Loading...
2.3a EMRUSR 07-09-2024SCHEDULE 3 - INTERCONNECTION PROCESS Interconnection Process: In order to provide for coordinated interconnection of customer -owned distributed energy resources and comply with Minnesota Statutes Section 21613.1611, subd. 3(2), Utility has adopted the "Minnesota Municipal Interconnection Process (M-MIP) 2022" as recognized by the Minnesota Municipal Utilities Association Board of Directors at its February 9, 2022, meeting and made publicly available at mmua.org. General technical requirements may be found in the Minnesota Technical Interconnection and Interoperability Requirements (TIIR) as adopted by the Minnesota Public Utilities Commission on January 22, 2020 as part of DOCKET NO. E-999/CI-16-521. For utility -specific safety standards, required operating procedures for interconnected operations, and the functions to be performed by any control and protective apparatus, please contact Utility for its Technical Specifications Manual (TSM). 43