6.3 Sr Capital ImprovementsDiscussion Item
To
Item Number
Multipurpose Facili Advisory Commission
6.3
Agenda Section
Meeting Date
Prepared by
PresentationJune
10, 2024
Tim Dalton, Facility Superintendent
Item Description
Reviewed by
2024 Capital Improvement List
Cal Portner, City Administrator
Reviewed by
Action Requested
Staff will present a draft of capital improvement items for review.
Background/Discussion
The Multipurpose Facility Advisory Ordinance requires the following regarding facility capital improvement items:
The commission shall annually provide a draft capital improvement plan to the city council that includes capitol replacement, repairs,
and additions. The plan shall project improvements over a rolling ten year period. The capitol plan shall be completed no later than
September > of eachyear.
FT Center staff has developed the included draft of a 10-year capital item list for the Multipurpose Facility. For
comparison, the draft capital items list prepared during the 2024 budget process is included.
Financial Impact
Provides long-range planning for expenditures necessary for the upkeep and improvement of the Multipurpose
Facility.
Mission/Policy/Goal
Appropriately govern in an ever -changing environment
Attachments
■ 6.3 at1 Draft Capital Improvement Items
Furniture and Things Community Event Center Mission
Provide an environment of diverse and inclusive activities ni opportunities that contribute p o w E e E u e T
to the wellbeing of all by listening to the needs and desires of the greater Elk River INAWREI
community. Respecting our past, serving the present and preparing for tomorrow.
Furniture and Things Community Event Center Vision
An inclusive and accessible facility, incorporating sustainable practices, while creating opportunities that foster pride in our community
with a commitment to quality of fife-
2023 LIST
2024 LIST
2024 Capital Projects
NA
Replace/Repair Branding Elements
Fieldhouse Equipment
L Screens x 3
Pitching Machines x 3
Lacrosse Nets x 2
Soccer Nets x 2
Batting Mats
Pitching Mound
Hard Court- Field House
Convert Cooler to Freezer
Ingress/Egress Cornerstone
Glass Removal and Storage Equipment
2025 Capital Projects
2025 Capital Projects
Additional Security Cameras
Additional Security Cameras
Replace Rental Skates
Large Video Board for Stair Wall
Large Video Board for Stair Wall
Facility Wayfinding Elements
Facility Wayfinding Elements
A/V Upgrades/Replacement
A/V Upgrades/Replacement
Replace/Repair Branding Elements
Fieldhouse Equipment
L Screens x 3
Pitching Machines x 3
Lacrosse Nets x 2
Soccer Nets x 2
Batting Mats
Pitching Mound
Hard Court- Field House
Convert Cooler to Freezer
Glass Removal and Storage Equipment
2026 Capital Projects
2026 Capital Projects
New Turf
New Turf
Replace/Repair Branding Elements
Replace/Repair Branding Elements
Electrical Outlet Reels in Fieldhouse
Electrical Outlet Reels in Fieldhouse
Additional Locker Room Benches
Additional Locker Room Benches
Facility Sound Deadening
Facility Sound Deadening
Add Cornerstone Shades
Fieldhouse lights/lighting control
Replace Rental Skates
2027 Capital Projects
2027 Capital Projects
Replace Batting Cages
Replace Batting Cages
Running surface for track
Running surface for track
Concrete for Flag Area
Concrete for Flag Area
Additional Locker Room Shower Capabilities
Additional Locker Room Shower Capabilities
Replace/Repair Branding Elements
2028 Capital Projects
2028 Capital Projects
Resident Team Room
Resident Team Room
Additional Storage Capabilities
Additional Storage Capabilities
Replace fieldhouse doors
Replace fieldhouse doors
Upgrade service doors
Upgrade service doors
Replace Batting Cages
Running surface for track
Concrete for Flag Area
Additional Locker Room Shower Capabilities
Replace/Repair Branding Elements
2029 Capital Projects
2029 Capital Projects
Replace Zamboni
Replace Zamboni
Upgrade lighting controls
Upgrade lighting controls
Upgrade door Controls
Upgrade door controls
Replace/Repair Branding Elements
2030 Capital Projects
]Replace
2030 Capital Projects
I
Replace Furniture - Senior Center
M
Furniture - Senior Center
Replace Furniture - Flex Space
Replace Furniture - Flex Space
Carpet replacement
Carpet replacement
Replace POS Systems
Replace POS Systems
Replace Concession Equipment
Replace Concession Equipment
Replace/Repair Branding Elements
Replace rubber flooring in players hallways
Replace ice edger
Look at replacing carpet in upper lobby/mtg rooms
2031 Capital Projects
2031 Capital Projects
Cooling Tower Refurbish/Upgrade
Cooling Tower Refurbish/Upgrade
Potential lease space upgrades
Potential lease space upgrades
Fire lane resurfacing
Fire lane resurfacing
Replace Furniture Meeting Rooms
Replace Furniture- Meeting Rooms
Replace Furniture Party Rooms
Replace Furniture - Party Rooms
Replace/Repair Branding Elements
2032 Capital Projects
]Replace/Refurbish
2032 Capital Projects
Replace/Refurbish Elevator
Elevator
Replace Front Door
Replace Front Door
Security Upgrades
Security Upgrades
Glass
Glass
Alarms
Alarms
New Turf Cleaner
New Turf Cleaner
Additional/Replacement Banquet Chairs and Tables
Replace/Repair Branding Elements
Additional/Replacement Banquet Chairs and Tables
2033 Capital Projects 1 2033 Capital Projects
Add Cornerstone Shades Sound system replacement
Sound system replacement Replace/Repair Branding Elements
2034 Capital Projects 1 2034 Capital Projects
DAK Scoreboard Replacement Start thinking about HVAC rooftop replacements
Start thinking about water heater replacements
Replace/Repair Branding Elements
1 2035 Capital Projects 1 2035 Capital Projects I
DNA I DAK Scoreboard Replacement �