r 01 r 03 r 02 02 43.5403388-109.6520657 a. Location files are typically loaded daily/weekly during the course of the project to keep the data up to date. b. Files are typically sent across Allegiant's SFTP site. C. Post Meter Change Out Import File d. Allegiant will work with Utility to create a file for import into NISC for the meter change outs. Sample: Allegiant Utility Services Template - Completed Meter Exchange File (Extended) CSV Preferred File Format Instructions: Update column headers, column positions, and length constraints as appropriate to Utility's CIS. Column Header to Column Exported Utility CIS Length Position Notes x Account 30 1 Customer account number x Old Meter Number is 2 Old meter serial number x Old kWh Reading 30 3 Old kW Reading 10 Optional based on project Old kVa Reading 10 Optional based on project Old kVar Reading 10 Optional based on project x New Meter 1s 4 x New kWh Reading 10 5 New kW Reading 15 New kVa Reading 15 New kVar Reading 15 New Meter Dial 10 x Reading Date 8 6 UTC unless otherwise agreed Meter Set Number 5 Demand Code 5 Service Location 20 Map Number 20 x New Latitude 15 7 Can be 18 if needed for NISC x New Longitude 25 8 Can be 19 if needed for NISC 228 Account Old Meter Number Old kWh Reading New Meter New kWh Reading Reading Date New Latitude New Longitude 2353456S3 TS3453453 3452 81929392934 0 2019-01.01 43.5403388-109.6520657 e. Allegiant will work hand and hand with you to ensure the file formats are correct through the data validation period of the project. f. Meter change out files can be provided daily by using Allegiant's SFTP site. g. Photo uploads to the NISC or other applicable are available in batches of 1000 meters which equates to 5000 photos. Allegiant uses the standard NISC XML formatfor the Vault. 6.5 Meter Manufacture File "MMF" a. The MMF is loaded into Allegiant's WMS, Peak Workflow, program and used to validate the new meters going into the field ensuring Allegiant has the correct bar coding. b. MMF files are typically provided through the course of the project as meter shipments are delivered. 6.6 Handheld Devices a. Meters tracked in map interface on Allegiant's handhelds b. Flexible meter reading inputs C. New meter numbers scanned in 6:08 1 .a = . Search... Beach V V Greenwood METER I ASSIGNED r TS4234920 FORM FACTOR 2S-SD STATUS Active ADDRESS 12345 Anytown Street SW Sometown, FL 24324 LAVLONG 46.96875456 -92.54673421 NOTES Small dog, gate code: 1234, be sure to not let dog out 6:07, ..i Work Order IdFIFH I A-1—H) TS4234920 Can Not Complete (CNC) or 3-strike o ; Show location information aaov Meer Number 23492342057 �IIIII', Pre -work Site Photo Old Meter Photo Add Photo 229 6.7 Web Tools Meters install detail screen: 6 CObW I Wark Ord. Deolb 1172a7621 Work Order: 234987925 ., ., 24351255 2S LL 200 U�Wee9roun6 39055 6.8 Deployment Progress Tracking During the project onboarding process, Allegiant Utility Services will align with ERMU (Elk River Municipal Utilities) on the desired production schedule. Typically, this is based on cycle and route or substation and circuit depending on the utilities network infrastructure and other considerations. This can be focused on single geographic regions or multiple areas again determined in collaboration with the utility. Allegiant's WMS has two primary views for work order assignment: list view and map view. The same powerful filter and search functionality is available on both views. Filters include status, district, substation, circuit, cycle, route, book, user -defined groups, form factor, technician, and other custom filters. Search includes serial numbers, customer, account, address, and other fields. Filter and search efficiently locate 230 appropriate record set for analysis and assignment to skilled Technician. Map views add capabilities to visualize by status including blackouts, district, substation, circuit, cycle, route, and assignment. Further shapes can be drawn directly on filtered or unfiltered views on the map to make assignments or save a user -defined group for later quick reference. For example, a program manager may filter the map view down to a specific circuit or route and form factor, then use the geo-shape tools to split it into assignments across differently skilled Technicians. a. Updated daily b. Color coded to track completed and skipped meters. C. Organized by Technician and meter type 6.9 Utility Access a. Unlimited access to web portal included in base contract during the deployment. b. Secure login for each user C. Custom reporting Application and Support Allegiant's proprietary WMS, Peak Workflow, offers robust configuration to meet Utility's requirements. UTILITY will have 24/7 access to the Peak Workflow web portal and related Mobile App. UTILITY staff will be assigned various roles that allow access to appropriate features. UTILITY Admin users will have the broadest access to the web portal with capabilities to view status, view planned progress and dashboards, assign work and inventory to Technician users and report all data. UTILITY Viewer users will have access to the same views/reports as Admin's, however, cannot affect change on the data. Technician users will have 231 access to work order maps and data capture features within the Mobile App. a. Administration i. areas including features like quality assurance, user management and multi - project reporting for an Account -level Admin will not be accessible. b. Support i. Allegiant provides 24X7 support on the applications. C. Validations i. In field validation of every data entry ensures accurate information. ii. New meter numbers scanned for accuracy and compared to preloaded list of available meters. iii. Meter reading dates preloaded to allow utility defined blackout period. iv. Meters cannot be changed out during blackout period. V. Database post processing ensures data integrity and accurate billing. vi. Follow up reporting provided for meters not found in field, or inaccessible for change out after multiple efforts to access site. 6.10 High Level Security and Architecture Web UI ♦ Modern Technology Stack ♦ 99.9% Uptime ♦ Encrypted Web and Mobile access via SSL/TLS ♦ Data and file -level encryption ♦ Cloud infrastructure protected within Virtual Private Network ♦ Redundant backups and clustered database instances ♦ SUP encrypted site for file sharing 232 .0 High-level Warehousing andStorage 1. Material Handling a. Utility issued keys and barrel lock tools will be tracked per technician. b. Technician will return old meters daily i. Old meter serial numbers on outside of box ii. Initials of tech and date on outside of box c. Old meters will be palletized and shrink wrapped 2. Meter Salvage a. Salvage Meter Process i. Allegiant palletizes and shrink wraps ii. Allegiant will pick up meters Monthly after hold period II Venter 1. Staffed 7 AM— 7 PM CST 2. #800 assigned to project 3. IP based platform support call forwarding to contacts 4. Call Volume Reporting and Issue tracking 5. Recording for calls and voicemail provided upon request .0 Safety Program Summary 1. All employees go through rigorous hot socket and meter handling training to ensure all of Allegiant's employees are following all appropriate guidelines. 2. Each Allegiant employee wears PPE gear to include the following: • Safety glasses\Face shield • Hardhat • Logoed FR shirt and pants • Protective footwear • 600 Volt protective gloves and leathers • FR High Viz vest 3. Allegiant employees are issued appropriate contractor ID badges. 4. Daily/Weekly tailgate meetings are conducted to review the safety guidelines and review any field incidents. 5. In the event a meter exchange results in an unsafe meter can condition Allegiant's employees will follow the local utility procedures and wait onsite until a utility personnel arrives. Safety manual will be provided for a detailed review of Allegiant's program. 1.24d Change Orders as provided after contracting 233 1.24e Certificate of Insurance Certificate of naming Elk River Municipal as additional insured ACC)R& I CERTIFICATE, OF LIABILITY INSURANCE 2J'13QM4 THIS, CERTIFICATE 119 ISSUED AS A MATTER OF INFORMATIION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW- THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING IINSURIER(S), AUTHORIZED REPRESENTATIVE OR PI=UCER, AND THE CERTIIFICATE HOLDER. IS PORTAKT- pf S bWdBr IS an ADINTIONAL INSUIRED, line pWiCyp,69) 1311984 ftWe ADEF11ONAL INSURED Provisions Or be endorsed. III SUBROGATION 19 WAIVED, SeNed to, Ift WM and COMIS100118 of the p0q, certain pollides may re"We aft MKIbleMMOnt A Stallament on this carbacate does riot confer ilghts to bw cartwaike IMRW In laid of'such onckweemenUal. rvnbw:�t* WaWns hsurance Group - Ausfin ,35M Spicewood Spnqp IRd" Ste 1 GO, Austn TX 78759 �Mti moslely 512-45249M 512-452-OM mmosIey@wMMwuuwqegmW.wn INWRE" AIM" Kwamll C&fi*AO& kolledo 1mwft* A:ChaneFOak. FIre Insurwice Co"Vwy 25615 INSU"t ALLEUD-11 Afiegaft 'U" Semmes, LLC Soow Melu Saks S, Serme, Inc., DBA Beftedw MwkVemerg Sakdions 14319 GreyManor IRd sbe 104 Manor TX INSUR" is: Trawelers Propefty Caswity Comipany 131,Ameflea 25674 Iftuftmt: HI B COVERAGES CERTIFICATE NUMBER-. I1MW369 REVISION NUMBER-. 0132 THIS IM TO, CER71FT THAT THE POLICIES OF INSURANCE LISTED BELOW HNiE BEEN ISSUED 70 THE INSURED NAMED ABOVE FOR THE POLICY PERICNM INDICATED. W7W17HSTANDING ANY REQUIREMENT TERM CR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO AHIGH THIS CERTIFICATE MAY BE 133JED OR Mkf FFRTAM, THE INSURMCS AFFORDED BY TIRS POUCIIES DESCRISED HEREIN 0 SUBJECT TO ALL THE TERMS. EXCLUSIONS ANOtOOMITIONS OF SUCH POLICIES IILIIMawITS SHOWN WAY NAME BEEN REDUCED BY PAM CLAIMS 11� LM t*ftd# INWAtAwt NAb POLICY Kuwato — — Lnwft A X L'"&WAM [fl wtum 63MG487893 4,%=3 141101I24 EALHLPCW%ftFNCE 41,0013,13011 I-Newma 0. Trrv— " 1, 333,011 F+W&*AL 9, AQNMJ1JWe S1,0011,1IM 4LVJ64SfATE CAPKIE'A KA, POUCW M 2LARt F-] Luc ONER WNFAALAOIAS�ATE tzam'am PROW.;'M - CkMXf A01.1 4,2�=,DEM ff 41 AtrravOtmku"LWY IANY A00 dAwfib aCHEDtAkid AU1uA,0NLY Hoeb APLA'ONLY x AUIDSUNLY N SIOSRSES625 4MOM3 4912834 NOU LMT JA,QW,1303 B=LYIHJURYJFWCasma� I betky INJURY 01*1 wddwW1 11 etX�"PAMM* 4, A, H. Doc- CL-hWSA"M CUPU3REEE& 4M=3 4VICOZ4 F.AcHuCLUMIENCE 10.melma AWAW.AYIE IZANAW afib X wo*Ktkfl CON09MIA"aft ANbtwAftM*%-1Lh%AJLFfY YrI9 Nwww" Ih N"I p, 21 1 NfA I PA"IU111 F E L EACH A)=UENT A, I., L UdEAM, EA EMPLOYEE 4, El, U8E02E KA&W UPHT 1, A Eno.- 0-01 L*b 63MG487M 4M7f123 44'1r282M4 L!A1rt JAA4WAWVVft1 100000M1'38UMM, w8C*1wIbr"# 00"Ah"Ns I LOCAUDIN AVtH;�L& Ml, Atdftk..g K-1. IdIn.&AK Ay b­fttftd N i;. ER RNW =11Z s ad2limal [rand on me [general Ifty pollc kWy with wWww rX stgrogoWn'stwe requM by w0en t dacor&w 30 y =.CT 1I n eMoffsemmt apples wtwPeqUmd by OW(cordract CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DrZCFMED, POLNUE'S BE CA20ELLED BEFORE THE EXPIRATION DATE THEREOF, NCTCE WILL BE DELIVERED IN ADCORDANCE WITIH TIM POLICY PRMVI*10014_ Elk Rver Muniapal Lffilibes 130@91 C*who Parkway NW, Elk KNer IMN 55M 0 III-2915 ACORD CORPORATION. All rightS resenvI ACORD 25 (2019=The ACORD name and logo, are IregWared marks of ACORD 234 1.24f Performance Bond Document A312111 - 20111 Elcn:� No. G?X,71154750 PerformanceBand CONTRACTOR: SURETY: 1 ",'Ooje� k , 1.� � . 'gin -TifJ6 , (I J lddverm." ALLEGIANT U7 FIFY SERVIC ES,, LaC' 1431 gvqq Vs rlul PAIJ e 7 L- 101 f ,NCBE ;MIM PANY 71�»ijncurerd Faz wripuim,II ;wz N ---. 7ri I rrive Pz�<-Aa. IL A615 nr=qaer," CXV-L U'Gl AflF "n Altf.)Try s ence x,Ad OWNIM rc.%„I!ct nn 1.a,yyqpjaHnr it FI K RIVER I,ALIwJIQPAl UTILIIIL,�3, EL< R"V711 MINNESOTA l.',,X.q Ororc, I larkwa-e W,V ui L n4lra, i ly Llr,ree cr Fie. Rv,e,. HNcu Jv hrr I rhA ue xl;(.wed 7kj-Ll Anp rahic CONSTRI.H'TION CONTRACT ;,14 unzurre-il "",3'2­70 V, D&.-: :o,rUi*7^r ;AI 150"Js, M Seven I T'-rmwid Two I 3ixty wirc 4-*_'(; Cellars3r'hAr�arcertia Ainounl',l 5" 0, Vill, nit farm of 3 6iglv curorriAn. Dasuip0wr Perfu -rrv,'oe,� orr. Fayrrur. 03nu. F"IpV Motui Tejjjijor BOND Dziue- 2(14!24 1 �N6eepber I&M -, I .- IDL Lrdrid SqwnI ore I h:'. SF'r, wl 0 Amount: 77' MWilla:vfioll� go this BOW: 121NOn. 0 &T SUl kM 16 CONTRAC71-UP, A$ PRINCIPAL SU I fom7&7e: (C - Al J"lU 1?,!, k,.IOEF, LLZ Re. 0)"I'MY j 0 Lin tu lft: plv ATfl1r: AGENT o: DR,OKER: OWNER'S REPRESENTATIVE: ME' SllmCIA. 'Pt --'ON ISK sz-,v LES C;F'.,TR!,.L, INC. 2X', E. C h i Cq Aj;l, 0,,M+ L, A2 J a" -, 'MIC, 7 " A—i-n, IflAb, 10 e 235 1.24g Workers' Compensation Certificate ACERTIFICATE OF (LIABILITY INSURANCE -G THIS CERTIFICATE IS ISSMJED AS Al, MATTER Of INNFORIMAATIONN ONLY AMD, CONFERS NO RIGHTS (UPON THE CERTIFICATE IHOLDEFL THUS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE (POLICIES BELOW. THUS CERTIFICATE Of INNSURANNCE, DYNES NOT CONSTIITUTE, A. CONTRACTBETWEEN THIS ISSUING INNSURERfg), AUTHORIZED REPRESENTATIVE OR PRODUCER. AND THE CERTIFICATE HOLDER. IMPORTANT: IFI Mw eMnealleIINV , ha an ADDITIONAL, INSURED, the pofty(II must Iluv a ADDITIONAL INSURED proWelons Or Ida 1 II SIUBROGATIIONN IS WAIVED, SUbjed to, the torma and cmMIMSIIDIM'a DI the plsNley, coftalrl polid s may Iracp pre SO aroilonamant A NIMdOCeockk ,0-Awk ... li 4Fes,: WMwmY, FL S.tl° iSN 1 6AadIr A r #Pb*NMkd d&WERA&E I Wit M THIS IS TCA CEIRTIIFY 7IILk7 THE PCL 10ES OF IHSLRWCE LI57E5 BELOW HAVE BEEN II T6 THE HIIMIYRED WJAIED ABOVE FOR THE POLICY (PERIOD INDICATED. 407WI MIH97ANDM.NG ANY RECLIREMENT, 7ERIIAI CAFIi COMMON OF ANY CCCWIATRACT' OR CTHER'. DOCUMEMkfT' "WrrHI RE'.El'FEC7 TD WFOCH 7HMIM9 CERTIIFTGATE PJAY ISLE IOR MAY PERTAAM, THE INSURANCS.AFFORDED 97' THEPOL ICIES LICIES DESCRIBED HEREIN IIS SUBJECT TO ALL THIS TERM,, EXCLUSIONSS OF SUCH POLICIES LaAL M EH WH IMMy` HAVE SEEN Ifl Qi1.IDr"..ECI EV PA M CLr+dNA'9., I.,VMAM'. SH ITA W ,NRE rM;":S; REVJESTEIDIMM .. L'M'R T'MIeE d7I! hM I1MAWMC'.E Abb. ". 6MhrMb. POLICY Y�IMIiIS'II " ' ` I i NJIWI", COiMMMMfklMNWIMrL Dt.. '" ". LLkEMI.IYrV 71 Ll"a4AADE ❑ NkS 0 KAIII MAaVI WJNM clatt. AU;rifliI UW'V APFUES HN:.IM,, ONEYk OEM" .A AAff ;I a plA'tlYr6Ww:vMI#.h'. Liket M"°a' A W MLCTC OWNED SA'WhI90 ED hlilY'OO& C:rWVd.V' ALItl'.'LPoS HAM, MW:Suk+'."WAWWM O AW.MOS m'ALY ALE"f�S L`NM.'Y I4 I `LWLYC OMtiM.MI'NY fM+reO.. idiaw, I Te E, m goe . maid. S diMIMILLA I" LrGk'.im 10r.'M: I I MIE'�TE,"Nu MrO A MIda XI M CM'OOMWEMSMAI'IM.MI AM EMIPLOVE `M'ItlM MMNYLE1M EMKI MwdAaaaR'�.rA�Jp�iMJ"nAaiN002 raP-7NNL°SVfS.MI:YM E.wCLruLMJ&V � NMMwulw.6 y W K64I ran, �x,e R++wL WC034274995GA 101.rGASu":0iZA 07MlrM0, x Ma EMI; M141 SMAMLI'GE ER : 330 iI L CIMTJI•,SL - E A EMMIiwLLTa S x,000, r I*W#JlrtlIIM.OMI CW NVAMMW l X)CASI OMNS d'AMKI L "ESIiML`i;«MIN 401:, AddrAbaiii PANAA* Seliw w o, u . Im m .. IF MM.* 4wk* it r N hwiI, dYM wwe�OMaazry�leMa.aeuwmtO.VWL YM iA MVLM'rY WWxMS'MES LLB:MrdSt.l4LA'�"'I'i'.+7Std�4u4b'mC,fllaZ'�.^silPrd rd avmae[x9.. rrt�44vae Sen nr5 9.p.cMry RrL1E«;'4U4bIV7 N"fILVTM'47I:�L6'' L4.t; ke . wueauwo atwkair.erc ma r 1h. Pd.1'. LMIa�N1V�LIN.AN�NaiN aN a-CMI Lot4INIFav1IIt"' EMk SH MLD AN19tl OF THE ABOVE DFACRISED POLMIES BE CANCELLED BEFORE v Sd iAaraaon l", 'Ma .,.w WMM"i SHE EXPIRATION DATE THEREOF, NOTICE. MILL BE DE.IIJMIERED IN EIk MWlw�w, I MM AAM ACCORDANCE WITHI THE. POLICY PRCOW'IIMIDHIS.. W.d MMYMANTIIAE 236 1.24h Blackout Schedule (Attachment III) 3 3/19/2024 3/19/2024 3/28/2024 4 3/22/2024 3/26/2024 4/4/2024 1 3/29/2024 4/2/2024 4/11/2024 2 4/5/2024 4/9/2024 4/18/2024 3 4/12/2024 4/16/2024 4/25/2024 4 4/19/2024 4/23/2024 5/2/2024 1 5/3/2024 5/7/2024 5/16/2024 2 5/10/2024 5/14/2024 5/23/2024 3 5/17/2024 5/21/2024 5/30/2024 4 5/24/2024 5/28/2024 6/6/2024 1 5/31/2024 6/4/2024 6/13/2024 2 6/7/2024 6/11/2024 6/21/2024 3 6/14/2024 6/18/2024 6/27/2024 4 6/21/2024 6/25/2024 7/5/2024 1 6/28/2024 7/2/2024 7/11/2024 2 7/5/2024 7/9/2024 7/18/2024 3 7/12/2024 7/16/2024 7/25/2024 4 7/19/2024 7/23/2024 8/2/2024 1 8/2/2024 8/6/2024 8/15/2024 2 8/9/2024 8/13/2024 8/22/2024 3 8/16/2024 8/20/2024 8/29/2024 4 8/23/2024 8/27/2024 9/5/2024 1 8/30/2024 9/3/2024 9/12/2024 2 9/6/2024 9/10/2024 9/19/2024 3 9/13/2024 9/17/2024 9/26/2024 4 9/20/2024 9/24/2024 10/3/2024 1 9/27/2024 10/1/2024 10/10/2024 2 10/4/2024 10/8/2024 10/17/2024 3 10/11/2024 10/15/2024 10/24/2024 4 10/18/2024 10/22/2024 11/4/2024 1 11/1/2024 11/5/2024 11/14/2024 2 11/8/2024 11/12/2024 11/21/2024 3 11/15/2024 11/19/2024 11/28/2024 4 11/22/2024 11/26/2024 12/5/2024 1 11/27/2024 12/3/2024 12/12/2024 2 12/6/2024 12/10/2024 12/19/2024 237 3 12/13/2024 12/17/2024 4 12/20/2024 12/26/2024 1 12/27/2024 1/7/2025 2 1/10/2025 1/14/2025 3 1/17/2025 1/21/2025 4 1/24/2025 1/28/2025 12/27/2024 1/3/2025 1/16/2025 1/23/2025 1/30/2025 2/6/2025 IN WITNESS WHEREOF, the Parties hereto have executed this Agreement in duplicate the day and year first above written. ELK RIVER MUNICIPAL UTILITIES 13069 ORONO PARKWAY NW, ELK RIVER, MN, 55330 By: ark Hanson, General Manager ALLEGIANT UTILITY SERVICES, LLC 14319 Gregg Manor Rd STE 101 Manor, TX 78653 BY: �v 4)�� Je'q SAKtm`an', Chie erating Officer 238