Loading...
6.1g ERMUSR 05-14-2024Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Mike Tietz —Technical Services Superintendent MEETING DATE: AGENDA ITEM NUMBER: May 14, 2024 6.1g SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • In April, the locators processed 482 locate tickets. These consisted of 405 normal tickets, 4 emergency tickets, 42 updated tickets, 16 cancellations, 7 meets, 5 boundary surveys and 3 non -excavations. This resulted in a 98.4% increase in tickets from the previous month and is a 13.9% increase from the prior April. • Electrical technicians completed 540 service order tasks, updated the power bill, addressed customer meter issues and any off-peak concerns. • The Advanced Metering Infrastructure (AMI) residential water meters and residential electric meters continue to be installed in new services. The electrical technicians have been busy changing out our Automated Meter Reading (AMR) meters to AMI around the system. We have completed the initial setup processes with Allegiant and are starting water meter installations. Staff has been shadowing the Allegiant technicians on the first few installations to make sure that the contractor is performing the work to our standards. We will continue to read AMR meters via drive -by method until we have fully deployed all the AMI meters. • For the month of April, staff did not run generators. • Staff has replaced the aging regulator controls at two of the three regulator banks that we have within the system. The third location in Dayton is presently waiting for material. This one will be more involved as we will be rebuilding the entire regulator bank. We are hoping to have this work done prior to summer. • Great River Energy (GRE) continues to utilize their feeder tie with us at Station #14, bank 3 substation. They have indicated that they plan to use this tie through the month of May while they finish demolition of their building on the GRE campus. Page 1 of 1 225