6.1i EMRUSR 07-09-2024•/i Ells River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: ERMU Commission Chris Kerzman — Engineering Manager MEETING DATE: AGENDA ITEM NUMBER: July 9, 2024 6.1i SUBJECT: Staff Update ACTION REQUESTED: None DISCUSSION: • Fiber splicing continues on the expansion of the fiber loop. Both ERMU and City of Elk River IT staff have assembled a punch list for the contractor to address. • Staff has received network equipment for the water OT network and is working with the vendor to load configuration and complete testing prior to installation. • Staff has been working with City of Elk River IT staff to update fiber mapping to make better splicing information and cable characteristics available. • Staff has sent out requests for quotations for the East substation high voltage circuit breaker and worked with DGR to prepare specifications and advertise for bids for the East substation transformer. Bid opening is scheduled for August 1, with expected award at the August commission meeting. • The operations director and I met with RJM Construction on July 2 to review a list of 10 warranty items for the field services building and continue to work on remaining closeout items. Page 1 of 1